Transportation Border Working Group – Portland March 3
Transcription
Transportation Border Working Group – Portland March 3
Transportation Border Working Group – Portland March 3-4, 2014 CBSA Infrastructure Project Update CBSA Project Status Update • Environmental/Challenges • Current Projects – – – – – – Lacolle Emerson and North Portal Aldergrove Small Ports St. Leonard Pacific Highway • Recent Government Announcements 2 Environment/Challenges The CBSA port infrastructure is suffering from rust-out and building fatigue; Since 2000 the Agency has invested over $300M to modernize and improve the infrastructure at ports of entry across Canada Investment has been focused on the large volume ports of entry with an emphasis on the Designated Commercial Offices (DCO); The majority of the CBSA’s larger DCO ports have been, or are in the process of being redeveloped and are functional and provide adequate serviceability; The challenge is to sustain the operational integrity of the existing facilities while securing the capital resources required to address those facilities that can no longer efficiently and effectively support the CBSA’s border services mandate. 3 Current Projects – Lacolle Conceptual Design – Lacolle POE Travellers – BtB Initiative: The new POE will have 15 travellers PIL – 13 regular lanes and 2 NEXUS lanes, an increase from the current 9 Lanes: o o Construction award anticipated in February 2016, with project completion targeted for October 2017 Our primary goal will be to increase traveller capacity to reduce border wait times Commercial Examination Facility – Gateways and Borders Crossing Fund (GBCF) Initiative The new commercial inspection facilities will include 6 offload examination bays, along with expanded office and enforcement capacity. The commercial facilities are scheduled to be completed by September 2015 Lacolle Commercial 4 Current Projects – Emerson and North Portal Emerson – BtB Initiative: Construction of dedicated Commercial By-Pass lane; North Portal New Land acquired Expanded Commercial Expanded Queuing o Commercial lane to have 3 PIL booths of which one will be a dedicated FAST The RFP to engage an architect to prepare plans and specifications was posted in February, 2015; Project completion scheduled for 2017 North Portal - BtB Initiative CBSA has secured the additional land required to implement the project; The RFP to engage an architect to prepare plans and specifications is expected to be posted in March, 2015; Project completion scheduled for 2017-18 This project will provide the following benefits to the current Port of Entry New Primary canopy to allow commercial vehicle access 1 new bi-level primary lane with expanded primary queuing capacity Expanded commercial capacity for 1 offload 5 Current Projects – Aldergrove Conceptual Design – Aldergrove POE Construction phase is underway and temporary PIL lanes have opened; Travellers facility scheduled to be completed in January 2016; Occupancy of the commercial facility and project completion scheduled for April 2016; The new POE facilities will include: o o o o 5 Travellers Primary Inspection Lanes (PIL) -Current facility has 3 PIL lanes; 2 Commercial PIL lanes; NEXUS; Commercial offload examination facility Currently: the foundations are completed, the slab is being poured, framing has begun 6 Small Ports Infrastructure Replacement Initiative Willow Creek POE Monchy POE Port replacement projects in Coronach, SK and West Poplar, SK are substantially complete and currently operational Port replacement projects are underway in Morses Line, QC, Monchy, SK and Willow Creek, SK; Willow Creek o o o o Modular unit was delivered in December 2015 Finishing work has begun Canopy has just been erected Expected occupancy in the Summer 2015 Monchy o o Foundation for the PIL booth has been poured and the modular unit interior finish work has begun Expected occupancy in the Summer 2015 Morses Line – o Port is being replaced in conjunction with the remote technology processing project 7 St. Leonard POE Replacement • New location USA • CBSA to acquire the adjacent land from PWGSC and construct a new POE using the modular units from Cornwall, ON Current site • • • New Site • • • 1 Primary lane for travellers only Clients must cross oncoming traffic 2 Bi-level lanes for traveller and commercial vehicles Added lane technology will increase processing capacity Timelines • Completion Fall 2016 8 Current Projects – PAC Fixed Large Scale Imaging • • • The Agency is investing in a stationary X-ray unit that will increase the processing capacity Examinations will be expedited with this new technology Project to be tendered • • April 2015 Anticipated completion • Fall 2016 LSI 9 Recent Government Announcements • November 24, 2014 announcement of $440 Million to expedite the replacement of border infrastructure • This funding will build on work recently completed and currently underway to improve border infrastructure at several Port’s of Entry • Boundary Bay, (Tsawwassen) BC; Boissevain, MB; Sprague, MB; have been announced to date. • Further announcements will be coming in the weeks and months ahead 10 Questions? 11