Great Northern Highway – Muchea to Wubin Upgrade Stage 2

Transcription

Great Northern Highway – Muchea to Wubin Upgrade Stage 2
PROJECT OVERVIEW
NOVEMBER 2015
MAIN ROADS WESTERN AUSTRALIA
Great Northern Highway –
Muchea to Wubin Upgrade Stage 2
PLANNING REVIEW COMPLETE: CONSTRUCTION TO START IN 2016
Main Roads, in conjunction with industry partners Jacobs and Arup, has completed
a planning review for the Great Northern Highway – Muchea to Wubin. Detailed
designs for construction packages are now being prepared and will be delivered
over the next four years.
This planning review was the first
phase of the project, which has
received funding of $307.8 million
from the Australian Government
and $76.95 million from the State
Government. An additional $23.88
million was also committed by
the Australian Government for the
construction of a New Norcia bypass,
as part of the National Highway Upgrade
Program. This is supplemented with
an additional $5.93 million from the
State Government.
The planning review was informed by
extensive community and stakeholder
feedback from a series of public
information sessions, as well as
close consultation with heavy vehicle
operators, industry bodies and local
government.
This comprehensive consultation
process has helped the project team
develop a revised upgrade strategy for
the highway that identifies and prioritises
a range of construction packages to be
delivered between 2016 and 2019.
IN PARTNERSHIP WITH JACOBS | ARUP
These construction packages will
feature a range of improvements such
as town bypasses, road widening, more
passing lanes, flattened crests, reduced
curves, safer roadsides and improved
rest area facilities with greater capacity.
These construction
packages will feature
a range of
improvements …
(
!
(
!
The following map illustrates the proposed construction packages:
This table provides details about the proposed construction packages, their construction status and expected timeframe:
(
!
!
(
380000
r ee n
420000
(
!
440000
460000
480000
!
(
idi-W
ubin
!
(
Wubin
Rd
260
Wubin Bypass
*
#
*
#
G uny
!
(
250
6660000
Nugadong
Nugadong !
(
240
Dalwallinu Bypass
Wubin
Summary of the proposed improvements
Construction
to start
Muchea North
(8 km from Old
Gingin Road to
Sugargum Drive)
• A new highway built next to the existing highway to provide a link to the
proposed NorthLink WA project (designed to allow for future lane duplication).
• New local access roads to provide safer access points to the highway.
• Existing highway to become a local access road.
Late 2016
Bindoon Bypass
• New 7 km bypass to the east of the town of Bindoon.
• Single carriageway (designed to allow for future duplication) with access roads
to serve adjacent properties.
• New northern and southern entrance to the town.
• Passing lanes in each direction.
• Northern tie-in to the existing highway at St Anne’s Catholic Church and
southern tie-in to the existing highway at the Brockman River Bridge.
Subject to
additional funding
Bindoon Hills
• A detailed planning study is currently underway to determine how best to upgrade
9 km of the Great Northern Highway over Bindoon Hill, just north of Bindoon.
• The study is considering several alignment options to efficiently and safely
traverse the Bindoon Hill, as well as the Perth-Darwin National Highway
alignment which was endorsed in 2002 and subsequently dismissed. This route
is located to the west of Great Northern Highway and east of Brand Highway.
• Once a route has been selected, additional funding will be sought for
construction.
Subject to
additional funding
New Norcia
Bypass
• New 6 km deviation to the east of the town to enable heavy vehicles to bypass
New Norcia.
• New 88 m bridge over Moore River.
• Scenic lookout on the northbound lane to allow road users to park and view the
historic town.
• Entry statement at southern connection to the town.
Early 2016
Batty Bog section
• 21 km section of new highway from Batty Bog to Walebing.
Construction
Completed 2015
Walebing
• Realignment of the existing highway to improve the tight curve at Walebing.
• Upgraded roadside parking facilities at Walebing.
• Realigned intersections with The Midlands Road and Old Geraldton Road.
2017
Bindi Bindi
Curves
• 11 km of new highway through the Bindi Bindi bends.
Construction
Completed 2015
Miling Bypass
• Upgrade of the highway from Lyons East Road to Miling North Road, including
a new eastern bypass of the town of Miling.
• New northern and southern accesses into town.
• Realigned Miling East Road to provide a staggered T-intersection for safe
crossing of the bypass.
Late 2016
Miling Straight
• New highway built next to the existing highway, from Miling North Road to
Gatti Road.
• Additional roadside stopping places.
• New overtaking lanes.
• Realignment of Miling North Road to provide a staggered T-intersection for safe
crossing of the highway.
Mid 2016
Pithara section
• Upgraded highway from Gatti Road to north of Pithara.
• New highway built next to the existing highway south of the Northam–Pithara
Road and a widening and upgrade for the remainder of this section.
• New overtaking lanes.
Late 2016
Dalwallinu Bypass
• Improved alignment of the curve at the northern end of the Dalwallinu Bypass to
improve safety.
• Improvements to the Kalannie Road Intersection.
2017
Dal wallinu-Kal anni e Rd
230
!
(
6640000
Muchea
( Namban
!
Pithara
Pithara Section
(
!
(
!
*
#
!
(
!
(
*
#
!
(
Perth
*
#
!
(
(
(
!
*
#
Dalwallinu !
Watheroo
(
!
Package
Marchagee
*
#
Co o r o w - G
400000
d
dR
He a
(
!
!
(
220
Miling Straight
Midlands
Rd
Berkshire
Valley
(
!
6620000
Rd
Miling
Dalaroo !
(
ra gan Rd
Danda
Mi
lin
g-
!
(
*
#
Round
Hill
(
!
Rd
ora
Mo
(
!
Cranmore
Park
(
!
Marne
!
(
*
#
200
190
!
(
!
(
!
(
210
Damboring
!
(
Miling Bypass
180
*
#
We
st
*
#
*
#
No
rth
Coomberdale
*
#
(
!
Tootra
!
(
170
Ballidu
!
(
Bindi Bindi Curves
!
(
! Bindi Bindi
(
*
#
(
!
(
!
Dandaragan
!
(
( 150
!
Walebing
*
#
( Kondut
!
*
#
Gabalong !
(
d
6600000
!
(
*
#
d
R
n-M oora
R
by
160
Walebing Curve
Bindoo
a
Cat
Moora
!
(
140
Korraling
(
!
Batty Bog Section
!
(
Regans
Ford
H wy
orthern
( Calingiri
!
100
Great N
Calingiri Rd
(
!
*
#
!
(
*
#
Oc
ea
nD
Bindoon Bypass
60
d
ing R
6520000
r
itte
Ch
*
#
o
Wanner
40
Muchea !
(
!
(
* Muchea East R
#
ar R
Chitibin
(
!
Miling Bypass
* #
#
* #
* #
* #
* #
*
* #
#
* #
* #
* #
* #
* #
*
Dalwallinu Bypass
* #
#
* #
* #
* #
* #
*
Bindoon Hills
Southern
Brook
!
(
( Jennapullin
!
(
!
Toodyay
o Rd
* #
#
* #
* #
* #
* #
* #
*
Bindoon Bypass
(
!
Hulongine
Key Farm !
(
!
(
Bindi Bindi Curves
a
om
Go
d
oo
g -T
ll i n
ya
! Ringa
(
Legend
Batty Bog Section
d
( Wongamine
!
d
d
(
!
R
h em
a tc
y alk
g-W
n
i
ll
Rossmore
(
!
Jennacubbine
(
!
Dewars Pool
(
!
Lunns (
! Coondle
(
Landing !
Julim
Burabadji !
(
( Goomalling
!
Culham
(
!
*
#
r
Muchea North
(
!
Chittering
Rd
a
om
Go
( Berring
!
(
!
50
llin
g
Bolgart
y Rd
ian
In d
!
(
Go
om
a
o dy a
Bindoon-Dew
ars
70
!
(
ter Dr
akwa
Bre
(
!
iri
-
90
Bindoon Hills
*
#
Bindoon
Ca
lin
g
!
(
Mooliabeenee
(
!
(
!
Rd
6540000
!
(
d
ol R
Po
Granville
Rd
(( Mool iabe en ee
!
Gingin !
(
!
To
indidi B
B in
Werribee
!
(
110
80
Cullalla
!
(
(
!
Carani !
(
ra
-Pith a
y
Hw
!
(
G ingin Brook Rd
s Rd
ngan Hill
ri-Wo
ingi
Cal
tham
No r
nd
Bra
6560000
Mogumber
Wannamal !
(
(
!
(
!
New Norcia Bypass
(
!
!
(
(
!
(
!
120
( Wongan Hills
!
Seaton
Ross
!
(
Yerecoin !
(
*
#
Budjarra
(
!
(
!
Piawaning
!
(
*
#
(
!
New
Norcia
d
d
6580000
Gillingarra
(
!
lR
130
*
#
!
(
ita
sp
Ho
Elphin
!
(
Waddington-Wongan Hills Rd
Waddington !
(
yR
(
!
(
!
Koojan
GNH Road Centreline (H006)
Muchea North
New Norcia Bypass
!
(
(
!
(Kilometre Marker
Straight Line!
Rail
(
!
Town / Place
Nugadong
Highway
Major Watercourses
Pithara Section
Major Road
Lakes
Walebing Curve
!
°
(
!
Jacobs Group (Australia) Pty Ltd
Durack Centre, 263 Adelaide Terrace,
Perth WA 6000
Tel +61 8 9469 4400 Fax +61 8 9469 4488
www.jacobs.com
Reserves / Parklands
Wubin Bypass
Miling Straight
© Main Roads Western Australia
0
Data Source: Landgate, Main Roads WA
MXD Location: I:\PBIF\Projects\PB50732\Technical\Planning & Design (.12)_MOVED TO PW_EXCEPT_GIS_MX_X SECTIONS\GIS\3. Maps Documents\Transport\GNH-PP00-T-TN-GD-0009-A2.mxd
(
!
5
10
Kilometres
Coordinate System: GDA 1994 MGA Zone 50
Drawing No
(
!
(
!
Great
( Northern Highway
!
(
!
Muchea to Wubin
Contract Locations
Joint Venture Partners:
Arup Pty Ltd
Level 7 Wellington Central
836 Wellington Street
West Perth WA 6005
Tel +61 8 9327 8300 Fax +61 8 9481 1334
www.arup.com
GNH-PP00-T-TN-GD-0009
!
(
(
!
Job No
( Western Australia
!
Main Roads
237669
Issue
A2
Drawing Status / Other
Draft
Client
Project
Scale at A3
1:500,000
Great Northern Highway
Muchea to Wubin Upgrade Stage 2
Date
By
Chkd
Appd
22/09/2015
BS
NB
AW
Package
Summary of the proposed improvements
Construction
to start
Nugadong
• Widening and improvements to the existing highway between Nugadong and
Wubin, including new overtaking lanes.
2017
Wubin Bypass
• New bypass to the east of Wubin, enabling through traffic to bypass the town.
• New intersections providing access to the town for 53.5 m road trains.
• Upgraded intersections at the Mullewa-Wubin Road to allow safe turning
movements for road trains.
2017
The planning review was
informed by extensive
community and
stakeholder feedback
from a series of public
information sessions,
as well as close
consultation with heavy
vehicle operators,
industry bodies and
local government.
FURTHER INFORMATION
The project team would like to thank everyone who provided input and
feedback throughout the planning review.
For more information, or to be added to the database for future
updates, please contact the Community Engagement Team.
Tel: 1800 820 366
Email: [email protected]
www.mainroads.wa.gov.au
IN PARTNERSHIP WITH JACOBS | ARUP