See Residential Projects
Transcription
See Residential Projects
RESIDENTIAL September 1, 2014 Localitation AJURIAGUERRA 3, S.L.P. Alameda Mazarredo, 63 1D 48009 Bilbao Bizkaia Spain Tel. (+34) 944 240 951 Fax (+34) 944 236 822 [email protected] www.aj3.net Residential Works 1.Residential Description Location Year ∙ 12 Multi-family Building in Zeberio Vizcaya. 2012 ∙ 7 Single-family Houses Complex in Gorliz Vizcaya. 2012 ∙ 116 Residential Complex in Torrelavega Cantabria. 2011 ∙ 84 Multi-family Building in Balmaseda Vizcaya. 2010 ∙ 120 Residential Complex in Bakio Vizcaya. 2009 ∙ 6 Multi-family Building in Bakio Vizcaya. 2008 ∙ 162 Residential Complex in Santurtzi Vizcaya. 2006 ∙ 22 Multi-family Building in Bilbao Vizcaya. 2005 ∙ 7 Multi-family Building in Bakio Vizcaya. 2005 ∙ 20 Multi-family Building in Mundaka Vizcaya. 2004 ∙ 35 Single-family Houses Complex in Mungia Vizcaya. 2003 ∙ 36 Residential Complex in Sondika Vizcaya. 2002 ∙ 52 Multi-family Building in Bermeo Vizcaya. 2001 ∙ 46 Multi-family Building in Derio Vizcaya. 2000 ∙ 16 Multi-family Building in Eibar Guipuzcoa. 2000 12 Multi-family Building_Zeberio ∙ Client: Promociones Ibailuce S.L. (Private Promoter) ∙ 2011-2012 ∙ Net developable area: 1,055.55 sqm ∙ Residential buildable area: 1,320.00 sqm ∙ Number of houses: 12 ∙ Urban development cost: 118,954.27 € ∙ Building construction cost: 969,067.95 € Proposes the development of a residential area promoted by the private sector, destined to serve the demand of residential Family Housing in Zeberio – Vizcaya (Spain) It has been conceived as a high quality building in a rural environment. Single-family Houses Complex_Gorliz ∙ Client: Promociones Kipulene 2005 (Private Promoter) ∙ 2007-2011 ∙ Net developable area: 8,262.98 sqm ∙ Number of houses built: 6 ∙ Urban development cost: 764,983.38€ ∙ Building construction cost: 1,420,060.74€ Proposes the development of a residential area promoted by the private sector, destined to Single Family Housing isolated. It has been conceived as a high quality environment for 10 luxury single houses close to the beach area. Ground Floor 1st Floor Ground Floor 1st Floor 25 Multi-family Building_Balmaseda ∙ Client: Excavaciones Viuda de Sainz S.A.(Private Promoter) ∙ 2008-2010 ∙ Net developable area: 1,200.15 sqm ∙ Residential buildable area: 8,444.73 sqm ∙ Number of houses: 25 ∙ Urban development cost: 123,613.56€ ∙ Building construction cost: 4,040,661.38€ Proposes the development of a multi-family building and garages in the historic center of the medieval town of Balmaseda. It is built using noble materials and finishes according to the municipal design manual of the historic town of Balmaseda. Front Elevation River Elevation 116 Residential Complex_Torrelavega ∙ Client: Torrela 2005 S.L. (Private Promoter) ∙ 2008-2010 ∙ Total urban development area: 297,418.44 sqm ∙ Total residential Buildable area proposed: 109,905.70 sqm ∙ Total number of houses proposed: 944 ∙ Residential Buildable Area built: 16,162.82 sqm ∙ Number of houses built: 116 ∙ Urban development built cost : 895,697.58 € ∙ Building construction built cost: 6,893,016.54 € Proposes urban development in the area of residential expansion of the city of Torrelavega, near universities. Currently it’s been developed a residential complex with three residential buildings and garages, with recreational areas for private use. 120 Residential Complex_Bakio ∙ Client: Moldis Echarro (Private Promoter) ∙ 2008-2011 ∙ Urban development area: 79,298 sqm ∙ Public surface: 62,272 sqm ∙ Residential buildable area: 15,810 sqm ∙ Number of houses: 120 ∙ Urban development cost : 3,865,423€ ∙ Building construction built: 19,762,650 € Proposes the development of a residential area promoted by the private sector, destined to serve the demand of a varied residential typology (social housing, non-regulated dwellings, Single Family Housing isolated, etc...). It is proposed to complete the existing urban fabric in the town, providing the necessary infrastructures and resources for attending, not only the demands of the population of this new development, but also to alleviate certain existing deficiencies in the Municipality. It has been conceived as a high quality environment, where 78,5% of its surface is destined to public transfers, highlighting the design of a riparian area of 28.740 square meters and a public sports equipment of 28.740 m2 square meters 6 Multi-family Building in Bakio ∙ Client: Moldis Echarro (Private Promoter) ∙ 2005-2008 ∙ Urban development area: 2,715.24 sqm ∙ Public surface: 738.34 sqm ∙ Residential buildable area: 1,022.66 sqm ∙ Number of houses: 6 ∙ Urban development cost : 42,987.03€ ∙ Building construction cost: 568,178.59 € Proposes the development of a residential area promoted by the private sector, destined to serve the demand of residential Family Housing in Bakio – Vizcaya (Spain). It has been conceived as a high quality building in a rural environment by the beach. Ground Floor 1st Floor 2nd Floor 3rd Floor 162 Residential Complex_Santurtzi ∙ Client: Promociones Residenciales Loruri S.A. ∙ 2000-2006 ∙ Urban development area: 84,008.20 sqm ∙ Public surface: 33,295.30 sqm ∙ Residential buildable area: 42,610.04 sqm ∙ Number of houses: 162 ∙ Urban development cost : 7,986,167€ ∙ Building construction built: 21,736,192 € Proposes the development of a residential area promoted by the private sector, designed to give the town of Santurce an endowment of low density housing, away from the dense city. It is designed as a residential area of quality, high-quality environment, with large green areas, protected from the north by Mount Serantes, this location provides views south. 22 Multi-family Building_Bilbao ∙ Client: Moldis Echarro (Private Promoter) ∙ 2004-2006 ∙ Residential buildable area: 3,166.56 sqm ∙ Number of houses: 22 ∙ Building construction cost: 1,416,378.69 € The Example of Bilbao, in its most central, historical and financial area of the city, it is proposed to rehabilitate a building from the early 20th century to luxury homes . The rehabilitation proposed integrated action respecting building facades because its architectural and historical value of the building. Inside the homes will be enabled using the most current constructively, giving them all proper standards of luxury houses. 7 Multi-family Building_Bakio ∙ Client: Private Promoter ∙ 2003-2005 ∙ Urban development area: 691.47 sqm ∙ Residential buildable area: 1,325.47 sqm ∙ Number of houses: 7 ∙ Urban development cost : 35,128.69€ ∙ Building construction cost: 589,257.00 € In Bakio, tourist city because its beach, it proposes the development of a residential area promoted by the private sector, where there are 4 duplex houses with garden in the ground floor and 3 apartments with in the upper plants with large terraces facing the beach. It is been designed as a high quality modern building line in a resort area next to the beach of Bakio. Basement Floor Ground Floor First Floor 2nd Floor 20 Multi-family Building_Mundaka ∙ Client: Moldis Echarro (Private Promoter) ∙ 2002-2004 ∙ Net developable area: 1,060.60 sqm ∙ Residential buildable area: 2,878.48 sqm ∙ Number of houses: 20 ∙ Urban development cost: 35,128.36 € ∙ Building construction cost: 1,146,338.58 € In Mundaka, world famous population because surfing, the development of a residential building for social living is proposed to absorb the demand for housing in the town. The building is protected from the north by the mountain, looking south orientation for housing. 2-3-4-5 Floors 1st Floor Ground Floor Single-family Housese complex_La Bilbaina ∙ 2001-2011 ∙ Net developable area: 8,262.98 sqm ∙ Residential buildable area: 9,456.63 sqm ∙ Number of houses built: 35 ∙ Urban development cost: 257,189.69€ ∙ Building construction cost: 3,527,395.47€ Promoted by the private sector, proposes the development of a luxury residential area in the country club La Bilbaina for high-level single family home. It is designed as a high quality environment, sunny with excellent views over the valleys and the valley of Mungía Txoriherri. It offers private sports equipment. 1st Floor Ground Floor Ground Floor 1st Floor 36 Residential Complex_Sondika ∙ Client: Moldis Echarro (Private Promoter) ∙ 2000-2002 ∙ Urban development area: 1,402.26 sqm ∙ Residential Buildable area: 4,658.10 sqm ∙ Number of houses propoused: 36 ∙ Number of houses built: 116 ∙ Urban development built cost : 450,689.65 € ∙ Building construction cost: 1,430,754.24 € Proposes the implementation of a residential complex for 36 homes in the residential expansion area of the city of Sondika, close to Bilbao airport. The complex contains three residential buildings and garages, as well as the urbanization of surrounding areas. 53 Multi-family Building_Bermeo ∙ Client: Moldis Echarro (Private Promoter) ∙ 1998-2001 ∙ Net developable area: 9,840.0 sqm ∙ Residential buildable area: 11,258,0 sqm ∙ Number of houses: 53 ∙ Urban development cost: 299,213.79 € ∙ Building construction cost: 3,427,765.36 € In the fishing town of Bermeo, on top of the watchtower of the city, the development of a residential building with a provision of urban green areas and plaza is proposed. The plot is located near the edge of the cliff facing the Cantabrian Sea, enjoying wonderful views over the Cantabrian coast, the city and port of Bermeo. Similar upper Floors Ground Floor 46 Multi-family Building_Derio ∙ Client: Moldis Echarro (Private Promoter) ∙ 1998-2000 ∙ Net developable area: 2,342.58 sqm ∙ Residential buildable area: 8,574.97 sqm ∙ Number of houses: 46 ∙ Urban development cost: 86,398.11 € ∙ Building construction cost: 2,185,411.53 € In Derio, near the city of Bilbao and its airport, in the residential sector Aldekone, it’s developed a building housing by residential buildings configuration around a common use of public space or place for recreation. The building developed is for social housing, where the implementation costs were indeed reduced, without sacrificing the normal quality standards. 4rd Floor 1-2-3 Floors 16 Multi-family Building_Eibar ∙ Client: Inbisa (Private Promoter) ∙ 1998-2000 ∙ Net developable area: 1,025.35 sqm ∙ Residential buildable area: 3,662.3 sqm ∙ Number of houses: 16 ∙ Urban development cost: 108,298.69 € ∙ Building construction cost: 1,398,003.21 € In Eibar, a dense inner city with an industrial character, it’s been developed a building between two streets with steep slopes between them. This building was raised in steps to save these steep slopes, developing different uses of the building through the garage, plazas, shops. The building was constructed using nobles materials, such as face brick work, natural stone veneer, and wood for carpentry, resulting in a building of noble bearing materials. Similar upper Floors