02 Bertrand van Leersum DOWES

Transcription

02 Bertrand van Leersum DOWES
Dutch Offshore Wind Energy
Services
December 1st, 2009
Den Helder
Bertrand van Leersum, ATO
This project (Dutch Offshore Wind Energy
Services) has been cofinanced with support of
the European Fund for Regional Development
of the European Commission
Associatie Technologie Transfer
Product- & market developer in the field of sustainable
technologies
Product&
Business
development
Investment
&
participation
Technology&
Market
Development
2
Associatie Technologie Transfer
Product&
Business
development
Investment
&
participation
Technology&
Market
Development
3
O&M in offshore wind energy
O&M aspects as by now:
•
Economical life time 20 year
•
Small marges
•
Maintenance by individual OEM
•
Waranty period
•
Continous development of
•
Growth in logistical supply
•
Upscaling…..
0W
8
technology s A3 !
m
rbu 80
i
A am
chain
sp
ing
Source: EWEA, 2009
Combining expertises
Combining expertises
D OWES: the project
4 year developmentproject
•
Development of an integral system
•
Optimising operation & maintenance activities
•
Minimal downtime
•
Optimal costs
D OWES: The focus
Focus area’s:
•
Development of corrosion sensors for tower
condition monitoring
•
Development of fibre optic sensors for blade
condition monitoring
•
Data warehousing and processing
•
Integration of spare part management
•
Logistical planning and service
•
Costs optimizing
•
Operational & Strategic deciscion support
Corrosion Sensors: The importance
source: www. iicorr.com
Fibre optic sensors
Source: www.
basinelectric.wordpress.com
Source: www. basinelectric.wordpress.com
Operation and Maintenace
Cost Estimator
D OWES: the project
User defined input
DATA
OMCE calculator
GENERAL DATA
+ maintenance reports
+ vessel transfer plans
+ contracts
+ weather
+ ….
Resultaten
scenario studies
AMICO
Lange termijn
advies
OMCE-BB
WT DATA
+ scada
+ sensoren:
loads,
conditining monitoring
corrosion
temperatures
User
interface
Decision support rules
Data reductie
FOBM
+ ….
Special purpose software:
FOBM, corrosie
Korte termijn
advies
USER
Logistic Supply Chain
Construction &
Engineering
Operator
Offshore
windpark
WT Manufactures
Subsuppliers
Retrofit
suppliers
Spare
Parts
Harbour
personel
Technical
Personnel
Vessel
Safety
Spare Part
suppliers
D OWES System
Second order actors
Education &
Training
Equipement
suppliers
Assets
suppliers
Information Process flow
Other:
-Weather
- Contracts
Operator
Construction &
Engineering
WT Manufactures
Subsuppliers
Retrofit
suppliers
Harbour
personel
Spare
Parts
Technical
Personnel
Vessel
Safety
Spare Part
suppliers
D OWES System
Windpark
Data
WT:
SCADA
Production
Sensors
….
Transformer
Station
….
Structuring the system process
7 Monitoring &
Control domains:
Process
System
•Evironmental
Condition
•System Conditions
•Maintenance
•Logistics
•Production
•System Control
•Cost Effectiveness
•Planning /
Prediction
•Observation
•Orientation
•Decision
•Action
•Evaluation
•SW & HW infr.
•Data sources
•Effectors
•Repositories
•SW applications/
•Algorithms
•User interface
Structuring the system process
System
SW & HW Infrastructure
Sensors / Data sources
Effectors
Process
Repositories
SW Applications / Algorithms
User Interface
Cost Effectiveness
System Control
Monitoring & Control
Production
Domains
Maintenance
System Condition
Environment
User perspective…
….or users!
Performance
driven contracts
Providing
information
D OWES: The potential
Owners Wind Farms
• Service Level Agreements
• Performance Reports
• Statistics
Operator room
Contract based authorisations
• Service Levels
• ILS procedures
• Spare Parts Management
D OWES: The potential
LogisticOperations
Operations
Logistic
LogisticOperations
Operations
Logistic
Remote
Remote
Control
Control
OperatorRoom
RoomDen
Den
Operator
Helder
Helder
Internet
Internet
ManagementInformation
Informationby
byBlack
Black
Management
Berry
Berry
OperatorRoom
Room
Operator
Dortmund
Dortmund
Thank you for your attention!
Contact

Similar documents

planung projektentwicklung projektmanagement örtliche bau

planung projektentwicklung projektmanagement örtliche bau PLANUNG PROJEKTENTWICKLUNG PROJEKTMANAGEMENT ÖRTLICHE BAU AUFSICHT MAKLER I BAUTRÄGER TRANSAKTIONEN

More information

Power Supply System

Power Supply System for existing Rail Vehicles

More information