September 2015 - City Of Greer

Transcription

September 2015 - City Of Greer
 September 2015
Monthly Activity Report
Building Inspections & Code Enforcement
Commercial Plan Review Project Name Address Estimated Cost Cox Dental – Upfit 206 B S. Main Street $95,000
210 Trade Street – Revisions 210 Trade Street N/A
Retaining Wall RV Storage 3312 Brushy Creek Road $11,700
Retaining Wall Hartwood Subdivision S. Suber Road N/A
Sush with Gusto 50 Pennsylvania Avenue $13,000
1st Presbyterian Church 100 School Street $1,000,000
Spec Office Space 6 Caliber Ridge 120 Caliber Ridge Suite 126
Verizon Wireless 6031 Wade Hampton Blvd.
$30,000
Culver’s – Engineered Plans 1040 Wade Hampton Blvd. N/A 1 $126,600
September 2015 Monthly Activity Report Building Inspections & Code Enforcement
Commercial Permits ‐Total Cost of Construction: $1,526,624.00 Mechanical Permits ‐ Total Cost of Construction: $600,305.00 Total New Housing Starts ‐ 19 Total Cost of all Residential Permits (Including Renovations &Remodels) ‐ $5,219,586.00 Total Misc. Permits ‐ $124,704.00 Total Valuation of all Permits ‐ $7,471,219.00 Total Inspections ‐ 909 Total Code Enforcement Inspections – 565 Providing for the health, safety and welfare of the general public through the equal enforcement of all applicable codes and ordinances of the City of Greer
2 City of Greer
Engineering and Stormwater Division
TO:
ED DRIGGERS, CITY ADMINISTRATOR
TAMMY DUNCAN, CITY CLERK
FROM:
ENGINEERING/STORMWATER DIVISION
SUBJECT:
DATE:
ACTIVITY REPORT for September 2015
October 22, 2015
O’Neal Village Phase II – photo by A. Copeland
CITY ENGINEER – Steve Grant
Storm water Issues – Completed drainage issue in Bent Creek.
Preparing R/W documents for drainage
on Wildwood Drive.
Subdivision/Development Issues – Continue
to meet regularly with engineers and developer
representatives in pre-submittal and pre-construction meetings to work out details with new subdivisions or
commercial sites that are in the early stages of planning. Also working through field issues discovered once
construction has started.

Blue Ridge Plantation
1










Lavendar Flatts
Jones Road
Highland Parc
2020 Gibbs Shoals Road
McElrath Road
Redcroft Phase 2
Peterbilt
Woodland Ridge
Brusters
Pleasant Drive Subdivision
Projects:




Wildwood Drive
Paving program for 2016
School Street re-striping
Dillard Creek I and II street inspection
Miscellaneous:





3- Board retreat
Wall lawsuit Bent Creek
Web QA and Stormwater coordination meetings
Advertise for part-time GIS person
Attended IECA erosion control conference
STORMWATER ENGINEER – Lillian Hanley
Construction/ Post-construction Program - Plan Reviews, Pre-construction
meetings, As-built Reviews and Project Meetings (Construction and Post-construction
BMPs) - Stormwater site plan reviews that incorporate consideration for water quality impacts and
attempt to maintain pre-development runoff conditions are required by our SMS4 permit.
During September, plan reviews were conducted for: Culvers (consultant), Redcroft Phase II
modification (consultant), Swafford Transport Building Expansion (consultant), Allen Bennett
Hospital Demolition project, Recycle Center Modifications, The Peterbilt Store, and Jones Avenue
Site Preparation (consultant).
Pre-submittal meetings were held for the following projects: Jones Avenue Site Preparation project.
Pre-construction meetings were held for: Pleasant Drive Subdivision and Allen Bennett Demolition
Project.
Miscellaneous Meetings – Redcroft Phase II major modification, Gilliam Road Site, Lavendar Flats,
Brusters relocation, and Providence Baptist Church preliminary/planning meetings, Wall lawsuit
meetings, and GIS intern meeting.
Project Close-out inspections were held for: Dillard Creek Phase II and Dillard Creek Phase II.
2
Bonds - Stormwater bonds were received for:
Pleasant Drive Subdivision
ACJ Property Third Building
Other –
`
1) Steve Grant, Anthony Copeland and I met with representatives from D.R. Horton - Woodland
Ridge project regarding sediment and erosion complaints from downstream property owners.
2) Prepared list of deficiencies requiring attention and sent certified letter to permittees and owners
at Blue Ridge Plantation in reference to Hidden Springs, Seven Oaks and Lakeside Phase I.
Public Education and Public Involvement –
1) Continued meeting with the board members and CPW personnel to plan the annual Friends of
Lake Robinson Day of Celebration. This year’s event was held on Sunday, October 18th from
1:00 until 6:00 PM.
2) City of Greer was a sponsor for the International Erosion Control Association SE Chapter annual
meeting held at Denver Downs on September 24, 2015. Steve, Anthony and I attended the
meeting.
3) Adopt A Road Cleanup – Saturday, September 19th participated in an Adopt A Road cleanup
along Mays Bridge Road with members of the Friends of Lake Robinson and Lake Cunningham
community. Twenty five bags of litter were collected. Adopt A Road Cleanups were identified
in our Stormwater Management Program as a Public Involvement/Participation measure with the
goal of collecting litter and debris in drainage areas along roads before it can be deposited in our
streams, lakes and rivers.
STORMWATER INSPECTOR:
Anthony Copeland
Stormwater Inspections - Stormwater Construction Inspections – Per the 2014 Small Municipal
Storm Sewer System Permit, (SMS4), all newly permitted sites must be inspected within the first two weeks
of beginning land disturbing activity and at least monthly during construction. All inactive sites must be
inspected at least bi-monthly.
3
PROJECT NAME INSPECTION DATE OPERATION Frequency Oneal Village Ph‐2 9‐3‐2015 Storm Water/Site Inspection Monthly Oneal Village Ph‐1 Thrive Greer Green Road Industrial Site CookOut Hartwell Lake Subd. Cott Beverage Belshire Subd.@ Riverside Enclave @ Lismore RV Boat & Storage Lowes‐(Riverside Crossing) Aldi Franklin Point Heatherfield Manor @ Abner Creek Subd. GrandSouth Bank Redcroft Subd. Ledges Subd. Velocity Park 9‐3‐2015 9‐3‐2015 9‐3‐2015 9‐8‐2015 9‐8‐2015 9‐8‐2015 9‐8‐2015 9‐8‐2015 9‐8‐2015 9‐9‐2015 9‐10‐2015 9‐11‐2015 9‐11‐2015 9‐11‐2015 9‐15‐2015 9‐16‐2015 9‐16‐2015 9‐17‐2015 Storm Water Site Inspection Storm Water Site Inspection Storm Water Site Inspection Storm Water Site Inspection Storm Water Site Inspection Storm Water Site Inspection Storm Water Site Inspection Storm Water Site Inspection Storm Water Site Inspection Storm Water Site Inspection Storm Water Site Inspection Storm Water Site Inspection Storm Water Site Inspection Storm Water Site Inspection Storm Water Site Inspection Storm Water Site Inspection Storm Water Site Inspection Storm Water Site Inspection Monthly Monthly Monthly Monthly Monthly Monthly Monthly Monthly Initial‐Monthly Monthly Monthly Monthly Monthly Monthly Monthly Monthly Monthly Initial ‐ Monthly REWA Force Main Greystone Cottages Ph‐3 Westhaven Subd. Allen Bennett Riverside Commons Highland Parc Woodland Ridge H & E Equipment 9‐21‐2015 9‐21‐2015 9‐21‐2015 9‐21‐2015 9‐22‐2015 9‐22‐2015 9‐22‐2015 9‐22‐2015 Storm Water Site Inspection Storm Water Site Inspection Storm Water Site Inspection Storm Water Site Inspection Storm Water Site Inspection Storm Water Site Inspection Storm Water Site Inspection Storm Water Site Inspection Monthly Monthly Monthly Initial‐Monthly Monthly Monthly Monthly Monthly Addressed Citizen Complaints
Issue Homeowner concern with removal of detention in rear of property. Complaint Date 8/22/2015 Address Resolution Brushy Meadow, COG met with Owners/Engineer 19 Meadow Spring to determine the impact of the Ln. removal of the pond.. 4
Completed Ongoing Pre-Construction Meeting
Project Name
Date
Allen Bennett Demolition
9/21/2015
Pleasant Drive Subdivision
9/30/2015
Lot Drainage Review
Development
Greystone Cottages
BRP
Date
9-1-15
9-1-15
Greystone Cottages
Greystone Cottages
Manor @ Abner Creek
Belshire @ Riverside
Manor @ Abner Creek
Redcroft Subd
Redcroft Subd
Greystone Cottages
Oneal Village P-I
Oneal Village P-I
Belshire @ Riverside
Manor @ Abner Creek
Redcroft Subd
Redcroft Subd
Belshire @ Riverside
Village Towns
Village Towns
Chartwell Estates
Greystone Cottages
Redcroft Subd
9-2-15
9-3-15
9-3-15
9-4-15
9-4-15
9-11-15
9-11-15
9-15-15
9-15-15
9-15-15
9-25-15
9-28-15
9-28-15
9-28-15
9-28-15
9-29-15
9-29-15
9-30-15
9-30-15
9-30-15
Address
30 Bradstock Dr.
105 Hidden Spring
Lane
26 Bradstock Dr.
31 Bradstock Dr.
714 Roseclift Dr.
10 Dauphene Wy.
510 Grandon Rd.
569 Allenton Wy.
576 Allenton Wy.
4 Bradstock Dr.
105 Meritage St.
205 Meritage St.
39 Dauphene Wy
143 Sand Pine
413 Combahee
505 Allenton Wy
47 Dauphene Wy
116 Village Ct
118 Village Ct
708 Chartwell Dr.
557 Ashler Dr
505 Allenton Wy.
Lot #
103
58
105
102
35
108
40
197
190
110
3
11
40
43
227
213
35
11
11
66
135
213
Final Engineering Visit
Name
Address
Date
Riverside Commons
300 Corday.
9-1-15
Oneal Village
34 Kelvyn
9-1-15
Oneal Village
Wickerplace Park
9-1-15
Riverside Commons
Riverside Commons
302 Corday
304 Corday
9-2-15
9-4-15
5
Belshires @ Riverside Subd
313 Carrollton
9-4-15
Woodland Ridge
83 Woodhollow
9-9-15
Oneal Village
30 Kelvyn
9-11-15
Creekside
628 Rudy Creek
9-18-15
Oneal Village
309 Wicker Park
9-18-15
Austin Woods
Austin Wood Ct
9-22-15
Belshires @ Riverside Subd
328 Carrollton Wy.
9-23-15
Manor @ Abner Creek
709 Redclift Dr.
9-23-15
Woodland Ridge
87 Woodhollow
9-23-15
Creekside
Manor @ Abner Creek
Highland Parc
604 Rudy Creek
514 Grandon Rd.
104 Highland Parc
9-25-15
9-25-15
9-25-15
Site Visits
Name
Date
Activities
Time
Orchard Crest
Orchard Crest
9-1-15
9-2-15
Not working
Not working
9:00am
8:30am
Orchard Crest
9-3-15
Installing Silt Fence
9:00am
9-4-15
Installing Chain Link
Fence
4:00pm
Orchard Crest
9-8-15
Orchard Crest
9:30am
Installing Silt Fence
Orchard Crest
9-9-15
Clearing Grubbing
Orchard Crest
9-10-15
Clearing Grubbing
9:00am
10:00am
9:30am
Orchard Crest
9-14-15
Clearing Grubbing
6
Orchard Crest
Orchard Crest
Orchard Crest
Orchard Crest
10:00am
9-15-15
Clearing/Grub,
Construct Detention
Pond
9:30am
9-16-15
Clearing/Grub,
Construct Detention
Pond
9:00am
9-17-15
Clearing/Grub,
Construct Detention
Pond
9:00am
9-18-15
Clearing/Grub,
Construct Detention
Pond
Orchard Crest
9-21-15
Orchard Crest
Orchard Crest
Orchard Crest
Orchard Crest
Orchard Crest
Orchard Crest
Orchard Crest
9-22-15
9-23-15
9-25-15
9-28-15
9-29-15
9-30-15
9-30-15
Clearing/Grub,
Construct Detention
Pond
Rough Grading
Rough Grading
No Work/ Rain
No Work/ Rain
No Work/ Rain
No Work/ Rain
No Work/ Rain
7
8:30am
9:00am
9:00am
10:00am
9:00am
8:30am
8:30am
9:00am
Planning&Zoning
Division
September 2015
These reports comprehend monthly and year to date information as it relates to Boards and Commissions of
the City of Greer. It further contains activity of Planning and GIS staff with fees collected.
0
Summary
September 2015
The Planning Commission (GPC) regular scheduled meeting was to review seven
cases, one an annexation of sixty acres located at Snow and Burns Road for the
construction of 142 single family dwellings. The other cases were related to
rezoning request by the City for five parcels of land located along Oakland Ave. and
Forest Drive. This was sought to assist in redevelopment of properties in the
Needmore community.
The Board of Zoning Appeals (BZA) the met to discuss a variance from side
setback for residential construction proposed for 1208 West Poinsett Street.
Board of Architectural Review (BAR) met to review exterior façade changes to 119
East Poinsett Street to include new window and door openings for Abbott Custard
Annexation Planning Committee (APC) and Planning Advisory Committee (PAC)
had no regularly scheduled meetings for the month of September.
We issued48 residential and commercial zoning permits for construction and new
business start-ups, along with sign permits, collecting $1,343.45 in fees
Planning staff conducted the inaugural Structuring Alliance event on September 15,
2015, which involved City Council, Planning Commission, Board of Zoning Appeals
and the Board of Architectural Review. This was conducted in an effort to bring all
groups that are involved in development activity within the to come together and
build a relationship that ties the city together. Staff has deemed this a success and
will look forward to repeating the event in the future.
1
Public Hearings and Business Meetings
Commission, Boards
and Committees
Cases
Reviewed
September
Cases Approved/Recommendation
Cases
Pending
Pending Review/Approval
Annexation Planning
Committee (APC)
0
Board of Architectural
Review (BAR)
1
119 E. Poinsett St.
Exterior, Landscaping &
Signage
Board of Zoning
Appeals (BZA)
1
Planning Commission
(GPC)
7
1208 W. Poinsett St.
Intersection of Snow Road and Burns Road
Oakland McKissick- Fuller
Oakland McKissick- Fuller
100 Oakland Ave
103 Forest St
107 Forest St
108 Forest St
Approved - Variance Side
Setback
Approved
Withdrawn
Approved
Approved
Approved
Approved
Denied
Planning Advisory
Committee (PAC)
0
2
TOTAL PERMITS
TOTAL PERMITS
TOTAL PERMIT
TOTAL FEES
YTD
September
FEES
Residential
204 22 $440.00 $4,520.00 Commercial
82 9 $450.00 $4,550.00 Signs
54 6 $303.45 $2,904.37 BZA: Residential
0 1 $100.00 $100.00 BZA: Commercial
4 0 $0.00 $1,200.00 Planning Commission Filing Fees
20 7 $0.00 $500.00 Planning Advisory Review Filing Fees
14 0 $0.00 $3,420.00 Zoning Verification Letters
11 2 $50.00 $325.00 Annexation Planning Committee
6 0 Board of Architectural Review
5 1 400
48
$1,343.45
$17,519.37
YTD
PERMIT TYPE
Board of Zoning Appeals Filing Fees
TOTAL
3
4
5
6
7