About our scheme

Transcription

About our scheme
About our scheme
Welcome to our
public exhibition for
Land West of Hoo
This exhibition gives you the chance to view and
comment upon our outline proposals for a new homes
development at Land West of Hoo St Werburgh.
We are currently in the process of preparing a planning application
for our proposed development which includes:
- A financial contribution towards primary school provision.
- Up to 500 new homes.
- Off-site highway improvements.
- Affordable housing (up to 25%).
- Improved walking and cycling routes.
- Vehicle access from Main Road and Ratcliffe Highway.
-Possible commercial floorspace (comprising units for retail,
café or takeaway).
We intend to submit an outline planning application to Medway Council in
September, which if approved, will mean the local planning authority has
accepted the principle of developing the land.
-Substantial areas of open space which include a circular walk
of approximately 2.4km.
- Children’s play areas.
You can let us know what you think of our plans by filling in a feedback form and
handing it to the team. Your feedback will help us refine our planning application
before we submit it to the council.
- Outdoor sports facilities and potential pavilion.
- Ecological improvements.
The scaling of this drawing cannot be assured
Date
Drn Ckd
Revision
N
LEGEND
Built-up Area
Main Areas of Woodland
Countryside
Water bodies
Motorway
A Roads
B Roads
Allhallows
Railway
Cliffe
Railway Station
The scaling of this drawing cannot be assured
Date
Drn Ckd
Revision
District Boundary
-
St Mary Hoo
Lower Stoke
Cooling
High Halstow
Isle of Grain
N
LEGEND
Upper Stoke
Built-up Area
Main Areas of Woodland
Cliffe Woods
Countryside
Project
THE SITE
Land at Hoo,
St Werburgh,
WaterKent
bodies
HOO ST WERBURGH
Chattenden
Drawing Title
Wider Context Plan
Hoo Marina
Motorway
STROOD
Scale
Date
NTS
A Roads
15.01.14
Drawn by
HS
Check by
CA
Project No
Drawing No
Revision
20894
M04.2
-
B Roads
Allhallows
Railway
GILLINGHAM
ROCHESTER
CHATHAM
Cliffe
Railway Station
Planning ● Master Planning & Urban Design
Architecture ● Landscape Planning & Design ● Project Services
Environmental & Sustainability Assessment ● Graphic Design
St Mary Hoo
Lower Stoke
Cooling
Isle of Grain
District Boundary
bartonwillmore.co.uk
Certificate FS 29637
Reproduced from the Ordnance Survey Map with the permission of the Controller of HMSO.
Crown
Copyright Reserved. Licence No 100019279.
High
Halstow
Offices at Reading London Bristol Cambridge Cardiff Ebbsfleet Edinburgh Leeds Manchester Solihull
K:\20000-20999\20800-20899\20894 - Land At Hoo, St Werburgh\A4 - Dwgs & Registers\Master Planning\Drawings\20894 M04 Wider Context Plan.dwg - 04.2 Site A3
Upper Stoke
About our scheme
Cliffe Woods
Project
THE SITE
500 homes with up to 25% affordable housing.
HOO ST WERBURGH
Chattenden
Hoo Marina
STROOD
Drawing Title
Wider Context Plan
Date
Possible units for retail, café or takeaway.
15.01.14
Contribution towards primary school provision.
Open spaces, children’s play areas and a circular walk.
GILLINGHAM
ROCHESTER
Vehicle access from Main Road and
Land at Hoo,
St Werburgh,
Kent
Ratcliffe
Highway.
CHATHAM
Scale
NTS
Drawn by
HS
Check by
CA
Project No
Drawing No
Revision
20894
M04.2
-
Outline planning permission would establish principle
of development.
Planning ● Master Planning & Urban Design
Architecture ● Landscape Planning & Design ● Project Services
Environmental & Sustainability Assessment ● Graphic Design
bartonwillmore.co.uk
Certificate FS 29637
About our scheme
Our proposals for
Land West of Hoo
The site
Medway Council expects to announce its housing need in spring 2015,
but in the meantime it has an interim target of building 1,000 new homes
a year across the district.
The proposed development site is greenfield land in agricultural use located on
the western edge of Hoo St Werburgh. It extends to approximately 31 hectares
in total and comprises four parcels of land between Aveling Close to the east
and the A228 dual carriageway to the north-west. It is owned by Taylor Wimpey.
However, it is likely that once the full assessment has been carried out,
a higher housing target will be required.
While Medway Council will continue to see its brownfield sites regenerated,
particularly in the Medway towns, significant development of greenfield sites
The scaling of this drawing cannot be assu
will also be required to ensure housing needs are met.
Date
Revision
The planning situation
There is a shortfall of new homes being built across the country and so the
The scaling
of thisauthorities
drawing cannot beto
assured
Government has ordered
local
identify the levels of housing need in
Date
Drn Ckd
Revision
their area to address this shortfall.
N
-
-
The development of our site would deliver up to 500 new homes –LEGEND
a valuable contribution towards the district’s housing targets.
LEGEND
The Site
The Site
N
ay
w
igh
H
e
f
if
l
c
t
Ra
RS
10
2
Parcel 4
Parcel 3
Parcel 2
A2
28
Parcel 1
Project
Land at Hoo,
St Werburgh, Kent
Project
Land at Hoo,
St Werburgh, Kent
Drawing Title
Aerial Photograph
Drawing Title
Aerial Photograph
Scale
Date
Drawn by
Project No
Drawing No
20894
0
CA
A
150
100
Check by
Revision
M07
50
oad
R
n
i
Ma
250m
04.06.14
1:5000@A3
Project No
Drawing No
20894
RS104
HS
1:5000@A3
04.06.14
Scale
Date
Drawn by
HS
M07
50
0
150
100
200
200
Planning ● Master Planning & U
Architecture ● Landscape Planning & Design ● Pro
Environmental & Sustainability Assessment ● Gr
About the site
Planning ● Master Planning & Urban Design
Architecture ● Landscape Planning & Design ● Project Services
Environmental & Sustainability Assessment ● Graphic Design
bartonwillmore.co.uk
Certificate FS 29
Reproduced from
the Ordnance Survey Map with the permission of the Controller of HMSO. Crown Copyright Reserved. Licence No 100019279.
bartonwillmore.co.uk
Offices at Reading London Bristol Cambridge Cardiff Ebbsfleet Edinburgh Leeds Ma
K:\20000-20999\20800-20899\20894 - Land At Hoo, St Werburgh\A4 - Dwgs & Registers\Master Planning\Drawings\20894 M07A Aerial Photograph.dwg - A3
Certificate FS 29637
Offices at Reading London Bristol Cambridge Cardiff Ebbsfleet Edinburgh Leeds Manchester Solihull
sters\Master Planning\Drawings\20894 M07A Aerial Photograph.dwg - A3
Site is on western edge of Hoo St Werburgh.
Medway needs 1,000 new homes a year.
Site comprises four parcels of land.
Our proposals would help meet housing target.
Land is owned by Taylor Wimpey.
Greenfield sites will need to be developed.
Site considerations
Before we start designing a new scheme, we complete
an assessment of the site and the surrounding area
as they are at the moment. We record those features
we will need to take into account in our design. All of
the relevant considerations, whether they fix the way
our scheme will have to be designed or give us a real
opportunity to make the most of a particular feature,
are shown here.
Information about
the site we need to
take into account
The scaling of this drawing cannot be assured
Date
Drn
Revision
-
Ckd
-
LEGEND
The scaling of this drawing cannot be assured
Date
Drn
-
Ckd
-
Revision
-
LEGEND
Site boundary
Site boundary
Opportunity for Vehicular Access
Opportunity for Vehicular Access
Opportunity for Pedestrian Access
Opportunity for Pedestrian Access
Opportunity for Circular Walk
Opportunity for Circular Walk
Approximate Location of
Attenuation Features
Approximate Location of
Natural Fall
of Land
Attenuation
Features
Public Rights of Way
Natural Fall of Land
60.50
61.00
RS
60.00
10
2
HSE Consultation Zone
60.50
59.50
61.00
60.00
59.00
62.50
60.50
Public
of Way
Max Extent
of HSE Rights
Consultation
Middle Zone
59.50
58.50
62.00
60.00
59.00
61.50
58.00
59.50
61.50
57.50
51.50
61.00
58.50
59.00
51.00
61.00
58.00
60.50
50.50
60.50
58.50
60.50
60.50
51.00
57.50
61.00
60.00
60.00
50.00
58.00
RS
49.50
60.00
60.00
59.50
10
49.00
59.00
58.50
48.50
58.00
59.50
57.50
2
15m SGN HSE
No-Build
Zone Offset
Consultation
60.50
59.50
57.00
59.50
61.00
59.00
56.50
57.00
48.00
49.00
48.50
57.50
59.00
59.00
56.00
60.00
59.00
58.50
48.00
47.50
48.50
62.50
55.50
58.50
58.50
58.00
60.50
Zone
48.00
50.50
57.00
47.00
47.50
59.50
47.50
50.00
58.00
57.50
47.00
58.00
49.50
46.50
58.50
49.00
62.00
46.50
Root Protection Area
56.50
57.50
48.50
60.00
57.00
46.00
57.50
46.00
48.00
47.50
Max Extent of HSE Consultation
Middle Zone
Contours (0.5m)
59.00
45.50
56.00
47.50
61.50
57.00
58.00
56.50
57.00
47.00
47.00
45.00
59.50
46.50
55.50
56.50
46.50
56.00
61.50
56.50
57.50
51.50
46.00
44.50
45.50
61.00
58.50
46.00
55.00
56.00
56.00
45.50
55.50
45.00
46.00
45.00
59.00
51.00
61.00
55.50
55.50
58.00
54.50
55.00
44.50
45.50
44.50
60.50
45.00
55.00
55.00
44.00
50.50
60.50
58.50
44.00
54.50
54.00
60.50
51.00
54.50
43.50
43.50
57.50
54.50
44.50
60.00
54.00
45.00
43.00
43.00
60.00
53.50
54.00
42.50
54.00
50.00
44.00
58.00
43.50
53.50
53.50
53.00
49.50
60.00
42.00
59.50
53.50
42.50
43.00
44.50
53.00
53.00
52.50
49.00
59.00
53.00
43.50
59.50
52.50
42.00
57.50
52.50
41.50
44.00
52.00
15m SGN No-Build Zone Offset
52.50
58.50
42.50
52.00
52.00
59.50
Listed Building- Mill House
51.50
43.00
48.50
57.00
52.00
41.50
58.00
40.50
51.00
41.00
41.00
43.50
50.50
51.50
51.50
42.00
40.50
51.50
50.00
41.50
59.00
40.50
42.50
51.00
51.00
56.50
48.00
43.00
57.00
49.50
41.00
48.00
40.00
48.50
40.00
50.50
51.00
40.50
46.00
49.00
50.50
43.00
40.00
42.00
50.00
49.00
56.00
42.50
57.50
59.00
59.00
39.50
50.50
45.00
42.00
42.50
49.50
48.50
50.00
44.50
58.50
41.50
48.00
41.00
48.00
45.50
40.00
50.00
44.00
47.50
48.50
50.50
49.00
49.50
43.50
39.50
42.00
48.50
40.50
50.00
55.50
49.00
49.50
39.00
39.50
58.50
48.00
39.50
47.50
58.50
58.00
41.50
48.00
49.00
48.50
41.50
41.00
39.00
49.50
41.00
50.50
40.00
48.50
47.50
48.00
38.50
40.50
57.00
47.00
38.50
47.00
40.50
47.50
39.00
49.00
49.00
Existing Structural Vegetation
48.00
45.00
47.50
41.00
39.00
47.50
47.00
50.00
47.50
58.00
57.50
48.50
40.00
47.00
40.00
39.50
46.50
48.50
43.00
40.50
58.00
47.00
47.50
44.50
49.50
46.50
46.50
38.00
48.00
42.50
38.50
46.50
46.00
47.00
48.00
38.00
38.00
40.00
39.00
39.50
56.50
47.00
46.00
42.00
38.00
49.00
46.50
46.50
46.00
47.50
45.50
38.50
48.50
Root Protection Area
47.50
44.00
37.50
57.50
46.00
39.50
57.00
37.50
37.50
45.50
47.00
45.50
46.00
43.50
57.50
39.00
37.50
45.50
46.50
45.00
47.00
39.50
46.00
45.50
38.00
37.00
41.50
39.00
48.00
47.50
46.50
44.50
45.00
45.00
46.50
38.50
46.00
45.00
45.50
41.00
37.00
38.50
43.00
57.00
44.50
44.00
44.50
38.50
56.50
37.00
37.50
46.00
40.50
45.50
45.00
42.50
36.50
47.00
46.00
37.00
57.00
47.00
45.00
45.00
39.00
47.50
56.00
43.50
36.50
44.50
44.00
44.00
38.00
38.00
44.50
45.50
40.00
38.50
45.50
42.00
36.50
43.00
44.00
45.00
38.00
43.50
45.00
36.50
Proposed Structural Planting
44.00
37.00
46.50
45.00
43.50
55.50
56.50
37.50
46.50
36.00
36.00
43.50
45.00
44.50
56.50
43.00
37.50
37.50
42.50
41.50
36.00
56.00
43.00
39.50
42.00
41.00
46.00
44.50
43.00
36.50
44.50
44.50
45.50
44.50
36.00
37.00
36.50
46.00
42.50
41.50
39.00
43.00
35.50
55.00
44.00
36.00
35.50
37.00
43.50
42.50
44.00
40.50
36.00
42.50
37.00
43.00
56.00
43.50
40.00
56.00
44.00
42.00
44.00
42.00
41.00
45.50
38.50
55.50
43.50
35.50
35.50
45.00
46.00
42.50
36.50
42.50
42.00
35.50
43.00
39.50
38.00
36.00
43.50
41.50
43.50
40.50
42.00
35.00
41.50
42.50
43.00
42.00
42.50
42.50
41.00
41.50
37.50
40.00
42.00
41.00
55.50
41.50
35.00
39.00
55.50
36.00
43.00
43.00
35.00
36.50
45.00
43.00
42.00
35.00
41.00
38.50
55.00
42.50
42.00
36.50
34.50
34.50
40.50
41.00
40.00
35.00
40.50
54.50
44.50
45.50
35.50
36.00
39.50
44.50
42.00
41.50
Contours
(0.5m)
Open Space/Green
Corridor
40.00
40.50
55.00
34.50
41.50
38.00
39.00
55.00
44.00
41.50
39.50
37.00
36.00
45.00
43.00
42.50
35.50
41.00
41.50
34.00
39.00
34.50
35.50
44.00
35.50
42.00
42.50
37.50
41.50
41.00
41.00
41.00
40.00
34.00
54.50
54.00
40.50
42.00
38.50
39.50
35.00
35.00
41.50
40.50
34.50
34.00
42.00
38.50
40.50
40.00
38.00
41.50
35.00
36.50
34.00
39.00
41.00
41.00
40.50
41.00
54.50
34.50
40.50
39.50
54.50
40.50
38.00
33.50
37.00
34.00
36.00
33.50
35.00
34.50
40.50
40.00
38.50
41.00
34.50
39.50
41.00
43.50
43.50
44.50
40.50
40.00
41.00
37.00
37.50
39.00
36.50
35.50
40.00
40.00
40.00
41.50
37.00
39.00
39.00
33.50
33.00
38.50
35.00
54.00
39.50
39.50
39.50
36.00
35.00
35.50
34.00
33.00
44.00
34.50
38.50
39.50
40.00
36.50
43.50
37.50
53.50
34.00
37.00
39.50
38.00
39.00
38.00
39.50
37.00
33.50
34.00
41.00
39.50
39.00
35.50
40.50
33.50
32.50
40.00
36.50
38.50
37.50
37.00
35.00
36.00
38.50
53.50
39.00
39.00
33.00
33.50
37.50
34.00
39.00
38.50
40.50
39.50
34.50
53.50
53.00
42.00
42.50
40.50
39.50
37.50
54.00
38.00
40.00
40.50
33.50
42.50
36.50
33.50
39.00
43.00
34.00
32.50
35.50
39.00
38.50
35.00
44.50
38.50
38.00
38.50
39.50
38.50
37.00
36.00
53.00
33.00
40.00
53.50
36.50
34.00
43.00
43.00
40.00
37.50
54.00
45.00
38.00
33.00
38.00
38.50
33.00
53.00
33.50
36.50
34.50
33.50
40.00
36.00
33.50
52.50
38.50
37.00
33.00
39.00
38.00
35.00
38.00
38.00
34.50
37.50
35.50
37.00
32.50
38.00
32.00
52.50
32.50
39.50
37.50
33.00
34.00
32.00
42.00
38.00
37.50
38.00
37.50
53.00
33.00
43.50
35.50
37.00
37.50
37.50
35.00
52.50
36.50
36.50
Wetland/Blue Corridor
37.50
34.50
41.50
44.00
36.00
52.00
33.00
33.00
35.00
37.00
37.00
37.00
36.50
39.00
34.00
32.50
32.00
32.50
32.50
37.50
37.50
37.00
52.50
42.50
38.50
34.50
36.50
37.00
34.00
36.00
33.50
32.00
52.00
37.00
38.50
31.50
32.50
36.00
52.00
36.50
36.50
35.50
34.50
35.50
36.50
37.00
32.00
36.00
36.00
35.50
51.50
35.00
34.00
43.00
52.00
38.00
36.50
36.00
33.50
32.50
31.50
41.50
35.50
33.00
51.00
36.00
36.00
34.00
36.00
32.00
41.00
Listed Building- Mill House
38.00
33.50
31.50
32.00
40.50
41.00
43.50
36.50
35.00
35.50
36.50
37.50
35.00
50.50
51.50
51.50
34.50
35.00
33.00
35.50
33.50
34.50
37.50
36.00
32.00
42.00
35.00
37.00
31.00
35.50
31.50
31.50
40.50
51.50
50.00
35.50
35.50
34.00
33.00
36.00
35.00
37.00
33.00
31.50
48.00
33.00
41.00
32.50
32.50
40.50
46.00
31.00
34.50
34.00
50.00
36.00
32.00
31.50
31.50
33.00
33.00
32.00
31.00
35.50
35.50
34.00
32.50
30.50
33.50
33.50
34.50
33.00
30.50
32.00
42.00
45.00
50.50
34.00
32.00
33.50
42.50
Steep Part of the Site (Approx.
1:10)
34.50
34.00
34.50
33.50
32.50
49.00
34.50
34.00
36.00
33.50
33.50
33.00
30.50
50.50
43.00
39.50
35.00
36.50
30.50
51.00
40.00
35.00
35.00
31.00
31.50
50.50
32.00
42.00
35.00
34.00
32.00
31.50
40.00
42.50
34.50
35.00
32.50
34.00
34.50
33.50
49.50
40.00
35.50
51.00
51.00
43.00
35.50
31.00
40.50
42.50
33.50
34.50
34.50
34.00
36.50
32.50
41.50
32.50
31.00
32.00
32.50
31.50
49.50
48.50
50.00
49.00
44.50
50.50
31.00
32.00
45.50
31.50
44.00
43.50
30.50
49.00
30.00
49.50
31.50
39.50
39.00
48.00
39.50
47.50
49.00
30.50
48.50
41.50
41.00
39.00
30.50
30.00
49.50
41.00
48.50
31.00
40.00
30.50
47.50
48.00
38.50
38.50
47.00
49.00
30.00
49.00
40.50
39.00
35.00
32.50
48.00
45.00
47.50
30.00
30.50
31.00
39.00
47.00
105m
31.50
30.50
31.50
31.00
33.00
29.50
32.00
31.00
31.50
31.50
32.50
31.50
31.00
31.00
32.00
31.00
29.50
30.50
30.50
31.50
29.50
30.00
30.50
31.00
30.50
31.00
30.00
30.50
31.00
30.50
29.00
29.50
30.00
29.00
29.50
31.00
41.00
33.00
32.00
32.00
30.00
40.00
30.50
30.00
47.50
48.50
47.00
47.50
105m
43.00
39.50
30.00
30.00
46.50
30.50
40.00
29.00
44.50
38.00
29.50
46.50
48.00
48.00
30.50
30.00
30.00
29.50
47.00
46.00
42.00
44.00
47.50
30.00
38.00
39.00
37.50
28.50
29.00
29.50
46.00
29.50
47.50
29.50
45.50
38.50
50m
42.50
38.50
46.50
46.00
30.50
38.00
38.00
40.00
39.50
29.00
39.50
30.00
47.00
30.00
45.50
45.50
46.50
45.00
47.00
37.00
41.50
29.00
46.50
44.50
45.00
38.50
45.00
46.50
29.50
28.50
46.00
28.50
29.50
41.00
37.00
38.50
43.00
39.00
44.50
44.00
44.50
38.50
37.00
46.00
28.50
29.00
37.50
37.00
46.00
40.50
45.50
29.00
36.50
42.50
43.50
36.50
44.00
45.50
29.50
38.00
38.00
40.00
38.50
45.50
42.00
29.00
43.00
45.00
29.00
36.50
38.00
28.00
44.00
43.50
28.00
36.50
28.50
37.00
29.50
29.50
37.50
36.00
36.00
28.00
45.00
44.50
43.00
28.50
39.50
42.00
41.00
44.50
43.00
28.50
45.50
45.00
45.00
45.00
44.50
Trunk Water Main
44.50
44.00
Proposed Structural Planting
44.00
27.50
43.50
43.00
27.00
44.50
44.50
43.50
42.50
44.00
28.50
27.50
42.50
41.50
39.00
43.00
29.00
29.00
35.50
36.00
44.00
42.50
37.00
26.50
29.00
36.50
40.50
36.00
43.00
35.50
37.00
43.50
28.00
40.00
44.00
42.00
Structural Vegetation
46.00
45.50
45.00
28.50
36.50
36.00
37.00
45.00
42.50
41.50
36.00
37.50
28.00
43.50
37.50
29.00
50m
50m
29.50
105m
39.50
29.50
47.00
46.50
28.00
43.50
37.50
38.00
28.00
37.50
37.50
39.00
39.00
Gas MainsExisting
30.50
30.50
30.00
29.50
48.50
40.50
34.50
33.50
32.50
49.50
31.00
34.00
33.50
31.00
31.50
30.50
50.00
31.50
41.50
31.50
32.50
32.00
31.00
50.00
48.50
40.50
40.50
32.00
32.50
30.00
31.00
40.00
39.50
35.00
33.00
30.00
48.00
41.00
31.00
41.50
42.00
44.00
42.00
41.00
27.50
38.50
27.50
28.50
42.50
43.00
43.50
41.50
43.50
28.00
40.50
35.00
HV U/G Electric
42.50
42.00
39.50
38.00
28.50
35.50
35.50
36.00
43.50
28.00
28.50
35.50
36.50
43.00
43.00
27.50
42.00
36.50
41.50
42.50
26.00
35.00
43.00
42.50
WO
40.00
42.00
41.00
28.00
41.00
27.00
41.50
SV
43.00
28.50
SV
35.00
42.00
42.50
41.50
35.00
39.00
37.50
36.00
42.00
27.00
27.00
28.00
40.50
42.50
29.00
42.00
36.50
40.50
43.00
41.50
28.00
39.50
42.50
41.50
39.50
29.00
37.00
38.00
36.00
42.00
41.50
40.00
39.00
27.00
40.50
34.50
26.50
26.50
41.00
41.50
26.50
39.00
34.50
35.50
37.50
28.50
28.00
34.00
28.50
42.00
42.50
27.50
35.00
40.50
42.00
38.50
39.50
28.50
41.50
41.00
41.00
25.00
41.00
40.00
41.50
Open
HV O/H Electric
40.50
27.50
50m
28.00
38.50
35.00
36.50
28.00
34.00
27.50
40.50
39.50
34.50
28.00
38.00
33.50
37.00
34.00
41.50
39.00
26.00
37.00
39.00
27.00
29.50
37.00
29.00
27.50
35.00
33.50
38.50
39.50
27.00
36.00
27.00
40.50
40.50
40.00
38.50
39.50
40.00
41.00
37.50
39.50
37.50
40.00
40.00
25.50
40.00
38.00
41.50
25.50
25.50
26.00
39.00
39.00
39.50
26.50
39.50
38.50
39.50
35.50
27.50
29.50
40.00
36.50
26.50
41.00
41.00
40.50
26.00
26.00
40.00
40.50
24.00
27.00
36.50
27.50
27.50
27.50
27.50
28.00
28.50
35.00
34.00
33.00
40.50
40.00
37.50
36.50
28.00
35.50
33.50
33.00
41.00
26.50
41.00
27.00
34.50
34.00
40.50
40.00
24.50
36.00
33.50
35.00
42.00
38.00
40.50
34.00
41.00
34.00
34.50
Space/Green Corridor
40.00
35.50
25.50
28.00
41.00
40.00
34.50
34.50
41.00
28.50
38.50
35.00
35.50
36.00
35.50
35.00
39.50
37.00
27.00
28.00
33.50
37.50
27.50
37.00
25.00
25.00
25.50
27.50
34.00
39.50
38.00
39.00
38.00
27.00
26.50
34.50
41.00
26.00
37.50
28.50
36.50
39.00
24.50
28.00
36.50
38.50
26.00
37.00
37.50
27.50
33.50
39.00
40.00
38.50
36.00
35.00
34.00
32.50
39.00
40.50
26.50
26.50
38.50
40.50
39.00
27.00
35.50
33.50
32.50
39.50
39.00
39.50
27.00
33.00
33.50
23.50
34.50
34.00
25.50
35.50
39.00
38.50
35.00
Enhanced Acoustic
Facade Treatment
Wetland/Blue
Required
38.50
38.00
38.50
39.50
38.50
37.00
36.00
38.00
33.00
38.00
26.00
26.00
38.50
33.00
25.00
24.50
36.50
34.50
36.00
33.50
25.50
40.00
38.50
37.00
38.00
37.50
38.00
35.00
25.50
38.00
33.00
39.00
38.00
37.50
38.00
34.50
37.50
23.00
33.00
33.50
25.00
33.00
35.50
37.00
32.50
38.00
32.00
32.50
39.50
37.50
33.00
27.50
35.00
35.50
24.00
36.50
36.50
37.00
37.50
37.50
27.00
34.00
32.00
37.50
34.50
23.50
25.00
24.50
36.00
37.50
37.50
37.00
35.00
23.00
37.00
37.00
37.00
24.00
36.50
39.00
24.50
34.00
32.50
24.00
26.50
34.50
36.50
22.50
32.00
32.50
32.50
23.50
24.50
33.00
38.50
37.00
34.00
36.00
33.50
37.00
28.00
38.50
31.50
32.50
32.00
36.00
36.50
36.50
34.50
35.50
36.50
37.00
36.00
28.50
32.00
35.50
36.00
35.50
26.00
23.50
38.00
38.00
33.50
25.50
36.50
36.00
32.00
33.50
35.50
26.50
33.00
22.00
32.50
36.50
35.00
24.00
35.00
34.00
31.50
31.50
36.00
36.00
36.00
34.00
32.00
35.50
36.50
37.50
27.00
35.00
35.00
27.50
34.50
34.50
33.00
35.50
33.50
37.50
36.00
32.00
35.00
37.00
31.00
Corridor
35.50
31.50
31.50
32.50
33.50
34.50
34.50
31.00
35.50
35.50
34.00
33.00
36.00
35.00
34.00
28.50
36.50
25.50
28.00
31.00
35.50
24.50
32.00
37.00
33.00
34.50
35.50
29.00
26.50
34.00
27.00
31.50
26.00
33.00
32.50
34.50
34.00
24.50
28.00
28.50
29.00
27.50
29.50
26.50
25.50
33.00
31.00
28.50
30.00
32.50
28.00
27.00
30.00
32.50
29.00
32.00
29.50
31.00
25.00
31.00
31.50
26.00
30.50
32.50
105m
34.00
32.00
Steep Part of the Site (Approx.
1:10)
33.50
33.50
34.50
33.00
35.50
35.50
34.00
31.50
21.00
35.00
32.00
31.50
35.00
34.00
33.50
31.00
34.50
33.50
32.50
33.00
31.50
31.00
28.50
28.00
30.00
33.00
32.00
31.00
26.00
29.50
31.50
29.00
31.50
32.50
31.50
31.00
25.50
31.00
32.00
31.00
27.00
29.50
30.50
30.50
28.50
31.50
29.50
30.00
30.00
29.00
30.50
31.00
30.50
31.00
26.50
30.00
29.50
28.00
30.50
30.50
27.50
31.00
30.50
29.00
29.50
26.00
30.00
30.00
29.00
29.50
29.50
30.50
27.00
30.00
30.00
30.50
30.50
28.50
30.00
32.00
36.00
32.00
31.50
30.50
29.50
27.50
30.00
30.00
30.50
29.50
29.00
30.50
32.00
30.00
34.00
34.50
33.50
32.50
26.50
30.00
21.50
105m
33.00
32.50
34.00
34.50
33.50
33.00
32.00
36.00
33.50
33.50
33.00
31.50
30.50
30.50
34.50
25.00
32.50
30.50
30.50
31.00
30.50
35.00
36.50
30.50
31.00
31.50
31.00
35.00
35.00
27.50
31.00
31.50
35.00
32.50
34.00
34.50
33.50
32.00
31.50
35.00
30.00
30.00
28.00
26.50
30.00
Gas Mains
30.50
27.50
31.00
29.50
28.50
31.00
30.00
27.00
50m
29.00
30.50
28.50
29.00
28.00
31.00
29.50
29.50
31.50
29.00
29.50
27.50
30.00
28.50
30.50
28.00
28.00
28.50
Trunk Water Main
28.00
29.50
30.00
30.50
31.00
28.00
29.00
28.00
28.00
50m
28.00
28.50
28.50
31.00
28.50
28.50
28.50
29.00
29.00
29.00
29.00
105m
50m
29.50
105m
29.00
29.50
29.50
Project
27.50
Hoo St. Werburgh
27.00
27.50
29.00
26.50
27.50
28.00
27.50
28.50
HV U/G Electric
Constraints & Opportunities
Plan
Drawing Title
27.50
26.00
27.00
27.00
27.00
25.50
29.00
27.00
26.50
26.50
28.00
26.50
28.50
27.50
25.00
50m
28.00
26.00
26.00
26.50
24.50
27.00
25.50
25.50
26.00
26.50
27.00
25.00
25.00
25.50
26.00
27.00
Drawn by
Check by
HS
HV O/HBG Electric
10.06.14
1:2500@A1
Project No
Drawing No
20894
M06
25.50
24.00
27.50
27.50
Scale
Date
26.00
Revision
C
26.50
26.50
23.50
20
60
24.50
26.00
25.50
0
26.00
26.00
25.00
40
24.50
25.50
23.00
25.50
25.00
24.00
23.50
25.00
24.50
23.00
24.00
24.50
26.50
22.50
24.00
23.50
24.50
26.00
24.00
23.50
22.00
25.50
25.50
26.50
RS104
24.50
26.50
26.00
27.00
This plan details the opportunities and constraints we have taken into consideration to help us develop our proposals.
100m
Enhanced Acoustic
Facade Treatment
Required
80
Planning ● Master Planning & Urban Design
Architecture ● Landscape Planning & Design ● Project Services
Environmental & Sustainability Assessment ● Graphic Design
25.00
24.50
21.50
105m
bartonwillmore.co.uk
21.00
27.50
26.50
25.50
27.00
25.00
26.00
Reproduced from the Ordnance Survey Map with the permission of the Controller of HMSO. Crown Copyright Reserved. Licence No. 100019279.
Certificate FS 29637
Offices at Reading London Bristol Cambridge Cardiff Ebbsfleet Edinburgh Leeds Manchester Solihull
K:\20000-20999\20800-20899\20894 - Land At Hoo, St Werburgh\A4 - Dwgs & Registers\Master Planning\Drawings\20894 M06C Opportunities & Constraints Plan.dwg
28.00
27.50
26.50
26.00
25.50
27.00
28.50
29.00
26.50
28.00
26.00
27.50
29.50
27.00
28.50
29.00
28.00
26.50
27.50
29.50
28.50
30.00
27.00
29.00
30.50
28.00
29.50
27.50
30.00
28.50
30.50
28.00
29.00
29.50
28.50
31.00
30.50
30.00
31.00
29.00
Project
Hoo St. Werburgh
Drawing Title
Constraints & Opportunities Plan
Assessing the site
Scale
Date
10.06.14
1:2500@A1
Project No
Drawing No
20894
M06
20
0
RS104
We’ve assessed the site and the surrounding area.
Drawn by
BG
Check by
HS
Revision
C
60
40
100m
80
The plan illustrates the things we need to take into account
in our design.
Planning ● Master Planning & Urban Design
Architecture ● Landscape Planning & Design ● Project Services
Environmental & Sustainability Assessment ● Graphic Design
bartonwillmore.co.uk
Certificate FS 29637
Offices at Reading London Bristol Cambridge Cardiff Ebbsfleet Edinburgh Leeds Manchester Solihull
K:\20000-20999\20800-20899\20894 - Land At Hoo, St Werburgh\A4 - Dwgs & Registers\Master Planning\Drawings\20894 M06C Opportunities & Constraints Plan.dwg
Our opportunities and constraints plan is based on
the assessments.
Read more about opportunities and constraints on the
following board.
Site considerations
Information about
the site we need to
take into account
Landscape
We have carried out a Landscape and Visual Assessment which
concluded there is potential for residential development on the lowerlying, less visually sensitive, land to the north and west of existing
development. Land at the northern extent of the site, on the higher
ground, is not proposed to be developed.
In terms of the impact on the wider landscape, the site is physically and
visually separated from Lodge Hill by the Deangate Ridge which rises
beyond the site to the north. The prevailing topography will enable the
separate identities (Hoo St Werburgh and Chattenden) to remain within
the surrounding landscape.
Agricultural
The site is comprised of predominantly Grade 3b agricultural land with
small areas of Grade 3a agricultural land on the eastern edge of the site.
Grade 3b land is categorised as moderate quality agricultural land. In
view of this agricultural category, there are no policy constraints to the
development of the land.
Cultural heritage
The site lies immediately south of Mill House, a Grade II-listed
property. The significant distance between the site and Mill House,
plus the intervening landscape, will ensure an appropriate relationship
with Mill House.
Flooding and drainage
The site lies within Flood Zone 1 and is at low risk of flooding from a
main river. An ordinary watercourse flows west to east through the site,
and so the site layout is designed to take this into account.
Sustainable Drainage System (SuDS) will be used to ensure surface
water run-off from the developed site will be discharged at rates no
Before we start designing a new scheme, we complete
an assessment of the site and the surrounding area
as they are at the moment. We record those features
we will need to take into account in our design. All of
the relevant considerations, whether they fix the way
our scheme will have to be designed or give us a real
opportunity to make the most of a particular feature,
are shown here.
greater than existing equivalent greenfield run-off rates. Drainage
measures could include permeable paving, dry basins, swales,
ponds or storage tanks or a combination of SuDS components,
before being slowly released to the watercourse through the use
of flow control devices.
Foul water will be discharged into the existing public sewer, within the
site boundary, which has capacity to accommodate the development.
Ecology
The site is within proximity of a number of sensitive sites, in particular
Medway Estuary & Marshes Special Protection Areas (SPA). On-site
public open space, including a circular walk (and potentially off-site
contributions to recreational measures) would reduce the recreational
pressure on local sensitive sites and mitigate the impact of additional
visitors to the SPA.
The majority of the site is considered to be of low ecological value. There
are some protected species that have been recorded on the site. These
include reptiles, great crested newts, bats and birds. The layout has been
well designed to retain habitats of value and create new habitat areas.
Noise
The site is not significantly constrained by noise, however, some
proposed homes located next to the A228/Peninsula Way and Main
Road will require careful design consideration to achieve relevant British
and World Health Organisation standards.
Gas mains
Two gas mains cross the site. Southern Gas Networks (SGN) and the
Health and Safety Executive have confirmed that additional ground
cover is required and there must be a 9-metre ‘no-build’ area along the
route of both pipelines.
Things to think about
No development proposed on the site’s higher ground.
Drainage measures will maintain current levels of water run off.
The land is not best quality agricultural land.
Design takes into account the watercourse through the site.
Site has lowest risk of flooding.
No building can take place in close proximity of the gas
pipe routes.
Scheme proposal
\\mlmips\WORK\MLM\6_\615_\61571_\615718\ISSUED\14_06_11_SK07\[615718-REP-CIV-Hoo-Accessibility.xlsx]Sheet1
Filter by numberFilter by location
The may also be off-site highway improvements to mitigate any traffic
impacts that are predicted.
Medway Council has confirmed that significant funding is already in place
to improve the Four Elms Hill roundabout. Taylor Wimpey is prepared to
pay a further appropriate contribution to improve the existing roundabout
if considered necessary as a result of its proposals.
Traffic, parking
and access
We would like to hear your views on transportation issues as we continue
with our Transport Assessment.
Parking
The parking strategy for the site will be in accordance with Medway
Council’s guidelines.
Tra
The
Bungalow
RO
PE
LA
N
Four Wents
Drain
Shop/Post Office/PH
Sports
Ground
Recreation Ground/Sports Pitch
Drain
Pav
FI
T H
W
S
E
G
800m walk distance
Main Bus Route
L
A
C
D
A
R
Y
R
U
98
C
R
E
S CE N
T
Y
Y
A
ns
ai
D
ROA
in
D
IT T
ROA D
HOO ST WERBURGH CP
PW
DN S
FL A C K G
T
Site
W
C
LA
HA
EE
STR
T
T
L
MEDWAY
DR I V E
4
10
RS
Path
F
E
Hoo
Lodge
W
B
E
400m walk distance
800m walk distance
190 Eureka Park, Upper Pemberton, Ashford, Kent TN25 4AZ
Tel: 01233 610530 Fax: 01233 618299
Website: www.mlm.uk.com Main Bus Route
L
A
C
D
Hard
98
th
RS
C
E
Pa
C
ES
NT
E
I
C
H
R
E
H
T
S
T
N
E
R
Y
FR
O
A
E
T VI
EW
ST
ES
D
ch
JUNE 2014
LAB
LAB
S
O
R
CH
Caravan
Site
IST E
Street
Junction Improvement
Proposed Cycle/Footway link
1:5000
1:10000
.
Proposed Access
S
MAIN
U
W
R
U
B
ea
k
FB
EG/LAB
E
rR
ee
Cr
R
no
oo
tH
C
Y
Up
es
rf
HIGHWAY AND SITE
ACCESSIBILITY PLAN
W
Mud
Hard
Mud
N
R
AD
Ford
Marsh
Footway Widening
Drawing Title
MHW
Pontoons
er
NT
A
D
D
R
J
T
AL
N
L
T
S
ER
RO
A
Y
at
Port Werburgh
E
W
E
IL
S
R
G
tty
kw
Wharf
N
L
N
H
R
IRE
A
S
MA
EY
RL
S
L
G
NN
L
D
OA
D
N
KI
Wharf
Y
L
T
B
R
O
G E
UN
A
MO
TT
A
N
IE
R
NR
G
RY
HE
' S
L
LE VIC
TO
ater
L
LI TT
wW
BE
AY
Hoo Marina
Je
ea
A
n Lo
Hoo Ness
Yacht Club
Br
R
E
W
ter
N H
IV
S
AT
W
TG
I L L W A T ER M
E
Wa
VE
R
EW
HOO ST. WERBURGH KENT
Jetty
I
DR
D
T
S HOR
9
S9
RMean Low
National Cycle Route No.179
Pa
Jetty
R
L
NO
IL
TE
H
Mea
N
ES
ST
dway
Project
Pontoon
Works
th
r
ME S
Marina
Fort
(remains of)
G
FO
R
S
Mud
E
E
TH
Path
ate
igh W
nH
TAYLOR WIMPEY UK LTDPublic Rights Of Way
Footpath number
RS104
Buttercrock Wharf
Hoo Marina Park
Slipway
G
C
Wh
a
L
IN
r Me
S
EW A Y
E
E
Mea
Occasional Bus Route
Client
Gull Down Plantation
Medical Centre/Dental Practice
Multidisciplinary Consulting
EA
CK
.
Checked
Petrol Station/Garage
Spr
Path
.
Made
INFORMATION
Reservoir
k
E
re W
ay
Rive
E
S
AU
W
DA
C
NT
NT
ON
U
ROA D
ME
LI
N
KH
T
RS
RE
MO
PA
Drain
R
E
th
Pa
NE
Pier
Landing Stage
E
Club
Sho
Slipways
C
LA
TH
C
k
ac I V
Tr
D
)
S
C LO
AT
R OA D
Recreation
Ground
Cockham Wood
xon
Description
Community Hall/Library/Place
of Worship
ac
Tr
O
(Sa
Date
Drawing Status:
2
IV
05
Issue
Recreation Ground/Sports Pitch
.
Path
G
H
.
th
T H
RC
.
Pa
Angel
Farm
CH U
CL
L A NE
RS1
Slipways
R
Lower Upnor
W EBB
Mud
Shop/Post Office/PH
Drain
M
k
Trac
AR
V I CA RA GE
Slipway
TE
ay
Wharf
w
se
AY
u
Ca
W
Sl
Slipway
Primary/Nursery Schools
E
C H URC H
N
R ES T
FB
' S
R
T
BU
PO
Bus Stop
PE
E N
RO
C OO M BE
NEW
D
Dra
h
ROA D
GE
t
Pa
ROA D
ID
Key:
Dr
E
ain
Dr
Drain
GRO V E
O N
S
K I L L IC
K
n
ai
H
W
Dr
ALL
E
LO
T
C RES C E N
N
H
M
C
R
Path
Rayes
Lodge
K
Jetty
EON
500m
VE
ain
1
B R O O KS I D E
TO A
RS
IST E
R
Dr
A
RS10
EV E
D
Causeway
Hard
1:10000
THE ABOVE NOTES REFER SPECIFICALLY TO THE INFORMATION SHOWN ON
THIS DRAWING.
AL
Recreation
Ground
ROA
RO
Allot Gdns
C
0
White
House
Farm
11
Bells
Lane
Stables
th
London Stone
N
A
PE
8
NT
R
D
A2
2
th
I
H
C
E
H
S
A
C HAT T
E NDE N
L A NE
Pa
E
T
Drain
R
S
T
N
E
W
I
O
N
R
R
D
B
O
E
E
RO
Yew Tree
Lodge
Mast
Cockham
Cottages
RS
Pa
Pontoon
E
I
FO
FR
D
Drain
U
D
D
Drain
S
C
E
L
A
U
NE
G
E
N
IRE
N
IL
L
RO
Street
Farm
R
LL LA
R
Y
S
A
H
AD
Y
IE
T
ON HI
C
A
N
L
S
RO
V
RI
S
Caravan
Site
O
CH
S
BEAC
W
A
O
G E
R
' S
L
G
E
N
H
E
L
N
L
L
G
BE
N
J
E
Y
A
E
L O DG
E
IV
LM
W OOD
E
IV
N H
DR
IV
R
L
B
R
R
E
R
NO
D
I
th
E
TE
L
T
C
K
TO
Cockham Farm
S
S
END
O
2
Track
Boat
House
Hard
S
O C HE
L
IS
M
10
th
ES
RO
F
Sta
RI
E
AL
AD
Riversview
Pa
RS105 (S
axon Shor
e Way)
T
C
S
RO
U PN O
R
Proposed Access
Masts
DS
W
L
AL
O
AT
G
PW
W
IE
YL
S
H
Jetty
RS
E
LD
R
L
Hillcrest
Nursery
BR
Depot
Proposed Cycle/Footway link
FB
Library
C
Mill
Farm
CH
Mill Farm
Cottages
Mast
R
N
F
S
Playing Field
Medway
Yacht Club
L
IF
L
ER
A
Path
HE
Tk
UP
R
A
TC
R
G
FB
Track
Spr
Sports Ground
th
Pa
Drain
T
AL
B
A
H
E
FI
EE N
K M
Drain
G
H
IL
O E'
S GR
Beacon
A
N
Pav
Mast
W
Junction Improvement
NT
Y
PW
Lingley
House
Drain
Y
Sports
Ground
Tamarisk
Beacon Hill
E
Playing Field
Pav
Deangate
Ridge Golf
As the site is within 400m of
a number
ofCourse
bus stops, there is unlikely to be
the need for any bus services to be re-routed through the site. This will,
however, be reviewed as we develop our proposals.
H
C
Sports
Ground
Hoo
Common
Path
Drain
S
L
IL
ROA D
C
UR
H
D
AV E N UE
Drain
FO
MS
EL
DWOO
Broadwood
ELM
L
B RO A
O
M
ON
IL
HO
S
H
CT
D
D
Drain
ROA D
HA LL
D
M
E
MA I N
CO
R
M
D
D
Haig
Villas
R
C RE S C
Swimming
Pool
D
OA
AIN
N
ROA
School
O
E
W
Y
TER
G
H
RG
W ER B U
T
OR
TU D
W
H
AD
PW
BS
MA IN
R
D
T
A
RO
N
K I
MIS
Broad Street
S
A
Playing Field
ON
GORD
School
N
DO W
O
AD
O
POT
Homeleigh
Path
R
R
R OA D
Chattenden
Four Wents
R
RO
Track
E
EY
Schools
H ERDS
in
N
UE
Footway Widening
9
S9
K N IG HT S
Hoo St Werburgh
Track
Dra
E
RL
S
RO
ING
ck
Playing Field
n
Drai
Drain
ck
Tra
H
EN
MA
EL
Tra
Rams Bottom
Wood
TC
N
L
C
AV
The
Bungalow
C
Deangate Cottage
Club House
ME S
Footpath number
National Cycle Route No.179
P
KI
RO
Rosehill
Deangate
ROA D
T
NN
DA
AV
N
RS
T
EN
EO
U
EM
O
NT
Stonebridge
Coronation
Bungalow
Issues
C
KH
N
RS104
h
at
G
R
PA
R
MO
Sundown
AVE N UE
IN
TE
th
2
G
VID
S W I N TON
K
S
E
Pa
10
Public Rights Of Way
CK
S
O C HE
S
C LO
RS
IV E
D
Riversview
Mill
House
LA N E
O
RI
E
Recreation
Ground
th
E
LAN
ck
Tra
D
Rayes
Lodge
W EBB
Depot
PH
LI
ILL
C
Pa
L
AL
Occasional Bus Route
EA
T
W
Playing Field
ROA
A pedestrian and cycle access is proposed to be accommodated via an
existing track west of the Hundred of Hoo Academy, which will provide
a key link to the village centre. It is also proposed to extend the footway
along the northern side of Main Road.
Drain
400m walk distance
Spr
DS
Hillcrest
Nursery
Drain
k
Drain
Drain
2
H
L
Mill
Farm
Pa
H I L L
Tr
KI
Mill
House
Reservoir
11
C
F
H
Y
S
L O DGE
Farm
Cottages
Drain
A full Transport Assessment to measure the impact of additional traffic
on the surrounding area is being prepared.
RS
Bells
Lane
Stables
D
HE
Mill Farm
Cottages
Mast
Within the site, the proposed layout maximises the potential for
neighbourhoods, where walking and cycling are encouraged. The
proposed development will also have a Travel Plan to encourage future
residents to choose alternative ways to travel, other than by car.
PH
O
N
IF
L
G
A
O
TC
A
R
Oak Lea
House
H
E
W
L
Drain
Wind
Whistle
Drain
Traffic generation
Community Hall/Library/Place
of Worship
Petrol Station/Garage
A
Drain
Playing Field
in
B
Sports Ground
R
K M
Chattenden
Farm
However, in addition, we are currently looking at creating a slip lane for
Lodge Hill Training
traffic turning
left atArea
the roundabout from Main Road onto the A228 dual
Deangate Wood
carriageway and would like to hear your views about this junction.
Dra
Medical Centre/Dental Practice
Angel
Farm
S
LD
E
E
Sports
Ground
ac
in
Dra
Primary/Nursery Schools
E
n
Deangate Ridge Golf Course
The access proposals have been discussed with Medway Council officers
and are accepted in principle.
in
Site
' S
R
Drain
in
Dra
Drain
Dra
ns
Bus Stop
Club House
Issues
Vehicular access to the site will be provided off Main Road (at the existing
roundabout south of the site) and off Ratcliffe Highway (to the north).
in
Dra
in
Drain
Drain
ck
Issues
ai
Tra
E
LAN
Dr
Homeleigh
Dra
LL
H I
in
Dra
Kennels
Key:
Dr
DG E
in
Dra
3.03
3.92
2.35
2.37
2.37
2.21
1.77
1.32
1.03
1.03
1.03
0.60
0.89
0.45
1.12
1.50
1.44
1.50
1.44
1.35
1.54
1.66
1.72
1.75
1.64
1.79
1.65
2.16
ain
LO
Iss
ai
in
Dra
Distance
Deangate
Deangate Cottage
in
Iss
Deangate Ridge golf course
Deangate Ridge indoor bowls complex
G.E.C. Avionics club bowls
Peninsula Social Club
Peninsula Sports Club
Choice meats + KM Messenger
Hoo Dental Care + Doctors and Surgeons
KM Messenger, Hairtrends, Pharmacy and Off-Licence
Community Hall Sports Pitch
Community Hall
Hoo St. Werburgh Primary School and Marlborough centre
The Hundred of Hoo School
Off-Licence + KM Messenger
Hundred of Hoo Swimming Pool
Medway NHS. The walter Brice rehabilitation Centre
Five Bells Pub
Indian restaurant/Take Away "Pink Paprika"
"SPAR" Store
Bank, Food Store, Pharmacy, Optitians, Estate Agents.
Hoo Village Institute
Coffe Shop " Taggs"
Marine supply shop " Whitton Marine"
Hoo Library
Saint Werburgh's - Hoo Church
Jet Fuel Station, Bosch Service and Car Wash
Jet Fuel Station, "SPAR" Shop, Garage.
Pub "The Chequers" + "SPAR" Shop
"The Windmill Public House"
Community facilities
Deangate Wood
Dra
Access
Filter by name
Recreation ground/ Sports pitch
Recreation ground/ Sports pitch
Recreation ground/ Sports pitch
Community hall/ Library/ Place of Worship
Recreation ground/ Sports pitch
Shop/ Post Office/ Public House
Medical centre/ Dental practice
Shop/ Post Office/ Public House
Recreation ground/ Sports pitch
Community hall/ Library/ Place of Worship
Primary/Nursery Schools
Primary/Nursery Schools
Shop/ Post Office/ Public House
Recreation ground/ Sports pitch
Medical centre/ Dental practice
Shop/ Post Office/ Public House
Shop/ Post Office/ Public House
Shop/ Post Office/ Public House
Shop/ Post Office/ Public House
Community hall/ Library/ Place of Worship
Shop/ Post Office/ Public House
Shop/ Post Office/ Public House
Community hall/ Library/ Place of Worship
Community hall/ Library/ Place of Worship
Petrol station/Garage
Petrol station/Garage
Shop/ Post Office/ Public House
Shop/ Post Office/ Public House
Dr
ck
Lodge Hill Training Area
COPYRIGHT © MLM CONSULTING ENGINEERS LTD
Filter by type of facility
01
Deangate
02
Deangate
03
Hoo
04
Hoo
05
Hoo
06
Hoo
07
Hoo
08
Hoo
09
Hoo
10
Hoo
11
Hoo
12
Hoo
13
Hoo
14
Hoo
15
Hoo
16
Hoo
17
Hoo
18
Hoo
19
Hoo
20
Hoo
21
Hoo
22
Hoo
23
Hoo
24
Hoo
25
Chattenden
26
Chattenden
27
Hoo
28 Ratcliffe Highw.
A
Masts
RO
Hoo Salt Marsh
E
ST
OK
Yew Tree
0
1:10000
500m
km
km
km
km
km
km
km
km
km
km
km
km
km
km
km
km
km
km
km
km
km
km
km
km
km
km
km
km
Scheme proposal
The sca
Revision
C
PROPOSED 2.4KM
CIRCULAR WALK
Our masterplan
for Land West
of Hoo
LOWER DENSITY
HOUSING UP
HIGHER SLOPES
RETENTION OF
OPENNESS AND
VIEWS FROM
LISTED BUILDING
RS
10
2
SECONDARY SITE
ACCESS FROM
RATCLIFFE HIGHWAY
PROPOSED
STRUCTURAL
PLANTING FOR
VISUAL SCREENING
AND BIODIVERSITY
ENHANCEMENT
E
The scaling of this drawing cannot be assured
Date
Drn
09.06.14 HS
Revision
C
Ckd
CA
N
Site Boundary
POTENTIAL BUS ROUTE
FROM MAIN ROAD
TODENSITY
PROPOSED 2.4KM
LOWER
RATCLIFFE HIGHWAY
CIRCULAR WALK
HOUSING UP
Dwellings
HIGHER SLOPES
This is our emerging masterplan for our scheme, which has
been drawn up following consultation with key stakeholders
and Medway Council.
RETENTION AND
ENHANCEMENT OF
EXISTING STRUCTURAL
PLANTING WHEREVER
POSSIBLE
SECONDARY
2.4KM SITE LOWER DENSITY
It indicates the proposed location of the PROPOSED
new
homes
onHOUSING
the UP
ACCESS
CIRCULAR
WALK FROM
RATCLIFFE HIGHWAY
HIGHER SLOPES
site. It also shows the location of open spaces,
including
the new village green and village square at the heart of the
development, and the proposed
hierarchy of roads within the
PROPOSED
STRUCTURAL
site. It also shows the areas
proposed
for planting and key
PLANTING
FOR
VISUAL SCREENING
SECONDARY
SITE
PROPOSED
2.4KM
LOWER DENSITY
pedestrian/cycle links.
AND BIODIVERSITY
ACCESS FROM
CIRCULAR
WALK
ENHANCEMENT
RATCLIFFE HIGHWAY
OPENNESS AND
VIEWS FROM
LISTED BUILDING
RATCLIFFE HIGHWAY
RETENTION AND
LOWER DENSITY ENHANCEMENT OF
HOUSING UP EXISTING STRUCTURAL
HIGHER SLOPESPLANTING WHEREVER
POSSIBLE
POTENTIAL BUS ROUTE
FROM MAIN ROAD TO
RATCLIFFE HIGHWAY
RETENTION AND
ENHANCEMENT OF
LOWER DENSITY
EXISTING
HOUSING
UP STRUCTURAL
HIGHERPLANTING
SLOPES WHEREVER
POSSIBLE
RETENTION OF
OPENNESS AND
VIEWS FROM
LISTED BUILDING
RETENTION OF
OPENNESS AND
VIEWS
AREAFROM
FOR
LISTED
BUILDING
OUTDOOR
SPORTS
FACILITIES
Garages
RETENTION OF
OPENNESS AND
VIEWS FROM
LISTED BUILDING
RS
RETENTION OF
OPENNESS AND
VIEWS FROM
LISTED BUILDING
RS
10
2
2
Ckd
CA
Vehicular Access Points
Site Boundary
Main Pedestrian/Cycle Access Point
KEY OPEN SPACES
ACCOMMODATING
Dwellings
RECREATION
OPPORTUNITIES
AND
Gardens
CHILDREN’S PLAY AREAS
The scaling of this drawing cannot be assured
Date
Drn
09.06.14 HS
Revision
C
2
Ckd
CA
Primary Route
Secondary Route
Garages
Access Street
Vehicular Access Points
Shared Surface
N
P
Site Boundary
Main Pedestrian/Cycle Access Point
ACCOMMODATION Primary Route
OF SURFACE WATER
DRAINAGE ON
Gardens
Secondary Route
SITE THROUGH
THE PROVISION OF Access Street
Garages
VARIOUS SUSTAINABLE
DRAINAGE
Vehicular Access Points
Shared Surface
SYSTEMS (SuDS)
E
Dwellings
The scaling of this drawing cannot be assured
Date
Drn
09.06.14 HS
10
Ckd
CA
Revision
C
2
N
Main Pedestrian/Cycle Access Point
Site Boundary
CREATION OF
NEW HABITATS
MAIN VEHICULAR
ACCESS FROM
Dwellings
MAIN ROAD
KEY OPEN SPACES
ACCOMMODATING
The scaling of this drawing cannot be assured
RECREATION
Date
Drn Ckd
Revision
C
09.06.14 HS CA
OPPORTUNITIES
AND
N
CHILDREN’S PLAY AREAS
Site Boundary
10
E
N
10
E
RS
The scaling of this drawing cannot be assured
Date
Drn
Revision
C
09.06.14 HS
E
RS
HOUSING UP
HIGHER SLOPES
Please take time to look at the masterplan and let us know
POTENTIAL BUS ROUTE
what you think.
RETENTION OF
FROM MAIN ROAD TO
PROPOSED
STRUCTURAL
PLANTING FOR
VISUAL SCREENING
SECONDARY
SITE
PROPOSED
2.4KM
AND
BIODIVERSITY
ACCESS WALK
FROM
CIRCULAR
ENHANCEMENT
RATCLIFFE HIGHWAY
Gardens
E
Emergency Link
Village Square
P
Neighbourhood Green
MAIN PEDESTRIAN/
CYCLE ACCESS
FROM MAIN ROAD
Key Open Space
Semi-Natural Open Space
Proposed and enhanced Structural
Planting
Emergency Link
17.04.14
Primary Route
E
IMPROVED FOOTWAY
TO THE VILLAGE
Village Square
Key Green Link
Gardens
Secondary Route
Neighbourhood Green
Pedestrian Links
Garages
Access Street
Key Open Space
Circular Walk
Approximately 2.5km
Shared Surface
Vehicular Access Points
Semi-Natural Open Space
Offices at Reading Lond
Proposed and enhanced Structural
Planting
Existing Stream
Primary Route
Village Square
Key Green Link
Attenuation Pond
Gardens
Secondary Route
Neighbourhood Green
Pedestrian Links
Pond for Habitat Creation
Garages
Access Street
Key Open Space
Circular Walk
Approximately 2.5km
Swale
Shared Surface
Semi-Natural Open Space
Existing Public Rights of Way
Emergency Link
Proposed and enhanced Structural
Planting
Existing Stream
Key Green Link
Attenuation Pond
Main Pedestrian/Cycle Access Point
E
E
AREA FOR
OUTDOOR
SPORTS
FACILITIES
RS
P
KEY OPEN SPACES
ACCOMMODATING
RECREATION
OPPORTUNITIES AND
CHILDREN’S PLAY AREAS
10
2
E
E
ACCOMMODATION
Vehicular
Access Points
OF
SURFACE
WATER
DRAINAGE ON
THROUGH
MainSITE
Pedestrian/Cycle
Access Point
THE PROVISION OF
VARIOUS
SUSTAINABLE
Primary Route
DRAINAGE
E
Archit
Env
K:\20000-20999\20800-20899\20894 - Land At Hoo, St Werburgh\A4 - Dwgs & Registers\Master Planning\Drawings\20894 M09C Illustrative Layout.dwg - A1
Emergency Link
E
Project No
20894
Existing Public Rights of Way
Reproduced from the Ordnance Survey Map with the permission of the Controller of HMSO. Crown Copyright Reserved. Licence No. 100019279.
Dwellings
Project
ILLUSTR
Land w
HOW UP
Drawing Tit
OF DIFFE
Illustr
INCLUDI
CANDateBE
MAIN PEDESTRIAN/
CYCLE ACCESS
Village Square
FROM MAIN ROAD
P
Project
Pumping Station
ILLUSTRATIVE
LAYOUT
SHOWING
Land west of Hoo
St. Werburgh
Scheme proposal
Open spaces
at Land West
of Hoo
1
•
•
•
•
•
Deangate Ridge and Slopes
Wildflower grassland, scrub and woodland
Low key recreational paths and open space
Extend wooded ridgeline character
Long views to south
Naturalistic play area
2 The Green
• Open grassed areas for
informal recreation
• Traditional orchard and
wildflower swathes
• Framed views to south-east
• Equipped play
1
4 Wetlands
• Wetland wildflowers, scrub
and canopy trees
• Drainage basins / ponds
• Low key walking / cycle
routes
1
1
Our emerging development proposals include approximately
14 hectares of open space.
1
2
The open spaces include:
• W
etland areas to create new habitats and for
attenuation ponds.
• A
dditional buffer zones/valley vistas for planting and
scrub for ecological/landscape enhancements.
3
5
• F
urther areas of open space, including a village square,
for informal recreation.
• A
network of footpaths, accommodating a circular
walk of approximately 2.4km.
1
4
• A central village green area including children’s play areas.
• A
n area for outdoor sports facilities and a new
changing pavilion.
3 Village Square
• Semi-formal mix of
paving / planting /
grassed areas
• Locally appropriate
ornamental trees
• Drainage basin / pond
5
5
4
6
5 Green Lanes
• Wildflower grassland
and scrub
• Low key walking /
cycle routes
5
6
6 Chattenden Buffer
• Wildflower margins, scrub and
canopy trees
• Low key recreational paths
• Formal sports provision
• Trim trail
• Ponds / Scrapes
Key Open Spaces
Indicative Proposals
Economic benefits of development –
Land West of Hoo St Werburgh.
What will our
scheme bring to
the area?
Our proposal is for a residential development of up to
500 new homes in Hoo St Werburgh. The development
will include a range of property styles and sizes. Up to
25% will be affordable homes.
Economic benefits
Environmental benefits
The development will make the following significant contributions to
economic growth and employment locally:
The development will also provide the following environmental
improvements:
• The site would provide for a population of 1,200 people.
• All new homes will meet Level 3 of the Code for Sustainable Homes.
• The total leisure and retail expenditure generated by future occupants
of the scheme would be approximately £8.7m per annum, which will
significantly benefit the local economy.
• High quality ‘green infrastructure’ with a landscaped circular walk,
sports and public open space.
• The development will generate approximately 52 construction jobs
per year on site.
• The proposal will seek to conserve and enhance biodiversity and
incorporate opportunities for biodiversity enhancement.
• The scheme would provide accommodation for approximately 588
economically active people.
• The scheme would equate to a New Homes Bonus payment of £3.2m
from the Government to Medway Council over a six-year period.
Social benefits
The development will contribute to significant social improvements locally,
including the following:
• Contributions through Section 106 Agreement or Community
Infrastructure Levy (CIL) are proposed to part fund new primary
school provision within The Hundred of Hoo Academy. The facility
will be designed so that it could be converted to a 2-form entry school
to accommodate pupils from the proposed development. It is the
intention to open a primary reception class on the Academy site
from September 2015.
• The proposed scheme will deliver up to 125 affordable housing units
(i.e. 25%). Approximately 60% of these will be allocated for affordable
rent and 40% for intermediate/shared ownership.
Benefits of our scheme
New homes bonus to local council.
Improved public services.
Improvements to local infrastructure.
Increased revenue from council tax.
Contributions to local facilities.
More money spent in the local economy.
About Taylor Wimpey
Information about
our company,
who we are and
what we do
Taylor Wimpey was formed by the merger of George
Wimpey and Taylor Woodrow in 2007. We are able to
draw upon experience and best practice gathered over
a history dating back to the 19th century. Today we are
one of the largest homebuilders in the UK, completing
over 11,000 homes each year.
Planning sustainable communities
We want our developments to be environmentally, socially and economically
sustainable. We understand the importance of stimulating strong, vibrant and
healthy communities while protecting and improving the natural, built and
historic environment.
More than building homes
Engaging with local people
We build roads and junctions, sewers and utilities that link our
developments with the surrounding areas. Where needed we provide
community facilities such as schools, doctor’s surgeries, shops and offices,
bus stops and even railway stations, as well as much needed affordable
homes. Such provision can help meet the day-to-day needs of the people
living on, or near, our developments.
We are committed to working with local people, community groups and
local authorities during the planning phase and aim to keep them up to
date with our activities and progress during construction. We aim to plan
and design developments that balance the demands of our business with
providing for the needs of our residents and their communities.
Green spaces
We design landscaping and open space to provide an attractive and safe
setting for homes, recreational space for residents, and habitats for plants
and wildlife. Green spaces could include tree or hedgerow planting,
playgrounds or sports pitches.
Energy efficient homes
We look to reduce the energy demand of our homes by improving wall and
roof insulation. In some cases we may also fit more complex technologies.
This means that residents benefit from energy bill savings while their long
term maintenance burden and costs are kept to a minimum.
“Our aim is to be the nation’s leading residential
developer for creating value and delivering quality.
We are passionate about working with local people,
businesses, local authorities and our customers to
build aspirational homes.”
For more information, visit:
about.taylorwimpey.co.uk
Taylor Wimpey lays the foundations
for thriving communities
We completed
11,696 homes in
2013, of which
2,124 (about 18%)
were affordable
homes.
In 2013, through
planning
obligations, we
invested over
£225m in the areas
in which we built.
We provide public
transport, road
improvements
and education
facilities on many
developments.
Landscaping
and open space,
including play
areas and sports
pitches, provide the
structure to many of
our developments.
Next steps
What we would
like from you,
and what you can
expect from us
Once you have had an opportunity to look at our
scheme proposals, please do talk to us and ask any
questions you may have, and feel free to fill in one of
the feedback forms provided.
Yours views are important to help us develop our scheme
and are very much appreciated. We will review all comments
received as we finalise our proposals before submitting a
formal planning application in September 2014.
At that time the Council will write to local residents again,
giving details of the application and providing an opportunity
for you to make further comments.
Please leave completed feedback forms with a
member of the project team today, or post to
the following address:
Land West of Hoo Consultation
c/o Webb Associates Public Relations
22 The Point, Market Harborough
Leicestershire, LE16 7QU
Alternatively you can email your comments to:
[email protected]
Comments can also be submitted online at
www.taylorwimpey.co.uk/hoo
All feedback must be received by Monday 14th July 2014.
Thank you for attending today, your views make a real difference
What is Taylor Wimpey already
doing in your area?
Taylor Wimpey has a
successful track record
of building high-quality
new homes in Kent and
the South East.
The following
developments are now
open across the county:
Hayle Park, Maidstone.
Kentleys Chase,
Tonbridge. Meadow
View, Herne Bay. Repton
Park, Ashford. Rookery
Court, Marden. The
Bridge, Dartford.
Taylor Wimpey also
delivered The Pastures
new homes development
in Stoke Road, Hoo,
which is sold out.
Scheme proposal
Our designs
for Land West
of Hoo
Here you can see sketches of how our proposed
development could look.
The central open space
The main green link
The neighbourhood on the eastern side of the site
The village square
The images show the central open space, the main green
link, the neighbourhood on the eastern side of the site
and the village square.