View the Bi-Weekly Project Update Flyer - I
Transcription
View the Bi-Weekly Project Update Flyer - I
Construction News Bi-Weekly Project Update July 11 – July 23, 2016 Rehabilitation of Bridge No. 00163A, I-95 over West River and State Route 745 in the Towns of West Haven and New Haven INSIDE THIS NEWSLETTER: Interstate Impacts/Local Road Impacts/Potential Vibration/Noise Construction Activities/Site Progress Photos/Work Zone Safety Tips INTERSTATE IMPACTS: - Right lane closure on I-95 SB between Exits 46 and 43 on Friday night, July 15, 2016, for roadway work associated with the opening of the new ramp from Ella T. Grasso Boulevard to I-95 SB. See attached CTDOT Press Release. LOCAL ROAD IMPACTS: - Construction of parapets for new I-95 SB Stage 2 Bridge over Ella T. Grasso Boulevard. - Roadway work for new I-95 SB Exit 44 ramp to Ella T. Grasso Boulevard. - Roadway work on new I-95 SB approaches to Bridge No. 164 over Ella T. Grasso Boulevard and Bridge No. 163 over the West River. POTENTIAL VIBRATION/NOISE CONSTRUCTION ACTIVITIES: - Daytime activities that may create vibrations and/or noise are scheduled to occur throughout the period from Monday, July 11, 2016 to Saturday, July 23, 2016. ”DON’T WRECK YOUR SUMMER” TIPS: - Warmer weather attracts many types of roadway users, including motorcyclist, bicyclists, and pedestrians, so please be alert. - Avoid changing the radio station, opening your sunroof, eating that delicious ice cream, or anything that may distract you from the road while driving. - Rear-end crashes are the most common on work zones, so keep a safe distance between cars. - Keep your vehicle hydrated by checking proper fuel levels; just like us they need their fluids. - Sunglasses are not just accessories; they help avoid the sun’s glare, which may cause accidents as it impairs visibility. - Always wear your seatbelt, why pay a fine when you can save lives. Newly Completed Bridge No. 163 Concrete Deck Bridge No. 164 Abutment 2 Prior to Backfill Application of the Membrane Waterproofing on Bridge No. 163 FOR MORE INFORMATION CONTACT: Project Resident Engineer George Cooper Office: 475-238-8538 Connecticut Department of Transportation Project Engineer Ghazi Alsaqri Office: 475-238-8538 The Connecticut Department of Transportation is working to inform local residents of current and upcoming construction activities through bulletins such as this. For additional information on this Project and other Projects, please visit the Connecticut Department of Transportation Project website: (www.i95westriver.com). Please feel free to contact [email protected] with any questions, concerns or to add your contact information to our distribution list.