Journal - BACnet
Transcription
Journal - BACnet
BACnet Europe ISSN 1614-9572 Journal BACnetForumAmsterdam6 Latitude20inParis16 05 11/06 Feldbus-Krieg ade Bye-byeFieldBusWar5 BACnet integriert Sicherheitstechnik BACnetIntegratesSecurity31 Automatisierte Konformitätstests BACnetTestFramework41 DeTeImmobilien wird Mitglied DeTeImmobilienBecomesMember51 DESIGO™ ensures that everything is under control. User-friendly solutions are a must: DESIGO™ – the ingeniously designed building automation and control system offers ease of operation in the proper sense of the word. The operator units feature straightforward menu-driven operation and full graphic displays. The result: Short training times for operating staff, optimum system usage and targeted actions should faults occur, independent of time and location, through Web technology. Easy to use – powered by DESIGO™ Please contact: Siemens Switzerland Ltd, Building Technologies Group, International Headquarters, Gubelstrasse 22, CH-6301 Zug, Tel. +41 41 724 24 24 www.siemens.com/buildingtechnologies s Editorial Notes Inhalt - Content 5 Editorial: Feldbus-Krieg ade – Editorial: Bye-bye Field Bus War 6 BACnet Forum Amsterdam – BACnet Forum Amsterdam BACnet Europe Journal ISSN 1614-9572 The BACnet Europe Journal is the European magazine for building automation based on BACnet technology. Experts, practitioners and professionals show the way in applying and developing the BACnet standard – from building automation trends to devices and application projects; from qualification and training to testing and certification; from who’s who in the BACnet community to useful information on events and publications. Special attention is given to members and activities of the BACnet Interest Group Europe (BIG-EU). Distribution This bi-annual and bi-lingual Journal (English/German) can be ordered free of charge by partners, members, media representatives and friends of the BACnet Europe Interest Group (BIG-EU) - registered society. Order the BACnet Europe Journal by E-Mail from [email protected] Online distribution The BACnet Europe Journal is posted as a Portable Document Format (PDF)-File to www.big-eu.org and www.bacnet.de Editor BACnet Europe Interest Group (BIG-EU), registered society, Droste-Hülshoff-Straße 1 44141 Dortmund Germany Phone: +49-2 31-56 77 72 69 Fax: +49-2 31-42 78 67 32 E-mail: [email protected] URL: www.big-eu.org Executive Board Volker Röhl, DeTeImmobilien (President), Hans-Werner Koch, Honeywell GmbH (Vicepresident) Gijs de Koning, Regel Partners B.V. Roger Braun, Siemens Schweiz AG (Treasurer) Anwendungen - Solutions 8 Leibniz-Rechenzentrum automatisiert mit BACnet BACnet Automation for the Leibniz Computing Centre 10 Systemintegration statt Austausch – Bernadus Pflegezentrum System Integration Instead of Replacement – Bernadus nursing centre 13 Ökonomische Renovierung in Den Helder – De Vijfsprong Economical Renovation in Den Helder – De Vijfsprong 16 Moderne Büros im „Latitude 20“ bei Paris Modern offices in “Latitude 20” in Paris 19 Stärken von BACnet und KNX – der St. Olav Klinik Trondheim Strengths of BACnet and KNX – in St. Olav Hospital Trondheim 22 Kostenreduzierung bei optimaler Servicequalität – Infraserv Höchst Cost Reduction with Optimum Service Quality – Infraserv Höchst BACnet insight 25 BACnet – eine Einführung – An Introduction to BACnet 27 BACnet in IT-Umgebungen – BACnet in IT Environments 31 BACnet integriert Sicherheitstechnik – BACnet Integrates Security 34 Neue BACnet-Objekte für Zutrittskontrollsysteme New BACnet Objects for Access Control Systems 37 Objekte und Funktionen für die Systemintegration Objects and Functions for System Integration Produkte – Products 41 BACnet Test Framework – BACnet Test Framework 44 BACnet/IP Protokollumwandler für die Erneuerung bestehender Systeme BACnet/IP Protocol Converter for the Renovation of Existing Systems 45 Frei programmierbarer modularer IO-Controller Free Programmable Modular IO-Controller 47 Gateways und Visualisierung – Gateways and Visualization BACnet Interest Group Europe 48 Neue Mitglieder – New Members Editorial Office MarDirect Marketing Direct GbR Bruno Kloubert Phone: +49-2 31-42 78 67 31 E-mail: [email protected] 50 Acht Gründe für Ihre Mitgliedschaft Eight Reasons for Becoming a Member Advertising MarDirect Marketing Direct GbR Carolin Seithel Phone: +49-2 31-56 77 72 69 Fax: +49-2 31-42 78 67 32 E-mail: [email protected] 52 Wie BACnet neue Bedürfnisse von Markt und Technik erfüllt How BACnet Meets the Latest Market and Technological Demands 51 DeTeImmobilien wird BIG-EU Mitglied DeTeImmobilien Becomes BIG-EU Member 54 BACnet Kalender – Calendar of Events Picture credits BIG-EU, MarDirect and specified companies Copyright © BIG-EU 2006 – Further editorial use of articles in the BACnet Europe Journal is encouraged (!) with reference to the source. Please send a specimen copy to the editor, or if published online, send the URL per mail to [email protected] BACnet® is a registered trademark of the American Society of Heating, Refrigerating and Air Conditioning Engineers, Inc. (ASHRAE) Titelbild Cover picture Neuer Höchstleistungsrechner am Leibniz-Rechenzentrum, Garching. New Supercomputer at the Leibniz Computing Centre, Garching, Germany. Alle Ausgaben sind als Download im Servicebereich von www.big-eu.org. verfügbar All issues can be downloaded from the service area of www.big-eu.org. © gsiCom BACnet Europe Journal 5 11/06 TA 7 em Syst JC DX/TC Don’t miss the connection! Priva Staefa AS1000/pronto BMS migration with BACnet IP Protocol Converter With the protocol converter, there’s no need to write off your current system. The protocol converter lengthens the lifespan of operationally sound DDC equipment and allows for a seamless connection with the BACnet communication protocol. BACnet immediately offers you various modern options, increased functionality and greater freedom of choice for the future. The benefits of BACnet? Interoperable system integration; compatibility across different brands, no specific hardware necessary and no licensing fees. Implemented in an Ethernet environment and remotely operated via the Internet. The result: affordable, easy to use, innovative building management systems. VisL&G Un ionik/ igy r Regel Partners B.V. Hogebrinkerweg 8 3871 KN Hoevelaken P.O. Box 86 3870 CB Hoevelaken T. +31 (0)33 254 48 48 F. +31 (0)33 254 48 44 [email protected] www.regelpartners.nl For more information, please visit our website. Regel Partners makes it happen! System Integrators with Content ABB Frequenzumrichter für HKL-Anwendungen Tolle Ausstattung – für mich und meine Gebäudeausrüstung „Der HKL-Frequenzumrichter von ABB kann alles; er ist bemerkenswert einfach zu bedienen und hilft Energie einzusparen. Meine Mitarbeiter sind begeistert. Mit seinen Energieeinsparmöglichkeiten amortisiert sich der ACH550 in weniger als zwei Jahren.“ Das macht den HKL-Frequenzumrichter ACH550 unschlagbar: • Ein weiter Leistungsbereich – von 0,75 kW bis 355 kW, 200 V oder 400V, IP 21 oder IP 54 • Die patentierten „Swinging DC- Chokes“ – reduzieren die Netzrückwirkungen bis zu 25% • Uhr mit Kalenderfunktion – Aufzeichnung von Zeit und Datum im Fehlerspeicher • Eingebauter EMV-Filter für 1. Umgebung – kein zusätzlicher externer Filter nötig • Fehlerspeicher – ermöglicht die Aufzeichnung von 7 Diagnosewerten mit Echtzeit und Datum • BACnet Application Specific Controller (B-ASC) ist immer integriert Erstklassige Ausstattung – alles eingebaut ABB Automation Products GmbH Motors & Drives Telefon: +49 (0) 6203 717 717 Telefax: +49 (0) 6203 717 570 E-Mail: [email protected] Internet: www.abb.de/motors&drives Feldbus-Krieg ade Bye-bye Field Bus War Liebe Leser, Dear Reader, Der Feldbus-Krieg ist vorbei. Noch vor Jahren stritten Interessenvertreter der jeweiligen Bus-Systeme, um ihr Produkt zur alleinigen allheilenden Lösung zu manifestieren. Heute hat sich das Nebeneinander von Kommunikationssystemen etabliert. Im Vordergrund stehen Lösungen für den Kunden. Systemintegration über einen Standard hinaus steht im Trend. BACnet mit seinen umfassenden Möglichkeiten, auch im Hinblick auf Mappings zu den Standards wie LonWorks oder Konnex, ist hier ein idealer Ansatzpunkt. Warum? The field bus war is over. It used to be the case that the various champions of the different bus-systems all claimed that their own products were the only solutions. Today, the different communication systems are no longer antagonists. The focus is on providing solutions for the customer. System integration that goes beyond a single standard is in demand. BACnet, with its wealth of possibilities, also concerning mappings to standards such as LonWorks and Konnex, is the ideal starting point. Why? BACnet ist das einzige Kommunikationsprotokoll für die Automations- und Managementebene, das in die Weltnorm für Gebäudeautomation aufgenommen wurde. Mit der weltweiten ISO-Standardisierung 2003 wurde die internationale Bedeutung des Standards bestätigt. Auch wurde BACnet als einziges Protokoll speziell für die Bedarfe in der Gebäudeautomation entwickelt. Entsprechend groß ist die Akzeptanz bei den Anwendern – Planern, Integratoren, Herstellern. Bei Architekten, Investoren und Betreibern spricht sich herum, dass besonders BACnet die ressourcensparende und rationelle Bewirtschaftung von Gebäuden unterstützt. So ist BACnet der einzige Standard der Gebäudeautomation, der Zeitprogramme und Betriebskalender herstellerunabhängig übertragen kann und auch Trends standardisiert weitergibt. Der Funktionsumfang zeichnet sich durch weitere leistungsfähige Dienste aus. Zum Beispiel können Anwendungsprogramme über BACnet geladen und gesichert werden – ein weiteres Zeichen der Offenheit. Durch die Arbeit des SSPC 135, dem Standardisierungsgre mium, ist der Anschluss an die Zukunft gesichert. Neue Funktionen werden in den Standard aufgenommen. Sie unter stützen zum Beispiel Lichtsteuerungen, Sicherheitseinrichtungen und Zugangskontrollsysteme. Damit fördert BACnet systematisch die übergreifende Integration aller Gewerke und bietet langfristigen Investitionsschutz. Der Feldbus-Krieg ist vorbei. BACnet unterstützt die Inte gration aller Gewerke und hat dabei übergreifende Ziele im Blick: Kosten- und Energieeinsparung, Sicherheit und Flexibilität. Viel Freude beim Lesen! BACnet is the only communication protocol for the automation and management levels to be adopted as a global stan dard for building automation. Acceptance as an international ISO standard in 2003 confirmed the global importance of the BACnet standard. BACnet is also the only protocol to be specifically developed to meet the requirements of building automation. Acceptance is particularly high amongst planners, integrators and manufacturers. Architects, investors and operators talk about how BACnet in particular supports the efficient use of resources and effective control of buildings. BACnet is the only building automation standard capable of forwarding manufacturer independent scheduling programs, operating calendars and standardized trends. Other powerful services such as, for example, the ability to load and secure application programs via BACnet are a further sign of openness. Thanks to the work of the SSPC 135 standardization committee, the future of the protocol is secured. New functions for supporting, for example, lighting control, safety and access control systems are being incorporated into the standard. In this way, BACnet systematically demands the cross-system integration of all assembly sections and offers the long term protection of investments. The field bus war is over. By demanding the cross-system inte gration of all assembly sections, BACnet is driving towards savings in costs and energy consumption as well as increased safety and flexibility. Happy reading! Hans Symanczik Kieback&Peter GmbH & Co. KG Mitglied des BIG-EU Beirates Member of BIG-EU Advisory Board BACnet Europe Journal 5 11/06 BACnet Interest Group Europe BACnet Forum Amsterdam – Effiziente Gebäudeautomation in den Niederlanden BACnet Forum Amsterdam – Efficient Building Automation in the Netherlands Wie in ganz Europa, so wird BACnet zunehmend auch in den Niederlanden eingesetzt. Gebäude wie das Krankenhaus in Almere, das Pflegeheim Bernardus in Sassenheim, die Zentrale der Woonstichting Den Helder und Teile der Universität von Amsterdam wurden mit BACnet realisiert. Das Potenzial weiterer Installationen und Integrationen ist groß. As all over Europe, BACnet is on the move in the Netherlands, too. Buildings like the hostipal in Almere, the nursing home Bernardus in Sassenheim, the main office of Woonstichting Den Helder and parts of the University of Amsterdam are already realized with BACnet. The potential of more installations and integrations is big. Zum ersten unabhängigen BACnet-Anwender-Forum der Niederlande treffen sich Vertreter der Bau-, Installations- und Immobilienwirtschaft sowie die Hersteller der Gebäudeautomationsund Regelungstechnik am 6. Dezember 2006 in Amsterdam. Eigentümer, Betreiber und Planer berichten über den Nutzen des BACnetStandards. Aus der wachsen den Zahl niederländischer BACnet-Projekte stellen sie besonders wirtschaftliche Beispiele vor und geben Hinweise zur Planung und Aus schreibung. Gastgeber des Forums sind die BACnet Interest Group Europe und Regel Partners B.V. BACnet im Aufbruch Das Forum mit dem Titel „BACnet im Aufbruch – effi ziente Gebäudeautomation in den Niederlanden“ zeigt die Anwendungspraxis heute, aber auch die zukünftige Entwicklung des Standards. Es führt in Nutzen, Potenziale und Wirtschaftlichkeit von BACnet ein und gibt Grundlagen zur Entscheidung für den richtigen Standard. Das BACnet-Potenzial in den Niederlanden steigt. Schon heute sind drei niederländische Unternehmen Mitglied in der BIG-EU. Weitere Mitglieder sind mit Tochterunternehmen oder Vertriebsbüros vor Ort. Insgesamt ist die Mitgliederzahl der BIG-EU in den letzten beiden Jahren von 40 auf 66 ge stiegen. Representatives of the buil ding, installation and real estate industries as well as the manufacturers of building automation and control engineering are to meet for the first independent BACnet user forum of the Netherlands on the 6th of December 2006 in Amsterdam. Ow ners, operators and planners will report on the increasing use of the BACnet standard. From the increasing number of Netherlands BACnet pro jects they present particularly economic examples and give tips regarding planning and bidding. The BACnet Interest Group Europe and Regel Partners B.V. are the hosts of the Forum. BACnet Europe Journal 5 11/06 BACnet on the move The forum with the title “BACnet on the move – effi cient building automation in the Netherlands” shows application practice today and, in addition, the future development of the standard. It introduces the utilisation, potential and economy of BACnet and provides the basis for decisions for the correct standard. Platinum Sponsors Gold Sponsors Silver Sponsor The BACnet potential in the Netherlands is increasing. Already today three Nether land´s enterprises are members of the BIG-EU. Further members are there with subsidiary companies or local sales offices. Altogether the number of BIG-EU members has risen from 40 to 66 in the last two years. Amsterdam ist ein euro päisches Zentrum für Architektur, Kunst und Design – der beste Platz für das erste BACnet Forum in den Nieder landen. Amsterdam is a European centre of architecture, art and design – there is no better place for the first BACnet Forum in the Netherlands. Wednesday, December 6, 2006 09.00 a.m. 10.00 a.m. Opening of the BACnet Trade Show BACnet for your total building solutions Lambert Rigter, Siemens Nederland B.V. Opening of the BACnet Forum Integration in projects Volker Röhl, President of the BIG-EU Peter Moolenbeek, Johnson Controls Automation Systems B.V. Welcome address Gijs de Koning, member of the BIG-EU board, Representative of the Dutch BIG-EU members, regel Partners B.V. Session 1 Added-value for the Real Estate through BACnet Advantages of standards in building automation Jan Kerdel, TVVL – Dutch Technical association for installations in buildings Economical renovation in Den Helder Dr. Simon Ginsburg, Saia Burgess Benelux B.V. BACnet compared to other communication standards in building automation Frank Schubert, Member of the BIG-EU Advisory Board, MBS GmbH Native BACnet and gateways Arien Peterse, Regel Partners B.V., ing. G.J. Bodin, Digicontrol Benelux B.V. KNX and BACnet - two complementary open world standards Marc Goossens, KNX Association BACnet in a “multi-protocol-world” Theo Smulders, Celsius Benelux B.V. BACnet – more than building automation Matthé Keulemans, Priva B.V. Discussion: Development of BACnet in the Netherlands Session 2 BACnet Best Practice Super cooperation between competitors Otto Meiring, Sauter Building Control Nederland B.V. Adriaan Boer, Kieback&Peter Nederland B.V Planning, tendering and placing of BACnet projects Karl-Heinz Belser, Member of the BIG-EU Advisory Board, Johnson Controls - JCI Regelungstechnik GmbH Successful integration of BACnet Theo Spithoven, Honeywell Building Solutions Nederland Listing of BACnet devices – the impact of the BTL logo Prof. Peter Fischer, Member of the BIG-EU Advisory Board, Fachhochschule Dortmund Exploiting possibilities of modern AC-Drives with BACnet Marcel Zevenbergen, ABB B.V. Building Automation at SWIFT Zoeterwoude Gaëtan Michielsen, Marco Wenzkowski, Trane Commercial Systems Europe The presentations will be held in Dutch and partly in English. Information and Registration: BIG-EU, [email protected], Tel. +49-231-56 77 72 69 BACnet im Aufbruch – Fahrplan des BACnet Forums BACnet on the move – roadmap of the BACnet Forum BACnet Forum Berlin Sept. 8-9, 2005 BACnet Forum Krakow Dec. 1, 2005 BACnet Forum Amsterdam Dec. 6, 2006 BACnet Forum Milan Feb. 8, 2007 BACnet Forum Paris April 2007 BACnet Forum Basle June 12, 2007 BACnet Forum Stockholm in preparation BACnet Forum London in preparation www.bacnetforum.org BACnet Europe Journal 5 11/06 Anwendungen Solutions Leibniz-Rechenzentrum automatisiert mit BACnet BACnet Automation for the Leibniz Computing Centre Mit einer nativen BACnet Lösung realisierte Honeywell die komplexe Automatisierung im Neubau des LeibnizRechenzentrums bei München. With a native BACnet solution Honeywell realised the complex automation in the new building sections of the Leibniz Computing Centre near Munich. Der neue Supercomputer SGI® Altix ® 4700 des Herstellers Silicon Graphics, der in seiner ersten Ausbaustufe über 4.096 Intel® Itanium®2 Prozessoren und einem Hauptspeicherausbau von 17 Terabyte verfügt, beansprucht eine Stellfläche von 25 Metern in beiden Richtungen. Für den Betrieb und die Klimatisierung des Pa rallelrechners werden circa 2 MW Energie benötigt. Drei neue Trakte im LRZ Eingesetzt wird der neue Supercomputer vor allem für die Simulation komplexer Systeme und Prozesse in der Physik, Materialforschung, Strömungsdynamik, Astro physik und Chemie sowie in den Geo- und Biowissenschaften. Die drei neuen Trakte des LRZ (Rechner-, Instituts- und Hörsaaltrakt) erstrecken sich über eine Fläche von 5.600 m 2 . Die Baukosten der Gebäude von 45 Mio. Euro und die Investitionen von 38 Mio. Euro in den Rechner teilen sich je zur Hälfte der Freistaat Bayern und die Bundesrepublik Deutschland. gases. Dazu wird das spezielle Brandschutzklappen-Bussystem der Firma DS-Steuerungstechnik über UG1500 Gateways der MBS GmbH in BACnet/IP umgesetzt. Das LRZ liegt am Südrand des Campus der Technischen Universität München in Garching. Der Bauherr, vertreten durch das Bauamt der Technischen Universität München, setzte für die Gebäudeautomation der drei neuen Trakte des LRZ auf den offenen BACnet ® Standard. Komplexes Automationskonzept Das umfangreiche Automationskonzept, das von Honeywell Building Solutions realisiert wurde, besteht aus 22 Honeywell BACnet DDC Systemen Excel Web® (ca. 3.500 Datenpunkte), zum Beispiel zur Regelung, Optimierung und Überwachung der Wärmeerzeugung und -verteilung sowie zur Baukerntemperierung, Regelung, Optimierung und Überwachung der Kälteerzeugung und -verteilung durch 5 Kältemaschinen der Firma Carrier. Diese verfügen über ein LON® -Interface. Dadurch können die Kältemaschinen optimal über den offenen LonTalk® Feldbus der Honeywell Excel Web Unterstationen in das BACnet Europe Journal 5 11/06 © Kai Hamann, produced by gsiCom Am 21. Juli 2006 nahm das L e ib n i z - R e c h e n z e nt r u m (LRZ) der Bayerischen Akademie der Wissenschaften im Forschungszentrum Garching bei München einen neuen Supercomputer in Betrieb. Zusammen mit weiteren Supercomputern in Jülich und Stuttgart ergibt dies den größten europäischen Rechnerverbund. Automationskonzept integriert werden. Temperaturüberwachung der Rechnerräume, Aufschaltung von zahlreichen Gewerkemeldungen, Höchstleistungsrechner am LRZ. New Supercomputer at the LRZ. einer Steuerung und Über- wachung von acht Kompaktklimageräten mit in tegriertem BACnet DDC System Siemens PXC52/ PXC12 (57 Datenpunkte je Gerät), einer Steuerung und Überwachung von 34 Umluftkühlgeräten der Firma Econdition GmbH, die über je ein PR-4000 MODBAC01 Modbus-Gate‑ way der Plüth Regelsys teme GmbH BACnet/IPfähig gemacht werden, einer Steuerung der Brandschutzklappen mit Ent rauchungsfunktion sowie Absaugung des Lösch- Sicherer Anlagenbetrieb Als Gebäudeleittechnik kommt die moderne und offene Integrationsplattform Honeywell Enterprise Buildings Integrator™ (EBI) zum Einsatz, die als B-OWS (BACnet Operator Workstation) optimale Voraussetzungen für die Realisierung einer so anspruchsvollen, Multivendor-Integrationsaufgabe mitbringt. Insgesamt 6.500 BACnet Datenpunkte werden vom EBI am LZR überwacht und unterstützen das Personal bei einem sicheren Betrieb der kritischen Anlagen. On July 21, 2006 the Leibniz Computing Centre (LRZ) of the Bavarian Academy of Sciences started up a new supercomputer at its research centre in Garching near Munich. Together with two other supercomputers loca ted in Jülich and Stuttgart, this makes for the largest European computer network. In phase one, the new supercomputer SGI® Altrix® 4700 from Silicon Graphics has been equipped with 4,096 Intel® Itanium®2 pro cessors and a main memory of 17 Terabytes. It requires a floor space of 25 metres in both directions. Approximately 2 MW are required to operate and air condition the parallel computer system. © Schürmann, TU München Three new building sections in the LRZ The new supercomputer is used for the simulation of complex systems and pro cesses in physics, material research, flow dynamics, astrophysics and chemistry as well as in the geosciences and life sciences. The construction cost for the three building sections (computer room, institute and the audi- Haupteingang des LRZ Main Entrance of the LRZ © Ernst A. Graf, TU München Anwendungen Solutions torium with an effective total space of 5.600 sqm) amount to 45 million Euros. On top of this comes an investment in the computer of 38 million Euros. Costs are split between the Free State of Bavaria and the Federal Republic of Germany. The LRZ is located at the south of the Technical University Munich Garching campus. The owner, represented by the construction authority of the Technical University of Munich, asked for the open BACnet standard when it came to building automation of the three LRZ sections. Complex automation concept The extensive automation concept was realised by Honeywell Building Solutions and consists of 22 Honeywell BACnet® DDC systems Excel Web® (approx. 3,500 data points). The DDC systems are responsible for example for the regulation, optimisation and monitoring of heat production and distribution as well as tem- Leibniz-Rechenzentrum, Luftaufnahme. Leibniz-Computing Centre, aerial photo. perature control of the building´s concrete core; regulation, optimisation and monitoring of the cooling and distribution by five chiller plants from Carrier with a LON® interface. The chillers are integrated into the automation concept via the LonTalk® field bus builtinto the Honeywell Excel Web; temperature monitoring of the computer rooms, integration of various plant messages; controlling and monitoring of eight compact air conditioning machines with integrated BACnet DDC systems Siemens PXC52/ PXC12 (57 data points for each machine); controlling and monitoring of 34 recirculation cooler systems delivered by Econdition GmbH. Each system is made BACnet/IP compatible through a PR-4000 MODBAC01 ModbusGateway from Plüth Regelsysteme GmbH; monitoring of the fire dampers with smoke exhaust function as well as exhausting of the fire extinguishing gas. UG1500 gateways from MBS GmbH facilitate conversion of the damper bus system from DS-Steuerungstechnik to BACnet/IP. Safe Plant Operation The state of the art open integration platform Honeywell Enterprise Buildings Integrator™ (EBI) is used on the management layer. It enables optimal multivendor integration tasks because it includes BACnet Operator Workstation functionality. In total 6,500 BACnet data points are supervised by the manage ment system at the LZR and support the technical staff in safely operating the critical plants. Christian Müller Manager Marketing and Communication Honeywell GmbH Honeywell Building Solutions [email protected] www.honeywell.de/hbs BACnet Europe Journal 5 11/06 Anwendungen Solutions Systemintegration statt Austausch System Integration Instead of Replacement Bei der Erweiterung des Gebäudemanagementsystems im niederländischen Bernardus Pflegezentrum setzt Regel Partners BACnet/IP Protokollumwandler zur Integration bereits vorhandener Komponenten ein. For the expansion of the building management system of the Dutch Bernardus nursing centre, Regel Partners uses BACnet/IP protocol converters to integrate already existing components. Das Bernardus im niederländischen Sassenheim ist ein somatisches Pflegeheim und Zentrum für betreutes Wohnen. Es beherbergt 142 Bewohner in drei getrennten Abteilungen, weitere 55 Bewohner leben im Zentrum für betreutes Wohnen. Seit Einbau des TS1500 Gebäudemanagementsystems von Siemens im Jahre 1998 sind im Bernardus regelmäßige Erweiterungen vorge nommen worden. Neue Unterstationen und Bedien pulten wurden installiert. Weitere Entwicklungen umfassen: die Optimierung der Warmwasserversorgung mit vier Kesseln, ca. 20 Temperaturmessun gen im gesamten Komplex, zur Vorbeugung gegen die Legionärskrankheit, die Erweiterung von zwei Lüftungsanlagen durch Einbau eines Kühlsystems, die Integration der Lichtsteuerung in das Gebäudeleitsystem, A larmmeldungen für verschiedene autonome Instal lationen und zusätzliche Temperaturmessungen mit dem Ziel eines offeneren Managementsystems. sind ab 2007 nicht mehr verfügbar. Einerseits läuft das TS1500 System unter MS-DOS und wird nicht mehr gepflegt. Andererseits ist die Implementierung moderner Managementfunktionen im Hinblick auf eine optimale Wartung der Gewerke und das Aufbringen der benötigten Mittel notwendig. Eine moderne Kommuni kationslösung zur Vernet‑ zung der unterschiedlichen Gebäudesysteme für die Angestellten der Valent RDB Organisation ist wünschenswert. Die komplette Erneuerung des Gebäudemanagement systems, die naheliegendste Lösung, wäre einschließlich Technische Herausforderungen Beim Ausbau des aktuellen Systems gab es folgende Probleme zu lösen: Die vorhandenen Unter stationen vom Typ AS1000 10 BACnet Europe Journal 5 11/06 System Integrators with Content der erforderlichen Erweiterungen mit Kosten in Höhen von 90.000 Euro verbunden. Hinzu kommt, dass eine vorzeitige Abschreibung des vorhandenen Systems einen sig nifikanten Verlust mit sich bringen würde, da erst die Hälfte des technologi schen Lebenszyklus abgelaufen wäre. Einsatz von Protokoll umwandlern Um die gewünschten Ziele mit einem annehmbaren Investitionsaufwand zu erreichen, hat man sich für den Einsatz von programmierbaren BACnet/IP Proto kollumwandlern entschieden. Die Protokollumwandler, direkt mit dem Kommunikationsport der DDC Ausrüstung verbunden, er- möglichen den weiteren Einsatz der vorhandenen AS1000 Komponenten und integrieren sie in eine moderne Umgebung. Alle Informationspunkte werden in BACnet Objekte umgewandelt und jedes Bedienfeld ist mit einer Verbindung zum vorhandenen Ethernet Netzwerk ausge stattet, das wiederum mit einem Webnutzer verbunden werden kann. Die Kommu nikation der AS1000 über Ethernet TCP/IP ermöglicht einen hohen Grad an Flexibilität. Zudem kann die vorhandene Infrastruktur für zukünftige Erweiterungen oder schrittweise Erneu erungen der Unterstationen genutzt werden. Anwendungen Solutions Das Bernardus Pflegezentrum im niederländischen Sassenheim. The Bernardus Nursing Centre in Sassenheim, Netherlands. Für Betrieb und Management wurde eine BACnet Operator Work Station (B-OWS) ausgewählt. Dieses System kann lokal und über das Internet betrieben werden – einschließlich notwendiger Alarm- und Ereignismeldungen. Da durch den Einsatz der Protokollumwandler die vorhandenen Unterstationen beibehalten werden konnten, waren neue, für die Erweiterung benötigte BACnet-Produkte der einzige Zukauf. Dies schlug sich in einer Investition nieder, die rund 45 Prozent niedriger war als bei einem kompletten Austausch des Systems. Gleichzeitig konnten die Kosten einer vorzeitigen Abschreibung eingespart werden. Bei allen zukünftigen Erweiterungen oder Erneuerungen werden die Vorteile des interopera blen BACnet-Standards weiterhin Gültigkeit haben. The Bernardus in Sassen heim, Netherlands is a soma tic nursing home and assisted living centre. The nursing home houses 142 residents, in three separate departments. The assisted living centre houses another 55 resi dents. Since the realisation of the Siemens TS1500 building management system in 1998, the Bernardus has experienced regular expansions, all of which were accompa- nied by the installation of new substations and control panels. The developments are ongoing in 2006 and include: The optimisation of the warm water supply, using four boilers. Around 20 temperature measurements taken throughout the complex as part of an effort prevent in legionnaire’s disease. The expansion of 2 air handling units through the installation of top cooling. Integrating the lighting control into the building management system. Alarm reports for various autonomous installations and additional temperature measurements, both aimed at a more open management system. Technical Challenges The expansion of the current system left the following problems unaddressed: The existing substations of the AS1000 type will no longer be available in 2007. The TS1500 system runs under MS-DOS, a system that no longer undergoes improvements. Implementation of modern management functions with respect to optimum maintenance of the installations and adequate deployment of funds is however necessary. A modern communication solution for connecting the various building systems is desired for the staff of the Valent RDB organisation. The complete replacement of the building management system, the most obvious solution, would incur a price tag of around 90 thousand Euros, inclu ding the necessary expansions. On top of this, the early depreciation of the existing system would pose a significant loss, with only half of the technological life-span having elapsed. Application of Protocol Converter In order to achieve the desired objectives at an acceptable investment level, the choice was made to use programmable BACnet/IP protocol converters. The protocol converter, directly connected to the com port of the DDC equipment, allows for the continued use of the existing AS1000 components and places them in a modern environment. All information points are converted to BACnet objects and every control panel is equipped with a connection to the existing Ethernet network that can, in turn, be connected to a web user. The communication of AS1000 via Ethernet TCP/IP allows for a high degree of flexibi lity. For future expansion or (partial) replacement of substations the existing infrastructure can be used. For operation and management, a BACnet Operator Work Station (B-OWS) has been selected. This system can be operated locally and via the Internet, including the reporting of necessary alarms and events. Since the application of the protocol converter resulted in the existing substations being maintained, the only purchase required for the expansion consisted of the new BACnet products. This resulted in an investment that came in at around 45% lower than the complete replacement of the system, while the costs of early depreciation were also saved. For any future expansions or replacements, the benefits of the interoperable BACnet standard will remain in effect. Gijs de Koning Regel Partners B.V. [email protected] www.regelpartners.nl BACnet Europe Journal 5 11/06 11 DIGICONTROL ems 4 Including fascination. DIGICONTROL ems 4 – economic modular system ist ein netzwerkbasiertes, interdisziplinäres Automationssystem für universelle Aufgaben in allen Bereichen der Gebäude- und Industrieautomation. Die offene Kommunikation über alle Übertragungswege, der konsequente Einsatz eingeführter Standards, die Nutzung vorhandener IT-Infrastrukturen, die Integration unterschiedlichster Gewerke und Systeme sowie das durchdachte, modulare Gesamtkonzept mit dezentraler Aufgabenverteilung durch feinmodulare, intelligente Baugruppen prädestinieren das Automationssystem für sämtliche Anforderungen der Zukunft. Zur neutralen Kopplung an beliebige Automations- und Managementsysteme ist die BACnet-Konformität ein integraler Bestandteil der Baureihe DIGICONTROL ems 4. DIGICONTROL ems 4 – economic modular system is a network-based, interdisciplinary, automation system for universal tasks in all areas of building and industrial automation for systems of all sizes. The open communication via all transfer methods, the consistent use of introduced standards, the use of existing infrastructure, the integration of various areas and systems as well as the sophisticated, modular overall concept with decentralised distribution of tasks via fine modular intelligent assemblies mean that the automation system is perfectly suited for all future requirements. BACnet compliance is an integral component of the DIGICONTROL ems 4 series for neutral connection to any automation and management systems. OFFEN OPEN REDUNDANT REDUNDANT INTELLIGENT INTELLIGENT DURCHGÄNGIG UNIVERSAL nativer BACnet Controller CAN-LIN-Bus I/O-Module mit integrierter CPU einfache Projektierung mittels WEBPROJECT und WEBCADpro FLEXIBEL feinmodularer Aufbau Ethernet/IP, USB, RS485, RS232 M-BUS, KNX, LCN, DALI, LON embedded WEBSERVER SD Memory Card Native BACnet controller CAN-LIN-bus I/O-modules with integrated CPU Simple project planning via WEBPROJECT and WEBCADpro FLEXIBLE Fine modular structure Ethernet/IP, USB, RS485, RS232 M-BUS, KNX, LCN, DALI, LON Embedded WEBSERVER SD memory card Lassen auch Sie sich begeistern. Infos unter www.gfr.de Let also become enthusiastic. More informations you will get here: www.gfr.de GFR –– Gesellschaft für Regelungstechnik und Energieeinsparung m.b.H. Kapellenweg 42 · D-33415 Verl Telefon +49 ’ 52 46’9 62-0 Telefax +49 ’ 52 46’9 62-199 Anwendungen Solutions Ökonomische Renovierung in Den Helder Economical Renovation in Den Helder Im Hauptsitz der Hausbaugesellschaft “Woningstichting Den Helder” sorgen Saia-Burgess Controls und Daikin für ein angenehmes Klima mit maximaler Energieeffizienz. Saia-Burgess Controls and Daikin realized an agreeable climate with maximum energy efficiency in the head office of the house-building society “Woningstichting Den Helder”. Die Hausbaugesellschaft “Woningstichting Den Helder” hat das Bürogebäude “de Vijfsprong” in Den Helder, Holland, vollständig umgebaut und nutzt es nun als Firmenhauptsitz. Vom Entwurf bis hin zur Umsetzung der Umbauten war die Energieeinsparung ein zentrales Anliegen: „Von Anfang an war es selbstverständlich für uns, dass das neue Bürogebäude weniger Energie benötigen durfte als bisher und den Angestellten dabei ein optimales Raumklima bieten sollte“, betont Peter van Doorn, technischer Leiter der Woningstichting. Umfassendes Klimasystem Das 1923 erbaute Gebäude “de Vijfsprong” befindet sich im Zentrum von Den Helder, der Heimatbasis der holländischen Flotte. Im Jahre 2004 wurde es zusammen mit einem angrenzenden Gebäude von der Hausbaugesellschaft mit der Absicht gekauft, ihren Hauptsitz dorthin zu verlegen. 2005 wurde es um einen neuen Flügel in der gleichen traditionellen Bauart erweitert; zur gleichen Zeit wurde auch das alte Gebäude vollständig umgebaut und den heutigen Anforderungen angepasst. Nun hat die Haus- baugesellschaft ihre gesamte Engineering Belegschaft von 50 Personen darin untergebracht. Einer der Knackpunkte des Umbaus war der fehlende Platz für eine zweite Heizzentrale. Deshalb wurde das Klimasystem Daikin VRVII aufgebaut, das den Neubau mit seinen hervorragenden Isolationswerten ohne Nachheizen vollständig kühlen, heizen und klimatisieren kann. Im Altbau wurde die konventionelle Heizung von Remeha zur Deckung des Heizbedarfes verwendet. Individuelles Klima in jeden Raum Damit sich die gesamte Anlage nahtlos von einer Zentrale aus steuern und bedienen lässt, wurde das BACnet-Protokoll für die Kommunikation gewählt. Die Daikin Klimageräte kommunizieren nun via Dai kin Gateway D-BACS mit einer Saia©PCD3 BACnet B-BC und dem Saia-Burgess Controls Leitsystem Visi+. Die gesamte Daikin Anlage, in der sich für jeden Raum ein individuelles Klima wählen lässt, besteht aus 46 Raumgeräten und sechs Primärwärmepumpen, die auf dem Dach installiert wurden. Alle relevanten Datenpunkte werden auf dem Gateway D-BACS als BACnet Objekte abgebildet. Die Saia©PCD3 Regler als leistungsfähiger BACnet-Client können diese Information nahtlos in die umfangreiche HLK-Biblio thek von Saia-Burgess Controls einfügen. Die beiden Wandthermen Remeha Quinta sowie alle Pumpen und Ventile wurden direkt auf die Ein- bzw. AusgabeBaugruppen der Saia©PCD3 geschaltet. Über ein daran angeschlossenes Modem ist die Ferndiagnose der gesamten Anlage problemlos möglich. Planansicht des Gesamtprojektes “de Vijfsprong”. Designed view of the complete project “de Vijfsprong”. BACnet Europe Journal 5 11/06 13 Anwendungen Solutions Der umgebaute Firmenhauptsitz “de Vijfsprong” in Den Helder. The renovated head office “de Vijfsprong” in Den Helder. 95 Prozent Wärmerückge winnung Aufgrund der Flexibilität der DDC-Lösung von SaiaBurgess Controls und der langjährigen Erfahrung der für die Integration betrauten Firma Zwirs Regeltechniek & Advisering B.V. verlief die gesamte Implementierung problemlos. Nach Angaben des Geschäftsführers Luc Zwirs hat sich die benötigte Zeit für das Engineering und die Inbetriebnahme dank BACnet merklich verringert. Die Anlage läuft nun seit einem halben Jahr zur vollsten Zufriedenheit des Gebäudebetreibers, der Nutzer und des Servicepersonals. Der Grad der Wärmerückgewinnung konnte in der Zwischenzeit auf 95% gesteigert werden. The house building society “Woningstichting Den Hel der” has completely renovated the monumental building “de Vijfsprong” in Den Helder, The Netherlands is now using it as their own head quarters. Starting from the first concept up to the realization of the reconstruction, energy saving was been the key issue to the house building society. Peter van Doorn, technical advisor of Woningstichting Den Helder, constitutes: ”It was self-evident that the new office should have low energy consumption with an excellent climate for all employees.“ Comprehensive Climate Control The monumental building “de Vijfsprong”, built in 1923, is situated in the centre of Den Helder, the hometown of the Royal Dutch Navy. The house building society bought “de Vijfsprong” in 2004 together with the adjacent buildings to enlarge their premise. In 2005, the building was extended in the same traditional style, while the old part was renovated to meet today’s standards. Today, the “Woningstichting Den Helder” engineering staff of 50 people work in the new building. One of the main concerns during the rebuilding was the lack of space for a second heating system in the old building. Therefore, a new heating and air conditio‑ ning concept was needed. The climate control unit from Daikin VRVII adequately supplies the well isolated new extension with heating and air conditioning. The older part of the building still uses the central heating system from Remeha. Suitable Climate for Each Room The BACnet protocol enables the existing central heating from Remeha to be integrated with and the new one Daikin for a smooth central control of the whole plant. The Daikin devices now communicate through the Daikin Gateway D-BACS with the Saia©PCD3 B-BC and the Saia-Burgess Controls SCADA package Visi+. With the Daikin VRVII installation, the climate can be regulated independently in all 46 rooms. With the 6 heating pumps, which are mounted on the roof of the building, it is possible to heat and cool with one system and without connected to the PCD3, the service staff is able to change every setting at any time. Heat Return of 95 Percent Thanks to the flexibility of the DDC solution from Saia -Burgess Controls and many years’ experience of Zwirs Regeltechniek & Advisering B.V., the integration of the different systems has been realized without any problems. Director Luc Zwirs confirmed that the time spent for engineering and commissioning decreased considerably because of the use of the BACnet-standard. The application has been running for half a year now, to the full satisfaction of the Sauber aufgeräumter Schaltschrank mit der Saia©PCD3 und dem Daikin BACnet Gateway D-BACS. Neat and clean looking cabinet with the Saia©PCD3 and the Daikin BACnet Gateway D-BACS. an additional technical room. All required data points are mapped on the Gateway D-BACS as individual BACnet objects. Using the high performance client functionality of the Saia©PCD3 B-BC, this information is integrated in the common control strategy. Both Remeha modulating wall-hung boilers of the type Quinta, all circulation pumps, valves and shutters are controlled with the through I/O modules within the PCD3 controller. With remote diagnostics by means of a modem owner, users and service staff. In the meantime, the efficiency of the heat return has been increased to 95%. Dr. Simon Ginsburg Product Manager Saia-Burgess Controls AG [email protected] www.start-controls.com Martin van Cappellen Technisch Commercieel Adviseur Saia-Burgess Benelux B.V. [email protected] www.start-controls.com BACnet Europe Journal 5 11/06 15 Anwendungen Solutions Moderne Büros im „Latitude 20“ bei Paris Modern offices in “Latitude 20” in Paris Mit dem Automationssystem DDC4000 von Kieback&Peter und nativem BACnet konnte im „Latitude 20“ eine moderne, intelligente und effektive Gebäudeautomations lösung realisiert werden. With the Kieback&Peter DDC4000 automation system and native BACnet a modern, intelligent and effective building management system could be realized in the new “Latitude 20” development. Bagneux ist ein wirtschaftlich attraktiver Vorort im Süden von Paris mit 40.000 Einwohnern. Acht Kilometer vom Zentrum der Metropole entfernt entstand hier ein modernes, viergeschossiges Bürogebäude – das „Latitude 20“. Mit einer Nutzfläche von 12000 Quadratmetern, flexibel gestaltbar, bietet es die Grundlage für weiteres Wirtschaftswachstum im Département Hauts de Seine. Der Investor STAM Europe bietet die flexibel gestaltbaren 12.000 Quadratmeter Bürofläche sowohl zur Vermietung als auch zum Verkauf an und rechnet mit einer schnellen Amortisation. Im Juni 2006 wurde das Objekt seiner Bestimmung übergeben. Das neue Gebäu de an der Avenue Aristide Briand hat eine markante Glasfassade. Sie erstreckt sich über alle vier Etagen und bietet den Nutzern in den Büros ideale Lichtverhält nisse. Ein Restaurant em pfängt die Beschäftigten und Besucher. 240 innen liegende Parkplätze und weitere 33 Stellplätze im Außenbereich schaffen ausreichend Platz für die Fahrzeuge der Mitarbeiter und Kunden. Attraktiv ist auch die S-Bahn-Anbindung in 400 Metern Entfernung. Im „Latitude 20“ wünschte der Investor für die Gebäudeautomation eine kosten effiziente, entwicklungsfähige Technik, die zudem unabhängig von proprietären Systemen sein sollte. Die Wahl fiel auf Kieback&Peter und BACnet. Auf der Automationsebene wurden zwei Automationsstationen DDC4200 aus dem Automationssystem DDC4000 installiert. Diese kommunizieren mit nativem BACnet und steuern Heizung, Lüftung, Beleuchtung und andere Gewerke. Mit ih- 16 BACnet Europe Journal 5 11/06 Anwendungen Solutions Mit BACnet konnten die Anforderungen des Investors im „Latitude 20“ optimal umgesetzt werden. “In Latitude 20” the investor’s requirements could be optimally realised with BACnet. rem zukunftsweisenden Bedienkonzept ermöglichen die Automationsstationen dem Techniker, die Anlagen laufend zu überwachen und ihren Betrieb zu optimieren. Die Automationsstationen kommunizieren im EthernetNetzwerk über BACnet/IP mit der Gebäudeleittechnik Neutrino-GLT. Von der Heizung und Lüftung über die Lichtsteuerung bis hin zur Energiedatenerfassung sind alle Gewerke zentral von der Neutrino-GLT zu überwachen und zu steuern. Zwei Kälteaggregate sind über den BACnet Standard genauso an die Neutrino-GLT eingebunden wie die 17 Energiezähler, die nachhaltig zur Energieeffizienz beitragen. Mit BACnet kommunizieren auch die Lüftungsanlagen und Beleuchtungssysteme. Aber auch die auf LON basierende Raumautomation ist integriert. Die Vorteile der offenen Gebäude automation mit BACnet liegen damit auf der Hand. Die Nutzung des offenen BACnet-Standards im „Latitude 20“ zeigt, dass eine B AC n e t / I P - A r c h i t e k t u r unterschiedliche technische Komponenten zu einem ganzheitlichen System zusammenfasst, das alle Steuerungs-, Regelungs- und Ü b e r wa c hu n g s au f g ab e n übernimmt. Mit BACnet konnten die Anforderungen, die Investoren an moderne und wirtschaftliche Bürogebäude stellen, optimal um gesetzt werden. Bagneux is an economically attractive suburb in the south of Paris with 40,000 inhabitants. Eight kilometres away from the centre of the metropolis, it now boasts a modern, four-storey office building, the “Latitude 20”. With a flexibly designed floor space of 12,000 square meters it offers the basis for further economic growth in the Haut de Seine department in Paris. The investor STAM Europe is offering the flexibly designed office space for rent and for sale and they are certain of a short amortization period. The new building in the Avenue Aristide Briand, was handed over in June 2006. It boasts a stunning glass façade which extends over all four floors and offers users in the offices ideal lighting conditions. A modern and popular restaurant caters for the needs of both employees and visitors. 240 parking spaces and a further 33 parking bays create sufficient place for the staff vehicles and customers alike. The rapid-transit railway is also only 400 meters away. In “Latitude 20” the investor for the building automation wanted a proven, costefficient building automation technology, which would be manufacturer independent. They chose Kieback&Peter and BACnet. On the automation level the DDC4000 automation system was installed with two DDC4200 automation stations, which communicate using native BACnet. These control heating, ventilation, lighting and other services. With their trend-setting control concept the automation stations of the DDC4000 system make it possible for the technicians to supervise the equipment and optimize performance while in operation. The automation stations communicate in the Ethernet network with the Neutrino GLT building management system via BACnet/IP. All services from heating and ventilation to lighting control and energy data acquisition can be supervised and controlled centrally by the Neutrino GLT. Two cooling units are merged to the Neutrino GLT via the BACnet standard as well as 17 energy meters, which contribute to energy efficiency. The ventilation systems and lighting installations also communicate using BACnet. In addition, room automation based on LON is integrated. The advantages of open building automation with BACnet are obvious. The use of the open BACnet standard in “Latitude 20” shows that a BACnet/IP archi tecture combines different technical components into an holistic system, which manages all control, regulation and monitoring tasks. With BACnet the requirements, which investors demand for modern and economical office buildings, could be optimally realised. BACnet Europe Journal 5 11/06 17 DER VORStAnD KümmERt SICh Um DIE GROSSEn GESChäFtE. KlEInIGKEItEn REGEln SICh FASt VOn SElBSt. AXI.COS ® – regelt alles. Zu den Aufgaben des Gebäudemanagements zählen nicht nur die kleinen Dinge des Alltags. Auch komplexe Prozesse lassen sich durch intelligente und effiziente Gebäudeautomation optimieren. Beispielsweise die Auswertung von Zugangskontrollen zur Festlegung von Reinigungs- und Serviceintervallen oder das Raumnutzungsmanagement. AXI.COS® unterstützt Sie dabei, als vollwertiges Control Operating System (COS), das Informationen generiert, verwaltet und bewertet – und die unterschiedlichsten Prozesse steuert. Um Gebäude intelligenter zu managen. Um Prozesse zu optimieren. Um Energie zu sparen. Kurzum: Mehr Effizienz und weniger Kosten. Axima GmbH Dürener Straße 403 - 405 · 50858 Köln Fon: (02 21) 4 69 05- 0 www.axima.de · [email protected] Axima GmbH ist ein Unternehmen der SUEZ Energy Services Germany Anwendungen Solutions Stärken von BACnet und KNX in einem Projekt vereint Strengths of BACnet and KNX Combined in one Project Die St. Olav Universitätsklinik in Trondheim/Norwegen wird bis 2015 zu einem der modernsten Gesundheitszentren Europas ausgebaut. In der Gebäudeautomation werden in großem Umfang die Stärken der Weltstandards BACnet (EN ISO 16484) und KNX (ISO/IEC 14543) kombiniert. The St. Olav University Hospital in Trondheim, Norway will be one of Europe’s most modern health centers by 2015. The strengths of the worldwide standards, BACnet (EN ISO 16484) and KNX (ISO/IEC 14543), are being combined in one building automation system. Die St. Olavs Klinik ist ein Gesundheitsunternehmen und eine Universitätsklinik in der mittelnorwegischen Region mit 630.000 Einwohnern. Im neuen Gesundheitszentrum werden Patientenbehandlung, Forschung und Ausbildung integrale Bestandteile. Die ersten Klinikzentren werden 2006 fertig gestellt, das Gesamtprojekt soll im Jahr 2015 abgeschlossen sein. Das Krankenhaus wird eine Gesamtfläche von 210.100 m 2 umfassen. Siemens wurde mit der Ausführung der Gebäude automation in den Neu‑ bauten beauftragt. In über 2.700 Räumen werden Beleuchtung, Beschattung und Temperatur mit dem Weltstandard KNX gesteuert und geregelt. Als Manage mentsystem wird DESIGO INSIGHT eingesetzt, die Integration der KNX-Anlagen erfolgt über DESIGO PX- Automationsstationen. Das Betriebspersonal verfügt zusätzlich über den externen Zugang zur Anlage durch DESIGO Fernzugriff über Internet. Die Vernetzung der DESIGO PX-Stationen unter einander und mit dem Managementsystem erfolgt physikalisch über Ethernet, wobei der Weltstandard BACnet auf IP als Protokoll eingesetzt wird. Integration KNX-Raum automation in BACnetGebäudeautomation Als weltweiter Standard für Haus- und Gebäudesystem technik wird das KNX-Protokoll seit über 15 Jahren in großen Projekten für die Feldebene eingesetzt. Die (durch die Produktzertifizie rung) garantierte Interopera bilität und Interworking ermöglichen die Erstellung projektspezifischer Multivendor-Anlagen mit einer großen Auswahl aus nahezu 7.000 Produktgruppen. Das hersteller- und produktunabhängige Inbetriebnahmetool (ETS) sorgt für die einfache Konfiguration. Für Automa tions- und Managementfunk tionen größerer Projekte etabliert sich zunehmend der BACnet-Standard. Mit Die Topologie der beiden offenen Protokolle. The topology of the two open protocols. BACnet Europe Journal 5 11/06 19 ® • ISO/IEC 14543 • CENELEC EN 50090 • CEN EN 13321 World´s only open Standard for Home and Building Control ABB Sace S.p.A • ABB Schweiz Normelec (Levy Fils AG) • ABB Stotz-Kontakt GmbH • AGFEO GmbH & Co. KG • Albrecht Jung GmbH & Co. KG • Altenburger Electronic GmbH • Amacher AG • arcus-eds GmbH • Ardan Control-Tech Ltd • BBT Thermotechnik GmbH • BeckerAntriebe GmbH • Berg Energie-Kontroll-Systeme GmbH • Berker GmbH & Co. KG • Bischoff Elektronik GmbH • Bosch & Siemens Hausgeräte GmbH • Brück Electronic GmbH (B.E.G.) • Bticino s.p.a. • Busch - Jaeger Elektro GmbH • Danfoss A/S • Dätwyler Kabel + Systeme GmbH • Dehn + Söhne GmbH & Co. KG • Eberle Controls GmbH • Eelectron srl • EIBMARKT GmbH • Electrak International Ltd. • Elektroanlagen Dieter Nagel • Elero GmbH • Elka-Elektronik GmbH • Elsner Elektronik GmbH • EMU Elektronik AG • Eutrac Stromschienen GmbH • F.W. Oventrop KG • Feller AG • Foresis SA • GE Grässlin GmbH & Co. KG • Gewiss S.p.A. • Gira Giersiepen GmbH & Co. KG • Griesser Electronic AG • Guangzhou Hedong Electronics Co. Ltd. (HDL) • Gustav-Hensel GmbH & Co. • Hager Holding GmbH • Heinrich Kopp AG • Herbert Waldmann GmbH & Co. KG • HTS High Technology Systems AG • Hugo Müller GmbH • Insta Elektro GmbH • IPAS GmbH • JEPAZ Elektronika spol, s.r.o. • Legrand S.A. • Licht Vision GmbH • Lingg & Janke OHG • Merten GmbH & Co. KG • Micro Innovation AG • Miele & Cie KG • Moeller Gebäudeautomation KG • Möhlenhoff Wärmetechnik GmbH • Novar GmbH • O.Y.L. Electronics SDN.BHD. • OAO „Research & Production Association SEM“ • Opternus Components GmbH • Oras Ltd • PKC Group Oy • Ritto GmbH & Co. KG • RTS Automation GmbH • S. Siedle & Söhne, Telefon- und Telegraphenwerke OHG • Schaeper Automation GmbH • Schlaps & Partner GmbH • Schneider Electric (Lexel AS) • SCHNEIDER Electric Industries S.A. • Schüco International KG • Siemens AG • Siemens Ltd. • Siemens Schweiz AG • Simon S.A. • Somfy Feinmechanik und Elektrotechnik GmbH • Stengler Gesellschaft GmbH • Tapko Technologies GmbH • Techem Energy Services GmbH • Techno Trend Systemtechnik GmbH • Tehalit GmbH • Teldat Security • Theben AG • Theodor Heimeier Metallwerk KG • Trialog • TridonicAtco GmbH & Co. KG • Viessmann - Werke GmbH & Co. WERK II • Vimar SpA. • Wago Kontakttechnik GmbH • Walther Werke • WAREMA electronic GmbH • Weinzierl Engineering GmbH • Wieland Electric GmbH • Wilhelm Huber + Söhne GmbH & Co. KG • Wilhelm Rutenbeck GmbH & Co. • WindowMaster A/S • Winkhaus Türtechnik GmbH & Co. KG • Woertz AG • Zennio Avance y Tecnología s.l. • Zumtobel AG Status: September 2006 We use Standards! +++ 100 Companies +++ 70 Countries +++ 7000 Certified Products +++ 21,000 ETS Users +++ 100 Training Centers +++ 50 Scientific Partners +++ www.konnex.org Die St. Olav Universitätsklinik in Trondheim/Norwegen wird bis 2015 zu einem der modernsten Gesundheitszentren Europas ausgebaut. The St. Olav University Hospital in Trondheim, Norway will be one of Europe’s most modern health centers by 2015. den beiden Standards lassen sich umfangreiche Anlagen – auch unterschiedlicher Hersteller – zukunftsgerecht integrieren, unter Verwendung von Ethernet und Internet als „Datenautobahn“. Der Einsatz von genormten Systemen sorgt für Investitionssicherheit. Errichter und Betreiber profitieren Die Integration der KNXRaumautomation erfolgt in diesem umfangreichen Projekt über die DESIGO-PXAutomationsstationen von Siemens Building Technolo gies, wobei ein rationelles Engineering mit vordefinier ten Datenpunktbeziehungen zum Einsatz gelangt. Damit profitieren Errichter und Betreiber gleichermaßen: Durch die serienmäßig angebotene Schnittstelle im DE SIG O - G esamtsystem werden die beiden welt- weiten Standards und ihre Stärken miteinander verbunden. Standardisiertes BACnetKNX-Mapping Um die Integration von KNX und BACnet zu vereinfachen, wurde von den beiden Organisationen das standardisierte Mapping („Einbindung“) geschaffen. Das Prinzip des BAC ne t- K N X- M appi ng s ist im Anhang H.5 zum BACnet-Standard „Using BACnet with KNX“ doku mentiert. Die Basis der normierten Beziehung zwischen BACnet und KNX ist die Vergleichbarkeit zwischen den „object types“ von BACnet und den “functional blocks“ von KNX, sie besitzen eine identische Semantik in ihrer Datenstruktur. KNX-Datapoints entsprechen demzufolge BACnet-Properties. The St. Olav Hospital is a company and university hospital in Norway’s middle region, covering 630,000 residents. The new health center will treat patients and carry out research and training. The first buildings will open in 2006 and the entire center will be ready by 2015. The hospital will cover a total area of 210,100 m2. Siemens won the contract to implement the building automation in the new center. The global KNX standard will be used to control lighting, sun protection and temperature in over 2,700 rooms. DESIGO INSIGHT will be used as the management system and the DESIGO PX automation stations will be used to integrate the KNX systems. DESIGO enables operational staff to access the systems remotely via Internet. The DESIGO PX stations are physically connected to the management system via Ethernet using the global BACnet standard on IP. Integrating KNX room automation into BACnet building automation system As a global standard for home and building automation systems, KNX has been implemented as standard at the field level in large projects for the last 15 years. Certification and guaranteed interoperability enable the development of project specific, multi-vendor systems with a large range of choice from nearly 7,000 product groups. The manufacturer and pro duct independent integration tool (ETS) ensures easy configuration. The BACnet standard continues to establish itself as the protocol for automation and management functions in large projects. Combining both standards in a single project enables the integration of numerous, future-safe systems from different manufacturers using Ethernet and the Internet as a “data highway”. Using standardized systems provides investment security. Benefits for constructors and operators In this project, the KNX room automation is being integrated with the DESIGOPX automation station from Siemens Building Technologies, using a “rational engineering” method with predefined data point connections. Both constructor and operator have equal benefits: The serial interfaces in the DESIGO system combine the strengths of both global standards. Standardized BACnet-KNX Mapping In order to simplify the integration of KNX and BACnet, both organizations have developed a standardized mapping which is documented in appendix H.5 of the BACnet Standard –“Using BACnet with KNX”. The comparability between the BACnet “object types” and KNX functional blocks forms the basis for the standardized mapping, since their data structures possess identical semantics. KNX data points correspond to BACnet properties. Richard Staub BUS-House [email protected] www.bus-house.ch www.konnex.org Booth Hall 7, 130 Anwendungen Solutions Kostenreduzierung bei optimaler Servicequalität Cost Reduction with Optimum Service Quality Im Building Control Center von Infraserv Höchst laufen Gebäudeleit- und Systemtechnik-Daten zusammen – System-Vernetzung über BACnet/IP. In the Infraserv Höchst Building Control Center, building control and automation system data run together – the systems are linked by BACnet/IP. Was haben das Torhaus Westhafen in Frankfurt und das Mehrzwecklaborgebäude im Industriepark Höchst gemeinsam? Die Informationen aus den Gebäudeleittechnik-Systemen beider Gebäude laufen im Building Control Center von Infraserv Höchst zusammen. Hier werden Heizungs-, Klima- und Lüftungsan lagen sowie andere Systeme, z. B. von Brandmeldeanlagen oder Notrufsysteme von Aufzügen, rund um die Uhr überwacht und gesteuert. Diese Form der lückenlosen Kontrolle von Gebäudeleittechnik-Systemen ist gerade im Industriepark Höchst sehr wichtig. Das 4,6 Quadratkilometer große Indust rieareal, in unmittelbarer Nähe zum Frankfurter Flughafen gelegen, ist Standort von mehr als 80 Unternehmen, die überwiegend in der Chemie-, Pharmaund Biotechnologiebranche zu Hause sind und rund 22.000 Mitarbeiter beschäftigen. Das Building Control Center von Infraserv Höchst, der Betreibergesellschaft des Industrieparks, garantiert den einzelnen Unternehmen, dass gerade in sensiblen Forschungs- und Laborbereichen jeder Defekt sofort behoben werden kann. Mit dem Torhaus Westhafen wurde nun auch ein Gebäude außerhalb des Industrieparks auf das Building Control Center aufgeschaltet. Der Vorteil für den Kunden: Geringerer Personalbedarf und Kostenreduzierung, aber ein komplettes Service-Paket – 24 Stunden am Tag, 365 Tage im Jahr. lichster Bus-Systeme sinnvoll einzugrenzen, kommen bei Infraserv Höchst für die Gebäudeautomation nur in ternational standardisierte Bussysteme beziehungsweise Protokolle wie EIB, LON oder BACnet zum Einsatz. Von welchem Hersteller die DDC’s (Digital Direct Con trol) stammen, ist uner heblich. Mit dem standardisierten BACnet-Protokoll auf der Automatisierungsebene der Das Building Control Center von Infraserv Höchst. The Infraserv Höchst Bilding Control Center. Integration unterschiedlicher Bus-Systeme Um den Aufwand für die Kunden zu reduzieren und gleichzeitig den Datenbestand beispielsweise zur Betriebsdatenerfassung, für Statusmeldungen oder zur Erfassung von Zählerständen nutzen zu können, musste Infraserv Höchst bestimmte technische Voraussetzungen schaffen. Um das für die Feldebene existie rende Spektrum unterschied- 22 BACnet Europe Journal 5 11/06 Systemtechnik, zwischen den einzelnen DDCs, den Gewerken und dem Gebäudeleitsystem wird gewährleistet, dass die Kommunikation sowohl innerhalb der Anlagen und Gebäude als auch zum Building Control Center einheitlich ist. Dieser Idealzustand lässt sich bei Neubauten realisieren, bei be stehenden Systemen konnte mit Hilfe von Gateways und OPC-Servern die Umsetzung auf BACnet erfolgen. Die Visualisierung wird mit der Web-basierenden Applika tion „WebCtrl“ realisiert, die alle Java2-kompatible Server und Browser unterstützt. Dort werden alle erforderlichen Datenpunkte dargestellt. Konvertierung durch OPC-Server Auch Daten aus verschiedenen Herstellersystemen von gebäudetechnischen Anlagen können von Infraserv Höchst in das System integ riert werden. Hierzu wurde zunächst ein zentraler OPCRechner installiert, über den mehrere OPC-Server verschiedene Bussysteme in OPC-Daten umsetzen. Innerhalb des Industrieparks ist die Kommunikation zwischen den einzelnen Systemen problemlos über die vorhandene IP-DatennetzInfrastruktur möglich. Externe Kunden können via ISDN oder DSL auf das Building Control Center aufgeschaltet werden. Natürlich schützen Firewalls die Netze vor unberechtigten Zugängen. Das moderne Leitsystem ermöglicht jedem beteiligten Unternehmen einen sicheren und zuverlässigen Betrieb seiner Anlagen. What do the business and office complex Torhaus West hafen in Frankfurt and the multi-purpose laboratory building in the Höchst Industrial Park have in common? Building control and automation system data from both buildings run together in the Infraserv Höchst Building Control Center. Here the Anwendungen Solutions heating, ventilation and air conditioning as well as other systems, such as the fire detection and elevator alarm systems, are monitored and controlled around the clock. Integrated control of building automation systems is particularly important in the Höchst Industrial Park. This 4.6 km2 industrial area, close to Frankfurt Airport, is home to more than 80 re sident companies, mainly from the chemical, pharmaceutical and biotechnology industries, employing about 22,000 people in total. The Building Control Center, installed by Infraserv Höchst, the Industrial Park operator, guarantees the individual resident companies that every fault can be corrected immediately. This is an essen tial requirement for sensitive research and laboratory areas. Now, a building complex situated outside the Industrial Park – Torhaus Westhafen – is also linked to the Building Control Center. The advantages of this for the customers are reduced manpower requirement and costs along with a complete service package – 24 hours a day, 365 days a year. Integration of Different Bus Systems In order to cut costs for customers and at the same time make it possible to use the data pool to collect operating data, for example, and post status messages or log meter readings, Infraserv Höchst had to ensure that certain technical requirements were in place. To sensibly restrict the diverse range of field bus systems that can be used, Infraserv Höchst employs only internationally standardized bus systems and protocols such as EIB, LON or BACnet for building automation. It does not matter which manu facturer supplies the DDCs (Direct Digital Controls). By using the standardized BACnet protocol at the automation level of system technology between the indivi dual DDCs, the assembly sections and the building control system, it is possible to ensure that communications both within the systems and building and with the Building Control Center are standardized. This ideal situation can be achieved from the outset in the case of new buildings, while with existing systems, conversion Luftbild des Industriepark Höchst. Aerial view of the Höchst Industrial Park. to BACnet is accomplished with the aid of gateways and OPC servers. Visuali zation is provided by the web-based application “WebCtrl”, which supports all Java-2-compatible servers and browsers. Here, all the required data points are represented. Conversion with OPC Servers Infraserv Höchst can also integrate data into the system from building service equipment supplied by different manufacturers. For this pur- Die Struktur der Leittechnik im Industriepark Höchst. The structure of the Building Automation System at the Höchst Industrial Park. pose, a central OPC computer was initially installed, through which several OPC servers convert different bus systems into OPC data. Within the Industrial Park, communication between the individual systems operates smoothly through the existing IP datanet infrastructure. External customers can be linked to the Building Control Center via ISDN or DSL. The networks are, of course, protected from unauthorized access by firewalls. The modern building management system enables every company to run their plants safely and reliably. Roland Schwab Infraserv GmbH & Co. Höchst KG [email protected] www.infraserv.com BACnet Europe Journal 5 11/06 23 GRAPHICS VIDEO ALARMS PERSONNEL RECORDS SCHEDULES BADGES REPORTS PROGRAMS SETPOINTS TREND GRAPHS Complete Overview – Anytime, Anywhere When you have buildings managed from different systems and organizations, it can be hard to tell what is really going on in the facilities. And what it is costing. There is a better way: Andover Continuum™ is the most powerful, integrated BACnet® building management system in the industry, offering: • • • • Native BACnet at all levels, BTL-listed Wireless BACnet Field Bus for cost-effective installations Integrated Building Automation and Security The industry’s first PDA-based BACnet Service Tool Together with our parent company, Schneider Electric, our complete building solutions give you a single approach for controlling all of a building’s systems, from the power line to the bottom line. Take control – turn to TAC. To learn more about Open Systems for Building IT®, visit www.tac.com. TAC was awarded the Frost & Sullivan 2006 Excellence in Technology Award in the field of Integrated Building Systems. www.tac.com BACnet insight BACnet – eine Einführung An Introduction to BACnet Hans Symanczik1 Geschichte von BACnet Die Entwicklung von BACnet be gann 1987 in den USA. Sie wurde getragen von der ASHRAE (Ameri can Society of Heating, Refrigera ting & Air-Conditioning Engineers), einer amerikanischen Ingenieurver einigung. Bereits während der Ent wicklung des Protokolls bestand er hebliches internationales Interesse. Im Juni 1995 wurde BACnet offi ziell von der ASHRAE akzeptiert und veröffentlicht. Im gleichen Jahr erfolgte ebenfalls die Anerkennung als amerikanischer Standard durch ANSI. 1996 kamen erstmals Pro dukte auf den Markt, die mitei nander über BACnet kommuni zierten. BACnet wandelte sich vom Papiertiger zum realen Protokoll mit entsprechenden Anwendungen. BACnet wurde schnell auch Kandidat für eine europäische (CEN) Norm und eine weltweite (ISO) Norm, welche 2004 Realität wurde. Große realisierte Projekte, wie beispielsweise der Technikver bund Parlamentsbauten mit dem Reichstagsgebäude in Berlin oder die Charité Berlin, in denen Geräte unterschiedlicher Hersteller über BACnet kommunizieren, bewiesen, dass das Protokoll den Anforderun gen gerecht wird. BACnet ist als ISO Norm das weltweit maßgebliche Protokoll in der Gebäudeautomation. BACnet ist an keine Hardware gebunden Worin liegen die Vorteile, die letzt endlich für das Durchsetzen dieses Protokolls verantwortlich waren? BACnet eignet sich für alle Arten von Gebäudeautomationssystemen einschließlich HLK-, Brand- und Ein bruchmelde-Systemen. Es besteht aus einem objektorientierten Daten modell, das die Konfiguration und den Betrieb verschiedenster Be dien- und Regelgeräte repräsentiert. Weiterhin sind Nachrichten und Dienste definiert, die nach dem Client-Server-Prinzip zwischen Ge räten ausgetauscht werden. Für die Übertragung der Informa tionen können unterschiedliche lokale (LAN) und Weitverkehrs netze (WAN) benutzt werden. Zur Verfügung stehen einfache Zwei draht-, Ethernet- ebenso wie TCP/ IP-Verbindungen. In Abhängigkeit vom Fortschritt der Technolo gie in der Datenkommunikation eröffnen sich neue Möglich keiten. BACnet ist an keine Hard ware gebunden. Weder spezielle Chips noch zugeschnittene Kom munikationsmedien müssen genutzt werden. BACnet ist lediglich ein Protokoll, das auf nahezu jeder Hardwarebasis implementiert wer den kann. Außerdem fallen keine Lizenzgebühren für die Nutzung von BACnet an. Die Übertragungs geschwindigkeit richtet sich nach dem verwendeten Medium (z. B. Ethernet 10MBit/s). Struktur von BACnet Grundlegend für BACnet ist das Objektmodell, in welchem jede Funktion eines Automationsgerätes (Eingaben, Ausgaben, Regelkreise, Zeitpläne) als Sammlung von In formationen (Objekt) dargestellt wird. Jedes Objekt verfügt dabei über Eigenschaften. Dazu zählen: aktuelle Werte, physikalische Standorte, Skalierungsparameter, Alarmgrenzen, Beschreibung der Objektfunktion usw. Zurzeit hält der Standard 28 Objekt-Typen bereit. Jedes BACnet-Gerät ist eine Ansammlung von den entsprechen den Objekten, welche das Gerät repräsentieren. Ein Feldgerät mit 16 digitalen Eingängen könnte repräsentiert werden durch 16 Ob jekte vom Typ binary-input (bi närer Eingang). Beliebig komplexe Geräte entsprechen einer Anzahl von solchen Elementar-Objekten auch gleichen Typs und deren Ei genschaften. Dieser Ansatz macht BACnet für nahezu jede Anwen dung nutzbar. Der zweite wesent liche Bestandteil von BACnet ist die Definition von BACnet-Diensten (Nachrichten bzw. so genannte Hans Symanczik, Kieback&Peter GmbH & Co. KG, ist Mitglied des BIG-EU Beirats. Hans Symanczik, Kieback&Peter GmbH & Co. KG, is member of the BIG-EU Advisory Board. 1 Services), die BACnet-Geräte unter einander austauschen. Im Standard sind 35 Dienste in fünf Kategorien definiert. Dabei handelt es sich um Alarm- und Ereignismeldungen (Alarm- and Event-Services), Datei-Zugriffs-Mechanismen (File-Access-Services), Objekt-Zugriffs-Dienste (Object-Access-Services), Geräte-Fernbedienungs-Dienste (Remote-Device-ManagementServices), Virtuelle Terminal-Dienste (Virtual-Terminal-Services). Weitere Objekte und Dienste wer den zurzeit für die Übernahme in den Standard diskutiert. Auch bei ihnen zeigt sich, dass BACnet prin zipiell erweiterbar ist und laufend weiterentwickelt wird. Zur letzten Komponente von BACnet zählen die verwendbaren Netzwerktechnolo gien. Diese wurden entsprechend den Anforderungen an Gebäudeau tomationssysteme wie Geschwin digkeit, Durchsatz, Kosten und Ver breitungsgrad aus den vorhandenen Standards gewählt. Ethernet-Ver netzungen gehören heute zur Stan dardverkabelung in Gebäuden. Ent sprechend einfach ist es also, auf diese Verkabelung für die Belange der Gebäudeautomation zurückzu greifen. Seit 1999 kann BACnet direkt über das IP (Internet-Protokoll) be trieben werden. Eine weitere inte ressante Möglichkeit ist das PTPProtokoll, mit welchem BACnet auch über Modem-Verbindungen möglich ist. Damit ist BACnet der einzige Kommunikations-Standard, der auch Regeln für einen Ver bindungsauf- und Abbau beinhaltet. Weiterhin kann BACnet über verdrillten Zweidraht (MS/ TP), ARCnet und sogar über das Echolon-LonTalk-Protokoll (es wird nur die Infrastruktur verwendet) betrieben werden. Hinsichtlich der Netzwerktechnologien wird BACnet ebenfalls ständig weiter entwickelt. Gewinnen neue Systeme an Bedeutung, werden sie in den BACnet-Standard übernommen. Im Moment werden beispielsweise der Funkstandard ZigBee und die BACnet-Übertragung basierend auf Web-Services in den Standard über nommen. Anwendung von BACnet BACnet ist für die ausschließli che Anwendung im Gebäude konzi piert. Heutige und zukünftige An forderungen von Gebäuden werden bei der Weiterentwicklung von BACnet berücksichtigt. Das ist der klare Fokus und gleichzeitig auch die eindeutige Abgrenzung. So gibt es zum Beispiel keine Ansätze für BACnet in der Prozess-, Gastro nomie- oder Luftfahrttechnik. BACnet-Lobby Rund um BACnet haben sich welt weit Interessen- und Nutzergrup pen gegründet. Deutsche Herstel ler sind in der 1998 gegründeten BACnet Interest Group Europe ver treten. Diese Gruppen vereinigen Nutzer und Hersteller von BACnetProdukten mit dem gemeinsamen Ziel, Marketing, Schulung und Zertifizierung von BACnet voran zutreiben. Die verschiedenen Nut zergruppen kommunizieren unter einander und tragen Sorge dafür, dass BACnet weiterhin ein uni verselles Protokoll bleibt und sich keine nationalen Dialekte und Aus prägungen ergeben. Offene Kom munikation beginnt nämlich immer mit verbaler Verständigung. Die Mitglieder sprechen miteinander, tauschen sich über Landes- und Kontinentsgrenzen aus. Dies führt zu einer sinnvollen Weiterentwicklung und Anpassung des BACnet-Standards. Ein wich tiges Ziel der BACnet lnterest Gruppen und der BACnet Inter national (ehemalige BACnet Manu facturers Association) in den USA besteht darin, einen einheitlichen Test- und Zertifizierungsmechanis mus für BACnet-Produkte zu fin den. Die Gründung des BACnetTestlaboratoriums BTL für den Test von BACnet-Geräten nach weltweit einheitlichen und somit vergleichbaren Testkriterien und Testskripten führte zu ersten ge testeten Geräten. Eine einheitliche Zertifizierung nach europäischen Maßstäben steht in Aussicht. [email protected] – www.kieback-peter.de BACnet Europe Journal 5 11/06 25 BACnet insight Wie wird sich BACnet weiterentwickeln? Die ersten Anwendungen erfolgten ausnahmslos in der Heizungs-, Lüftungs- und Klimatechnik. Neu erdings kommen aber immer mehr Erzeugnisse von Firmen der Brand melde-, Sicherheits- sowie Beleuch tungstechnik hinzu. BACnet ist also nicht nur auf die Belange einer spe ziellen Branche zugeschnitten. Ge meinsam ist hier der Fokus auf der Anwendung im Gebäude. The History of BACnet The development of BACnet began in the United States in 1987, borne by ASHRAE, (the American Socie ty of Heating, Refrigerating & AirConditioning Engineers), an Amer ican engineer’s society. But even while the protocol was being de veloped, there was considerable in ternational interest. In June 1995, BACnet was officially accepted and published by ASHRAE and in the same year it was also recognised by ANSI as an American standard. The first products to communicate with one another via BACnet were brought to market in 1996, trans forming BACnet from a paper tiger to a real-life protocol with actual applications. BACnet then quickly advanced to becoming a candidate for a Euro pean standard (CEN) and a global standard (ISO) which became a re ality in 2004. Some major projects were launched such as the Techno logy Association for Parliament Buildings with the German Reichs tag Parliament in Berlin and Berlin‘s Charité hospital. They have a whole series of devices from various manu facturers communicating with one another via BACnet, which demons trates that this protocol is in tune with requirements. With an ISO standard BACnet is the key global protocol in building automation equipment. BACnet is not linked to any hardware What benefits does BACnet offer to enable it to assert itself? Well, one thing is the fact that BACnet is suited to all kinds of building au tomation systems including HVAC, fire and security systems. It consists of an object-orientated data model that represents the configuration and operation of a wide variety of operating and control devices. It also defines messages and services Binary Input Multi-state Input File Binary Output Multi-state Output Program Binary Value Multi-state Value Schedule Analog Input Loop Trend Log Analog Output Calendar Group Analog Value Notification Class Event Enrollment Averaging Command Device LifeSafetyPoint LifeSafetyZone Global Group Accumulator Pulse-Converter Trendlog-Multiple Eventlog Die 28 BACnet Objekte. The 28 BACnet objects. exchanged between devices on the client-server principle. Varying lo cal (LAN) and wide-area networks (WAN) can be used for trans mitting information and simple two-wire Ethernet and TCP/IP connections are available. This is pioneering new frontiers in stateof-the-art data communications. A major benefit is the fact that BACnet is not linked to any parti cular hardware so you don‘t need either special chips or tailor-made communication media. BACnet is simply a protocol that can be im plemented on virtually any hard ware basis. That eliminates license fees for using BACnet, meaning only the medium – such as Ethernet 10 MBit/s – dictates the transmis sion speed. The Structure of BACnet BACnet is based on the object mo del where each function of automa tion equipment (such as inputs, out puts, control circuits and schedules) are shown as a collection of infor mation (i.e. an object; ). Each ob ject has properties including cur rent values, physical locations, scaling parameters, alarm limits and a description of the object function. These days, the standard provides 28 object types and each BACnet system is an accumulation of ob jects representing the system. For instance, a field unit with 16 digital inputs could be represented with 16 binary input objects. Systems with a random amount of complexity correspond to a number of these elementary objects of the same type and their properties. This model means that BACnet can be used for virtually any application. The second essential component of 26 BACnet Europe Journal 5 11/06 BACnet is defining BACnet services (messages or services) that BACnet systems exchange with one another. The standard defines 35 services in five categories including: Alarm and event services, File access services, Object access services, Remote device management services and Virtual terminal services. Other objects and services are under discussion for being included in the standard, which also demonstrates that BACnet can be progressively expanded and developed. The latest components of BACnet include ap plicable network technologies such as speed, throughput, expenditures and degree of dissemination selected from existing standards according to the needs of building automation equipment. Ethernet networking is standard cabling in buildings these days, which means that it is easy to use this cabling for the needs of building automation equipment. Since 1999, direct BACnet oper ation has been possible over IP (the Internet protocol), although an other fascinating option is the PTP protocol, that enables BACnet via modem connections. That means that BACnet is the only communi cation standard that also constitutes rules for establishing and clearing communication. But BACnet can al so be operated via twisted pair (MS/ TP), ARCnet and even the Echelon LonTalk protocol (just using the in frastructure). What‘s more, BACnet is constantly evolving in terms of its network technologies and new systems are being included in the BACnet standard whenever they come to the fore. Right now, the radio standard ZigBee and BACnet transmission based on web services are being included in the standard. Applying BACnet BACnet was conceived exclusively for use in buildings. Present and future building requirements will be integrated into the BACnet stand ard. In other words, it is distinctly focused and narrowed down, mean ing there are no plans for applying BACnet in process, restaurant or aviation technology. BACnet Lobby Global interest and user groups have sprung up in connection with BACnet with German manufac turers represented in the European BACnet Interest Group that was set up in 1998. These groups bring together users and manufacturers of BACnet products who have the common interest of promoting the marketing, training and certifica tion of BACnet. These different user groups are in communication with one another to make sure that BACnet stays a universal protocol and does not develop national dia lects or varieties. The bottom line is the fact that open communication always starts with verbal under standing. Another thing members do is to talk to one another and ex change information over national and continental borders in order to meaningfully transform and adapt the BACnet standard. A major priority of the BACnet interest groups and BACnet Inter national (formerly the BACnet Manufacturers Association) in the United States is finding a uniform testing and certification mechanism for BACnet products. The BACnet BTL test laboratory was set up to test BACnet systems according to globally uniform and thus compa rable test criteria and test scripts. This generated the first tested systems while uniform certification according to European measures is a prospect for the future. How will BACnet progress? All of the initial applications were in heating, ventilation and air con ditioning equipment, although there are more and more products from companies for alarm, security and lighting equipment. In other words, BACnet is not simply tailor-made to the needs of any special sector, al though there is a common focus on building applications. BACnet insight BACnet in IT-Umgebungen BACnet in IT Environments Dr. Simon Ginsburg1 Clemens Schaumann2 Frank Schubert 3 gemacht wurde, ist der Kommu nikation vom einen zum anderen BACnet-Gerät der Weg geebnet. BACnet unterstützt insgesamt sechs verschiedene Netzwerkstan dards als mögliche Verbindung. Darunter befindet sich auch das Internetprotokoll IP. Aus diesem Grund liegt es nahe, über eine In tegration in bestehende IT-Umge bungen nachzudenken, wenn eine Vernetzung von Komponenten der Gebäudeautomation vorgenom men werden soll und bereits ein Netzwerk vorhanden ist. Bei der praktischen Umsetzung sind jedoch drei wesentliche Be reiche bereits in der Planungspha se zu berücksichtigen, auf die in diesem Artikel näher eingegangen werden soll. Broadcast-Nachrichten Allerdings muss bei der Integra tion in IT-Umgebungen die Frage geklärt werden, ob BroadcastNachrichten (dies sind Telegramme an alle Teilnehmer im Netzwerk) transportiert werden. Diese Nach richten dienen bei BACnet u. a. da zu, die BACnet-Teilnehmer eines Netzwerkes mittels Who-Is (Wer ist…) bzw. I-Am (Ich bin…) Tele grammen zu ermitteln. Da diese Nachrichten von allen Teilneh mern (auch Nicht BACnet-Geräten) bearbeitet werden müssten, werden Broadcast-Nachrichten im Normal fall zwischen verschiedenen Netz werksegmenten (z.B. abteilungsoder etagenweise) gesperrt. Der Einsatz eines BBMD (BACnet Broadcast Management Device) kann dieses Problem lösen, indem das BBMD ein BroadcastTelegramm im eigenen Segment erkennt und dieses an eine pro jektierte Liste weiterer BBMDs sendet, welche die Broadcast erhal ten sollen. Die entfernten BBMD senden stellvertretend den Broad cast wieder aus. Da das Telegramm als gerichtetes Telegramm verpackt wird, transportieren die vorhan denen Router diese Nachrichten. Dieses Verfahren wird „Two Hop“ genannt und ist der Regelfall für den Einsatz von BBMDs. Dynamische Adressvergabe Weitere technische Belange sind im Hinblick auf die dynamische Adressenvergabe (DHCP) zu be achten, in den meisten Fällen arbeiten Komponenten für die Gebäudeautomation so, dass auf der Managementebene einesta tische Zuordnung zu den ange schlossenen Automationsgeräten besteht, daher ist in vielen Fällen die Vergabe einer statisch festgelegten IP-Adresse erforder lich. 1. Technische Anforderungen an das Netzwerk BACnet unterstützt auf Basis des weit verbreiteten Ethernet-Stan dards gleich zwei Protokolle: ISO8802-3 und das Internetpro tokoll IP. Moderne Router (auch Layer 3 Router genannt) transpor tieren nur IP-Telegramme, nicht je doch Pakete vom Typ ISO 88023, weshalb letztere für eine flächen deckende Vernetzung insbesondere in großen Netzwerken ungeeignet sind. BACnet/IP bietet eine direkte Unterstützung des Internetproto kolls und ist daher für die Integra tion in bestehende Netzwerke sehr gut geeignet. Als technische Anforderung an das Netzwerk gilt Folgendes: BACnet/IP basiert auf dem UDPProtokoll und kommuniziert über einen Port (standardmäßig ist dies der Port 47808, in hexadezimaler Schreibweise 0xBAC0, also leicht zu merken). Solange die Router untereinander die Routing Tables austauschen und den BACnet Ge räten mindestens einer dieser Rou ter als „Default-Gateway“ bekannt 1 2 3 Dr. Simon Ginsburg, Saia-Burgess Controls AG und Dr. Simon Ginsburg, Saia-Burgess Controls AG and Clemens Schaumann, t.a.c., sind Mitglieder der BIG-EU ArbeitsgruppeMarketing. Clemens Schaumann, t.a.c., are members of the BIG-EU Working Group Marketing. Frank Schubert, MBS GmbH, ist Mitglied des BIG-EU Beirats. Frank Schubert, MBS GmbH, is member of the BIG-EU Advisory Board. [email protected] [email protected] [email protected] Adressumsetzung In der IT kommt ab und zu ins besondere beim Einsatz von Fire walls das Thema NAT (Network Address Translation = Adressum setzung) auf. Hier wird dem Gerät nach außen eine andere/öffentliche Adresse zugeteilt als die intern ver wendete private Adresse. Da BAC net-Geräte bei einem I-Am-Tele gramm ihre IP-Adresse mitteilen (in diesem Fall die intern verwen dete private Adresse), kann dieses Verfahren nicht funktionieren. Die nächste Generation des IP-Adres senschemas IPv6 wird heute noch nicht von BACnet unterstützt, dies ist jedoch für die Zukunft geplant. Zur Zeit wird der aktuelle Stan dard IPv4 unterstützt. Transport über VPN VPN (=Virtual Private Network, virtuelles privates Netzwerk) passt sehr gut zu BACnet und erlaubt den Transport von Nachrichten zwi schen zwei Geräten oder Netzwer ken, ohne dass andere diese Telegramme entschlüsseln könnten. Dabei ist zu beachten, dass zum Beispiel die oft eingesetzte IKE/ IPSec Implementierung nicht im mer mit der NAT von Firewalls zu rechtkommt, es sei denn die Imple mentierung unterstützt RFC 3947 (Negotiation of NAT-Transversal in the IKE). Die auf Basis von SSL-PN arbeitenden Implementa tionen sind demgegenüber immer mit NAT kompatibel. Zum Thema Netzwerksicherheit gibt es mit Addendum 135-2004 g zur Zeit einen aktuellen Entwurf, der unter www.bacnet.org herun ter geladen werden kann. Dieses erlaubt zukünftig die direkte Ver wendung von Sicherheitsmechanis men in BACnet-Geräten. 2. Organisatorische Aspekte Bei der Integration in bestehende Netzwerke, aber auch beim Auf bau eigener Netzwerke für die Ge bäudeautomation sind viele orga nisatorische Fragen zu klären. Neben der geplanten Maximalan zahl von Geräten spielen häufig auch Fragen der Betriebssicherheit und der Netzwerksicherheit eine entscheidende Rolle. Gebäudeautomation und IT IT-Administratoren haben u. a. die Aufgabe, das Netzwerk vor Ein dringlingen zu schützen und einen sicheren Betrieb zu gewährleisten. Gebäudeautomation ist aber mehr als ein potentieller Störfaktor. Auch die IT profitiert davon, wenn die Klimaverhältnisse im Rechen zentrum einen sicheren Betrieb garantieren und Fehler rechtzeitig erkannt werden. Die Komponenten der Gebäudeautomation benöti Glossar BBMD: BACnet Broadcast Management Device, empfängt Broadcast Telegramme und sendet diese als gerichtetes Telegramm (Unicast) an die anderen BBMD im Netzwerk. „Two Hop“ Verfahren: Hier werden die gerichteten Telegramme der BBMD bis zur Empfänger BBMD als Unicast gesendet. „One Hop“ Verfahren: Dieses Verfahren benötigt spezielle (IP-) Router, die die gerichteten Telegramme der BBMD ohne Zutun der Empfänger BBMD wieder in Broadcasts umwandeln. UDP: Das User Datagram Protocol ist ein minimales, verbindungsloses Netzprotokoll, das zur Transportschicht der Internetprotokoll familie gehört. TCP: Das Transmission Control Protocol ist ein zuverlässiges, verbin dungsorientiertes Transportprotokoll in Computernetzwerken. BACnet Europe Journal 5 11/06 27 integrieren Wenn Integrationsaufgaben komplexer werden, ist die Wahl des Systemintegrators entscheidend für die erfolgreiche Umsetzung eines Projektes. Die Mitarbeiter von Honeywell Building Solutions verfügen über langjährige Erfahrung mit kritischen Automations- und Integrationsaufgaben zum Beispiel im Gesundheitswesen, der Pharmaindustrie, Sonderimmobilien wie Flughäfen und Verwaltungs- und Produktionsgebäuden. Erfahrung und innovative Produkte wie der Excel Web® mit BACnet® und LON®-Schnittstellen sowie die offene Gebäudeleittechnik Enterprise Buildings IntegratorTM bilden die Grundlage für niedrige Betriebskosten, maximalen Investitionsschutz und verbesserte Produktivität unserer Kunden. Setzen Sie bei Ihrem Projekt auf Erfahrung und offene Standards: Honeywell. Wir informieren Sie gerne über zukunftssichere Lösungen: Honeywell GmbH – Honeywell Building Solutions, Kaiserleistraße 39, 63067 Offenbach Tel.: 069 8064-723 – [email protected] – www.honeywell.de/hbs © 2006 Honeywell GmbH, Alle Rechte vorbehalten BACnet insight Glossary gen zu nahezu jedem Zeitpunkt ei ne funktionierende Infrastruktur, auch wenn z. B. durch Daten sicherungen das Netzwerk hoch belastet ist. Dies ist beim Entwurf eines „QoS“-(Quality of Service) Schemas unbedingt zu berücksich tigen. Integrationen in Netzwerke scheitern in der Praxis oft daran, dass die Befürchtungen auf bei den Seiten so hoch sind, dass sepa rate Netze aufgebaut bzw. betrie ben werden. Verantwortung für das Netzwerk Zu den organisatorischen Fragen zählen auch die nach der Verant wortung: Wer behebt die Fehler in einem Netzwerk und in welchem Zeitrahmen? Von wem dürfen überhaupt Eingriffe in das Netz werk vorgenommen werden? Insbe sondere in Netzwerken mit per sonenbezogenen Daten oder an deren Daten, die dem Datenschutz unterliegen, stellt sich die Frage, ob bei Inbetriebnahmen Proto‑ kollmitschnitte vom Netzwerkver kehraufgezeichnet werden dürfen. Auf jeden Fall ist die Benennung eines Netzwerk-Verantwortlichen für die Gebäudeautomation un erlässlich, sowohl zur Planung des Netzwerkes, zur Definition BACnet-spezifischer Festlegungen wie Gerätenamen und -nummern, als auch zur Dokumentation des Netzwerkes. 3. Kosten / Nutzen Obwohl der Einsatz bestehender Netzwerke für die Gebäudeauto mation zunächst interessant und kostengünstig erscheint, müssen bei einer Kosten/Nutzen-Betrach tung mehrere Faktoren berück sichtigt werden. In vielen Fällen arbeiten IT-Ab teilungen intern als Profitcenter, die ihre Dienstleistungen wie z. B. Bereitstellung der Netzwerkin frastruktur den Abteilungen an bieten. Hier ist mit Kosten im zweistelligen Eurobereich pro Monat und Netzwerkanschluss zu rechnen, wobei die Wartung und die Reparatur ausgefallener Netz werkkomponenten selbstverständ lich hierin enthalten sind. Die Er fahrung zeigt, dass für wenige benötigte Netzwerkanschlüsse der Aufbau eines eigenen Netzwerkes zu teuer wäre, jedoch ab einer größeren Anzahl sich die Inves titionen in ein eigenes GA-Netz werk innerhalb weniger Jahre lohnen können. Dann ist jedoch die GA für Wartung und Betrieb des Netzes verantwortlich. Umfangreiche Planung Wie bereits erwähnt ist die Frage der Kompetenz und Verantwort lichkeit ein nicht zu unterschät zender Faktor bei der Integration und auch ein potentieller Grund des Scheiterns. GA als Teil der IT zu betrachten, nur weil die Ge räte über Netzwerkanschlüsse ver fügen, ist genauso wenig sinnvoll, wie die Grundlagen der Netzwerk technik bei der Planung zu igno rieren und auf den Zeitpunkt der Realisierung zu legen. Insgesamt sollte eine umfangreiche Betrachtung zum Zeitpunkt der Planung erfolgen, und auch die IT-Abteilung sollte frühzeitig in diesen Prozess mit einbezogen werden, damit eine Integration zum Erfolg wird. BACnet supports a total of six different network connection stan dards. Among these standards you will also find the IP internet proto col. Therefore, it is worth consid ering the integration into existing IT environments when compo nents of building automation are to be connected in a network and such a network already exists. For implementation, however, three essential areas must be consid ered already in the planning phase. These topics are covered in more detail in this article. 1. Technical requirements for the network Based on the widely used Ethernet standard, BACnet supports two protocols: ISO8802-3 and the IP internet protocol. State-of-theart routers (also called “layer 3 routers”) only transport IP tele grams and no ISO8802-3 pack ets, which makes them unsuitable for complete coverage, particularly in large networks. BACnet/IP pro vides direct support of the internet protocol and is thus perfectly suited for the integration into existing net works. The following technical require ments apply: BACnet/IP is based on the UDP protocol and commu nicates via a port (default is port 47808, in hexadecimal notation this is 0xBAC0, which can be easily remembered). As long as the rout ers exchange the routing tables with BBMD: BACnet Broadcast Management Device; receives broadcast telegrams and transmits them as unidirectional telegrams (unicast) to the other BBMDs in the network. Two-hop technique: The unidirectional telegrams of the BBMDs are sent as “unicast” to the receiving BBMD. One-hop technique: This method requires special (IP) routers that convert the unidirec tional telegrams of the BBMDs without intervention of the receiving BBMD into broadcasts. UDP: The user datagram protocol is a minimum connectionless network protocol as part of the transport layer of the internet protocol family. TCP: The transmission control protocol is a reliable, connection-oriented transport protocol in computer networks. each other and at least one of these routers is known to BACnet as “default gateway”, the door is open for communication between BACnet devices. BACnet Broadcast Management Device However, during integration into IT environments the issue, whether broadcast messages (telegrams to all network members) are to be transported, must be resolved. For example, such messages are used in BACnet to identify the BACnet members by means of “who-is-who” or “I-am-…” telegrams. Since these messages must be processed by all members (even by non-BACnet devices), the broadcast messages normally are blocked between dif ferent network segments (for ex ample between work groups or floors). The problem can be solved by using a BBMD (BACnet Broadcast Management Device), where the BBMD detects broadcast telegrams in its own segment and forwards them to a predefined list of other BBMDs that are supposed to re ceive the broadcast. The remote BB MDs then in turn resend the broad cast. Since the telegram is packaged as a unidirectional telegram, the existing routers will transport these messages. This technique is called “two hop” and is the standard application for BBMDs. Dynamic Address Allocation Other technical requirements have to be considered with respect to dynamic address allocation (DHCP). In most cases, building automation components are statically assigned to the connected automation de vices on management level, there fore the allocation of a statically determined IP address is required in many applications. Network Address Translation In the IT departments, the topic of network address translation (NAT) occasionally arises, particu larly when firewalls are used. This means that a device is assigned an externally used public address that is different from the internally used private address. Since BACnet de vices broadcast their IP address in an “I-am-telegram” (in this case the internally used address), this meth od cannot be applied. As of today, the next generation of IP address scheme IPv6 is not yet supported by BACnet, but this is planned for the future. The current standard IPv4 is supported. Transport via VPN VPN (Virtual Private Network) is well suited for BACnet and permits the transport of messages between two devices or networks without others being able to decode these telegrams. It must be noted that the frequently used IKE/IPSec imple mentations are not always compat ible with firewall NAT, unless the implementation supports RFC3947 (negotiation of NAT transversal in the IKE). Compared with this, im plementations based on SSL-PN are always compatible with NAT. For more information on the sub ject of network security you can download Addendum 135-2004g from www.bacnet.org. In future, this allows the use of direct security mechanisms in BACnet devices. BACnet Europe Journal 5 11/06 29 BACnet insight 2. Organizational aspects A multitude of organizational is sues must be resolved during inte gration into existing networks or during establishment of own net works for building automation. Apart from the projected maximum number of devices, other crucial is sues are operational safety and net work security. Building Automation and IT Among other tasks, IT administra tors are responsible for protecting the network against intruders and ensuring reliable operation. How ever, building automation is more than just a source of friction. Also the IT will benefit from climatic conditions in the computer cent er ensuring reliable operation and allowing timely recognition of faults. At nearly all times the build ing automation components require an operational infrastructure, even when the network load is extreme ly high, for example, due to data backup operations. This must be absolutely taken into account when designing a QoS (Quality of Ser vice) scheme. In practice, network integration frequently fails because apprehensions are too high on both sides so that separate networks are established or operated. Responsibility for the Network Other organizational issues are the responsibility for network trouble shooting and the timeframe for it, and who is allowed interventions in the network at all. Particularly in networks with personal data and other data subject to protection, the question arises whether network traffic recording should be allowed during commissioning. At any rate, naming a responsible person for the building automation network is in dispensable, also for BACnet-speci fic definitions such as device names and numbers and for documenting the network. 30 BACnet Europe Journal 5 11/06 3. Cost / Benefit Although at first glance the use of existing networks seems to be feasi ble and cost-effective, several other factors must be taken into account for a cost-benefit-analysis. In many organizations, IT de partments act as an internal profit center that offers its services, such as the provision of the network in frastructure, to the other depart ments. This involves monthly costs of double-digit Euro sums per net work connection, though of course the cost for maintenance and repair of faulty network components is in cluded in the sum. Experience has shown that the establishment of a separate network would be too ex pensive when only few network connections are needed, but the in vestment in an own building auto mation network for a larger number of connections could pay off within a few years. In the latter case, how ever, the building automation group is responsible for maintenance and operation of the network. Comprehensive Planning As mentioned earlier, the question of competence and responsibility is a factor not to be underestimated for integration and at the same time a potential reason for failure. To consider building automation as part of IT only because the devices have network connections makes as little sense as to ignore network ing principles during planning and postponing their consideration until the implementation phase. Altogether, a comprehensive consideration should be made dur ing the planning phase and the IT department, too, should be involved in the process at an early stage to make the integration a success. BACnet insight BACnet integriert Sicherheitstechnik – Neuer Objekttyp „Access Door“ BACnet integrates Security – New object type “Access Door” Christian Müller 1 Als die ASHRAE (American Soci ety of Heating, Refrigerating and Air-Conditioning Engineers Inc.) 1995 den BACnet ® Standard der Fachöffentlichkeit vorstellte, war es das Ziel, eine Möglichkeit zu schaffen, wie Geräte und Systeme unterschiedlicher Hersteller der Automatisierung von Heizungs-, Lüftungs- und Klimatechnik mit einander Daten austauschen kön nen. Zehn Jahre später hat sich der Standard außerordentlich bewährt und sich als internationale Norm (EN ISO 16484-5) etabliert. Der objektorientierte Ansatz von BACnet ermöglicht aber auch die Standardisierung des Kom munikationsverhaltens von Gerä ten anderer Gewerke, z. B. aus der Sicherheitstechnik. Im Englischen unterscheidet man zwischen Life Safety und Security, also dem Objekttyp „Zutrittsüberwachte Tür“. Access Door Object Type. Schutz des menschlichen Lebens vor Elementarschäden, z. B. durch Feuer (Life Safety), und dem Schutz von Menschen und Inventar vor unberechtigten und kriminellen Eingriffen durch Menschen (Ein bruch, Diebstahl, Sabotage, ...). Si cherheit vor den zuletzt genannten Schäden wird im Englischen als Se curity bezeichnet. 1 Objekteigenschaft (L)esen (S)chreiben Conformance Code Mögliche Werte (auszugsweise) Present_Value S Verbindlich LOCK UNLOCK PULSE-UNLOCK IN_ALARM FAULT OVERRIDDEN Status_Flags L Verbindlich OUT_OF_SERVICE Bedeutung Tür wird verriegelt. Tür wird entriegelt. Tür wird für die Dauer der Door_Pulse_ti me (eine weitere Objekteigenschaft) freige geben. Türalarm. Fehlerzustand. Tür derzeit nicht kommandierbar, da vor Ort Bedienung. Tür derzeit nicht kommandierbar. Door_Status S Optional CLOSED OPENED UNKNOWN Rückmeldung des Türzustandes: Tür geschlossen, Tür steht offen, Türzustand unbekannt. Lock-Status S Optional LOCKED UNLOCKED PENDING_LOCK PENDING_UNLOCK Rückmeldung über das letzte Kommando an die Tür: Die Tür ist verriegelt. Die Tür ist entriegelt. Das Kommando „Verriegeln“ wurde ab gesetzt, aber die Tür ist nicht verriegelt. Das Kommando „Entriegeln“ wurde abgesetzt, aber die Tür ist verriegelt. Door_Members L Optional Hier werden die BACnet Objekte aufge führt, die der physikalischen Tür zugeordnet sind. Dies sind in der Regel binäre Ein- und Ausgänge, aber auch Zeitprogramme. Die binären Datenpunkte repräsentieren z. B. Kontakte, Leser oder Schlösser. Door_Alarm_ State L Optional Diese Eigenschaft wird notwendig, sobald vom Access Door Object das so genannte Intrinsic Alarming unterstützt wird. Auf einem Algorithmus basierend auf den Zu ständen von Lock_State, Door_State und Present_Value oder Informationen von anderen Objekten kann der Türalarm erzeugt werden. BACnet und „Life Safety“ BACnet hat bereits seit einigen Jahren auch den Bereich Life Safe ty (Brandmeldetechnik) erobert. Dazu wurden neben den notwendi gen Diensten die zwei Objekttypen Life Safety Point Object (Gefahren melder-Objekt wie Rauchmelder, Sirene, überwachter Drucker) und Life Safety Zone (Sicherheitsbe reichsobjekt, also z. B. eine Melde linie mit Rauchmeldern) definiert. Christian Müller ist Mitglied im BIG-EU Beirat, Leiter der BIG-EU Arbeitsgruppe Marketing und Leiter Marketing Kommunikation der Honeywell GmbH, Honeywell Building Solutions, Offenbach. Christian Müller is a member of the BIG-EU Advisory Board, head of the BIG-EU Working Group Marketing and Manager Marketing and Communications of Honeywell GmbH, Honeywell Building Solutions, Offenbach, Germany. Auf diese Weise können z. B. heute Brandmeldezentralen über BACnet in einen integrierten Gebäudema nagement-Leitstand eingebunden werden. Die Vorteile einer solchen Integration liegen auf der Hand: Nutzung bestehender Grundrisspläne für die Darstellung der Einbauorte von Rauch- und Brandmeldern, Integration mit der Videoüber wachung, um rasch genaue In formationen über das Brandereignis zu erhalten, einheitliche Bedienung aller Ge werke; dadurch sichere Reak tion des Personals unter Stress, weniger Platzbedarf in der Leit warte, da ein separates Manage- mentsystem für die Brandmel dezentrale (BMZ) entfallen kann. BACnet und „Security“ Im März 2006 wurde eine neue Erweiterung - Addendum „f“ zum ANSI/ASHRAE Standard 1352004 – der Fachöffentlichkeit zum so genannten Public Review (zur Stellungnahme) vorgestellt, die dem Bereich Security zuzuordnen ist. In dem neuen Addendum (Ergän zung) zum BACnet Standard wird ein neuer Objekttyp, nämlich der Access Door Object Type vorgestellt. Frei übersetzt könnte man das Objekt in Deutsch etwa „zu trittsüberwachte Tür“ nennen. [email protected] – www.honeywell.de/hbs BACnet Europe Journal 5 11/06 31 Marie-Elisabeth-Lüders-Haus, Berlin Im „Gedächtnis der Demokratie“ arbeitet eine intelligente gewerkeübergreifende Gebäudeautomation · Systemintegration · Gebäudeautomationssysteme · Technisches Gebäudemanagement · Integrated Facility Management · Performance Contracting · Integrierte Sicherheitslösungen Johnson Controls Controls Group Germany · Bonsiepen 13 · D-45136 Essen Telefon 0201/2400-0 · Fax 0201/2400-351 · E-Mail [email protected] Spezialisten für intelligente Gebäude. BACnet insight Der neue Objekttyp „Access Door Object Type“ Das Objekt Access Door ist eine Abstrahierung der Kommunika tionsschnittstelle zu einer physikali schen Tür und ihrer elektronischen Zutrittskontrollsteuerung. Der Tür werden dabei Karten- oder bio‑ metrische Leser, die Verschluss technik der Tür sowie das Motor schloss, der Zylinder oder die Tür- und Riegelkontakte zugeord net. Die „Tür“ kann natürlich auch beispielsweise eine Schranke im Parkhaus sein. Einige wichtige Objekteigen schaften des vorliegenden Entwurfs für den neuen Objekttyp werden in der Tabelle vorgestellt. Im fol genden Artikel stellen Berhard Isler und Hans-Joachim Mundt alle neu en BACnet-Objekte für Zutrittkon trollsysteme vor. Object property (R)ead (W)rite Conformance Code Property values Present_Value W Required LOCK UNLOCK PULSE-UNLOCK Status_Flags R Required IN_ALARM OVERRIDDEN OUT_OF_SERVICE Biometrische Zuordnung. Biometrical tracking. The door had been commanded to the locked state. The door had been commanded to the unlocked state. The door had been commanded to the unlocked state for the maximum of the Door_Pulse_time. Door alarm. Door has been overridden by a local BACnet device mechanism. Door cannot be commanded. Door_Status W Optional CLOSED OPENED UNKNOWN Door status feedback The door is closed. The door is open. The door status unknown. Lock-Status W Optional LOCKED UNLOCKED PENDING_LOCK PENDING_UNLOCK Feedback regarding the last door command The door is locked. The door is unlocked. The door was commanded to locked bus is (still) unlocked. The door was commanded to unlocked bus is (still) locked. R Optional This category holds references to BACnet objects which represent I/O devices, authorisation devices or schedules or other objects associated with the physical door. R Optional This property is required where the Access Door Object supports the Intrinsic Alarming. An algorithm will take into account the states of Lock_State, Door_State and Present_Value or Information from other objects’ properties to generate a door alarm. When ASHRAE (the American So Door_Members ciety of Heating, Refrigerating and Air-Conditioning Engineers Inc.) rolled out the BACnet® stand ard in 1995 it sought to provide a means of enabling communica Door_Alarm_ tion between different HVAC con State trol systems from various vendors. After ten years of experience with BACnet, the standard was con firmed to be very satisfactory and thus it became an international standard (EN ISO 16484-5). The BACnet object orientated design also supports standardised communication with other func tions like Life Safety devices. BACnet and “Life Safety” BACnet® has been in the Life Safety market for several years now. Its presence is supported by the crea tion of two objects and the appro Meaning of the property priate services. One object type is called the Life Safety Point Object (this could be a smoke detector, a siren or a monitored printer), the other is the Life Safety Zone Ob ject (for example a bus with smoke detectors belonging to a dedicated zone). This configuration allows the fire panels to be brought into an integrated management system us ing the BACnet protocol. The ad vantages of this solution include: Existing floor plans can be used to show the location of smoke and fire detectors. Integration with video surveil lance can help to get a fast and precise overview in the event of a fire. Equal operation of all functions supports a proper and fast re sponse to critical events when under stress. Less floor space is required for the management system because a separate supervisory system for the fire panels is no longer required. BACnet and “Security” In March 2006 a new Addendum “f” to the ANSI/ASHRAE Stand ard 135-2004 was presented to the public for review. This addendum starts to open BACnet to the secu rity industry. It describes a new ob ject type called Access Door Object Type. The new object type “Access Door Object Type” The Access Door object type is an abstraction of the communication interface for a physical door and the accompanying electronic access control. The door can be assigned to various devices such as access card or biometrical readers and the door locking technology (motor driven lockers, cylinder, door con tacts). A “door“ can also be a barri er in a parking deck for example. Some of the important object properties of the current object specification are shown in the table. Bernhard Isler und HansJoachim Mundt specify the new BACnet objects for access control systems on the subsequent pages. BACnet Europe Journal 5 11/06 33 BACnet insight Neue BACnet-Objekte für Zutrittskontrollsysteme New BACnet objects for Access Control Systems Bernhard Isler1 Hans-Joachim Mundt2 Die „Life Safety and Securi ty Arbeitsgruppe“ (LSS-WG) ist der Arbeitskreis des ASH RAE SSPC-135, der die Auf gabe hat, den Standard für Zutrittskontrollsysteme (PACS = „Physical Access Control Systems“) und Videoüberwachungssysteme sowie für Audio-Sicherheitssys teme zu erweitern. Teile der Er weiterungen für PACS waren be reits im ersten „Public Review“ (siehe Addendum f zu 135-2004 und Artikel von Christian Mül ler auf den vorigen Seiten), an dere sind kurz vor der Diskus sion im SSPC-135. Details kann man in einem „White Paper“ zur PACS Standardisierung entneh men, das auf www.bacnet.org erhältlich ist. Video- und Audio systeme werden durch ein verein heitlichtes Model unter dem Ar beitstitel „Multimedia Security Systems“ (MSS) abgedeckt. Alle Erweiterungen werden mit der „Security Industry Association“ (SIA) koordiniert. Zutrittskontrollsysteme (PACS) Ein PACS kontrolliert gesicherte Zonen, indem der Zutritt zu geo graphischen Bereichen (Gebäude, Abteilungen, Räume, Aufzüge, usw.) auf berechtigte Personen, Personengruppen oder Gegenstän de („User“) beschränkt wird. Gesi cherte Türen oder Tore dienen als physikalische Ein- und Austritts punkte. Ein „User“ hat sich an die sen Punkten an Erfassungslesern (z. B. Ausweisleser, PIN-Tastatu ren, biometrische Leser) zu identi fizieren. Das BACnet-Modell eines PACS PACS haben erweiterte Funktiona litäten gegenüber HLK-Systemen: große Mengen von Transakti onsereignissen, große komplexe Datenbank mit Personen, Ausweisen und Zu trittsrechten, die über viele Ge räte repliziert werden müssen, 1 2 Bild 1: Funktionale Zerlegung eines PACS sehr häufige Konfigurationsän derungen, komplexe Beziehungen zwischen Objekten. Für die Standardisierung wurden sieben neue Objekte, aber keine neuen BACnet-Dienste eingeführt. Ein neuer Ereignisalgorithmus wurde entwickelt und existierende BACnet Objekte (Calendar, Sche dule) wieder verwendet. Zuerst wurde das PACS auf einer funktionalen Ebene zerlegt (Bild 1). Für das BACnet Modell sind nur die Interfaces interessant (siehe die „Lollipops“). Im weiteren folgt ein Überblick über die Objekte und ihre Bezie hungen untereinander (Bild 2). Zutrittsleser-Interface Dieses Interface wird vom Zutritts leserprozess bereitgestellt. Es ent hält einen Satz BACnet-Objekte, die die Eingabe von Zutrittsdaten (z.B. „Authentication Factors“) und andere physikalische Leserkompo nenten repräsentieren. Authentication Factor Input Objekttyp Dieser neue Objekttyp liefert die Bernhard Isler, Siemens Building Technologies. Hans-Joachim Mundt, Siemens Building Technologies. [email protected] [email protected] www.siemens.de/sbt 34 BACnet Europe Journal 5 11/06 Authentifizierungsinformationen, die von der Zutrittsidentifizierung gelesen wurden. <Any Type> Andere Elemente des Zutrittsle sers können mit Hilfe existierender BACnet-Objekte modelliert wer den, z.B. Anzeigelampen mit einem „Binary-Output“-Objekt. Authentifizierung und Autorisierungsinterface Dieses Interface wird vom Authen tifizierungs- und Autorisierungs prozess zur Verfügung gestellt. Die BACnet-Objekte dieses Interfaces ermöglichen Konfiguration, Steue rung und Ereignismeldung von Authentifizierungen und Autorisie rungen. Access Point Objekttyp Dieser neue Objekttyp repräsentiert den Punkt, an dem Authentifizierung und Autorisierung stattfin den, bevor der Zutritt gewährt wird. Ereignisse werden von sol chen Objekten gemeldet. Access Zone Objekttyp Dieser neue Objekttyp repräsen tiert die gesicherte Zone mit Einund Austrittspunkten. Belegungs zähler, Anwesenheitsmeldung, Doppelzutrittssperre und Aus weisverfolgung sind einige Eigen schaften dieses Objekttyps. Ob jekte dieses Typs melden keine Ereignisse, unterstützen aber „Ac cess Point“ Objekte, um Ereignisse und Alarme zu evaluieren. Access Credential Objekttyp Dieser neue Objekttyp repräsen tiert einen Container für zuge hörige „Authentication Factor“ Elemente (z.B. Karten, PIN, bio metrische Merkmale usw.). Die Zutrittsrechte werden durch Be ziehungen zu „Access-Rights“ Ob jekten spezifiziert. Access Rights Objekttyp Dieser neue Objekttyp repräsen tiert eine Menge von Zutritts rechten. Jedes Zutrittsrecht ent hält je eine externe Bedingung (typisch: gültiges Zeitfenster), zu welcher der Zutritt erlaubt ist sowie eine Angabe, für welchen Be drohungszustand („Threat Level“) dieses Recht gültig ist. Zutritts rechte können hierarchisch vererbt werden, um eine rollenbasierte Zutrittskontrolle zu ermöglichen (z.B. NIST RBAC = Role Based Access Control). BACnet insight Schedule and Calendar Objekttyp Diese Objekte werden zur Spezifi zierung der Zeitfenster für Zu trittsrechte verwendet. <Any Type> Beliebige andere Objekttypen kön nen für externe Bedingungen ver wendet werden, um Zutrittsrechte auszuwerten. Tür-Interface Dieses Interface wird vom Türsteu erungs- und Überwachungsprozess zur Verfügung gestellt. Es umfasst einen Satz von BACnet-Objekten, welche die Überwachung und Kon trolle einer Tür sowohl in abstrak ter Form als auch auf einzelnen Türelementen ermöglichen. Access Door Objekttyp Dieser neue Objekttyp repräsen tiert eine Tür oder ein Tor in abs trakter Form. Ereignisse werden durch den existierenden CHAN GE_OF_STATE Algorithmus ge meldet. Beziehungen zu anderen Objekten zeigen, welche individu ellen Elemente eine Tür ausmachen. Multimedia Sicherheits Systeme (MSS) Diese Systeme decken Videoüber wachungs- und Audiosysteme ab. Die vereinheitlichte Modellierung war wegen der Gleichartigkeit des Datenstroms offensichtlich. Das BACnet-Modell wird die Kontrolle über Erfassung, Übertragung, Aufnahme und Wiedergabe, Ana lyse und Anzeige von Video- und Audiodaten realisieren. Die Daten stromübertragung selbst ist außer halb des Umfangs von BACnet und wird von existierenden Stan dards der digitalen und analogen Übertragungstechnik abgedeckt. Ein „White-Paper“ analog zu dem PACS „White-Paper“ ist in der LSS-WG in Arbeit. Ausblick Die LSS-WG hat nun vorrangig zur Aufgabe, die Standardisierung für PACS abzuschließen, bevor MSS detailliert wird. Jeder Beitrag zur Arbeit der LSS-WG ist willkom men. Kontaktinformation und De tails siehe www.bacnet.org. The Life Safety and Security Work ing Group (LSS-WG) is the subgroup of ASHRAE SSPC-135, that is working on extensions for Physical Access Control Sys tems (PACS), Video Supervi sion (or CCTV) and Audio Secu rity Systems. Parts of the exten sions for PACS has already been through a first public review (see Addendum f to 135-2004 and the article of Christian Müller on pre vious pages), while others are close before discussion at SSPC-135. A white paper on the PACS standardization is available at www.bacnet.org. Video and Audio systems will be covered by a uni fied model, under the working title Multimedia Security Systems (MSS). These standardization acti vities are coordinated with the Security Industry Association (SIA). Physical Access Control Systems (PACS) A PACS is used to secure accesscontrolled zones by restricting access to geographic areas (build ings, departments, rooms, eleva tors, floors, etc.) to only those per sons or assets (i.e. users) who are allowed to enter the zone. Con trolled doors or gates act as phys ical ingress and egress points. At these points the user has to identify themselves at credential readers (e.g. card readers, keypads, biomet ric scanners). The BACnet Model of a PACS PACS have some specific function ality beyond HVAC: Large number of transactionbased events. Large and sophisticated data base of users, credentials and rights, replicated over many devices. High frequency of configuration changes. Complex relationships between objects. To cover this, seven new BACnet object types, but no new BACnet services were introduced. One new event algorithm was developed, and existing objects such as calendar and schedule were reused. First a PACS was decom posed on a functional level (Figu re 1) of interest for the BACnet model were the three interfaces (see the lollipops). The following provides an over view of the objects and their rela tions in these interfaces (Figure 2). Credential Reader Interface This interface is provided by the Credential Reader Process. It com prises a set of BACnet objects which represent credential data (i.e. au thentication factors) input and credential reader physical elements. Authentication Factor Input Object Type This new object type provides authentication factors read from credentials. <Any Type> Other elements of a credential reader may be modeled using exist ing BACnet objects. As an example, indicator LEDs may be represented by a Binary Output object. Authentication & Authorization Interface This interface is provided by the Authentication & Authorization Process. The BACnet objects of this interface enable configuration, con trol and event reporting of authen tication and authorization. Access Point Object Type This new object type represents the point of authentication and author ization before access is granted. Any authentication and author ization events (alarms and trans actions) are reported by objects of this type. Access Zone Object Type This new object type represents a secured zone with ingress and egress access points. Occupancy counting, Bild 2: Überblick über das BACnet PACS Modell. BACnet Europe Journal 5 11/06 35 BACnet insight “Who’s In” reporting, passback de tection support or credential track ing are some of the features of this object type. Objects of this type do not report events, but support Access Point objects to evaluate events and alarms. Access Credential Object Type This new object type represents a container of related authentication factors, such as card, PIN, biome tric, etc. Access rights are specified through referencing Access Rights objects. Access Rights Object Type This new object type represents a collection of access rights, each in cluding an external condition (typi cally when the right is valid), where access is allowed, and for which threat level the right is valid. Base access rights may be inherited for hierarchical structuring, e.g. to support setups according NIST‘s Role Based Access Control (RBAC) model. Figure 1: Functional decomposition of a PACS Schedule and Calendar Object Type Such objects are used to specify validity time windows of access rights. Access Door Interface This interface is provided by the Mechanical Door Control & Moni toring Process. It comprises a set of BACnet objects enabling abstract monitoring and control of the door, as well as specific monitoring and control of single door elements. Access User Object Type This new object type represents an individual person, a group (e.g. or ganizational entity) or an asset. Hi <Any Type> Objects of other types may be used for specification of external condi tions to validate access rights. Access Door Object Type This new object type (see adden dum f) represents a door or gate of any kind in an abstract way. Events erarchical and ownership of assets relations are supported. are reported through the existing CHANGE_OF_STATE algorithm. References to other objects indicate, which individual elements make up a door. <Any Type> Object of other type may be used to represent individual elements of a door. Multimedia Security Systems (MSS) This covers both video surveillence (a.k.a. CCTV systems) and Audio systems. Unification became ob vious, because both types of sys tems deal with data streams. The BACnet model will cover control of capture, transmission, recording & playback, analysis and display. The stream transmission itself is outside the scope of BACnet, left to exist ing standards for digital and analog transmission. A white paper is be ing prepared at the LSS-WG, simi lar to the one for PACS. Outlook The LSS-WG has set its priority to complete standardization of the PACS model over MSS. Any contri butions are welcome. For contacts and details see www.bacnet.org. Figure 2: Overview of BACnet PACS model 36 BACnet Europe Journal 5 11/06 BACnet insight Objekte und Funktionen für die Systemintegration Objects and functions for system integration HANS KRANZ1 Die Weltnorm für Gebäudeautoma tion DIN EN ISO 16484 umfasst derzeit vier zusammengehörende Teile. BACnet in den Teilen 5 und 6 gehört dazu wie die Teile 2 „Hard ware“ und 3 „Funktionen“. Im he terogenen Gebäudeautomations(GA)-Projekt, also bei Systemen unterschiedlicher Hersteller, müs sen die jeweiligen Funktionen der Produkte, Systeme und Anlagen aufeinander abgestimmt werden. Eine klare und eindeutige vertrag liche Festlegung der Liefergren zen, der Koordinations-, Funk tions- und Gewährleistungsverant wortung ist erforderlich, denn die Kommunikationspartner haben meist keinen Vertrag untereinan der, sondern nur jeweils mit dem Bauherrn. Die GA-Weltnorm ist heute normative Grundlage für diese Festlegungen. Mehrere unterschiedliche, in teroperabel zusammenarbeiten de Systeme nennt man integrierte Systeme. Die Integration geschieht durch Verwendung gemeinsamer Datenpunkte, aufeinander abge stimmter Funktionen und durch den Einsatz des geeigneten ge normten Kommunikationsproto kolls an den Schnittstellen. Andere Varianten als das global genormte Kommunikationsprotokoll BACnet werden dabei grundsätzlich mit einem Verlust an „Offenheit“ bezahlt. Kommunikationsobjekte und GA-Funktionen Die BACnet-Objekttypen mit den Properties und BACnet-Prozeduren sind der wichtigste semantische Be standteil des BACnet-Protokolls, denn sie beschreiben die Bedeutung der Daten. Daten werden hierdurch zu eindeutigen Informationen für Mensch und Software, das heißt für programmgestützte Interpretation im GA-Kontext. Das unterscheidet BACnet grundlegend von den meisten sonstigen Kommunikationsprotokollen. In den letzten 30 Jahren war die Datenpunktliste im VDI/3814Standard für einen beratenden Ingenieur der Gebäudeautoma tion die einzige und überragende Arbeitshilfe zur Festlegung der Anlagenfunktionalität. Wir sagen „VDI/3814-Standard“ in Anleh nung an den „ASHRAE/BACnetStandard“, denn die GA-Funktio nen der VDI 3814 wurden in den Teil 3 der GA-Weltnorm aufge nommen (DIN EN ISO 16484-3) wie der „BACnet-Standard“ in den Teil 5. Die Funktionen zur Datenpunktliste wurden ursprünglich als Leis tungsverzeichnis-Positionen vom GAEB² Arbeitskreis 070 für das Standardleistungsbuch entwickelt und dann in das Richtlinienwerk VDI 3814 übernommen und mit der ISO 16484-3 global anerkannt. Die Anzahl an zu übertragenden – und darzustellenden – BACnet-Ob jekt-Properties ergibt sich aus den erforderlichen GA-Funktionen. Der Planer legt mit der GA-Funktions liste (GA-FL) die Informationsinhalte eines Datenpunkts fest. Für die Massenermittlung der zu „engineerenden“ Funktionen ist es von Bedeutung, dass die geforderten Informationen – bei BACnet sind das „Properties“ – und die Leis tungsgrenzen eindeutig festgelegt werden. Die genormten GA-Funk tionen helfen, die Kommunikation zwischen allen beteiligten Planungsund Ausführungspartnern effizien ter und kostengünstiger zu gestalt en. Es wird dringend davor gewarnt, die Funktionsüberschriften der GA-FL selbst zu interpretieren. Es gilt grundsätzlich der Wortlaut der offiziellen Erklärung in der GA-Norm DIN EN ISO 164843:2005 – bzw. der GA-Funktionen in VDI 3814-1:2005. Die BACnet-Ausschreibung Mit der GA-FL lassen sich in Systemintegrationsprojekten Über schneidungen bei Dienstleistun gen und Systemkomponenten, also bei Hardware und Lizenzen für die Software, vermeiden. Gemeinsam für unterschiedliche Errichter sind bei Server und Client nur die Datenpunktnamen, die Kommunikationsfunktionen und gegebenenfalls bestimmte Bedien- Hans R. Kranz ist Mitglied im DIN Präsidium, VDI-TGA Vorstand, Projekt leiter der ISO und CEN GA-Normung. Hans Kranz is member of the DIN Presidial Board, member of the executive board of VDI-TGA, project leader of the ISO and CEN BACS standards. 1 funktionen. Die physikalischen Ein- und Ausgabefunktionen können im verbundenen Gesamt system nur einmal vorkommen. Die projektspezifische Zusam menstellung der GA-Funktionen in der GA-FL beschreibt die zuge hörige Anlagen-Funktionalität und umfasst in einem Leistungs verzeichnis die komplette betriebs fertige Dienstleistung (das Enginee‑ ring) für den jeweiligen Daten punkt. Daher sind bei Leistungs verzeichnissen nach VOB/C DIN 18386 keine weiteren pau schalen (und unkalkulierbaren) „Ingenieurleistungen“ wie Projek‑ tierung, Programmierung, Inbe triebnahme, Einregulierung, Test, Einweisung und Doku mentation für Gebäudeautoma‑ tion zugelassen. Die spezifizier ten normativen GA-Funktionen können natürlich bei einer Verga be als „Bauleistung“ pauschaliert werden. Für Gebäudeautomation gibt es die VOB/C DIN 18386 als „Allgemeine Technische Vertrags bedingung“ mit Festlegung der GA-Funktionen nach „VDI-3814Standard“ als Abrechnungsein heiten. Wenn ein Gebäudeleitsystem, ein Gebäudemanagementsystem oder ein Gebäude-Energiemanagement system die Anforderungen der in ternationalen Normenreihe DIN EN ISO 16484 erfüllt, darf es als ein Gebäudeautomationssystem (GA-System) bezeichnet werden (DIN EN ISO 16484-2, 3.31). The global standard for building automation and control systems EN ISO 16484 comprises 4 corre lated parts today. BACnet in Parts 5 and 6 belongs to this as to Part 2 “Hardware” and Part 3 “Func tions”. In a heterogeneous project, i.e. with systems of different origin, the dedicated functions of prod ucts, systems and plants have to be harmonized with each other. Clear and unambiguous stipulated limits of supply and the responsibility for co-ordination, functionality and warranty is essential because the communication partners are not liable under a contract to each other, but only with the awarding authority – mostly the building owner. The normative contractu al basis is provided by the Interna tional Standard EN ISO 16484. Multiple different, but interoperating systems are referred to as integrated systems. The in tegration is accomplished by im plementation of common data points, interacting functions and by application of the adequate standardized communication pro tocol at the interfaces. Alterna tives to the globally standardized protocol BACnet in principle will be paid with a loss of openness. Communication objects and BACS functions The BACnet object types with their properties and BACnet pro cedures are the most important semantic element of the BAC net protocol because they de scribe the meaning and sense of data. Through this data is dis tinct information for users and software, i.e. for computer aided interpretation in the context of building automation and con trol. This is what distinguishes BACnet from other communi cation protocols. During the last 30 years the data points list defined in the VDI/3814 standard was for a German consulting engineer of BACS the only and outstanding tool for specifying the functional ity of plants. VDI is the associa tion of German engineers. We say VDI/3814 standard following the “ASHRAE/BACnet-Standard”, because the VDI BACS functions have been adopted in Part 3 of the global BACS standard as the BACnet-Standard was adopted in the EN ISO Part 5. The BACS functions for the data points list were originally developed for the German master specification for tenders (from the GAEB³) then they have been accepted for the VDI Guideline 3814 and then globally taken over for EN ISO 16484-3. The number of BACnet object properties to transmit and to display results from the required BACS func ² GAEB = Gemeinsamer Ausschuss Elektronik im Bauwesen beim Bundesamt für Bauwesen und Raumordnung, Bonn. ³ GAEB = Joint Committee for Information Technology in the Construction Industry (Fed. Ministry for Construction, Germany) [email protected] BACnet Europe Journal 5 11/06 37 BACnet insight tions. By filling the BACS func tion list (BACS FL) the consult ant determines the matters of in formation of a data point. For the estimation of the quantity of engi neering work it is of significance that the required information – with BACnet the “properties” – and the border for fulfillment of Warning: do not self interpret the function type headlines of the BACS FL. Strictly the word ing of the official statement in the BACS standard EN ISO 16484-3:2005 (resp. the explanation within VDI 3814-1) is valid. obligations is clearly committed. The standardized BACS functions help to arrange the communica tion between all involved partners in planning and execution more efficient and at lower cost than anything else. The tendering of BACnet With use of the BACS FL in sys tem integration projects the over lapping or duplication of engineer ing services and components (hard ware and licences) can be avoided. Only the point names at BACnet servers and clients, the communi cation functions and some selected operator functions are common for different contractor‘s systems. The physical input and output functions can be found only once in the com bined system. In the list of bid items and quantities (specifications) the project specific compilation of the BACS functions in the BACS FL describes the asso ciated plant functionality and com prises the complete ready for use en gineering work and commissioning for the particular data point. There fore in the specifications for tenders no further lump sum positions are accredited for engineering, commis sioning, hand over, instruction and documentation. These positions usually are incalculable. The spec ified standard BACS functions may be consolidated into a lump sum at awarding of the contract. In Ger many for BACS there is the VOB/ C DIN 18386 (General Technical Contract Condition) with the de termination of the standard BACS function types as billing unit. If a building control system, building management system, or building energy management sys tem complies with the require ments of the EN ISO 16484 standard series, it should be des ignated as a building automation and control system (BACS). (ISO 16484-2, 3.31) BACnet-Objekttypen und GA-Funktionstypen BACnet object types and BACS function types Die Tabelle zeigt den Zusammenhang von BACnet-Objekttypen mit GA-Funktionstypen. Die Abkürzungen für die Objekttypen sind nicht Bestandteil der Norm, sollten jedoch nicht beliebig neu „erfunden“ werden. 1. BACnet-Object type, Original language, Abbr. German translation BACnet-Objekttyp, Ori ginalsprache, Abk. deut sche Übersetzung Data point / Function type, BACS Function list (Section.Column) Relevance und Entry in the BACS Functon list Datenpunkt-/ VDI-Funktionstyp, GA-Funktionsliste (Abschnitt.Spalte) Bedeutung und Eintragung in die GA-Funktionsliste Accumulator ACC Counting (binary input), 1.4 In case of system integration as common communicative function 2.4, resp. 7.1. Zählen (Binäreingabe), 1.4 Bei Fremdkopplung als gemeinsame, kommunikative Funktion 2.4, bzw. 7.1. For measuring sensors with pulse output for counting and totalization of values over time. With exact adoption to the displayed value of the physical counter and with corresponding pre-adjustment for the accuracy. Für Messgeräte mit Impulsausgabe zum Zählen und Aufsummieren der Werte über die Zeit. Mit genauer Anpassung an den angezeigten Wert im physikalischen Zähler und entsprechender Voreinstellung für die Genauigkeit. Measuring, 1.5 In case of system integration as common communicative function 2.5 resp. 7.1. Messen, 1.5 Bei Fremdkopplung als gemeinsame, kommunikative Funktion 2.5 bzw. 7.1. e. g. measuring temperature Positioning, 1.2 In case of system integration as common communicative function 2.2 resp. 7.1. Stellen, 1.2 Bei Fremdkopplung als gemeinsame, kommunikative Funktion 2.2 bzw. 7.1. e. g. positioning command or actuating signal for control valve Virtual analog DP In case of system integration as common communicative function 2.2, 2.5, resp. 7.1. Virtueller analoger DP Bei Fremdkopplung als gemeinsame, kommunikative Funktion 2.2, 2.5, bzw. 7.1. Digital presented analog value, e.g. the result of a calculation Virtual analog DP In case of system integration as common communicative function 2.2, 2.5, resp. 7.1. Virtueller analoger DP Bei Fremdkopplung als gemeinsame, kommunikative Funktion 2.2, 2.5, bzw. 7.1. Digital presented analog value as the result of a statistical function with mean, minimum, maximum and variance Notification (binary input state), 1.3 In case of system integration as common communicative function 2.3 resp. 7.1. Melden, 1.3 Bei Fremdkopplung als gemeinsame, kommunikative Funktion 2.3 bzw. 7.1. e.g. plant state, status, alarm Zählwerteingabe 2. Analog Input AI Analogeingabe 3. Analog Output AO Analogausgabe 4. Analog Value AV Analogwert 5. Averaging AVG Mittelwert 6. The table shows the interrelationship of BACnet object types and BACS function types. The abbreviations for object types are not part of the global standard, but should not be “invented” arbitrarily. Binary Input BI Binäreingabe 38 BACnet Europe Journal 5 11/06 z. B. Temperaturmessung. z. B. Stellbefehl für Regelventil. Digital dargestellter Analogwert, z. B. das Ergebnis einer Rechenoperation. Digital dargestellter Wert aus Statistikfunktion als Mittelwert mit Minimum, Maximum und Varianz. z. B. Betriebszustands- Störungs- oder Alarmmeldung. BACnet insight 7. Binary Output BO Binärausgabe 8. Binary Value BV Binärwert Switching, positioning, 1.1 In case of system integration as common communicative function 2.1 resp. 7.1. Schalten, Stellen, 1.1 Bei Fremdkopplung als gemeinsame, kommunikative Funktion 2.1 bzw. 7.1. e. g. command on/off, open/close Virtual binary DP In case of system integration as common communicative function 2.1, 2.3, resp. 7.1. Virtueller binärer DP Bei Fremdkopplung als gemeinsame, kommunikative Funktion 2.1, 2.3, bzw. 7.1. Notification, binary state, e.g. 0/1 of a logic interlock function z. B. Schaltbefehl Ein/Aus, Stellbefehl Auf/Zu. Melden, Binärzustand, z. B. 0/1 aus einer logischen Verknüpfung. 9. Calendar CAL Betriebskalender System parameter Systemparameter Holiday list, not a BACS function, included in 6.4 Time schedule Feiertags- und Ferienliste, keine GA-Funktion, in 6.4 „Zeitabhängiges Schalten“ enthalten. 10. Command CMD Virtual DP, in case of system integration as common management-communication function for complex object types 7.2. Virtueller DP, bei Fremdkopplung als ManagementKommunikationsfunktion 7.2. Command for execution of several predefined activities, e.g. from optimization functions 6.3 to 6.13 and operator function 8.2; Basic system parameter, in case of system integration as virtual DP 7.2., e.g. for watchdog-functions System-Grundparameter, bei Fremdsystemkopplung als virtueller DP 7.2, z. B. für Watchdog-Funktionen Properties of nodes with BACnet objects; Basic system parameter, to specify in a standard descrip tion for the entire project. System-Grundparameter, in einer Standardbeschreibung für das Gesamtprojekt festzulegen. Specification of event types for fixed reactions on events/alarms, included in the standard BACS functions; Festlegung von Ereignisarten für spezifizierte Reaktionen auf Ereignisse/ Alarme, in den GA-Funktionen enthalten. Virtual DP, in case of system integration as common management-communication function for complex object types 7.2. Ggf. virtueller DP, bei Fremdkopplung als virtueller DP mit Management-Kommunikationsfunktion 7.2. Transmission of a list with event states and time stamps, 7.3, may also be used for BACS function 7.4; File FIL System function Datei Systeminterne Funktion File transfer, e.g. for configuration data, programs or backup (archiving); is part of BACS-software; Dateiübertragung, z. B. für Konfigurationsdaten, Programme oder für Datensicherung (Archivieren), in GA-Software enthalten. Global Group GGRP Virtual DP, in case of system integration as common management-communication function for complex object types 7.2. Virtueller DP, bei Fremdkopplung mit ManagementKommunikationsfunktion 7.2. Grouping of input values from various objects in the BACS network; is part of BACS functions 3.6, 6.1, 6.2, 7.3, 7.4, 8.2. Virtual DP, in case of system integration as common management-communication function for complex object types 7.2. Virtueller DP, bei Fremdkopplung als virtueller DP mit Management-Kommunikationsfunktion 7.2. Grouping of input values from various objects in the same device; is part of BACS functions 3.6, 6.1, 6.2, 7.3, 7.4, 8.2. Gruppenauftrag 11. Device DEV Device 12. Event Enrollment EE Ereigniskategorie 13. Event Log ELOG Ereignis-Aufzeichnung 14. 15. Globale Gruppeneingabe 16. Group GRP Gruppeneingabe 17. Life Safety Point LSP 19. Übertragen einer Liste mit Zuständen und Zeitstempel, 7.3, darf auch für GA-Funktion 7.4 genutzt werden. Gruppierung von Eingabewerten beliebiger Objekte im GA-Netzwerk, ist enthalten in den GA-Funktionen 3.6, 6.1, 6.2, 7.3, 7.4, 8.2. Gruppierung der Eingabewerte beliebiger Objekte im selben Device, ist enthalten in den GA-Funktionen 3.6, 6.1, 6.2, 7.3, 7.4, 8.2. nformation about the properties for life safety applications in the network. Derived actions are corresponding BACS functions. Informationen über die Properties für Gefahrenmelde-Anwendungen im Netzwerk. Abgeleitete Aktionen sind entsprechende GA-Funktionen. Life Safety Zone LSZ Virtual DP, in case of system integration as common management-communication function for complex object types 7.2. Sicherheitsbereich Virtueller DP, bei Fremdkopplung als virtueller DP mit Management-Kommunikationsfunktion 7.2 Combination of life safety objects, e.g. for fire alarming loops, fire sections, alarming devices. Application for e.g. 7.3, 7.4 (reports), 8.2 dynamic insertion in user interfaces, Derived actions are corresponding BACS functions. Zusammenfassung von Gefahrenmelder-Objekten, z. B. für Brandmel delinien, Brandabschnitte, Nebenmeldezentralen etc. Anwendung z. B. für 7.3, 7.4 (Protokolle), 8.2 dyn. Einblendung etc. Abgeleitete Aktionen sind entsprechende GA-Funktionen. Loop LP Virtual DP, in case of system integration as common management-communication function for complex object types 7.2. Virtueller DP, bei Fremdkopplung als virtueller DP mit Management-Kommunikationsfunktion 7.2. Properties (attributes and parameters) of control loop functions; as part of BACS functions 5.1-5-8, 7.3, 7.4, 8.2. Multi state notification, 1.3; in case of system integra tion as common communicative function per stage, 2.3 resp. 7.1. Melden, 1.3, bei Fremdkopplung als gemeinsame, kom munikative Funktion je Stufe, 2.3 bzw. 7.1. Properties (attributes and parameters) of control loop functions; as part of BACS functions 5.1-5-8, 7.3, 7.4, 8.2. Regler 20. Properties von Netzwerk-Teilnehmern (Geräte, Stationen und andere Einrichtungen), in denen BACnet-Objekte repräsentiert werden. complex input object type as common management-com munication function 7.2. Komplexes Eingabe-Objekt Bei Fremdkopplung als Management-Kommunikations funktion 7.2 Gefahrenmelder 18. Auftrag (Kommando) zur Ausführung (mehrerer) vordefinierter Aktivitäten (z. B. beauftragt von Optimierungsfunktionen 6.3 bis 6.13 und ggf. Bedienfunktion 8.2.) Multi-state Input MI Mehrstufige Eingabe Properties (Attribute und Parameter) von Regelfunktionen, enthalten in den GA-Funktionen z. B. 5.1-5.8, 7.3, 7.4, 8.2. Properties (Attribute und Parameter) von Regelfunktionen, enthalten in den GA-Funktionen z. B. 5.1-5.8, 7.3, 7.4, 8.2. BACnet Europe Journal 5 11/06 39 BACnet insight 21. Multi-state Output MO Mehrstufige Ausgabe Multi state command, 1.1, in case of system integration as common communicative function per stage, 2.1 resp. 7.1. Schalten, Stellen, 1.1; bei Fremdkopplung als gemeinsame, kommunikative Funktion je Stufe, 2.1 bzw. 7.1. Logic output state coded as a figure, e.g. for commands off, slow, fast,… Each stage counts as a BACS function in the BACS FL. Logische Ausgabezustände als Zahl kodiert, z. B. Schaltbefehl: Aus, Stufe 1, Stufe 2, ... Je Stufe ist eine GA-Funktion einzutragen. 22. Multi-state Value MV Virtual multy state DP, iIn case of system integration as com mon communicative function 2.1, 2.3, resp. 7.1. Virtueller mehrstufiger DP, bei Fremdkopplung als gemein same, kommunikative Funktion je Stufe, 2.1, 2.3, bzw. 7.1. Logic state coded as a figure, e.g. state definition 1,2,3,… Each stage counts as a BACS function in the BACS FL. Logische Zustände als Zahl kodiert, z. B. Zustands definition 1,2, 3, … Je Stufe ist eine GA-Funktion einzutragen. Basic system parameter, to specify in a standard description for the entire project. System-Grundparameter, in einer Standardbeschreibung für das Gesamtprojekt festzulegen. Time and destination depending dedication of alarm and event notifi cations, included in the corresponding BACS functions; Zeit- und empfängerbezogene Zuordnung von Alarm- und Ereignis meldungen, in den betreffenden GA-Funktionen enthalten. Complex object, in case of system integration as common management-communication function for complex object types 7.2. Komplexes Objekt, bei Fremdkopplung als virtueller DP mit Management-Kommunikationsfunktion 7.2. Access to a program in a BACnet device, e.g. to load and start this. The program is to be described. Mass/quantity counting, 1.4 In case of system integration as common communicative func tion 2.4, resp. 7.1. Mengenzählung, 1.4, alternativ zu Zählwert-Eingabe. Bei Fremdkopplung als gemeinsame, kommunikative Funk tion 2.4, bzw. 7.1. For counting a quantity over a given time interval, e.g. for cars, water quantity. Also for periodic power measuring as for load shedding, not for tenant billing (see Nr. 1 Accumulator). Für Mengenzählung über ein gegebenes Zeitintervall, z. B. für Automobile, Wassermenge. Auch für periodische Leistungserfassung z. B. für Höchstlastbegrenzung, nicht jedoch für Abrechnungszwecke. Für Eich- bzw. Abrechnungszwecke siehe Nr. 1 ZählwertEingabe-Objekt. Schedule SCHED Virtual DP, in case of system integration as common manage ment-communication function for complex object types 7.2. Zeitplan Virtueller DP Bei Fremdkopplung als virtueller DP mit Management-Kom munikationsfunktion 7.2. Schedule for execution of repeating activities and specification of exceptions, is part of the BACS function 6.3, is required for 6.5 to 6.7 and 6.12/6.13. Zeitplan zur Ausführung wiederkehrender Aktivitäten und Festle gung einmaliger Ausnahmen, enthalten in der GA-Funktion 6.3, wird benötigt für 6.5 bis 6.7 und ggf. 6.12/6.13. Trend Log TLOG Virtual DP, in case of system integration as common manage ment-communication function for complex object types 7.2. Ggf. virtueller DP, bei Fremdkopplung als virtueller DP mit Management-Kommunikationsfunktion 7.2. Subscription to a value for COV reporting to report a trend 7.3, may also be used for historical data base 7.4. Abonnement auf einen Wert für zeitweise ereignisorientierte Über tragung (COV-Reporting) für Trendaufzeichnung 7.3, darf auch für Historisierung in Datenbank 7.4 genutzt werden. Trend Log Multiple TLOGM Virtual DP, in case of system integration as common manage ment-communication function for complex object types 7.2. Mehrfach trendaufzeichnung Virtueller DP, bei Fremdkopplung als virtueller DP mit Management-Kommunikationsfunktion 7.2. Subscription to multiple values from various objects in the BACS network for COV reporting to report trends 7.3, may also be used for historical data base 7.4. Abonnement auf mehrere Werte für zeitweise ereignisorientierte Übertragung (COV-Reporting) oder „Lesen“ von Werten für z. B. netzwerkübergreifende Trendaufzeichnung 7.3, darf auch für Historisierung in Datenbank 7.4 genutzt werden. Mehrstufiger Wert 23. Notification Class NC Meldungsklasse 24. Program PR Programm 25. Pulse Converter PC Impulszähler Eingabe 26. 27. Trendaufzeichnung 28. Zugriff auf ein Programm in einem BACnet-Device, z. B. um dieses zu laden und zu starten. Das Programm muss zusätzlich beschrie ben werden. Quellen Sources DIN EN ISO 16484-2, Ausgabe:2004-10, Systeme der Gebäudeautomation (GA) – Teil 2: Hardware (ISO 16484-2:2004); 117,70 EURO. DIN EN ISO 16484-3, Ausgabe:2005-12, Systeme der Gebäudeautomation (GA) – Teil 3: Funktionen (ISO 16484-3:2005); 130,40 EURO. DIN EN ISO 16484-5, Ausgabe:2004-08, Systeme der Gebäudeautomation – Teil 5: Datenkommunikationsprotokoll (ISO 16484-5:2003); Englische Fassung, CD-ROM, 367,80 EURO. DIN EN ISO 16484-6, Ausgabe:2006-04, Systeme der Gebäudeautomation – Teil 6: Datenübertragungsprotokoll - Konformitätsprüfung (ISO 16484-6:2005); Englische Fassung, CD-ROM, 318,80 EURO. ISO 16484-2:2004-08, Building Automation and Control Systems (BACS), – Part 2: Hardware; 102,70 EURO. ISO 16484-3:2005-01, Building Automation and Control Systems (BACS), – Part 3: Functions; 117,30 EURO. ISO 16484-5:2003-11, Building Automation and Control Systems (BACS), – Part 5: Data communication protocol; 203,11 EURO. ISO 16484-6:2006-04, Building Automation and Control Systems (BACS), – Part 6: Data communication - Conformance testing; 218,70 EURO. VDI 3814 Blatt 1, Ausgabe:2005-05, Gebäudeautomation (GA) – Systemgrundlagen, de, 131,50 EURO VDI 3814 Blatt 2, Ausgabe:2005-05, Gebäudeautomation (GA) – Gesetze, Verordnungen, Technische Regeln, de, 36,70 EURO VDI 3814 Blatt 3, Entwurf, Ausgabe: 2006-04, Gebäudeautomation (GA) – Hinweise für das Technische Gebäudemanagement - Planung, Betrieb und Instand haltung, de, 53,40 EURO VDI 3814 Blatt 4, Ausgabe:2003-08, Gebäudeautomation (GA) – Datenpunktlisten und Funktionen – Beispiele, de, 169,70 EURO VDI 3814 Blatt 5, (Überarbeitung in Vorbereitung) Gebäudeautomation (GA) – Systemintegration, de, VDI 3814 Blatt 6, (in Vorbereitung) Gebäudeautomation (GA) – Darstellung von Steuerungsaufgaben, de, 40 BACnet Europe Journal 5 11/06 VDI 3814-1 en: Building automation and control systems (BACS) – System basics, multilingual; 131,50 EURO VDI 3814-2 en: - Legislation, technical rules, multilingual; 36,70 EURO VDI 3814-3 en: Advices for technical building management – design, operation, maintenance, multilingual; 53,40 EURO VDI 3814-4 en: - Data points list und functions – Examples, multilingual; 169,70 EURO VDI 3814-5 en: system integration (in preparation), VDI 3814-6 en: graphical specification of interlock tasks (in preparation). Produkte Products BACnet Test Framework – Automatisierte Konformitätstests ab 2007 BACnetTestFramework–Automated ConformanceTestsfrom2007 Konformitätstests für BACnet sind zurzeit ausschließlich auf Basis manueller Tests möglich. Dies erschwert die Reproduzierbarkeit durchgeführter Tests. Aufgrund des hohen Dokumentationsaufwands sind diese Tests außerdem mit erheblichen Kosten verbunden. Today, conformance tests for BACnet are only available as manual tests. This complicates reproducibility and due to the higher effort for documentation, significantly increases costs. Die Software BACnet Test Framework BTF aus dem Hause MBS erlaubt die Automation von BACnet-Tests und sorgt für einfache, kostengünstige und reproduzierbare Testreihen als Grundlage von Konformitätstests. Sie kommt aber auch bei Qualitätssicherungsmaßnahmen oder ähnlichen Anlässen, bei denen es auf automatisierte Prüfungen und deren Auswertung ankommt, zum Einsatz. Aufbau der Software Die Software, lauffähig auf Microsoft Windows®, setzt sich aus vier grundlegenden Komponenten zusammen, die jede für sich einen Teil der Gesamtfunktionen bereitstellen. 1. Der BACnet Protokollstack: Dieser ist als Dienst ausgeführt und sorgt für die Kommunikation mit den angeschlossenen BACnetGeräten. Der Stack arbeitet mit der LOD-Technologie (=”Load on Demand“ =„lade wenn benötigt“), mühsames Aus- und Einschalten dieses Dienstes entfällt. 2.Die Python-Script Engine: Python ist eine einfach zu erlernende, aber sehr mächtige Scriptsprache, die es auch ungeübten Anwendern nach kurzer Zeit erlaubt, eigene Scripte zu erstellen und damit eigene automatisierte Tests zu entwerfen. 3. Die Benutzeroberfl äche: Diese bildet das Regiezentrum, in dem die Testpläne bearbeitet, die Ergebnisse angezeigt und Auswertungen durchgeführt werden. Zwischen der Benutzeroberfl äche und der Scriptengine werden die Informationen über TCP/IP übertragen, was die Installation auf zwei Rechnersysteme und damit die Entkopplung beider Prozesse erlaubt. bank verbunden, die in vielfältigen Tabellen den BACnet-Standard enthält. Zusätzlich werden dort die Testprojekte sowie die zugehörigen Ergebnisse gespeichert. Beispiel eines Prüfablaufs Im ersten Schritt muss bei jeder Prüfung das zu prüfende Gerät und dessen Eigenschaften der Testumgebung bekannt gemacht werden. Hierzu wird das elektronische PICS-Format (PICS = Protocol Implementation Conformance Statement) EPICS verwendet, in dem die Geräteeigenschaften dokumentiert sind. In einem ersten Testschritt wird dann die Konsistenz, d.h. die Vollständigkeit und Richtigkeit der Angaben des EPICS geprüft. Das Bild auf der nächsten Seite zeigt das Ergebnis eines solchen EPICSKonsistenztests. Ist das EPICS vollständig und syntaktisch richtig, kann der Testplan erstellt werden. Dabei unterstützt die Software die Erstellung des Testsplans anhand der Vorgaben des jeweiligen Geräteprofi ls (Device Profi le). Hängt ein bestimmter Test von weiteren Tests ab, so werden diese mit in den Testplan integriert. Die Software erlaubt ebenfalls, dem Testplan selbst erstellte Scripts für eigene Untersuchungen hinzuzufügen. Hier bietet sich ein weites Feld für Anwendungen neben den Konformitätsprüfungen. Das BACnet Test Framework ist aufgrund seiner flexiblen Struktur für alle Arten von Prüfungen geeignet und erlaubt ab der Standard-Edition die Erstellung eigener Scripte sowie selbst erstellter Auswertungen und Reports. Damit ist diese Software hervorragend für den Einsatz in der Qualitätssicherung oder für Dauertests und ähnliche Anwendungen geeignet. Die Testergebnisse werden auf Basis einer OK/ERROR – Bewertung in der Datenbank hinterlegt, können aber manuell mit Angabe eines Kommentars noch übersteuert werden. Die Software wird im 4. Quartal 2006 im WSP-Lab in Stuttgart eingeführt. Dort stehen dann ab dem 1. Quartal 2007 automatisierte Tests bereit. Ab diesem Zeitpunkt kann die Software auch bei MBS erworben werden. 4. Die SQL-Datenbank: Direkt mit der Benutzeroberfläche ist die Daten- BACnet Europe Journal 5 11/06 41 Produkte Products profile. If a test depends on further tests, these dependent tests are also included. Furthermore the user may include own tests to the test plan. Die Bedienungsoberfläche des BACnet Test Framework. The user-interface of the BACnet test framework. The software BACnet Test Framework (BTF) from MBS makes automated BACnet tests available and allows easy, cost-effective and reproducible tests, not only for conformance testing but also for quality assurance or similar applications in automated testing and analysis. Software-structure The software, running on Microsoft Windows®, is based on four main components, each providing one part of the full functionality: 1.The BACnet protocolstack: This service allows communication to the connected BACnet devices. The stack is based on the LODTechnology (=Load on Demand), extensive switching of this service becomes obsolete. 2.The Python-scriptengine: Python is an easy-to-use, but powerful scripting language. This allows untrained users after a short time to write their own scripts to design own automated testprocedures. ous tables as well as the test projects and their results. 3.The userinterface: This application is the “stage direction”, where testplans are defined, results are displayed and analysis is operated. The connection between the script-engine and the user-interface is based on TCP/IP, so both parts may be installed on different machines to decouple both processes. Example Procedure of a Test In the first step the device and its capabilities must be introduced to the test framework. For this, the electronic PICS format (PICS = Proto col Implementation Confor‑ mance Statement) EPICS is used, where all the device capabilities are listed. In the first test, the consistency of the EPICS, this means integrity and accuracy of the EPICS, are checked. The picture shows the results of such an EPICS consistency check. 4.The SQL-database: Directly connected to the userinterface is the database, which contains the full BACnet standard in vari- If the EPICS is correct, the test plan may be generated. The software supports this process by selecting the tests according to the device This allows a wide range of applications far beyond conformance tests. The BACnet test framework with its highly flexible structure is qualified for all kinds of automated tests and allows, the standard or premium edition the definition of own tests, reports or statistics. This makes the BACnet test framework an excellent choice for quality assurance, for long-term tests or similar applications. The results are stored on the basis of OK or ERROR in the database, but may be manually overwritten by adding a comment. The software will be introduced to the testlab WSP-Lab in Stuttgart, Germany within the 4th quarter of 2006. From the beginning of 2007, automated BACnet tests will be available there and at the same time, the software will also be available from MBS. MBS GmbH [email protected] www.mbs-software.de BACnet Europe Journal 5 11/06 43 Produkte Products BACnet/IP Protokollumwandler für die Erneuerung bestehender Systeme BACnet/IP Protocol Converter for the Renovation of Existing Systems Die Internettechnologie ist maßgeblich daran beteiligt, dass die Zahl der Anwendungen im Bereich der Ge bäudeautomation und der entsprechenden Leistungen mit Managementfunktionalität wächst. Internet technology significantly broadens the range of application of building automation systems, with the corresponding services providing increased management functionality. Moderne DDC/PLC Produk te sind im allgemeinen mit ei‑ ner Verbindung zum Ethernet Netzwerk ausgestattet und unterstützen das BACnetProtokoll. Durch diese Inno vation ist es möglich, Informationen in Echtzeit direkt vom Controller zu erhalten. Jedes Remote-Gerät, das über eine sichere Intranetoder Netzwerk-Verbindung und einen Standard-Browser verfügt, hat Zugang zu den Prozessinformationen. Als Webserver fungiert ein DDC/PLC-Controller oder PC. Die auf dem Server ge speicherten Dokumente sind von jedem Arbeitsplatz aus zugänglich. Durch diese Funktionalität werden die Aufgaben des Managements erheblich reduziert. Ein weiteres Beispiel zum Einsatz von BACnet/IP Protokoll umwandlern ist der automa tische Transfer von Prozessdaten und Alarmmeldungen zu den Nutzern und Datenbanken. Einsparungen bei mehr Systemerweiterung Normalerweise wird die Einführung einer neuen Tech nologie mit höherer Funktionalität und Komfort gleichgesetzt. In neuen Gebäuden oder bei abgeschlossenen Sanierungen, wo noch keine besonderen Faktoren berücksichtigt werden müssen, entstehen auch keine Probleme bei der Integration. Bei einem gegebenen PreisLeistungs-Verhältnis steht die Investition nicht zur Diskussion. Wenn aber ein schon beste hendes System verändert oder erweitert werden soll, sieht die Situation anders aus. Das meist noch gut funktionierende Equipment muss viel zu früh ausgetauscht werden, da im System integrierte Komponenten nicht mehr erhältlich sind oder vom Hersteller nicht mehr unterstützt werden. Die Folge ist der Wertverlust einer Kapitalanlage. Die Implementierung des BACnet/IP Protokollumwandlers kann diese Einbußen verhindern. 44 BACnet Europe Journal 5 11/06 Modern DDC/PLC products are generally equipped with an Ethernet connection port and support the BACnet communication protocol. This innovation has led to a shift towards obtaining realtime process information directly from the controller. The process information is easily accessible from any remote location using a secure intranet or network connection and standard web browser. A DDC/PLC controller or PC is used as a web server. Documents are stored on the web server and are accessible from any location. This functionality means a significant reduction in management tasks. Another example is the automatic transfer of process data and alarms to users and databases. Reduction of costs The introduction of new technology usually means increased functionality and comfort. In new buildings or complete renovations, where there is no existing situation that has to be worked around, there are no integration problems. The investment, at a given price/quality ratio, is not a point of discussion. When an existing system is adapted or expanded, the situation is different. Existing components might no longer be available or supported and the early replacement of often perfectly functioning equipment becomes necessary. A loss of capital investment can be avoided by implementing the BACnet IP protocol con verter. BACnet/IP Umwandler. BACnet/IP protocol converter. Regel Partners B.V. [email protected] www.regelpartners.nl Produkte Products Frei programmierbarer modularer IO-Controller Freely programmable Modular IO-Controller SysMik stellt den grafisch frei programmierbaren Controller ICS-709-B in 32-Bit-Technologie für das Inline-Modular-IO-System mit Schnittstellen für BACnet- und LonMark®-Standards vor. SysMik introduces the graphically free programmable Controller ICS-709-B in 32 Bit Technology for the Inline Modular IO System. It includes interfaces for BACnet and LonMark® standards. Systemstruktur. System structure. Der Inline ControlServer ICS-709-B verfügt über Busschnittstellen für TP/FT-10LON und BACnet/IP über 10/100Base-T-Ethernet. Der integrierte Switch ermöglicht die Verkettung mehrerer ICS-Controller in Linienbustopologie. Mit der optiona len Bedienebene des ICS werden bei der Inbetriebnahme Hardware-IOs gesetzt. Grafische Programmierung mit IPOCS Mit IPOCS erstellt man die Projekt-Software auf Basis von Funktionsbibliotheken. Software- und Hardware datenpunkte werden im Projekt frei definiert und mit einander verknüpft. Hardwaredatenpunkte sind das Abbild der IO-Konfiguration der Inline-Klemmen, während Softwaredatenpunkte Properties in BACnet-Objekten bzw. Netzwerkvari ablen in LonMark-Objekten repräsentieren. Der Controller unterstützt für beide Seiten die ereignisgesteuerte Kommunikation (BACnet: COV). Somit können Daten ohne Zeitverzögerung emp fangen bzw. versandt werden. Die LonMark-Inter operabilität (insbes. die Integration mit LNS-Tools) wie auch die Übereinstimmung mit dem BACnetStandard sind gewährleistet. IPOCS kann die Applikation simulieren, in den Controller laden und online beobachten bzw. parametrieren. IO-Klemmen nach Wahl Bis zu 63 analoge und digitale IO-Klemmen je Station können mit Hardware-Zykluszeiten deutlich unter 100ms bedient werden. Beim Mapping zwischen LON und BACnet werden z.B. 1.000 Netzwerkvariablen in weniger als 5 Sekunden verarbeitet. Für Lichtsteuerungen gibt es 4-fach-Leistungsrelais oder DALI-Schnittstellen, für Verbrauchserfassung SOKlemmen. Verschiedene Gewerke lassen sich so in einer Station effektiv zusammenfassen. ICS mit Controller ICS-709-B. controller ICS-709-B. den „nativen“ standardi sierten Kommunikationsschnittstellen für BACnetund LON-Systeme ist unabhängig von Management systemen in Multivendorprojekten als Komponente frei integrierbar und darüber hinaus als Datenpunkt-Gateway einsetzbar. The Inline ControlServer ICS-709-B includes bus interfaces for TP/FT-10-LON and BACnet/IP via 10/100BaseT-Ethernet. The integrated switch allows for linking of several ICS-Controllers in line bus technology. The optional ICS control level sets hardware IOs during start-up. Graphical programming with IPOCS IPOCS enables the realization of project software based on function libraries. Software and hardware data points are freely defined within the project and linked to each other. Hardware data points represent the map of the inline terminals’ IO configuration, while software data points represent properties in BACnet objects or network variables in LonMark objects. Event driven com- munication is supported for both protocols (BACnet: COV). The interoperability compliant with the LonMark guidelines is granted (especially the integration with LNS tools). The same applies to the conformity with the BACnet standard. IPOCS can simulate the applications, load them into the controller and monitor/parameterize them online. Free choice of IO terminals Up to 63 analog and digital IO terminals per station can be operated with hardware cycle times considerably below 100ms. A LON/BACnetmapping for 1,000 network variables is processed in less than 5 seconds. Quadruple power relays or DALI interface are available for BACnetlighting control and SO terminals for metering, thus allowing for efficient centralization of different assembly section within one station. ICS with its “native” and standardized communication interfaces for BACnet and LON systems can be freely integrated as component and also be used as data point gateway in multi-vendor projects as it is independent of management systems. SysMik GmbH Dresden [email protected] www.sysmik.de BACnet Europe Journal 5 11/06 45 Zusammenführen aller Kräfte auf ein Ziel: mehr Effizienz ❚ Einheitlicher Zugriff auf die gesamte Gebäudeinformation ❚ Effektivste Integration verschiedener Hersteller und Gewerke ❚ offen ❚ fabrikatsneutral ❚ integrativ ❚ Durchgängige BACnet-Lösungen ❚ Unterstützung von weiteren Standards wie z.B.: OPC, EIB, LON, M-Bus, CAN ❚ Vielzahl von Fabrikatsmodulen zum direkten Anschluss von Fremdsystemen Messner Gebäudetechnik GmbH Weidenweg 13 D-91058 Erlangen Tel. +49 (0) 91 31 68 70 - 0 Fax +49 (0) 91 31 68 70 - 190 http://www.messner.de E-Mail: [email protected] Produkte Products Gateways und Visualisierung Gateways and Visualization LOYTEC, bekannt als Hersteller von Netzwerkinfrastrukturkomponenten für ANSI/EIA-709 Netzwerke, ergänzt sein Portfolio um BACnet–Produktlösungen, um der steigenden Nachfrage des Marktes gerecht zu werden. Alle BACnet-Produkte von LOYTEC bauen auf dem Multiprotokoll-Chip LC3020 auf. LOYTEC, a well known manufacturer of network infrastructure products for ANSI/EIA-709 networks, supplements its portfolio by BACnet connectivity products to meet the increasing demand of the market for such solutions. All upcoming products for BACnet are based on the LOYTEC/NEC multi protocol chip LC3020. L-OPC – Embedded OPC XML/DA Server Mit dem LOPC-ME200 für BACnet-Netzwerke bietet LOYTEC einen OPC-Server mit dezentralem Ansatz. Der OPC-Server wird vom PC getrennt ins Feld gebracht. Dort werden Informationen aus dem BACnet-Netzwerk auf bis zu 1000 OPC Datenpunkte pro LOPC abgebildet. OPC Clients, die dem OPC XML/DA (Web Services - SOAP/XML) Standard entsprechen, greifen über Ethernet/IP auf den LOPC zu. Die Einbindung ins BACnet-Netzwerk erfolgt via BACnet/IP oder BACnet MS/TP. Über einen integ rierten Web-Server können kundenspezifische Webseiten mit dynamischen Einblendungen hinterlegt werden. L-DALI – BACnet/DALI Gateway LDALI-ME204 verfügt über vier unabhängige DALI Kanäle und kann je Kanal bis zu 64 DALI-Leuchten individuell ansteuern und überwachen. Als BACnet-Server (B-ASC) ermöglicht LDALI204 die Integration von DALI-Anwendungen in BACnetUmgebungen (BACnet/IP oder BACnet MS/TP). L-GATE – EIA-709/BACnet Gateway Entsprechend dem Standard CEN/TS 15231:2005 spie gelt LGATE-900 bis zu 500 BACnet Server-Objekte auf entsprechende ANSI/EIA709 Standardnetzwerkvari ablen (SNVTs). Die Ein bindung in das BACnetNetzwerk erfolgt über BACnet/IP oder BACnet MS/TP und in das ANSI/ EIA-709 Netzwerk über LonMark IP-852 oder TP/ FT-10. Die Konfiguration erfolgt über die ANSI/EIA709 Seite. L-VIS – Visualisierung Mit der Bedieneinheit LVISME200 bietet LOYTEC ein frei konfigurierbares TouchPanel (5,7“, 256 Farben) für BACnet-Netzwerke an. Bis zu 500 BACnet Ser ver-Objekte werden unterstützt. Die Einbindung in das BACnet-Netzwerk erfolgt über BACnet/IP oder BACnet MS/TP. Ein Konfi gurations-Tool gehört – wie bei allen LOYTEC Produkten – zum Lieferumfang. L-OPC – Embedded OPC XML/DA Server With the LOPC-ME200 for BACnet/IP and MS/TP networks LOYTEC offers an OPC Server with a de centralised approach. The OPC Server is running on the embedded device and can thus be connected directly to field or automation level devices. Up to 1000 OPC data points can be mapped to BACnet objects per L-OPC device. OPC clients compliant to the OPC XML/ DA standard talk to the L-OPC through WEB ser vices (SOAP/XML). The integration into the BACnet network is realised via BACnet/ IP or BACnet MS/TP. An integrated web server can host customized Web pages with an active content. L-DALI – BACnet/DALI Gateway L-DALI provides 4 indepen dent DALI channels and individually controls up to 64 DALI-based luminaries per DALI channel. As a BACnet server (B-ASC), L-DALI enables the easy integration of DALI applications into the BACnet environment (BACnet/IP or BACnet MS/TP). L-GATE – EIA-709/BACnet Gateway The L-GATE is an ANSI/ EIA-709 / BACnet Gateway, which maps EIA-709 network variables (NVs) to up to 500 BACnet Server Objects according the CEN/TS 15231:2005 standard. L-Gate integrates easily into BACnet/ IP or MS/TP networks and connects to LonMark IP-852 and TP/FT-10 channels. The configuration is done through the ANSI/EIA-709 side. L-VIS – Visualization The LVIS-ME200 is a freely configurable touch panel BACnet-Produkte von LOYTEC im Netzwerk. BACnet products of LOYTEC in the network. (5.7”, 256 colours) for BACnet networks. Up to 500 BACnet Server Objects are supported. The integration into a BACnet network is funded by BACnet/ IP or BACnet MS/TP. A configuration tool supports a WYSIWYG preview and is – as for all LOYTEC products – included in the delivery. LOYTEC electronics GmbH [email protected] www.loytec.com BACnet Europe Journal 5 11/06 47 BACnet Interest Group Europe Neue Mitglieder New Members Cylon Controls “Smart Energy Eontrol” – dies ist der Leitspruch von Cylon: Gegründet 1985, hat sich das Unternehmen zu einem der größten unabhängigen Hersteller von Systemen für die Gebäudeautomation in Europa entwickelt. Seit der Einführung des Systems UnitronUC32 mit der bahnbrechenden UniPutTM Technologie wächst Cylon weltweit. Offenen Standards begegnet Cylon u. a. mit seinen UnitronUC32 BACnetLösungen (Client- und ServerLösungen). Cylons Marktphilosophie baut auf Partnerschaft: Alle Projekte werden ausschließlich von ausgewählten Systempartnern durchgeführt. Dies bedeutet Kundennähe – unabhängig von der Größe des Projekts. Ralph Lammers / John Fallon Tel. +49-4171-68 638 [email protected] www.cylon.com Cylon Controls provide smart energy control solutions for buildings. Founded in 1985, Cylon is now one of largest independent manufacturer of building control systems in Europe and continues to grow worldwide. With the UnitronUC32 solution Cylon delivered the groundbreaking 48 BACnet Europe Journal 5 11/06 UniPut™ technology and today continues to lead in terms of innovation and responsiveness to customer requirements. Cylon is committed to open standards and provides BACnet client and server support in UnitronUC32. As the independent supplier Cylon’s go-to-market philosophy is based solely on working through approved system integrator partners which ensures competitive service and support for all projects big or small. Hieronymus SicherheitsSystemhaus GmbH Hieronymus Sicherheits-Systemhaus GmbH ist ein nach DIN EN ISO 9001 zertifiziertes, herstellerunabhängiges Systemhaus, das sich seit jeher auf Beratung, systemübergreifende Planung, Realisierung und Betreuung von Lösungen für die Gebäudesicherheit spezialisiert hat. Ein integriertes aufeinander abgestimmtes Gesamtkonzept aus Risiko- und Gefährdungsanalyse über Planungsleistungen, Einsatz verschiedener Technologien, Service & Support und effektivem Handling während der Betriebsphase ist die Basis unserer Arbeit. Wir nennen es IntegratedSecurity-Management ISM. Klaus Hieronymus Tel. +49-69-5050280-0 [email protected] www.hieronymus-sicherheit.de Neue Mitglieder New Members BACnet-fähige Technologie und Software sind eine wichtige Basis unseres Denkens, insbesondere bei Planungsleistungen für unsere internationalen Großkunden und Projektentwickler. Hieronymus Sicherheits-Systemhaus GmbH is a producer-independent system house, certified according to DIN EN ISO 9001, which specializes in consulting services, and the systemwide planning, realization and support of security-relevant solutions for building security. An integrated total concept from risk and endangerment analysis to planning services, employment of different technologies, service & support, and effective handling during the operating phase is the basis of our work. We call it Integrated Security Management or ISM. BACnet capable technology and software are an important basis of our thinking, in particular with planning services for our major international customers and project developers. primion Technology AG Mit weltweit über 4.000 Kunden gehört die primion Technology AG zu den führenden Systemanbietern für integrierte Sicherheitstechnik, Zeiterfassungs- und Zugangsmanagement. Unsere 20 europäischen Niederlassungen und weltweit 25 Systempartner sorgen für optimalen Kundenservice. Da BACnet als weltweiter Datenkommunikationsund Protokollstandard ISO 16484 die gewerkeübergreifende Kommunikation auch in der Sicherheitstechnik unterstützt, ergibt sich für die primion Technology als innovativer One-Stop-Shop Komplettanbieter zukünftig ein durchgängiger Mehrfachnutzen des Global-Standards BACnet. Roland Schmider Tel. +49-7573-952-548 [email protected] www.primion.de With over 4,000 customers worldwide, primion Technology AG is one of the leading system providers in the field of integrated security management, time recording and access control management. Our 20 European branches and 25 system partners worldwide mean that we can offer optimum custom- er service. BACnet, the global standard data communication protocol for building automation and control networks, ISO 16484, also supports interoperability in security technology. As a groundbreaking one-stop-shop provider, primion will be able to integrate the BACnet global standard in a multitude of ways. Wizcon Systems Das Unternehmen Wizcon Systems mit Sitz in der Nähe von Lyon, Frankreich, ist einer der führenden Anbieter der webfähigen SCADA Software und drahtloser Automatisierungslösungen und Dienstleistungen für Unternehmen. Seit 1988 wird der internetbasierte Wizcon Supervisor zur Kontrolle und Bereitstellung von Informationen in der Gebäudeautomatisierung, bei umfangreichen Infrastrukturen und in anderen Automatisierungsmärkten eingesetzt. Mehr als 50.000 installierte Wizcon Systeme überwachen und steuern Prozesse auf der ganzen Welt. Wizcon bietet innovative und leistungsstarke M2M Funktionen für das Management von Anlagen. Als die einzige unabhängige Software mit vollständiger BACnet Implementierung (PICS) vereinfacht Wizcon die komplexe BACnet Integration erheblich. Wizcon Systems, based near Lyon in France, is a leading global provider of Webenabled SCADA software and Wireless Enterprise Automation solutions and ser vices. Since 1988, Wizcon Supervisor is a complete Internet-based solution for control and information used in building automation, large Infrastructures, and other automation markets. More than 50,000 Wizcon licen ses proactively monitor and manage processes around the world. Wizcon offers innovative and powerful M2M asset management features. As the only independent software with full BACnet implementation (PICS), Wizcon makes complex BACnet integration easy. Emmanuel Vitrac Tel. +33-4 72 47 98 98 [email protected] www.wizcon.com BACnet Europe Journal 5 11/06 49 Werden Sie Mitglied der BIG-EU Become a Member of the BIG-EU Europäischer Interessenverband für offene Gebäudeautomation mit BACnet® European interest group for open building automation systems with BACnet® Acht Gründe für Ihre Mitgliedschaft: Eight reasons for becoming a member: 1.Netzwerk 1.Network Nutzen Sie die BACnet Kontakte zu Betreibern und Investoren, Planern und Herstellern, Systemhäusern, Anlagenerrichtern und Systemintegratoren in Europa! Nehmen Sie Verbindung zu den BACnet Interest Groups in Nordamerika, Australien, Asien und im Mittleren Osten auf! Tauschen Sie persönliche Erfahrungen aus in Arbeitsgruppen, Mitgliederversammlungen, bei Ausstellungen und in unseren Mail-Communities. 2.Podium für Produkte und Projekte Mit unserem BACnet Europe Journal und unserem Internetauftritt www.big-eu.org bieten wir Plattformen für BACnet Botschaften aus Ihrem Unternehmen zur Entwicklung des BACnet Standards. Informieren Sie über Ihr Unternehmen und Ihre BACnet Produkte und stellen Sie Ihre Referenzprojekte vor. Neue Mitglieder präsentieren sich mit einem Kurzprofil. 3.Referenz gegenüber dem Kunden Weisen Sie sich mit einer Mitgliedschaft in der BIG-EU als kompetenter BACnet Partner Ihren Kunden gegenüber aus! 4.Informationen aus erster Hand Sichern Sie sich einen Wissensvorsprung bei der Entwicklung von BACnet Produkten. Die BIG-EU steht im Austausch mit dem Standing Standard Project Committee SSPC 135 der ASHRAE und informiert ihre Mitglieder über Innovationen zum BACnet Standard. 5.Mitgestaltung der BACnet ISO-Norm Wir begleiten die Normenentwicklung und kommunizieren die Anforderungen unserer Mitglieder an den BACnet Standard. Mitglieder sind eingeladen, in den Marketing- und Technik-Arbeitsgruppen mitzuwirken und Ihre Erfahrungen einzubringen. 6.Beteiligung an BACnet Veranstaltungen Beteiligen Sie sich an unseren Gemeinschaftsständen, zum Beispiel auf der light+building in Frankfurt/M, und an unseren BACnet Fachtagungen. 7.Trainingsangebote Nehmen Sie unsere Trainingsangebote wahr und gestalten Sie diese aktiv mit. 8.Zentrale Geschäftsstelle Unsere Geschäftsstelle steht Ihnen jederzeit mit Informationen über die BIG-EU und unsere Leistungen zur Verfügung. Take advantage of the BACnet network of European contacts to get in touch with operators and investors, planners and suppliers, system vendors, plant engineers and system integrators! Get connected with the BACnet Interest Groups in North America, Australia, Asia and the Middle East! Exchange experiences with others in working groups and general meetings, at exhibitions and in our mail communities. 2.A podium for products and projects With our BACnet Europe Journal and our Internet presence at www.bigeu.org, we offer platforms for spreading the latest BACnet news from your company for the development of the BACnet Standard. Tell others about your company and your BACnet products and present your reference projects. New members introduce themselves with a short company profile. 3.A reference for your clients As a BIG-EU member, you will present yourself to your clients as a qualified BACnet partner. 4.First hand information Make sure that you are the first to know about the latest BACnet developments when designing your products. The BIG-EU is in close contact with the Standing Standard Project Committee SSPC 135 of ASHRAE and informs its members about innovations to the BACnet Standard. 5.Develop the BACnet ISO Standard We participate in the development of the BACnet ISO Standard and make sure that the requests of our members are heard. Members are invited to participate in the Working Groups Marketing and Technique and to share their experiences. 6.Participation in BACnet events Take part in our community stands, e.g. at the light+building in Frankfurt, and in our `BACnet days´. 7.Training Take advantage of our BACnet training and take an active role in its development. 8.Head Office If you require any further information about the BIG-EU and its services, please do not hesitate to contact our Head Office. Ja, ich interessiere mich für die Leistungen der BIG-EU. Bitte senden Sie mir detaillierte Informationen über eine Mitgliedschaft zu. I am interested in the BIG-EU’s services. Please send me further information about becoming a member. Name ........................................................................................ Land/Country ............................................................................ Firma/Company ......................................................................... E-Mail . ...................................................................................... Straße Nr./Street No .................................................................. Tel. ............................................................................................ PLZ Ort/City/town sort/post code . ............................................ .................................................................................................. Datum, Unterschrift/Date, signature Seite kopieren und faxen an / Please copy this page and fax it to: +49-2 31-42 78 67 32 Neue Mitglieder New Members DeTeImmobilien wird BIG-EU Mitglied DeTeImmobilien becomes BIG-EU member „Die Anwendung und Weiterentwicklung des BACnetStandards liegt im direkten Interesse der DeTeImmobilien“, erklärt DeTeImmobilien-Geschäftsführer Wilfried Schmahl. “The application and advancement of the BACnet standard are in the direct interest of DeTeImmobilien”, declared managing director Wilfried Schmahl. Die DeTeImmobilien wird Mitglied der BACnet Interest Group Europe (BIG-EU). Der größte Facility Management Dienstleister Deutschlands tritt als viertes Sponsormitglied der BIG-EU an die Seite von Honeywell, Johnson Controls und Siemens Building Technologies. Erstmals wird BACnet damit auch von einem Anwender massiv gefördert. BIG-EU Präsident Volker Röhl: „Der Weltstandard für Gebäudeautomation wird sich noch stärker am Bedarf der Anwender orientieren.“ Die Zahl der BIG-EU Mitglieder wächst derzeit zweistellig. Nach der weltweiten Normierung (ISO 16484-5) folgen besonders Systemhersteller, Planer und System integratoren dem offenen Standard. Nun sind mit DeTeImmobilien auch die Anwender vertreten. Wilfried Schmahl, Geschäftsführer Facility Management bei der DeTeImmobilien erklärt: „Die Anwendung und Wei terentwicklung des BACnetStandards liegt in unserem direkten Interesse, um die technischen Anlagen in den Gebäuden unserer Kunden noch effizienter betreiben und überwachen zu können.“ Volker Röhl, bisher bei Johnson Controls tätig, übernimmt bei der DeTeImmobilien ab November 2006 die Leitung des Bereichs Kommunikations- und Störungsmanagement. Vorstand und Beirat der BIG-EU haben ihn in seinem Amt als Präsident der BIG-EU bestätigt. Die Mitglieder begrüßen den Beitritt der DeTeImmobilien einhellig. Als Serviceanbieter rund um die Immobilie kennt DeTeImmobilien die Vorteile des herstellerunabhängigen Kommunikationsstandards. Denn das Leistungsportfolio umfasst neben dem kaufmännischen Real Estate Management auch das technische und infrastrukturelle Facility Management. DeTeImmobilien has become a member of the BACnet Interest Group Europe (BIG-EU). Germanys largest facility management service provider steps in as the fourth sponsoring member of the BIG-EU alongside Honeywell, Johnson Controls and Siemens Building Technologies. With this development, BACnet is also substantially promoted by a user for the first time. BIG-EU president Volker Roehl stated: “The world standard for building automation has now become even more strongly oriented to the needs of the user.” The number of BIG-EU members has now grown to double figures. After the world-wide standardisation (ISO 16484-5), system manu facturers, planners and system integrators in particularly are following the open standard. End-users are now also represented by DeTeImmobilien. Wilfried Schmahl, managing director of Facility Management at DeTeImmobilien explains: “Our direct interests are in the application and advancement of the BACnet standard, in order to be able to more efficiently operate and supervise the technical equipment in the buildings of our customers.” Volker Roehl, formerly with Johnson Controls, takes over the leadership of the Communications and Fault Management department at DeTeImmobilien starting from November 2006. The executive committee and advisory board of the BIG-EU support him in his new position as a president of the BIG-EU. The members unanimously welcomed the joining of DeTeImmobilien. As a service providers of real estate DeTeImmobilien knows the advantages of the producer-independent com‑ munication standard as the service portfolio covers technical and infrastructure facility management in addition to commercial real estate management. Volker Röhl, Präsident der BIG-EU, wechselt zu DeTeImmobilien. Volker Röhl, the president of BIG-EU joins DeTeImmobilien. BACnet Europe Journal 5 11/06 51 BACnet Interest Group Europe Wie BACnet neue Bedürfnisse von Markt und Technik erfüllt How BACnet meets the latest market and technological demands BACnet Systeme sind auf Zukunft programmiert. Um die BACnet-Norm ISO 16484-5 den aktuellen Bedürfnissen von Markt und Technik anzupassen, wird sie ständig erweitert. Verantwortlich ist der Normenausschuss “SSPC 135” der American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE). Die europäischen Anträge werden von der BACnet Interest Group Europe eingebracht. BACnet systems are programmed for the future. The BACnet standard, ISO 16484-5, is being constantly developed to keep pace with the latest market and technological demands. This is the responsibility of the “SSPC 135” standards committee of the American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE). European proposals are added by the BACnet Interest Group Europe. Die Gebäudeautomation mit BACnet schafft zunehmend weitere Integrationsmöglich keiten, vor allem im Bereich der Sicherheitstechnik. Im Normenausschuss SSPC 135 befasst sich eine Arbeitsgruppe mit Zutrittskontrollsystemen, eine andere mit Videoüberwachung. Addenda zur Norm Zwischen einer Bedarfsmeldung und der Ergänzung des Standards liegt ein solides Verfahren. Anfragen können direkt an die Arbeitsgruppe Technik der BIG-EU gestellt werden. Substantielle Beiträge werden von dort in den Normenausschuss einge bracht, der ein so genanntes Addendum vorbereitet. Der Entwurf geht anschließend in die öffentliche Revi sion. Weltweit sind dann die BACnet-Nutzer zu Kommentaren aufgefordert. Erst danach, wenn abschließende Änderungen eingearbeitet sind, wird das Addendum offiziell als mitgeltende Erweiterung der Norm veröffentlicht. Ausschreibungen dürfen erst auf die Addenda Bezug nehmen, wenn die Revision abgeschlossen ist und die Entwürfe offiziell als „Standard Addendum“ auf der ASHRAE Website veröffentlicht sind (www.ashrae.org /technology/page/132/). Vorher ist noch mit substantiellen Änderungen zu rechnen. Öffentliche Revision Der BACnet Standard 1352004 kann über einschlägige Verlage oder direkt bei der ASHRAE bezogen werden. Die Addenda sind über die Internetseiten der BIG-EU www.big-eu.org und des Normenausschusses www.bacnet.org abrufbar. Die BIG-EU hält auf ihren Internetseiten unterstützende Dokumente bereit. Begehrt sind der VDI-TGA/BIG-EU Leitfaden zur Ausschreibung interoperabler Gebäudeauto mation und das Handbuch zur Implementierung von BACnet-Systemen. In der öffentlichen Revision stehen zurzeit fünf Normenzusätze. Einen neuen Weg zur sicheren Kommu- 52 BACnet Europe Journal 5 11/06 nikation in Netzwerken erschließen Verschlüsselungsund Authentifizierungstechnologien (Addendum g). Neue BACnet-Objekte zur Zugangskontrolle verstärken Schutz und Sicherheit (Addendum f). BACnet web services sind nach 53 Kommentaren in der zweiten öffentlichen Revision (Addendum c). Die vorgeschlagene Laststeuerung ging ebenfalls in die zweite Runde (Addendum e). Ständige Erweiterung Der Dynamik des BACnetStandards sind auch nach diesen Ergänzungen keine Grenzen gesetzt. Im Nor menausschuss stehen Defini tionen zur Einbindung von Regelantrieben an, zur Anwendung neuer IP Technologien und zur Unterstützung von Beleuchtungssystemen. Zunehmend baut BACnet auch auf die Integration betrieblicher Anwendungssysteme: Herstellerunabhängig werden damit Raumbelegungsplanung, Energiedaten management und industrielle Anwendungen integriert. BACnet offers ever increasing possibilities for integra ting building automation systems, particularly in the area of safety engineering. One of the task groups in the standards committee is working on access control systems, another on video surveillance. Addenda to the Standard Any required changes to the standard have to go through a specified procedure before being accepted as part of the standard. Requests for chan ges can be made directly to the Working Group Technology which is part of the BIG-EU. Significant contributions are then sent to the standards committee which prepares an addendum to the standard. The draft addendum then goes for public review. At this stage, BACnet users around the world are asked to give their comments. Only once all of the relevant suggestions and changes have been incorporated is the addendum published as an official extension of the BACnet standard. Tenders may only refer to the addendum when the public review process is finished and when it has been published on the ASHRAE website (www. ashrae.org/technology/ page/132/) as a “standard addendum“. Until then, there are still likely to be substan tial changes to the draft addendum. BACnet Interest Group Europe Public Review The BACnet Standard 1352004 can be obtained from appropriate publishers or directly from ASHRAE. The addenda are available on the websites of the BIG-EU www.big-eu.org and the standards committee www. bacnet.org. Supporting do cuments can also be found on the BIG-EU website. Most popular are the VDI-TGA/ BIG-EU guidelines on writ- ing tenders for interoperable building automation systems and the manual on implementing BACnet systems. There are currently five revisions for public review. Encryption and authentication technologies ensure secure network communica tion (Addendum g). New BACnet objects for access control increase protection and security (Addendum f). Addenda zum geltenden Standard BACnet-2004 Addenda to the Effective Standard BACnet-2004 Addendum 135-2004a (This addendum is final and was approved for publication by the ASHRAE Board of Directors and by the American National Standards Institute on February 10, 2005.) 1. Revise Life Safety Point and Life Safety Zone objects to modify their behaviour when placed out of service Addendum 135-2004b (This document contains only independent substantive changes made to the first public review draft and must be reviewed with that document. The SSPC is currently responding to comments received.) 1. Add a new Event Log object type 2. Add a new Global Group object type 3. Add a new Trend Log Multiple object type 4. Harmonize the Trend Log object with the new Event Log and Trend Log Multiple objects 5. Define a means for a device to provide a notification that it has restarted 6. Define a means to configure a device to periodically send time synchronization messages 7. Extend the number of character sets supported 8. Enable devices other than alarm recipients to acknowledge alarms 9. Allow MS/TP BACnet Data Expecting Reply frames to be broadcast 10. Revise the Clause 5 state machines to handle slow servers 11. Add new Error Codes and specify usage Addendum 135-2004c (This addendum is final and was approved for publication by the ASHRAE Board of Directors September 29, 2006 and by the American National Standards Institute on October 2, 2006.) 1. Adding BACnet/WS web services interface After receiving 53 comments, the BACnet web services are now in their second public review (Addendum c). The suggested load control is also in its second review (Addendum e). Continued Extensions Even after these extensions there is still plenty of potential for the continued growth of the BACnet standard. Definitions for incorporating control drives for using new IP technologies and for supporting lighting systems are currently with the standards committee and are pending. BACnet is increasingly working on operational application systems. Manufacturer independent room layout planning, energy management and industrial applications are being integrated. Addendum 135-2004d (This addendum is final and was approved for publication by the ASHRAE Board of Directors June 29, 2006 and by the American National Standards Institute on June 30, 2006.) 1. Add a new Load Control object type 2. Add a new Structured View object type 3. Allow acknowledgement of unseen TO-OFFNORMAL event notifications 4. Relax the Private Transfer and Text Message BIBB requirements 5. Exclude LIFE_SAFETY and BUFFER_READY notifications from the Alarm Notifications BIBBs 6. Establish the minimum requirements for a BACnet device with an application layer 7. Remove the requirement for the DM-DOB-A BIBB from the B-OWS and B-BC device profiles 8. Relax mandated values for APDU timeouts and retries when configurable, and change default values 9. Fix EventCount handling error in MS/TP Master Node State Machine 10. Permit routers to use a local network number in Device_Address_Binding 11. Identify conditionally writable properties 12. Errors with classes SECURITY or SERVICES mean the service is not executed at all 13. Specify Error returns for the AcknowledgeAlarm service Addendum 135-2004e (This document contains only independent substantive changes made to the first public review draft and must be reviewed with that document. The second public review ended May 1, 2006 and the SSPC is currently responding to comments received.) 1. Add a new Load Control object type Addendum 135-2004f (The first public review ended May 1, 2006 and the SSPC is currently responding to comments received.) 1. Add a new Access Door object type Addendum 135-2004g (The first public review ended May 1, 2006 and the SSPC is currently responding to comments received.) 1. Revise Clause 24 to add new network features Quelle/Source: ASHRAE SSPC 135 BACnet Europe Journal 5 11/06 53 BACnet Interest Group Europe BACnet Kalender Calendar of Events Datum - Date Ort -Location Veranstaltung - Event Kontakt - Information 2006 06.12.2006 Amsterdam, NL BACnet Forum Amsterdam Britta von Helden, MarDirect GbR, Dortmund, D, [email protected] 06.12.2006 Amsterdam, NL BIG-EU AB Meeting Prof. Peter Fischer, Fachhochschule Dortmund, D, [email protected] 07.12.2006 Amsterdam, NL BIG-EU WG-M Meeting Christian Müller, Honeywell GmbH, Offenbach, D, [email protected] 07.12.2006 Amsterdam, NL BIG-EU WG-T Meeting René Quirighetti, Siemens Building Technologies Ltd., Zug, CH, [email protected] 2007 27.-31.01.2007 Dallas, Texas ASHRAE Winter Meeting http://www.ashrae.org/template/AssetDetail/assetid/49746 René Quirighetti, Siemens Building Technologies Ltd., Zug, CH, [email protected] 27.-29.01.2007 Dallas, Texas SSPC135 BACnet Meeting René Quirighetti, Siemens Building Technologies Ltd., Zug, CH, [email protected] 29.-31.01.2007 Dallas, Texas AHR Expo www.ahrexpo.com René Quirighetti, Siemens Building Technologies Ltd., Zug, CH, [email protected] 08.02.2007 Milan, IT BACnet Forum Milan Britta von Helden, MarDirect GbR, Dortmund, D, [email protected] 08.02.2007 Milan, IT BIG-EU AB Meeting Prof. Peter Fischer, Fachhochschule Dortmund, D, [email protected] 09.02.2007 Milan, IT BIG-EU WG-M Meeting Christian Müller, Honeywell GmbH, Offenbach, D, [email protected] 09.02.2007 Milan, IT BIG-EU WG-T Meeting René Quirighetti, Siemens Building Technologies Ltd., Zug, CH, [email protected] ISH Fair Bruno Kloubert, MarDirect GbR, Dortmund, D, [email protected] BIG-EU/VDI-Training: Gebäudeautomation mit BACnet Frank Schubert, MBS GmbH, Krefeld, D, [email protected] Hans R. Kranz, HAK-Ingenieurberatung Haustechnik Automation Kranz, Forst, D, [email protected] April 2007 Paris, F BACnet Forum Paris Britta von Helden, MarDirect GbR, Dortmund, D, [email protected] 11.06.2007 Basle, CH BIG-EU AB Meeting Prof. Peter Fischer, Fachhochschule Dortmund, D, [email protected] 12.06.2007 Basle, CH BACnet Forum Basel Britta von Helden, MarDirect GbR, Dortmund, D, [email protected] 12.06.2007 Basle, CH BIG-EU General Meeting Prof. Peter Fischer, Fachhochschule Dortmund, D, [email protected] 13.06.2007 Basle, CH BIG-EU WG-M Meeting Christian Müller, Honeywell GmbH, Offenbach, D, [email protected] 13.06.2007 Basle, CH BIG-EU WG-T Meeting René Quirighetti, Siemens Building Technologies Ltd., Zug, CH, [email protected] BIG-EU/VDI-Training: Gebäudeautomation mit BACnet Frank Schubert, MBS GmbH, Krefeld, D, [email protected] Hans R. Kranz, HAK-Ingenieurberatung Haustechnik Automa tion Kranz, Forst, D, [email protected] 06.-10.03.2007 Frankfurt/ Main, D 19.-20.03.2007 Karlsruhe, D 29.-30.11.2007 Krefeld, D 54 BACnet Europe Journal 5 11/06 BACnet Gebäude-Automation 1.4 von Hans R. Kranz mit Zitaten aus der Weltnorm, der DIN und dem GAEB Das erste deutsche Fachbuch zum Datenkommunikationsprotokoll BACnet® (DIN EN ISO 16484-5) für interoperable Gebäudeautomation hat sich zu einem Standardwerk der Branche entwickelt. In verständlicher und kurzweiliger Art zeigt das Buch, wie funktionales Zusammenwirken bei unterschiedlicher Systemtechnik erreicht wird, und führt in die Geheimnisse der Netzwerktechnik ein. Autor: Herausgeber: BACnet Gebäude-Automation 1.4 vermittelt: Format: Umfang: • was BACnet ist und kann, • wozu Gebäudeautomation mit BACnet nützt, ISBN: Verkaufspreis: • wie BACnet eingesetzt wird, • das Zusammenspiel mit LON, KNX/EIB und dem Internet, • wie BACnet in einer Ausschreibung beschrieben wird, • wo die Grenzen des Einsatzes sind, • wie offen „offene interoperable GA-Systeme“ sein können. Hans R. Kranz Promotor Verlag www.cci-promotor.de Tel: 0721-565 14-14 17 x 24 cm jetzt 448 Seiten mit Abbildungen, Softcover 2. aktualisierte Auflage 2006 3922420095 39,75 Euro (inkl. 7% MwSt. zzgl. Versandkosten) Die wesentlichen Interessen des Bauherrn, wie Herstellerunabhängigkeit und langfristiger Investitionsschutz, werden eingehend behandelt. “homo mensura” Man is the measure of all things Der Mensch ist das Maß ... that is also true for our products. We offer the latest building automation technology – with easy operation and extensive application. This is literally “tangible” with our DDC4200 central unit, which is equipped with native BACnet and comes with easy and intuitive touchscreen operation. The Neutrino-GLT building automation system is our interface between the human operator and the control technology. With individually generated site images and many other functions, even complex systems can be monitored and controlled. … das gilt auch für unsere Produkte. Wir bieten Ihnen modernste Technik für die Gebäudeautomation – mit hohem Bedienkomfort und mit großem Nutzen. Im Wortsinne „fühlbar“ wird das bei unserer mit nativem BACnet ausgestatteten DDC4200-Zentrale. Diese wird einfach und intuitiv über einen Touchscreen bedient. Die Gebäudeleittechnik Neutrino-GLT ist unsere Schnittstelle zwischen Mensch und Regelungstechnik. Mit individuell gestalteten Anlagenbildern und vielen anderen Funktionalitäten werden auch komplexe Systeme sicher überwacht und gesteuert. Kieback&Peter GmbH & Co. KG Tempelhofer Weg 50, 12347 Berlin, Germany Tel.: +49 30 60095-0, Fax: +49 30 60095-164 www.kieback-peter.de, [email protected] Kieback&Peter SA Parc des Bellevues, Allée Rosa Luxembourg Bât. Le Wisconsin, 95610 Eragny/Oise, France Tel.: +33 1 34 30 22- 33, Fax: +33 1 34 30 22- 34 www.kieback-peter.fr, [email protected] Kieback&Peter Nederland B.V. Edisonweg 24, 8071 RC Nunspeet, Netherlands Tel.: +31 341 27 80 20, Fax: +31 341 27 03 74 www. kieback-peter.nl , [email protected]