BLDG`s 6–9 - Stream Realty Partners
Transcription
BLDG`s 6–9 - Stream Realty Partners
BLDG’s 6–9 EXPO BUSINESS PARK PHASE I IS A CLASS A INDUSTRIAL DEVELOPMENT IN SOUTHEAST AUSTIN ADDRESS: 6301 Stassney Lane Austin, TX 78744 SUBMARKET: Southeast Industrial TOTAL BUILDINGS:4 offering excellent visibility on Stassney Lane and is a premier location for distribution tenants requiring quick access to major thoroughfares such as Highway 71, Highway 183, State Highway 130, and Interstate 35. Expo TOTAL SF: 417,093 SF PROJECT SPECS: ESFR compatible sprinklers Business Park is also minutes from both the CBD and Austin-Bergstrom Concrete truck courts International Airport. Ample truck courts In addition, Expo Phase I is adjacent to Expo Phase II. Expo Business Park Phase II will offer the newest industrial buildings in Southeast Austin providing modern and attractive designs with inviting entrances while also 24’ clear-height minimum Ambundant parking City of Austin water and wastewater Austin Energy electricity meeting all of the needs of today’s industrial tenant. The buildings offer Texas Gas Service substantial power, 28’ clear-height, sky-lights in the warehouse, over-sized AT&T telecommunications concrete truck courts and easy access to major thoroughfares. With the ability to construct additional buildings on adjacent land, tenants will be able to easily fulfill facility needs as business expands. 6 BUILDING 6 BUILDING 7 BUILDING 8 BUILDING 9 6301 Stassney Lane 6301 Stassney Lane 6301 Stassney Lane 6301 Stassney Lane 85,627 SF 104,666 SF 122,400 SF 104,400 SF 180’ x 680’ 180’ x 580’ 160' x 535' Column spacing: 40' x 40' 7 2 180’ x 680’ Column spacing: 40’ x 45’ 8 Column spacing: 40’ x 45’ 9 Column spacing: 40’ x 45’ 6,400 SF bays 7,200 SF bays 7,200 SF bays 7,200 SF bays Dock high loading Dock high loading Dock high loading Dock high loading 24' clear height 24’ clear height 24’ clear height 24’ clear height Ample parking Ample parking 2.03:1,000 Parking 1.88:1,000 Parking BUILDING PROFILES & SITE PLAN 9 7 6 8 DRIVE TIMES EA S PL 71 183 VALLEY RD NT SA HWY 71 2 Minutes ABIA 6 Minutes HWY 183 4 Minutes HOUSTON 2.5 Hours IH-35 5 Minutes DALLAS 3 Hours AUSTIN-BERGSTROM INTERNATIONAL AIRPORT MAJOR AUSTIN EMPLOYERS E . O LT O R F S T BURLESON RD 71 35 McKINNEY FALLS STATE PARK E AM CANNON DR WILLI 183 3M Intel Corp. Activision Blizzard JPMorgan Chase & Co. AMD Lower Colorado River Authority Apple National Instruments Applied Materials PPD Development AT&T Progressive Insurance Austin Community College Samsung Austin Energy Sears Charles Schwab Seton Healthcare Dell St. David’s Farmers Insurance Group St. Edward’s University Flextronics State Farm Insurance Freescale Semiconductor State of Texas Girling Healthcare Time Warner Cable Goodwill Industries U.S. Internal Revenue Service Harte-Hanks University of Texas at Austin Hospira Whole Foods IBM WHERE TO EAT WHERE TO GO WHERE TO STAY Jack in the Box McKinney Falls State Park Super 8 Austin/Airport South El Mesón Taqueria Riverside Golf Course Comfort Suites Austin Airport Burger King The Trade Group Austin, TX Holiday Inn Express Waffle House Emo’s Hampton Inn & Suites Austin/Airport Denny’s Montopolis Park Microtel Inn and Suites by Wyndham Subway Restaurants Whip-In Parlour Café Courtyard Austin Airport Sonic Drive-in Clicks Billiards La Qunita Inn & Suites Austin/Airport Catfish Parlour 888 Pan Asian Restaurant Bella Donna Subs McDonald’s Salt Lick Best Western Austin Airport Inn & Suites Staybridge Suites Austin Airport Hilton Austin Airport Professionally Leased and Managed by Stream Realty Partners Developed by Owned by FOR LEASING INFORMATION, CALL 512.481.3000 OR VISIT WWW.STREAMREALTY.COM A B C D E 18 17 BLDG 8 16 15 128,900 SF 14 100% HVAC 23,040 SF of office 13 66,720 SF of production 12 29,440 SF of warehouse M W 9,700 SF of mechanical S S 11 S 3 incoming feeds, dual fed from “Met-10” and “Carson Creek II” 10 3-2500 KVA transformers (one per feed) 5-40k CFM Air Handling Units 9 2-20k CFM Air Handling Units 8 2-40k CFM Make-up air Units R 21 roof top units 7 2 roof top units for data center 16" EQ 14" EQ 14" EQ 16" CWS 16" CWS R W 6 2 800-ton cooling towers for condensed water M 2 800-ton chillers for chilled water 5 7,500 gallon de-ionized water tank 4 150 KW Cummins diesel generator MGE 3500 Galaxay, 15 KVA, UPS for Data Center 2 Siemens building automation network for HVAC systems 3 Distributed high speed fiber throughout space 1 WILL NICHOLS [email protected] T 512.481.3009 SAM OWEN [email protected] T 512.481.3030 BLDG 9 14,400 SF available 104,400 SF WILL NICHOLS [email protected] T 512.481.3009 180’ x 580’ 7,200 SF bays 1.88:1,000 Parking Column spacing: 40’ x 45’ Dock high loading 24’ clear height SAM OWEN [email protected] T 512.481.3030