PIPM NewsLetter 1st Issue

Transcription

PIPM NewsLetter 1st Issue
Is s u e # 1, M a r c h 2 0 0 9
THE NEWSLETTER
2
Articles of the
Month
3
Updated list of
Projects
Updated list of
Employee
Employee of the
Quarter
4
5
6
7
8
PIONEER IPM
A NEW PIONEER BRANCH:
Pioneer International Projects Management has just started
the process of establishing of a new branch in Jordan as a
part of its preparation for a Potential Mega Project in Amman
and AQABA.
The operation of this newly established branch is supposed to
be activated within the second quarter of this year.
OUR NEW PROJECTS:
The following projects have been assigned to Pioneer International Projects Management during the 1st quarter of the
2009:
1. P048: Claim Preparation for 5 Commercial
buildings related to NTCC
2. P049: Boundary Wall of Grand Mosque in Abu
Dhabi
3. P050: Um Ul-Quwain General Hospital
INSIDE THIS
ISSUE:
OF
INTRODUCTION TO THE 1ST ISSUE: ( BY THE GENERAL MANAGER)
It is my pleasure to write this introduction for our news letter implementation.
I hereby encourage every Pioneer Member to participate in the preparation of the coming issue as well as providing constructive comments
to the IT section to enrich their vision for the preparation of the new
issue.
Finally, I would like to thank all the participated members in this issue
for their efforts which are the success of this issue to see the light.
Project Status
Inform Your Self
Pioneer Events
Knowledge
Entertainment
1
Articles of The Month
By: Ahmed El Sayed ABDELBAKEY
Subject:
PROGRAMME CRASHING
Defenition: Crashing is decreasing your project duration.
e.g.: If I have 2000 m3 excavation and a loader which excavates 500 m3/day then the excavation
activity will take 2000/500=4
days the loader rate per day
is 600 Dhs. Then the excavation activity will cost me
600 x 4 = 2400 Dhs.
If I decide to get 2 loaders
per day the productivity will
increase to be 1000 m3/day
and the excavation activity
will take 2000/1000= 2 days
the activity cost then will be
600 x 2 x 2 =2400 Dhs.
Is this called crashing????
Of course no this is a bad
planning from you from the
beginning why to do the activity in 4 days instead of doing it in 2 days although both
have the same cost. Planning is to use the optimum solution which in this case is using 2 loaders.
So why people always says crashing results in extra cost????
I will tell you why just please see the following example
e.g.: the same above example if I need to do the same activity in one day and the max loaders
that can work in excavation is 2 loaders due to area constrains, then I will get two other loaders
and let them work a night shift where the loader rate in the night shift is 700 Dhs , now I can finish the activity in one day but the cost will become (2 x 600) + (2 x 700) = 2600 Dhs., which is
more than 2400 Dhs.
Now you know why crashing cost you an extra time, in fact night shifts is not only the cause of
increasing cost due to crashing but also some times especially in finishing works when you increase number of crews you increase the total productivity but the one crew productivity decrease because or disruption of crowded area, so the crew which produces for example 10 m2/
day and take 100 Dhs will produce 9 m2 and take the same 100 Dhs. (I.e. increase in cost of 1
m2). There is many other factors affects crashing cost and many researches are made in this
concern but I hope I give you a good start to know more about crashing.
2
Update
Issue Details
Updated List of Employee
Updated list of Projects
For More Details Please Proceed Page 4
Employee of the Quarter
Your Name:
We encourage everybody to participate in the selection
of the “ Employee of the Quarter”.
To do so, please cut out the form to the right side of
this text, fill it in and then hand it over to the HR and
Admin Officer
Your No.:
Selected Employee:
Note:
Note:
Fill it and give it to HR and Admin Department for submit to
General Manager.
A minimum 8 votes should be achieve to get the reward
3
Update
Project Status
Project Code: P040
Description: Princess Tower in
Dubai
Contractor: Arabian Construction
Company (ACC)
Project Code: P009
Description: Four
no prestigious
Commercial and
Residential Towers
Contractor: Civilco
LLC.
Project Code: P043
Description:
Al Wahda City –1
Project
Contractor: Civilco
Project Code: P030
Description: Construction of
Library & New Research Building for Qatar University
Contractor: Tadmur Contracting & Trading Est.
Project Code: P025
Description: Landscaping, Irrigation, Paving Marble, Granite, Fountains &
Drainage System Works
Contractor: Al Jurf Development Projects
Project Code:
P042
Description: All
Road works & Infrastructure for Radat
City Abu Dhabi
Contractor: Delma
Engineering Projects Co.
Project
Code:
P038
Description: Construction of 200
Villas & Terrace Homes
Contractor: Al Shaafar
Ghantoot
Project Code: P035
Description: 2
Building Type E
Contractor: Test
Contracting
Project Code: P033
Description: 72 Buildings with
Fully MEP Services
Contractor: Group Five Contracting & Al Naboodah Contracting
Project Code: P046
Description: Hotel and Resort
Project in Abu Dhabi
Contractor: MACE
4
Update
Inform Your Self
Share the Knowledge
Software & IT
Pioneer is one of the companies that are highly updated in
terms of technology, it is currently using the latest Primavera
software that is being use by the engineers to record and
update the progress or development of every project.
This issue is forming a trial to issue our corporate 1st newsletter and the participants are
very limited. However, if you wish to participate
in the newsletter please send your idea to the
IT Department with you text, photo, and your
photograph to the following e-mail addresses
All the departments are using a high technology machines
and programs to ensure the smooth flow of the company’s
every day business. Like by checking the employee’s attendance, the company is using a Blue Key Finger Print system
to record the log in and log out of every employees. Peachtree accounting system is also one of the programs that are
being use by our accountants right now to check the flow of
the company’s liquidity and statistics. In the Administration
department they are using MS Office 2007 in making some
documents. IT is using the latest
Photoshop for editing and creating some designs. All computers
are having a windows XP, even
though this is not the latest processor our IT is making it sure that
all computers are powerful and
still convenient to use and helpful.
[email protected]
[email protected]
Thank You.
Certification
General Issues
PIONEER IPM is a Projects Management firm registered in
the United Arab Emirates for Management Consultancies
Services and is internationally recognized by several regulatory organizations. And it is ISO 9001:2000 certified for the
Quality Management System in terms of Provision of Projects, Planning and Scheduling, Financial Planning, Claims &
Dispute Management, Contract Administration, Engineering
Management, and HSE & Quality Control Management Services for the Construction Project since on June 2008.
This is announce to Pioneer Staffs
that our IT Department is now producing a telephone directory which
will include the required communication numbers and e-mail addresses for all our running projects
and clients. It is responsible of Pioneer staffs to give more information and to update especially for On-site
Engineers
Pioneer is a certified agent for the American MPMM Management Methodology System. And being managed by a league
of Project Management Professional (PMP) certified staff
from the Project Management
Institute (PMI), USA.
5
Update
Pioneer Events
PIONEER held an IFTAR Party last on Oct. 11, 2008 at Sheraton Hotel. It was a successful event because everybody were able to enjoyed and each other’s company.
These are photos of the event.
Last Dec. 02, 2008 and March 13, 2009 Pioneer Staffs are get together in Khalidia
Park to bonding each employee, to know each other, and to tackle about how to solve
and survive the company for the global crisis.
6
Update
Knowledge : (By Ahmed ABDULBAKY)
I am a Contractor Can I claim against the Engineer or the Employer????
Of course you can, Sheikh Khalifa Bin Zayed Law no 21 for the year 2006 gives you the right to
claim the Engineer or the Employer for their failure to comply with their obligations it also gives
you the right to claim for an extension of time and extra cost for any reasons that was out of your
hand and it affects your project completion date.
On what basics contractor built their entitlement to an extra cost claim???
Contractors build their cost claims on the following (prolongation, financial charges, loss of profit,
and loss of trade, escalation in material rates, disruptions, and variations ….etc)
All versions of FIDIC also give you the right to claim. The FIDIC new version (FIDIC 1999) and
its yearly updating is showing a complete clause “clause 20.1” for contractor claims.
Even if the engineer or the Employer disagree to your claim you can raise your claim to arbitration or court after failing to solve the issue with amicable settlement, all as per the FIDIC and
Sheikh Khalifa Bin Zayed Law. Here below are some clauses showing your right to claim.
Clause
“Clause 1.9”
Description
Delayed Drawings or
instructions
Clause
“Clause 8.9”
Description
Consequences of
suspension
“Clause 2.1”
Rights of access to
the site
“Clause 12.4” Omissions
“Clause 2.2”
Permits, licenses or
approvals
“Clause 13.1” Rights to vary
Adjustments for
“Clause 13.7” changes in Legislation
Adjustments for
“Clause 13.8”
changes in Cost
“Clause 4.6”
Co-operation
“Clause 4.7”
Setting out
“Clause 4.12”
Unforeseeable
Physical conditions
“Clause 14.8” Delayed Payments
“Clause 8.4”
Extension o time for
completion
“Clause 17.4”
Consequences of
Employer’s Risks
“Clause 8.5”
Delays Caused by
Authorities
“Clause 19.4”
Consequences of
Force Majeure
7
You are
invited to
make a
slogan for
our
company
and get
reward.
P.O Box 129590 Abu Dhabi, UAE
Telephone No. +971 2 632 2990
Fax No. +971 2 632 2338
E-Mail [email protected]
www.pioneeripm.com
8