Great Northern Highway – Muchea to Wubin Upgrade Stage 2
Transcription
Great Northern Highway – Muchea to Wubin Upgrade Stage 2
PROJECT OVERVIEW NOVEMBER 2015 MAIN ROADS WESTERN AUSTRALIA Great Northern Highway – Muchea to Wubin Upgrade Stage 2 PLANNING REVIEW COMPLETE: CONSTRUCTION TO START IN 2016 Main Roads, in conjunction with industry partners Jacobs and Arup, has completed a planning review for the Great Northern Highway – Muchea to Wubin. Detailed designs for construction packages are now being prepared and will be delivered over the next four years. This planning review was the first phase of the project, which has received funding of $307.8 million from the Australian Government and $76.95 million from the State Government. An additional $23.88 million was also committed by the Australian Government for the construction of a New Norcia bypass, as part of the National Highway Upgrade Program. This is supplemented with an additional $5.93 million from the State Government. The planning review was informed by extensive community and stakeholder feedback from a series of public information sessions, as well as close consultation with heavy vehicle operators, industry bodies and local government. This comprehensive consultation process has helped the project team develop a revised upgrade strategy for the highway that identifies and prioritises a range of construction packages to be delivered between 2016 and 2019. IN PARTNERSHIP WITH JACOBS | ARUP These construction packages will feature a range of improvements such as town bypasses, road widening, more passing lanes, flattened crests, reduced curves, safer roadsides and improved rest area facilities with greater capacity. These construction packages will feature a range of improvements … ( ! ( ! The following map illustrates the proposed construction packages: This table provides details about the proposed construction packages, their construction status and expected timeframe: ( ! ! ( 380000 r ee n 420000 ( ! 440000 460000 480000 ! ( idi-W ubin ! ( Wubin Rd 260 Wubin Bypass * # * # G uny ! ( 250 6660000 Nugadong Nugadong ! ( 240 Dalwallinu Bypass Wubin Summary of the proposed improvements Construction to start Muchea North (8 km from Old Gingin Road to Sugargum Drive) • A new highway built next to the existing highway to provide a link to the proposed NorthLink WA project (designed to allow for future lane duplication). • New local access roads to provide safer access points to the highway. • Existing highway to become a local access road. Late 2016 Bindoon Bypass • New 7 km bypass to the east of the town of Bindoon. • Single carriageway (designed to allow for future duplication) with access roads to serve adjacent properties. • New northern and southern entrance to the town. • Passing lanes in each direction. • Northern tie-in to the existing highway at St Anne’s Catholic Church and southern tie-in to the existing highway at the Brockman River Bridge. Subject to additional funding Bindoon Hills • A detailed planning study is currently underway to determine how best to upgrade 9 km of the Great Northern Highway over Bindoon Hill, just north of Bindoon. • The study is considering several alignment options to efficiently and safely traverse the Bindoon Hill, as well as the Perth-Darwin National Highway alignment which was endorsed in 2002 and subsequently dismissed. This route is located to the west of Great Northern Highway and east of Brand Highway. • Once a route has been selected, additional funding will be sought for construction. Subject to additional funding New Norcia Bypass • New 6 km deviation to the east of the town to enable heavy vehicles to bypass New Norcia. • New 88 m bridge over Moore River. • Scenic lookout on the northbound lane to allow road users to park and view the historic town. • Entry statement at southern connection to the town. Early 2016 Batty Bog section • 21 km section of new highway from Batty Bog to Walebing. Construction Completed 2015 Walebing • Realignment of the existing highway to improve the tight curve at Walebing. • Upgraded roadside parking facilities at Walebing. • Realigned intersections with The Midlands Road and Old Geraldton Road. 2017 Bindi Bindi Curves • 11 km of new highway through the Bindi Bindi bends. Construction Completed 2015 Miling Bypass • Upgrade of the highway from Lyons East Road to Miling North Road, including a new eastern bypass of the town of Miling. • New northern and southern accesses into town. • Realigned Miling East Road to provide a staggered T-intersection for safe crossing of the bypass. Late 2016 Miling Straight • New highway built next to the existing highway, from Miling North Road to Gatti Road. • Additional roadside stopping places. • New overtaking lanes. • Realignment of Miling North Road to provide a staggered T-intersection for safe crossing of the highway. Mid 2016 Pithara section • Upgraded highway from Gatti Road to north of Pithara. • New highway built next to the existing highway south of the Northam–Pithara Road and a widening and upgrade for the remainder of this section. • New overtaking lanes. Late 2016 Dalwallinu Bypass • Improved alignment of the curve at the northern end of the Dalwallinu Bypass to improve safety. • Improvements to the Kalannie Road Intersection. 2017 Dal wallinu-Kal anni e Rd 230 ! ( 6640000 Muchea ( Namban ! Pithara Pithara Section ( ! ( ! * # ! ( ! ( * # ! ( Perth * # ! ( ( ( ! * # Dalwallinu ! Watheroo ( ! Package Marchagee * # Co o r o w - G 400000 d dR He a ( ! ! ( 220 Miling Straight Midlands Rd Berkshire Valley ( ! 6620000 Rd Miling Dalaroo ! ( ra gan Rd Danda Mi lin g- ! ( * # Round Hill ( ! Rd ora Mo ( ! Cranmore Park ( ! Marne ! ( * # 200 190 ! ( ! ( ! ( 210 Damboring ! ( Miling Bypass 180 * # We st * # * # No rth Coomberdale * # ( ! Tootra ! ( 170 Ballidu ! ( Bindi Bindi Curves ! ( ! Bindi Bindi ( * # ( ! ( ! Dandaragan ! ( ( 150 ! Walebing * # ( Kondut ! * # Gabalong ! ( d 6600000 ! ( * # d R n-M oora R by 160 Walebing Curve Bindoo a Cat Moora ! ( 140 Korraling ( ! Batty Bog Section ! ( Regans Ford H wy orthern ( Calingiri ! 100 Great N Calingiri Rd ( ! * # ! ( * # Oc ea nD Bindoon Bypass 60 d ing R 6520000 r itte Ch * # o Wanner 40 Muchea ! ( ! ( * Muchea East R # ar R Chitibin ( ! Miling Bypass * # # * # * # * # * # * * # # * # * # * # * # * # * Dalwallinu Bypass * # # * # * # * # * # * Bindoon Hills Southern Brook ! ( ( Jennapullin ! ( ! Toodyay o Rd * # # * # * # * # * # * # * Bindoon Bypass ( ! Hulongine Key Farm ! ( ! ( Bindi Bindi Curves a om Go d oo g -T ll i n ya ! Ringa ( Legend Batty Bog Section d ( Wongamine ! d d ( ! R h em a tc y alk g-W n i ll Rossmore ( ! Jennacubbine ( ! Dewars Pool ( ! Lunns ( ! Coondle ( Landing ! Julim Burabadji ! ( ( Goomalling ! Culham ( ! * # r Muchea North ( ! Chittering Rd a om Go ( Berring ! ( ! 50 llin g Bolgart y Rd ian In d ! ( Go om a o dy a Bindoon-Dew ars 70 ! ( ter Dr akwa Bre ( ! iri - 90 Bindoon Hills * # Bindoon Ca lin g ! ( Mooliabeenee ( ! ( ! Rd 6540000 ! ( d ol R Po Granville Rd (( Mool iabe en ee ! Gingin ! ( ! To indidi B B in Werribee ! ( 110 80 Cullalla ! ( ( ! Carani ! ( ra -Pith a y Hw ! ( G ingin Brook Rd s Rd ngan Hill ri-Wo ingi Cal tham No r nd Bra 6560000 Mogumber Wannamal ! ( ( ! ( ! New Norcia Bypass ( ! ! ( ( ! ( ! 120 ( Wongan Hills ! Seaton Ross ! ( Yerecoin ! ( * # Budjarra ( ! ( ! Piawaning ! ( * # ( ! New Norcia d d 6580000 Gillingarra ( ! lR 130 * # ! ( ita sp Ho Elphin ! ( Waddington-Wongan Hills Rd Waddington ! ( yR ( ! ( ! Koojan GNH Road Centreline (H006) Muchea North New Norcia Bypass ! ( ( ! (Kilometre Marker Straight Line! Rail ( ! Town / Place Nugadong Highway Major Watercourses Pithara Section Major Road Lakes Walebing Curve ! ° ( ! Jacobs Group (Australia) Pty Ltd Durack Centre, 263 Adelaide Terrace, Perth WA 6000 Tel +61 8 9469 4400 Fax +61 8 9469 4488 www.jacobs.com Reserves / Parklands Wubin Bypass Miling Straight © Main Roads Western Australia 0 Data Source: Landgate, Main Roads WA MXD Location: I:\PBIF\Projects\PB50732\Technical\Planning & Design (.12)_MOVED TO PW_EXCEPT_GIS_MX_X SECTIONS\GIS\3. Maps Documents\Transport\GNH-PP00-T-TN-GD-0009-A2.mxd ( ! 5 10 Kilometres Coordinate System: GDA 1994 MGA Zone 50 Drawing No ( ! ( ! Great ( Northern Highway ! ( ! Muchea to Wubin Contract Locations Joint Venture Partners: Arup Pty Ltd Level 7 Wellington Central 836 Wellington Street West Perth WA 6005 Tel +61 8 9327 8300 Fax +61 8 9481 1334 www.arup.com GNH-PP00-T-TN-GD-0009 ! ( ( ! Job No ( Western Australia ! Main Roads 237669 Issue A2 Drawing Status / Other Draft Client Project Scale at A3 1:500,000 Great Northern Highway Muchea to Wubin Upgrade Stage 2 Date By Chkd Appd 22/09/2015 BS NB AW Package Summary of the proposed improvements Construction to start Nugadong • Widening and improvements to the existing highway between Nugadong and Wubin, including new overtaking lanes. 2017 Wubin Bypass • New bypass to the east of Wubin, enabling through traffic to bypass the town. • New intersections providing access to the town for 53.5 m road trains. • Upgraded intersections at the Mullewa-Wubin Road to allow safe turning movements for road trains. 2017 The planning review was informed by extensive community and stakeholder feedback from a series of public information sessions, as well as close consultation with heavy vehicle operators, industry bodies and local government. FURTHER INFORMATION The project team would like to thank everyone who provided input and feedback throughout the planning review. For more information, or to be added to the database for future updates, please contact the Community Engagement Team. Tel: 1800 820 366 Email: [email protected] www.mainroads.wa.gov.au IN PARTNERSHIP WITH JACOBS | ARUP