Periodic report - 1st period - all docs - CORDIS
Transcription
Periodic report - 1st period - all docs - CORDIS
2. Work Package achievements 2.1 1-4: Project objectives, work progress and Project objectives and person month planned for the period WP 1 Analysis of relevant SMEs as well as FP7 projects to compile a comprehensive picture on RDI needs, trends and challenges of SMEs WP 1 Statistical measurement of the relevancy of the SME’s RDI needs established in the qualitative analysis WP 1 Validation of survey results with relevant stakeholders and EU decision makers. WP 2 WP 2 WP 2 WP 3 Identification of best practices of NM R&D commercialization Compilation of Guidelines for successful commercialization Creation of a prototype activity in an international Workshop on NM R&D commercialization Finalizing findings from WP1 and WP2 into policy tools, strategies and practice for SMEdriven European research on Networked Media R&D Raise awareness for the project activities at EU and international level Disseminate the project and its findings to the public at large, progress raising and broadening interest and knowledge about commercialisation in Europe’s regions Greater visibility of SMARD project results and network Generate regional and political support for Guideline WP 4 WP 4 WP 4 WP 4 Figure 4: Person Month planned for Period 1 (Spt. 2011 – Aug. 2012) according to DOW 7 2.2 Work progress and achievements during the period WORK PACKAGE 1: ANALYSIS OF THE DIGITAL MEDIA INDUSTRIES NM R&D FOR ENHANCING THE COMPETITIVENESS OF SMES IN a) Summary of progress towards objectives and details for each task Objective 1: Analyse relevant SMEs as well as FP7 projects to compile a comprehensive picture on RDI needs, trends and challenges of SMEs The following activities have been realized: • Development of a concept for a needs and requirements analysis of SMEs in the digital media industries and the web economy (see deliverable 1.1.1) • Development of templates for o conducting interviews with SMEs o developing case studies on selected SMEs o analysing FP7 projects (All templates included sections for formulating need statements based on the prior analysis) • Sending the templates to the project partners for input and then integrate feedback into the templates; • Conducting the qualitative analysis of RDI needs by: o analysing eight relevant SMEs through in-depth interviews (each project partner interviewed two SMEs); o developing more detailed case studies on 4 SMEs that were previously interviewed (one case study per partner); these focused on the particularly interesting SMEs for the analysis; o analysing relevant FP7 projects: The project partners analysed 12 relevant FP7 projects + an additional 3 FP7 projects; altogether 15 FP7 projects were analysed; The qualitative analysis formed the basis for developing the RDI needs survey in task 1.2 (see below). Objective 2: Conduct Europe-wide survey on RDI Needs of SMEs (qualitative assessment) The main activities were: • Developing a concept for the survey on RDI needs of SMEs in the digital media industry and web economy. This concept was discussed and further developed by contributions from the partners, in particular through an extensive workshop session at the Salzburg SMARD project meeting; the survey included general questions on SMEs as well as a set of RDI need statements (based on the findings of the qualitative analysis). • Implementation and design of the web-based RDI survey: Based on the concept and the contributions from the partners, the survey was finalised and implemented in the form of an online survey (utilising Survey Gizmo). Great care was taken that the survey was both comprehensive in terms of identifying RDI needs as well as not taking too much time to complete; another aspect was to have a pleasant design. • Pretesting of survey and finalisation: Before the start of the survey, the survey was extensively tested internally to discover bugs and mistakes, but also any 8 misunderstandings in the text or design-related issues; this feedback was included to refine and finalise the online survey; • Establish a database of relevant SMEs and SME multipliers in Europe, based on a template that was developed and provided by SRFG; this database formed the basis for distributing the survey Europe-wide; to establish a Europe-wide database, each partner was allocated various European countries to research SMEs and multipliers; • Distribution of the RDI needs survey to SMEs by SRFG and the partners Europe-wide through: o The database of SMEs that was established previously (SRFG: 9 countries; other partners 7 countries each); o SME multipliers established in the database; these were asked to distribute information to SME contacts in different countries; o Utilising various contact networks of each partner; o Posting links on SMARD website as well as other platforms and websites; Distribution was mainly done via email (using an invitation text formulated by the partners) but also via contacting SMEs by phone. • Extraction and analysis of the survey data and findings by SRFG: At the end of June the online survey was closed; the data were extracted from Survey Gizmo, cleaned and recoded; this was followed by an extensive statistical analysis and data visualisation, which formed the basis for the Survey Report (see below). • Survey Report on RDI Needs of SMEs in the digital media industry and the web economy: Following the analysis of the survey data and findings, a comprehensive RDI needs survey report was written by SRFG; a draft survey was sent to partners to provide further input; the report was finalised until the end of August 2012; Objective 3: Concertation meeting with stakeholders and decision makers (discussion & synthesis of survey results) Activities implemented until August 2012: • Develop a concept for a concertation meeting with stakeholders and decision-makers (see Del. 1.1.2); the concept provides a basis for planning and preparing the actual concertation meeting which is being held in conjunction with the WP2 workshop on commercialisation at the NEM Summit in Istanbul in October 2012; • Preparation and organisational issues for the concertation meeting, which is being done together with organising the WP2 workshop on commercialisation (e.g. invitation letter, concept for the workshop etc.); Please note: This activity is still in progress: in the Stuttgart project and Advisory Board meeting in September 2012 the workshop/concertation meeting session was further elaborated. The actual concertation meeting will be held at the NEM Summit in October 2012. b) Major outcomes and significant results: Deliverable 1.1.1 Concept of Needs and Requirements Analysis of SMEs: The methodology and approach for the qualitative analysis as well as the relation and dependencies on tasks 1.2 (Conduct Europe-wide survey on RDI needs of SMEs) and 1.3 (Concertation meeting with 9 stakeholders and decision-makers) were described in detail in the Deliverable 1.1.1 Concept of Needs and Requirements Analysis of SMEs prior to the qualitative analysis. Establish a basis for RDI Needs Survey: The major outcome of the qualitative analysis was to create the basis for designing and formulating questions and RDI statements for the quantitative survey on RDI needs of SMEs (see task 1.2). Del 1.1.3 – Survey Report on RDI Needs of SMEs in the Digital Media Industry and the Web Economy: The main survey findings were presented in a Survey Report. Please note: the report is to be further validated through the External Advisory Board in the Stuttgart project meeting in September 2012 as well as in a workshop with decision makers and stakeholders at a workshop at the NEM Summit in Istanbul in October 2012. Findings of the survey will also feed into the Strategy for SME-driven Research on Networked Media RDI. (see WP3) Del. 1.1.2 Concept for the International Concertation Meeting, which outlines the concertation meeting to be held in conjunction with the WP2 workshop on commercialisation at the NEM Summit in Istanbul. c) Deviations from Annex I • According to Annex 1 at least two FP7 projects per partner had to be analysed (8 altogether). To gain even more insights we decided, however, to analyse at least 3 projects per partner (12 altogether). In the end, we analysed 15 projects. As a consequence Del 1.1 – Concept of needs and requirements analysis of SME – was delivered later then foreseen (16 January 2012 instead of October 2011). The postponing was agreed with the Project Officer • The target of the survey was N=400. While we originally had 603 respondents in the survey, not all respondents could be included in the survey for data analysis. In a first step, 191 non-respondents, i.e. respondents that did not answer more than the first five questions, were identified and excluded. Also respondents that filled in the survey twice, respondents that needed an impossibly short time span for filling in the survey or that tended to always select the same values were excluded where necessary. As a result of this data cleaning, 352 remained in the final dataset. • Due to scheduling and organisation planning it was decided to hold the concertation meeting in conjunction with the WP2 workshop on commercialisation. This was also communicated to the European Commission. • Overall deviation from Annex 1: Change in terminology – from R&D to RDI: In the Salzburg project meeting the four project partners agreed to focus rather on research, development and innovation (RDI) needs instead of research & development (R&D) needs, as we learned from initial interviews in the qualitative assessment (see below) that many SMEs do not consider their research activities as R&D but often rather as innovation. Hence we decided to use a broader terminology. d) Statement on use of resources PM Spent in MFG PM SRFG PM IBBT PM CSP PM Period 1 spent spent in spent in spent in all Total Plan PM Period 1 Period 1 Period 1 Period 1 Period 1 partners PM WP 1 16,11 22,24 17,9 2,5 10,7 2,74 6,3 Figure 5: Comparison Person Month Planned and Person Month Spent on WP 1 (PM = Person Month) 10 The additional 4,13 person month spent for WP 1 during the 1st reporting period can mainly be explained by the fact that some tasks (such as the distribution of the survey) have been accomplished by junior researchers and junior project managers. WORK PACKAGE COMMERCIALIZATION 2: TECHNOLOGY TRANSFER MODELS IN REGIONS FOCUSING ON a) summary of progress Objective 1: Identification of best practices of NM R&D commercialization + Objective 2: Compilation of Guidelines for successful commercialization • Literature review has been conducted as basic input for the work package • Templates have been made to collect best practices in the four regions • Best practices have been collected in the four regions, based on the input of the four SMARD consortium partners and their direct partner organisations • Based on interviews with four relevant stakeholders in each regions by all partners (16 interviews in total): technology transfer offices, incubators, government agencies and SMEs, the guidelines for successful Networked Media R&D commercialisation has been written and finalised after multiple feedback rounds with the consortium partners. • The guidelines have been made publicly available and dissemination has been accelerated through communication efforts (social media, newsletters etc). • The guidelines are to be validated by the SMARD Advisory Board (meeting of the first week of September 2012). Objective 3: Creation of a prototype activity in an international Workshop on NM R&D commercialization • A workshop concept has been designed and discussed with the consortium partners • The workshop concept has been validated with two stakeholders: o The European Commission representatives of DG Connect o The SMARD Advisory Board (September 2012) • Three EU funded projects have been asked for participation to serve as case studies in the workshop. Their participation has been confirmed. • The workshop has been confirmed to take place within the NEM Summit, to be held in October 2012 in Istanbul, Turkey. • The workshop preparations are currently being undertaken. b) Clearly significant results • Template for best practice delivered to project partners (Del. 2.2.1) • Collection of best practices from all partner regions (Del. 2.2.2) • Public deliverable: Guidelines for successful Networked Media R&D commercialisation (Del. 2.2.3) 11 • Concept for International Workshop on NM R&D Commercialization (Del 2.2.4) and announcement and preparations for the interactive workshop (October 2012, Istanbul) c) Deviations from Annex I • The final guidelines for successful Networked Media R&D commercialisation have been made available with some delay, given the fact that conducting the interviews to collect the underlying data have taken more time than anticipated. • The interactive workshop has been postponed, given the cancellation of the concertation meeting initially planned for May/June 2012. There are no direct consequences for the other activities. d) Statement on use of resources MFG PM Total spent in WP 2 PM Plan PM Period 1 Period 1 10,2 7,14 PM Spent in SRFG PM IBBT PM CSP PM Period 1 spent in spent in spent in all Period 1 Period 1 Period 1 partners 2 0,7 4,19 3,3 10,19 Figure 6: Comparison Person Month Planned and Person Month Spent on WP 2 (PM = Person Month) The additional 5,05 person month spent for WP 2 during the 1st reporting period can be explained by the fact that some tasks (such as the collection of best practices) have been accomplished by junior researchers and junior project managers. Furthermore, the conduction of 16 interviews for the collection of best practices has proven to take more time than estimated in the project proposal. WP 3 Developing EU strategic framework for support and transfer of Networked Media R&D for SMEs Objective: Finalizing findings from WP1 and WP2 into policy tools, strategies and practice for SME driven European research on Networked Media R&D a) summary of progress In the reference period, WP3 has worked as planned and has delivered • the SMARD Draft Strategy on Commercialization (D3.1) and • the Validation Plan (D3.2) . The draft strategy is based on the results of WP1 and WP2 and includes 16 statements to be validated, located along a process. The validation foresees the tasks to be performed in the following months. Validation is based on the consultation of stakeholders. The process to draft the strategy and the validation plan can be synthesized as follows: • Analysis of WP1 and WP2 outputs and raw materials (interviews, cases, projects, etc) • Analysis of literature on technology transfer, cases, EU funding programs and policies • Draft of the first list of statements. 1st round of feedback, comments and contribution from partners, via e-mail consultation and via skype conference calls 12 • Inclusion of feedbacks, review of the list of statements, draft of the process-roadmap. Release of the second version. 2nd round of feedback, comments and contribution from partners, via e-mail consultation and via skype conference calls • Inclusion of feedbacks, review of the process-roadmap. 3nd round of feedback, comments and contribution from partners, via e-mail consultation and via skype conference calls. • Draft of validation plan, release and collection of feedback by partners, via e-mail consultation and via skype conf calls. • Release of “Draft Strategy “ and “Validation Plan” b) clearly significant results • the SMARD Draft Strategy on Commercialization (D3.1) and • the Validation Plan (D3.2) . c) deviations from Annex I In Annex I the validation process of the SMARD Strategy (within WP3) forecasts a dedicated workshop involving stakeholders, to be hold during the EU Networked Media cluster concertation meting around month 12. Within WP2, the DOW forecasts another dedicated stakeholder workshop, to be hold during a previous concertation meeting, aimed at presenting WP1 and WP2 results. This interactive workshop has been postponed to the NEM Summit in October 2012, given the cancellation of the concertation meeting initially planned for May/June 2012. The SMARD consortium has evaluated as not feasible (for organizational reasons) and nor effective (in relation with SMARD goals), to organize 2 SMARD workshops during the NEM concertation meeting forecast in Istanbul in October 2012. As a consequence, the WP3 leader, together with Project leader and the SMARD consortium has proposed a change in methodology in order to achieve the forecast goal of WP3, that is the validated Strategy. The change of methodology will consist of: • the WP3 workshop will merge in the WP2 workshop: most relevant WP3 issues, useful for the Strategy validation, will be tackled together with WP2 goals and feedback for validation will be collected. • The WP Leader will hold qualitative validation interviews with FP 7 Projects and SMEs on the occasion of the NEM Summit • the validation process will include other actions beside the workshop (see validation plan): o consultation of experts belonging to the SMARD advisory board; o consultation of local stakeholders o consultation of FP7 project leaders during NEM summit This change of methodology has been confirmed in an amendment (October 2012). 13 d) Statement on use of resources PM Spent in MFG PM SRFG PM IBBT PM CSP PM Period 1 spent spent in spent in spent in all Total Plan PM Period 1 inPeriod 1 Period 1 Period 1 Period 1 partners WP 3 PM 7,2 5,45 12 1,8 0,4 0,35 2,9 Figure 7: Comparison Person Month Planned and Person Month Spent on WP 3 (PM = Person Month) WP 4 Dissemination Objective 1: Raise awareness for the project activities at EU and international level To that aim, the following activities have been undertaken: • Production and Update of Dissemination Plan • Development, launch and maintenance of project website: www.smard-project.eu • Development of project logo • Development of project flyer • Development and production of project rollup Objective 2: Disseminate the project and its findings to the public at large, progress raising and broadening interest and knowledge about commercialisation in Europe’s regions This objective has been realized through the following activities: • Direct Talks to stakeholders (see communication reporting in annexe) • E-mailings on the occasion of the of Dissemination of the survey • Participation in the following third party events: 14 Partner Details rd 3 party events • 2011 NEM Sumit, Turin (presentation September 27th,2011) • 8th FP7 Networked Media Concertation meeting, Brussels (presentation December 14th 2011 • Kick-off meeting Entrepreneurship and Innovation Cluster, Brussels (presentation March 23rd 2012) • CeBIT 2012, Hannover Trade show (MFG booth, participation March 6-10th 2012) • Heidelberg Innovation Forum 2012, Heidelberg (flyer display, participation, April 17th, 2012) • The European Cluster Conference 2012, Vienna (MFG booth, flyer display, participation April 1820th, 2012) Tehnovacija 2012, Maribor (dissemination, participation April 5th 2012) • NEM Summit 2011, September 2011, Torino, Italy • Science Night April 2012, Salzburg IBBT • • • • • iMinds 2011, November 2011, Ghent, Belgium NEM Summit 2011, September 2011, Torino, Italy Startups.be launch event, March 2012, Brussels, Belgium ISPIM Conference 2012, June 2012, Barcelona, Spain HTSF Conference 2012, May 2012, Amsterdam, The Netherlands CSP • NEM Summit 2011, September 2011, Torino, Italy MFG SRFG Objective 3: Greater visibility of SMARD project results and network This objective has been realized through the update of Website, establishing of Web 2.0 channels for disseminating SMARD project results: • • • Post on SMARD survey on http://cordis.europa.eu/fp7/ict/netmedia/neweve_en.html Making twitter and linkedin channel on ICT Tech Transfer the project’s voice (see communication reporting) Update of website (events, upload of deliverables) Objective 4: Generate regional and political support for Guideline • • • Guidelines published on SMARD website and dissemination through twitter and linkedin Guidelines sent to SMARD Advisory Board (Marta Ysern Business Development Barcelona Media, Flavia Barca Director of IEM Fondazione Rosselli, Rome, Thierry Baujard President Media Deals Berlin) Guidelines sent to stakeholders (such as FP 7 projects and regional stakeholders) b) clearly significant results • • • Launch of Website www.smard-project.eu (Del 4.1) Dissemination and Exploitation Plan (Del 4.2) and Dissemination Report (Del 4.3) Launch of Flyer (Del 4.4) 15 • • Use of Twitter and linkedin channel for project d) Statement on use of resources PM Spent in MFG PM SRFG PM IBBT PM CSP PM Period 1 Total spent in spent in spent in spent in all WP 4 PM Plan PM Period 1 Period 1 Period 1 Period 1 Period 1 partners 3,6 0,4 0,12 0,6 4,72 6,84 11,4 Figure 8: Comparison Person Month Planned and Person Month Spent on WP 4 (PM = Person Month) Figure 8 shows that 2.12 person month less than foressen have been spent on WP 4. This can be explained by the fact that the concertation meeting planned for May 2012 has been cancelled and that the workshop on NM Commercialization has been reported to October 2012. The latter is an important moment for promoting the project – in the workshop itself but also through PR activities after the workshop. 2.3 List of deliverables and milestones 16 Del. no.4 Deliverable name W P no. Lead benef iciary numb er Nature5 Diss eminati on level 6 Delivery date7 Actual / Forecast delivery date from Annex I (proj month) Dd/mm/yyyy Status No submitted/ Contractua l Submitted Yes/No D1.1 Concept of Needs and Requirements Analysis of SMEs 1 2 O PP M2 16/01/2012 Submitted Yes D1.2 Concept for international concertation meeting 1 2 O CO M8 07/05/2012 Submitted Yes D1.3 Survey Report on Networked Media R&D needs of SMEs 1 2 R PU M12 03/09/2012 Submitted Yes D2.1 Template for best practices 2 3 O PP M2 16/01/2012 Submitted Yes D2.2 Collection best practices from BW. Piedmont, Flanders, Salzburg 2 3 O PP M3 16/01/2012 Submitted Yes D2.3 Guideline for successful Networked Media R&D commercialization 2 3 O PU M6 06/06/2012 Submitted Yes Comments Postponed , see p. 10, section: WP 1, c) Postponed , see p . 12, section 4 Deliverable numbers in order of delivery dates. Please use the numbering convention <WP number>.<number of deliverable within that WP>. For example, deliverable 4.2 would be the second deliverable from work package 4. 5 Please indicate the nature of the deliverable using one of the following codes: R = Report, P = Prototype, D = Demonstrator, O = Other 6 Please indicate the dissemination level using one of the following codes: PU = Public PP = Restricted to other programme participants (including the Commission Services). RE = Restricted to a group specified by the consortium (including the Commission Services). CO = Confidential, only for members of the consortium (including the Commission Services). 7 Measured in months from the project start date (month 1). 17 WP 2, c) D2.4 Concept for International workshop on Networked Media R&D commercialization 2 3 O CO M10 19/04/2012 Submitted Yes D.3. 1 Draft strategy for SME-driven 3 research on networked media R&D 4 O PP M10 24/07/2012 Submitted Yes D3.2 Validation plan 3 4 O PP M10 24/07/2012 Submitted Yes D3.3 Concept for international concertation meeting 3 4 O CO M12 D4.1 Website 4 1 O PU M2 16/01/2012 Submitted Yes D4.2 Initial Exploitation and Dissemination Plan & Materials 4 1 O PP M4 22/11/2011 Submitted Yes D4.3 Dissemination Report and Plan/Materials Update 4 1 R PU M12 28/09/2012 Submitted Yes D4.4 Project flyer 4 1 O PU M4 15/12/2011 Submitted Yes D5.1 Work plan for every work package 5 1 O CO M2 16/01/2012 Yes D5.2 Web 2.0 collaboration platform 5 1 O CO M1 11/10/2011 Yes Yes Alternative proceedin g agreed with Project Officer Amendme nt, see explication on p. 13, section: WP 3, c) 18 Milestones Milestone number Milestone name M1.1 Database of European SMEs International concertation meeting M1.2 M2.1 M2.2 M4.1 M5.1 Collection of Best practices from BW. Piedmont, Flanders, Salzburg Publication of Guideline for successful Networked Media R& D commercialization Dissemination Report and Plan/Material Update 1st Periodic Report Work package(s) involved 1 Lead beneficiary Achieved Yes/No 2 Delivery date from Annex I dd/mm/yyyy M5 Comments Yes Actual / Forecast achievement date dd/mm/yyyy 9/12/2011 1,4,5 2 M10 No 16/10/2012 Agreed with Project Officer to hold the workshop within the NEM Summit 2012, see p. 12, section WP 2, c) 1,2 3 M3 Yes 16/01/2012 2,4 3 M6 Yes 06/06/2012 1,2,3,4,5 M12 28/09/2012 5 M7 Dissemination Report and Plan/Material Update available Yes Postponed, see p . 12, section WP 2, c) 31/10/2012 19 2.4 Project management during the period Consortium Management tasks and achievements • • Drafting of Work Plan for every work package (Del 5.1) Coordination of consortium partners and internal knowledge management through regular project updates (email /phone) and maintenance of web 2.0 collaboration platform (Del 5.3) Figure 9 Screenshot of filedepot of web 2.0 collaboration platform • • • • • • • • • • • • Coordination, moderation of monthly consortium conference call Constant monitoring of project results (c.f. WP1, WP2; significant results, workplan Coordination) Coordination, preparation of project kick-off meeting in Turin at CSP premises, Sept. 26th27th, 2011 Turin, Environment Park, Via Livorno 60 Coordination, preparation and conduction/moderation/resolution minutes of second project meeting in Salzburg at Salzburg Research Forschungsgesellschaft mbH premises, JakobHaringer-Str. 5/III, 5020 Salzburg, February, 1st – 2nd 2012 Coordination and preparation of third project meeting in Stuttgart at MFG BadenWürttembeg mbH premises, Breitscheidstraße 4, 70174 Stuttgart, Sept. 5-6 2012 Coordination, preparation of first advisory board meeting in Stuttgart at MFG BadenWürttembeg mbH premises, Breitscheidstraße 4, 70174 Stuttgart, Sept. 6-7 2012 Coordination and information of the Advisory Board Communication with the European Commission (regular up-dates via phone calls + emails, provision of deliverables) Communication to external partners such as NEM Summit Organisers (Project Manager as voice of the project) Coordination of Amendment No.1 and Amendment No.2 Organisation, coordination of partners to the periodic report (internal consortium reporting), this included preparation of templates, exchange with/advices to partners Consultation of European Commission: o Various personal consultations with project officer Rossella Magli, Scientific & Communication Officer European Commission, DG Information Society and Media, Unit D2 - Networked Media Systems, Viorel Peca, Head of Unit, Networked Media, 20 o o o o o DG Information Society European Commission Unit D2 - Networked Media Systems; Francisco Medeiros Deputy Head of Unit, Networked Media DG Information Society, European Commission, Unit D2 - Networked Media Systems (during NEM Sumit, 27-28 Sept. 2011, October 19th 2011: Meeting with Viorel Peca, New Head of Unit, Networked Media DG Information Society, Brussels, Presentation of SMARD Project (Jürgen Jähnert) December 13th - 14th 2011, FP7 Networked Media Concertation meeting, SMARD Presentation to all FP7 NM Projects (Jürgen Jähnert and Martina Groeschel) January 27th 2012, Presentation Jürgen Jähnert to Francisco Medeiros and Viorel Peca, SMARD Contribution to next call / work programme ICT 2013 Participation in Kick Off of Transversal Cluster on Innovation and Entrepreneurship (Brussels, March 23rd) Feedback on Paper on Innovation Hubs and Innovation and Entrepreneurial Studies (coordinated by Bodgan Ceobanu, Networked Media, DG Information Society European Commission Unit D2 - Networked Media Systems) Changes that have occurred during the reporting period: • The project manager Martina Groeschel has left the lead partner’s organization by end of April 2012 and Alexandra Rudl took over project management tasks from May 2012 on. As Alexandra Rudl has already been working for the lead partner organization before, there was an extensive period of transition from beginning of March until end of April 2012 when the new project manager has taken over the project management responsibilities step by step. List of project meetings, dates and venues: • Project kick-off meeting in Turin at CSP premises, Sept. 26th-27th, 2011 Turin, Environment Park, Via Livorno 60 • Second project meeting in Salzburg at Salzburg Research Forschungsgesellschaft mbH premises, Jakob-Haringer-Str. 5/III, 5020 Salzburg, February, 1st – 2nd 2012 Cooperation with external stakeholders / other projects: • Establishment of an external Advisory Board (Marta Ysern Business Development Barcelona Media, Flavia Barca Director of IEM Fondazione Rosselli, Rome, Thierry Baujard President Media Deals Berlin) • Several Calls with Thierry Baujard, Media Deals, concerning the involvement of investors • Call on possible cooperation between SMARD and EBAN on 10 July 2012 (exchange of project results, mutual information on events) • Setting up of cooperation between SMARD and EMC2 Project (exchange of project results, mutual information on events) • Cooperation with FAME project (exchange of project results) Project planning and status / deviations and their impact The timing for deliverable 2.2.3 (Guidelines for successful Networked Media R&D commercialization) has proven too ambitious for several reasons. In the first place, the SMARD project partners have decided that it would make sense to include some (preliminary) results of WP1, which have only been available since February 2012. Furthermore, obtaining data and information on best practices in tech transfer and commercialisation from the different stakeholders (especially some government agencies) has turned out to be more difficult than initially estimated. In all four regions, more time was needed to collect these data and reach the targets in this regard, leading to a delay in the subsequent analyses of the data and information and obviously in bringing all elements together in a guideline for successful commercialisation. The postponement was accepted by the EC (project officer Rossella Magli, cf. email 30.03.2012) and the guidelines were 21 delivered by 06/06/2012. The postponing of this deliverable does not have an impact on the overall project plan. Deliverable 2.2.4 (Concept for international workshop on NM R&D commercialization) (originally to be delivered June 2012) was delivered and discussed with EC (project officer Rossella Magli) already in April 2012. Deliverable 3.3.1 (Draft Strategy for SME driven research on networked media R&D) was due end of June 2012 and should include results from WP 1 (mainly the survey) as well as from WP 2 (mainly the guidelines). Whereas the results of the guidelines have already been finalized by May, the survey has been only closed by end of June and first preliminary results were only available during the first week of July. In order to produce a coherent document, the consortium wanted to include these first preliminary results in the draft strategy and thus asked for postponing the deadline until end of July. The postponement was accepted by the EC (project officer Manuel Carvalhoso, cf. email 27/06/2012) and the draft strategy was delivered by 24 July 2012. The postponing of this deliverable does not have an impact on the overall project plan. The updated project planning is as follows: Figure 10 Updated Project Plan 22 3 Explanation of the use of the resources 3.1 Overview for consortium MFG PM spent Plan PM Period 1 Period 1 Total PM WP 1 WP 2 WP 3 WP 4 WP 5 Total SRFG PM IBBT PM spent spent Period 1 Period 1 17,9 10,2 12 11,4 10 61,5 16,11 7,14 7,2 6,84 6,6 43,89 2,5 2 1,8 3,6 7,3 17,2 10,7 0,7 0,4 0,4 0,5 12,7 2,74 4,19 0,35 0,12 0,12 7,52 CSP PM spent Period Total PM Spent 1 by all partners 6,3 3,3 2,9 0,6 0,7 13,8 22,24 10,19 5,45 4,72 8,62 51,22 Figure 11: Comparison Person month planned / spent during Period 1 Total Staff Budget Total 405.390,00 Plan Budget Period 1 (according to Figure 4) 289.310,03 Budget Spent Period 1 278.031,75 Figure 12 Comparison Plan Budget per WP in Period 1 and Budget spent in Period 1 The difference of 11.278,28 Euro between the planned budget for period 1 and the spent budget can be explained by the fact that some activities have been postponed from summer 2012 to autumn 2012. This is the case for the concertation meeting (see international workshop on NM R&D) as well as for the validation of the draft strategy (through validation interviews instead of workshop). 3.2 Verification of expenditure per partner For each partner the following documents are listed: • Staff Costs • Other Direct Costs (Travel) • Other Direct Costs ( Events and Others) 23 Personalkosten 1.9.2011 - 31.8.2012 inkl. 7 % OVH-Aufschlag year project_name name SMARD ECKHOFF Robert A. WP 1 - ANALYSIS OF NETWORKED MEDIA R&D WP 1 - ANALYSIS OF NETWORKED MEDIA R&D Ergebnis WP 4 - DISSEMINATION WP 4 - DISSEMINATION Ergebnis WP 3 - STRATEGIC FRAMWORK WP 3 - STRATEGIC FRAMWORK Ergebnis ECKHOFF Robert A. Ergebnis LASSNIG Markus WP 5 - PROJECT MANAGEMENT rate Periode 34,16 2012,06 2012,07 2012,08 34,16 2012,08 34,16 2012,08 54,07 2012,01 2012,02 2012,04 2012,05 WP 5 - PROJECT MANAGEMENT Ergebnis WP 1 - ANALYSIS OF NETWORKED MEDIA R&D 54,07 2012,01 2012,02 2012,03 2012,04 2012,05 WP 1 - ANALYSIS OF NETWORKED MEDIA R&D Ergebnis WP 2 - TECHNOLOGY TRANSFER MODELS 54,07 2012,02 2012,03 54,07 2012,06 46,3 2011,09 2011,1 2011,11 2011,12 2012,01 2012,02 2012,03 2012,04 2012,05 2012,06 2012,07 2012,08 WP 2 - TECHNOLOGY TRANSFER MODELS Ergebnis WP 3 - STRATEGIC FRAMWORK WP 3 - STRATEGIC FRAMWORK Ergebnis LASSNIG Markus Ergebnis MARKUS Mark WP 1 - ANALYSIS OF NETWORKED MEDIA R&D 47,55 48,76 WP 1 - ANALYSIS OF NETWORKED MEDIA R&D Ergebnis 1 v. 5 Daten 2011 Stunden Projektkosten 49,15 51,33 17,42 7,87 2.434,94 2.543,10 862,84 389,72 125,77 6.230,61 2012 Gesamt: Stunden Gesamt: Projektkosten Stunden Projektkosten 100,75 3.682,53 100,75 3.682,53 109,03 3.985,30 109,03 3.985,30 68,50 2.503,76 68,50 2.503,76 278,28 10.171,59 278,28 10.171,59 20,75 758,44 20,75 758,44 20,75 758,44 20,75 758,44 29,75 1.087,40 29,75 1.087,40 29,75 1.087,40 29,75 1.087,40 328,78 12.017,43 328,78 12.017,43 4,50 260,35 4,50 260,35 3,57 206,35 3,57 206,35 1,53 88,71 1,53 88,71 12,83 742,47 12,83 742,47 22,43 1.297,88 22,43 1.297,88 42,10 2.435,69 42,10 2.435,69 48,87 2.827,18 48,87 2.827,18 57,05 3.300,62 57,05 3.300,62 8,27 478,27 8,27 478,27 3,40 196,71 3,40 196,71 159,68 9.238,46 159,68 9.238,46 11,27 651,83 11,27 651,83 8,73 505,27 8,73 505,27 20,00 1.157,10 20,00 1.157,10 2,30 133,07 2,30 133,07 2,30 133,07 2,30 133,07 204,42 11.826,51 204,42 11.826,51 49,15 2.434,94 51,33 2.543,10 17,42 862,84 7,87 389,72 107,93 5.491,49 107,93 5.491,49 16,28 849,55 16,28 849,55 20,07 1.046,94 20,07 1.046,94 13,57 707,82 13,57 707,82 3,77 196,52 3,77 196,52 71,85 3.748,64 71,85 3.748,64 74,65 3.894,73 74,65 3.894,73 4,07 212,17 4,07 212,17 312,18 16.147,86 437,95 22.378,47 02.11.2012 year project_name name MARKUS Mark Ergebnis STRASSER Andreas WP 5 - PROJECT MANAGEMENT rate 39,82 40,92 43,29 WP 5 - PROJECT MANAGEMENT Ergebnis WP 1 - ANALYSIS OF NETWORKED MEDIA R&D 39,82 40,92 43,29 WP 1 - ANALYSIS OF NETWORKED MEDIA R&D Ergebnis WP 4 - DISSEMINATION 39,82 40,92 43,29 WP 4 - DISSEMINATION Ergebnis WP 2 - TECHNOLOGY TRANSFER MODELS WP 2 - TECHNOLOGY TRANSFER MODELS Ergebnis WP 3 - STRATEGIC FRAMWORK 39,82 Periode 2011,09 2011,1 2011,11 2011,12 2012,01 2012,02 2012,03 2012,04 2012,06 2012,08 2011,09 2011,1 2011,11 2011,12 2012,01 2012,02 2012,03 2012,04 2012,06 2012,07 2012,08 2011,09 2011,1 2011,11 2012,06 2012,08 40,92 2011,1 2011,11 2012,02 40,92 43,29 2012,02 2012,07 WP 3 - STRATEGIC FRAMWORK Ergebnis STRASSER Andreas Ergebnis SMARD Ergebnis Gesamtergebnis 2 v. 5 Daten 2011 2012 Gesamt: Stunden Gesamt: Projektkosten Stunden Projektkosten Stunden Projektkosten 125,77 6.230,61 312,18 16.147,86 437,95 22.378,47 9,50 404,77 9,50 404,77 2,00 85,21 2,00 85,21 11,00 468,68 11,00 468,68 1,00 42,61 1,00 42,61 7,50 328,38 7,50 328,38 7,50 328,38 7,50 328,38 1,50 65,68 1,50 65,68 2,00 87,57 2,00 87,57 2,00 87,57 2,00 87,57 4,00 185,28 4,00 185,28 23,50 1.001,27 24,50 1.082,86 48,00 2.084,14 60,50 2.577,75 60,50 2.577,75 71,50 3.046,43 71,50 3.046,43 35,00 1.491,26 35,00 1.491,26 39,00 1.661,69 39,00 1.661,69 123,25 5.396,43 123,25 5.396,43 92,00 4.028,16 92,00 4.028,16 125,75 5.505,89 125,75 5.505,89 44,00 1.926,51 44,00 1.926,51 3,00 131,35 3,00 131,35 34,50 1.598,05 34,50 1.598,05 34,50 1.598,05 34,50 1.598,05 206,00 8.777,12 457,00 20.184,45 663,00 28.961,57 4,00 170,43 4,00 170,43 3,50 149,13 3,50 149,13 1,50 63,91 1,50 63,91 6,50 284,60 6,50 284,60 25,50 1.181,17 25,50 1.181,17 9,00 383,47 32,00 1.465,77 41,00 1.849,23 3,50 149,13 3,50 149,13 19,50 830,84 19,50 830,84 57,00 2.495,71 57,00 2.495,71 23,00 979,97 57,00 2.495,71 80,00 3.475,68 1,00 43,78 1,00 43,78 21,00 972,73 21,00 972,73 22,00 1.016,51 22,00 1.016,51 261,50 11.141,84 592,50 26.245,30 854,00 37.387,13 387,27 17.372,44 1.437,88 66.237,09 1.825,15 83.609,53 387,27 17.372,44 1.437,88 66.237,09 1.825,15 83.609,53 02.11.2012 FP7 - VERIFICATION OF EXPENDITURE ITEMISATION OF PROJECT EXPENDITURE PER PROJECT PARTNER First Reporting Period (September 2011 - August 2012) Project Number + Title: Partner Name + Country: 288734 SMARD SRFG, Austria Other Direct Costs Travel BUDGET LINE: INTERNAL N° Item Description Work Package Invoice total with 2 decimals (incl. VAT) Euro paid (2 decimals) Euro eligible (2 decimals) Amount Explanations Strasser,Mark MUC-TRN-MUC 25.28.9.2011 WP 5 flight 1.017,82 1.017,82 1.017,82 VR9_1_100990 WP 5 train 114,00 114,00 114,00 Strasser Sbg-Muc-Sbg 25.-28.9.2011 100911 100998 WP 5 travel costs 637,60 637,60 591,60 Mark, Turin Kick-off 25.-28.9.2011 101026 WP 5 travel costs 130,80 130,80 130,80 Strasser, Turin Kick-off 25.-28.9.2011 KA 12-33 WP 1 tickets 16,10 16,10 14,64 Mönchsbergaufzug + Bus KA 12-45 WP 1 ticket 2,00 2,00 1,67 Lassnig, parking ticket meeting ITG 1.918,32 1.918,32 TOTAL + 7 % OVH-Aufschlag Gesamtsumme 1.870,53 130,94 2.001,47 FP7 - VERIFICATION OF EXPENDITURE ITEMISATION OF PROJECT EXPENDITURE PER PROJECT PARTNER First Reporting Period (September 2011 - August 2012) 288734 SMARD SRFG, Austria Project Number + Title: Partner Name + Country: BUDGET LINE: INTERNAL N° Other direct costs Events Work Package Item Description Amount Invoice total with 2 decimals (incl. VAT) Euro paid Euro eligible Explanations VR8_1_100868 WP 5 conference fee 468,00 468,00 390,00 Mark; NEM Summit 2011 VR8_1_100868 WP 5 conference fee 468,00 468,00 390,00 Strasser; NEM Summit 2011 120145 WP 1 hosting costs 423,40 423,40 378,47 m32; Hosting 1.2.2012 KA 12-21 WP 1 hosting costs 30,00 30,00 27,27 Bäckerei Hofmann 1.2.2012 120128 WP 1 hosting costs 97,00 97,00 86,74 Itzlinger Hof 5.2.2012 VR0212_120226 WP 1 other costs 37,94 37,94 37,94 Survey Gizmo USD 49,00 VR0312_120339 WP 1 other costs 38,22 38,22 38,22 Survey Gizmo USD 49,00 VR04_12_120459 WP 1 other costs 11,50 11,50 10,00 Skype Guthaben VR04_12_120459 WP 1 other costs 38,55 38,55 38,55 Survey Gizmo USD 49,00 KA 12-97 WP 1 fee 150,00 150,00 150,00 Gudlin; Translation VR05_12_120579 WP 1 other costs 38,85 38,85 38,85 Survey Gizmo USD 49,00 120607 WP 1 fee 980,00 980,00 980,00 Berger; WV 28.3.2012 VR07_12_120865 WP 1 other costs 40,96 40,96 40,96 Survey Gizmo USD 49,00 2.822,42 2.822,42 TOTAL 2.607,00 + 7% OVH-Aufschlag Gesamtsumme 182,49 2.789,49 FP7 - VERIFICATION OF EXPENDITURE ITEMISATION OF PROJECT EXPENDITURE PER PROJECT PARTNER First Reporting Period (September 2011 - August 2012) Project Number + Title: Partner Name + Country: BUDGET LINE: Name(s) and Functions of involved staff 288734 SMARD IBBT, Belgium Staff Workpackage Month* Amount in Euro with 2 decimals (basic salary + employer share) Sophie De Vinck - senior researcher WP1, WP2, WP3 2,76 22.874,09 Sven Johan Lindmark - senior researcher WP1, WP2, WP3 1,41 18.958,04 An Moons - senior researcher WP1, WP2, WP3 0,57 3.433,13 1,62 14.252,68 1,13 7.410,35 TOTAL 66.928,29 Sven De Cleyn - Tech Transfer WP1, WP2, WP3, WP4, WP5 Manager Katrien Van Gucht WP1, WP2, WP3 Innovation Models & Issuing * manmonth Explanations FP7 - VERIFICATION OF EXPENDITURE ITEMISATION OF PROJECT EXPENDITURE PER PROJECT PARTNER First Reporting Period (September 2011 - August 2012) Project Number + Title: 288734 SMARD Partner Name + Country: BUDGET LINE: IBBT, Belgium Other Direct Costs Travel Item Description Invoice total with 2 decimals (incl. VAT) Euro paid (2 decimals) Euro eligible (2 decimals) Amount INTERNAL N° Work Package 241100682 WP5 relocation own car 44,92 44,92 44,92 to Brussels airport (to and fro) 101100397 WP5 Uniglobe - flight tickets 288,70 288,70 288,70 Brussels - Turin (to and fro) 241100682 WP5 NV Interparking - parking ticket 48,00 48,00 39,67 Brussels airport 26/09 to 28/09 241100682 WP5 Pronto taxi 46,00 46,00 46,00 taxi in Turin 241100682 WP5 Radio taxi 50,00 50,00 50,00 taxi in Turin 101100568 WP5 Uniglobe - flight tickets 474,64 474,64 474,64 Brussels - Salzburg (to and fro) 241200046 WP5 Salzburg taxi 15,00 15,00 13,50 taxi in Salzburg 241200046 WP5 Osman taxi 13,70 13,70 13,70 taxi in Salzburg 980,96 980,96 971,13 TOTAL Explanations FP7 - VERIFICATION OF EXPENDITURE ITEMISATION OF PROJECT EXPENDITURE PER PROJECT PARTNER First Reporting Period (September 2011 - August 2012) Project Number + Title: 288734 SMARD Partner Name + Country: BUDGET LINE: IBBT, Belgium Other direct costs Events Amount INTERNAL N° Work Package Item Description 241100682 WP5 Autogrill Turin 24110682 WP5 241200046 WP5 Invoice total with 2 decimals (incl. VAT) Explanatio ns Euro paid Euro eligible 9,60 9,60 9,60 Food Turin Art Hotel Boston Turin 238,00 238,00 214,20 Hotel Turin Salzburg Food 18,67 18,67 18,67 Salzburg food 266,27 266,27 242,47 TOTAL FP7 - VERIFICATION OF EXPENDITURE ITEMISATION OF PROJECT EXPENDITURE PER PROJECT PARTNER First Reporting Period (September 2011 - August 2012) Project Number + Title: Partner Name + Country: BUDGET LINE: 288734 SMARD CSP Innovazione nelle ICT-Italy Staff Workpackages Month Amount in Euro with 2 decimals (basic salary + employer share) Silvia Gilli-administrative manager- 5 September 2011 196,32 Silvia Gilli-administrative manager- 5 October 2011 196,32 Silvia Gilli-administrative manager- 5 November 2011 196,32 Silvia Gilli-administrative manager- 5 December 2011 196,32 Silvia Gilli-administrative manager- 5 March 2012 815,68 Silvia Gilli-administrative manager- 5 June 2012 815,68 Michela Pollone-contact person and senior researcher- 1 September 2011 1.038,60 Michela Pollone-contact person and senior researcher- 2 September 2011 207,72 Michela Pollone-contact person and senior researcher- 4 September 2011 138,48 Michela Pollone-contact person and senior researcher- 1 October 2011 484,68 Michela Pollone-contact person and senior researcher- 2 October 2011 346,20 Michela Pollone-contact person and senior researcher- 3 October 2011 380,82 Michela Pollone-contact person and senior researcher- 4 November 2011 380,82 Michela Pollone-contact person and senior researcher- 4 December 2011 380,82 Michela Pollone-contact person and senior researcher- 3 January 2012 846,24 Michela Pollone-contact person and senior researcher- 4 January 2012 564,16 Michela Pollone-contact person and senior researcher- 3 February 2012 1.093,06 Michela Pollone-contact person and senior researcher- 4 February 2012 352,60 Michela Pollone-contact person and senior researcher- 3 March 2012 881,50 Michela Pollone-contact person and senior researcher- 4 March 2012 387,86 Michela Pollone-contact person and senior researcher- 3 Apr-12 775,72 Michela Pollone-contact person and senior researcher- 4 Apr-12 387,86 Michela Pollone-contact person and senior researcher- 3 May 2012 1.057,80 Michela Pollone-contact person and senior researcher- 5 May 2012 387,86 Name(s) and Functions of involved staff Explanations Michela Pollone-contact person and senior researcher- 3 June 2012 1.410,40 Michela Pollone-contact person and senior researcher- 4 June 2012 387,86 Michela Pollone-contact person and senior researcher- 3 July 2012 846,24 Michela Pollone-contact person and senior researcher- 4 July 2012 282,08 Michela Pollone-contact person and senior researcher- 3 August 2012 564,16 Eleonora Pantò-senior expert- 1 September 2011 1.114,08 Eleonora Pantò-senior expert- 3 January 2012 1.129,68 Eleonora Pantò-senior expert- 3 February 2012 1.412,10 Eleonora Pantò-senior expert- 3 March 2012 1.176,75 Eleonora Pantò-senior expert- 3 Apr-12 1.035,54 Eleonora Pantò-senior expert- 3 May 2012 1.412,10 Eleonora Pantò-senior expert- 3 June 2012 1.412,10 Eleonora Pantò-senior expert- 3 July 2012 1.412,10 Eleonora Pantò-senior expert- 3 August 2012 1.412,10 Sergio Duretti-senior expert- 4 March 2012 694,32 Sergio Duretti-senior expert- 3 May 2012 694,32 Sergio Duretti-senior expert- 3 June 2012 694,32 Sergio Duretti-senior expert- 3 July 2012 694,32 Isabella Bianco-junior researcher- 1 November 2011 650,00 Isabella Bianco-junior researcher- 2 November 2011 350,00 Isabella Bianco-junior researcher- 1 December 2011 650,00 Isabella Bianco-junior researcher- 2 December 2011 350,00 Isabella Bianco-junior researcher- 1 January 2012 650,00 Isabella Bianco-junior researcher- 2 January 2012 350,00 Isabella Bianco-junior researcher- 1 February 2012 650,00 Isabella Bianco-junior researcher- 2 February 2012 350,00 Isabella Bianco-junior researcher- 1 March 2012 650,00 Isabella Bianco-junior researcher- 2 March 2012 350,00 Isabella Bianco-junior researcher- 1 Apr-12 1.430,00 Isabella Bianco-junior researcher- 2 Apr-12 770,00 Isabella Bianco-junior researcher- 1 May 2012 780,00 Isabella Bianco-junior researcher- 2 May 2012 420,00 Isabella Bianco-junior researcher- 1 June 2012 780,00 Isabella Bianco-junior researcher- 2 June 2012 420,00 Isabella Bianco-junior researcher- 1 July 2012 780,00 Isabella Bianco-junior researcher- 2 July 2012 420,00 TOTAL 41.094,01 FP7 - VERIFICATION OF EXPENDITURE ITEMISATION OF PROJECT EXPENDITURE PER PROJECT PARTNER First Reporting Period (September 2011 - August 2012) Project Number + Title: 288734 SMARD Partner Name + Country: BUDGET LINE: INTERNAL N° CSP Innovazione nelle ICT-Italy Other Direct Costs Travel Work Package Item Description Invoice total with 2 decimals (incl. VAT) Amount Euro paid (2 decimals) Euro eligible (2 decimals) WP5 Michela Pollone-Train Stuttgard-Salzburg-2nd 34,00 Consortium Meeting, Salzburg,1-3 February 2012 34,00 34,00 WP5 Michela Pollone-Hotel Salzburg-2nd Consortium 162,00 Meeting, Salzburg,1-3 February 2012 162,00 162,00 WP5 Michela Pollone-Train Salzburg-Monaco-2nd 30,90 Consortium Meeting, Salzburg,1-3 February 2012 30,90 30,90 WP5 Michela Pollone-Flight Monaco-Turin-2nd 258,71 Consortium Meeting, Salzburg,1-3 February 2012 258,71 129,35 WP5 Michela Pollone-Bus Caselle Airport-Turin-2nd 6,50 Consortium Meeting, Salzburg,1-3 February 2012 6,50 6,50 WP5 Michela Pollone 3 days of daily allowance-2nd 150,00 Consortium Meeting, Salzburg,1-3 February 2012 150,00 150,00 TOTAL 642,11 642,11 512,75 Explanations FP7 - VERIFICATION OF EXPENDITURE ITEMISATION OF PROJECT EXPENDITURE PER PROJECT PARTNER First Reporting Period (September 2011 - August 2012) Project Number + Title: 288734 SMARD Partner Name + Country: BUDGET LINE: INTERNAL N° CSP Innovazione nelle ICT-Italy Other direct costs Events Work Package Item Description Invoice total with 2 decimals (incl. VAT) Amount Euro paid Euro eligible Explanations WP4 Pantò NEM Summit 2011 -Turin- 468,00 468,00 468,00 DISSEMINATION WP4 Pollone NEM Summit 2011 -Turin- 468,00 468,00 468,00 DISSEMINATION 194,70 177,00 EVENT COSTS 165,80 150,73 EVENT COSTS WP5 WP5 Kick off meeting -26-27 September 2011 Coffee break -invoice n°334 27/09/11 194,70 Envi Point Kick off meeting -26-27 September 2011Evening meal Ristorante Porto di Savona 165,80 Invoice n°1617 26/09/11-Ristorante Porto di Savona WP5 Kick off meeting -26-27 September 2011Local rent-Invoice n°1252 29/09/11 181,50 Environtment Park 181,50 150,00 EVENT COSTS WP4 SMARD Flyer-Invoice n°5 29/02/12 Valentina Savio 471,90 471,90 390,00 DISSEMINATION WP4 SMARD Flyer-Invoice n°17 30/03/12 Zeronove 2.662,00 2.662,00 450,00 DISSEMINATION TOTAL 4.611,90 4.611,90 2.253,73 FP7 - VERIFICATION OF EXPENDITURE ITEMISATION OF PROJECT EXPENDITURE PER PROJECT PARTNER First Reporting Period (September 2011 - August 2012) Project Number + Title: Partner Name + Country: BUDGET LINE: 288734 SMARD MFG, Germany Staff Month Amount in Euro with 2 decimals (basic salary + employer share) 1 - 2; 4 - 5 September 11 2.757,10 see timesheets 1 - 2; 4 - 5 October 3.976,59 see timesheets 1 - 2; 4 - 5 November 11 4.480,29 see timesheets 1 - 2; 4 - 5 December 11 2.253,40 see timesheets 1 - 2; 4 - 5 January 12 3.022,21 see timesheets 1-5 February 12 3.287,31 see timesheets 1 - 2; 4 - 5 March 12 2.651,06 see timesheets 1 - 2; 4 - 5 April 12 2.995,69 see timesheets May 1.246,00 see timesheets 1-5 March 12 1.177,08 see timesheets 1-5 April 12 1.286,58 see timesheets 1-5 May 3.421,75 see timesheets 1-5 June 12 3.476,50 see timesheets 1-5 July 12 3.257,51 see timesheets 1-5 August 12 2.586,84 see timesheets Bernd Hertl, Dissemination 4 January 12 622,08 see timesheets Bernd Hertl, Dissemination 4 February 12 654,82 see timesheets Bernd Hertl, Dissemination 4 March 12 687,56 see timesheets Bernd Hertl, Dissemination 4 April 12 638,45 see timesheets Bernd Hertl, Dissemination 4 June 12 605,71 see timesheets Bernd Hertl, Dissemination 4 July 12 687,56 see timesheets Bernd Hertl, Dissemination 4 August 12 638,45 see timesheets Christian Förster, Research Funding/ Trend Monitoring 3 July 12 405,60 see timesheets Name(s) and Functions of involved staff Martina Groeschel, Project leader Martina Groeschel, Project leader Martina Groeschel, Project leader Martina Groeschel, Project leader Martina Groeschel, Project leader Martina Groeschel, Project leader Martina Groeschel, Project leader Martina Groeschel, Project leader Martina Groeschel, Project leader Alexandra Rudl, Project leader Alexandra Rudl, Project leader Alexandra Rudl, Project leader Alexandra Rudl, Project leader Alexandra Rudl, Project leader Alexandra Rudl, Project leader Workpackage 1; 4 -5 1 of 6 Explanations FP7 - VERIFICATION OF EXPENDITURE ITEMISATION OF PROJECT EXPENDITURE PER PROJECT PARTNER First Reporting Period (September 2011 - August 2012) Project Number + Title: Partner Name + Country: BUDGET LINE: 288734 SMARD MFG, Germany Staff Name(s) and Functions of involved staff Workpackage Month Amount in Euro with 2 decimals (basic salary + employer share) Explanations Jürgen Jähnert, Head of Unit ICT and Knowledge Networks 1, 4 -5 September 11 2.976,35 see timesheets Jürgen Jähnert, Head of Unit ICT and Knowledge Networks 1, 3 -5 October 4.155,66 see timesheets Jürgen Jähnert, Head of Unit ICT and Knowledge Networks 1, 3 -5 November 11 5.925,29 see timesheets Jürgen Jähnert, Head of Unit ICT and Knowledge Networks 1-5 December 11 2.583,25 see timesheets 1, 3 -5 January 12 3.453,69 see timesheets Jürgen Jähnert, Head of Unit ICT and Knowledge Networks 1, 3 -5 February 12 3.116,75 see timesheets Jürgen Jähnert, Head of Unit ICT and Knowledge Networks 4, 5 March 12 1.881,28 see timesheets Jürgen Jähnert, Head of Unit ICT and Knowledge Networks 3, 5 April 12 1.544,33 see timesheets Jürgen Jähnert, Head of Unit ICT and Knowledge Networks 2-5 May 12 1.797,04 see timesheets Jürgen Jähnert, Head of Unit ICT and Knowledge Networks 2-5 June 12 2.386,70 see timesheets Jürgen Jähnert, Head of Unit ICT and Knowledge Networks 1-5 July 12 3.987,19 see timesheets Jürgen Jähnert, Head of Unit ICT and Knowledge Networks 1, 3 -5 August 12 2.892,11 see timesheets Stefanie Springer, Innovation Fostering/Start-Up and Growth Support 2 September 11 86,56 see timesheets Stefanie Springer, Innovation Fostering/Start-Up and Growth Support 2 October 108,20 see timesheets Stefanie Springer, Innovation Fostering/Start-Up and Growth Support 2 November 11 273,92 see timesheets Stefanie Springer, Innovation Fostering/Start-Up and Growth Support 2 December 11 137,87 see timesheets Stefanie Springer, Innovation Fostering/Start-Up and Growth Support 2 January 12 173,12 see timesheets Stefanie Springer, Innovation Fostering/Start-Up and Growth Support 2 February 12 108,20 see timesheets Stefanie Springer, Innovation Fostering/Start-Up and Growth Support 2 March 12 43,28 see timesheets Stefanie Springer, Innovation Fostering/Start-Up and Growth Support 2 April 12 86,56 see timesheets Stefanie Springer, Innovation Fostering/Start-Up and Growth Support 2 May 12 43,28 see timesheets Jürgen Jähnert, Head of Unit ICT and Knowledge Networks 2 of 6 FP7 - VERIFICATION OF EXPENDITURE ITEMISATION OF PROJECT EXPENDITURE PER PROJECT PARTNER First Reporting Period (September 2011 - August 2012) Project Number + Title: Partner Name + Country: BUDGET LINE: 288734 SMARD MFG, Germany Staff Name(s) and Functions of involved staff Workpackage Month Amount in Euro with 2 decimals (basic salary + employer share) Explanations Heiko Schlecht, Controlling 5 September 11 243,45 see timesheets Heiko Schlecht, Controlling 5 October 251,39 see timesheets Heiko Schlecht, Controlling 5 November 11 467,94 see timesheets Heiko Schlecht, Controlling 5 December 11 346,49 see timesheets Ingo Schuler, Controlling 5 January 12 49,73 see timesheets Ingo Schuler, Controlling 5 February 12 16,58 see timesheets Ingo Schuler, Controlling 5 March 12 16,58 see timesheets Ingo Schuler, Controlling 5 April 12 16,58 see timesheets Ingo Schuler, Controlling 5 May 12 82,89 see timesheets Ingo Schuler, Controlling 5 June 12 49,73 see timesheets Ingo Schuler, Controlling 5 July 12 99,46 see timesheets Ingo Schuler, Controlling 5 August 12 182,35 see timesheets TOTAL 86.399,92 without ind. costs Indirect Costs 6.047,99 3 of 6 FP7 - VERIFICATION OF EXPENDITURE ITEMISATION OF PROJECT EXPENDITURE PER PROJECT PARTNER First Reporting Period (September 2011 - August 2012) Project Number + Title: Partner Name + Country: 288734 SMARD MFG, Germany Other Direct Costs Travel BUDGET LINE: INTERNAL N° Work Package Item Description Invoice total with 2 decimals (incl. VAT) Euro paid (2 decimals) Euro eligible (2 decimals) Amount Explanations 5 Project negotiations with EC 111,60 111,60 111,60 Business trip, Martina Groeschel, Brüssel 4 NEM Summit 2011, 27.-29.09.2011 468,00 468,00 468,00 Registration fees, Martina Groeschel, Torino 4 NEM Summit 2011, 27.-29.09.2011 468,00 468,00 468,00 registration fees, Jürgen Jähnert, Torino 4 NEM Summit 2011, 27.-29.09.2011 1.030,72 1.030,72 1.030,72 4 NEM Summit 2011, 27.-29.09.2011 267,00 267,00 267,00 Hotel booking, Jürgen Jähnert, Torino 4 NEM Summit 2011, 27.-29.09.2011 267,00 267,00 267,00 Hotel booking, Martina Groeschel, Torino 4 NEM Summit 2011, 27.-29.09.2011 50,60 50,60 50,60 Business Trip, Martina Groeschel, Torino 4 NEM Summit 2011, 27.-29.09.2011 245,90 245,90 245,90 Business Trip, Jürgen Jähnert, Torino 4 13.-14.12.2011 184,10 184,10 184,10 Train booking, Martina Groeschel, Jürgen Jähnert, Brussels 4 13.-14.12.2011 144,56 144,56 144,56 Hotel booking, Martina Groeschel, Jürgen Jähnert, Brussels 4 Project presentation, 12.-14.2011 92,13 92,13 92,13 Business trip, Martina Groeschel, Brussels 4 Project presentation, 13.-14.2011 130,76 130,76 130,76 Business trip, Jürgen Jähnert, Brussels 4 12.12.2011 71,90 71,90 71,90 Train booking, Martina Groeschel, Brussels 4 12.12.2011 63,00 63,00 63,00 Hotel booking, Martina Groeschel, Brussels 4 of 6 Flight booking, Martina Groeschel, Jürgen Jähnert, Torino FP7 - VERIFICATION OF EXPENDITURE ITEMISATION OF PROJECT EXPENDITURE PER PROJECT PARTNER First Reporting Period (September 2011 - August 2012) Project Number + Title: Partner Name + Country: 288734 SMARD MFG, Germany Other Direct Costs Travel BUDGET LINE: INTERNAL N° Work Package Item Description Invoice total with 2 decimals (incl. VAT) Euro paid (2 decimals) Euro eligible (2 decimals) Amount Explanations 5 01./02.02.2012 144,30 144,30 144,30 Train booking, Jürgen Jähnert, Salzburg 5 01./02.02.2012 83,00 83,00 83,00 Train booking, Martina Groeschel, Salzburg 5 01./02.02.2012 162,00 162,00 162,00 Hotel booking, Martina Groeschel, Jürgen Jähnert, Salzburg 5 01./02.02.2012 109,90 109,90 109,90 Business Trip, Martina Groeschel, Slazburg 4 23.03.2012 398,00 398,00 398,00 Flight booking, Martina Groeschel, Brussels 4 23.03.2012 541,25 541,25 541,25 Flight booking, Martina Groeschel, Brussels 5 01./02.02.2012 75,20 75,20 75,20 Business trip, Jürgen Jähnert, Salzburg 4 25.01.2012 35,00 35,00 35,00 Business trip, Jürgen Jähnert, Karlsruhe 4 23.03.2012 49,80 49,80 49,80 Business trip, Martina Groeschel, Brussels 4 22./23.03.2012 193,90 193,90 193,90 Train booking, Alexandra Rudl, Brussels 4 18.04.2012 95,00 95,00 95,00 Hotel booking, Alexandra Rudl, Heidelberg 4 22./23.03.2012 76,00 76,00 76,00 Business trip, Alexandra Rudl, Brussels 4 17./18.04.2012 33,00 33,00 33,00 Train booking, Alexandra Rudl, Heidelberg 4 05.07.2012 35,00 35,00 35,00 Business trip, Jürgen Jähnert, Karlsruhe 4 12./18.10.2012 239,62 239,62 239,62 Flight booking, Alexandra Rudl, Istanbul 4 12.09.2012 756,00 756,00 756,00 Flight booking, Alexandra Rudl, Brussels 6.622,24 6.622,24 6.622,24 TOTAL Indirect Costs 463,56 5 of 6 without ind. costs FP7 - VERIFICATION OF EXPENDITURE ITEMISATION OF PROJECT EXPENDITURE PER PROJECT PARTNER First Reporting Period (September 2011 - August 2012) 288734 SMARD MFG, Germany Project Number + Title: Partner Name + Country: Other direct costs Events BUDGET LINE: INTERNAL N° Work Package Item Description Amount Invoice total with 2 decimals (incl. VAT) Euro paid Euro eligible Explanations 4 1&1 Internet AG 314,38 314,38 20,87 Internet 1&1/basic charge 4 E.P.A. Language Services 148,00 148,00 148,00 Translation Flyertext SMARD 4 1&1 Internet AG 120,86 120,86 2,85 Internet 1&1/basic charge 4 TNT express 67,32 67,32 67,32 Distribution of documents to Belgium 4 1&1 Internet AG 99,99 99,99 2,78 Internet 1&1/basic charge 4 flyeralarm 82,06 82,06 82,06 print 4 flyeralarm 73,21 73,21 73,21 print 4 1&1 Internet AG 207,22 207,22 3,61 Internet 1&1/basic charge 4 1&1 Internet AG 189,27 189,27 2,78 Internet 1&1/basic charge 4 1&1 Internet AG 272,67 272,67 2,78 Internet 1&1/basic charge 4 Frank und Freunde GmbH 2.142,00 2.142,00 102,00 Service contract 1. Quarter 2012 4 Frank und Freunde GmbH 1.706,46 1.706,46 50,19 Maintenance contract 1. Quarter 2012 4 TNT express 156,06 156,06 68,14 Distribution of documents to Belgium 4 1&1 Internet AG 219,10 219,10 3,61 Internet 1&1/basic charge 4 1&1 Internet AG 790,83 790,83 2,78 Internet 1&1/basic charge 4 1&1 Internet AG 272,88 272,88 3,61 Internet 1&1/basic charge 4 sigma orionis 3.290,00 3.290,00 3.290,00 4 chamäleon group 149,00 149,00 149,00 Roll-Up Banner 4 printfactory 103,53 103,53 103,53 displayholder 10.404,84 10.404,84 4.179,12 TOTAL Indirect Costs (7%) 292,54 6 of 6 Workshop without ind. costs 3.1 Publishable summary Through EU-funded research projects, many outstanding new technologies and knowledge are developed. However, these are rarely applied in the digital media and internet industries. Furthermore, SMEs currently benefit to a relatively lower extent from the new knowledge and research efforts when compared to larger companies. Besides, those smaller companies still experience difficulties in accessing EU funding. One consequence of the above situation is that the transfer of these new technologies and knowledge between research institutions and creative enterprises is delayed or does not happen at all. This prevents the integration of new technologies into next generation products and services. Therefore, the SMARD project aims at providing support and input on two of these main issues: • to increase participation in EU-funded research programmes, especially from SMEs, • to support technology commercialisation by providing best practices in technology transfer and commercialisation. During the first reporting period the consortium has advanced in identifying and specifying R&D needs and requirements of SMEs in the Digital Media Sector as we ll as in providing guidelines for successful networked media commercialisation. Based on that, a draft of the European strategy for SME-driven research on networked media R&D has been developed. The working process is described in the graph below. Figure 1: Dependency of work packages / Process of drafting the European Strategy on NM R&D In WP 1 “Analysis of Networked Media (NM) R&D for enhancing the Competitiveness of SMEs in the Digital Media Industries”, state-of-the-art in current business and research trends as well as relevant FP7 initiatives regarding their responsiveness to SME needs 3 and requirements have been analysed in face-to-face interviews. These analyses served as a basis for developing the survey on NM R&D needs. In the survey, SMEs of the digital media industries and the web economy were asked to quantify specific RDI (Research, Development & Innovation) needs statements in terms of a) the degree of their importance, as well as b) the degree to which these are currently satisfied. Using these two metrics enabled the consortium to identify those RDI needs that have the highest potential for action and that should be especially taken into consideration by decision makers, i.e. those that were rated as highly important but being addressed in EU research projects only with low satisfaction. As a result, the survey allows the SMARD project to identify diverse categories of RDI needs in terms of technological needs, networking and learning needs, organisational or commercialisation needs (see graph below). Figure 2 Importance Satisfaction Graph The main finding of the survey was that technological needs are less important for the SMEs that responded to the survey (603 respondents) while organisational needs were evaluated most important. The three main needs identified were: • • • Minimising the effort to apply for RDI funding Minimising the administrative effort to manage RDI projects Minimising the financial risks of participating in RDI projects In parallel to the conducting of the survey, Guidelines for successful Networked Media R&D commercialization (WP 2) have been produced based on the Best Practices reported by each partner. The guidelines help researchers and SMEs involved in (EU funded) research projects in their efforts to translate their research results into economic and/or social value and applying the most appropriate technology transfer and commercialisation methods. This should result in an enhanced translation of new technologies and knowledge obtained through these research projects into new products and services commercialised by the projects partners or other (European) SMEs. The guidelines focus on the three most relevant and visible technology transfer and commercialisation mechanisms, being by creating a new spin-off or start-up, by commercializing within an existing SME or existing 4 organisation or through licensing towards a third party. The complete Guidelines can be downloaded on the SMARD Website Based on first results of the survey as well as based on the guidelines, a first draft of the European strategy for SME-driven research on networked media R&D (WP 3) has been developed including a suggestion for a European NM Research and Innovation Roadmap. (see graph below). This roadmap as well as single statements being part of that roadmap will be validated with the SMARD Advisory Board as well as with regional and European stakeholders from research, business and the policy level. Figure 3 Draft Resarch and Innovation Roadmap for Networked Media The finalized strategy will provide: • suggestions as for an innovation policy approach, addressed to policy makers at different levels (EU, national, local) • suggestions as for innovation policy tools contributing to the Horizon2020 drafting. By doing so, the strategy will contribute to tackle the following open issues and challenges: 1. the full and effective transfer of the “fortune” of innovation to the enterprises, above all the SMEs, and the market: this refers to the relative small amount of new knowledge and research results of EU projects that have been translated into new technologies, products and services delivered to customers, 2. the fully beneficial involvement of SMEs in the research programs, their access to funds and to the innovation potential of R&D results, 3. the large application of this innovation to the digital media and Internet sector and the transfer of this innovation from research institutions to digital creative enterprises with consequent effects on EU Digital Media sector competitiveness. 5 Besides the validation process with the SMARD Advisory Board and with regional stakeholders, some of the tools suggested by the SMARD draft strategy will be tested during the SMARD Final Conference. The latter will be held as a conference including a pitching session in the framework of the already established Heidelberg Innovation Forum (www.heidelberger-innovationsforum.de). The consortium aims to motivate FP7 projects to apply for presenting a business idea on the occasion of the SMARD Final Conference. This shall provide a best practice for raising awareness for commercialization questions in (European) research projects. SMARD - European Support Framework on Networked Media R&D for SMEs www.smard-project.eu 6