Diapositiva 1 - Confindustria Bulgaria

Transcription

Diapositiva 1 - Confindustria Bulgaria
1
2
 Sices SPA PE
Main Subcontractor for all the work discipline in Burgas Project
Supervisors Staff Employed
N. 200 (more than 60% Local employed)
 Sices POLSKA PE
Subcontractor for Mechanical Activities
Manpower
N. 1.500
Indirect Staff
N. 100
(more than 50% Local employed)
(more than 40% Local employed)
 Consortium SICES – AKZ
Maintenance Contract awarded from Lukoil and other Projects under execution
Manpower
N. 600 (100% Local)
Indirect Staff
N. 30 ( 98% Local, 2% Italian)
3
 Oil & Gas
 Power
 Petrochemical
 Infrastructure
 Maintenance
4
NEW PLANTS,
TURN KEY
PLANTS
NEW PLANTS, TURN KEY
PLANTS
• New plants: mechanical
erection
• Turn key plants: skid,
packages and modules
erection
• Heavy lifting management
• Site completion / assembling
of workshop items (including
piping prefabrication)
CONSTRUCTION
ACTIVITIES
MAINTENANCE
&
TURN AROUND
MAINTENANCE & TURN
AROUND
• Ordinary & extraordinary
maintenance services
• Turn around services during
plants shut-down
• Special interventions on
Fluid Catalytic Cracking
plants
• Revamping on short call
emergency cases
5
AREA 2
MAIN CONSTRUCTION
AREA 1
SITE
MAIN TEMPORARY
1 MAIN ENTRANCE
parking trucks
BUS / PERSONAL ROUTE
1st bus stop
existing fence
CONSTRUCTION
Post office / training room / alcool test
Pedestrian
entrance
(already existing)
existing fence
fence
Lukoil
FACILITIES
SICES
Support depot
fence
civil 1
civil 2
civil 3
Change rooms
fence
porter's lodge
Lukoil
2nd bus stop
Valves depot
SICES
fence
GATE
5
ENTRANCE
new fence
(trucks & materia ls)
EXIT
instrumental workshop 1
electrical workshop 1
mechanical workshop 1
instrumental workshop 2
electrical workshop 2
insulation workshop 2
mechanical workshop 2
insulation workshop 2
-pipes
-pipe rack
-fitting
mechanical workshop 3
painting workshop
change room
construction site offices
office
canteen
new fence
infirmary
fence
Steel structure
fence
fence
Steel structure
fence
Technip / Sices offices
Covered depot
fence
fence
fence
Fenced
area
Fenced area
fence
fence
fence
TECHNIP / SICES
OFFICES
Reel & cable area
Spool
Spool
fence
fence
fence
Spool
Spool
fence
fence
Machinery
fence
Machinery
fence
fence
fence
Insulation depot
fence
6

New “Heavy Residue Process Complex first phase” to be constructed in LUKOIL
NEFTOCHIM BOURGAS Refinery.

The Complex is composed by the following sections under Licensor AXENS design
or TECHNIP technology:
 H-Oil: the final product is mainly heavy gasoil (2.5 Million of T/y of
vacuum residue)
 Amine: to remove the excess of Sulphur content in the hydrocarbons
 Sour Water Stripper: to treat all the water flows (acid and basic)
 Hydrogen Production: production capacity 77.500 Nm3/h with 100% H2
purity
 Utilities and Off-Sites
7
 Sices is the “Nominated Construction Subcontractor”.
 Sices is providing the following activities directly or through subsubcontractors:
 Civil Works (quantity more than 33.500 m3 of concrete, 1.500.000 man
hours)
 Heavy Lifts (reactors weight 1.400 tons each)
 Piping Prefabrication (at jobsite or in workshops 6.000 tons)
 Piping Erection (12.500 tons)
 Steel Structures Erection (13.500 tons)
 Field Painting (305.000 m2) and Insulation (350.000 m2)
 Mechanical Erection (38.000 tons)
 Electrical and Instrumentation Works
 Field Fire Proofing Installation (100.000 m2)
 Temporary Construction Facilities
8
 The project started in January 2012 and the RFSU is foreseen in the first
quarter of 2015.
 The scheduled direct man hours are over 9.000.000 and the peak of
Direct and Indirect people at site is more than 3.500 (70% of Local
Personnel)
 The total amount of steel structures to be installed is more than 13.500
Tons, the above ground piping is more than 12.500 Tons, the under ground
piping is more than 28.000 Lm.
 Civil works are more than 33.500 m3 of concrete, progress achieved 90%
 30 Main Subcontractors, over 200 Sub-Subcontractors/Suppliers
9
10
11
12
OUR
ORGANIZATION
SICES
1958
100%
77,19%
100%
SICES
ENGINEERS&
CONTRACTORS
60%
STEELELECTRO
CANADA
SICES
REAL
ESTATE
SICES
INTERNATIONAL
SICES
BULGARIA
SICES
POLSKA
24%
ASSI
20%
DOS
99,99%
14%
99,75%
100%
SICES MISR
100%
100%
FLUITEK
ORSENIGO
VALVES
PENSOTTI
FCL
SICES
33%
33,33%
SBI
SICES
MONTAZ
62%
60%
MECAER
AVIATION
GROUP
SICES AKZ
HOLDING
EQUIPMENT
DIVISION
BOILERS
DIVISION
VALVES
DIVISION
CONSTRUCTION
DIVISION
REAL
ESTATE
OTHERS
14
589
554
The data within this slide
are considering only the
Personnel permanently
employed by the Group.
195
125
114
44
2,65%
OTHER
EXTRA UE
39
2,35%
6,87%
OTHER (EU) LITHUANIA
11,75%
7,53%
33,37%
35,48%
ROMANIA
BULGARIA
POLAND
ITALY
1.660
1.509
151
9,10%
90,90%
100,00%
FEMALES
MALES
TOTAL
15
MAIN
FINANCIAL
DATA
EUR in .000
CAGR 14,5%
500.000
450.000
GROWTH IN 12 YEARS:
400.000
5 TIMES
350.000
300.000
250.000
200.000
150.000
100.000
50.000
-
2002*
* Aggregated data
2003*
2004*
2005*
2006
2007
2008
2009
2010
2011
2012 2013F* 2014B*
17
500.000
EUR in .000
450.000
400.000
350.000
300.000
250.000
200.000
150.000
100.000
50.000
2002*
2003*
2004*
2005*
2006
2007
2008
2009
2010
2011
2012
2013F*
2014B*
2002*
2003*
2004*
2005*
2006
2007
2008
2009
2010
2011
2012
2013F*
2014B*
100%
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
* Aggregated data
Boilers
Valves
Pressure Equipment
Construction
18
DOWNSTREAM
21%
GENERAL
INDUSTRY
7%
UPSTREAM
52%
ECOLOGY &
GREEN ENERGY
6%
POWER
14%
19
ITALY
20
EUROPE
21
RUSSIA &
former SOVIET
UNION
22
NORTH
AMERICA
23
SOUTH
AMERICA
24
MIDDLE
EAST
25
FAR EAST
26
AFRICA
27
28

Similar documents

past projects - Barnescoins.com

past projects - Barnescoins.com Teri Barnes, CIC Teri Barnes has utilized her Bachelor of Science degree in Insurance combined with 35 years experience to provide solutions to her clients’ volatile construction risk management n...

More information