STUDIO PETRETTI
Transcription
STUDIO PETRETTI
STUDIO PA REC TH IRT EEC TTUTR EI WWW.STUDIOPETRETTI.COM amanda petretti : architect LANGANO APARTMENTS PORTLAND, OR Works Partnership Architecture Project Architect, CA, June 2015 UNITARIAN UNIVERSALISTS OF CENTRAL OREGON NEW HOME PROJECT, BEND, OR THA Architecture Project Architect, Design, Pursuit,18,000gsf, $7.8M, 2014 K yle 7 0 K le y 7 0 VAN E2 E1 G UP KGBUILDING PORTLAND, OR Works Partnership Architecture Project Architect, 22,750gsf, $3.4M, 2015 LEWIS INTEGRATIVE SCIENCE BUILDING, UNIVERSITY OF OREGON THA Architecture Design Assist, Detailing, CA, 104,000gsf, $43M, 2012 LEED PLATINUM_168 kbtu/sf/yr EUI_ 60% BETTER THAN AVG_50% BETTER THAN CODE BLDG FELTON PROPERTIES HEADQUARTERS PORTLAND, OR Works Partnership Architecture Project Architect, Interior Finishes & Furniture, 2014 FRY RESIDENCE SUNSHINE CANYON, BOULDER, CO THA Architecture Design Refinement, Detailing, 3,000gsf, 2013 LINCOLN-JUAREZ VEHICLE PROCESSING FACILITY GENERAL SERVICES ADMINISTRATION THA Architecture Schematic Design, 40,000 gsf bldg, $35 M, 2013 44 kbtu/sf/yr EUI w/ on-site PV 42% BETTER THAN CODE BLDG LENTS TOWN CENTER REDEVELOPMENT FEASIBILITY STUDY PORTLAND DEVELOPMENT COMMISSION THA Architecture Pursuit, Planning, Concept, 2008 CROSSROADS MAIN STREET FABRIC URBAN DESIGN CONCEPT SE HAROLD ST Legend ENCOURAGE MAIN STREET ENVIRONMENT ON SE 92 AVE: CLUSTER APPROPRIATE USES Main Street Couplet Activity Node SE ELLIS ST Boys & Girls Club LTC Entry SE 88TH AVE SE REEDWAY ST SE REEDWAY ST EXTEND THE STREET FABRIC INTO THE LTC AND CONNECT NEW DEVELOPMENT TO LIGHT RAIL CREATE PEDESTRIAN SCALE BLOCKS WITH FREQUENT STREET CROSSINGS FOS TER RO AD I - 205 SE RAMONA ST CREATE PUBLIC PLAZA ON 92 AVE SIGNAL WESTERN ENTRY WITH STRONG COMMERCIAL DEVELOPMENT SE 91ST AVE LTC / FOSTER RD STATION TRIMET GREEN LINE WOODSTOCK BLVD SUPPORT COMMERCIAL GATEWAY: MAXIMIZE THE VALUE OF THE FOSTER WOODSTOCK COUPLET SE 92ND AVE SE 90TH AVE SE 89TH AVE SE 88TH AVE SIGNAL EASTERN ENTRY WITH GATEWAY ART PROJECT WO OD STO CK Relocate Carnegie Library SE HAROLD ST SE HAROLD ST Boys & Girls Club SE ELLIS ST RO AD Library/CC/ Community Cntr TER SF Housing Converted to Retail Specialty Grocery w/ Mixed Use RO SE RAMONA ST AD LTC / FOSTER RD STATION LTC / FOSTER RD STATION LTC / FOSTER RD STATION LIbrary/ CC SE 91ST Ave SE 91ST Ave SE 91ST Ave 5 FOS SE RAMONA ST I - 205 SE RAMONA ST Carnegie Library SE 91ST Ave TER SE REEDWAY ST CC Grocery Parking FOS Specialty Grocery REDEVELOPMENT FEASIBILITY STUDY SE REEDWAY ST SE REEDWAY ST SE 88TH AVE SE REEDWAY ST Boys & Girls Club SE ELLIS ST SE 88TH AVE SE 88TH AVE It is essential that redevelopment efforts encourage a variety of uses that will attract localSE REEDWAY and ST non-local residents to work, shop, and play in the LTC. With specific improvements, the Foster - Woodstock Couplet presents a unique SE REEDWAY ST opportunity for the business district to exploit existing traffic patterns to attract customers to keystone businesses. The couplet has the capacity to function as a commercial gateway to the town center. Currently, many visitors to Lents pass through the area via the couplet and are unaware of the businesses in the LTC. ForFOthis reason, it STE R D is important to mark the entry to the town center with gateway elements to create awareness about theROAchanging character of the LTC. It is recommended that the western entry to the couplet be reinforced with strong mixed-use development that departs from the established character of many existing Foster Road businesses. The eastern entry to the town center, beneath the I-205 overpass should be signaled with the completion of the Gateway Art Project. Grocery Parking WOODSTOCK BLVD WOODSTOCK BLVD KB OU LE VA R D SE 92ND AVE D ST OC SE 90TH AVE VA R OD SE 89TH AVE LE WO SE 88TH AVE OU SE 92ND AVE KB SE 90TH AVE ST OC Specialty Grocery WOODSTOCK BLVD SE 89TH AVE OD SE 88TH AVE SE 92ND AVE SE 90TH AVE SE 89TH AVE SE 88TH AVE WO SE HAROLD ST Boys & Girls Club I - 205 Relocate Carnegie Library The redevelopment scenarios presented in this study support the development of an active mixed-use town Legend center with New Street Connection a strong connection to the surrounding neighborhood. To achieve this goal, pedestrian-oriented development is Commercial focused on SE 92nd Ave to encourage a strong main street environment. The street structure of the surrounding New Ground Floor Retail Office area is extended into the town center to decrease the scale of existing super-blocks and increase the frequency of Housing SE ELLIS ST pedestrian crossings. Extending the street grid increases developable street frontage and increases theCivicon-street Space Public Plaza parking supply within the LTC. Creating improved street connections will also allow new development to capitalize on Existing Properties to transit access and improve site access. be Renovated WO Grocery Parking OD ST OC KB OU LE VA R D MONTEREY BAY NATIONAL MARINE SANCTUARY DISCOVERY CENTER, SANTA CRUZ, CA THA Architecture Design Development thru Construction Documents10,000 gsf, $6.5 M, 2011 DOWNSTREAM WORLD HEADQUARTERS PORTLAND, OR THA Architecture Schematic Design, 70,000 gsf, Unbuilt 2012 QuaNTITy aND QuaLITy Downstream Office Design: Upper Level Reception MTG/Office Storage WC, Stair, Elevator MTG MTG MTG Waiting MTG Tech Lab MTG Studio/Office Stair QuaNTITy aND QuaLITy: BuILDING PrOGram aND COmParaBLE PrOjECTS 35 Downstream Office Design: Lower Level Gallery Materials Library MTG/Office MTG/Office WC, Stair, Elevator MTG MTG/Office Kitchen MTG MTG/Office Lounge MTG Outdoor Lounge 34 HQ Feasibility Study Studios/Office 06 0606 mar mar mar 2012 2012 2012 NDIX: ENDIX: NDIX: STuDy STuDy STuDy OF OF OF DESIGN DESIGN DESIGN OPTIONS OPTIONS OPTIONS nfiguration onfiguration figuration ctect team team team studied studied studied 33building building 3 building masses masses masses on onon the thethe site site site asking asking asking uestions stions tions for forfor each each each one: one: one: hat atwhat part part part ofofthe the of the site sitesite can cancan Downstream Downstream Downstream be belocated? be located? located? does oes w does Downstream Downstream Downstream take take take advantage advantage advantage ofofviews views of views and and and eractions ctions tions with with with the thethe urban urban urban landscape? landscape? landscape? sis atthe the is the shape shape shape and and and proportion proportion proportion ofofthe the of the Downstream Downstream Downstream space? space? space? do ow you do youyou enter enter enter the thethe building/site? building/site? building/site? does oes w does the thethe scheme scheme scheme work work work within within within the thethe urban urban urban fabric? fabric? fabric? does oes w does the thethe scheme scheme scheme change change change atatdifferent different at different scales scales scales ofofprogram program of program mall/medium/large)? medium/large)? /medium/large)? w sthe the is the unbuilt unbuilt unbuilt portion portion portion ofofthe the of the site sitesite dealt dealt dealt with with with ––parking parking – parking etc? etc? etc? AA(1-2) A (1-2) (1-2) BB(1-3) B(1-3) (1-3) CC(1-2) C(1-2) (1-2) Example of solid bar office scheme Solid Bar mtg mtg studio studio Broken Bar storage office materials office wc guest office mtg studio wc servers kitchen lounge tech lab studio office office open mtg + gathering office office guest office mtg studio office office open mtg + gathering studio office office mtg mtg studio studio office office Solid Bar reception + waiting guest office offices Wider and More Equal-Sided? offices office office mtg mtg studio studio office office offices materials wc kitchen lounge mtg tech lab gallery HQ Feasibility Study mtg kitchen loungestudios studios 48 Teams may be larger or smaller therefore different sized spaces are required studios • mtg Team studio format surrounded by tall vertical pin up space rules out large open office floor studios storage • servers Downstream envisions a variety of spaces with different levels of acoustic privacy mtg wc • Interior workspace relationships storage The Field or Folder Plane approaches were preferred for their flexibility in space making. servers guest office offices gallery reception + waiting wc Folded Planes studio Wider and More Equal-Sided? OR The project team explored ways offices can be organized in order to inform the building shape on the site Alternating Rhythm OR Long and Narrow? Field reception + waiting gallery Long and Narrow? studio aPPENDIX: STuDy OF DESIGN OPTIONS mtg studio studios WAy SITE TO A DESIGN DISTRICT Union Station Parking Future Amtrak garage hotel site Ziba design + Jama Software ew ay ac ce ss Broadway Bridge over Willamette River fre NW N orthru to do w NW nt ow n Na ito Pa rk w ay p gateway into the Pearl Dist rict NW 9th activity node with building entries on to NW er aerial view from Encore residential tower gateway view into Pearl District from NW 9th Ov e-b l “T ock he Fie ld O P F to n s” Pa rk Pinnacle residential tower