Old Bridge Repair
Transcription
Old Bridge Repair
BOTTOM OF DECK SLAB PROJECT PROFILE NAME OF PROJECT : Construction and Maintenance of Bridges along National Roads-Rehabilitation/Major Repair of Permanent Bridges, Mandaue-Mactan Bridge 1 along A.C. Cortes Ave., including the Rehabilitation/Improvement of Access road at Approach A (Mandaue City Side) and RROW Acquisition CONTRACT ID : 15H00031 CONTRACTOR : JEGMA CONST. AND DEV’T. CORP. NET LENGTH (Access Road) (Bridge Proper) : 313.76 m : 854 m. CONTRACT COST : Php 129,601,770.52 CONTRACT EFFECTIVITY : August 10, 2015 CONTRACT EXPIRY : July 4, 2016 REVISED EXPIRY : August 3, 2016 SCOPE OF WORKS (ACCESS ROAD) Removal of Trees Removal of Existing Slope Protection Removal of Structures and Obstruction (Houses) Embankment Subgrade Preperation Aggregate Subbase Course Aggregate Surface Course Portland Cement Concrete Pavement, 230mm Reinforcing Steel Bar (for Retaining wall and Line Ditch-U Type) Structural Concrete Pipe Culverts, (910mm) Catch Basins Side Walk Concrete Curb and Gutter Reflectorize Thermoplastic Pavement Marking (white) SCOPE OF WORKS (BRIDGE PROPER) Removal of Damaged Existing Deck Slab Removal of Existing Damaged Asphalt (Sidewalk) Bituminous Tack Coat(Emulsified Asphalt) Bituminous Concrete Surface, 50mm Reinforcing Steel Bar, Gr. 40 Structural Concrete (for Deck Slab) Reflectorize Thermoplastic Pavement Marking (white) Reflectorize Thermoplastic Pavement Marking (yellow) Epoxy Coating on Cracks Water Proofing on Deck Slab and Sidewalk Expoxy Injection on Concrete Cracks Patching Concrete Members using PCM Special Anti-Corrosion Paint (Polyurethane Paint), For Bearing Replacement of Expansion Joint Special Protective Coating (Base on 6mm thickness)Anti-Salt Attack Polymer Cement mortar with Lithium Hydrate Replacement of Drain Pipes (Using 4” dia. PVC) Gap Filler of Deck Slab and End Restrainer(Using fast setting mortar) Water Proof Concrete Paint Legend: - Trucks / vehicle going to Lapulapu City - Single Flow Lane MANDAUE CITY Legend: - Trucks / vehicle going to Mandaue City - Single Flow Lane MANDAUE CITY Legend: - Trucks / vehicle going to Mandaue City - Single Flow Lane going to Lapulapu City LAPULAPU CITY LEGEND: - Concrete Cured - Subject for Curing GOING TO MANDAUE - Ongoing L GOING TO LAPU-LAPU Scope of Work - Removal of Existing Damaged Deck Slab - Installation of formworks - Installation of Reinforcing Steel bars - Concrete Pouring L LEGEND: - Concrete Cured - Subject for Curing GOING TO MANDAUE - Ongoing L GOING TO LAPU-LAPU Scope of Work - Removal of Existing Damaged Deck Slab - Installation of formworks - Installation of Reinforcing Steel bars - Concrete Pouring L LEGEND: - Concrete Cured - Subject for Curing GOING TO MANDAUE - Ongoing L Scope of Work - Removal of Existing Damaged Deck Slab - Installation of formworks - Installation of Reinforcing Steel bars - Concrete Pouring GOING TO LAPU-LAPU L LEGEND: - Concrete Cured - Subject for Curing GOING TO MANDAUE - Ongoing L Scope of Work - Removal of Existing Damaged Deck Slab - Installation of formworks - Installation of Reinforcing Steel bars - Concrete Pouring GOING TO LAPU-LAPU L LEGEND: - Concrete Cured - Subject for Curing GOING TO MANDAUE - Ongoing L Scope of Work - Removal of Existing Damaged Deck Slab - Installation of formworks - Installation of Reinforcing Steel bars - Concrete Pouring GOING TO LAPU-LAPU L LEGEND: - Concrete Cured - Subject for Curing GOING TO MANDAUE - Ongoing L L GOING TO LAPU-LAPU Scope of Work - Removal of Existing Damaged Deck Slab - Installation of formworks - Installation of Reinforcing Steel bars - Concrete Pouring LEGEND: - Waterproof with Asphalt Overlaying - Subject for Curing GOING TO MANDAUE - Ongoing L GOING TO LAPU-LAPU Scope of Work - Removal of Existing Damaged Deck Slab - Installation of formworks - Installation of Reinforcing Steel bars - Concrete Pouring - Water Proofing - Asphalting LEGEND: - Waterproof with Asphalt Overlaying - Subject for Curing GOING TO MANDAUE - Ongoing L GOING TO LAPU-LAPU Scope of Work - Removal of Existing Damaged Deck Slab - Installation of formworks - Installation of Reinforcing Steel bars - Concrete Pouring LEGEND: - Waterproof with Asphalt Overlaying - Subject for Curing GOING TO MANDAUE - Ongoing L Scope of Work - Removal of Existing Damaged Deck Slab - Installation of formworks - Installation of Reinforcing Steel bars - Concrete Pouring - Water Proofing - Asphalting GOING TO LAPU-LAPU LEGEND: - Waterproof with Asphalt Overlaying - Subject for Curing GOING TO MANDAUE - Ongoing GOING TO LAPU-LAPU Scope of Work - Removal of Existing Damaged Deck Slab - Installation of formworks - Installation of Reinforcing Steel bars - Concrete Pouring LEGEND: - Subject for Curing GOING TO MANDAUE - Ongoing GOING TO LAPU-LAPU Scope of Work - Removal of Existing Damaged Deck Slab - Installation of formworks - Installation of Reinforcing Steel bars - Concrete Pouring LEGEND: - Subject for Curing GOING TO MANDAUE - Ongoing GOING TO LAPU-LAPU Scope of Work - Removal of Existing Damaged Deck Slab - Installation of formworks - Installation of Reinforcing Steel bars - Concrete Pouring LEGEND: - Concrete Cured - Subject for Curing GOING TO MANDAUE - Ongoing GOING TO LAPU-LAPU Scope of Work - Removal of Existing Damaged Deck Slab - Installation of formworks - Installation of Reinforcing Steel bars - Concrete Pouring LEGEND: - Concrete Cured - Subject for Curing GOING TO MANDAUE - Ongoing GOING TO LAPU-LAPU Scope of Work - Removal of Existing Damaged Deck Slab - Installation of formworks - Installation of Reinforcing Steel bars - Concrete Pouring LEGEND: - Concrete Cured - Subject for Curing GOING TO MANDAUE - Ongoing GOING TO LAPU-LAPU Scope of Work - Removal of Existing Damaged Deck Slab - Installation of formworks - Installation of Reinforcing Steel bars - Concrete Pouring LEGEND: - Water Proofing/Asphalting - Concrete Cured - Subject for Curing GOING TO MANDAUE - Ongoing GOING TO LAPU-LAPU Scope of Work - Removal of Existing Damaged Deck Slab - Installation of formworks - Installation of Reinforcing Steel bars - Concrete Pouring - Water Proofing - Asphalting LEGEND: - Water Proofing/Asphalting - Concrete Cured - Subject for Curing GOING TO MANDAUE - Ongoing GOING TO LAPU-LAPU Scope of Work - Removal of Existing Damaged Deck Slab - Installation of formworks - Installation of Reinforcing Steel bars - Concrete Pouring - Water Proofing - Asphalting LEGEND: - Water Proofing/Asphalting - Concrete Cured - Subject for Curing GOING TO MANDAUE - Ongoing GOING TO LAPU-LAPU Scope of Work - Removal of Existing Damaged Deck Slab - Installation of formworks - Installation of Reinforcing Steel bars - Concrete Pouring - Water Proofing - Asphalting GOING TO MANDAUE BRIDGE IS NOW PASSABLE AND SAFE TO ALL TYPES OF VEHICLES. GOING TO LAPU-LAPU MCWD PIPELINE MCWD PIPELINE RROW : HOUSES RROW : TREES AND HOUSES RROW : HOUSES RROW : HOUSES RIGHT SIDE OF BRIDGE LEFT SIDE OF BRIDGE HOUSES HOUSES HOUSES ESTIMATED DURATION FOR 1 SHIFT PER DAY: (8 HOURS) Republic of the Philippines Department of Public Works and Highways OFFICE OF T HE REGIONAL DIRECT OR Regional Office VII South Road Properties (SRP), Cebu City CONSTRUCTION SCHEDULE FOR MANDAUE-MACTAN BRIDGE 1 REPAIR S1 S2 S3 S4 S5 S6 S7 S8 S9 S10 S11 S12 S13 S14 37.2 m. 37.2 m. 37.2 m. 37.2 m. 50 m. 50 m. 112 m. 144 m. 112 m. 50 m. 50 m. 37.2 m. 37.2 m. 37.2 m. L/S R/S SCHEDULE FOR THE RIGHT SIDE S1 & S14 (R/S) = 74.4 m. Feb. 8-21, 2016 (14 days) S2 & S13 (R/S) = 74.4 m. Total Length = 148.8 m. Feb. 22-Mar. 6, 2016 (14 days) S3 & S12 (R/S) = 74.4 m. Total Length = 148.8 m. Mar. 7-22, 2016 (16 days) S4 & S11 (R/S) = 100 m. Total Length = 336 m. Mar. 23-Apr. 9, 2016 (18 days) S5 & S10 (R/S) = 100 m. Total Length = 436 m. Apr. 10-27, 2016 (18 days) S6 & S9 (R/S) = 162 m. Total Length = 598 m. Apr. 28-May 25, 2016 (28 days) S7 & S8 (R/S) = 256 m. Total Length = 854 m. May 26-July 8, 2016 (44 days) SCHEDULE FOR THE LEFT SIDE S1 & S14 (L/S) = 74.4 m. Jul. 9-22, 2016 (14 days) S2 & S13 (L/S) = 74.4 m. Total Length = 148.8 m. Jul. 23-Aug. 5, 2016 (14 days) S3 & S12 (L/S) = 74.4 m. Total Length = 148.8 m. Aug 6-21, 2016 (16 days) S4 & S11 (L/S) = 100 m. Total Length = 336 m. Aug 22-Sep 8, 2016 (18 days) S5 & S10 (L/S) = 100 m. Total Length = 436 m. Sep 9-26, 2016 (18 days) S6 & S9 (L/S) = 162 m. Total Length = 598 m. Sep. 27-Oct. 24, 2016 (28 days) S7 & S8 (L/S) = 256 m. Total Length = 854 m. Oct. 25-Dec. 7, 2016 (44 days) Plus 16 days for Curing & Asphalting in S7 & S8 (L/S) The Bridge will be passable (2 Lanes) on December 23, 2016 Total of 320 Calendar Days (1 shift = 8 hrs) ESTIMATED DURATION FOR 2 SHIFTS PER DAY: (16 HOURS) Republic of the Philippines Department of Public Works and Highways OFFICE OF THE REGIONAL DIRECTOR Regional Office VII South Road Properties (SRP), Cebu City CONSTRUCTION SCHEDULE FOR MANDAUE-MACTAN BRIDGE 1 REPAIR S1 S2 S3 S4 S5 S6 S7 S8 S9 S10 S11 S12 S13 S14 37.2 m. 37.2 m. 37.2 m. 37.2 m. 50 m. 50 m. 112 m. 144 m. 112 m. 50 m. 50 m. 37.2 m. 37.2 m. 37.2 m. L/S R/S SCHEDULE FOR THE RIGHT SIDE S1 & S14 (R/S) = 74.4 m. Feb. 8-14, 2016 (7 days) S2 & S13 (R/S) = 74.4 m. Total Length = 148.8 m. Feb. 15-21, 2016 (7 days) S3 & S12 (R/S) = 74.4 m. Total Length = 148.8 m. Feb. 22-29, 2016 (8 days) S4 & S11 (R/S) = 100 m. Total Length = 336 m. Mar. 1-9, 2016 (9 days) S5 & S10 (R/S) = 100 m. Total Length = 436 m. Mar. 10-18, 2016 (9 days) S6 & S9 (R/S) = 162 m. Total Length = 598 m. Mar. 19-Apr. 1, 2016 (14 days) S7 & S8 (R/S) = 256 m. Total Length = 854 m. Apr. 2-23, 2016 (22 days) SCHEDULE FOR THE LEFT SIDE S1 & S14 (L/S) = 74.4 m. Apr. 24-30, 2016 (7 days) S2 & S13 (L/S) = 74.4 m. Total Length = 148.8 m. May 1-7, 2016 (7 days) S3 & S12 (L/S) = 74.4 m. Total Length = 148.8 m. May 8-15, 2016 (8 days) S4 & S11 (L/S) = 100 m. Total Length = 336 m. May 16-24, 2016 (9 days) S5 & S10 (L/S) = 100 m. Total Length = 436 m. May 25-Jun. 2, 2016 (9 days) S6 & S9 (L/S) = 162 m. Total Length = 598 m. Jun. 3-16, 2016 (14 days) S7 & S8 (L/S) = 256 m. Total Length = 854 m. Jun. 17- Jul. 8, 2016 (22 days) Plus 16 days for Curing & Asphalting in S7 & S8 (L/S) The Bridge will be passable (2 Lanes) on July 24, 2016 Total of 168 Calendar Days (2 shifts = 16 hrs) TRAFFIC ADVISORY EFFECTIVE FEBRUARY 8, 2016, THE MANDAUE-MACTAN BRIDGE 1 WILL BE PARTIALLY CLOSED FOR ITS ON-GOING REPAIR. THERE WILL BE A SINGLE LANE OPEN FOR THE SAID BRIDGE AND TRAVELLING PUBLIC ARE ADVISED TO TAKE ALTERNATIVE ROUTES GOING TO MARCELO FERNAN BRIDGE. PLEASE BEAR WITH US SORRY FOR THE INCONVENIENCE DPWH – REGION VII JEGMA CONST. & DEV’T. CORP.