0 - Village of Huntley
Transcription
0 - Village of Huntley
VillAGE PRESIDENT Charles H. Sass BOARD OF TRUSTEES VILLAGE OF Pam Fender Jay l<adakia Niko l<anakaris Harry Leopold Paul Mercer John Piwko HUNTLEY VillAGE MANAGER October 26, 2009 David J. Johnson Mr. Christopher B. Burke, Principal Christopher B. Burke Engineering, Ltd. 9575 W. Higgins Road, Suite 600 Rosemont, IL 60018 Re: Village Board Meeting of October 22, 2009 Dear Mr. Burke: At the October 22, 2009 Village Board meeting, the Board of Trustees passed and approved Resolution (R)2009-1 0.65 - Christopher B. Burke Engineering, Ltd. (CBBEL) Proposal for Professional Engineering Services to Provide Assistance with the Continuation of GIS Base Maps and Utility Atlases. A copy of the Resolution and executed Agreement are enclosed for your records. Should you have any questions regarding the Village Board's action, please contact me at 847-515-5261. Very truly yours, ~ Rita McMahon Village Clerk cc: David Johnson, Village Manager Lisa Armour, Sr. Assistant to the Village Manager William Geegan, Village Engineer Enclosures 10987 Main Street • Huntley, Illinois 60142 www.huntley.il.us • 847-669-9600 RESOLUTION AUTHORIZING A PROFESSIONAL ENGINEERING SERVICES AGREEMENT FOR ASSISTANCE WITH THE CONTINUATION OF GEOGRAPHIC INFORMATION SYSTEM (GIS) BASE MAPS AND UTILITY ATLASES Christopher B. Burke Engineering. Ltd. Resolution (R)2009-10.65 WHEREAS, the Village of Huntley has received a proposal for a Professional Engineering Services Agreement for Assistance with the Setup of GIS Base Maps and Utility Atlases; and WHEREAS, Phase I, approved by the Village Board on February 26, 2009, included the Horizontal and Vertical Control Survey which establishes a reliable and accurate GIS system, utility atlases for quarter sections 25 (Georgian Place, 40 (east side of Route 4 7 between Mill Street and Kreutzer Road east to Smith Drive) and 55 (west of Del Webb Boulevard and north of Sun City Boulevard); and WHEREAS, Phase 2 approved by the Village Board on July 23, 2009 included the development of utility atlases for Section 23 (north of Main Street and south of Algonquin Road between Kathleen Street and Bonnie Brae) and 31 (south of Main Street between Myrtle Street and Sunset Lane), and WHEREAS, Phase 3 will include the creation of utility atlases for Section 20, 24, 32-north Yz, 34 and 43-northeast half WHEREAS, the approved FY2009 Budget includes funding for the establishment of a Geographic Information System; and WHEREAS, the Village of Huntley has reviewed the proposal submitted and has determined that it is in the best interest to enter into an agreement with Christopher B. Burke Engineering, Ltd. in an amount not to exceed $75,000.00. NOW, THEREFORE, BE IT RESOLVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF HUNTLEY as follows: SECTION I: The Village of Huntley adopts and approves the execution of the Professional Engineering Services Agreement to provide assistance with the continuation of GIS Base Maps and Utility Atlases in the form attached hereto and a copy of which is incorporated herein. SECTION II: The Village President and Village Clerk are authorized to execute said agreement with Christopher B. Burke Engineering, Ltd. SECTION III: This Resolution shall be in full force and effect from and after its passage and approval as provided by law. SECTION IV: All Resolutions and parts of resolutions in conflict herewith are hereby repealed. AYES: NAYS: 0 ABSENT: 0 PASSED this 22"d day of October 2009 Village Clerk CHRISTOPHER B. BURKE 9575 West Higgins Road Suite 600 ENGINEERING, LTD. Rosemont, Illinois 60018 TEL (847) 823-0500 FAX(847) 823-0520 September 18, 2009 Revised September 29, 2009 Village of Huntley 10987 Main Street Huntley, Illinois 60142 Attention : Ms. Lisa Armour, Assistant Village Manager Subject: Proposal for Professional Engineering Services to Provide Assistance with The Continuation of GIS Base Maps and Utility Atlases Dear Ms. Armour: Christopher B. Burke, Engineering, Ltd. (CBBEL) is pleased to submit this proposal for the next phase of GIS Base Maps and Utility Atlases for the Village. CBBEL recommends that the Village of Huntley continue with sheets 20, 24, North Half of 32, 34 & the Northeast Half of 43 in the Downtown District. We have avoided the IL Route 47 corridor due to the pending construction. CBBEL will utilize the current Village atlases, which are inaccurate and outdated due to the improvements implemented in recent years, to expedite the start-up of this project. This proposal includes the continuation of a comprehensive GIS system centered on underground utilities . CBBEL proposes the following specific services to assist you in the completion of the project requirements. SCOPE OF WORK Phase 6 - Sections 20, 24, North Half of 32, 34 & the Northeast Half of 43 Utility atlases for 8 additional quarter sections will be developed based on field observations with the use of GPS and conventional surveying methods. These methods will require field crews to collect pipe sizes and inverts by opening each structure. Our field crews will survey the locations of all storm, sanitary and water structures for both quarter sections . Separate atlases will be completed for water, storm and sanitary sewers. Task 6A - Locating Structures : This task will consist of locating all public fire hydrants, valve vaults, storm and sanitary manholes, catch basins and inlets using standard GPS and conventional surveying methods. The horizontal locations and rim elevations (as applicable) will be determined based on the Village's documentation and will match the Kane and McHenry County's datum. The surveyed structure locations will be downloaded into the base digital orthophotography mapping . It is estimated that our two man crew with GPS equipment will be able to locate approximately 125 structures per day depending on weather and the condition of the structures . As the structures are downloaded (weekly) into the digital orthophotography mapping, CBBEL will print out atlas sheets showing the location of each of the structures . These sheets will be given to the field crews to open each combined sewer structure and determine pipe sizes and inverts. The crews will measure down from the known rim el evation to determine the pipe flowline elevations. Pipe sizes will be determined by measurement and the manhole will be rated by condition, it is estimated that our two man crew can complete 70 structures per day. Task 68 - Data Base/Drafting : CBBEL will utilize the information collecte d above to develop a data base and a utility atlas for each major utility. Drafts of each sheet will be submitted to Public Works for review and comment. For difficult locations , CBBEL will ask Public Works to clean/inspect structures prior to re-surveying them. Atlases will be developed in both a MicroStation and Arc GIS format. DELIVERABLES CBBEL will provide the Village water, storm and sanitary sewer atlases for the 5 quarter sections for their use, analysis and comment. CBBEL will incorporate comments received and will provide the Village with one complete atlas for each utility within these 5 quarter sections . CBBEL estimates the work within these phases to take approximately 6 - 8 weeks for completion. ESTIMATE OF FEE Phase 6 -Section 20. 24. North Half of 32 , 34 & the Northeast Half of 43 TOTAL $75 ,000 {Please see attached Cost Estimate Sheet for detailed summary) We will bill you at the hourly rates specified on the previously accepted Schedule of Charges and establish our contract in accordance with the attached General Terms and Conditions. Direct costs for blueprints, photocopying, mailing, overnight delivery, messenger services and report compilation are not included in the Fee Estimate. These General Terms and Conditions are expressly incorporated into and are an integral part of this contract for professional services. It should be emphasized that any requested meetings or additional services that are not included in the preceding Fee Estimate will be billed at the attached hourly rates. Please sign and return one copy of this agreement as an indication of acceptance and notice to proceed. Please feel free to contact us anytime . Sincerely, Michael E. Kerr, PE Executive Vice President Encl. General Terms and Conditions THIS PROPOSAL OF HUNTLEY. ACCEPTED FOR VILLAGE BY: TITLE: DATE: JRM/jmc/gs N:IPROPOSALSIAOMIN\2009\Huntley·GIS·Add'l.093009.doc Page 2 of 2 Village of Huntley GIS Proposal - Water I Water System Sheet# Existing Count Projected Count 0.050 Field Location 125 Field Location Hours Cost $153.00 20 24 32 {N 1/2) 34 43 INE 1/2) 85 80 50 85 35 89 84 53 89 37 0.7 0. 7 0.4 0.7 0.3 5.7 5.4 3.4 5.7 2.4 873.9 822.5 514.1 873.9 359.9 Totals II 335 I 352 I I 23 I $3,444.34 I I I I II==:Jc:=J I Drafting Hours 0.033 Cost $1 15.00 Format Subm ittal Hours Cost $107 .00 Supervision Rev1ew Hours Cost $150.00 Cost Per Sheet 3.0 2.8 1.8 3.0 1.2 342.1 322.0 201 .3 342.1 140.9 4 4 4 4 4 428.0 428.0 428.0 428.0 428.0 2 2 2 2 2 300.0 300.0 300.0 300.0 300.0 $1 ,944.06 $1 ,872.53 $1 ,443 .33 $1.944 .06 $1,228.73 12 I $1 ,348.38 I 20 II S2 ,14o.oo I 10 I S1,5oo.oo I $8,432.71 I I Village of Huntley GIS Proposal - Stormwater Stormwater Sewer System Sheet# Existing Count Projected Count 0.050 Field Location 125 Field Location Hours Cost $153.00 Field Cuts 70 Field Cuts Hours Cost $153 .00 Drafting Hours 0.083 Cost $115.00 Form at Submittal Hours Cost $107.00 Supervision Review Hours Cost $150.00 Cost Per Sheet 20 24 32 (N 1/2 ) 34 43 {NE 1/2)_ 473 130 70 473 175 497 137 74 497 184 4.0 1.1 0. 6 4.0 1.5 31 .8 8.7 4.7 31 .8 11 .8 4863.2 1336.6 719.7 4863.2 1799.3 7.1 2.0 1.1 7.1 2.6 56.8 15.6 8.4 56.8 21 .0 8684 .3 2386 .8 1285.2 8684 .3 3213.0 41 .4 11.4 6.1 4 1.4 15.3 47 59.6 1308.1 704.4 47 59.6 1760 .9 4 4 4 4 4 428.0 428.0 428.0 428.0 428.0 2 2 2 2 2 300.0 300.0 300.0 300.0 300.0 $19,035 .04 $5.759 .53 $3.437.29 $19 ,035.04 $7.501 .22 I Totals II 1321 II 1387 I I 89 II $13,581 .99 lc::::=::Jc:=J I 116 II $13,292.56 II 20 II $2,140.00 I 10 II $1 ,500.00 II $54,768.12 Village of Huntley GIS Proposa l -Sanitary Sanitary Sewer System Sheet# Existing Count Projected Count 0.050 Field Location 125 Field Location Hours Cost $153.00 Field Cuts 70 Field Cuts Hours Cost $153.00 Drafting Hours 0.083 Cost $115 .00 Format Submittal Hours Cost $107 .00 Supervision Review Hours Cost $150 .00 Cost Per Sheet 20 24 32 (N 1/2) 34 43_lNE 1/2_l 85 70 45 5 35 89 74 47 5 37 0.7 0.6 0.4 0.0 0.3 5.7 4 .7 3.0 0.3 2.4 873.9 719.7 462.7 51.4 359.9 1.3 1.1 0.7 0.1 0.5 10.2 8.4 5.4 0.6 4.2 1560.6 1285.2 826.2 91.8 642.6 7.4 6.1 3.9 0.4 3.1 855.3 704.4 452.8 50.3 352.2 4 4 4 4 4 428.0 428 .0 428.0 428.0 428.0 2 2 2 2 2 300.0 300.0 300.0 300.0 300.0 $4 ,017.85 $3.437.29 $2,469 .68 $921.52 $2.082.64 I Totals I 240 II 252 II I 16 I $2,467.58 lc::::=::Jc:=J I 21 I $2,415.00 I 20 I $2,140.00 II "For estimate purposes we have projected an additional 5% of structures in the field than are shown on the current Atlas's, price may be readjusted if this is substantially different in the field . 10 I $1,500 .00 II $12,928.98 I 0 (' I L I G.. c 0: Q_ I 1/1 t') L ) VI ( J u u u CHRISTOPHER B. BURKE EI .Gli!E.E><'f. , ~ VILLAGE OF HUNTLEY - PHASE 6 Ill T • VT' LACE () . !I' 1 s onriP H ~~ l 2009 - PHASE 6 GIS