Untitled
Transcription
Untitled
Wir bewegen Ihr Projekt – Werbung in ruhigen wie in stürmischen Zeiten. Und Ihre Bank? Kunde 1/1 s/w oder 4c Sprechen Sie mit uns: 0421 332-1667 Jürgen Broers, Projektfinanzierungen Erneuerbare Energien Editorial English Deutsch Wind energy is still a young and therefore dynamically changing industry. The year 2012 was characterized by such changes, positive as well as negative. The further de velopment of wind energy in Germany has proved to be very stable in 2012, with an additional installation of 2,400 MW. With a total of 44,711 MW of new installations, the global installed wind power capacity grew by about 8.4% compared to 2011 (ref. GWEC). With more than 13,000 MW each, the US and China together once more account ed for clearly over 50% of the global market, but whereas for the US this meant an increase of 93% compared to 2011, China suffered a decrease of 27%. Both changes are clear indications of the impact of political incentives or failures, and so it will be very interesting to watch how the Production Tax Credit whose extension was delayed be cause of the elections will now influence this year’s instal lation figures on the US market. Both incidents show how sensitive the wind industry reacts on government inter vention in existing financial support schemes. In the case of Germany this means that any modifications of the Re newable Energy Sources Act (EEG) should be considered very carefully in order to ensure that the development of renewables will continue even when the economic condi tions have changed. The disadvantage of support schemes such as they ex ist in Germany is that they have to be revised regularly in order to avoid over-subsidization due to technological progress. In doing so, is not very helpful to refer to the costs of the status quo, because all parties interested will calculate “backwards” starting from the given rates of re muneration in order to secure the largest possible profit for their project share. As a result, everyone is only inter ested in protecting their acquired possessions. Studies on the cost situation of wind energy therefore do not lead to the desired results because they always reflect the wishful thinking of the parties concerned. By contrast, in auction mechanisms, calculations are “forward-oriented” in order to explore the lowest possible rate of remuneration which would still allow them to win the auction. The disadvan tage of this scheme, however, is that only a later detailed planning of the project will reveal whether it is economi cally feasible on the basis of the remuneration offered. Still, it is recommendable when revising the Renewable Die Windenergiebranche ist eine immer noch junge und daher sich sehr dynamisch verändernde Industrie. Das Jahr 2012 war von solchen Änderungen geprägt, positiven wie auch negativen. Deutschland mit einem Zubau von 2.400 MW im Jahr 2012 zeigte sich im weiteren Ausbau der Windenergie als sehr stabil. Mit insgesamt 44.711 MW [1] wuchs der weltweite jährliche Zubau gegenüber 2011 um 8,4 %. USA und China stellten mit je über 13.000 MW erneut deutlich über 50% aller Anlagen auf, allerdings war dabei gegenüber 2011 in den USA eine Steigerung um 93% und in China ein Rückgang um 27% zu verzeichnen. Beides deutliche Zeichen politischer Vorgaben oder Ver säumnisse, weshalb es sehr interessant sein wird, wie sich der wegen der Wahlen verspätet verlängerte Production Tax Credit auf die diesjährigen Aufstellzahlen in den USA auswirken wird. Beide Vorgänge zeigen, wie empfindlich die Windbranche reagiert, wenn staatliche Eingriffe im Bereich der Förderung stattfinden. Übertragen auf Deutschland heißt dies, über mögliche Modifizierungen des EEG sehr sorgfältig nachzudenken, damit sich der Aus bau der Regenerativen auch unter veränderten Rahmen bedingungen fortsetzt. Fördermodelle wie in Deutschland haben den Nachteil, dass sie regelmäßig überprüft werden müssen, um Über förderungen, die sich durch technischen Fortschritt erge ben, zu vermeiden. Es ist dabei wenig hilfreich, sich auf Kosten des erreichten Status quo zu beziehen, da alle Beteiligten vom gegebenen Vergütungsumfang aus „rück wärts“ rechnen, um sich den größtmöglichen Gewinn für ihren Projektanteil zu sichern. Das führt dann dazu, dass niemand bereit ist, auf erreichte „Besitzstände“ zu ver zichten. Kostenstudien sind in diesem Fall daher nicht zielführend, da sie immer das eigene Wunschdenken der Beteiligten wiedergeben. Bei Auktionsmodellen wird „vor wärts“ gerechnet, um auszuloten, mit welchem gerings ten Vergütungswert das Vorhaben noch zu gewinnen ist. Nachteilig ist hier eindeutig, dass sich erst bei der genau eren Auslegung des Projektes herausstellt, ob es über haupt mit dem angebotenen Vergütungssatz wirtschaft lich machbar ist. Dennoch wäre für die Fortentwicklung des EEG in Deutschland zu empfehlen, die gezahlten Ver gütungen aller Modelle auf der Basis der Standortwindge schwindigkeiten miteinander zu vergleichen. DEWI MAGAZIN NO. 42, February 2013 3 Energy Act in Germany, to compare the remunerations paid in the various promotion models on the basis of the site-specific wind speeds. The wind turbines themselves account for about 75% of the cost of a wind farm project, and these are produced by globally operating companies. It is therefore safe to as sume that turbine prices can be very similar world-wide and the local differences depend on the attractiveness of the respective market. The fact that wind turbine costs are on the decrease world-wide shows that with a proper de sign of the wind turbine’s power output, there is a poten tial for further cost reduction in wind turbines. Therefore we should ask ourselves, why the remunerations achieved under an auction mechanism in another country with the same wind conditions are approximately 20% lower than in Germany. One could assume that at least in wind-rich regions, wind energy in Germany could also manage with a smaller remuneration. This thought is also reflected in the present discussion in Germany in which without much opposition the opinion is accepted that at least onshore the EEG remuneration could be reduced in order to avoid over-subsidization criticized by consumers. Together we can find a way to turn the Energiewende (en ergy transition), with wind energy as one of the key en ergy sources, into an economic success. Everyone will gain a long-term benefit from this, industry, investors, consum ers and last but not least the environment. We at DEWI with our international experience will be glad to contrib ute to achieving a sustainable result. Etwa 75% der Kosten eines Windparkprojektes ergeben sich durch die Windturbinen und diese werden durch international tätige Hersteller gefertigt. Man kann also davon ausgehen, dass die Anlagenpreise weltweit sehr ähnlich sein können und die lokalen Unterschiede haupt sächlich durch die Attraktivität der jeweiligen Märkte bedingt sind. Zusätzlich zeigen die international sinken den Windturbinenkosten, dass bei richtiger Leistungsaus legung auch bei diesen noch ein Kostensenkungspotenzial existiert. Daher gibt es Anlass darüber nachzudenken, warum die in einer Versteigerung erzielte Energievergütun gen in einem anderen Land bei gleichen Windverhältnissen in der Größenordnung 20 % niedriger liegen, als in Deutschland. Es könnte dann vermutet werden, dass die Windenergie in Deutschland zumindest in guten Windge schwindigkeitsgebieten mit einem geringeren Vergütungs satz auskommen könnte. In der derzeit geführten Diskus sion in Deutschland spiegelt sich diese Auffassung wider, wird doch ohne viel Widerspruch die Meinung akzeptiert, dass zumindest Onshore die EEG Vergütung abgesenkt werden könnte, um eine beim Energieverbraucher schlecht angesehene Überförderung zu vermeiden. Lassen Sie uns gemeinsam Wege finden, wie die Energie wende, mit der Windenergie als einem der zentralen Energieträger, zu einem volkswirtschaftlichen Erfolg wird. Alle werden davon nachhaltig profitieren, Industrie, Inves toren, Verbraucher und nicht zuletzt die Umwelt. Wir als DEWI sind bereit mit unserer internationalen Erfahrung zu einem tragfähigen Ergebnis beizutragen. Wilhelmshaven, February 2013 Jens Peter Molly Managing Director References / Literatur: [1] Global Wind Statistics 2012, GWEC, 11.2.13 www.tuev-sued.de TÜV Süddeutschland Bau und Betrieb GmbH Wind Energy Certification Accreditation No. DAP-ZE-3510.02 4 DEWI MAGAZIN NO. 42, February 2013 Our independent certi support your business Wind turbine certification In-depth design approval of service life Product certification, man Our acceptance tests assur turbines Review of the Real Energy Production Data of Operating Wind Farms in Comparison to Former Predicted Energy Yields page 6 Wind Energy Development 2012 in Germany Benefits from Repowering page 42 Successful DEWEK 2012 page 74 Content No 42 3 Editorial (GB, DE) 6 Review of the Real Energy Production Data of Operating Wind Farms in Comparison to Former Predicted Energy Yields (GB, DE) 14 Use of Different Globally Available Long-term Data Sets and its Influence on Expected Wind Farm Energy Yields (GB) 19 Calculation of Wind Farm Production Losses via MERRA Data in Consequence of Bat Based Temporary Wind Turbine Shut Downs(GB) 23 Assessment of the Potential for Wind, Solar and Bio Energy in the Northwest of Lower Saxony (GB, DE) 31 Wind Energy Use in Germany - Status 31.12.2012 (GB, DE) 42 Wind Energy Development 2012 in Germany Benefits from Repowering (GB, DE) 51 Temporal & Energetic Downtime Losses and its Influence on Wind Farm Economics (GB) 55 Gearmesh as Source of Vibration and Application of Modal Synthesis Techniques to the Characterization of Mechanical Systems (GB) 61 Park Correction for FINO1-Wind Speed Measurements at alpha ventus (EN) 65 Detailed Analysis of Offshore Wakes Based on Two Years Data of alpha ventus and Comparison with CFD Simulations (EN) 72 DEWI News (GB, DE) 74 Successful DEWEK 2012 High quality of conference contributions attracted wind experts from 20 countries (GB, DE) 60 70 Impressum List of Advertisers GB = English, DE = Deutsch, ES = Español, FR = Français, PT = Português, TR = TÜRKÇE DEWI MAGAZIN NO. 42, February 2013 5