1 2 Sices SPA PE Main Subcontractor for all the work discipline in Burgas Project Supervisors Staff Employed N. 200 (more than 60% Local employed) Sices POLSKA PE Subcontractor for Mechanical Activities Manpower N. 1.500 Indirect Staff N. 100 (more than 50% Local employed) (more than 40% Local employed) Consortium SICES – AKZ Maintenance Contract awarded from Lukoil and other Projects under execution Manpower N. 600 (100% Local) Indirect Staff N. 30 ( 98% Local, 2% Italian) 3 Oil & Gas Power Petrochemical Infrastructure Maintenance 4 NEW PLANTS, TURN KEY PLANTS NEW PLANTS, TURN KEY PLANTS • New plants: mechanical erection • Turn key plants: skid, packages and modules erection • Heavy lifting management • Site completion / assembling of workshop items (including piping prefabrication) CONSTRUCTION ACTIVITIES MAINTENANCE & TURN AROUND MAINTENANCE & TURN AROUND • Ordinary & extraordinary maintenance services • Turn around services during plants shut-down • Special interventions on Fluid Catalytic Cracking plants • Revamping on short call emergency cases 5 AREA 2 MAIN CONSTRUCTION AREA 1 SITE MAIN TEMPORARY 1 MAIN ENTRANCE parking trucks BUS / PERSONAL ROUTE 1st bus stop existing fence CONSTRUCTION Post office / training room / alcool test Pedestrian entrance (already existing) existing fence fence Lukoil FACILITIES SICES Support depot fence civil 1 civil 2 civil 3 Change rooms fence porter's lodge Lukoil 2nd bus stop Valves depot SICES fence GATE 5 ENTRANCE new fence (trucks & materia ls) EXIT instrumental workshop 1 electrical workshop 1 mechanical workshop 1 instrumental workshop 2 electrical workshop 2 insulation workshop 2 mechanical workshop 2 insulation workshop 2 -pipes -pipe rack -fitting mechanical workshop 3 painting workshop change room construction site offices office canteen new fence infirmary fence Steel structure fence fence Steel structure fence Technip / Sices offices Covered depot fence fence fence Fenced area Fenced area fence fence fence TECHNIP / SICES OFFICES Reel & cable area Spool Spool fence fence fence Spool Spool fence fence Machinery fence Machinery fence fence fence Insulation depot fence 6 New “Heavy Residue Process Complex first phase” to be constructed in LUKOIL NEFTOCHIM BOURGAS Refinery. The Complex is composed by the following sections under Licensor AXENS design or TECHNIP technology: H-Oil: the final product is mainly heavy gasoil (2.5 Million of T/y of vacuum residue) Amine: to remove the excess of Sulphur content in the hydrocarbons Sour Water Stripper: to treat all the water flows (acid and basic) Hydrogen Production: production capacity 77.500 Nm3/h with 100% H2 purity Utilities and Off-Sites 7 Sices is the “Nominated Construction Subcontractor”. Sices is providing the following activities directly or through subsubcontractors: Civil Works (quantity more than 33.500 m3 of concrete, 1.500.000 man hours) Heavy Lifts (reactors weight 1.400 tons each) Piping Prefabrication (at jobsite or in workshops 6.000 tons) Piping Erection (12.500 tons) Steel Structures Erection (13.500 tons) Field Painting (305.000 m2) and Insulation (350.000 m2) Mechanical Erection (38.000 tons) Electrical and Instrumentation Works Field Fire Proofing Installation (100.000 m2) Temporary Construction Facilities 8 The project started in January 2012 and the RFSU is foreseen in the first quarter of 2015. The scheduled direct man hours are over 9.000.000 and the peak of Direct and Indirect people at site is more than 3.500 (70% of Local Personnel) The total amount of steel structures to be installed is more than 13.500 Tons, the above ground piping is more than 12.500 Tons, the under ground piping is more than 28.000 Lm. Civil works are more than 33.500 m3 of concrete, progress achieved 90% 30 Main Subcontractors, over 200 Sub-Subcontractors/Suppliers 9 10 11 12 OUR ORGANIZATION SICES 1958 100% 77,19% 100% SICES ENGINEERS& CONTRACTORS 60% STEELELECTRO CANADA SICES REAL ESTATE SICES INTERNATIONAL SICES BULGARIA SICES POLSKA 24% ASSI 20% DOS 99,99% 14% 99,75% 100% SICES MISR 100% 100% FLUITEK ORSENIGO VALVES PENSOTTI FCL SICES 33% 33,33% SBI SICES MONTAZ 62% 60% MECAER AVIATION GROUP SICES AKZ HOLDING EQUIPMENT DIVISION BOILERS DIVISION VALVES DIVISION CONSTRUCTION DIVISION REAL ESTATE OTHERS 14 589 554 The data within this slide are considering only the Personnel permanently employed by the Group. 195 125 114 44 2,65% OTHER EXTRA UE 39 2,35% 6,87% OTHER (EU) LITHUANIA 11,75% 7,53% 33,37% 35,48% ROMANIA BULGARIA POLAND ITALY 1.660 1.509 151 9,10% 90,90% 100,00% FEMALES MALES TOTAL 15 MAIN FINANCIAL DATA EUR in .000 CAGR 14,5% 500.000 450.000 GROWTH IN 12 YEARS: 400.000 5 TIMES 350.000 300.000 250.000 200.000 150.000 100.000 50.000 - 2002* * Aggregated data 2003* 2004* 2005* 2006 2007 2008 2009 2010 2011 2012 2013F* 2014B* 17 500.000 EUR in .000 450.000 400.000 350.000 300.000 250.000 200.000 150.000 100.000 50.000 2002* 2003* 2004* 2005* 2006 2007 2008 2009 2010 2011 2012 2013F* 2014B* 2002* 2003* 2004* 2005* 2006 2007 2008 2009 2010 2011 2012 2013F* 2014B* 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% * Aggregated data Boilers Valves Pressure Equipment Construction 18 DOWNSTREAM 21% GENERAL INDUSTRY 7% UPSTREAM 52% ECOLOGY & GREEN ENERGY 6% POWER 14% 19 ITALY 20 EUROPE 21 RUSSIA & former SOVIET UNION 22 NORTH AMERICA 23 SOUTH AMERICA 24 MIDDLE EAST 25 FAR EAST 26 AFRICA 27 28
Similar documents
past projects - Barnescoins.com
Teri Barnes, CIC Teri Barnes has utilized her Bachelor of Science degree in Insurance combined with 35 years experience to provide solutions to her clients’ volatile construction risk management n...
More information