BLDG`s 6–9 - Stream Realty Partners

Transcription

BLDG`s 6–9 - Stream Realty Partners
BLDG’s
6–9
EXPO BUSINESS PARK PHASE I IS A
CLASS A INDUSTRIAL DEVELOPMENT
IN SOUTHEAST AUSTIN
ADDRESS:
6301 Stassney Lane
Austin, TX 78744
SUBMARKET: Southeast Industrial
TOTAL BUILDINGS:4
offering excellent visibility on Stassney Lane and is a premier location for
distribution tenants requiring quick access to major thoroughfares such as
Highway 71, Highway 183, State Highway 130, and Interstate 35. Expo
TOTAL SF: 417,093 SF
PROJECT SPECS:
ESFR compatible sprinklers
Business Park is also minutes from both the CBD and Austin-Bergstrom
Concrete truck courts
International Airport.
Ample truck courts
In addition, Expo Phase I is adjacent to Expo Phase II. Expo Business
Park Phase II will offer the newest industrial buildings in Southeast Austin
providing modern and attractive designs with inviting entrances while also
24’ clear-height minimum
Ambundant parking
City of Austin water and wastewater
Austin Energy electricity
meeting all of the needs of today’s industrial tenant. The buildings offer
Texas Gas Service
substantial power, 28’ clear-height, sky-lights in the warehouse, over-sized
AT&T telecommunications
concrete truck courts and easy access to major thoroughfares. With the ability
to construct additional buildings on adjacent land, tenants will be able to
easily fulfill facility needs as business expands.
6
BUILDING 6
BUILDING 7
BUILDING 8
BUILDING 9
6301 Stassney Lane
6301 Stassney Lane
6301 Stassney Lane
6301 Stassney Lane
85,627 SF
104,666 SF
122,400 SF
104,400 SF
180’ x 680’
180’ x 580’
160' x 535'
Column spacing: 40' x 40'
7
2
180’ x 680’
Column spacing: 40’ x 45’
8
Column spacing: 40’ x 45’
9
Column spacing: 40’ x 45’
6,400 SF bays
7,200 SF bays
7,200 SF bays
7,200 SF bays
Dock high loading
Dock high loading
Dock high loading
Dock high loading
24' clear height
24’ clear height
24’ clear height
24’ clear height
Ample parking
Ample parking
2.03:1,000 Parking
1.88:1,000 Parking
BUILDING PROFILES & SITE PLAN
9
7
6
8
DRIVE TIMES
EA
S PL
71
183
VALLEY RD
NT
SA
HWY 71
2 Minutes
ABIA
6 Minutes
HWY 183
4 Minutes
HOUSTON
2.5 Hours
IH-35
5 Minutes
DALLAS
3 Hours
AUSTIN-BERGSTROM
INTERNATIONAL AIRPORT
MAJOR AUSTIN
EMPLOYERS
E . O LT O R F S T
BURLESON RD
71
35
McKINNEY FALLS
STATE PARK
E
AM CANNON DR
WILLI
183
3M
Intel Corp.
Activision Blizzard
JPMorgan Chase & Co.
AMD
Lower Colorado River Authority
Apple
National Instruments
Applied Materials
PPD Development
AT&T
Progressive Insurance
Austin Community College
Samsung
Austin Energy
Sears
Charles Schwab
Seton Healthcare
Dell
St. David’s
Farmers Insurance Group
St. Edward’s University
Flextronics
State Farm Insurance
Freescale Semiconductor
State of Texas
Girling Healthcare
Time Warner Cable
Goodwill Industries
U.S. Internal Revenue Service
Harte-Hanks
University of Texas at Austin
Hospira
Whole Foods
IBM
WHERE TO EAT
WHERE TO GO
WHERE TO STAY
Jack in the Box
McKinney Falls State Park
Super 8 Austin/Airport South
El Mesón Taqueria
Riverside Golf Course
Comfort Suites Austin Airport
Burger King
The Trade Group Austin, TX
Holiday Inn Express
Waffle House
Emo’s
Hampton Inn & Suites Austin/Airport
Denny’s
Montopolis Park
Microtel Inn and Suites by Wyndham
Subway Restaurants
Whip-In Parlour Café
Courtyard Austin Airport
Sonic Drive-in
Clicks Billiards
La Qunita Inn & Suites Austin/Airport
Catfish Parlour
888 Pan Asian Restaurant
Bella Donna Subs
McDonald’s
Salt Lick
Best Western Austin Airport Inn &
Suites
Staybridge Suites Austin Airport
Hilton Austin Airport
Professionally Leased and Managed
by Stream Realty Partners
Developed by
Owned by
FOR LEASING INFORMATION, CALL 512.481.3000
OR VISIT WWW.STREAMREALTY.COM
A
B
C
D
E
18
17
BLDG
8
16
15
128,900 SF
14
100% HVAC
23,040 SF of office
13
66,720 SF of production
12
29,440 SF of warehouse
M
W
9,700 SF of mechanical
S
S
11
S
3 incoming feeds, dual fed from “Met-10” and “Carson Creek II”
10
3-2500 KVA transformers (one per feed)
5-40k CFM Air Handling Units
9
2-20k CFM Air Handling Units
8
2-40k CFM Make-up air Units
R
21 roof top units
7
2 roof top units for data center
16" EQ
14" EQ
14" EQ
16" CWS
16" CWS
R
W
6
2 800-ton cooling towers for condensed water
M
2 800-ton chillers for chilled water
5
7,500 gallon de-ionized water tank
4
150 KW Cummins diesel generator
MGE 3500 Galaxay, 15 KVA, UPS for Data Center
2
Siemens building automation network for HVAC systems
3
Distributed high speed fiber throughout space
1
WILL NICHOLS
[email protected]
T 512.481.3009
SAM OWEN
[email protected]
T 512.481.3030
BLDG
9
14,400 SF
available
104,400 SF
WILL NICHOLS
[email protected]
T 512.481.3009
180’ x 580’
7,200 SF bays
1.88:1,000 Parking
Column spacing: 40’ x 45’
Dock high loading
24’ clear height
SAM OWEN
[email protected]
T 512.481.3030