city of saint louis board of public service
Transcription
city of saint louis board of public service
CITY OF SAINT LOUIS BOARD OF PUBLIC SERVICE Matt Poirot, P.E. Engineering Manager TRANSPORTATION PROJECTS ANTICIPATED TO START CONSTRUCTION IN 2016 Road Improvement Projects • • • • • • South Broadway Streetscape, Ph 2 (Courtois to River Des Peres Bridge) North Broadway Improvements (Thrush to Walter) Washington Streetscape (Grand Center from Grand to Sheldon Concert Hall) Kiener Plaza Roadway Improvements (City Streets Around Kiener Plaza) Newstead Improvements (Natural Bridge to St. Louis Ave.) Washington Streetscape, Ph 3 (Downtown STL from 7th to Memorial) Bridge Improvement Projects • Forest Park Parkway over Metro (In Forest Park Just West of Kingshighway) South Broadway Streetscape – Phase 2 Courtois to River Des Peres Bridge Estimated Construction Cost $1.7 M .70 miles Streetscape Involving: •Street Lighting •Sidewalk Reconstruction •Traffic Signals at Marceau and Davis •Landscaping •Street Furniture North Broadway Improvements Thrush Avenue to Walter Avenue Estimated Construction Cost $2.2 M .33 miles of Street Improvements In Historic Baden District: • • • • • • Road Diet Street Lighting Bumpouts and Sidewalk Reconstruction Traffic Signals at Halls Ferry and Baden Landscaping and Street Furniture Transit and Bicycling Improvements Washington Streetscape in Grand Center Grand Avenue to Sheldon Concert Hall Estimated Construction Cost $1.2 M 1 Block Streetscape Involving: • • • • Street Lighting Sidewalk Widening, Bumpouts, Pavers Asphalt Mill and Overlay Landscaping and Street Furniture Kiener Plaza Roadway Improvements Estimated Construction Cost $1.2 M .50 miles of Street Imp. involving: •Asphalt Mill and Overlay •Signal Improvements at all intersections •Bumpouts at intersections •Parking Protected Bike Lane on Chestnut •This Project compliments the City Arch River Project in Kiener Plaza Newstead Avenue Improvements St. Louis Avenue to Natural Bridge Avenue Estimated Construction Cost $1.5 M .44 miles of Street Imp. Involving: • • • • • Pedestrian and Roadway Lighting Sidewalk Reconstruction Landscaping and Street Furniture Asphalt Mill and Overlay Transit Upgrades Washington Streetscape – Phase 3 Downtown St. Louis from 7th to Memorial Estimated Construction Cost $1.9 M .30 miles Streetscape Involving: •Street Lighting •Sidewalk and Curb Reconstruction •Landscaping and Street Furniture •Wayfinding Signage Reconstruction of Forest Park Parkway Bridge Over Metro in Forest Park Estimated Construction Cost $3.0 M Bridge Reconstruction Involving: • New Bridge Over Metro in Forest Park (Shown in Orange) • Ties into BJC’s Campus Renewal Project involving removal of Kingshighway Bridge at Forest Park Parkway to be converted to an “At-grade” intersection • Multi-use Greenway Tunnel Under Forest Park Parkway • Extensive Landscaping in Forest Park City of St. Louis Bidding Procedures and Special Requirements How to find out about City of St. Louis Public Works Projects: • Advertised in Post-Dispatch, St. Louis American • Bidding Documents distributed to MOKAN • Project Plans, Specs, and Addenda found on BPS website www.stl-bps.org • Purchase plans/specs directly through the BPS website from INDOX Services Disadvantaged Business Enterprise (DBE) Minority Business Enterprise (MBE) Woman Business Enterprise (WBE) Federally-Funded Projects are required to meet DBE goals • MoDOT sets these goals and are typically 10%-20% DBE, depending on project scope • All projects identified in this presentation are federally-funded and will be required to meet DBE goals established by MoDOT City-Funded Projects are required to meet Mayor’s Executive Goals • 25% MBE • 5% WBE Questions? Matt Poirot, P.E. Engineering Manager Board of Public Service 618-560-8679 [email protected]
Similar documents
west main street action plan - West Main Street Charlottesville
PROJECT HISTORY NOT STARTING FROM SCRATCH
More information