Debris Management Monitoring
Transcription
Debris Management Monitoring
Debris Management Monitoring THE VALUE OF MONITORING CONTRACTORS Presented by: John Buri October 30, 2013 History and Importance of Debris Monitoring Debris Management Monitoring History of Monitoring > Hurricane Andrew - 1992 > Largest debris removal operation in U.S. History (pre-Hurricane Katrina) > Many problems with debris contractors > Level of monitoring continues to evolve > Increases in requirements for documentation 3 Debris Management Monitoring Federal Laws Guiding Debris Monitoring > Stafford Act – Section 407 > Authorizes Public Assistance Grant Program > Provides provisions for rebuilding local economy > 9500 Series – Policy Guidance > FEMA Debris Management Guides 325 and 327 > Monitoring and management are “eligible costs” > Direct Administrative Cost (DAC) authorized as “Sub-grantee Administrative Expense” 4 Debris Management Monitoring Purpose and Importance of Monitoring > Mitigate risk of non-reimbursement by FEMA > Create “paper-trail” of removal and disposal of debris > Oversee contractor activities in the field > Necessary if debris contractor is engaged > Individual record (load tickets) generated for each load of debris > During large events, records may be in tens of thousands > Invoicing, project worksheets and reconciliation tied to load tickets 5 Debris Management Monitoring Degree of Monitoring Dictated by Field Operations > > Force Account Labor > Record activities in field logs > Track all personnel and equipment > Develop estimates of debris collected Debris Contractor Engaged > High level of monitoring required > Track each truck and load 6 Debris Management Monitoring Federal Versus Local Monitoring > > FEMA provides some oversight of debris removal operations > Spot check inspection towers and field > Will not “approve contracts” Reliance on competent monitors at local level for bulk of monitoring operations 7 Debris Management Monitoring Local Government Monitoring Responsibilities > Have adequately trained collection and disposal site monitors > Documentation procedures > Safety procedures > Develop documentation that is legible and complete > Ensure that all monitors have direct supervision in the field and at disposal sites > Be available to answer questions or provide documentation to elected officials, FEMA and State 8 Overview of Debris Monitoring Activities Debris Management Monitoring Monitoring Responsibilities > Verifying all debris picked up is a direct result of the disaster > Measuring and inspecting trucks to ensure capacities are accurate, and trucks are sufficiently loaded > Segregating debris collection documentation based on maintenance responsibility > Verifying the contractor is working in assigned contract areas > Verifying all debris reduction and disposal sites have access control > Providing invoice reconciliation and reimbursement support 10 Debris Management Monitoring Operational Timeline Disaster Risk Identified PreSeason Planning / Training & Exercises G.I.S & Contracts Finalized Disaster Impact Pre-event Identify Additional Funding Applicants Sources Briefing Kickoff Meeting INF Damage Assessment Key Personal mobilized Project Validation Final Inspection Recovery Process Project Closeout Initial project staffing needs are met Temporary debris sites prepared and opened Staff and crews continually added/removed to meet project needs as well as evaluated and trained daily Best performers selected for specialized projects Implement Recovery Plan 11 11 Debris Management Monitoring Operational Activities - Pre-Event /Annually > Review of GIS Layers / Roadway Maintenance Responsibilities > Identify primary routes > Hospitals > Assisted living facilities > Pump stations > Location of Debris Management Sites (DMS) > Review of Contracts 12 Debris Management Monitoring Operational Activities - Immediately After Event > > Emergency (70 – Hour) Push > Documented on a time & materials basis > Typically reimbursed at 100% > Force Account or contractor labor to perform work Preliminary Damage Assessment 13 Debris Management Monitoring Operational Activities - Immediately after event > DMS and final disposal sites must be permitted > > > Dept. of Environmental Protection Dept. of Agriculture Local Environmental Agencies > Applicant is ultimately responsible for final disposition of all debris > Site Layout > > > > > > > Ingress / Egress Traffic Control Type of Reduction Entrance/Exit Tower Lighting Fire Protection Restrooms 14 14 Debris Management Monitoring Operational Activities - Truck & Equipment Certification > Measure maximum capacity of debris hauling vehicles > Perhaps the most crucial element of a debris removal operation > > Tracks debris quantities Combats opportunity for fraud > Periodic re-certification 15 Debris Management Monitoring Operational Activities – Right-of-Way Debris Collection Monitoring > Right-of-Way (ROW) Collection > Paid by the unit > > Cubic Yard Weight > Only event generated debris is eligible > Debris must be on public ROW > All debris collected must be monitored 16 16 Debris Management Monitoring Operational Activities - Disposal Site Monitoring > Load calls made at tower > > > > > > > Calls made based on percentage full Staff must be able to handle conflict resolution Staff must not be coerced into making calls Staff must be able to identify truck modifications > Vehicle measurement routinely checked Debris may need to be segregated depending on origin Staff rotated frequently Tower must meet OSHA requirements > > > Floor must be 15’ high Staff must wear protective gear Staff must notify contractor of safety concerns 17 Debris Management Monitoring Operational Activities – Hazardous Limb and Tree Removal Monitoring > Hazardous tree and limb removal > Must meet eligibility requirements > GPS and photographs required Must pose an immediate threat to public health and safety > 18 18 Debris Management Monitoring Operational Activities – Private Property Debris Removal Monitoring > Private Property Debris Removal (PPDR) > Must prove legal authority > Must prove need for program > Any PPDR project must be pre-approved by FEMA prior to commencing any work > Insurance issues may occur > Residents must sign right-of-entry agreement 19 19 Debris Management Monitoring Operational Activities – Additional Special Projects > > > > > > > > > > > > Beach remediation/restoration Marine/waterway debris removal Private property demolition/debris removal White goods debris removal Animal carcass removal and disposal Vessel and vehicle recovery Food waste removal Subsurface storm drain debris removal Hazardous waste debris removal Nuisance abatement ordinance administration Saltwater killed tree removal Asbestos abatement 20 20 Management and Reporting Systems Automated Debris Management Systems (ADMS) > Direction in industry is away from paper tickets > Significantly reduces back-end reconciliation costs > No scanning of tickets > No data entry errors > No duplicate ticket numbers > Provides real-time reporting and progress updates > Allows for rapid contractor invoicing and subcontractor reconciliation > Enhances fraud prevention > Increases productivity – user friendly > Results in a central repository for all field documents including incident reports Simple…Reliable…Low Cost 21 Why Contract for Monitoring Services? Contracting for Monitoring Services > Reimbursed at Federal cost share > Established like other professional services > Must be competitively bid > Cannot be tied to hauling contract or contingent on FEMA reimbursement > Pricing structure on a time and materials basis 23 Benefits of Monitoring Firm > Staff able to return to normal duties > Bring experience and expertise to operation > Additional services/capabilities > Training program > Reporting tools > Transfers safety risk of monitoring staff to private firm > Experts in reimbursement process – Your advisors on potential issues and things to be aware of 24 Common Reasons for Non-Reimbursement > Reasonable costs issues > Original contracts not competitively bid or properly procured > Contingency language in contracts > Collection volumes cannot be tracked through processing / final disposal > Incomplete or insufficient documentation > Field validation does not support ticketing > Engaging in certain projects without FEMA approval > Not following disaster specific guidance > Improper categorization of projects (i.e. permanent work treated as emergency work) > Agency not legally responsible applicant 25 Point of Contact John Buri DIRECTOR OF CLIENT SERVICES | BDR DIVISION 1234 Leidos Street Suite 202 McLean, VA 12345 713.973.5705 (office) 713.737.5763 (mobile) [email protected] Visit us at leidos.com/engineering 26