1003/09 BACnet Standard erweitert
Transcription
1003/09 BACnet Standard erweitert
BACnet Europe ISSN 1614-9572 Journal Be open – be BACnet Frankfurt/Main März 10.–14., 2009, Halle 10.2, Stand D60 10 03/09 BACnet Standard erweitert BACnet standard expanded 6 Höchstleistung in Turins Hauptverwaltung Maximising performance at Turin Provincial Headquarters 23 Deutsche Flugsicherung realisiert großflächigstes BACnet-Netzwerk German air traffic control provider implements most extensive BACnet network 26 LEED 2009 und offene BACnet Systeme LEED 2009 and Open BACnet Systems 37 BACnet auf dem Vormarsch in Dubai BACnet on the move in Dubai 66 DESIGO – saves energy efficiently through intelligent building automation Flexible for use in any building or application With the DESIGO™ building automation system, you can significantly reduce energy consumption while at the same time optimize comfort. The system’s high control quality reduces energy consumption and ensures an especially pleasant room climate. Innovative energy saving functions allow you to sustainably preserve resources and therefore to lower costs. And an intelligent, easy-to-operate energy management system identifies saving potentials for all integrated building systems. For you, that means a system that really pays off and that can be used for all applications and expanded as needed – thanks to its high degree of flexibility. For more information, please visit www.siemens.com/desigo Answers for infrastructure. Pictures used show the new court house in Gent, designed in 2007 by the architects Stéphane Beel and Lieven Achtergael from Beel-Achtergael architecten F.V and by Technum. Inhalt – Content Editorial Notes 5 6 7 Anwendungen – Solutions 8 10 13 15 17 19 21 23 26 29 33 35 BACnet Europe Journal ISSN 1614-9572 The BACnet Europe Journal is the European magazine for building automation based on BACnet technology. Experts, practitioners and professionals show the way in applying and developing the BACnet standard – from building automation trends to devices and application projects; from qualification and training to testing and certification; from who’s who in the BACnet community to useful information on events and publications. Special attention is given to members and activities of the BACnet Interest Group Europe (BIG-EU). Distribution This bi-annual and bi-lingual Journal (English/German) can be ordered free of charge by partners, members, media representatives and friends of the BACnet Europe Interest Group (BIG-EU) – registered society. Order the BACnet Europe Journal by E-Mail from [email protected] Universitätsklinikum Hamburg-Eppendorf – University Medical Center Hamburg-Eppendorf Erbe Medizintechnik – Hightech in der Elektromedizin – Erbe medical technology – Hightech in electromedicine Süßwaren mit BACnet – Cadburys neue Produktionsstätte Sweets with BACnet – Cadbury’s new factory Hohe Energieeinsparung – Saving energy – Design hotel “The George” Effiziente Lüftungstechnik im Staatstheater – Efficient ventilation technology in the state theatre Klimasystem für Computercenter integriert – Einwahl per UMTS Air conditioning system for computercenter integrated – Dial-in per UMTS Transparenz im Neubau des Hauptsitzes der Rabobank Rabobank’s new head office will be characterised by transparency Höchstleistung in Turins Hauptverwaltung – Maximising Performance at Turin Provincial Headquarters Deutsche Flugsicherung (DFS) realisiert großflächigstes BACnet-Netzwerk German air traffic control provider implements most extensive BACnet network Generalsanierung – BACnet für weltgrößte Mineraliensammlung Overall refurbishment – BACnet for the World’s Largest Mineral Collection BACnet an der Universität Amsterdam – BACnet at the University of Amsterdam Moderne Gebäudeautomation für das Deutsche Raumfahrt-Kontrollzentrum Modern Building Automation for the German Space Operations Centre BACnet insight 37Offene BACnet Systeme und LEED 2009 – LEED 2009 and Open BACnet Systems 39BACnet MS/TP Geräte – Übersicht 2009 – BACnet MS/TP Devices – Overview 2009 42Zeitschaltfunktion in BACnet – Schedule-integration in BACnet Online distribution The BACnet Europe Journal is posted as a Portable Document Format (PDF)-File to www.big-eu.org and www.bacnet.de 44AMEV aktualisiert die BACnet 2007-Empfehlung – German AMEV updates BACnet 2007-recommendation 45GAEB: Beiblatt BACnet einsatzbereit für STLB-Bau German master specification for tenders with BACnet Annex 47Synergie von BACnet und IT-Technologie nutzen dem Anwender User profits of synergy between BACnet and IT technology Editor BACnet Europe Interest Group (BIG-EU), registered society, Droste-Hülshoff-Straße 1 44141 Dortmund Germany Phone: +49-2 31-56 77 72 69 Fax: +49-2 31-42 78 67 32 E-mail: [email protected] URL: www.big-eu.org Editorial: BACnet entwickelt sich weiter – Advancements in BACnet BACnet Standard erweitert – BACnet standaard expanded ISH 2009: Be open – be BACnet Produkte – Products 49 Ethernet und BACnet/IP standardmäßig – Ethernet and BACnet/IP as standard 50 L-WEB – Verteilte Visualisierung und Datenaufzeichnung Distributed Visualization and Data Logging with L-WEB 51 Neutrino-GLT Version 9: Komfortabel und leistungsfähig Version 9 of Neutrino-GLT is comfortable and capabl 53 BACnet Building Controller mit Kommunikationsmodulen BACnet building controller with communication modules 55 Automationssystem TROVIS 6600 für den flexiblen Einsatz – TROVIS 6600 Automation System for flexible use 57 Luftklappen- und Regelkugelhahn-Antriebe mit BACnet MS/TP Schnittstelle Air flap drives and control ball valves with BACnet MS/TP interface 58 Grafiktool für integriertes Netzwerkmanagement mit BACnet Graphic network management tool for BACnet 59 Der einfach Weg zur Integration – BACnet-Gateway BACnGTW-SMART: The easy way to Integration 61 Ein-/Ausgabefunktionen in BACnet integrieren – BACnet I/O Modules – I/O integration into BACnet 62 Frei programmierbarer BACnet Building Controller – Freely programmable BACnet Building Controller 63 Grenzenlose Programmierfreiheit – Boundless programming freedom 64 Barrierefreie Kommunikation – Barrier-free Communication Executive Board Volker Röhl, Strabag Property and Facility Services GmbH (President), Bill Swan, Alerton/Honeywell (Vicepresident) Gijs de Koning, Regel Partners B.V. Roger Braun, Siemens Schweiz AG (Treasurer) Editorial Office MarDirect Marketing Direct GbR Bruno Kloubert (Editor in chief), Carolin Seithel, Eva-Maria Erps Phone: +49-2 31-42 78 67 31 E-mail: [email protected] BACnet Interest Group Europe Advertising MarDirect Marketing Direct GbR Britta von Helden Phone: +49-2 31-56 77 72 69 Fax: +49-2 31-42 78 67 32 E-mail: [email protected] 65 BACnet auf dem Vormarsch in Dubai – BACnet on the move in Dubai 66 Willkommen in der BIG-EU – Welcome to the BIG-EU 67 Entwickler in Helsinki beim 4. BIG-EU Plugfest Workshop Helsinki is the venue of the 4th BIG-EU Interoperability Workshop Picture credits BIG-EU, MarDirect and specified companies 69 69 BACnet Forum Beijing – Chinesisches Normenkomitee ist Gastgeber – Host is Chinese Standard Committee Grenzlose Integration – BACnet in Mailand – BACnet in Milan – Boundless Integration Copyright © BIG-EU 2009 – Further editorial use of articles in the BACnet Europe Journal is encouraged (!) with reference to the source. Please send a specimen copy to the editor, or if published online, send the URL per mail to [email protected] 70 BACnet Kalender – Calender of BACnet Events BACnet® is a registered trademark of the American Society of Heating, Refrigerating and Air Conditioning Engineers, Inc. (ASHRAE) BACnet Europe ISSN 1614-9572 Journal BIG-EU auf der ISH 2009: Be open – be BACnet BIG-EU at ISH 2009: Be open – be BACnet Titelbild – Cover picture Columbus-Kontrollzentrum des Deutschen Zentrums für Luftund Raumfahrt (DLR) in Oberpfaffenhofen. Columbus Flight Control Centre in the German Aerospace Cen- 10 03/09 BACnet Standard erweitert BACnet standard expanded 6 Höchstleistung in Turins Hauptverwaltung Maximum performance at Turin Provincial Headquarters 23 Deutsche Flugsicherung realisiert großflächigstes BACnet-Netzwerk German air traffic control provider implements most extensive BACnet network 26 LEED 2009 und offene BACnet Systeme LEED 2009 and Open BACnet Systems 37 BACnet auf dem Vormarsch in Dubai BACnet on the move in Dubai 66 tre (DLR) at Oberpfaffenhofen. © Deutsches Zentrum für Luft- und Raumfahrt Alle Ausgaben sind als Download im Servicebereich von www.big-eu.org verfügbar All issues can be downloaded from the service area of www.big-eu.org BACnet Europe Journal 10 03/09 3 Editorial BACnet entwickelt sich weiter Advancements in BACnet Liebe Leser, „Stillstand ist Rückschritt“ sagt ein Sprichwort. BACnet steht nicht still. Der Standard entwickelt sich laufend weiter. Neue Marktbedürfnisse im bisherigen Kernbereich der Gebäudeautomation werden abgedeckt und der Anwendungsbereich wird erweitert, beispielsweise in Richtung Zutrittskontrolle oder Energieoptimierung. Soeben ist die Ausgabe ANSI/ASHRAE 135-2008 des BACnetStandards erschienen. Hier sind alle, seit der Ausgabe 2004 des Standards neu angenommenen Addenda 135-2004a, b, c, d, e, f und m eingearbeitet. Neben Verbesserungen und Klarstellungen sind dies die neuen Objekte Eventlog und Trendlog multiple, ein Laststeuerungs-Objekt, ein Access Door Objekt als erster Vertreter der Objekte für Zutrittskontrolle und ein Structured View Objekt, welches die hierarchische Darstellung von Komponenten, Teilanlagen und Anlagen unterstützt. Und nicht zuletzt werden Web-Dienste definiert, um einen standardisierten Zugriff von Web-Anwendungen auf BACnet-Objekte zu ermöglichen. Noch nicht in der Ausgabe 2008 des Standards enthalten, aber unmittelbar vor der Veröffentlichung als Addendum steht BACnet/ZigBee wireless. Damit verfügt BACnet über drahtlose Verbindungsmöglichkeiten für den Raumbereich. BACnet ist als EN ISO 16484-5 europäische- und Welt-Norm. CEN und ISO fassen die oben erwähnten Addenda (außer b und m, die zeitlich nicht mehr hineinpassten) als EN ISO 16484-5 Amendment-1 zusammen. Dieses Amendment befindet sich momentan in der CEN- und ISO-Schlussabstimmung. Dear Reader, A proverb says: “To stand still is to move back”. BACnet doesn‘t stand still. The standard continuously evolves. New market requirements in the current core business of building automation are covered and the business is also extended to new areas, e.g. access control and energy optimization. Version ANSI/ASHRAE 135-2008 of the BACnet-standard has just been released. In this issue all the addenda 135-2004a, b, c, d, e, f and m approved since the edition 2004 of the standard have been included. Besides improvements and clarifications, new eventlog-, trendlog multiple- and load control objects have been included. Furthermore, an Access-Door object as a first of a set of access control objects has been included as well as a Structured-View object allowing for hierarchical access to components, partial plants and plants. Last but not least web services have been defined providing for standardized access to BACnet-objects from web based applications. BACnet/ZigBee wireless has not yet been included in edition 2008 of the standard but will be published as an addendum soon. Therewith BACnet provides for wireless connections on room level. BACnet is also an European and worldwide standard EN ISO 16484-5. CEN and ISO are subsuming the mentioned addenda (except b and m that didn‘t fit the timeframe) as EN ISO 16484-5 Amendment-1. This amendment is currently in the CEN and ISO final voting process. And BACnet makes further progress… Additional BACnet proposals are ready for public review. They will – depending on the outcoming of the review – be formalSchon stehen weitere BACnet-Zusätze zum öffentlichen ly published as an addenda to the standard. These are among Kommentar bereit und werden – je nach Resultat der others a lighting output object, additional access control obPrüfung – als formelle Zusätze (Addenda) zum Standard jects and a global group object that is mainly important for publiziert. Dies sind unter anderem ein Licht-Steuerungs- the Japanese market. Further functionalities will be BACnet Objekt, weitere Zutrittskontroll-Objekte, ein vor allem für Network Security, XML dataformats to be used among others den japanischen Markt wichtiges globales Gruppen-Objekt, for a machine readable description of objects and an extended des Weiteren BACnet-Netzwerk-Sicherheit, XML Daten- set of BACnet-workstation profiles and functionality. formate, die auch zur maschinenlesbaren Beschreibung von BACnet-Objekten benutzt werden können und ein stark er- I wish you much success with a BACnet-protocol with continuweitertes Set von BACnet-Bediengeräten, Profilen und Funk- ously improved functionality! tionalitäten. Und BACnet entwickelt sich weiter… Viel Erfolg mit einem immer funktionaleren BACnet Protokoll! René Quirighetti Siemens Schweiz AG, Building Technologies Group Mitglied im Beirat der BIG-EU Member of the BIG-EU Advisory Board Leiter Arbeitsgruppe Technik der BIG-EU Head of BIG-EU Working Group Technique BACnet Europe Journal 10 03/09 5 BACnet Interest Group Europe BACnet Standard erweitert BACnet standard expanded Die weltweit wachsende BACnet Gemeinschaft hat einen erweiterten Standard. Zum Jahreswechsel 2008/2009 publiziert, löst „BACnet 2008“ die alte Standardversion von 2004 ab. Die neue Version unterstützt die Vernetzung von Gebäuden mit Energieversorgern. Sie verbessert die herstellerübergreifende Vernetzung der Gebäudeautomation mit neuen Möglichkeiten. The worldwide growing BACnet community has an expanded standard. Published at the turn of the year 2008/2009, “BACnet 2008” replaces the old standard version of 2004. The new version supports the cross-linking between buildings and energy providers. It enhances the manufacturer-independent cross-linking of building automation with new possibilities. Der international besetzte BACnet Normenausschuss „SSPC 135“ der amerikanischen ASHRAE stellte den neuen BACnet Standard in Chicago zur AHR Expo vor. Auch die BACnet Interest Group Europe (BIG-EU) war an der Entwicklung beteiligt. Offener Standard - BACnet BACnet ist der einzige offene Standard der Gebäudeautomation, der kooperativ von der amerikanischen, asiatischen und europäischen Industrie für Gebäudetechnik entwickelt wird. Das Protokoll für „Building Automation and Control Networks (BACnet)“ ermöglicht es, dass Geräte und Sys teme verschiedener Hersteller zusammenarbeiten. Damit entstehen leistungsfähige Gebäudesysteme, die den neuen ökonomischen und ökologischen Anforderungen entsprechen. ANSI/ASHRAE Standard 135-2008 BACnet. 6 Um insgesamt sieben Punkte wurde der BACnet Standard ergänzt – darunter sind neue Wege der Internetnutzung, der Zutrittskontrolle und der Anbindung von BACnet Geräten. Ein Schlüsselfaktor für die Vernetzung der Gebäude mit den Energieversorgern ist die Integration der Laststeuerung. Sie ermöglicht es, den Energieverbrauch bei Bedarf zu steuern. Damit können Lastspitzen in den Versorgungsnetzen abgefangen werRené Quirighetti und Bill Swan mit dem erweiterten Standard. den. René Quirighetti and Bill Swan with the expanded standard. Der neue BACnet Standard wurde zunächst als ANSI/ ASHRAE Standard 135-2008 veröffentlicht. Dass die Neuerungen auch in die DIN EN ISO Norm 16484-5 aufgenommen werden, gilt in Fachkreisen als sicher. ANSI/ASHRAE Standard 135-2008, BACnet® – A Data Communication Protocol for Building Automation and Control Networks. ISSN 1041-2336. The internationally assigned BACnet standards committee “SSPC 135” of the American ASHRAE presents the new BACnet standard in Chicago at the AHR Expo. The BACnet Interest Group Europe (BIG-EU) was engaged in the development as well. BACnet Europe Journal 10 03/09 Open standard - BACnet BACnet is the only open standard in building automation that is cooperatively developed by the American, Asian and European building automation industry. The Protocol for “Building Automation and Control Networks (BACnet)” enables devices and systems of different manufacturers to work together. This creates high-performance building systems that meet the new economic and ecological requirements. The BACnet standard was expanded by seven points – including new ways to use the internet, as well as new ways of access control and implementation of BACnet Devices. One of the key factors for cross linking the buildings with the energy providers is the integration of load control. It enables one to manage the energy supply by demand. Therewith peak loads in the supply net can be absorbed. At first the new standard was published as ANSI/ASHRAE standard 135-2008. That the improvements will be integrated into the DIN EN ISO standard 6484-5 as well is considered certain in circles of experts. ANSI/ASHRAE Standard 135-2008, BACnet® – A Data Communication Protocol for Building Automation and Control Networks. ISSN 1041-2336. BACnet Interest Group Europe ISH Frankfurt 2009: Be open – be BACnet Offene Gebäudesysteme bieten eine Vielzahl technischer und wirtschaftlicher Vorteile. Unter dem Motto „Be open – be BACnet“ präsentiert sich der BACnet Gemeinschaftsstand vom 10. bis 14. März auf der ISH Frankfurt. 13 System anbieter zeigen neue BACnet konforme Produkte und effiziente Integrationslösungen – in Halle 10.2 am Stand D60. Open building systems provide a multitude of technical and economical advantages. Themed ”Be open – be BACnet“. BACnet presents itself on the joint booth at ISH Frankfurt, Germany, from March 10 to 14. In hall 10.2, booth D60, 13 system providers present new BACnet conform products and efficient integration solutions. BACnet, der weltweite Kommunikationsstandard DIN EN ISO 16484-5, ermöglicht die einfache Integration einer zunehmenden Zahl von Gewerken. Neben Heizung, Klima und Lüftung werden auch Energiemanagement, Funkanwendungen, Sicherheit, Zugriffskontrolle und weitere Funktionen eingebunden. Aufgrund der Interoperabilität entstehen leistungsfähige, h e r s t e l l e r ü b e r g r e i f e n d e G esamtsysteme. Gebäude automation mit BACnet ist offen für neue Funktionen und einfach zu erweitern. 13 Aussteller bestätigen auf der ISH den Trend zum BACnet Standard. Erstmals vor zwei Jahren vertreten, meldet die BACnet Interest Group Europe (BIG-EU) ein deutliches Ausstellerplus von 30% gegenüber 2007. Vertreten sind A BB Automation Products, ACELIA, D&S Steuerungssysteme Köln, Danfoss, ELESTA building automation, I.T.E.N.O.S., Johnson Controls Systems & Service, der Novar Bereich TREND. Plüth Regelsysteme, Saia-Burgess Controls, Sauter-Cumulus, Siemens und Vacon. Die Mitglieder der BIG-EU sind führend in der Gestaltung offener Systeme. Von der Gebäudeleittechnik bis in die Feldebene werden die Gewerke mit BACnet integriert. Das erleichtert Planung und Ausschreibung. Auch KNX, LON und andere Protokolle lassen sich einbinden: „Be open – be BACnet“ und willkommen am BACnet Stand auf der ISH 2009! Be open − be BACnet crease of 30% compared to 2007. Represented are: ABB Automation Products, ACELIA, D&S Steuerungssysteme Cologne, Danfoss, ELESTA building automation, I.T.E.N.O.S., Johnson Controls Systems & Service, the Novar sector TREND. Plüth Regelsysteme, Saia-Burgess Controls, Sauter-Cumulus, Siemens and Vacon. The BIG-EU members are leading the way in the creation of open systems. From building control to field level the assembly sections are integrated with BACnet. That eases planning and bidding. KNX, LON and other protocols can be embedded as well: “Be open – be BACnet” and welcome to the BACnet booth at the ISH 2009! BACnet, the world wide communication standard DIN EN ISO 16484-5, enables easy integration of an increasing number of assembly sections. Besides heating, air-conditioning and ventilation functions like energy management, remote control applications, security, access control and many more are embedded as well. Due to the interoperability complete, highly productive, multi manufacturer systems can be created. Building automation with BACnet is open for new functions and easy to expand. 13 exhibitors confirm the trend towards the BACnet standard. Represented for the first time two years ago, the BACnet Interest Group Europe (BIG-EU) announces a considerable exhibitor in- Der BACnet Gemeinschaftsstand auf der ISH 2007. The BACnet joint booth at the ISH 2007. BACnet Europe Journal 10 03/09 7 Anwendungen Solutions Universitätsklinikum Hamburg-Eppendorf – Einsatz von BACnet zur Lebensrettung University Medical Center Hamburg-Eppendorf – Application of BACnet for Lifesaving Kontinuierlich neue Herausforderungen im Leistungsumfeld von Kliniken stellen die Technische Gebäudeausrüstung und insbesondere deren Vernetzung und Feinabstimmung durch die Gebäudeautomation vor neue Herausforderungen. Gerade im hoch spezialisierten Klinikumfeld ist die Gewährleistung eines laufenden Betriebs zur Versorgungssicherheit von essentieller Bedeutung. Continually new requirements in the field of hospital services present new demands on building services and in particular their networking and fine tuning through building automation. In the highly specialized hospital field the guarantee of continuous service for supply guarantee is of essential importance. 8 es Ebert-Ingenieure wichtig, die Wünsche des Betreibers genau zu identifizieren und die Eckpfeiler des neuen integrierten BACnet-Systems Verwendung von standardisierten BACnet-Profilen Für die Planung der Automationsstationen wurde auf das standardisierte BACnet Profil B-BC (BACnet Building Controller) zurückgegriffen, um einer großen Bandbreite von möglichen Produkten die Teilnahme am Wettbewerb zu ermöglichen. Ein weiterer Vorteil eines standardisierten Profils im späteren Betrieb liegt in der Möglichkeit, dass sich im Fall eines Austausches bestehender Systeme oder bei eventuellen Erweiterungsmaßnahmen weitere, anbieterunabhängige Automationsstationen in das Gesamtsystem integrieren lassen. Anhand der Pla- Bildquelle/Source: UKE Das Universitätsklinikum Hamburg-Eppendorf stand im Frühjahr 2004 vor der Aufgabe, die Automationsstationen seines Neubaus Klinikum West an die bestehende Gebäudeleittechnik anzubinden. Neben der wirtschaftlichen und technischen Umsetzbarkeit war es wichtig, auf einen hohen technischen Standard zu setzen, da der technische Fortschritt nicht still steht und ein Universitätsklinikum hohe Ansprüche an ein Technikkonzept stellt. Ebert-Ingenieure als verantwortliches Planungsbüro entschied sich deshalb im Gewerk Gebäudeautomation für den Einsatz des firmenneutralen Protokolls BACnet/IP, um die neuen Automationsstationen an die bestehende L eitzentrale anzubinden. Bereits in der frühen Planungsphase war zu definieren. Die bestehende Leitzentrale des Typ DESIGO INSIGHT von Siemens verwaltete bis dahin ca. 25.000 Hardwaredatenpunkte, durch den Neubau sind weitere 12.000 hinzugekommen. Das Universitätsklinikum Hamburg-Eppendorf. The University Medical Center Hamburg-Eppendorf. BACnet Europe Journal 10 03/09 Anwendungen Solutions BACnet-spezifische Forderungen Bereits in der Ausschreibung hatte Ebert-Ingenieure die notwendigen BACnet-Tests beschrieben und spezifiziert, die im Vorfeld im Planungsteam koordiniert wurden. Die Kommunikationspartner mussten zu diesen Tests ein gemeinsames Pflichtenheft erarbeiten, koordinieren und dokumentieren, das durch den Betreiber und den Planer geprüft wurde. Der finale Test des Gesamtsystems vor dem Einbau der Automationsstationen in das Gebäude wurde mit den neuesten, getesteten und zertifizierten DDC-Stationen durchgeführt. Alle gewünschten Funktionen, insbesondere die komplexen wie Scheduling, Trending, Network Management, Alarm and Event Management etc. wurden vom Gesamtsystem – DESIGO INSIGHT und EXCEL WEB – bestanden. Während der Bauphase wurde ein 1:1 Test von der Feldebene bis zur Managementebene durchgeführt und protokolliert, um somit nochmals die Funktionalitäten des Systems detailliert zu testen. Bildquelle/Source: EB nungsvorgaben von EbertIngenieure hat Honeywell das Gewerk MSR-Technik ausgeführt, Siemens wurde mit der Managementebene betraut. Zum Einsatz kommen die Automationsstationen des Typ Excel Web der Firma Honeywell. Die Heizungs- und Kältezentrale des Universitätsklinikums. The Heating and cooling system of the University Medical Center. Das Universitätsklinikum Hamburg-Eppendorf verfügt jetzt über eine Multivendor-Anlage, die nicht nur auf dem neuesten Stand der Technik ist, sondern auch die wirtschaftlichste Gesamtlösung darstellt. economic and technical feasibility it was important from the outset to set a high technical standard, since on the one hand technical progress in construction characteristics constantly changes, and on the other hand as a university hospital high demands are placed on an engineering plan. As the responsible desginer, Ebert-Ingenieure therefore decided on the installation of manufacturerneutral BACnet/IP protocols for the task of building automation in order to tie the new automation stations to the existing primary control unit. Already in the early planning phase it was important for Ebert-Ingenieure to accurately identify the wishes of the users and to define the cornerstone of the new integrated BACnet system. The existing DESIGO INSIGHT primary control unit from Siemens managed about 25,000 hardware data points until then, and with the new construction a further 12,000 were added. In the spring of 2004 the University Medical Center Hamburg-Eppendorf (UKE) was confronted with the assignment of tying the automation stations of its newly-built Klinikum West to its current building management system. In addition to Standardized BACnet profiles The system designers relied upon a standardized BACnet B-BC (BACnet Building Controller) profile for the planning of the automation stations in order to allow for the participation of a large range of possible products by competing producers. A further advantage of the installation of a standardized profile in operation lies in the possibility that manufacturer-independent automation stations can be integrated in the overall system in case of a replacement of the existing systems or system extensions. By means of planning specifications by Ebert-Ingenieure, Honeywell performed the task of process control and measurement technology, while the management level was entrusted to Siemens. Honeywell Excel Web automation stations were applied. BACnet-specific requirements In the tender offer the requirements had already been described and would be coordinated beforehand by the design team. The partners had to acquire, coordinate and document a common functional specification to these tests which would be verified by the user and the designer. The final test of the entire system, before the installation of the automation stations in the building, was implemented with the most newly tested and certified DDC stations. All desired functions from the complete DESIGO INSIGHT and EXCEL WEB system passed, particularly the complex ones such as scheduling, trending, network manage- ment, alarm and event management, etc. During the construction phase a 1:1 test from the field level on up to the management level was verified and protocolled in order to thereby test the functionality of the system in detail. The University Medical Center Hamburg-Eppendorf now benefits of a multi-vendor plant which is not only of the newest standard of technology, but which also represents the most economical overall solution. Oliver Skowasch Assistant Director – Building Automation in Automation and Communication Competence Centers at Ebert-Ingenieure [email protected] www.eb-ing.com BACnet Europe Journal 10 03/09 9 Anwendungen Solutions Erbe Medizintechnik – Hightech in der Elektromedizin Erbe medical technology – Hightech in electromedicine Bei der Erbe Elektromedizin in Tübingen sorgt das Automationssystem DDC4000 von Kieback&Peter mit nativem BACnet für die sichere und effiziente Regelung der gebäudetechnischen Anlagen. At the Erbe medical technology in Tübingen the DDC4000 automation system with native BACnet by Kieback&Peter cares for secure and effective regulation of the building facilities. Die Erbe Elektromedizin GmbH in Tübingen erforscht, entwickelt und produziert Geräte und Instrumente für die Chirurgie. Das Unternehmen wurde 1847 als Werkstatt für optische und mechanische Geräte in Tübingen gegründet. Heute ist es ein weltweit tätiger Konzern mit Tochterunternehmen in Europa und den USA und Repräsentanzen in China, Russland und Singapur. Moderne Technik zum Wohle des Menschen Das Produktportfolio von Erbe umfasst Systeme für die Wasserstrahl- und Kryo chirurgie (Kältechirurgie) mit Kernkompetenz in der Elektro- oder Hochfrequenz- Chirurgie. Diese chirurgischen Techniken werden im OP eingesetzt zum Schneiden und Blutstillen von Gewebe, zum Versiegeln von Gefäßen sowie zum Zerstören von krankem Gewebe. Patienten in aller Welt werden mit der HF-Chirurgie – häufig Erbe-Systeme – offen chirurgisch und minimalinvasiv, mit Schlüsselloch-Chirurgie, operiert. Im April 2008 wurde ein neues LogistikZentrum fertig gestellt. Das Automationssystem ist in das Gesamtsystem des Werkes integriert. Drei Automationsstationen DDC4200 in drei Informationsschwerpunkten regeln, steuern und optimieren über 500 Datenpunkte die technischen Anlagen. So stellt die Druckregelung der Raumlufttechnischen Anlage Lackiererei über Unterdruck sicher, dass aus den Trockenspritzkabinen keine Gase entweichen. Im Logistikzentrum regelt und optimiert eine Automationsstation DDC4200 die effi ziente Energieversorgung über zwei Brennwertkessel und die Wärmeverteilung. Eine weitere Automationsstation DDC4200 automatisiert die gesamte Lüftungstechnik und ist bereits für den weiteren Ausbau gerüstet. Eingebunden sind auch Zustandsmeldungen der Dachfenster, der Türen, der Trafos und der Hebeanlagen. Der in allen Automationsstationen DDC4200 integrierte TFTFarbtouchscreen signalisiert Betriebszustände eindeutig und erlaubt die intuitive, sichere Bedienung der Anlagen direkt vor Ort. Sicher informiert Durch die Gebäudeleittechnik Neutrino-GLT mit integrierter BACnet-Kommunikation ist der Betreiber jederzeit sicher informiert und kann bei Störungen Fremdsysteme in GLT sofort eingreifen. Melintegriert dungen erhält er per SMS und Die Automationsstationen E-Mail. Über PHWIN kann kommunizieren in einem er die GLT im EDV-Raum Cat6-Netzwerk untereinan- eins zu eins von jedem Netzder und mit der Gebäude- bedienplatz aus bedienen. leittechnik Neutrino-GLT Die Gebäudeautomation erüber BACnet. Da lag es na- möglicht dem Nutzer einen he, auch die Siemens-Re- energieeffizienten, transpagelung der Howatherm- renten Betrieb seiner LiegenLüftung über BACnet in das schaft. Die Erbe Elektromedizin GmbH in Tübingen. The Erbe medical technology in Tübingen. 10 BACnet Europe Journal 10 03/09 Kieback&Peter Automationssystem zu integrieren. Anwendungen Solutions Erbe Elektromedizin GmbH in Tübingen researches, develops and produces devices and instruments for surgical use. The company was founded in 1847 in Tübingen as shop floor for optical and mechanical Devices. Today it is a world wide operating group with subsidiaries in Europe and the USA as well as representative offices in China, Russia and Singapore. Modern technology for the welfare of humankind Erbe’s product range includes systems for water-jet and cryo surgery with core competences in electric and highfrequency surgery. Theses surgical techniques are used in the operation room to cut and stop bleeding in tissue, to seal off vessels as well as to destroy damaged tissue. Patients all over the world are openly or minimally invasive, with keyhole surgery, operated on with HF-surgery – and often with Erbe systems. A new logistics centre was finished in April 2008. The automation system has been integrated into the automation system of the factory. Three DDC4200 automation stations at three information centres control, actuate and optimize the technical facility using more than 500 data points. With low-pressure the pressure regulation of the compartment air application at the paint shop ensures, that no gas leaks from the dry spraying booth. At the logistics centre a DDC4200 automation station controls and optimizes efficient energy supply via two heating value boilers and heat distribution. Another DDC4200 automation station automises the ventilation technology and is already prepared for further extension. Status reports of the roof windows, the doors, the transformers and the pump system are embedded as well. The TFT colour touch screen that is integrated into all DDC4200 automation stations clearly reports operating statuses and enables intuitive, safe operation of the facility on-site. sent by SMS and email. Via PHWIN the GLT in the EDV room can be operated oneto-one from any network operation station. Building automation enables energy efficient, transparent operation of properties. Foreign systems integrated into GLT The automation stations communicate with each other in a Cat6 network and via BACnet with the Building Management System (BMS) Neutrino-GLT. Therefore it was logical to integrate the Siemens Howatherm ventilation control into the Kieback&Peter automation system via BACnet as well. Safely informed Due to the Neutrino-GLT BMS with integrated BACnet communication the operater is safely informed at any time and can intervene directly in case of failure. Reports are Neuberger Gebäudeautomation GmbH & Co. KG Oberer Kaiserweg 6 D-91541 Rothenburg o. d. Tauber Thomas Ritter Kieback&Peter GmbH & Co. KG Niederlassung Stuttgart www.kieback-peter.de [email protected] Telefon Telefax E-Mail: Internet: 0 98 61/4 02- 0 0 98 61/4 02- 333 [email protected] www.neuberger.net PMC2 - die flexible und zuverlässige Automationsstation Automatisch. Richtig. Bedarfsorientierte Gebäudeautomation BACnet Europe Journal 10 03/09 11 Reduce energy consumption. Increase profits. Slow global warming. How’s it feel to be a hero? Going green doesn’t have to land you in the red. An integrated building management system cuts energy and operational costs, improving your bottom line and corporate image. Learn more at tac.com today. Copyright © 2009, TAC, a company of Schneider Electric. Anwendungen Solutions Süßwaren mit BACnet – Cadburys neue Produktionsstätte Sweets with BACnet – Cadbury’s new factory Die polnische Cadbury PLC Süßwarenfabrik zählt weltweit zu den modernsten und größten Anlagen ihrer Art. Das in Skarbimierz inmitten der Industrie- und Wirtschaftszone “Invest Park” gelegene Werk erstreckt sich mit mehreren Gebäuden über eine Gesamtfläche von 2,6 Hektar. Cadbury PLC chewing gum manufacturing plant is one of the most modern and largest manufacturing plants of its kind in the world. The development is situated in Skarbimierz, within the Wałbrzych Special Economic Zone “Invest Park”, occupying the plot of 2.6 ha. Das Cadbury-Werk wurde von TAC Polen als hoch integrierte Lösung mit Sicherheits-, Gebäudeautomations- und Gebäudemanagementsystem ausgestattet. Das Projekt wurde durchgehend von TAC-Ingenieuren geleitet. Die drei TAC-Partner Hertz-System Ltd., Noma2 und Telecomm führten die untergeordneten Gewerke Zutrittkontrolle, Einbruchs alarmsystem und Videoüberwachung, Brandschutz- und Brandmeldesystem sowie Gebäudeautomation und -management aus. Gebäudeautomation mit BACnet Controllern Der Einbau der Zutrittskontrolle, des Einbruchs- und Alarmsystems sowie der Gebäudeautomation erfolgte mit Continuum BACnetControllern. Für die gesamte Überwachung wird die Continuum CyberStation v. 1.81 (B-OWS) als voll integriertes Gebäudemanagementsystem eingesetzt. Als durchge- hendes Kommunikationsprotokoll auf allen Ebenen der Gebäuderegelung wurden BACnet/IP und BACnet MS/ TP verwendet, wobei zusätzliche Bereiche, die nicht über BACnet abgedeckt werden konnten, über Modbus eingebunden wurden. Die Gebäudeautomation basiert auf insgesamt 252 Continuum b3-BACnet Controllern und ATV21-Frequenzumrichtern mit BACnet-Interface. Die komplette Videoüberwachung basiert auf IP, wobei die Bildaufzeichnung und Auswertung aller Kameras über einen digitalen IP Network Recorder (NVR) von PELCO Integral erfolgt. Das BACnet Gebäudemanagementsystem Cyberstation 1.8 integriert mehr als 3.000 Datenpunkte aus den unterschiedlichsten Gewerken. Die BACnet-Controller steuern über 20 Klimaanlagen, verschiedene Heizund Lüftungseinheiten, ca. 70 Fan Coils sowie mehr als 50 Abluftventilatoren. Zur sicheren Einhaltung der Anforderungen des Herstellungsprozesses im Lebensmittelbereich wurde ein besonderes Augenmerk auf die Überwachung und Regelung der Luftparameter gelegt. Datenaustausch BACnet b3-Controller regeln die Pumpen und stellen sicher, dass die Kühlhäuser die richtige Temperatur haben. Der Datenaustausch mit den Reglern der TRANE Kältemaschinen erfolgt über BACnet. Das Continuum BACnet Gebäudeautomationssystem regelt die Pumpen. Der Datenaustausch mit den Controllern des Heizkessels erfolgt über Modbus. Mit Continuum und Cyberstation werden zusätzlich alle anderen Systeme innerhalb der Anlage überwacht. Die Aufschaltung erfolgte entweder mit Modbus oder durch direkte Aufschaltung auf den Eingängen der Controller. Die wichtigsten Energiewerte (Strom, Wasser, Gas), die Menge des erzeugten Dampfes sowie das Abwasser aus der Fabrik werden regelmäßig über Messgeräte im Modbus-Netzwerk überwacht. Darüber hinaus wird der Stromverbrauch in den Hauptleitungen der Leistungsverteiler erfasst. Im gesamten Werk werden über 80 Türen via Zutrittskontrolle überwacht. Über 40 Continuum Zutrittskontroller CX9702 sind über das IP-Netzwerk hierfür vernetzt. Auf die Zutrittscontroller und weitere Continuum Controller des Einbruchs- und Alarmmeldesystems wurden Überwachungssignale wie etwa Türüberwachungskontakte, Glasbruchsensoren, Bewegungssensoren und Perimeterüberwachung mit InfrarotSchranken aufgeschaltet. Die Gebäude werden mit zwölf IP-Kameras, haupt- BACnet Europe Journal 10 03/09 13 Die Cadbury PLC Süßwarenfabrik in Skarbimierz Polen. The Cadbury PLC chewing gum manufacturing plant situated in Skarbimierz Poland. sächlich Außenkameras, überwacht. Die Aufzeichnung und Bildauswertung erfolgt über einen PELCO Integral NVR Rekorder. Die Videoüberwachung und das Einbruchsmeldesystem sind so aufeinander abgestimmt, dass jegliches Eindringen in die geschützten Bereiche von der Video-Überwachung direkt dokumentiert und aufgezeichnet wird. Cadbury plant was equipped with security and building automation systems, as well as BMS (Building Management System) by TAC Polska. The project was managed by TAC engineers, and the contractors Herz System Ltd, Noma2 and Telecomm implementing particular systems like the access control system, intrusion and panic alarm system and CCTV, the fire detection and alarm system and the building automation system and BMS. Building automation with BACnet Controllers The access control system, the intrusion and panic alarm system and the building automation were implemented on the base of Continuum BACnet controllers, and Continuum CyberStation v. 1.81 (B-OWS) was used as the fully integrated software for the BMX and monitoring system. The main communication standard on all levels is based on BACnetIP and BACnet/MSTP, and the standard adopted for the devices manufactured by companies not supporting this protocol was Modbus. The building automation is based on b3 series controllers and ATV21 inverters with BACnet communication cards (together 252 BACnet devices). CCTV network was based on Axis cameras with IP communication, and the digital network video recorder from Integral. BMS integrates over 3000 points of the systems mentioned. The controllers serve over 20 AHUs, several heating and ventilation units and ca. 70 fan-coils, as well as over 50 exhaust fans in various rooms. In the manufacturing areas it is necessary to control and monitor air parameters in order to comply with the requirements of manufacturing processes. B3 controllers control pumps and guarantee maintaining the appropriate temperature 14 BACnet Europe Journal 10 03/09 of the cooling towers. The information is exchanged with the controllers of Trane chiller units on BACnet level. The building automation system controls pumps and enables information exchange with boiler controller on Modbus main level. The system enables monitoring of the numerous technical devices in the plant. Depending on the possibilities, the integrations using Modbus protocol or directly by inputs of the building controllers were used. Regular monitoring All the main utility consumption measurements (electricity, water, gas consumption) and the amount of steam produced and the sewer discharged by the plant are monitored on a regular basis by a system of meters working in Modbus network. Also several electricity consumption meters in the main lines from switchboards are monitored. The plant building has ca. 80 doors covered with access control. The system is based on network controllers CX9702 (over 40 controllers). The following devices were connected to the intru- sion and panic alarm system, reed switch mechanisms from numerous entrance doors, glass break sensors, movement sensors and signals from the infra-red barriers protecting the fence surrounding the premises. The system guarantees displaying and recording images from 12 video cameras situated mostly outside the building. The CCTV system cooperates with the intrusion alarm system in such a way that the intrusion into the protected zones in the plant is recorded in CCTV system. Leszek Pondel Technical Support Engineer TAC Sp. z o.o. Warsaw Branch/Poland [email protected] www.tac.com Anwendungen Solutions Hohe Energieeinsparung ohne Komfortverlust – das Design Hotel „The George” Saving energy without a loss in comfort – Design Hotel “The George” Im neuen Design Hotel „The George” und dem angren zenden Bürogebäude sorgt das Automationssystem TROVIS 6600 (zertifizierter B-BC) von Samson für maximalen Wirkungsgrad. TROVIS 6600 Automation System (certified B-BC) of Samson ensures maximum efficiency in the new design hotel “The George” and the adjacent office building. Design Hotels™ als Dachmarke und Marketingplattform repräsentiert eine erlesene Kollektion von mehr als 170 individuell geführten Hotels in über 40 Ländern weltweit. Die Mitglieder im Portfolio von Design Hotels™ verbindet ihr kreatives Verständnis von moderner Hotellerie. Im Oktober 2008 eröffnete in Hamburg das Hotel „The George”. 118 komfortable Hotelzimmer, fünf Juniorsuiten sowie zwei elegante Suiten verteilt auf sieben Etagen mit zum Teil direkten Blick auf die Außenalster laden den Gast ein, stilvoll zu übernachten und mitten im Hamburger Stadtteil St. Georg am bunten Leben teilzunehmen. Die Innenausstattung der Hotelzimmer ist „very British” und zeichnet sich durch warme Farben des Interieurs aus. Englische Tapeten, originelle Spiegel, kurze flokatiähnliche Teppiche, komplett in schwarz-weiß gehaltene Badezimmer und edle dunkelbraune Holz möbel strahlen englische Gemütlichkeit aus. Heizungstechnik Die Bereitstellung der Primärenergie des Hotels erfolgt über Fernwärme. Bereits hier ist die SAMSON Beispiel einer Buchungsübersicht vom Hotel „The George“. Example of a reservation overview of the hotel „The George“. AG „massiv” mit bekannten Produkten aus der Palette der ROH (Regler ohne Hilfsenergie) vertreten. Die Temperierung des Hotels erfolgt im Wesentlichen durch thermodynamische Luftbehandlung. Aufgeteilt in die Lüftungszentralen „Gästezimmer“, „Gastronomie/Lobby“, „Küche“, „Lager/ Abstellräume“ und „Tiefgarage“, ist eine dezentrale Instrumentierung von Automationskomponenten unerlässlich. Über drei Informationsschwerpunkte verteilt sich das Automations system TROVIS 6600. In jedem der Schwerpunkte sind ein CPU-Modul TROVIS 6610, I/O-Module TROVIS 6620 und je ein WebTerminal TROVIS 6615 installiert. Mit Hilfe der Web-Terminals können alle anlagenrelevanten Daten komfortabel direkt vor Ort visualisiert und über Berührung geändert werden. Wert wurde auf eine offene Systemtechnik mit entsprechenden Schnittstellen zu sämtlichen Gewerken bzw. Partnersystemen gelegt. In Frage kam nur ein Produkt, dass durch ein Zertifikat die vollständige Implementierung des BACnet-Standards nach DIN EN ISO 16484-5 des B-BC (BACnet Building Controller) bekundet. Mit dem Check-in kommt der Stein ins Rollen Während sich der Gast noch beim Check-in auf ein angenehmes Zimmer freut, hat das Automationssystem TROVIS 6600 schon die Buchung registriert. Durch die Systemkopplung über das FIAS-Protokoll (Fidelio Interface Application Service) mit dem Hotelbuchungs system von Protel kennt TROVIS 6600 den Status jedes Zimmers. Sämtliche Partnersysteme, wie auch TROVIS 6600, sind in die bauseitigen Strukturen der Ethernet-Verkabelung eingebunden und generieren keine weiteren Kosten für eine separate Verkabelung. Auf diesem Weg registriert TROVIS 6600 die Zimmerbuchung und über BACnet/IP werden Einzelraumregler von Daikin vom Reduzierbetrieb in den Komfortbetrieb geschaltet. Hier kommen über 500 Kommunikationsdatenpunkte zusammen. Das betreffende Zimmer wird entsprechend temperiert. Der Gast kann die vorgegebenen Temperaturen individuell anpassen. Von der ganzen Technik bekommt der Hotelgast selbstverständlich wenig mit und kann sich im Zimmer entspannen. BACnet Europe Journal 10 03/09 15 Anwendungen Solutions system-related data at the web terminal and can change them at the touch of a button. Right from the start, importance was attached to open systems technology with corresponding interfaces to all installations and partner systems. Only products with B-BC (BACnet Building Controller) certification for full implementation of the BACnet standard in compliance with ISO 16484-5 were shortlisted. Die Anlagenübersicht vom Hotel. The equipment overview of the hotel. Design Hotels™, a global hotel brand and marketing platform, represents an exclusive collection of more than 170 independently managed hotels in over 40 countries around the globe. The Design Hotels™ members are united by their individualistic approach to modern hospitality business. In October 2008, “The George” was opened in Hamburg, Germany, with 118 comfortable hotel rooms, five junior suites and two elegant suites distributed over seven floors. The direct view from some of the rooms onto the Alster Lake invites guests to enjoy an overnight stay in style. The hotel’s location in the Hamburg district of St. Georg allows visitors to soak up the avantgarde atmosphere of the neighborhood. Thermodynamic air heating is mainly in charge of keeping the hotel at the right temperature. The instrumentation of the automation components is distributed over the various ventilation stations for rooms, gastronomy/lobby, kitchen, storage rooms and underground parking. The TROVIS 6600 Automation System is subdivided into three different areas. A TROVIS 6610 CPU Module, TROVIS 6620 I/O Modules and a TROVIS 6615 Web Terminal are installed in each area. The user has immediate access to all It all starts at check-in While guests are still waiting for their cozy room at reception, the TROVIS 6600 Automation System has already logged the booking. Thanks to the system link over the FIAS (Fidelio Interface Application Service) protocol to the Protel hotel reservation system, TROVIS 6600 recognizes the reservation status of every room. All the partner systems, including TROVIS 6600, are integrated into the Ethernet network in the building. As a result, no additional costs are incurred for separate wiring. With the information on check-in, TROVIS 6600 orders the Daikin room controllers to switch from re- duced mode to comfort mode over BACnet/IP. This control task involves over 500 data points. The guests’ rooms are brought to the required temperature. Once in the room, the guests can adjust the predetermined temperature to their individual needs. The hotel guests are hardly aware of the technology working in the background and can fully enjoy their stay. André Strauch SAMSON Aktiengesellschaft [email protected] www.samson.de The interiors of the hotel rooms are kept in a modern English style and welcome guests with warm colors. English wallpaper, original mirror designs, thick pile rugs, bathrooms completely in black and white as well as noble dark furniture radiate traditional English charm. Heating technology The primary source of heating energy to the hotel is supplied by a district heating network. The correct distribution of heat is taken care of by various SAMSON selfoperated regulators installed in the transfer station. Ein Doppelzimmer im englischen Stil im Design Hotel “The George” in Hamburg. A double room in English style of the Design Hotel “The George“ in Hamburg. 16 BACnet Europe Journal 10 03/09 Anwendungen Solutions Effiziente Lüftungstechnik sorgt für gutes Klima im Staatstheater Efficient ventilation technology ensures a good climate in the state theatre Das Staatstheater Stuttgart ist eines der erfolgreichsten und renommiertesten Opern- und Schauspielhäuser in Deutschland. Erfolgreich verlaufen ist auch der Umbau des Chorprobensaals. Eine neue Lüftungsanlage sorgt hier für gutes Klima bei den Proben. Zur Übermittlung relevanter Regelgrößen zwischen Lüftungsanlage und Gebäudeleittechnik (GLT) wird ein BACnet-Interface eingesetzt. The Stuttgart state theatre is one of the most successful and prestigious Opera and theatres in Germany. The refurbishment of the choir rehearsal hall has also been successfully completed. New ventilation equipment ensures that there is a good climate available for the rehearsals. A BACnet interface has been installed for the transferring of all relevant control variables between the ventilation equipment and the building control technology (BCT). Wärmerückgewinnung „Die Anforderungen an die Anlage waren vielfältig“, kommt Kai-Uwe Ebert vom VBBW auf die Herausforderungen bei Planung und Einbau zu sprechen. Die fehlende Anbindung an die Heizzentrale beispielsweise war ausschlaggebend für die Installation eines Klimagerätes mit eigener Kälteanlage. „Wir konnten die Anlage quasi steckerfertig liefern“, so Jürgen Layer, Key Account Manager von Menerga Baden-Württemberg. Die komplett integrierte Kälteanlage ist reversierbar ausgeführt und kann somit zum Heizen und zum Kühlen eingesetzt werden. Das Klimaund Lüftungsgerät hat eine Leistung bis zu 5.500 m³/h. Dabei sorgt ein asymmetrischer Hochleistungswärmeübertrager im Kreuzstromverfahren dafür, dass ein Großteil der Energie der warmen Abluft an die einströmende, kalte Außenluft übertragen wird. Der so erreichte Wärmerückgewinnungsgrad liegt bei 70 Prozent. plug&play Einbindung Eine weitere wichtige Voraussetzung war zudem die vollständige Integration in die bestehende Gebäudeleittechnik. Hier konnte der Hersteller mit der plug&playFähigkeit der eigenen Geräteregelung überzeugen. Das Interface zwischen GLT und Lüftungsanlage wird über den international weit verbreiteten BACnet-Standard realisiert. So werden laufend rund 25 bis 30 Betriebsdaten – bei Bedarf auch mehr – übertragen und visualisiert. Alle Informationen zum Betriebszustand der Anlage wie Temperatureinstel- Menerga GmbH / 23.01.2009 Die grundlegende Renovierung des Chorprobensaals stand schon lange auf der Agenda des Staatstheaters – einer Liegenschaft, die vom Vermögen und Bau Baden-Württemberg (VBBW), Amt Stuttgart betreut wird. Im Jahr 2007 gab es grünes Licht für den Umbau. Waren zuvor keinerlei lüftungstechnische Einrichtungen vorhanden, wurde nun für den bis zu 100 Personen fassenden Saal eine Komplettanlage von Menerga konzipiert. Der Chorprobensaal im Staatstheater Stuttgart wurde mit einer neuen Lüftungs- und Klimaanlage ausgestattet. The choir rehearsal at the Stuttgart state theatre hall has been equipped with a new ventilation and air conditioning equipment. BACnet Europe Journal 10 03/09 17 Menerga GmbH / 23.01.2009 Die Regelung überträgt die Betriebsdaten mittels BACnet-Protokoll direkt an die GLT. Die Anbindung kann über BACnet IP, BACnet MS/TP oder BACnet PTP erfolgen. The adjusting device transmits the operational data by means of a BACnet protocol directly to the BCT. The connection is implemented with BACnet IP, BACnet MS/TP or with BACnet PTP. lungen, Feuchtegrade, Ventilatorleistung, Luftmengen, Klappenstellung der Motoren, etc. können so von den technischen Mitarbeitern in der Zentrale direkt verfolgt und geändert werden. Der große Vorteil von BACnet für den Betreiber: Er kann mit unterschiedlichen Herstellern protokollunab hängig zusammenarbeiten. Und deshalb setzt auch Menerga auf diesen international gültigen Standard. So kommuniziert die Regelung des Klima- und Lüftungsgerätes, die mit Komponenten von SE-Elektronic arbeitet, problemlos mit der BACnetfähigen GLT. Hier werden die Betriebsdaten zunächst übersetzt und dann mittels BACnet übertragen. Anders herum können auch Anweisungen seitens der GLT von der Geräteregelung interpretiert und umgesetzt werden. „Mit der Verbindung von BACnet und unserer Regelung steht dem Betreiber der Anlage eine komfortable Bedienmöglichkeit zur Verfügung“, resümiert Jürgen Layer. Und Kai-Uwe Ebert ergänzt: „Hier wurde eine Anlage installiert, die ideal an die Bedürfnisse des Betreibers angepasst ist, opti- The fundamental refurbishment of the choir rehearsal hall had been on the agenda of the state theatre for a long time - an immovable estate that is managed by the “Vermögen und Bau BadenWürttemberg” (VBBW), official department Stuttgart. In the year 2007 green light was given for the refurbishment. There had been previously absolutely no ventilation technical installations existing, and now complete equipment for the hall which could hold up to 100 persons was to be planned by the company Menerga. “We could deliver the equipment as a plug&play system”, stated Jürgen Layer, Key Account Manager from the company Menerga Baden-Württemberg. The completely integrated cooling equipment was implemented as reversible and can therefore also be utilized for heating and cooling. The air conditioning and ventilation equipment has a performance factor of up to 5,500 m³/h. Thereby an asymmetrical high performance heat transfer device designed in a cross flow technique ensures that the major portion of the energy from the warm exhaust air is fed back into the cold air feed exterior air. This ensures a heat recovery degree of approximately 70 percent. Heat recovery “There were a multiple of demands that would be made on the equipment”, explained Kai-Uwe Ebert from the VBBW when questioned about the challenges being set by the planning and installation. The non existent connection to the heating central for example was the deciding factor for the installation of an air conditioning equipment with its own unique cooling equipment. plug&play BACnet interface An additional pre-requirement was also the complete integration into the existing building control technology. The manufacturer was able to stand out with the plug&play capability of their own equipment adjustment facility. The interface between the BCT and the ventilation equipment is realized by the internationally utilized BACnet-Standard. This mal vernetzt ist und sich sehr gut regeln lässt. Wir sind mit dem Ergebnis sehr zufrieden.“ 18 BACnet Europe Journal 10 03/09 facilitates for approximately 25 to 30 operational data (if required more) being transferred and visualized. All information concerning the operational condition for the equipment such as the temperature adjustments, degree of humidity, ventilator performance, air amounts, flap adjustment for the motors etc., can be directly monitored and changed if required by the technical personnel. The major advantage given by BACnet for the operator is: It can independent work alongside various manufacturers protocol. For this reason the company Menerga also relies upon this international valid standard. The adjustment device for the air conditioning and ventilation equipment communicate in this way, working in cooperation with components from the company SE-Elektronic without any problems occurring with the BACnet capable BCT. The operational data is translated here and then transmitted by means of the BACnet. Instructions from the BCT can opposed to this also be interpreted and implemented by the equipment control device. “With the interconnecting of BACnet and our control device the equipment operators have a comfortable operational facility available”, summarized Jürgen Layer. Kai-Uwe Ebert also added, “We have had an equipment installed here, that has been ideally adjusted to the requirements of the operator, which is optimally cross linked and facilitates for an excellent controlling. We are very happy with the results.” Bogomir Dajcman Geschäftsführer SE-Elektronic GmbH [email protected] www.se-elektronic.de Jürgen Röben Geschäftsführer der Menerga GmbH [email protected] www.menerga.com Anwendungen Solutions Klimasystem für Computercenter integriert – Einwahl per UMTS Air conditioning system for computercenter integrated – Dial-in per UMTS SWG hat eine neues Klimasystem für das Computercenter der SULO Herford errichtet. Auftraggeber war die KKL Kälte Klima Lüftung GmbH. SWG constructed a new climate system for the SULO Herford computer center. It was ordered by KKL Kälte Klima Lüftung GmbH. Hohe Funktionssicherheit ist eine wichtige Voraussetzung für den Betrieb von Rechenzentren. Durch den Einbau von Klimaschränken und deren Integration mit einer interoperablen Gebäudeautomation kann diese Funktionssicherheit gewährleistet werden. Durch proprietäre Automationsgeräte war in der Vergangenheit eine einheitliche Gebäudeautomation ohne Abhängigkeit von Herstellern schwer möglich. chungen und die vorhandene Raumklimaanlage konnten durch das BACnet-Protokoll auf Basis der DIN EN ISO 16484-5 herstellerneutral integriert werden. Die Steuerung der Raumklimageräte über Danfoss Frequenzumformer mit BACnet-Anbindung und sämtlicher verbundener Meldungen, Störungen und Steuerungen zur Entrauchung wurde durch das BACnet-Regelsystem der Firma Delta Controls realisiert. Mit Einbindung in das Integration mit BACnet TCP/IP Netzwerk der GeFür das Rechenzentrum der bäudeautomation erfolgte eiFirma Sulo aus Herford war ne Web-Server Aufschaltung die Aufgabenstellung eine In- mit einem Orca-Web der Firtegration von Klimaschrän- ma Delta Controls – einken alter und neuer Bauart gesetzt als BACnet-Operamit Einbindung der vorhan- tor-Workstation, die durch denen Raumlufttechnik, Stör- eine Firewall zusätzlich geüberwachung wichtiger An- schützt wird. Störungen und lagenfunktionen und der betriebsrelevante InformatiEntrauchungssteuerung. Ge- onen werden umgehend als plant durch Ottensmeier In- E-Mail Nachricht über das genieure aus Paderborn, bei der Firma Sulo vorhanbeauftragt durch die Kälte- dene E-Mail Programm Lofachfirma KKL Kälte Klima tus-Notes und zusätzlich als Lüftung mit Sitz in Bielefeld SMS zum Servicedienst der erfolgte die Integration über Firma KKL gesendet. das BACnet-Protokoll aller Anlagen durch das BIG EU- Der Clou der gesamten Mitglied SWG Stuckmann BACnet-Anlage ist die EinWirtschaftliche Gebäudesy- wahl über ein virtuelles steme GmbH aus Beckum- UMTS-Netzwerk, mit allen Ahlen in Westfalen. notwendigen Bedienungen. Dies wird realisiert durch Verschiedene zum Teil be die Einbindung in einen zur stehende und neu zu in- Verfügung gestellten VPNstallierende Systeme mit Zugang und der Internet Klimaschränken von Her- GLT-Bedienung. Dadurch hat stellern wie ECO, Stultz, der Notdienst und die SerAEG für USV-Überwa- vice- und Wartungsabteilung der Firma KKL die Möglichkeit, sich ortsunabhängig, z.B. von einem Servicewagen aus, in das Netz einzuwählen und umgehend die erforderlichen Maßnahmen durchzuführen. Ebenso können das Ingenieurbüro, die Hersteller und der Systemintegrator über UMTS schnell und sicher in die Anlage eingreifen und einen reibungslosen Ablauf sicherstellen. High functional reliability is the requirement for the safe operating of an electronic data processing center. With the installation and integration of interoperable building automation devices of different manufacturers in conditioning cabinets this functional reliability can be secured. With proprietary building automation devices an integrative building automation without dependency of manufacturers was hardly to realize in the past. Integration through BACnet The task was to integrate old and existing conditioning cabinets with new cabinets under the especially integration of the existing ventilation and air conditioning, failure supervision of important units, and the smoke extraction system. The object SULO electronic data center was planned by the engineering office Ottensmeier in Paderborn. Ordered through the Specialist KKL Kälte Klima Lüftung from Bielefeld the complete integration through the BACnetprotocol of all unit systems was developed by SWG Stuckmann Wirtschaftliche Gebäudesysteme GmbH in Beckum-Ahlen. Many different existing and new systems with manufacturers of conditioning cabinets, e.g. ECO, Stultz, AEG for USV- control, and the existing clima control has been integrated through the BACnet protocol based on DIN EN ISO 16484-5. The regulation of clima units through Danfoss frequency converter with BACnetlink and the integration of all other information, such as failure supervision and control of the smoke extraction system, was realised with the BACnet regulation system platform of Delta Controls. Integrated in the TCP-IP network of the building automation, a web-server intrusion through Orca-Web of Delta Controls, used as a BacnetOperator-Workstation, additional protected through a firewall, was installed. All errors and all operational important informations are directly passed on as an e-mail information to the LotusNotes e-mail-program of Sulo. Additional an SMS is sent to the Service centre of KKL. BACnet Europe Journal 10 03/09 19 Anwendungen Solutions The highlight of this construction is the dial-in through a virtual UMTSnetwork with all necessary operation systems. This can be done with the installed VPN-access and the internet GLT-operation system. The emergency department or the service and maintenance team has immediately the possibility to dial into the network and can react without any local dependency. The necessary measurements can be organised immediately. Also the Engineering office, the appropriate manufacturer and the System Integrator can via UMTS quickly and safely take appropriate action into the system and solve actual problems to gain a frictionless function. SWG Stuckmann Wirtschaftliche Gebäudesysteme GmbH [email protected] http://swg-beckum.de/ Die KKL Kälte-, Klima-, Lüftungsanlage im Rechenzentrum der SULO Herford. The Coldness- climate- ventilation installation in the Electronics Data Processing Center of SULO Herford. Anwendungen Solutions Transparenz im Neubau des Hauptsitzes der Rabobank Rabobank’s new head office characterised by transparency Mit dem Bau des Hauptverwaltungsgebäudes der Rabobank Niederlande erhält die Skyline von Utrecht eine neue Dimension. Das Design des Hochhauses umfasst zwei 105 Meter hohe, leicht gedrehte Türme, die durch eine doppelte, vollständig verglaste Umhüllung mitein ander verbunden sind. „Transparenz“ ist der Begriff, der Gebäude und Gebäudetechnik treffend charakterisiert. Für das energieeffiziente Gebäudemanagementsystem ist SAUTER verantwortlich. Utrecht’s skyline will be enhanced by the construction of a new administration centre for Rabobank Nederland. The high-rise building comprises two 105 meters tall towers that stand at a slight angle to each other being connected by a double-skin facade made entirely of glass. ‘Transparency’ is the word that correctly typifies both the building and the technology within. SAUTER is the supplier of this energy-efficient building management system. Das Hauptverwaltungsgebäude der Rabobank Niederlande. The Administration centre for Rabobank Nederland. Transparenz ist der Begriff, der für den Charakter von Gebäude als auch Gebäudetechnik steht. Er kommt im klaren, unkomplizierten Entwurf der Anlagen zum Ausdruck. Ein ausgeklügeltes Konzept kombiniert Wärme-/Kältespeicher, Wärmepumpen und Fernheizung. Zusätzlich wird zwischen Komfort- und Prozesskühlung unterschieden. Die insgesamt rund 2.500 Einzelregelsysteme des Gebäudes sorgen für Komfortregelung des Klimas, Steuerung des in der Fassade aufgenommenen Sonnenschutzes und Bedienung der Beleuchtung. Zukunftsweisend: BACnet/IP Die Transparenz des Gebäudes wird auch in der wechselseitigen Vernetzung der gebäudegebundenen Anlagen durchgesetzt. Im Konzept hat man sich entschieden, sämtliche Anlagen über BACnet/IP miteinander zu vernetzen. „Mit der Anwendung von BACnet/IP sind wir sicher, über ein zukunftsweisendes Open Protocol zu verfügen“, berichtet Gerrit de Vries von der Rabobank. Auf diese Weise sind Klimaanlagen, Notstromaggregate, Beförderungsanlagen und mehr als 100 Frequenzregler über BACnet/IP und SAUTER novaPro Open mit dem BACnet Gebäudemanagementsystem von der Rabobank vernetzt. Vernetzung der Gewerke Bei den gewählten Wärmepumpen, der Belüftung der Parkgaragen und den Kühlmaschinen ist es noch nicht möglich, diese über BACnet/ IP zu vernetzen. Sie sind über Modbus RTU Protokoll direkt ans SAUTER- Gebäudemanagementsystem novaPro Open gekoppelt. Dies gilt auch für die Energieverbrauchszähler, die über das M-Bus Protocol vernetzt sind. Das vollständige Security Management System (SMS), bestehend aus Zugangskontrolle, Überwachungskamerasystem, Einbruchsicherung, Räumung, Brandmeldezentrale und Sprinkleranlage, ist ebenfalls über BACnet/IP mit dem Gebäudemanagementsystem novaPro Open vernetzt. Für die Gebäudeautomation der Anlagen wird die neue Systemfamilie SAUTER EY-modulo 5 mit BACnet/IP eingesetzt. Diese neue modulare Baukastenlösung passt ausgezeichnet ins flexible Konzept der Rabobank und bietet die Möglichkeit der stufenweisen und individuellen Erweiterung. BACnet Europe Journal 10 03/09 21 Anwendungen Solutions Die Gewerkeintegration bei der Rabobank mit BACnet. The Integration of the assembly section with BACnet by Rabobank. Neue BACnet-Objekte In den verschiedenen Arbeitsgruppen von BACnet wird zurzeit an der Definition neuer Objekte und der Aufzeichnung neuer Dienstleistungen gearbeitet. Weil die Regelsysteme für die Raumlufttechnik bei der Rabobank zukünftig mit verschiedenen neuen BACnet-Objekten und Dienstleistungen versehen werden können, bleibt die Anlage up to date. Zahlreiche neuere Entwicklungen wie die des BACnetStandards, mit dem Structured View Object (SV) und Webservices, sind schon in der neuen Linie EY-modulo 5 integriert. Beide Beispiele zeigen deutlich, dass Transparenz und Offenheit sowohl bei der Rabobank als auch bei SAUTER ganz groß geschrieben werden. „Die Rabobank hat sich ganz bewusst für BACnet/IP entschieden“, erklärt De Vries. „Ursprünglich war BACnet ein Netzwerk für den Datenaustausch, heute entwickelt es sich ganz klar zu einer Netzwerkplattform für integrale Anlagetechnik. Wir sind davon überzeugt, dass BACnet/IP eine zukunftsorientierte Plattform ist. Und das paßt ausgezeichnet zu unserem Unternehmen.“ ‘Transparent’ is the word that typifies both the building and the technology within. The transparency is expressed in the clear, uncomplicated set-up of the installations. A clever concept combines heat and cooling from the aquifers, heat pumps and additional heat from the district heating network. Furthermore there is a distinction made between comfort cooling and process cooling. The almost 2,500 individual control devices in the building control the air-conditioning system, the window blinds integrated in the facade, and the lighting. BACnet/IP The transparency of the building has also been continued in the way that the building’s installations are networked with each other. In the design, it was decided that all installations communicate via BACnet/IP. “By applying BACnet/IP, we are assured of an open protocol with a highly potential future perspective”, says Gerrit de Vries of Rabobank. For example the air-conditioning system, the emergency power aggregates, the transport installations and the over 100 frequency regulators communicate via BACnet/IP and SAUTER novaPro Open, Sauter’s BACnet building management system. Integration of the assembly section The heat pumps, the carpark ventilation system and the chillers are not yet able 22 BACnet Europe Journal 10 03/09 to communicate via BACnet/ IP. They are connected via the Modbus RTU protocol on a SAUTER EY-modulo 5 controller to novaPro Open; this also applies to the energy meters that are connected by means of the M-bus protocol. The complete Security Management System (SMS), consisting of access control, CCTV, burglar alarm system, evacuation, fire alarm system and sprinkler system, also communicates via BACnet/IP with the novaPro Open building management system. SAUTER’s new EY-modulo 5 series with BACnet/IP, is being employed for the building automation of the installations. This new modular solution kit fits in well with Rabobank’s flexible concept and offers the possibility of stepwise and individual extension. New BACnet objects Within BACnet’s various work groups, work is being carried out to define new objects and to create new services. Because the control systems for the HVAC installations at Rabobank can be provided with various new BACnet objects and services, it is guaranteed that the installations will remain up to date. Many recent developments within BACnet, such as structured view object (SV) and others such as web services, have already been incorporated into the new SAUTER EY-modulo 5 series. Both examples clearly indicate that transparency and openness are of paramount importance to both Rabobank and SAUTER. “The choice of BACnet/IP was a very conscious one made by Rabobank”, says De Vries. “Where BACnet was originally a communication medium for exchanging data, it is now clearly developing into a communication platform for integral installation technology. We are convinced that BACnet/IP is a future-orientated platform – and that matches the aims of our organisation very well.” Wietse Hut Vertriebsleiter SAUTER Nederland [email protected] www.sauter-controls.nl Anwendungen Solutions Höchstleistung in Turins Hauptverwaltung Maximising Performance at Turin Provincial Headquarters Das bisher größte BACnet Netzwerk in einem öffentlichen italienischen Gebäude befindet sich in Turin: Ein System von Delta Controls realisiert in der Haupt verwaltung der Provinz Turin die komplette HVAC-Lösung mit nativem BACnet. The hitherto largest BACnet network installed in an Italian public administration building is located at Turin: A Delta Controls system with native BACnet provides the complete HVAC automation solution at the Turin Provincial Headquarters. Das Gebäude der Hauptverwaltung der Provinz Turin liegt direkt im Stadtzentrum, nahe der zentralen Bahn- und U-Bahnstationen. Es ersetzt alle Büros, die bisher über verschiedene Standorte verteilt waren. Nach einer zweijährigen Renovierung wurde das Gebäude im Oktober 2008 eingeweiht. Die Büros, die sich auf 14 Stockwerken erstrecken, das Auditorium und die Cafe teria, insgesamt 32.000 m², beherbergen täglich die 1.500 Mitarbeiter der Provinzregierung. BACnet wurde schon sehr früh, übereinstimmend mit den Anforderungen des Eigentümers, als das benötigte Automationsprotokoll in den technischen Spezifikationen des Projekts definiert. Der HLK Lieferant und Serviceanbieter Idro.Erre Spa wählte nach einer eingehenden Untersuchung das offene BACnet Protokoll, um die versprochene optimale Performance des Gebäudes zu erreichen und die Betriebsbedürfnisse zu befriedigen. Hohe Energieeinsparung Das System von Delta Controls gewann die Ausschreibung. Es bietet eine komplette HLK Automationslösung mit nativem BACnet auf jedem Level und damit Flexibilität und Skalierbarkeit, Effizienz, Kosteneffektivität und Energieeinsparung, sowohl während der Installation als auch während den anschließenden Die BACnet Systemarchitektur in der Hauptverwaltung der Provinz Turin. The BACnet system architecture at the Turin Provincial Headquarters. Wartungen. Das BACnet Netzwerk macht es möglich, die gesamte Installation über das Internet zu überwachen. Die Einzelraumcontroller in jedem Büro des Gebäudes führen zu weiteren Energieeinsparungen. Die Lösung von Delta Controls in Verbindung mit anderen Gebäudeeigenschaften wie der Fassadendämmung und einem innovativen Design des HLK Systems (Nutzung von Fernwärme und geothermalem Wasser) macht es möglich, das jährliche Energieeinsparungsziel von drei Millionen Euro zu erreichen. Das System ist hoch strukturiert und beinhaltet alle Eigenschaften eines kompletten BACnet Netzwerkes. Jede Anlage wird vom idealen BACnet Geräteprofil gesteuert. Wärmeumtauscher, Lüftungsanlage, fan-coil Einheiten, die häusliche Wasserverteilung und alle anderen Anlagen werden von den entsprechenden BACnet-Geräten (B-BC, B-ASC und BAAC) gesteuert. Alle B-BC Geräte sind über ein Ethernet-Backbone verbunden, das vom zweiten Untergeschoss bis zur 15. Etage verläuft. Auf jeder Etage befindet sich ein BACnet-Router, um das BACnet Europe Journal 10 03/09 23 Another innovative design from the world’s BACnet leader. With Delta Controls’ new touchscreen operators are able to monitor and manage building systems from any wall or panel in the building. Customize 3D-animated graphics to depict floor plans, air handlers, boilers and chillers. Our seven-inch diagonal colour screen makes it simple to change occupancy schedules, adjust temperature setpoints and more. It connects to your facility via BACnet over Ethernet. Control energy costs and occupants’ comfort—all at a finger’s touch. ® For an animated demonstration visit www.deltacontrols.com/hmi Anwendungen Solutions project’s technical specifications, in accordance with the owner’s requirements. The HVAC supplier and service provider, Idro.Erre Spa, conducted an exhaustive evaluation and concluded that the BACnet open protocol was indeed the right choice to meet the proposed facility’s optimum performance and operation at needs. Außenansicht der Hauptverwaltung der Provinz Turin. Exterior View of the Turin Provincial Headquarters. Ethernet-Backbone mit dem MS/TP Netzwerk zu verbinden und über das gesamte Stockwerk auszuweiten. Das MS/TP Netzwerk verbindet 68 Geräte inklusive fan-coil Controllern und Controllern für die Elektrizitätsverteilung. BACnet erste Wahl In Übereinstimmung mit den technischen Spezifikationen der Planungs-Ingenieure war BACnet wieder die erste Wahl, da es die Einbindung von Kühlaggregaten und variablen Frequenzumformern von Drittanbietern ohne zusätzliche Kosten ermöglicht. Das gesamte System besteht aus mehr als 1.200 BACnet Geräten, wovon sich mehr als 900 in den MS/TP Netzwerken befinden. Die Bedienarbeitsplätze sind per Web mit der Delta Controls ORCA Websoftware verbunden und bieten somit einer virtuell unendlichen Anzahl von Nutzern den Systemzugriff. Alle Nutzer werden durch ihre persönliche Zugangsberechtigung identifiziert und nach ihren Zugangsleveln gruppiert. Jeder Nutzer hat Zugang zu den Daten, die er für die Erfüllung seiner Aufgaben benötigt. Es wurde auch ein grafisches Benutzerinterface implementiert, um eine intuitive und benutzerfreundliche Systemnavigation zu gewährleisten. Die Nutzer können die gesamte Liegenschaft über dieses Interface überwachen sowie Statusund Trendlogprotokolle in bekannte Formate exportieren, zum Beispiel in CSV und XML. Somit können sie den größtmöglichen Nutzen aus den gesammelten Daten ziehen. Dasselbe Interface wird auch von der Wartungs- und Energieservicefirma genutzt, die damit die Möglichkeit haben, aus der Ferne den Betrieb und die Energieeinsparung des HLK Systems der Liegenschaft zu kontrollieren und Feineinstellungen vorzunehmen. The Turin Provincial headquarters facility is located right in the city centre, close to the central railway and metro stations. It replaces all the smaller offices formerly scattered in different locations. Following a complete two-year renovation process, the building was inaugurated in October 2008. The offices on fourteen floors, the auditorium and the cafeteria, comprising 32,000 sq m, host more than 1,500 people working of the provincial government on a daily basis. BACnet was specified from early on as the required automation protocol in the Major energy savings The Delta Controls system won project tender , providing a complete HVAC automation solution, with native BACnet at every level, delivering flexibility and scalability, efficiency, cost-effectiveness and energy savings, both during the installation and in the subsequent maintenance. The BACnet network enables the entire installation to be supervised via the Internet, and the individual temperature control of every office in the building further increases energy savings. The Delta Controls solution, together with other building features, such as the façade insulation and an innovative HVAC system design (exploiting district heating and geothermal water), makes it possible to achieve the annual energy savings target of three million Euros. The system is highly structured and implements all the features of a complete BACnet network. Each equipment is controlled by the ideal device BACnet profile. Heat exchangers, AHUs, fan-coil units, domestic water distribution and all the other equipment are controlled by the respective B-BC, B-ASC and B-AAC devices. All the B-BC devices are connected on an Ethernet backbone running from the second underground floor to the 15th floor. On each floor, a BACnet router is used to connect the Ethernet backbone to the MS/TP network extending across the entire floor area. The MS/TP network connects a minimum of 68 devices, including fan-coil unit controllers and electrical distribution controllers. BACnet is first choice In accordance with the design engineer’s technical specification, BACnet was again first choice by allowing the third party chillers and the variable speed drives to be connected without any additional cost. The entire system is made up of more than 1,200 BACnet devices, over 900 of which reside on the MS/TP networks. User workstations are linked via the web into the Delta Controls ORCAWeb software, providing system access to a virtually unlimited number of different users. All users are identified by their personal access credentials and grouped by their access level. Each user has access to the respective data that they require for their given tasks. A graphical interface has also been implemented in order to provide intuitive and user-friendly system navigation. Users can supervise the entire facility by means of this interface, exporting status and trend log reports in popular formats, such as CSV and XML for example. As a result, users can make maximum usage of the collected data. The same web interface is also utilized by the maintenance and energy service company, allowing them to remotely monitor and fine tune the facility HVAC system operational behaviour and energy saving performance. Antonio Catalano Italy Business Manager DELTA CONTROLS [email protected] www.deltacontrols.it BACnet Europe Journal 10 03/09 25 Anwendungen Solutions Deutsche Flugsicherung realisiert großflächigstes BACnet Netzwerk German air traffic control provider implements most extensive BACnet network Die Verfügbarkeit von Flugsicherungssystemen hat bei der DFS höchste Priorität. Wegen der überregionalen Verknüpfung gebäudetechnischer Anlagen und Gebäude automationssysteme entschieden sich die Verantwortlichen für einen zentral positionierten redundant aufgebauten virtuellen GLT-Applikationsserver. Der auf BACnet basierende Systemaufbau gilt durch die bundesweite Verknüpfungen als Deutschlands großflächigstes BACnetNetzwerk. Air traffic control system availability is of the highest priority for DFS. Due to the supra-regional connection of building technology systems and building automation systems, those responsible decided to turn away from the decentralized building specific GLT system architecture in favor of centrally positioned redundant virtual GLT application servers. The system structure based on BACnet is Germany‘s most extensive BACnet network due to its connections throughout the country. Die Deutsche Flugsicherung GmbH (DFS) in Langen bei Frankfurt/Main will die Verfügbarkeit der gebäudetechnischen Anlagen bzw. deren Gebäudeautomationssysteme in ihren rund 500 Liegenschaften besser absi- chern und nach und nach auf eine Verfügbarkeit von 99,99 Prozent steigern. Erreicht wird diese extrem geringe Ausfallzeit durch den Aufbau einer zentral stationierten übergeordneten Plattform der Managemente- 1 2 S implex 0 0 2 2 hp Pr oLia nt DL 380 G4 1 UI D ch 1 ch 2 hp Pr oLia nt DL 380 G4 1 2 UI D 0 0 S implex 1 1 Duplex Tape 5 3 2 2 3 4 4 5 1 3 4 4 3 5 5 Ta pe Duplex c h 1 ch 2 Die Hard- und Software-Topologie des VIGAS-System. The Hardware and software topology of the VIGAS system. 26 BACnet Europe Journal 10 03/09 bene auf der Basis „Virtuelle GLT-Applikations-S erver“, kurz VIGAS, die mittels Softwaremodulen des USUnternehmens VMware Inc. aufgebaut wird. Das Projekt geht auf ein Konzept des DFS-Produktmanagements „MSR-Technik“ zurück und wurde zusammen mit dem DFS-Systemhaus und Experten von Siemens Building Technologies der Region Rhein-Main realisiert. Basis der gemeinsam von der DFS, dem Systemhaus und Siemens entwickelten Lösung ist ein physikalischer, redundant aufgebauter Server (Host), auf dem mit Hilfe der VMware-Software virtuelle Serverplattformen mit einer definierbaren Performance (Prozessorleistung, RAM-Speicher, Netzwerkkarte, Festplatte) generiert werden. Die Software dient gleichzeitig als Betriebssystem des physikalischen Servers. Die Installation auf dem virtuellen Server ist unabhängig vom Betriebssystem und kann frei nach den Anforderungen der Applikation konfiguriert werden. Die eigentliche „Neuheit“ der VIGAS-Lösung ist die Kombination bewährter IT-Komponenten zu einem neuen System, speziell zur Anwendung in der Gebäudeautomation für Gebäude mit dem Anspruch auf eine enorm hohe Performance und Verfügbarkeit. Desigo Insight für die Managementebene Die DFS hat sich als übergeordnete Applikation der Managementebene für das System Desigo Insight von Siemens sowie für BACnet Anwendungen Solutions als Übertragungsprotokoll entschieden. Damit die GLTApplikation überall und ohne lokale Installation verfügbar ist, wird sie auf einem Terminalserver bereitgestellt, der den mehrfachen zeitgleichen Zugriff auf die Applikation ermöglicht. Die Terminalserver sind durch die Integration in das DFS-weite Netzwerk in allen anderen DFS-Liegenschaften verfügbar. Der Zugriff auf die GLT-Applikation kann von jedem zugelassenen Rechner der DFS bereitgestellt werden. Einzigartiges BACnetNetzwerk Abgesehen von der Hochverfügbarkeit des Systems sowie der Konzentration der GLT-Applikationen für die bundesweit verteilten DFSLiegenschaften wurde mit dem VIGAS-System auch Deutschlands großflächigstes BACnet-Netzwerk geroutet. Eine besondere Herausforderung war hierbei unter anderem die Vergabe der BACnetDevice-Adressen sowie der entsprechenden Site-Nummern für sämtliche BACnetGeräte und DFS-Liegenschaften, um Duplikate zu vermeiden. Bei der Aufschaltung von Fremdfabrikaten auf der Automationsebene zeigte sich, dass eine vollständige Durchgängigkeit der Funk- tionen nicht immer gegeben ist. Probleme bereiteten insbesondere BACnet-Auto mationsstationen der ersten Generation mit BACnetGateways, die sich nur mit zusätzlichem Aufwand in das BACnet-Netzwerk integrieren ließen. Dahingehend gestaltete sich die BACnetAufschaltung der Managementebenen relativ einfach. German air traffic control provider in Langen close to Frankfurt/Main wants to increase the security of availability of the building technology systems or building automation systems (GA systems) in their 500 properties and gradually improve availability to 99.99 percent. This extremely low down-time is achieve using a centrally stationed higher level platform at management level based on a “Virtual GLT-Applications Server” abbreviated VIGAS, which is set up using software modules provided by the US company VMware Inc. The project is based on a concept of the DFS product management “MSR technology” and was implemented together with the DFS system house and experts from Siemens Building Technologies in the Rhine Main region. The solution developed by DFS, the system house and Siemens is based on a physi- Bei der DFS werden rund 15 Liegenschaften mit zusammen rund 61.000 Datenpunkten über das neue VIGAS-System überwacht. Approximately 15 properties with a total of around 61,000 data points are monitored via the new VIGAS system at DFS. cal redundant server (host), on which virtual server platforms are generated with defined performance (processor performance, RAM, network card, hard drive) using the VMware software. The software is simultaneously used as an operating system for the physical server. The installation on the virtual server is independent of the operating system (MS, Linux or Unix) and can be configured freely depending on the application’s requirements. The actual “innovation” of the VIGAS solution is the combination of proven IT components to form a new system especially for use in building automation for buildings requiring an extremely high level of performance and availability. Desigo Insight for the management level DFS decided on the System Desigo Insight from Siemens as the parent application for the management level and for BACnet as the transfer protocol. In order to ensure availability of the GLT application everywhere without a local installation, it is placed on a terminal server, which allows for multiple users to access the application simultaneously. Diese beiden Einschübe enthalten die gesamte GLT-Applikationssoftware Desigo Insight und ADP für alle DFS-Liegenschaften These two inserts contain the entire GLT application software Desigo Insight and ADP for all DFS properties The terminal servers are available in all other DFS properties via integration in the DFS network. Access to the GLT application can be provided from every approved DFS computer. Unique BACnet network In addition to the system’s high level of availability and the concentration of the GLT application for DFS properties throughout Germany, the most extensive BACnet network in Germany was routed with the VIGAS system. Among other things, a special challenge here consisted of the allocation of BACnet device addresses as well as the respective site numbers for all BACnet devices and DFS properties to avoid duplicates. The connection of third-party products at the automation level showed that full function consistency is not always provided. First generation BACnet automation stations with BACnet gateways were especially challenging and required additional effort for integration in the BACnet network. Whereas the BACnet connection at management level was relatively simple. Christoph Harnischfeger Vertriebsbeauftragter Endkunden, Siemens Building Technologies, Region Rhein-Main christoph.harnischfeger@ siemens.com www.siemens.de/ buildingtechnologies BACnet Europe Journal 10 03/09 27 keep cool! It's cool to be green The Vacon 100 HVAC begins a new wave of fresh green thinking in HVAC matters. Vacon 100 HVAC AC drives excel in efficient investment, installation, operation and maintenance. Es ist cool Grün zu sein Der neue Vacon 100 HVAC Frequenzumrichter bringt eine neue Dimension von umweltbewusstem Denken in den HKLBereich. Der Vacon 100 HVAC ist allemal eine gute Investition, denn er überzeugt auch durch Installationsfreundlichkeit, Zuverlässigkeit und Wartungsarmut. BACnet Version Standard BACnet/IP (Ethernet) ✔ BACnet MS/TP (RS-485) ✔ www.vacon.com Anwendungen Solutions Generalsanierung – BACnet für weltgrößte Mineraliensammlung Overall refurbishment – BACnet for the World’s Largest Mineral Collection Auf Schloss Freudenstein in Freiberg (Sachsen) wird die größte Mineraliensammlung der Welt sowie das sächsische Staats- und Bergarchiv Freiberg beherbergt. GFR erstellte im Zuge der Generalsanierung die Gebäude automation und das Gebäudemanagement auf Basis von BACnet. Freudenstein Castle in Freiberg (Saxony) is home to the largest mineral collection in the world as well as the Saxon Public Records Office and Mining Archives Freiberg [Staats- und Bergarchiv Freiberg]. As a part of the overall refurbishment, GFR developed building automation and building management based on BACnet. Die neuzeitliche Sanierung des vierflügligen Gebäudes erfolgte in zwei Bauabschnitten. Beginnend im Juli 2004 und weiterführend im März 2006 wurde das Schloss bezüglich des Baukörpers wie auch der gesamten Haustechnik restauriert und modernisiert. Heute gehört das Schloss Freudenstein zu den modernsten Gebäuden Freibergs. Bildquelle/Source: Stadtverwaltung Freiberg/Detlev Müller Zum Erreichen dieses Anspruchs wurde im Bereich Gebäudeautomation und Gebäudemanagement auf die Weltnorm BACnet gesetzt. Gründe lagen zum einem in der durchgängigen Implementierung der vorhandenen wie auch der neu zu errichtenden Gebäudeautomation auf einem einheitlichen Managementsystem. Zum anderen spielt auch die nachhaltige Betrachtung wirtschaftlicher Gesichtspunkte im Bereich der Erst- und Folgeinvestitionen wie natürlich auch im Betreiben der Anlagen nach Luftaufnahme von Schloss Freudenstein Freiberg. Aerial photograph of Freudenstein Castle Freiberg. komforttechnischen und energetischen Maßstäben eine Rolle. BACnet Building Controller (B-BC) Im daraus folgenden öffentlichen Wettbewerb konnte sich die elektro-union freiberg anlagenbau-, handelsund service GmbH mit Hilfe des Teilangebotes der GFR mbH gegenüber dem Wettbewerb durchsetzen. GFR bekam im Dezember 2006 den Auftrag, die Gebäudeauto- mation und das Gebäude management zu errichten. Das Gesamtkonzept umfasst in den Schlüsselbereichen innovative GFR Produkte der Automationsbaureihe B -BC ems 4.CP03B-BAC sowie das Webservice basierte Gebäudemanagementsystem BACnet Operator Workstation (B-OWS) WEBVISION. Eine Vorortbedienung erfolgt mit Hilfe eines Notebook über das Ethernet auf dem Gebäudemanagementsystem B -OWS WEBVISION. Zur Schadens- und Bereitschaftsdienstbetreuung wurde die B -OWS WEBVISION über eine Firewall mit dem Internet verbunden. Durch auto matische Weiterleitungen von Störmeldungen als SMS, Fax und E-Mail ist eine de zentrale Betreuung der Anlage über die Interneteinwahl vollständig möglich. Gesamtheitliche Intergration Der Umfang des Gebäudemanagements spiegelt sich in der gesamtheitlichen Integration aller Anlagenbereiche der Haustechnik wieder. Dies betrifft zum einen die Aufschaltungen der PRIVA Bestandsanlagen über ein BACnet Gateway und zum anderen die neuen GFR Regelungen aller Lüftungs-, BACnet Europe Journal 10 03/09 29 DIGICONTROL ems 4 – economic modular system www.gfr.de DIGICONTROL ems 4 liefert die Performance zur Umsetzung außergewöhnlich effizienter und vielfältiger Integrationslösungen. Die Baureihe DIGICONTROL ems 4 BACnet® wird beispielsweise eingesetzt in: DIGICONTROL ems 4 offers the performance to realise remarkable efficient and most differing integration solutions. The DIGICONTROL ems 4 BACnet® model range is used for example in: O2 World Berlin, Universitätsklinikum Carl Gustav Carus Dresden, Universität Potsdam-Golm, Hochschule für Musik Würzburg, Landesamt für Maß und Gewicht München, FHG Saarbrücken, Kurpark Bad Oeynhausen, Schloss Freudenstein Freiberg /Sachsen … GFR –– Gesellschaft für Regelungstechnik und Energieeinsparung mbH Firmenzentrale Kapellenweg 42 · D-33415 Verl Telefon +49 52 46 / 9 62-0 Telefax +49 52 46 / 9 62-199 Niederlassung Jena Löbstedter Straße 101 · D-07749 Jena Telefon +49 36 41/ 46 97-0 Telefax +49 36 41/ 46 97-13 Anwendungen Solutions Die Busstruktur im Schloss Freiberg. The bus structure at Freiberg Castle. Klima-, Heizungs- und Kälteanlagen. Zur homogenen und vor allem energieoptimierten Regelung der Neuanlagen wurden alle Umwälzpumpen der Firma Grundfos über den GeniBUS und alle Frequenzumformer der Firma Danfoss über den FC-BUS auf das GFR Automationssystem B-BC ems 4.CP03B-BAC aufgeschaltet. Ermöglicht haben dies optionale Schnittstellenmodule, welche beliebige Anbindungen von externen BUS-Systemen (z.B. EIB/ KNX, DALI, CAN, LON M-BUS, Modbus, PROFIBUS, LCN) an die Automationsbaureihe ems 4 ermöglichen. Weitere Integrationen wurden im Bereich Brandschutzklappensysteme der D&S Steuerungssysteme Köln GmbH über Modbus over Ethernet sowie im Bereich Zähleraufschaltung der Aquametro Messtechnik GmbH über Webservice over Ethernet durchgeführt. The modern restoration of the four-wing building took place in two construction phases. Beginning in July 2004 and continuing in March 2006, the structure and building technology of the castle were restored and modernised. Today, Freudenstein Castle is one of Freiberg’s most modern buildings. To meet this challenge, the BACnet world standard was used in the field of building automation and building management. On the one hand, this was due to the comprehensive implementation of the existing as well as new building automation into a unified management system. On the other hand, it was due the effective observation of economic considerations regarding initial and follow-up investments and also the operation of systems in accordance with convenience-related and energy standards. BACnet Building Controller (B-BC) In the public bidding that followed, elektro-union freiberg anlagenbau-, handels- und service GmbH won with the help of GFR mbH‘s partial bid. In December 2006, GFR received the contract to construct the building automation and building management. In the key areas, the overall concept includes in- novative GFR products from the B-BC automation series: ems 4.CP03B-BAC as well as the web service-based building management system BACnet Operator Workstation (B-OWS) WEBVISION. Local operation takes place via Ethernet using a laptop on the B-OWS WEBVISION building management system. B-OWS WEBVISION is connected to the Internet via a firewall for damage support and on-call service support. Automatic forwarding of malfunction messages as text messages, faxes and e-mails allows decentralised support of the system via Internet dial-in. Complete integration The scope of the building management is reflected in the complete integration of entire system sections of building technology. This applies to the connections of the PRIVA existing systems via a BACnet gateway and to the new GFR control systems for all ventilation, air conditioning, heating and cooling systems of the new investment. For homogenous and, most importantly, energyoptimised control of the new systems, all Grundfos circula- tion pumps and all Danfoss frequency inverters have been connected to the GFR automation system B-BC ems 4.CP03B-BAC via the geniBus and via the has been carried out in the field of fire protection flap systems from D&S Steuerungssysteme Köln GmbH via Modbus over Ethernet as well as in the field of connecting meters from Aquametro Messtechnik GmbH via Webservice over Ethernet. Olaf Durst GFR - Gesellschaft für Regelungstechnik und Energieeinsparung mbH [email protected] www.gfr.de BACnet Europe Journal 10 03/09 31 Ideenreichtum für die Welt von morgen Damit aus einer Vision Wirklichkeit wird, muss man das Unmögliche behandeln, als wenn es möglich wäre. Wir von Johnson Controls arbeiten daran, das Leben lebenswerter zu gestalten und die Orte zu verbessern, an denen die Menschen ihre Zeit verbringen. Dafür optimieren unsere Spezialisten Prozesse und planen maßgeschneiderte Lösungen für Ihre Industrieanlagen und Gebäudesysteme. Von Lüftung, Klima und Kälte bis zur Sicherheits-, Steuer- und Regelungstechnik: wir haben für viele Anwendungen die passende technische Antwort – und die entscheidenden Ideen, damit aus Ihren Visionen Wirklichkeit wird. Für mehr Energieeffizienz, mehr Qualität und mehr Verlässlichkeit in Ihrem Betrieb. Wann sprechen wir über Ihre Ideen? JOHNSON CONTROLS SYSTEMS & SERVICE GMBH | TELEFON: 0621 / 468-601 | FAX: 0621 / 468-314 | WWW.JOHNSONCONTROLS.DE Anwendungen Solutions BACnet an der Universität Amsterdam BACnet at the University of Amsterdam Acelia, Tochter der ARCOM Group Frankreich realisierte an der Universität von Amsterdam ein neues Konzept der Integration. Acelia, subsidiary of ARCOM Group France, realized a new concept of integration at the University of Amsterdam. 600 IRC-MS/TP BACnet Integrated Room Controllers wurden 2008 im Science Park (FNWI) der Univer sität Amsterdam installiert. Dieser umfasst 300.000 m² an Bürofläche, Laboratorien und Lehrgebäuden. Die enge Zusammenarbeit mit Johnson Controls, die mit dem “Metasys System Extended Architecture” beteiligt sind, ermöglichte den ersten Installationsschritt, bei dem der integrierte Raum-Regler in jedem Büro eine umfassende Lösung mit MultiEnergie-Management bot. HVAC Karno Regler Der HVAC Karno® Regler ist per digitalem Link direkt mit den Dalilon® Add-On “Licht” Modulen verbunden. Der Karno® Regler zur Kontrolle von Heiz- und Klimageräten, wird direkt auf dem HLK Gerät installiert. Er kontrolliert die Ventilatorgeschwindigkeit und verfügt über ein Wärmeventil zur Beheizung und ein Kälteventil zur Kühlung. Er ist zudem in der Lage, einen 0-10 VDC Ventilationsmotor mit variablen Geschwindigkeiten anzutreiben und somit die Luftqualität per Lufterneuerung zu regulieren. Die Dalilon® Licht Add-Ons ermöglichen An/Aus- oder Dimmer Modi für die Beleuchtung abhängig vom Benutzungsstatus. Sonnenblenden Add-On-Module können ebenfalls hinzugefügt werden. Alle Module können in der Decke installiert werden, in der Nähe der Lichtoder Sonnenblendenregelgeräte oder auch direkt auf dem HVAC Equipment. Es steht ein RJ9 Reglereingang zur Anbindung von Ausrüstungsteilen wie auch von fest verdrahteten Raumgeräten, einem IR- oder RF-Receiver oder einem Multisensor zur Anwesenheitserkennung und Kontrolle des Luxlevels zur Verfügung. Acelia – eine Vertriebstochterfirma der ARCOM Gruppe – Spezialist in der Gebäudeautomation, profitiert seit über zehn Jahren von der Expertise seiner R&D Abteilung. Ihre Fachgebiete liegen in den Bereichen HLK, Beleuchtung und Sonnenblenden. 2008 realisierten Acelia und seine R&D Abteilung das Design für den ersten BACnet MS/TP Multi-Energie-Regler (B-ASC: BACnet Application Specific Controller), dem IRC-MS TP BACnet. der Produktpalette bis zu interoperablen Protokollen. Acelia wird seine multitechnologische Expertise in den nächsten Jahren weiter ausbauen. Die Haupterfolgsfaktoren werden neue Angebote für BACnet und LON Netzwerke, Lösungen die den Anforderungen der neuen Umweltstandards gerecht werden sowie Drahtlosgeräte auf der Basis von EnOcean Technologie sein. Acelias pro-aktiver Ansatz könnte die Antwort für Endnutzer sein, die die Gebäudesysteme standardisieren und ihre Ausgaben kontinuierlich kontrollieren und optimieren möchten. Neue, kosteneffektive Lösungen werden helfen, energieeffizientere und intelligente Reglersysteme anbieten zu können. Acelia wird die BACnet Innovation auf der ISH Messe im März 2009 in Frank- furt, Deutschland, vorstellen (BACnet Stand Halle 10.2 D60). 600 IRC-MS/TP BACnet Integrated Room Controllers have been installed in 2008 in the Science Park (FNWI) of the University of Amsterdam. This comprises 300,000 m² of office space, laboratories and educational buildings. The close collaboration with Johnson Controls that already contributed a BMS “Metasys System Extended Architecture”) allowed the first step of the installation, where the Integrated Room Controller gives a global solution and multi-energy management in each office. HVAC Karno controller The HVAC Karno® controller is directly connected by digital link to Dalilon® addon “Light” modules. controller, The Karno® 2009 ist ein globales Angebot von BACnet Technologien für Automation im tertiären Bausektor verfügbar. Dieses enthält das Laden von HLK-Produktsoftware über das Netzwerk mit Hilfe eines benutzerfreundlichen Softwaretools zur ReKonfigurierung von Büros in Gebäuden, das mit der Newron Software erstellt wurde. Ausbau der Experise Die R&D Abteilung macht 10% des Gesamtgewinns der ARCOM Gruppe aus und ihre Expertise erstreckt sich von der Entwicklung Fakultät der Wissenschaft – Universität Amsterdam – Johnson Controls/Acelia. Faculty of Science (FNWI) – University of Amsterdam – Johnson Controls/Acelia. BACnet Europe Journal 10 03/09 33 Anwendungen Solutions Der HVAC Karno Regler. The HVAC Karno controller. dedicated to heating and air conditioning devices control, is directly installed on the HVAC device: it controls fan speed and has one warm valve for heating and one cold valve for cooling. It can also drive a 0-10 VDC variable speed fan motor for managing the air quality via air renewal. Dalilon® Light add-on modules allow on/ off or dimming modes for lighting, depending on the occupancy status. Sunblind add-on modules can be also added. All modules can be installed into the ceiling, near lighting or sunblind devices, or directly on the HVAC equipment as well. A RJ9 control input is available to connect accessories such as a hard-wired room device, an IR or RF receiver or a multi sensor for presence detection & monitoring lux level. Acelia, a sales subsidiary of ARCOM group – specialist in building automation, benefits from the expertise of its R&D department for more than 10 years. Their know-how is in the fields of HVAC, lighting & sunblinds. In 2008, Acelia and its R&D department carried out the design of the first BACnet MS/TP Multi Energy Controller (B-ASC: BACnet Application Specific Controller), the IRC-MS/TP BACnet. In 2009, a global offering in BACnet technology dedicated to automation in tertiary building areas will be available. This will include loading HVAC products software through the network and a user-friendly software tool designed with Newron System for reconfiguring offices within building. More expertise The R&D department represents 10% of the ARCOM group turnover and its expertise evolves through product range design based on interoperable protocols. Acelia is consolidating its multi-technology expertise in the following years. Its key success factors will concern new offers on BACnet and LON networks as well as solutions answering to new environmental standards and wireless devices based on EnOcean technology. Acelia’s proactive approach may give the answer to the needs of end users who want to standardize building systems and continually optimize and control expenses. New cost-effective solutions will help deliver more energy-efficient and intelligent control systems. Acelia will show BACnet innovation at the ISH fair in March 2009 in Frankfurt, Germany (BACnet booth Halle 10.2 D60) Raphaëlle Rechagneux Marketing Manager HVAC - Light - Sunblind Management ARCOM Group raphaelle.rechagneux@ groupe-arcom.com www.acelia.eu 34 BACnet Europe Journal 10 03/09 Anwendungen Solutions Moderne Gebäudeautomation für das Deutsche Raumfahrt-Kontrollzentrum Modern Building Automation for the German Space Operations Centre Bei der Erneuerung der MSR-/GLT-Technik im Deutschen Raumfahrt-Kontrollzentrum in Oberpfaffenhofen setzte das Deutsche Zentrum für Luft- und Raumfahrt (DLR) auf zertifizierte BACnet-Produkte des Gebäudeautomations systems von Neuberger. Modernization of the ICA/BMS technology in the German Space Operations Centre at Oberpfaffenhofen the German Aerospace Centre DLR relies on certified BACnet products from the Neuberger product line. Der Standort Oberpfaffenhofen des Deutschen Zentrums für Luft- und Raumfahrt (DLR) zählt mit 1500 Mitarbeitern und acht wissenschaftlichen Instituten zu den größten Forschungszentren in Deutschland. Schwerpunktmäßig beschäftigt man sich mit Weltraummissionen, Luftfahrttechnik, Klimaforschung, Navigationstechnik (Galileo) und Robotertechnik. Als Aushängeschild gilt das Deutsche RaumfahrtKontrollzentrum. Dort erfolgt die Überwachung von Satelliten und des europäischen Forschungslabors Columbus an der internationalen Raumstation ISS. Für diese Aufgaben übernimmt ein Hochleistungsrechenzentrum die gesamten Kontroll-, Speicher- und Kommunikationsaufgaben. Umbau während des Betriebs Dass hinter soviel zukunftsgerichteter Hochtechnologie eine zuverlässige Gebäudeautomation stehen muss, ist selbstverständlich. Das DLR entschloss sich daher, die MSR- und GLT-Technik des gesamten Gebäudekomplexes zu erneuern. Besondere Anforderungen waren ein unterbrechungsfreier Umbau während des laufenden Betriebs und hochverfügbare Automationsstationen für die Kälteversorgung des Rechenzentrums. Endprüfung einer PMC2-Automationsstation mit redundanter CPU. Final check of a PMC2 automation station with redundant CPU. Neuberger Gebäudeautomation erhielt den Auftrag zur Ausführung der MSR/GLTTechnik für die Gewerke Kälte, Heizung, Lüftung und Elektro. Zur Ausführung ka- men Automationsstationen PMC2, Touch PCs mit dem Leitsystem ProGrafNT als Mensch-Maschine-Interface. Die Kommunikation erfolgt über BACnet/IP. Die eingesetzten BACnet Building Controller (B-BC) entsprechen dem BACnet-Protokollstandard ANSI/ASHRAE 135-2004, DIN EN ISO 16484-5 und gehören zu den ersten im Jahre 2008 BTLzertifizierten Produkten nach Teststandard ANSI/ ASHRAE 135.1, DIN EN ISO 16484-6. Mensch-Maschine- Interface MMI Die Informationsschwerpunkte sind mit Touch PCs (Mensch-Maschine-Interfaces) ausgerüstet. Die Verbindung untereinander und mit allen Automationsstationen PMC2 ist über BACnet/ IP realisiert. Mit dem Leitsystem ProGrafNT ist eine intuitive Bedienung und Überwachung der Anlagen direkt vor Ort möglich. Da die Rechenzentren äußerst zuverlässig mit Kühl energie versorgt werden müssen, ist die Anforderung an die MSR/GLT-Technik entsprechend hoch. Um diesem Umstand Rechnung zu tragen, sind diese Anlagen mit redundanten CPUs ausgestattet. Eine Watchdog-Funktion überwacht die aktive CPU und startet im Fehlerfall die Standby-CPU. Nahtlose Integration Auf der Feldbusebene kamen verschiedene Bussysteme zur Ausführung: Kältemaschinen, Klima schränke (für Kontroll-, Server- und Büroräume) und Elektrozähler mittels LON Brandschutzklappen über den AS-i Bus Notstromaggregate und USV-Anlagen via Modbus Die Anbindung der gesamten Anlage an die übergeordnete Managementebene eines anderen Fabrikats erfolgte über BACnet/IP. Die Ausführung bei laufendem Betrieb war eine besondere Herausforderung, die aber bewältigt werden konnte – nicht zuletzt durch die gute Zusammenarbeit aller Beteiligten. The German Aerospace Centre (DLR) at Oberpfaffenhofen is one of the largest research centres in Germany and is home to 8 scientific institutes BACnet Europe Journal 10 03/09 35 Anwendungen Solutions and currently employs approx. 1,500 people. The main fields of research activities include participating in space missions, aerotechnics, climate research, development of navigation systems (Galileo) and robotics. The German Space Operations Centre is the most prominent space establishment at its Oberpfaffenhofen site and is responsible for the monitoring of satellites as well as the European Research Lab Columbus on board of the International Space Station ISS. A high-performance computer centre is assigned to the overall control, storage and communication duties. Modification at running operation It is a matter of course that this future-oriented high technology requires a reliable building automation system. Therefore, the DLR site decided to modernize the ICA and BMS technology of the entire complex of buildings. An uninterrupted modification at running operation as well as highly available automation stations for the cold air supply of the computer centre had to be guaranteed. Neuberger Gebäudeauto mation received the order to execute the ICA/BMS tech- (Foto: DLR) Blick in das Columbus-Kontrollzentrum während der Überwachung eines Satelliten. View to the Columbus Flight Control Centre during monitoring of a satellite. nology for the cooling, heating, ventilation and electric section. Thus the automation stations PMC2, Touch PCs with the ProGrafNT monitoring system as a manmaschine-interface could be realized. The communication is realized via BACnet/IP. The used BACnet Building Controller (B-BC) comply with the BACnet protocol standard ANSI/ASHRAE 135-2004, DIN EN ISO 16484-5 and is one of the first products which has been BTL certified in 2008 according to the ANSI/ASHRAE 135.1, DIN EN ISO 16484-6 test standard. Man-Machine-Interface MMI The set of controllers are equipped with Touch PCs (Man-Machine-Interfaces). The connection with all PMC2 automation stations is realized via BACnet/IP. The ProGrafNT monitoring system enables intuitive operation and monitoring of the plants directly on site. rooms) and electric counter by means of LON Fire dampers via AS-i Bus Emergency power generator and UPS units via Modbus The connection of the overall system to the superordinate management level of another product has been realized via BACnet/IP. To realize the project at running operation was a great challenge – but it was managed due to the good cooperation of all parties concerned. As the computer centres have to be reliably supplied with cooling energy, the ICA/BMS technology requirements are very high. To comply with these requirements the plants are equipped with redundant CPUs. A Watchdog function monitors the active CPU and starts the Standby CPU in case of any failure. (Foto: DLR) Blick auf das Deutsche Zentrum für Luft- und Raumfahrt, Standort Oberpfaffenhofen. View to the German Aerospace Centre at Oberpfaffenhofen site. 36 BACnet Europe Journal 10 03/09 Seamless integration On fieldbus level the following bus systems have been realized: Cooling machine, conditioning cabinets (for control, server and office Karl Heinz Schwartz Neuberger Gebäudeauto mation GmbH & Co. KG Technischer Vertrieb karlheinz.schwartz@ neuberger.net www.neuberger.net BACnet insight Offene BACnet Systeme und LEED 2009 LEED 2009 and Open BACnet Systems Bill Swan1 Die LEED 2009 Bewertungssysteme zeigen auf, wie Gebäude auf ihrem Weg zum „grünen Gebäude“ energie effizienter gestaltet werden können. Die Methoden werden in Form von Guthabenpunkten dargestellt, die ein Gebäude erreichen kann. Die LEED Zertifizierung erfolgt in vier Stufen: LEED zertifiziert (40 bis 49 Punkte) Silber (50 bis 59) Gold (60 bis 79) und Platin (80 bis 110). Systeme zur MSR- und Beleuchtungssteuerung können LEED Punkte erlangen, aber diese Systeme alleine erreichen relativ wenig, nämlich durchschnittlich nur jeweils etwa vier Punkte. Aber bestehende Leistungsmerkmale von BACnet Gebäude automationssystemen und die erhöhte Integration von Gebäude systemen können heute bereits auf andere Weise genutzt werden, um mehr LEED Punkte zu erlangen und den Weg frei zu machen für energieeffizientere Strategien von morgen. Erreichen von LEED Punkten Die Anzahl der zu erreichenden Punkte sind in den verschiedenen LEED Bewertungssystemen unterschiedlich, aber im Allgemeinen können sie in fünf (vereinbarte) Bereiche aufgeteilt werden: Trinkwasserverbrauch, Lichtsteuerung, Sensoren, Messung und Überwachung sowie das Gebäudeautomationssystem. 1. Trinkwasserverbrauch Der Verbrauch von Trinkwasser, obwohl weniger aufbereitetes Wasser genutzt werden könnte, stellt eine versteckte, aber große Energieverschwendung dar. Ein System zur Reduzierung des Trinkwasserverbrauchs sammelt Regenwasser, Kondenswasser von Klimaanlagen und/ oder Schmutzwasser und verwendet dieses zur Toilettenspülung oder zur Bewässerung. Hiermit können zwischen 7 bis 14 LEED Punkte erreicht werden. Mithilfe des Gebäudeautomationssystems kann der Wasserspiegel in den Lagertanks überwacht werden und auf städtisches Wasser umgeschaltet werden, wenn der Stand zu niedrig ist. Bei Bedarf können auch die Pumpen betrieben und die Nutzungsdauer der Wasserfilter über- wacht werden. Extra LEED Punkte werden erreicht durch die Aufzeichnung des Trinkwasser- und Brauchwasserverbrauchs. Das Alarmsystem kann auch Fehler und Wartungs erfordernisse melden. 2. Lichtsteuerung Deutliche Energieeinsparungen und zwischen 1 bis 5 Punkte bei der LEED Zertifizierung können durch eine automatische Beleuchtungssteuerung erreicht werden. Punkte gibt es außerdem für die Nutzung von Tageslicht, indem die Intensität des „künstlichen“ Lichts in Abhängigkeit zum Tageslicht, das von draußen hereinfällt, gesteuert wird. Weitere Punkte können durch die Nutzung von Auslastungssensoren, um 75 Prozent oder mehr von der Beleuchtung zu steuern, erreicht werden. sowie des GebäudemanagementBetriebs kann zwischen 3 und 24 Punkten einbringen, wenn verifiziert werden kann, dass das Gebäude ordnungsgemäß betrieben wird. Dies umfasst das Auslösen von Alarmen, wenn das System zu weit von den Vorgaben abweicht. Zusätzlich sorgt LEED dafür, dass die Mieter für ihren gemessenen Energieverbrauch zahlen. 5. Gebäudeautomationssystem Die letzte Kategorie ist das Gebäudeautomationssystem selbst, in den LEED Standards spezifiziert mit Anforderungen für Bereichseinteilung, Effizienz oder Leistung. Einen Punkt erhält man für den Einsatz eines Gebäudeautomationssystems, das zumindest die MSR- und Beleuchtungssysteme steuert. Punkte erhält man aber auch durch eine reduzierte Intensität der Innenbeleuchtung (ausgenommen der Notbeleuchtung) um 50 oder mehr Prozent während der Nacht. Dies verringert nicht nur die „Lichtverschmutzung“, sondern spart auch Energie. Zeitlich begrenzte Überschreitungen, manuell oder durch Auslastungssensoren gesteuert, sind erlaubt. LEED Punkte können auch durch das Zurücksetzen der MSR-Systeme nach Plan und der Bestimmung der Auslastung erreicht werden. Weitere Punkte bringt der Einsatz von Diagnose-Programmen für Systemfehler einschließlich undichter AHU-Ventile, 24/7 manueller Übersteuerung und außerplanmäßiger Systemsteuerung. Die meisten Systeme definieren einzelne Steuerungen für die Hälfte oder mehr der Nutzer in individuellen Räumen sowie für gemeinschaftlich genutzte Räumlichkeiten. Schulklassenräume haben beispielsweise zwei “AN” Modi: Allgemeinbeleuchtung und Audiovisueller Modus. BACnet GA-System ist am besten geeignet Jedes halbwegs leistungsfähige Gebäudeautomationssystem kann die oben beschriebenen Strategien nutzten, um LEED Punkte zu erlangen. Aber im Zusammenhang mit energieeffizienten Gebäuden hat BACnet einen einzigartigen Vorteil gegenüber proprietären Systemen: Weil es auf einem offenen Standard basiert, ermöglicht das System, auch zukünftige Strategien hinzuzufügen, sobald diese entwickelt sind. 3. Sensoren Die Nutzung von Auslastungssensoren und CO2 Sensoren zur Steuerung des Gebäudemanagementsystems spart Energie und kann zwischen 1 und 8 Punkten einbringen. Die Nutzung von Auslastungssensoren für die Beleuchtung wurde bereits erläutert, sie können aber auch zum Einsatz kommen, um herauszufinden, ob bestimmte MSR-Bereiche belegt sind. Die CO2 Sensoren sind für die bedarfsgesteuerte Belüftung in dicht besetzten Bereichen oder zur Überwachung von natürlich belüfteten Bereichen ausgelegt. 4. Messung und Überwachung Die Messung, Überwachung und Aufzeichnung des Energieverbrauchs Neue Methoden zur Reduzierung des Energieverbrauchs eines Gebäudes werden sich auftun, während auch die Möglichkeiten von BACnet, mehr Gebäudesysteme zu unterstützen, wachsen werden. Zwei Systeme, die sich derzeit in der Entwicklung durch das BACnet Komitee befinden, sind erweiterte Beleuchtungs- und Zugangskontrollen. Es ist nicht schwer, die Vorzüge und Synergien zu erkennen, die sich durch die Kombination dieser Systeme ergeben. Als Antwort auf die steigende Energienachfrage und begrenzte Ressourcen entwickelt das BACnet Komitee außerdem eine standardisierte Kommunikation zwischen Gebäuden und Energieversorgern, um den Energieverbrauch des Gebäudes während der Spitzenzeiten durch reduzierte Nachfrage, Echtzeit-Preisgestaltung und andere Maßnahmen zu verringern. Wenn diese Strategien erst einmal entwickelt sind, können sie ebenfalls auf jedes BACnet-Gebäude übertragen werden. Mit einem BACnet-basierten Gebäudemanagementsystem können neue Möglichkeiten – entwickelt von Firmen, die heute noch nicht einmal existieren oder Technologien, die man sich heute nur schwer vorstellen kann – in bestehende Gebäude integriert werden. Das Einführen von BACnet in ein Gebäude öffnet den Weg zur Nutzung zukünftiger Technologien, die das Gebäude immer weiter ”ergrünen“ lassen. The LEED 2009 rating systems show how buildings may be made more energy-efficient as part of their becoming “green.” The methods are presented in the form of credit points which can earn the building LEED certification at four levels: LEED Certified (40 to 49 points) Silver (50 to 59) Gold (60 to 79) and Platinum (80 to 110). HVAC and lighting control systems can earn LEED points but these systems by themselves earn relatively few points, on average only around 4 points each. But existing capabilities of BACnet building automation systems, and increased integration of building systems, can be used in other ways to acquire more LEED points today and open the way for more energyefficiency strategies tomorrow. Earning LEED Points The number of points that can be earned are different in the different LEED rating systems, but generally they can be grouped in five (arbitrary) categories: potable water use reduction (PWR), lighting controls, sensors, measurement and monitoring, and building automation system (BAS). BACnet Europe Journal 10 03/09 37 BACnet insight 1. PWR Using potable (drinking) water where less-processed water could be used is a hidden waste of a lot of energy. A PWR system collects rainwater, air-conditioning condensation and/or greywater for uses such as flushing and irrigation and can earn from 7 to 14 LEED points. The BAC can monitor the water level in the storage tank, switch to municipal water when the tank is low, run the pumps when needed, and monitor water filter usage time. Extra LEED points can be earned by recording potable and non-potable water usage. The BAS alarm system can also report faults or maintenance requirements. 2. Lighting Significant energy savings can be achieved through automatic lighting control, and can earn from 1 to 5 points toward LEED certification. Points can be earned through “daylighting”: controlling light intensity in response to the amount of daylight entering from outside. Points can be earned using occupancy sensors to control 75% or more of the lighting. Points can also be earned by reducing the power of non-emergency interior illumination by 50% or more during the night; the intent is to reduce “light pollution” but it also saves energy. Time-limited overrides, manual or by occupancy sensors, are permitted. Most systems specify individual controls for half or more of building occupants in individual spaces as well as for shared spaces. School classrooms have two “on” modes: general illumination and audio-visual mode. 3. Sensors The use of occupancy sensors and CO2 sensors to control BAS operation can earn from 1 to 8 points, while also saving energy. The use of occupancy sensors for lighting has been noted, but they can also be used to determine whether HVAC zones are occupied. CO2 sensors are specified for demand-controlled ventilation in densely-occupied areas or to monitor naturally-ventilated areas. 4. Measuring and Monitoring Measuring, monitoring and recording energy consumption and BAS operation can earn from 3 to 24 points while verifying that the building is operating properly. This includes issuing alarms when system operation deviates too far from design. In addition, LEED encourages having tenants pay for their measured energy use. Sparen Sie so Energie? 5. BAS The final category is the BAS itself, specified in the LEED standards with zoning and efficiency or performance requirements. One point is earned for having a BAS that controls at least the HVAC and lighting systems. LEED points can be earned by controlling HVAC setbacks by schedule and occupancy detection. Points may also be earned by adding diagnostics for system faults including leaking AHU valves, 24/7 manual override, and unusual system operation. A BACnet BAS is suited best Any reasonably capable BAS can implement the strategies described above to acquire LEED points. But in the context of energy-efficient buildings, BACnet has a unique advantage over proprietary systems: As an open standard system, it allows future strategies to be added when they are developed. New methods for reducing a building’s energy consumption will arise as BACnet‘s capabilities expand to support more building systems. To name just two systems currently in development by the BACnet committee, advanced lighting controls and physical access control; it is not hard to see the advantages and synergies that can be gained by combining these systems. Responding to increasing energy demand and limited supply, the BACnet committee is also developing standardized communications between buildings and energy utilities in order to lower buildings’ energy consumption during times of peak demand through demand reduction, real-time pricing and other strategies. Once developed, these could be added to any BACnet building. With BACnet as the BAS, new capabilities – which could be developed by companies that do not yet exist or with technologies difficult to imagine today – can be integrated into existing buildings. Putting BACnet in the building opens the way to use future technologies to further “green” the building. Unser Analysesystem kennt die Schwachstellen. Kennen Sie sie auch? Wir beraten Sie gerne. www.itenos.de/energiesparen Tel.: 0800 / 44 33 440 · [email protected] Bill Swan, Honeywell/Alerton USA, ist Vizepräsident der BIG-EU. [email protected] Bill Swan, Honeywell/Alerton USA, is Vice-president of BIG-EU. [email protected] 1 38 BACnet Europe Journal 10 03/09 I.T.E.N.O.S. GmbH · Lievelingsweg 125 · 53119 Bonn BACnet insight BACnet MS/TP Geräte – Übersicht 2009 BACnet MS/TP Devices – Overview 2009 Uwe Haeseler1 BACnet/IP hat sich in der Management- und Automationsebene der Gebäudeautomation durchgesetzt. Erfahrene Planer fordern inzwischen wegen der einfacheren Integration BACnet auch für die Feldebene. Zu Recht, denn mit den mittlerweile am deutschen und europäischen Markt verfügbaren BACnet MS/TP-Geräten lassen sich immer mehr Aufgaben der Gebäudeautomation reali sieren. Technische Grundlagen von MS/TP sind in dem Artikel [1] erläutert, die Vorteile einer durchgängigen BACnet-Lösung in Projekten auf der Basis von MS/TP sind in Artikel [2] beschrieben (siehe Literaturangaben). Gateways vermeiden Gateways zu anderen Feldbusprotokollen bedürfen meist eines aufwändigen Engineerings für jeden Datenpunkt. Gerade bei nachträglichen Änderungen bzw. Erweiterungen kann das hohe Kosten nach sich ziehen. Weiterhin stellt ein Gateway stets einen „Flaschenhals“ für die zu übertragenen Daten dar. Für einen Router BACnet/IP zu BACnet MS/TP müssen lediglich wenige Parameter (Adressen) eingestellt werden. Bei nachträglicher Änderung von Datenpunkten bzw. der Anzahl der angeschlossenen Ge- räte ist kein erneutes Engineering der Router erforderlich. Ein erneutes, automatisches Auslesen des MS/TP-Netzwerks aktualisiert die Daten in der Gebäudeleittechnik. Übersicht Die Übersicht auf den nächsten Seiten enthält BACnet MS/ TP fähige Geräte, die am deutschen Markt und auch in vielen europäischen Ländern verfügbar sind, bzw. ab 2009 verfügbar sein werden. Die Geräte sind nach unterschiedlichen Einsatzzwecken (Function Type) gruppiert. Geräte mit fester bzw. konfigurierbarer Applikation ohne proprietäres Engineering Tool lassen sich besonders einfach integrieren. Unter Verwendung der Router BACnet/IP zu MS/TP können sogar Systemintegratoren, die selbst keine BACnet MS/TP fähigen Geräte im Produktportfolio haben, Geräte wie Frequenzumrichter, Raumregler bzw. Raumbediengeräte, Ventil- und Klappenstellantriebe, Pumpen usw. per BACnet komfortabel integrieren. Die Übersicht wird vom Autor fortgeführt, ergänzende Infor mationen sind willkommen! Dr.-Ing. Uwe Haeseler ist Leiter Gebäudeautomation der Axima GmbH (NL Berlin) und Mitglied der Arbeitsgruppe Technik der BIG-EU, [email protected] Dr.-Ing. Uwe Haeseler is Director of Building Automation of Axima GmbH and member of the working group technique of the BIG-EU, [email protected] 1 BACnet/IP has by now been firmly established at the management and automation levels of building automation. Experienced planners now require BACnet for field level also due to the ease of integration. Rightly so, because with the BACnet MS/TP devices now available in the German and European Market, it is possible to realize more and more building automation functions. Technical basics are explained in article [1], the benefit of a continuous BACnet solution based on BACnet MS/TP is described in article [2] (see literature). Avoid Gateways Gateways to other field bus protocols often require complex engineering for each data point. Especially additional changes or extensions can result in high costs. Furthermore, a gateway always represents a “bottleneck” for the data transmission. To configure a router from BACnet/IP to BACnet MS/TP, only few parameters (addresses) have to be adjusted. After an additional change of data points, no further router engineering is necessary. A re-scan of the MS/TP network refreshes the data in the building automation management software. Overview The overview presented on the next pages contains BACnet MS/TP devices which are available in the German and European markets or which will be available in 2009. The devices are grouped by their different function type. Devices with fix or configurable application can be integrated very easily. Using a router BACnet/IP to MS/TP, even system integrators who do not have BACnet MS/TP devices in their product portfolio can comfortable integrate devices such as frequency converters, room controls or room control panels, valves, pumps etc. via BACnet. The overview will be continued by the author, additional information is welcome! Literatur / literature: [1] Frank Schubert, Technische Details zum MS/TP Protokoll / Technical Details of the MS/TP Protocol, BACnet Journal 07 (11/07) [2] Uwe Haeseler, BACnet MS/TP – Integration und BACnet Feldbus / BACnet MS/TP – Integration and BACnet field bus, BACnet Journal 4 (04/06) BACnet Europe Journal 10 03/09 39 BACnet insight BACnet MS/TP devices Project Engineering BACnet Engineering Building Automation Application Engineering Tool Address Commission Physical I/O Access-Controller free programmable proprietary proprietary tool Yes No B-BC Analyser [Electro] free programmable proprietary directly No Yes B-SA BACnet Explorer without without directly No Optional Frequency Converter free configurable without directly Yes Frequency Converter free configurable without directly Frequency Converter free configurable proprietary directly Frequency Converter free configurable without directly Frequency Converter Function Type Schedule Trend-log BBMD MS/TP (Master/ Slave) Yes Yes Yes Yes Master Yes No No No Master Router No No No No --- Yes B-ASC No No No No Master Yes Yes B-ASC No No No No Master Yes Yes B-ASC No No No No Slave Yes Yes B-ASC No No No No Master Display Alarm BACnet Profile Management free configurable without directly Yes Optional B-ASC Yes No No No Master Gateway fix without directly Optional No B-ASC No No No No Master Gateway free configurable proprietary Webbrowser No No B-AAC Yes Yes Yes No Master Gateway free configurable proprietary Webbrowser No Optional B-AAC Yes Yes Yes No Master Gateway free configurable Webbrowser Webbrowser No No B-ASC No No No No Master Master HMI Touchscreen free programmable proprietary proprietary tool No Yes B-AAC Yes Yes Yes No HVAC-Controller free configurable Webbrowser Webbrowser Yes Optional B-ASC No No No No Master HVAC-Controller free programmable proprietary directly Yes Optional B-AAC Yes Yes No No Master HVAC-Controller free programmable Webbrowser Webbrowser No No B-BC Yes Yes Yes Yes Master HVAC-Controller free programmable proprietary proprietary tool Yes No B-BC Yes Yes Yes No Master HVAC-Controller free programmable proprietary proprietary tool Yes No B-AAC Yes Yes Yes No Master HVAC-Controller free programmable proprietary Webbrowser Optional Optional B-BC Yes Yes Yes Yes Master HVAC-Controller free programmable proprietary proprietary tool Yes Optional B-AAC Yes Yes Yes No Master HVAC-Controller free programmable proprietary proprietary tool No No B-BC Yes Yes Yes Yes Master HVAC-Controller free programmable proprietary proprietary tool Yes No B-AAC Yes Yes Yes Yes Master HVAC-Controller free programmable proprietary proprietary tool Yes No B-ASC No No No No Master HVAC-Controller free programmable proprietary Webbrowser Yes Optional B-AAC Yes Yes Yes Yes Master HVAC-Controller free programmable proprietary proprietary tool Optional Optional B-BC Yes Yes Yes Yes Master HVAC-Controller free programmable proprietary proprietary tool Yes Optional B-BC Yes Yes Yes Yes Master I/O unit without Webbrowser Webbrowser Yes No B-ASC No No No No Master I/O unit without Webbrowser directly Yes No B-SS No No No No Slave I/O unit without without directly Yes No B-ASC No No No No Master I/O unit without Webbrowser Webbrowser Yes No B-ASC No No No No Master I/O unit without proprietary directly Yes No B-SA No No No No Slave I/O unit without without directly Yes No B-ASC No No No No Master IP-MS/TP Router without Webbrowser directly No No Router No No No No Master IP-MS/TP Router free programmable proprietary proprietary tool No No B-BC Yes Yes Yes Yes Master IP-MS/TP Router without without Webbrowser No No Router No No No Yes Master IP-MS/TP Router without without Webbrowser No No B-ASC No No No Yes Master IP-MS/TP Router fix without Webbrowser No No B-AAC No No No Yes Master IP-MS/TP Router without without Webbrowser No No B-ASC No No No Yes Master IP-MS/TP Router free programmable proprietary Webbrowser Optional No B-BC Yes Yes Yes Yes Master IP-MS/TP Router free configurable Webbrowser Webbrowser No No Router Yes Yes Yes Yes Master IP-MS/TP Router without Webbrowser Webbrowser No No Router No No No Yes Master IP-MS/TP Router without Webbrowser Webbrowser No No Router No No No No Master Pump unit without without directly No No B-ASC No No No No Master Pump unit fix proprietary directly Yes Yes B-ASC No No No No Slave Room-Controller fix without directly Yes Yes B-ASC No No No No Master Room-Controller free programmable proprietary directly Yes No B-AAC Yes Yes Yes No Master Room-Controller free programmable proprietary proprietary tool Yes Optional B-AAC Yes Yes Yes No Master Room-Controller free configurable proprietary proprietary tool Yes No B-ASC No No No No Master Room-Controller free configurable proprietary proprietary tool Yes Optional B-AAC Yes Yes Yes No Master Room-Controller free programmable proprietary proprietary tool Yes Yes B-BC Yes Yes Yes No Master Room-Control-Unit fix without directly Yes Yes B-ASC No No No No Master Room-Control-Unit free programmable proprietary directly Yes Yes B-BC Yes Yes Yes No Master Room-Control-Unit free programmable proprietary directly Yes Yes B-AAC Yes Yes Yes No Master Room-Control-Unit fix without directly Yes No B-ASC No No No No Master Room-Control-Unit fix without directly No Yes B-ASC No No No No Master Room-Control-Unit free configurable proprietary proprietary tool Yes Yes B-AAC No Yes Yes No Master Sensor free configurable proprietary proprietary tool Yes No B-SS Yes No Yes No Master Valve [air] fix without directly Yes No B-ASC No No No No Master Valve [water] fix without directly Yes No B-ASC No No No No Master VAV-Controller free configurable proprietary directly Yes No B-ASC No No No No Master VAV-Controller free programmable proprietary proprietary tool Yes No B-AAC Yes Yes Yes No Master VAV-Controller free programmable proprietary proprietary tool Yes Optional B-AAC Yes Yes Yes No Master VAV-Controller free configurable proprietary proprietary tool Yes Optional B-AAC Yes Yes Yes No Master 40 BACnet Europe Journal 10 03/09 BACnet insight Vendor & Product Vendor ID 8 Vendor Name Model Name Market Availability (Germany) Other Delta Controls ASM-24 2005 up to 24 doors Janitza Electronics GmbH UMG 604 2008 Electro network analyser, programmable analyse functions 10 TAC RoamIO-2 2006 Portable for Notebook or Handheld, connection at MS/TP with access to the entire BACnet network 10 TAC FU21, FU61 2007 Green FCU with BACnet Interface 127 ABB, Inc. ACH-550 2004 169 Vacon Plc NX series Vacon 100 HVAC 316 2008/2009 2 loop controllers, optional I/O extension 1 or 2 PID loop controller, optional I/O extension, Vacon 100 HVAC series with BACnet/IP 189 Schneider Toshiba Inverter Europe Altivar 21 / Altivar 61 2007 190 Danfoss Drives A/S 2008 3 additional loop controllers, optional binary and analog I/O extension 142 Plueth Regelsysteme 2009 Receiver for wireless sensors 178 LOYTEC Electronics GmbH FC-102 mit MCA 109 - BACnet Wireless Receiver-BAC LGATE-900 2006 178 LOYTEC Electronics GmbH LINX-2xx series 2008 178 LOYTEC Electronics GmbH LDALI-ME204 2006 BACnet-LON Gateway (IP or MS/TP), csv Trend storage, Email notification BACnet Gateway (IP or MS/TP) for OPC XML/DA, MODBUS, M-Bus. Internal HMI, csv Trend storage, Email notification, optional IP-MS/TP-Router BACnet-DALI Gateway (IP or MS/TP), 4 DALI channels, up to 256 DALI devices 178 LOYTEC Electronics GmbH LVIS-ME200 2006 Touchscreen (5,7”, color), csv Trend storage, Email notification 5 Johnson Controls, Inc. FEC Controller Series 2008 field controllers with a wide range of HVAC control applications 5 Johnson Controls, Inc. FX Controller Series 2008 different I/O range from 17 to 29 5 Johnson Controls, Inc. NAE 2008 Higher level BACnet/IP device with MS/TP Router 8 Delta Controls DSC series 2005 diff. I/O configurations, applications and firmware flash loaded over network, Modbus support 8 Delta Controls DAC series 2005 diff. I/O konfigurations, applications and firmware flash loaded over the network, Modbus support 10 TAC bCX1-CR 2005 Fast BACnet IP to MS/TP Router Web-Interface, SNMP Alarming and Monitoring 10 TAC b3 920, b3 8xx serie 2004 Fast BACnet, expandable IO 18 Alerton / Honeywell BCM-ETH 2005 Router BACnet IP - Ethernet - MS/TP - PTP up to 1000 AV/BV 18 Alerton / Honeywell VLX 2004 Router BACnet IP - Ethernet - MS/TP - PTP designed for complex HVAC units 18 additional I/O units Alerton / Honeywell VLC 2003 designed for mechanical and electrical equipment 105 PRIVA BV TC BACnet Router with HX8E 2008 Universal BACnet Router with I/O extensions 159 SE-Elektronic GmbH E-DDC 3 2005 DDC, BACnet/IP, BACnet PTP, Router 159 SE-Elektronic GmbH E-DDC series 2009 3 types (E-DDC 4, E-DDC 5, E-DDC6), E-DDC 4 with Display, optional BACnet/IP Router 5 Johnson Controls, Inc. IOM 2008 I/O Expansion Module for FEC Series 5 Johnson Controls, Inc. I/O Modules 2008 I/O Expansion Module for FEC Series (hardware override) MBS GmbH I/O Modul series 2009 DI-24, AI-24 (PT1000 & 0..10V), DO-8 (manual overwrite) 245 Contemporary Control Systems, Inc. BAS Remote series 2008 6 Universal I/O Points, 2 Relay Outputs, Expansion Port (up to 32 I/O Points) 290 Romutec Steuer-u. Regelsysteme GmbH RCD6xx series 2009 Module series with different number and types of I/O (manual overwrite) 50 277 Functional Devices, Inc. RIB xxx 240xB-BC series 2009 Series with different number of I/O Small enclosure, ready for field installation 5 Johnson Controls, Inc. MS/TP-IP Router 2008 Universal BACnet/IP - MS/TP router 8 Delta Controls DSM-RTR 2005 BACnet PTP, IP, Ethernet, MS/TP 10 TAC bCX1-R 2005 Fast BACnet IP to MS/TP Router 50 MBS GmbH UBR-01 2008 200MB Free Space for document storage PRIVA BV TC BACnet Router 2008 Universal BACnet Router with Multiple MS/TP 105 127 ABB, Inc. RBIP-01 2008 Universal BACnet Router with Multiple MS/TP 142 Plueth Regelsysteme COSMOS OPEN series 2008 COSMOS 4000 OPEN and COSMOS 800 OPEN BACnet MS/TP - IP-Router, optional BACnet PTP 159 SE-Elektronic GmbH X-ROUTER 1 2009 178 LOYTEC Electronics GmbH LIP-ME201 2008 BACnet Router 245 Contemporary Control Systems, Inc. BAS Router series 2008 DIN Rail & portable version, up to 32 devices on local MS/TP bus 227 Grundfos Management A/S Clx 300 series 2009 Available as add-on module (CIM 300) or external box (CIU 300) 251 Wilo SE IF-Module BACnet series 2009 Universal BACnet plugin module for WILO pumps 5 Johnson Controls, Inc. TEC26XX Series 2008 for heating and cooling equipment specifically 8 Delta Controls DFC-3xx R3 series 2005 direct Fancoil control DIP switch / jumpers or software setup 10 TAC b3 867, b3 887 2004 Best Energy optimization, online programmable 89 Saia-Burgess Controls, Ltd. PCD7.L680 2009 Digital interface for one room control unit and light and sunblind extension modules 159 SE-Elektronic GmbH X-FCU 2 2009 Fan Coil Unit 159 SE-Elektronic GmbH X-RUS 2 2008 Modular system in shape of a light switch, flexible IO-Configuration with additional modules 8 Delta Controls DNS / DNT series 2005 field selectable applications 4 Configurable push buttons 8 Delta Controls DSC-T305 2005 diff. keypad konfigurations, 4/8/16 button keypad 8 Delta Controls DAC-T305, DNT-T305 2005 several keypad configurations (4/8/16 button), keypad or software setup 142 Plueth Regelsysteme PR-CORA-B 2008 Room control unit with extensive functions 142 Plueth Regelsysteme GALAXY-BAC 2009 Room control unit with extensive functions 159 SE-Elektronic GmbH X-RB 1 2008 Operator Display in shape of a light switch with temperature sensor 159 SE-Elektronic GmbH X-SRCO2 2009 CO2-Sensor 142 Plueth Regelsysteme PLDxx-24-BAC series 2009 Continuous air flap drives with additional sensor inputs 142 Plueth Regelsysteme PWD05-24-BAC 2009 Continuous ball valve drive with additional sensor inputs 5 Johnson Controls, Inc. VMA Series 2008 best control for variable air volume boxes. 8 Delta Controls DVC series 2005 opt. Belimo/Siemens actuator, different pressure sensor TAC b3 86x serie, b3 885 2007 Direct installable BACnet VAV-Box driver SE-Elektronic GmbH X-VAV 1 2009 VAV-Control unit 10 159 BACnet Europe Journal 10 03/09 41 BACnet insight Zeitschaltfunktionen in BACnet Schedule-integration in BACnet Frank Schubert1 Zeitschaltfunktionen, d.h. die zeitgesteuerte Auslösung von Kommandos an die betriebstechnische Anlage, spielen in der Gebäudeautomation eine wichtige Rolle. Zum Beispiel sollen Büroräume nach einem Wochenende bereits voll aufgeheizt sein, wenn die Nutzung beginnt. Diese Funktion soll – einmal vordefiniert – ohne Bedienereingriff automatisch an die Anlage gesendet werden (z. B. jeden Montagmorgen um 6:00 Uhr). Für diese Anwendungen spezifiziert der BACnet-Standard das Schedule-Objekt in Verbindung mit dem Kalenderobjekt. Der Vorteil dieser standardisierten Objekte liegt darin, dass diese Funkt ionen auch herstellerübergreifend verwendet werden können und somit neben dem einfachen Datenaustausch auch für diese qualifizierten GAFunktionen ein hoher Grad an Interoperabilität erreicht wird. Kalender Der Zweck des Kalenderobjektes ist es zu ermitteln, ob das aktuelle Tagesdatum einem der Einträge in der Datumsliste des Kalenders entspricht. So könnte z. B. der Kalender die Daten der lokalen Ferienzeiten enthalten. Anhand des aktuellen Wertes (PresentValue) des Objektes kann dann ermittelt werden, ob der heutige Tag einem Ferientag entspricht. Mögliche Einträge in der Datumsliste sind einzelne Daten, Datumsbereiche (von…bis) oder Einträge des speziellen Datentyps WeekNDay (dieser enthält zusätzliche Definitionen der Wochen eines Monats). Zeitplan Der Zweck des Zeitplanobjektes ist es, den Wochenschaltplan und/oder den Ausnahmezeitplan dezentral zu speichern und die Zeitschaltaktionen zu den jeweiligen Zeitpunkten auszuführen. Der Zeitplan kann zusätzlich auf einen Datumsbereich (EffectivePeriod) eingeschränkt werden (z. B. vom 1. März des Jah- res bis zum 31. Oktober). Zum jeweiligen Zeitpunkt schreibt das Zeitplanobjekt den im Zeitplan festgelegten Wert auf die in der Liste (ListofDeviceObjectPropertyReferences) festgelegten Eigenschaften. Neben der Möglichkeit, den Zeitschaltplan abzuschalten, die Schreibpriorität festzulegen, einen Vorgabewert zu definieren und den Zustand des Zeitplans abzubilden, existiert für den Ausnahmeschaltplan (ExceptionSchedule) eine weitere interessante Option. Kopplung von Kalender und Zeitplan Die Definition des Ausnahmezeitschaltplans, d. h. die Information, an welchem Datum oder Datumsbereich die Ausnahme wirken soll, kann entweder direkt im Ausnahmeplan festgelegt werden, als Alternative kann diese Information jedoch auch von einem Kalenderobjekt im gleichen Gerät entnommen werden. So lassen sich die Informationen über die Ausnahmefunktionen selbst von der eigentlichen Gültigkeit entkoppeln. Interoperabilitätsbereich Zeitschalten Der BACnet-Standard legt für Zeitschaltfunkt ionen zwei I n t e r o p e r a b i l i t ä t s b e r e i c h e (BIBBs) fest, SCHED-I-B (Internes Zeitschalten) und SCHEDE-B (Externes Zeitschalten). Beide Bereiche erfordern die Unterstützung von Kalender und Zeitplanobjekt, die Unterstützung von mindestens sechs Schaltzeiten pro Tag sowie der Möglichkeit, Ausnahmepläne zu definieren. Weiterhin muss Uhrzeitsynchronisation integriert sein. Beim Einsatz des externen Zeitschaltens könnte z.B. eine funktional größer ausgebaute Station (z. B. ein B-BC BACnet-Building Controller) diese Funktion stellvertretend für kleine Geräte übernehmen, die nicht über diese 42 BACnet Europe Journal 10 03/09 funktionalen Möglichkeiten verfügen. In der nächsten Ausgabe des BACnet Europe Journals folgt Teil 2 über Zeitschaltfunktionen, in welchem die Zusammenhänge und die Arbeitsweise dieser Funktionen im Detail erklärt und dargestellt werden. Schedule functions, i.e. scheduled commands to the facility, play a major role in building auto mation. For example the rooms in an office building may be heated before start of the working hours after a weekend. This function is expected to be provided – once defined – automatically without a manual operator (e.g. every Monday morning at 6:00 a.m.). For this, the BACnet standard specifies the schedule-object type in conjunction with the calendarobject type. The main advantage of these standardized objects is to assure a high level of interoperability far beyond just simple data-sharing, even between different manufacturers. Calender The purpose of the Calendar object is to determine, if the current date matches one of the entries specified in the date-list. E.g. a calendar object may contain a date-list of public-holidays. The present value of the object will provide the information, if the current date is a public holiday because it matches one of the entries in the list. Possible values in the date-list are single dates, date-ranges (from…to) or WeekNDay elements (which contain special definitions for adding weeks to the comparison). Schedule The purpose of the schedule object is to locally store the schedule-program (weekly or exception schedule) and to execute the schedule actions when they become effective. The effective period of the schedule program may be specified in a property contain- ing a date-range (e.g. program valid only from march, 1st until October, 31st). At the respective point of time the schedule object writes the associated value to the list of properties defined in the list of ObjectProperty-References. Besides the option to stop the schedule-execution (OutOfService), to define the write priority, to define a schedule-default and to provide the status (the “health”) of the schedule-object, an interesting application may be defined for exception schedule. Coupling calendar and schedule objects The definition for an exception schedule, i. e. the information at which date(s) the exception is active, may either be defined directly within the exception schedule or can alternatively be taken from a calendar object inside the same device. Using this allows separation of the exception program from the date range of validity of the exception. Interoperability area Scheduling For scheduling the BACnet standard defines two interoperability areas (BIBBs), SCHED-I-B (internal scheduling) and SCHED-E-B (external scheduling). Both areas require support for both calendar and schedule object types, at least 6 time-values per day and the requirement to support exception schedule. Additionally TimeSynchronization must be supported. Using external scheduling can realize schedule functions w ithin a “bigger” station like a B-BC (BACnet Building Controller) on behalf of smaller devices, where this functionality is not implemented. This article will be continued in the next issue of the BACnet Europe Journal explaining the relationships and the operating modes of both object types. BACnet insight Property Identifier Bedeutung Object_Identifier Eindeutige Adresse des Objektes innerhalb des Gerätes. Unique address of the object within the device. Object_Name Eindeutiger Name des Objektes innerhalb des Gerätes. Unique Name of the Object within the device. Object_Type 17 = Zeitschaltobjekt 17 = Schedule Object Present_Value Aktueller Zeitschaltwert des Zeitschaltprogramms Current value of the schedule-program Description Freier Beschreibungstext Free Description Text Effective_Period Datumsbereich, in dem der Zeitschaltplan Gültigkeit hat Range of dates within which the Schedule object is active Weekly_Schedule In dieser Eigenschaft wird der Wochenschaltplan abgebildet. This property represents the content of the weekly-schedule program. Exception_Schedule In dieser Eigenschaft wird der Ausnahmeschaltplan abgebildet. This property represents the content of the exception-schedule program. Vorgabewert für den Fall, dass kein anderer Wert durch den Zeitschaltplan vorgegeben wird. Liste der Eigenschaften, auf die der Zeitschaltplan die Werte schreibt. Schreibpriorität (vergl. Insight-Artikel im BACnet Europe Journal Ausgabe 8) Default value to be used for the Present_Value property when no other scheduled value is in effect Schedule_Default List_Of_Object_ Property_References Priority_For_Writing Status_Flags Reliability Out_Of_Service Profile_Name Diese Eigenschaft bildet den Zustand des Zeitschaltobjektes ab. Diese Eigenschaft bildet die Information ab, ob alle Konfigurationsinformationen des Zeitschaltplans konsistent sind. Bei Bedarf kann die Beeinflussung der zu schreibenden Eigenschaften von der Berechnung des Zeitschaltplans entkoppelt werden. Damit kann der Zeitschaltplan deaktiviert werden. Name eines Mappingprofils, falls das Objekt aus anderen Kommunikationssystemen als BACnet abgebildet wird. Meaning Properties to be written by the schedule-program. Write priority (refer to the insight article in BACnet Europe Journal issue 8) This property represents the status of the schedule-object. This property provides an indication that the properties of the schedule object are in a consistent state. Property which indicates that the internal calculations of the schedule object are used to determine the value of the Present_Value property or not. This property allows de-activating the schedule-program. Name of the mapping-profile, if the data-source is a non-BACnet communication system. Tabelle 1: Eigenschaften des Zeitpaln-Objektes sowie deren Bedeutung und Funktion. Table 1: Properties of the schedule object type and its meanings and functionalities. Property Identifier Bedeutung Meaning Object_Identifier Eindeutige Adresse des Objektes innerhalb des Gerätes. Unique address of the object within the device. Object_Name Eindeutiger Name des Objektes innerhalb des Gerätes. Unique Name of the Object within the device. Object_Type 6 = Kalenderobjekt 6 = calendar object type Present_Value Gibt an, ob das aktuelles Tagesdatum in der Datums liste enthalten ist (Kalender ist erfüllt) oder nicht (Kalender ist nicht erfüllt). Current value of the schedule-program Represents the information if or if not the current date matches the date-list. Description Freier Beschreibungstext Free Description Text Date_List Datumsliste innerhalb des Kalenders. Wird zum Vergleich mit dem aktuellen Tagesdatum verwendet. Date-list within the calendar-object. This is used to be compared against the current date. Profile_Name Name eines Mappingprofils, falls das Objekt aus anderen Kommunikationssystemen als BACnet abgebildet wird. Name of the mapping-profile, if the data-source is a non-BACnet communication system. Tabelle 2: Das Kalenderobjekt Table 2: The calendar object type. Frank Schubert, MBS GmbH, ist Mitglied des Advisory Boards und der Arbeitsgruppe Technik der BIG-EU sowie als Schulungsleiter der BACnet Interest Group Europe aktiv, [email protected] Frank Schubert, MBS GmbH, is active member of the Advisory Board and Working Group Technique of the BIG-EU as well as training-leader of the BACnet Interest Group Europe, [email protected] 1 BACnet Europe Journal 10 03/09 43 BACnet insight AMEV aktualisiert ihre BACnet-Empfehlung German AMEV updates BACnet recommendation Jürgen Hardkop1 Bernhard Hall2 Marius Hartel3 Im April 2008 stellten 14 Hersteller auf der Light+Building Messe die ersten zertifizierten BACnet-Produkte vor. Die Zertifikate des unabhängigen Prüfinstituts WSPLab attestieren die Konformität der BACnet Implementierung zum BACnet-Standard ISO 164845. Von dieser wichtigen Aktivität der BIG-EU ausgehend entwickelte der Arbeitskreis Maschinen- und Elektrotechnik staatlicher und kommunaler Verwaltungen (AMEV) eigene Initiativen mit dem Ziel, den BACnet-Anwendern weitere effiziente und aktuelle Arbeitshilfen zur Verfügung zu stellen. Im September 2008 beschloss der AMEV, die in der Fachwelt positiv aufgenommene AMEV-Empfehlung BACnet 2007 durch eine Erste Ergänzung 2009 zu aktualisieren. Die AMEV-Empfehlungen fließen auch in das Beiblatt 070-12 BACnet des Gemeinsamen Ausschuss Elektronik im Bauwesen beim Bundesamt für Bauwesen und Raumordnung (GAEB) ein (siehe Artikel auf Seite 45). Als Entscheidungshilfe dient dem AMEV u. a. eine Marktübersicht der zertifizierten BACnet-Geräte auf der Grundlage der veröffentlichten Zertifikate und PICS (siehe Abbildungen 1 und 2). Die Abbildung 1 enthält eine Auswahl der marktgängigen BACnet-Objekttypen mit Angabe der AMEV-Empfehlungen für BACnet-AS und einer Übersicht der 14 zertifizierten BACnet- Geräte, die nach Standard-Geräteprofilen sortiert sind. Zu jedem Gerät wird angegeben, welche BACnet-Objekttypen es unterstützt. Die Abbildung 2 bündelt die BACnet-Dienste (BIBBs) für BACnet-Controller (B-BC) mit den AMEV-Empfehlungen für BACnet-AS und gibt für jedes zertifizierte BACnet-Gerät an, welche BIBBs es unterstützt. Hohe Konvergenz Die Konvergenz zwischen den AMEV-Empfehlungen und den zertifizierten BACnet-Produkten ist erfreulich hoch. Dem von AMEV und BIG-EU gemeinsam angestrebten Ziel, eine möglichst große Übereinstimmung zwischen den Anwenderwünschen und den Marktangeboten der BACnet-Hersteller zu erreichen, kommt man Schritt für Schritt näher. Zusätzlich hat der AMEV im Herbst 2008 einen Erfahrungsaustausch für herstellerneutrale Vernetzungen bestehender GA-Inseln durchgeführt. Die Fragen des AMEV und die Antworten der Länder, Städte, Bundesverwaltungen, Hochschulen und GA-Planer sind auf der AMEV-Homepage veröffentlicht: http://www.amevonline.de/Fib_dat/amev-i-erfahrung.htm Mehrere erfahrene Einsender betonen, dass genaue Planungen und Vorgaben der BACnet- spezifischen Parameter für die reibungslose Funktion unabdingbar sind. Die Bauherren, Betreiber und Planer müssen die benötigte BACnet-Funktionalität im Vorfeld eindeutig festlegen und dokumentieren. Mit dem Beiblatt BACnet des GAEB, der AMEVMarktübersicht und den aktualisierten BACnet-Empfehlungen des AMEV stehen dafür neue Arbeitshilfen zur Verfügung, die mit der BIG-EU abgestimmt worden sind. Es wird empfohlen, die neuen Arbeitshilfen nicht nur für die eindeutige Definition der gewünschten BACnet-Funktionen in herstellerneutralen Ausschreibungen, sondern auch in Lasten- und Pflichtenheften, für BACnet-TAB und Migrationskonzepte zu verwenden. Der AMEV veröffentlicht die vollständige, aktualisierte Markt übersicht (einschließlich BACnet Properties) und die neue BACnetErgänzung 2009 auf seiner Home- 44 BACnet Europe Journal 10 03/09 page: http://www.amev-online. de/Fib_dat/amev-i-empfehl-planbacnet.htm#download. In April 2008, 14 manufacturers presented the first certified BACnet products at the Light+Building fair. The certificates of the independent Testing Institute WSPLab attest the conformance of the BACnet implementation to the BACnet standard ISO16484-5. The AMEV (Working Group of the Mechanical and Electrical Engineering of National, State and Local administrations) – basing on the activity of the BIG-EU - developed its own initiatives to offer BACnet users other efficient and current work aids. In September 2008, the AMEV decided to update the recommendation BACnet 2007, that has been affirmatively registered by experts, with the 1. supplement 2009. The AMEV recommendations are included in the new Annex 070-12 BACnet of the Joint Committee for Information Technology in the Construction Industry (Fed. Ministry for Construction) (GAEB) (see article on page 45). An overview of certified BACnet devices - based on published certificates and PICS – provides AMEV, amongst others, as a decision supporting tool (see Figure 1 and 2). The Figure 1 contains a selection of standard BACnet object types, with a specification of the AMEV recommendations for BACnet AS (automation station) and an overview of the 14 certified BACnet devices, sorted according to the standard device profiles. For each device the supported BACnet object types are specified. The Figure 2 combines the BACnet services (BIBBs) for BACnet controller (B-BC) with AMEV recommendations for BACnet AS and specifies the supported BIBBs for each certified BACnet device. High Convergence The convergence between the AMEV recommendations and the BACnet-certified products is highly gratifying. The joint target of AMEV and BIG-EU to achieve the widest possible compliance between the user desires and the market offers of BACnet manufacturers will be accomplished step by step. In the autumn of 2008, the AMEV arranged an experience exchange concerning an integration of existing GA-Subsystems in vendor- neutral networks, additionally. The questions of AMEV and the answers of the states, cities, federal administrations, universities and BAC planners are published on the AMEV homepage: http://www.amev-online.de/Fib_ dat/amev-i-erfahrung.htm. Several experienced respondents accent that a detailed design and specification of the BACnet-specific parameters is essential for the smooth functioning. The Building owners, operators and planners need to define and clearly document the required BACnet functionality previously. With the new BACnet Annex of GAEB, the AMEV market overview and the updated AMEV BACnet recommendations new, effective work supporting tools – coordinated with BIG-EU – are provided. It is recommended to use the new work supporting tools not only for vendor-neutral biddings of tenders but also for system requirements/specifications for planning, BACnet technical connection conditions and migration concepts. The AMEV published the complete, updated market overview (including properties) and the BACnet Supplement 2009 on the AMEV homepage: http://www.amev-online.de/Fib_dat/amev-i-empfehlplan-bacnet.htm#download. BACnet insight X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X * Quelle: BIG-EU Produktliste Europa für geprüfte BACnet-Konformität (http://www.big-eu.org/conformance/listeu.php) Abbildung 1: Auswahl der marktgängigen BACnet-Objekttypen. Figure 1: Selection of standard BACnet object types. ReadProperty-A ReadProperty-B ReadProperty Multiple-A ReadProperty Multiple-B WriteProperty-A WriteProperty-B WriteProperty Multiple-B COV-Support-A COV-Support-B COV-Unsolicited-A COV-Unsolicited-B 3 DS-RP-A DS-RP-B DS-RPM-A DS-RPM-B DS-WP-A DS-WP-B DS-WPM-B DS-COV-A DS-COV-B DS-COVU-A DS-COVU-B Alarm and Event-Notification Internal B AE-N-I-B Alarm and Event-ACK-B AE-ACK-B Alarm and Event-Alarm-Summary-B AE-ASUM-B Alarm and Event-Enroll-Summary-B AE-ESUM-B Alarm and Event-Information-B AE-INFO-B Scheduling-Internal-B SCHED-I-B Scheduling-External-B SCHED-E-B Viewing and Modifying Trends-Internal-B T-VMT-I-B Automated Trend Retrieval-B T-ATR-B Dynamic-Device-Binding-A DM-DDB-A Dynamic-Device-Binding-B DM-DDB-B Dynamic-Object-Binding-A DM-DOB-A Dynamic-Object-Binding-B DM-DOB-B DeviceCommunicationControl-B DM-DCC-B TimeSynchronization-B DM-TS-B UTCTimeSynchronization-B DM-UTC-B Reinitialize Device-B DM-RD-B Backup and Restore-B DM-BR-B Connection Establishment-A NM-CE-A 15 16 4 5 6 7 8 9 10 11 12 A A B B A A B A A B B A A 0 B A A B B B A A A A A A A A A B A A B B A A B A A B B A A B 0 A A B B B A A B A A A A A A B X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X MBS UGW Rev. 1.2 A A A A A A A A A A A A A B B B B 1 2 3 4 7 8 10 11 12 15 16 18 21 23 25 27 31 32 34 37 38 39 40 41 43 49 51 53 55 64 Sauter EY-AS525F001 18 TAC Andover bCX1-CR 17 Priva TC BACn. Router + HX 8E 16 Siemens Desigo PXC22-E.D 15 Samson Trovis 6610-0000 14 Plüth Cosmos 4000 Open 13 SAIA PCD3.M5540 +Modul PCD7.R560 12 14 Neuberger PMC2 MBS UGW Rev. 1.2 11 13 K&P DDC4000 DDC4200 Sauter EY-AS525F001 10 B-ASC HSC Pro-B. Modell 1.00 TAC Andocer bCX1-CR Priva TC BACnet Router + HX 8E 9 B-AAC JCI NCE MS-NCE2510-0 Siemens Desigo PXC22-E.D 8 Honeywell XL1000C1000 Samson Trovis 6610-0000 7 AS (1. Erg. 2009) Plüth Cosmos 4000 Open SAIA PCD3.M5540 +Modul PCD7.R560 6 Kurzbez. (Norm) 2 Delta DCE DSC-1212E Neuberger PMC2 5 1 AS (BACnet 2007) K&P DDC4000 DDC4200 4 Lfd. Bezeichnung Nr. (Norm) Stand: 16.09.2008 Unterstützung bei Standard-Geräteprofil: B-BC X X X X X X X 0 0 X X X X 0 X X 0 X X X X X X X X X3) X3) X X X B-ASC HSC Pro-B. Modell 1.00 Analog Input 2 Analog Output 3 Analog Value 4 Binary Input 5 Binary Output 6 Binary Value 7 Calendar 8 Device 9 Mehrstufige Eingabe Multi-state Input 10 Mehrstufige Ausgabe Multi-state Output 11 Mehrstufiger Wert Multi-state Value 12 Meldungsklasse Notification Class 13 Zeitplan Schedule 14 Datei File 15 Trendaufzeichnung Trend Log 16 Ereigniskategorie Event Enrollment 17 Regler Loop 18 Mittelwert Averaging 19 Gruppenauftrag Command 20 Gruppeneingabe Group 21 Programm Programm 1 Analogeingabe Analogausgabe Analogwert Binäreingabe Binärausgabe Binärwert Kalender Gerät 3 B-AAC JCI NCE MS-NCE2510-0 Bezeichnung (Norm) 2 Standard-Geräteprofil: B-BC Honeywell XL1000C1000 1 Unterstützte BIBBs * BIBBs (Auszug aus DIN EN ISO 16484-5:2007) Delta DCE DSC-1212E Lfd. Bezeichnung Nr. (BACnet 2007) AMEV-Marktübersicht BACnet-AS Stand: 16.09.2008 Zertifizierte BACnet-Produkte AS AMEV-Empf. (A = Bas., B = Erw.) BACnet-Objekttyp (Auszug aus DIN EN ISO 16484-5:2007) B-BC (X) Unterstützte Objekttypen * AMEV-Marktübersicht BACnet-AS 17 18 19 20 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X * Quelle: BIG-EU Produktliste für geprüfte BACnet-Konformität (http://www.big-eu.org/conformance/listeu.php) Abbildung 2: BACnet-Dienste (BIBBs) für BACnet-Controller (B-BC). Figure 2: BACnet services (BIBBs) for BACnet controller (B-BC). GAEB: Beiblatt BACnet einsatzbereit für STLB-Bau German master specification for tenders with BACnet Annex Jürgen Hardkop1 Bernhard Hall2 Marius Hartel3 Im Dezember 2007 hat der GAEB4 (Gemeinsamer Ausschuss Elektronik im Bauwesen) Arbeitskreis LB070 der Gebäudeautomation sich personell erneuert und einen Unterarbeitskreis BACnet eingerichtet. Der UAK BACnet unter der Leitung von Jürgen Hardkop sollte ein neues Beiblatt BACnet für das Standardleistungsbuch (STLB) erarbeiten, das die in BACnet-Systemen benötigten Leistungsmerkmale eindeutig beschreibt und herstellerneutrale Ausschreibungen von BACnetSystemen unterstützt. Die ersten Seiten des inzwischen fertigen Beiblattes sind in den Abbildungen 3 und 4 auf der folgenden Seite dargestellt. Als Basis für das Beiblatt dient die BACnet-Norm DIN EN ISO 16484-5 mit allen freigegebenen Addenda bis einschließlich Addendum f. Zusätzlich wird die Empfehlung „BACnet 2007“ des Arbeitskreises Maschinen- und Elektrotechnik staatlicher und kommunaler Verwaltungen (AMEV) zu Grunde gelegt (siehe Artikel auf Seite 44). Der Kopfteil (Abb. 3) bündelt die projektspezifischen Eintragungen durch Auftraggeber und Bieter. Danach folgt die Tabelle der für das BACnet-Produkt vorgegebenen BIBBs. Auf der nächsten Seite (Abb. 4) werden die ausgewählten dynamisch erzeugbaren und löschbaren Objekte angegeben. Darunter beginnt die Tabelle der geforderten BACnet-Objekte und Properties, die entsprechend den Objekttyp Codes sortiert sind. Empfehlungen Um die Entscheidungsfindung bei BACnet-Projekten zu erleichtern, enthalten die Tabellen der BIBBs und Objekte/Properties jeweils einen informativen Teil, in dem die Vorgaben der BACnet-Norm und die Basis-Empfehlungen des AMEV dargestellt sind. Die projektspezifischen Vorgaben sind vom Auftraggeber oder seinem Fachplaner in der rechten Spalte einzutragen (Projektvorgabe). Zusätzlich zu den Angaben im Beiblatt sind vom Bieter das PICS und das Zertifikat (Listing) des angebotenen BACnet-Produktes zu fordern. Weitergehende Angaben der Bieter im Beiblatt sind nicht vorgesehen, da deren Prüfung und Wertung ggf. problematisch werden kann (z. B. bei unvollständigen Detail-Angaben). Die Beschränkung auf die BasisEmpfehlungen des AMEV dient dazu, eventuell möglichem Bestreben nach Maximal-Ausstattungen und den daraus resultierenden Einschränkungen des Wettbewerbs entgegen zu wirken. Jedem Auftraggeber bleibt es freigestellt, eine erweiterte Ausstattung entsprechend den örtlichen Bedürfnissen und der aktuellen Marktsituation projektspezifisch vorzugeben. Aktualisierung Der AMEV hat das Beiblatt im September 2008 zustimmend zur Kenntnis genommen. Zugleich hat der AMEV beschlossen, die Empfehlungen der BACnet 2007 im Hinblick auf die inzwischen zertifizierten BACnet-AS baldmöglichst zu aktualisieren. Die überarbeiteten AMEV-Empfehlungen sollen auch Bestandteil des neuen GAEB-Beiblattes werden. Das Arbeitsergebnis des UAK BACnet wurde im Oktober 2008 vom Arbeitskreis 070 Gebäudeautomation beim GAEB im DVA unter der Leitung von Jörg Balow (Hosch Gebäudeautomation Berlin) verabschiedet. Das Beiblatt wird mit den Leistungstexten des LB070 (Leistungsbereich Gebäudeautomation) verlinkt durch die Textergänzung „gemäß BACnet Normprotokoll DIN EN ISO 16484-5 und Beiblatt 070-12 BACnet“. Das Beiblatt 070-12 BACnet wurde in einem konstruktiven Gespräch im Februar 2009 mit der BIG-EU abgestimmt und ist ab März 2009 auf der Homepage des GAEB veröffentlicht, siehe http://www.gaeb.de/ download1.php. In December 2007, the working group of GAEB5 (Common Comittee for Electronic Tendering in Construction) LB070 Building Automation was rebuilt and a new BACnet working group was established. The BACnet working group under the direction of Jürgen Hardkop should develop a new BACnet Annex for the German master specification for tenders, which clearly describes required features for BACnet systems and supports multivendor tenders for such systems. The first pages of the finished Annex are attached as Figure 3 and Figure 4. The Annex is based on the BACnet standard DIN EN ISO 16484-5 with its all addenda released until Addendum f and on the “BACnet 2007” recommen- BACnet Europe Journal 10 03/09 45 Angebot: Produkt Name: Firmware Revision: AS BACnet MS/TP Router ISO 8859-2 Produkt Typ Nr.: Firmware Revision Datum Angebot Datum PICS: Datum Zertifikat: ohne Vorgabe BACnet LonTalk stat. Einbind. ohne Vorgabe ……………… ………...…… ………...…… ……...……… Informativ MBE (Basis) AS (Basis) AMEV d B-OWS B-BC B-AAC B-ASC B-SA B-SS DIN EN ISO 16484-5 c Addendum BIBBs (DIN EN ISO 16484-5) MBE BACnet IP BBMD ANSI X3.4 DIN EN ISO 16484-5 Geräteprofil: a Übertr. Medium: Netzwerk: Zeichensätze: ISP-Nr.: 1 2 3 4 5 6 7 8 9 10 11 Data Sharing BIBBs (Objektzugriff, Datenaustauch, gemeinsame Datennutzung) DS-RP-A DIN X X X X DS-RP-B DIN X X X X X X X DS-RPM-A DIN X X X DS-RPM-B DIN X X DS-RPC-A DIN DS-RPC-B DIN DS-WP-A DIN X X X X DS-WP-B DIN X X X X X DS-WPM-A DIN X DS-WPM-B DIN X X DS-COV-A DIN X X DS-COV-B DIN X DS-COVP-A DIN X DS-COVP-B DIN DS-COVU-A DIN X X DS-COVU-B DIN X Alarm and Event Management BIBBs (Alarm- und Ereignisverarbeitung) AE-N-A DIN X X AE-N-I-B DIN X X X AE-N-E-B DIN AE-ACK-A DIN X X AE-ACK-B DIN X X X 12 Abbildung 3: Beiblatt 070-12, BACnet-BIBBs Figure 3: Annex 070-12, BACnet BIBBs dation of AMEV (Mechanical and Electrical Engineering Working Party of National, State and Local Authorities) additionally. See also articel on page 44. The heading section (Figure 3) combines the project-specific entries from client and tenderer. This is followed by the BIBB table of the BACnet device. The dynamically creatable and deletable objects are to be stated on the next page (Figure 4) followed by the table of the required BACnet objects and properties, sorted according to the object codes. Recommendations The tables of BIBBs and objects / properties include an informative section with the requirements of the BACnet standard and the basic recommendations of AMEV to facilitate the decision making in BACnet projects. The project-specific requirements have to be entered by a client or his planner in the right column (project requirements). The PICS and the certificate of the offered BACnet product (list- ing) should be requested additionally from a tenderer. Further detailed specifications from the tenderers are not provided in the Annex, because their testing and scoring can be problematic if necessary (e.g. incomplete detailed information). The appliance of the basic AMEV recommendations should contrary affect the possible maximum equipment ambitions and the resulting restrictions of competition. Each client is allowed to provide project specific, advanced equipment in accordance with local needs and the current market situation. Objekte (DIN EN ISO 16484-5) 1 0 Analog Input Object_Identifier Object_Name Object_Type Present_Value Description Device_Type Status_Flags Event_State Reliability Out_Of_Service Update_Interval Units Min_Pres_Value Max_Pres_Value Resolution COV_Increment Time_Delay Notification_Class High_Limit Low_Limit Deadband Limit_Enable Event_Enable Acked_Transitions Notify_Type Event_Time_Stamps Profile_Name 46 BACnet Europe Journal 10 03/09 DIN DIN DIN DIN DIN AS f MBE f 5 DC/DD 6 DC/DD DC/DD DC/DD DC/DD DC/DD DC/DD CONF.CODE (Norm) e 2 3 4 DIN DIN DIN DIN DIN DIN DIN DIN DIN DIN DIN DIN DIN DIN DIN DIN DIN DIN DIN DIN DIN DIN DIN DIN DIN DIN DIN R R R R1 O O R R O R O R O O O O2 O3 O3 O3 O3 O3 O3 O3 O3 O3 O3 O Informativ AMEV (Bas.) AS f MBE f 5 A R R R Rg R R R R 6 A R R R W R R R R W W R R R W W R W W W W W R R R R W W R W W W W W R R R Projektvorgabe (DC/DD)a 3 Informativ AMEV (Bas.) 7 7 Abbildung 4: Beiblatt 070-12, BACnet-Objekte Figure 4: Annex 070-12, BACnet Objects The results of BACnet working group were approved from the Common Comittee for Electronic Tendering in Construction (GAEB) Chapter 070 Master Specification for Building Automation and Control Systems, led by Chairman Jörg Balow (Hosch Building Automation and Control Berlin) in October 2008. The Annex is linked with the specification texts of LB070 (building automation specification) 1 2 Update The AMEV took note of the Annex in September 2008 approvingly. At the same time, the AMEV decided to update the recommendations of the BACnet 2007 as soon as possible with a view to the meanwhile certified BACnet devices. The AMEV’s revised recommendations thus shall become a part of the new GAEB Annex. 2 CONF.CODE (Norm) e 4 Projektvorgabe (R/W) a Anbieter: b Hersteller Name: BACnet Prot. Stand: Vergabe-Nr.: Addendum Projekt-Nr.: Projekt-vorgabe (X)a Projekt: a Objekte (Dynamically Creatable / Dynamically Deletable) 1 6 Calendar 9 Event Enrollment 15 Notification Class 17 Schedule 21 Trend Log Addendum © 2009 GAEB Quellen: DIN EN ISO 16484-5 (2008-05); freigegebene Addenda bis einschl. Addendum f AMEV-Empfehlung BACnet 2007 DIN EN ISO 16484-5 Beiblatt 070-12 BACnet DIN EN ISO 16484-5 BACnet insight 3 by the following note: “in accordance with BACnet protocol standard DIN EN ISO 16484-5 and Annex 070-12 BACnet”. The voting of the BACnet Annex 070-12 with the WG-T of BIG-EU was completed in February 2009 and published on the homepage of the GAEB in March 2009, see http:// www.gaeb.de/download1.php. MinRat Jürgen Hardkop, Ministerium für Bauen und Verkehr des Landes NRW, Düsseldorf, [email protected] MinRat Jürgen Hardkop, Ministry for Building and Transport of the State of NRW, Düsseldorf, [email protected] BauDir Dr.-Ing. Bernhard Hall, Vermögen und Bau Baden-Württemberg, Betriebsleitung Stuttgart. [email protected] Dipl.-Ing. Marius Hartel, geschäftsführender Gesellschafter GA Ingenieurgesellschaft mbH, [email protected] Dipl.-Ing. Marius Hartel, Managing Partner GA Ingenieurgesellschaft mbH, [email protected] GAEB = Gemeinsamer Ausschuss Elektronik im Bauwesen beim Bundesamt für Bauwesen und Raumordnung, Bonn 5 GAEB = Joint Committee for Information Technology in the Construction Industry (Fed. Ministry for Construction, Germany) 6 STLB = Standardleistungsbuch STLB = German master specification for tender 4 BACnet insight Synergie von BACnet und IT-Technologie nutzen dem Anwender User profits of synergy between BACnet and IT technology Joachim Krusch1 Oliver Greune2 Die Nachrichten im Fernsehen oder im Radio machen es uns jeden Tag deutlich: Wir leben in einer Zeit knapper werdender Ressourcen und Finanzen. Wir können es uns nicht mehr leisten, nur noch aus dem Vollen zu schöpfen. „Grün“ und „effizient“ sind Schlagwörter, die das Marketing häufig benutzt, um aufmerksam zu machen. BACnet an sich ist nicht „grün“, es ist ein Kommunikations-Protokoll. Ebenso benötigt die IT-Technologie Energie, was soll das Ganze also? So fragt mancher nach dem tiefen Sinn heutiger Entwicklungen. Damit Energie, Ressourcen und Arbeitskraft heute und in Zukunft bezahlbar bleiben, ist es Zeit, das größte Potential zu nutzen: Synergien! In der Gebäudeund Anlagentechnik ist eine offene Kommunikation ein wichtiger Weg, um Synergien zu erschließen. Ein Weg, der über alle von Herstellern gemachten Grenzen aus proprietären Systemen hinweg Brücken schlägt. BACnet Mit BACnet ist es Endkunden und Planern erstmals möglich, ohne an einen bestimmten Hersteller gebunden zu sein, jeweils die beste Lösung für ihre Aufgaben aus dem reichhaltigen Angebot an Automationssystemen auszuwählen. BACnet ist in der Gebäudeautomation das, was die englische Sprache für uns Menschen ist: Fast überall auf der Welt ist es die einzige Möglichkeit, Grenzen zu überwinden und miteinander in einen Dialog zu treten. Wie selbstverständlich nutzen wir diese gemeinsame Basis, um Informationen auszutauschen. So profitiert jeder von den Erfahrungen und dem Wissen seiner Nachbarn. Das gleiche gilt im übertragenen Sinne auch für Automationssysteme, die nur vernetzt wirklich effizient wirken können. Gerade im Hinblick auf den optimierten Einsatz von Ressourcen jeder Art ist der Austausch von In- formation von größter Wichtigkeit. Web-/ IT-Technologie in der Automation Die Web- und IT-Technologie hat in den letzten Jahren einen enormen Zuwachs erlebt. Nicht nur, dass mehr investiert wurde, auch die Bedienung von z.B. Web Browsern ist mittlerweile zu Allgemeinwissen geworden. Mobiltelefone, PCs, Notebooks und E-Mail machen uns ortsunabhängig, (A)DLS, Kabel, Wireless und Flatrates sorgen für die notwendige Geschwindigkeit. Automationsstationen mit integrierter Web-/IT-Technologie profitieren in gleichem Maße von dieser Infrastruktur. Aktuelle und historische Daten können direkt aus der Steuerung heraus in Webseiten dem Nutzer zugänglich gemacht und auf Flash-Filesystemen (SD Karte) in grossen Mengen archiviert werden. Diese so gewonnenen Daten können mittels IT-Standard-Kommunikationsdiensten (CGI, FTP,…) von ERP (Enterprise Resource Planning) Systemen zur Steuerung und Optimierung betrieblicher Prozesse weiter verarbeitet werden. Mittels SMS und E-Mail informiert die Steuerung regelmäßig oder Ereignis-getriggert (Alarm) über alle gewünschten Anlagenzustände – und dies alles weltweit ohne zusätzlichen Aufwand und Kosten, Tag und Nacht, rund um die Uhr. Technologische Grenzen Beide Systeme, sowohl BACnet als auch die Web-/ IT-Technologie haben ihre Stärken und Schwächen. So benötigt die IT-Technologie ein Minimum an Rechenleistung, welche nicht in jedem System wirtschaftlich sinnvoll zur Verfügung gestellt werden kann. Dagegen ist sie auf jedem Rechner, PC, Webpanel etc. vorhanden und kann ohne Aufwand sofort genutzt werden. BACnet auf PCs gehört noch nicht zum Standard-Betriebssystem und benötigt deshalb immer eine separat zu installierende Client Software, die dazu noch bearbeitet werden muss. Zur weltweiten Kommunikation über das Internet werden darüber hinaus VPN-Verbindungen (Virtual Private Network) benötigt. Zusätzliche Hardware, Einrichtungskosten etc. sind die Folge. Synergie Eine Automationsstation, die beide Systeme – BACnet und Web-/ IT-Technologie – vereint, kann die Stärken beider Seiten voll nutzen. Es versteht sich von selbst, dass solche Systeme ohne Zusatzaufwand skalierbar auf die Bedürfnisse des Nutzers zugeschnitten werden können. Daraus entstehen wichtige Vorteile: Für den Endkunden: Investitionsschutz durch offene, beliebig erweiterbare Web/IT Funktionen herstellerunabhängige DatenKommunikationslösung mit BACnet Vorort Anlagen- und ProzessDatenmanagement Kostenreduktion durch einheitliche, weltweite Web-Bedienung für eine unbegrenzte Anzahl „User/ Workstations“ Zugriff auf historische Daten (.csv, .txt, etc.) mittels Standardtechnologie z.B. via FTP oder das Ablegen von Dokumentationen, Programm-Backups etc. auf z.B. SD Flash - Filesystemen Reduzierung des Netzwerkverkehrs, kein Polling nötig (BACnet Event oder E-Mail Service) Geringerer Aufwand für Service und Administration Für den Planer: Vereinfachtes Ausschreibungs-Verfahren durch einheitliche Netzwerkstruktur- und Netzwerkübergänge keine Datenschnittstellen-Spezifikation notwendig vereinfachtes Abnahmeverfahren BACnet und IT-Technologie in der Synergie können einen Beitrag dazu leisten, Ressourcen weltweit bewusst und verantwortungsvoll einzusetzen. Everyday we hear it on the radio or see it on the news: we live in a time of ever scarcer resources and finances. We can no longer afford to draw on them indefinitely. Words like ‘green’ and ‘efficient’ have become frequent marketing slogans to call our attention. BACnet is not in itself a green technology; it is a communications protocol. Equally, IT technology also uses power. So what’s it all about? This is the kind of question people ask about the fundamental meaning of today’s developments. To keep energy, resources and manpower affordable now and in the future, it is time to exploit the greatest potential: synergies! In building and installation technology, open communication is the way to unlock synergies. It is also the way to build bridges over all the barriers put up by manufacturers of proprietary systems. BACnet With BACnet, end-user customers and planners for the first time are able to select the best solution for their tasks from the wealth of automation systems on offer, without being tied to a particular manufacturer. For building automation, BACnet has in the figurative sense the same function as the English language to us humans: almost anywhere in the world, it is the only way to surmount barriers and enter into dialogue with one another. It goes without saying that we use this common basis to exchange information. Therefore, everyone benefits from the experience and knowledge of their neighbours. This bears analogy to automation systems, which only can work really efficiently when they are in a BACnet Europe Journal 10 03/09 47 BACnet insight network. It is precisely when every use of resources must be optimized, that exchanging information has the greatest importance. Web / IT technology in automation Web and IT technology has experienced enormous growth in recent years, not only in the form of increased investment, but also in use. Web browsers have become general knowledge. Mobile telephones, PCs, notebooks, and e-mail have abolished our location dependency. (A)DSL, cable, wireless and broadband provide the necessary speed. Automation stations with integral web/IT technology benefit from this infrastructure to the same extent. Using web pages, it is possible to obtain current data and history data directly from the controller and make it accessible to the user, or archive it in large quantities on flash file systems (SD card). Data acquired in this way can be further processed using standard IT communications services (CGI, FTP, etc.), from ERP (enterprise resource planning) systems to the control and optimization of oper- ational processes. The controller uses SMS and e-mail to provide information about any selected system state, either regularly or when triggered by an event (alarm). All this is available anywhere in the world, at no extra cost or effort, day and night, around the clock. Limits of technology Both systems – whether based on BACnet or web/IT technology – have their strengths and weaknesses. For example, IT technology requires a minimum amount of computing capacity that it would not be economically feasible to provide in every system. However, it is still present on every computer, PC, web panel, etc. and can be used immediately at no expense. On PCs, BACnet does not yet belong to the standard operating system and therefore always needs separately installed client software, which also requires engineering. For world-wide internet communication, VPN connections (virtual private network) are also necessary. Additional hardware and set-up costs are the consequence. Synergy An automation station that unites both the BACnet and web IT technology systems can make full use of the strengths of both sides. Obviously, such systems are scalable and can be tailored to user requirements at no added expense. This gives rise to important advantages: For end-user customers: Investment protection through open, freely expandable web/IT functions Vendor-independent data communication solution with BACnet On-site data management for systems and processes Cost reduction through uniform, world-wide web control of an unlimited number of users or work stations Access to history data (.csv, txt, …) by means of standard technology, e.g. via FTP or the storing of documents, program backups, etc. on for example SD flash via file systems Reduction of network traffic, no polling necessary (BACnet event or e-mail service) Lower expenditure on service and administration For planners: Simplified tendering procedure due to standard network structure and network transitions no specification of data interfaces is required simplified acceptance procedure The synergy between BACnet and IT technology can contribute to the deliberate, responsible use of resources throughout the world. Joachim Krusch, Saia-Burgess Controls AG, ist Mitglied der Arbeitsgruppe Marketing der BIG-EU, [email protected]. Joachim Krusch, Saia-Burgess Controls AG, is member of the working group marketing of BIG-EU. [email protected]. 2 Oliver Greune, Saia-Burgess Controls AG ist Mitglied der Arbeitsgruppe Technik der BIG-EU, [email protected]. Oliver Greune, Saia-Burgess Controls AG, is member of the working group technique of BIG-EU, [email protected]. 1 Innovation by integration Does your organisation enjoy the advantages of BACnet? Interoperable system integration; a one-time investment that provides supplier independence; no licensing costs and freedom to choose hardware technology. Remote access utilizing BACnet over Ethernet makes systems operation from any location a reality. The result: low-cost investment + optimal ease-of-use = an innovative building management system. Regel Partners does it right! 48 BACnet Europe Journal 10 03/09 System Integrators with Content Regel Partners B.V. Hogebrinkerweg 8 3871 KN Hoevelaken P.O. Box 86 3870 CB Hoevelaken T. +31 (0)33 254 48 48 F. +31 (0)33 254 48 44 [email protected] www.regelpartners.nl Produkte Products Ethernet und BACnet/IP standardmäßig Ethernet and BACnet/IP as standard Vacon Plc, der finnische Umrichterhersteller, hat eine neue und gezielt für die HLK-Branche entwickelte Reihe von Frequenzumrichtern eingeführt. In diese sind sowohl Schnittstellen zur Kommunikation über BACnet/IP wie auch BACnet MS/TP standardmäßig integriert, wodurch zusätzliche optionale Kommunikationsbaugruppen oder externe Gateways entfallen können. Vacon Plc has introduced a new dedicated AC drive for the building automation market. This new product incorporates both BACnet/IP and BACnet MS/TP as a standard, thus fully eliminating the need for option boards or gateway-type solutions. Der neue Vacon 100 HVAC. Vacon 100 HVAC is new. “Als wir den neuen Vacon 100 HVAC planten, wollten wir ganz bewusst einen Maßstab für alle sogenannten HLK-Umrichter setzen. Ein leichter Einbau und eine einfache Inbetriebnahme sind in dieser Branche extrem wichtige Entscheidungskriterien und die fest eingebaute BACnet- Kommunikation macht einen erheblichen Unterschied“, erklärt Jukka Hannuksela, der für diese Baureihe bei Vacon zuständige Produktmanager. Die auf RS 485 basierende Kommunikation über BACnet MS/TP unterstützt alle üblichen Baudraten bis hin zu 76.8kbit/s. Zur weiteren Vereinfachung gibt es auch eine Funktion zur automatischen Baudratenerkennung. Alle E/A-Punkte im Vacon 100 HVAC-Umrichter sind für alle an BACnet angeschlossenen Einheiten frei zugänglich. BACnet/IP basiert auf dem IEEE802.3-Standard, welcher die Kompatibilität zum weitverbreiteten EthernetEquipment sichert. BACnet/IP-Schnittstelle Durch die fest in die Vacon 100 HVAC-Umrichter integrierte BACnet/IP-Schnittstelle ist es möglich, den Umrichter später auch direkt an ein Ethernet-basierendes Netzwerk anzuschließen, ohne dann irgendwelche Schnittstellen nachrüsten zu müssen. Die Ethernet-Schnittstelle vereinfacht zudem die Parametrierung, die Inbetriebnahme und die Betriebsdatenerfassung bei der Nutzung über das neue PC-Programm von Vacon mit dem Namen Vacon Live. Dieses kann übrigens parallel zum BACnet/ IP-Protokoll zur Anzeige bzw. Parametrierung genutzt werden. Da heutzutage jeder PC mit einer EthernetSchnittstelle ausgerüstet ist, werden auch hierfür keinerlei Adapter oder spezielle Signalkabel benötigt. Die Umrichter der Baureihe Vacon 100 HVAC sind kompatibel zu den Kommunikationsbaugruppen der wich- tigsten Anbieter von BACnet/ IP- und BACnet MS/TP fähigen Geräten. “When we created the new Vacon 100 HVAC, we wanted it to set a benchmark for all HVAC drives. Installation and commissioning costs are highly important in the HVAC market and native BACnet interfaces really make a difference”, says Jukka Hannuksela, Product Manager for the Vacon 100 HVAC. The standard RS-485 based BACnet MS/TP interface supports all standard communication speeds up to 76.8 kbit/s. To further simplify setup and commissioning, it also supports automatic detection of the communication speed. In the Vacon 100 HVAC, all I/O points are freely usable for all units connected to the BACnet fieldbus. BACnet/IP interface BACnet/IP is based on the IEEE802.3 standard, which ensures the compatibility with other Ethernet equipment. The standard BACnet/ IP interface in the Vacon 100 HVAC makes it possible to connect the drive to an Ethernet network at a later date without further investment in the AC drives. The standard Ethernet interface simplifies the setup, commissioning and supervision of the drives allowing the Vacon Live PC tool to be used in parallel to the BACnet/IP protocol for simultaneous monitoring and parameterization. As every modern PC has an Ethernet interface, no extra adapters or special cables are typically needed. Vacon 100 HVAC is compatible with the products from all major BACnet/IP and BACnet MS/TP product suppliers. Vacon Plc www.vacon.com [email protected] BACnet Europe Journal 10 03/09 49 Produkte Products L-WEB – Verteilte Visualisierung und Datenaufzeichnung Distributed Visualization and Data Logging with L-WEB L-WEB steht für ein neuartiges Konzept der Visualisierung und Speicherung von Daten aus verteilten Liegenschaften sowie Gebäuden jeder Größe. L-WEB is a novel concept for the visualization and storage of data from connected real estate and buildings of any size. Die grafische Benutzerschnittstelle LWEB-800, jüngst ausgezeichnet mit dem Innovationspreis ‚Mercur 2008’ der Wirtschaftskammer Wien für das innovativste Produkt, visualisiert unterschiedlichste Applikationen wie Raumbediengeräte oder Anlagenbilder. Die .NET Applikation LWEB-800 passt sich an jegliche Displayformate an. Unterstützt werden dabei sämtliche Plattformen mit Windows Betriebssystem wie Desktops, Notebooks oder auch Smart Phones. Mit einem frei verfügbaren Konfigurations-Tool lassen sich in kürzester Zeit ohne HTML-Kenntnisse etc. ansprechende Grafikseiten entwerfen. Über die dynamischen Grafikseiten werden Informationen dargestellt oder bedient. Sollwertverstellungen sind z.B. ebenso möglich wie der transparente Zugriff auf Automationsfunktionen Alarming (Alarmmanagement), Scheduling (Zeitschalten) und Trending (Trendaufzeichnungen). Der LWEB-801 Data Logger speichert historische Daten in einer zentralen SQL Datenbank (MySQL, SQLight, Microsoft SQL Server Express, etc.). Die Daten können über LWEB-800 dargestellt oder von ERP-Systemen verarbeitet werden. Web Services Die physikalische Schnittstelle zum BACnet Netzwerk oder auch zu LonMark-Systemen bzw. MODBUS- und MBus Netzwerken stellen die Automation Server LINX20x oder LINX-10x dar. Dabei verfügt LINX-201 über einen integrierten BACnet/ IP - BACnet MS/TP – Router mit BBMD Unterstützung. Die Kommunikation erfolgt via Web Services (OPC XML/DA), welche Port 80 (HTTP) verwenden und es erleichtern, über Firewalls hinweg zu kommunizieren sowie den Datenverkehr zu tunneln (SSH). Dies und der Verzicht auf JavaScript und ActiveX ermöglichen IT-Administratoren eine einfache und sichere Einbindung in jedes IP-Netzwerk. The graphical user interface LWEB-800, recently awarded the Innovation Award “Mercur 2008” from the Vienna Chamber of Commerce for the most innovative product, visualizes different applications such as operating and display units or system images. The .NET application LWEB-800 adapts to any display formats. It supports all platforms with a Windows operating system, such as desktops, laptops or smart phones. With a free configuration tool attractive graphical pag- 50 BACnet Europe Journal 10 03/09 Anwendungen mit L-WEB L-WEB Applications es can easily be created in a very short time without knowledge of HTML etc. Information are displayed or controlled via the dynamic graphical pages. Setpoint adjusters are e.g. possible as well as the transparent access to automation functions such as alarming, scheduling, and trending. The LWEB-801 Data Logger stores historical data in a central SQL database (MySQL, SQLight, Microsoft SQL Server Express, etc.). The data can be displayed via LWEB-800 or processed by ERP systems. Web Services The physical interface to the BACnet network, or even to LonMark, Modbus, or M-Bus networks, are the Automation Server LINX20x or LINX-10x. LINX-201 comes with an integrated BACnet/IP - BACnet MS/TP – Router (supports BBMD). Communication takes place via Web Services (OPC XML / DA) using port 80 (HTTP) which is extremely firewall friendly and easy to tunnel the traffic (SSH). Not using JavaScript and ActiveX enable IT administrators an easy and secure integration into any IP network. LOYTEC electronics GmbH [email protected] www.loytec.com Produkte Products Neutrino-GLT Version 9: Komfortabel und leistungsfähig Version 9 of Neutrino-GLT is comfortable and capable Die Neutrino-GLT Version 9, die neue Version der Gebäudeleittechnik Neutrino-GLT von Kieback&Peter, bietet eine komfortable Bedienoberfläche sowie neue, nützliche Funktionen zur Datenauswertung und nachhaltigen Anlagenoptimierung. The Neutrino-GLT Version 9, the newest version of Neutrino-GLT building management system, offers a comfortable operating interface as well as new, useful functions for data evaluation and long lasting installation optimization. Neutrino-GLT Version 9. Auf der Bedienoberfläche kann jeder Nutzer sein individuelles Bedienmenü anlegen. Dazu kommen eine TOP-5-Funktion für den schnellen Zugriff auf häufig verwendete Programme und ein Systemmonitor. Die Datenauswertung und die Anlagenoptimierung werden durch neue Funktionen vereinfacht. Aus der Zählwertverarbeitung können umfangreiche Informationen generiert und in unterschiedlichen Darstellungen angezeigt werden. Der Vergleich von Zählerwerten macht Analysen und Auswertungen einfach. Störmeldungen werden in einer Störmeldestatistik dokumentiert und können ebenfalls analysiert werden. Parametrierung von Datenpunkten Die Projektierung ist auch bei großen Datenmengen unkompliziert. Die GLT sortiert nach Gerät, Adresse, Datenpunkttyp und nach den An- wendungen, mit denen der Datenpunkt verknüpft ist. Die Eigenschaften jedes Datenpunktes können über das Programm „Parametrierung“ schnell geändert, gelöscht oder zugewiesen werden. Wird ein Anlagenkennschlüssel (AKS) verwendet, kann direkt nach den Feldern des AKS gefiltert und sortiert werden. Die Neutrino-GLT ist durch den Einsatz gesicherter Protokolle wie HTTPS oder SSH auch vor Angriffen und Gefahren aus dem Internet gesichert. Die Neutrino-GLT V9 bietet sparende Möglichkeiten zur Dokumentation. Vor dem Druck wird für jedes Anlagenbild und für jede Parameterliste eine Voransicht erzeugt, und der Nutzer kann sich für die korrekte Dokumentation entscheiden. Each user can design an individual operating menu on the newly designed operat- ing interface. In addition to this there is a TOP-5 function list for quick access to frequently used programs and a system monitor. Data evaluation and installation optimization has been significantly simplified with these new functions. The comparison of meter data in various time periods makes analysis and statistical evaluation simple. A fault indicator statistic provides information on when and how often a malfunction took place and how long it lasted. The fault indicators are stored in a database so that statistics for each time period can be retrospectively prepared. Parameterization of data points Project planning is also uncomplicated for large data volumes. The GLT sorts according to appliance, address, data point type and relevant application to which the data point is linked. The parameters of each data point can be quickly changed, deleted or assigned via program parameterization. If an address assignment system is used for the installation, fields in the system can be directly filtered and sorted. The Neutrino-GLT is secured against attacks and risks from the Internet with the use of secure protocols such as HTTPS or SSH. The Neutrino-GLT V9 offers possibilities for making savings in documentation. Before the print is started, a preview for every installation picture and parameter list is produced, and the user can decide on the correct documentation. Kieback&Peter GmbH & Co. KG [email protected] www.kieback-peter.de BACnet Europe Journal 10 03/09 51 Every detail under control: PVSS BACnet from ETM SCADA- and building management system: with PVSS BACnet you unite both technologies under one roof and every detail is under your control. In this way you reduce costs and concurrently increase energy efficiency! Please visit us at ww.etm.at Prepared for new challenges! Produkte Products BACnet Building Controller mit Kommunikationsmodulen BACnet building controller with communication modules SAUTER erweitert den modularen Lösungsbaukasten EY-modulo mit Modulen für Modbus, M-Bus und den Applikations-Master moduNet300 für die novaNet Integration. SAUTER has extended its modular EY-modulo solution system by adding modules for Modbus and M-Bus and the moduNet300 application master for novaNet integration. Das System EY-modulo 5 aus der modularen Produktpalette SAUTER EY-modulo wird mit neuen modular hinzufügbaren Kommunikationsmodulen moduCom erweitert. Das EIA-232 Modul modu710 kann mittels Pegelwandler M-Bus-Zähler direkt auf Automationsebene eingebunden werden. Die Kombination von Elektro- und Wärme-Zählwert-Erfassung, vom BACnet Trendlog Objekt und dem integrierten Webserver der Automationsstation modu525 erlaubt eine optimale Gebäude-EnergieeffizienzAnalyse. Mit dem EIA-485 Modul modu720 können Modbus-Slave Geräte direkt in die Automation des webfähigen EY-modulo 5 B-BC modu525 integriert werden. Die offene Systemintegration dieser Feldbus-Protokolle erfolgt mit dem EngineeringTool SAUTER CASE Suite, welches in der neuen Version die komplette BACnet Produktpalette und die neuen BACnet-Funktionen wie Trendlog, Event Enrollment und BBMD enthält. BTL-Konformitätstest Die neue Firmware Version der modularen Automations- Produktpalette BACnet/IP von SAUTER. Product range BACnet/IP from SAUTER. station modu525 erfüllte in einer zweiten BTL-Konformitäts-Testrunde beim WSPLab erfolgreich die volle BACnet Building Controller Funktionalität. Als weiteren Schritt wird SAUTER die neue Raumautomationsstation ecos502 für die BACnet Advanced Application Controller BTL-Prüfung einreichen. Auch bestehende SAUTER Systeme mit dem Systembus novaNet können in die offene BACnet/IP Welt mit dem neuen Applikations-Master moduNet300 integriert werden. Dabei werden die EY-modulo 2 und EY3600 Stationen direkt durch den Applikations-Master erfasst und BACnet-Objekte werden automatisch erstellt. Weitere BACnet-Funktionen runden den Applikations-Master als B-BC ab. Die offene Kommunikationsfähigkeit der SAUTER EY-modulo BACnet/IP Produktpalette ermöglicht so vielfältige und interessante Integrationen. The EY-modulo 5 system from SAUTER’s modular EYmodulo product range has been extended by the addition of new modular moduCom communication modules. Using a level converter, the modu710 EIA-232 module can incorporate M-Bus meters on the automation level itself. The combination of metering for both electrics and heat, and the amalgamation of BACnet trendlog object and the integrated web server of the modu525 automation station, enable a first-rate analysis to be made of the building‘s energy efficiency. With the modu720 EIA-485 module, Modbus slave devices can be integrat- ed directly into the automation system of the EY-modulo 5 modu525 B-BC with web capability. The open system integration of these field-bus protocols is effected using SAUTER‘s CASE Suite engineering tool, the new version of which also includes the complete BACnet product range and the new BACnet functions, i.e. trendlog, event enrollment and BBMD. BTL conformity testing After a second phase of BTL conformity testing at the WSPLab in Stuttgart, the new firmware version of the modu525 modular automation station now successfully provides the full functionality of a B-BC. As a further step, SAUTER will submit its new ecos502 room automation station for the BTL test for BACnet Advanced Application Controllers. Existing SAUTER systems with the novaNet systembus can also be integrated into the world of open BACnet/IP by means of the new moduNet300 application master. This involves the EY-modulo 2 and EY3600 stations being registered directly by the application master, while BACnet objects are created automatically. Further BACnet functions complement the application master as a B-BC. The open communication capability of the SAUTER EY-modulo BACnet/IP product range provides a wide range of integration possibilities. SAUTER AG roland.hofstetter@ch. sauter-bc.com www.sauter-controls.com BACnet Europe Journal 10 03/09 53 Produkte Products Automationssystem TROVIS 6600 für den flexiblen Einsatz TROVIS 6600 Automation System for flexible use Das CPU-Modul TROVIS 6610 von SAMSON hat den BACnet-Standard nach ISO 16484-5:2007 implementiert und trägt die BTL-Marke. The TROVIS 6610 CPU Module by SAMSON complies with the BACnet standard ISO 16484-5:2007 and carries the BTL mark. Das frei programmierbare CPU-Modul TROVIS 6610 von SAMSON hat das Device-Profil BACnet Building Controller (B-BC) und darüber hinausgehende Funktionen integriert. Bereits 40 physikalische Kanäle sind „on board“, davon 20 Universaleingänge (analog/binär), 12 Binärausgänge mit Koppelrelais sowie acht Analogausgänge. Die Anzahl der Kanäle kann mit I/O-Modulen TROVIS 6620 um jeweils 20 erweitert werden. Durch diese freie Skalierbarkeit lassen sich kleine Applikationen ebenso wie Anwendungen in weit verzweigten Liegenschaften realisieren. Komfortable Projektierung Dank der neu entwickelten Grafischen Projektierung TROVIS 6690 ist das Erstellen von Applikationen denkbar einfach. Eine umfangreiche HLK-Bibliothek unterstützt den Anwender bei der Umsetzung seiner Aufgabenstellungen. Vom Erstellen der Belegungslisten für den Schaltschrankbau, dem Verknüpfen der Funktionsbausteine bis zum Online-Modus zur Inbetriebnahme – ein Tool für alle Projektphasen. Ferner werden BACnet- Objekte nicht aufwendig separat konfiguriert, sondern sie bilden eine weitere Eigenschaft der Datenpunkte. Touchdown Die Bedienung und Visualisierung ist durch den im CPU-Modul TROVIS 6610 integrierten Webserver äußerst flexibel. Ob mit einem Browser auf einem mobilen Gerät (z. B. Notebook, PDA) oder mit fest angebundenem Client. Als Touchpanel steht das Web-Terminal TROVIS 6615 zur Verfügung. Mit einer Auflösung von 640x480 Pixeln und einer Bildschirmdiagonalen von 5,7" lassen sich selbst komplexe Applikationen übersichtlich darstellen. Neben dem Zugriff auf die im CPU-Modul TROVIS 6610 gespeicherten historischen Daten steht ein Alarmmanager zur Verfügung, der anstehende Meldungen chronologisch darstellt. Per E-Mail kann das Servicepersonal umgehend über eine Störung informiert werden. The BACnet Building Controller (B-BC) device profile as well as further functions are implemented into the module. TROVIS 6610 has 40 integrated physical channels, of which 20 are universal inputs (analog/binary), 12 are binary outputs with coupling relay and 8 are analog outputs. Using TROVIS 6620 I/O Modules, a further 20 channels can be added per module. Thanks to this scalability, the automation system can be tailored to fit small applications as well as complex building compounds. Convenient project management The new TROVIS 6690 Graphical Project Management Tool makes creating applications quick and easy. An extensive library of preconfigured HVAC devices and functions supports users in implementing their tasks: generating assignment lists to build switch cabinets, linking function blocks, starting up the system in online mode, etc. TROVIS 6690 is a tool for all stages of a project. In addition, BACnet objects do not need to be configured separately, they can simply be assigned to the data points as a property. Flexible use Operation and visualization are highly flexible thanks to the web server integrated into the TROVIS 6610 CPU Module: a web browser is sufficient, no matter whether it is used on a stationary cli- Der TROVIS 6600 von SAMSON. The TROVIS 6600 from SAMSON. ent or a mobile device (e.g. notebook computer, PDA). The TROVIS 6615 Web Terminal comes with a 5.7" touch screen at a resolution of 640x480 pixels, which allows even complex applications to be displayed clearly. It can be used to access the historical data saved in the TROVIS 6610 CPU Module. An alarm management function, which records events in chronological order, is also included. As a result, service staff can be notified immediately by e-mail in case of an alarm. SAMSON AKTIENGESELLSCHAFT [email protected] www.samson.de BACnet Europe Journal 10 03/09 55 Produkte Products Luftklappen- und RegelkugelhahnAntriebe mit BACnet MS/TP Schnittstelle Air flap drives and control ball valves with BACnet MS/TP interface Der Einsatz von BACnet in der Feldebene mit BACnet MS/TP ist weiter auf dem Vormarsch. BACnet MS/TP eignet sich aufgrund seines einfachen physikalischen Aufbaus hervorragend für Buskommunikation in der Feldebene. Die einfache Verkabelung über eine zwei Draht RS485 Technologie ermöglicht eine kostengünstige Busverlegung. The application of BACnet in the field level with BACnet MS/TP is further on advance. BACnet MS/TP is suitable due to its simple physical structure outstanding for bus communictation in the field level. The simple wiring over two wire technology makes an economical bus wiring possible. Die neuen Luftklappenantriebe PLD10-24-BAC, PLD20-24-BAC und der neue Regelkugelhahnantrieb PWD05-24-BAC von Plüth verfügen standardmäßig über die BACnet MS/TP Schnittstelle. Hiermit können die Antriebe direkt über das BACnet Protokoll mit anderen BACnet Geräten kommunizieren. Alle Einstellungen sind direkt über das BACnet Protokoll möglich. Es wird keine zusätzliche Software für die Inbetriebnahme benötigt. Die Geräte besitzen das BACnet Device Profil BACnet Application Specific Controller (B-ASC). Zusätzlich zu den geforderten BIBBs ist noch DS-COVU-B integriert. Somit kann das Gerät unaufgefordert Wertänderungen anderen Teilnehmern mitteilen. Die Sollwertvorgabe 0-100% erfolgt über ein Analog Output Objekt. Der aktuelle Istwert wird aus dem Antrieb zurückgelesen und über ein Analog Input Objekt zur Verfügung gestellt. Weiterhin wird die Betriebslaufzeit des Antriebs ermittelt. Mehr Funktionalität Zur Erweiterung der Funktionalität sind die Antriebe mit drei zusätzlichen flexiblen Eingängen ausgestattet. Der PLD20-24-BAC mit BACnet MS/TP Schnittstelle. The PLD20-24-BAC with BACnet MS/TP interface. Eingang 1: Pt1000, Ni1000 oder Digitaleingang Eingang 2: Pt1000, Ni1000 oder Digitaleingang Eingang 3: Analogeingang 0..10 V oder Handsteuerung 2..10 V Als Versorgungsspannung kann wahlweise 24 V AC oder 24V DC genutzt werden. Es können bis zu 99 Geräte an einem Bus betrieben werden. The new air flap drives PLD10-24-BAC, PLD20-24BAC and the new control ball valve PWD05-24-BAC by Plüth have as standard BACnet MS/TP interface. Thereby the drives can communicate directly over the BACnet protocol to the other BACnet devices. All settings are possible directly via BACnet protocol. No additional software will be needed for initial operation. The devices have the BACnet Device Profil BACnet Application Specific Controller (B-ASC). Additionally to the requested BIBBs also DS-COVU-B is integrated. Therefore the device can unsolicited inform all other participants about change in values. The setpoint setting 0-100% happens over an analog output object. The current actual value will be read back by the actuator and will be available via one analog input object. Furthermore the runtime of the actuator will be calculated. More functionality To extend the functionality of the actuators they are equipped with 3 additional flexible inputs. Input 1: Pt1000, Ni1000 or digital input Input 2: Pt1000, Ni1000 or digital input Input 3: analog input 0…10 V or hand control 2…10V As supply voltage 24 V AC or 24 V DC can be used alternatively. Up to 99 devices can be configurated on one bus. Plüth Regelsysteme GmbH [email protected] www.plueth.de BACnet Europe Journal 10 03/09 57 Produkte Products Grafiktool für integriertes Netzwerkmanagement mit BACnet Graphic network management tool for BACnet Mehr als 15 Jahre hat NEWRON SYSTEM Software für die Installation, das Management und die Pflege von BMS Netzwerken entwickelt. Dabei hat man sich auf BMS-Tools spezialisiert. Diese Expertise wird genutzt, um Integratoren eine einfache, kosteneffektive und verlässliche Software für das BACnet-Protokoll zu bieten. Ziel ist, die Integrationszeit und -kosten zu reduzieren und das Systemdesign zu vereinfachen. For more than 15 years, NEWRON SYSTEM has been committed to developing software to install, manage and maintain BMS networks. NEWRON have specialized in BMS tools and now engage there expertise into providing integrators an easy, cost effective and reliable software for the BACnet protocol. Aim is to reduce integration time and cost and ease system design. Newron hat ein GrafikTool zum Managen der ACELIA Raumautomations linie entwickelt, um den Energieverbrauch und die Endnutzerbequemlichkeit in Gebäuden zu optimieren. Die Idee ist, einen Gebäudegrundriss zu nehmen, HVACs, Lampen und Fensterverdunkelungen hinzuzufügen und Zonen zu erstellen. Mit nur vier Klicks erstellen Nutzer automatisch die Zonen für die Klimaanlage, die Beleuchtung, die Fensterverdunkelung, weisen die Fernbedienungsmaßnahmen zu… alles durch die Benutzung des Modells, ohne das technisches Wissen erforderlich wäre! Flexibilität Das Tool bringt zudem Flexibilität und Neuaufteilungen: Es beinhaltet das grafische Handling von Lebensräumen als Funktion der Teilpositionierung. Nutzer können die Zonen modifizieren und die Technologie dahinter neu kalkulieren. Dieses Tool arbeitet mit einer “integrierten Vorlage”, die im Paket enthalten ist. Der Experte steckt sein gesamtes Know-how in das Paket das somit von Anfängern (wieder-) benutzt werden kann. Sie führen einfach die grafische Integration aus und wenden unwissentlich das technische Wissen des Newron Grafiksoftware Newron grafic software 58 BACnet Europe Journal 10 03/09 Experten an, damit wird die Integration geschützt und die Expertise verbreitet und gefördert. Das Tool kann mit den Produktlinien jedes Herstellers gekoppelt werden auch mit proprietären Objekten oder Dienstleistungen. Außerdem plant N EWRON SYSTEM diverse Herstellerlösungen in das Tool zu implementieren. So soll ein wirklicher Mehrwert auf den ständig wachsenden BACnet-Markt gebracht werden. NEWRON developed new graphic software to manage ACELIA room control line to optimize energy and endusers comfort in buildings. The idea is to work from a building layout, place HVAC, lamps, blinds on the map and draw a zone. With 4 clicks, users automatically set up the zones for air conditioning, lighting, blinds, assign the remote control actions … all using the model, with no need for technical knowledge! Flexibility Tool also brings flexibility and re-portioning: it includes the graphic handling of living spaces as a function of the partition positions. User can indeed modify the zone drawing and then recompute technology below. This tools works with an “integration template” included within a package. The expert puts his know how into the package that can thus be (re)used by beginners. They only carry out the graphic integration and unknowingly apply the expert’s technical knowledge, protecting the integration and distributing and sustaining the expertise. This tool can be interfaced to any manufacturer product line even with proprietary objects or services and NEWRON SYSTEM intends to implement several manufacturer solutions within the tool. NEWRON definitely want to bring real added value to the increasing BACnet market. Newron System serge.lemen@newron system.com www.newron-system.com Produkte Products Der einfache Weg zur Integration BACnet-Gateway BACnGTW-SMART: The easy way to Integration Das BACnet-Gateway SMART der INH-GmbH/HHO-Automation ist ein wirtschaftlicher, Hutschienen montierbarer und frei programmierbarer Industrie-PC zur Integration verschiedener Feldbusprotokolle in BACnet-Systemen. The BACnet-Gateway SMART from INH-GmbH/HHOAutomation is an economic, rail mounted and free programmable Industrial PC, which integrates different fieldbus protocols into BACnet. Einsatzziel ist unter Anderem die kostengünstige Sicherung von getätigten Investitionen in Sanierungsprojekten durch Integration vorhandener Systeme und „Zug-um-Zug Umrüstung“ auf BACnet. Zusätzlich können Modbus I/O Klemmen über Netzwerk oder seriell angeschlossen werden. Die seriellen Schnittstellen sind einzeln konfigurierbar als RS232-, RS485- oder RS422-Ausführung. Durch die skalierbare Auswahl seiner Leistungsgrößen eignet sich das Gateway besonders für den Einstieg bzw. Umstieg in die BACnetUmgebung. Mit einem separaten Webinterface wird eine übersichtliche, tabellarische Darstellung aller Datenpunkt-Integrationen zur Inbetriebnahme und Diagnose realisiert. System-Funktionalität Der eingebaute Lua-Interpreter ermöglicht dem Benutzer direkte Lese- und Schreibzugriffe auf alle Devices im BACnet-Netzwerk. Durch Syntaxerweiterungen sind Abhängigkeiten und Verknüpfungen unterschiedlicher BACnet-Objekte und deren Properties frei programmierbar und steigern deutlich die SystemFunktionalität. Die LuaProgramme werden dabei in mehreren Tasks parallel ausgeführt. Die Konfiguration erfolgt ausschließlich mit BACnetMechanismen und -Diensteverwaltung. Die Lua-Tasks werden als File-Objekte geladen und über Programm Objekte gesteuert. Das Lua-Interface ist Lieferbestandteil aller BACnetKomponenten der INHGmbH/HHO_Automation wie BACnet-Gateway, -Controller und -Watcher. The operational aim is the cost-efficient covering of concluded investments in restructuring projects available by integration of the existing systems and a step-by-step integration to BACnet. Additional I/O Modbus clamps will be attached via network or serial interface. Each serial interface is configurable as RS232, RS422 as well as RS485. By the scalable choice of its performance variables the gateway is particularly suitable for the entry vestibule or switch into the BACnet environment. Well arranged additional tabular representation of all integrated datapoints by means of own webserver for implementing and diagnosis. System functionality The build in Lua interpreter gives users ability to have read and write access to all devices located in the BACnet network. The procedural syntax enhancement allows free programming of dependencies and properties between different BACnet objects, this will increase the functionality of the control- ler enormous. The Lua programs will run in multiple tasks simultaneous. The configuration is exclusively carried out over BACnet mechanisms and -services. The Lua-Tasks are loaded as file-objects and controlled over program objects. The Lua interface is included in all BACnet components of the INH-GmbH/HHO_ Automation such as BACnetGateway, -Controller and -Watcher. INH-GmbH/ HHO_Automation [email protected] www.hho-automation.de BACnet Europe Journal 10 03/09 59 Produkte Products Ein-/Ausgabefunktionen in BACnet integrieren BACnet I/O Modules – I/O integration into BACnet Die MBS GmbH aus Krefeld stellt ihre neue Produktlinie „BACnet I/O Module“ vor. Mit insgesamt drei Produkten werden die Anforderungen für digitale Eingabe- und Ausgabefunktionen als auch für analoge Eingabefunktionen zur Erfassung von Messgrößen der Gebäudeautomation abgedeckt. The company MBS from Krefeld introduces their new product-line “BACnet I/O Modules”. With a total of three products, this product-line covers the requirements for digital input and output as well as analog input for data acquisition in building automation. Alle Module werden über das Medium BACnet MS/TP auf Basis RS485 angeschlossen und bei Bedarf miteinander vernetzt. MS/TP ermöglicht den einfachen Aufbau von Segmenten mit bis zu 32 Teilnehmern und einer Buslänge von weit über einem Kilometer mit einfachem, verdrillten Schaltkabel bis hin zu 255 Teilnehmern in einem gesamten Feldnetzwerk. brücken (Jumper) auch ohne umfangreiche BACnet Kenntnisse vornehmen. Weitergehende Eigenschaften wie die Festlegung eigener Beschreibungstexte, Stufen texte und sogar die Einstellung der Baudrate und spontanes Melden von Wertänderungen (COV-U = Change of Value Unsolicited) lassen sich bei Bedarf zusätzlich über BACnet beschreiben. Es werden alle gemäß BACnet Standard festgelegten Baudraten von 960076800 bit/s unterstützt, alle Module können sowohl als MS/TP Master als auch als Slave konfiguriert werden. Dies erlaubt eine flexible Konfiguration des Einsatzzwecks. Die Geräte unterstützen in der Betriebsart Master das BACnet Device-Profil B-ASC (Application Specific Controller). Beschreibbare Eigenschaften sind u.a. Objektinstanz, Objektname, Beschreibung, Stufentexte, MAC-Adresse. Einstellung über Steckbrücken Die Grundeinstellungen der Module lassen sich auf einfache Weise über Steck- Die Produkte sind ab sofort verfügbar. Alle Module sind ebenfalls in einer Variante mit Unterstützung des Protokolls Modbus/RTU erhältlich. All modules support the medium BACnet MS/TP based on EIA-485 and may be connected to a field-network. MS/TP allows easy setup of network segments with up to 32 devices each and a segment-length of more than 4.000 feet with a total of up to 255 devices within the entire field-network using simple twisted pair cable. All baud-rates specified in the BACnet standard within the range from 9600 to 76800 bit/s are supported, all modules can be setup to run in MS/TP master- as well as in slave-mode, this allows flexible configuration according to the project requirements. Setting by Jumpers The basic settings of the modules are provided by jumpers, so that setup becomes easy even without extensive BACnet know ledge. Further settings may be defined by writing to the module over BACnet, so that Description- and State texts may be specified, even baudrate or COV-U (Change of Value Unsolicited) can be configured over BACnet. In master-mode the modules support the BACnet DeviceProfile: B-ASC (Application Specific Controller). Writable properties are (amongst others): Object-Instance number, Object-Name, Description, State-Texts, MAC-Address. This product is immediately available. All Modules are available as a variant supporting the communication protocol Modbus/RTU, too. MBS GmbH [email protected] www.mbs-software.de BACnet Europe Journal 10 03/09 61 Produkte Products Frei programmierbarer BACnet Building Controller Freely programmable BACnet Building Controller Zu Beginn des Jahres wurde Elesta’s Gebäudeautomationssystem Controlesta RCO um die native BACnet-Fähigkeit erweitert. With the beginning of the year Elesta‘s Building Automation System Controlesta RCO has been extended by the native BACnet ability. Die frei programmierbaren Controlesta RCO Master Controller der D-Serie mit dem BACnet Geräteprofil B-BC unterstützen neben den BACnet-Varianten BACnet/Ethernet, BACnet/ IP, BACnet MS/TP und BACnet/PTP auch die Proto- troller zu verbinden. Ausgangsmodule mit integrierter Handbedienebene und auto matisierter Rückmeldung ans System, sowie verschiedene Montagearten, DINSchiene oder Schaltschranktür, runden das Einsatzgebiet des Systems ab. Der frei programmierbare Controlesta RCO Master Controller, D-Serie. The freely programmable Controlesta RCO Master Controller of the D-series. kolle Modbus, M-Bus, Wilo, Grundfos, ASCII, etc. Diese vielfältigen Integrations- und Kommunikationsmöglichkeiten können simultan, in Abhängigkeit der freien Schnittstellen, genutzt werden. Für die Regelung und Steuerung von HLK-Anlagen bietet das modulare System die Möglichkeit, bis zu 32 E/A-Module mit einem Con- Verschiedene BACnetNetzwerk Topologien Die BACnet Netzwerk option “Router“ ermöglicht die systeminterne Umsetzung verschiedener BACnetNetzwerk Topologien, z.B. BACnet/Ethernet auf BACnet/IP oder BACnet MS/TP auf BACnet/IP. Bei Bedarf kann in der Betriebsart BACnet/IP die BBMD- Funktion aktiviert werden. 62 BACnet Europe Journal 10 03/09 Das Engineering von HLKAnlagen erfolgt komfortabel und effizient mit der Engineering-Software RCOTool: Unterstützt werden Netzwerklayout, Programmierung der Controller, Anlegen und Verwalten der BACnet-Objekte sowie die Dokumentation und Inbetriebnahme. Die generierten Daten des RCO-Tools können komplett in die neue GLT-Software RCO-View eingelesen und ohne weitere Konvertierungsschritte verarbeitet werden. The freely programmable Controlesta RCO Master Controller of the D-series with the B-BC BACnet device profile supports the BACnet variants BACnet/ Ethernet, BACnet/IP, BACnet MS/TP and BACnet/ PTP. Additionally the protocols Modbus, M-bus, Wilo, Grundfos, ASCII, etc. are supported. These various integration and communication abilities can be used simultaneously in dependence of the available interfaces. For regulation and control of HVAC installations the modular system offers to connect up to 32 I/O-Modules to one Controller. Output modules with integrated manual override ability and automatic feedback to the system, as well as different mounting methods, DIN rail or panel door, are further advantages of the system. Different BACnet network topologies The BACnet network option “Router” give the opportunity for the system internal conversion of different BACnet network topologies, e.g. BACnet/Ethernet to BACnet/IP or BACnet MS/TP to BACnet/IP. The BBMD functionality can be activated in the BACnet/ IP operation mode if necessary. The engineering of HVAC installations takes place comfortably and efficiently with the engineering software RCO-tool: Supported are network layout, programming of the controllers, creation and administration of the BACnet objects as well as the documentation and commissioning. The generated data of the RCO-tool can be completely transferred into the new BMS-Software RCO-view and can be used without further conversion steps. ELESTA GmbH Building Automation [email protected] www.elesta.de Produkte Products Grenzenlose Programmierfreiheit Boundless programming freedom Mit dem BACnet/IP-Controller 750-830 hält das WAGOI/O-SYSTEM seit Kurzem auch in BACnet Anwendungen Einzug. With the BACnet/IP-Controller 750-830 the WAGO-I/OSYSTEM has found its way into BACnet applications as well. Der WAGO BACnet/IPController 750-830 bietet alle bekannten Produktvorteile des modularen WAGOI/O-Systems 750 und der 32 Bit Ethernet-Controller inkl. modbus/TCP-Protokoll und Webserver. Mit dem freiprogrammierbaren Controller können HLK- und Einzelraumapplikationen realisiert werden. Insbesondere die Gateway-Funktionalität mittels angesteckter K N X / E I B / T P 1- K l e m m e zu KNX/TP1-Linien und DALI Beleuchtungssteuerungen ist hier hervorzu heben. Universell einsetzbar In Verbindung mit dem modularen WAGO-I/O-System ergeben sich vielfältige Einsatzmöglichkeiten, die weit über die genannten Anwendungen hinausgehen. Im einfachsten Fall arbeitet der WAGO BACnet-Controller im „Nativen Betrieb“ zur direkten Datenerfassung und -weitergabe an einer B-OWS (Visualisierung) oder zur kostengünstigen Erweiterung der I/O-Ebene für BACnet-DDCs anderer Hersteller. Mittels der freien Programmierung lassen sich jedoch direkt eine Vielzahl an Applikationen im Bereich HLK (Primäranlagen) und Einzelraum realisieren. Der WAGO BACnet/IPController 750-830 kann somit universell in einem Gebäudeautomationsprojekt eingesetzt werden: Als kostengünstige Erweiterung von I/Os in einem BACnet Netzwerk mit vorhandenen oder vorge gebenen DDCs. Als eigenständige DDC in einem BACnet Netzwerk ausschließlich mit WAGO Controllern und einer übergeordneten Leitwarte (B-OWS). Als interoperabler BACnet/ IP-Controller in einem Multi-Vendor Projekt. Ausführliche Datenblätter und Handbücher zu Hardund Software stehen unter www.wago.com im Unterpunkt „Gebäudeportal“ zum Download bereit. there is a multitude of deployment possibilities that go a lot further than the mentioned applications. In “native operation” the WAGO BACnet-Controller works for direct data collection and distribution at a B-OWS (visualization) or as a cost effective enhancement of the I/O level for BACnet-DDCs of other producers. Due to the free programmability there are a lot of applications in HLK (primary devices) and sole rooms that can be directly realised. Therefore the WAGO BACnet/IP-Controller 750830 can be used for many purposes in a building automation project: As cost effective enhance- ment of I/Os in a BACnet network with existing or preset DDCs. As stand-alone DDC in a BACnet network only with WAGO controllers and superior master disply (B-OWS). As interoperable BACnet/ IP-Controller in a multi vendor project. To download comprehensive data sheets and manuals for hard and software please visit www.wago.com, sub item “building portal”. WAGO Kontakttechnik GmbH & Co. KG [email protected] www.wago.com The WAGO BACnet/IPController 750-830 provides all product advantages of the modular WAGO-I/O system 750 as well as the 32 Bit Ethernet controllers including MODBUS/TCP protocol and web server. With this freely programmable controller HLK and sole room applications can be realised. The gateway functionality via connected KNX/EIB/TP1 clamp to KNX/TP1 lines and DALI lighting controllers should be emphasised at this point. Variety of usage In combination with the modular WAGO-I/O system BACnet/IP-Controller und Screenshot des Configurators. BACnet/IP-Controller and screenshot of the Configurator. BACnet Europe Journal 10 03/09 63 Produkte Products Barrierefreie Kommunikation Barrier-free Communication Die neue PMC2-Automationsstation von Neuberger wurde nach aktuellem BACnet Standard entwickelt. The new PMC2 automation station from Neuberger was developed according to the latest BACnet standard. PMC2 wurde für BACnet/IP entwickelt und ist eine kommunikative Automationsstation mit integrierter LVB (lokale Vorrangbedien- /Anzeigeeinrichtung). Durch ihre software- und hardwareseitige konsequent modulare, freiprogrammierbare Konzeption ist PMC2 flexibel in allen Bereichen der Gebäudeautomation sowie für Reinraummonitoring einsetzbar. BTL zertifiziert PMC2 wurde nach dem aktuellen Standard ANSI/ ASHRAE 135-2004, DIN EN ISO 16484-5 entwickelt und ist eines der ersten europäischen Produkte, die das BTL-Zertifikat für erfolgreich getestete BACnet-Konformität erhielt. So wurde die Neuberger-Automationsstation als BACnet Building Controller (B-BC) nach Teststandard ANSI/ASHRAE 135.1, DIN EN ISO 164846 zertifiziert. Der Controller bietet vollen Zugriff auf die Objekte, unterstützt alle Alarm- und Eventfunktionen und ist über Remote Device Management bedienbar. Die offene Architektur ermöglicht barrierefreie Kommunikation ohne Umwege: Neben dem nativen BACnet/ IP gibt es Profibus, LON, Modem, ISDN, EIB, M-Bus, MODBUS, RK512, eBus, USB, RS232 und SD-Karte. Weitere Eigenschaften sind: ein sekundengenaues Langzeit-Eventarchiv mit bis zu 1024 Kanälen für Messwerte, Zählwerte und Ereignisse, ein leistungsfähiges CPUModul, geeignet für alle Ausbaustufen, die Möglichkeit, für Redundanzanwendungen auch mit zweitem StandbyCPU-Modul zu arbeiten, intelligente, hotplug-fähige Module, die auch autark arbeiten können sowie ein optionales Bediendisplay als Anzeige-, Bedien- und Parametriergerät, mit Meldeticker, Archiv- und Trendanzeige. Alle Eigenschaften machen die PMC2 zu einer zuverlässigen und flexiblen Automationsstation. PMC2 has been developed for BACnet/IP and is a communicative automation station with integrated LO/ID (local override/indication device). PMC2 is flexibly applicable in all areas of the building automation system as well as for clean room monitoring due to the consequent modular, freely programmable conception from the hardware and software. 64 BACnet Europe Journal 10 03/09 Die Automationsstation PMC2 und Bediendisplay. The Automation Station PMC2 and Operator Display. BTL certificate PMC2 has been developed according to the latest ANSI / ASHRAE 135-2004, DIN EN ISO 16484-5 standard and is one of the first European products which obtained the BTL certificate of successfully tested BACnet conformity. The Neuberger Automation Station was certified as a BACnet Building Controller (B-BC) that complies with the ANSI/ASHRAE 135.1, DIN EN ISO 16484-6 test standard. The Controller provides full access to the supported objects, supports all alarm and event functions and can be managed via Remote Device Management. The open architecture enables direct and barrier-free communication: Additionally to the native BACnet/IP also Profibus, LON, Modem, ISDN, EIB, M-Bus, MODBUS, RK512, eBus, USB, RS232 and SD card are provided. Further Features are: longterm event archive to the second including up to 1024 channels for measured values, count values and events a high-performance CPU module, suitable for all expansion stages also working with second Standby CPU Module for redundancy applications intelligent, hotplug-capable modules which are also able to operate independently optional operator display (display, operation and parameterization device, incl. message ticker, archive and trend display). Thanks to these features the PMC2 is a reliable and flexible automation station. Neuberger Gebäude automation GmbH & Co. KG [email protected] www.neuberger.net BACnet Interest Group Europe BACnet auf dem Vormarsch in Dubai BACnet on the move in Dubai Zum ersten Mal haben sich BACnet Fachleute aus Amerika, Europa und dem Mittleren Osten für gemeinsame Marketingmaßnahmen zusammengeschlossen. Sie waren Aussteller auf der Big 5 in Dubai im November 2008. Die großen 5 Tage der Bau- und Konstruktionsbranche sind die größte Ausstellung ihrer Art im Mittleren Osten. For the first time BACnet professionals from America, Europe and Middle East joined for common marketing activities. They were exhibitors at the Big 5 in Dubai in November 2008. The “big five” days of building and construction exhibition are the largest ones in Middle East. Vier BACnet Technologieanbieter und drei BACnet Nutzergruppen präsentierten den offenen Standard auf einem Gemeinschaftsstand. Zukunftssichere Controller waren unter den verschiedenen Anbietern verbunden. „Das ist wahre Interoperabilität, nicht nur eine Verkaufsmasche! Die Kunden können wirklich sehen wie die verschiedenen BACnet Systeme an diesem Stand nahtlos miteinander arbeiten“, betont Vijay Kumar, Vizepräsident der BACnet Interest Group Middle East (BIG-ME). “Unsere Bauindustrie braucht offene BACnet Lösungen. Sie passen perfekt zu den großen Multi-Vendor-Projekten, die in der Region des Mittleren Ostens mittlerweile Usus sind. Im Endeffekt geht es darum, dem Kunden eine größere Auswahl zu bieten: BACnet stellt sicher, das fair gespielt wird und gleiche Wettbewerbsbedingungen für alle in der Gebäudeautomations- und Steuerungsindustrie herrschen.” BACnet zum „Anfassen“ Am Stand wurden Demonstrationen von Automated Logic, Delta Controls, Plüth Regelsysteme und Siemens durchgeführt. Mit BACnet können die verschiedenen Gebäudesubsysteme leicht geregelt werden. Strom, Lüftung, Heizung, Sicherheit und vieles mehr – der offene Standard verbindet alle Geräte zu einem System. Die Ausstellung wurde von der amerikanischen BACnet International (BI), der BACnet Interest Group Europe (BIGEU) und der BIG-ME unterstützt. Sie war der Ausgangpunkt für mehr gemeinsame BACnet Aktivitäten im Mittleren Osten. Das erste BACnet Middle East Journal wird bald erscheinen und die BACnet Nutzer im Mittleren Osten werden sich vom 23.27. November auf der Big 5 2009 wieder treffen. Four BACnet technology providers and three BACnet user groups presented the open standard at a common booth. Future-proof controllers were interconnected between the providers. “This is real interoperability, not just a sales pitch! Customers can actually see competing BACnet systems interoperate seamlessly at this booth”, stressed Vijay Kumar, Vice President of the BACnet Interest Group Middle East (BIG-ME). “Our building industry needs BACnet open solutions. They go perfectly with the huge multi-vendor projects that are now common throughout the middle east region. Eventually it is all about giving customers a wider choice: BACnet ensures fair-play and a level playing field within the Building Automation & Controls industry.” BACnet “made real” At the booth demonstrations were done by Automated Logic, Delta Controls, Plüth Regelsysteme and Siemens. With BACnet the different building subsystems can be easily controlled. A/C, ventilation, heating, security and more - the open standard links all devic- es to one system. The show was supported by the American BACnet International (BI), by the BACnet Interest Group Europe (BIG-EU) and the BIG-ME. It was the starting point for more common BACnet activities in Middle East. The first BACnet Middle East Journal will come up soon. And BACnet users in Middle East will meet again at the Big 5 2009, November 23-27. In Dubai zeigt BIG-ME Vizepräsident Vijay Kumar Perspektiven für den BACnet Standard. BIG-ME vice president Vijay Kumar points to BACnet standard prospects. BACnet Europe Journal 10 03/09 65 BACnet Interest Group Europe Willkommen in der BIG-EU Welcome to the BIG-EU Olli Tevä Tel. +358 (0)20 1212 632 [email protected] www.vacon.com Vacon stellt eine neue Produktfamilie vor, die eigens für den Bereich der Haustechnik einschließlich Heizungs-, Lüftungs- und Klimatechnik (HLK-Technik) konzipiert wurde. Weltweit werden 40% der Energie in Gebäuden verbraucht und hier gehört die HLK-Technik zu den größten Verbrauchern. Frequenzumrichter sind in der Lage, durch elektronische Drehzahlregelung den Energieverbrauch von eingesetzten Elektromotoren drastisch zu reduzieren und so auch zur weltweiten Reduzierung von CO2-Emissionen beizutragen. Vacon liefert Frequenzumrichter im Niederspannungsbereich mit Leistungen zwischen 0.25 kW – 5 MW. Der Umsatz der Vacon Gruppe im Jahr 2007 betrug 232,2 Millionen Euro. Der neue Vacon 100 HVAC setzt neuen Maßstab bei Frequenzumrichtern. Vacon introduces a new product range, specifically tailored to building automation industry, comprising of the heating, ventilation and air conditioning sector (HVAC) applications. Globally, 40% of the energy is used in buildings, where HVAC applications are the biggest consumers. AC drives can dramatically decrease the energy consumption of HVAC applications, thus contributing to a global reduction of CO2 emissions. Vacon provides AC drives in the power range 0.25 kW – 5 MW. Revenues in 2007 totalled EUR 232.2 million. Vacon 100 HVAC sets new standard in HVAC drives. Legrand pursue a dual ambition, namely to become the leader in products and systems for electrical installations and information networks on all markets, and to become the benchmark player in smart electricity by providing innovative solutions and services. Jean-Luc Citerne [email protected] www.legrand.fr Its product offer is particularly extensive since the Legrand Group’s catalogues include over 150,000 items, subdivided into 80 product families. The Group offers complete solutions through to home and building automation, which integrate in particular the distribution of electrical energy and information, controls and connections, security systems for people and property, solutions for industrial buildings and processes. Legrand’s market, which represents around Euro 60 billion, is very fragmented. The Group holds leadership positions in at least one of its major business areas in a number of countries. Legrand erwirtschaftete im Jahr 2007 einen Gesamtumsatz von 4,1 Milliarden Euro, d.h. eine Steigerung um 10,5% im Vergleich zu 2006. Legrand verfolgt zwei Ziele: einerseits die Führungsposition bei Produkten und Systemen für Elektroinstallationen und Datennetzwerke auf allen Märkten einzu nehmen und andererseits sich als Benchmark im Bereich der intelligenten Elektrizität zu etablieren, indem innovative Lösungen und Services geboten werden. Mit über 150.000 Artikeln aus 80 Produktfamilien ist das Produktangebot in den Katalogen der Legrand-Gruppe überaus vielfältig. Angeboten werden Komplettlösungen für Hausund Gebäudeautomation mit Strom- und Datenverteilung, Steuerungen und Anschlüssen, Sicherheitssystemen für Mensch und Gebäude, aber auch Lösungen für Industriegebäude und -prozesse. Der Markt der Legrand-Gruppe, der etwa 60 Milliarden Euro darstellt, ist stark gesplittet. Die Gruppe hat Führungspositionen in mindestens einem ihrer Hauptgeschäftsfelder in zahlreichen Ländern inne. Legrand in 2007 made sales totalling Euro 4.1 billion, up by 10.5% in comparison with 2006. 66 BACnet Europe Journal 10 03/09 Newron System serge.lemen@newronsystem. com www.newron-system.com 1993 gegründet ist NEWRON SYSTEM ein reines Softwarehaus das Tools, Expertise und Training in BMS Systemen anbietet. Wir haben uns mit Scada Engine, einer Australischen Firma, zusammengetan und bieten nun eine weitläufige Palette an Software zum mana- gen, pflegen und überwachen von BACnet Netzwerken an. Newron bietet eine Komplettlösung zur Kopplung eines SCADA Systems oder einer Windows Anwendung mit dem nativen BACnet an. Im Newron Portfolio sind außerdem hoch entwickelte OPC-Server oder aber kostengünstige Windows API für eine schnelle Entwicklung einer nativen BACnet Kundenanwendung für Windows (OWS). Ziel ist es, die Integrationszeiten und –kosten zu verringern und das Systemdesign zu vereinfachen. Founded in 1993, NEWRON SYSTEM is a pure software house proposing tools, expertise and training on BMS Systems. In the beginning Newron developed LonWorks software, now they producing products on the BACnet standard. We teamed up with Scada Engine, an Australian company, and now we are proposing a complete range of software to manage, maintain and supervise BACnet networks. Newron offers a complete solution to interface a SCADA system or any Windows API to native BACnet. Furhtermore Newron propose enhanced OPC servers but also a low cost Windows API to quickly develop a BACnet native client application for Windows (OWS). Our aim is to reduce integration time and cost and ease system design. BACnet Interest Group Europe Entwickler in Helsinki beim 4. BIG-EU Plugfest Workshop Helsinki is the venue of the 4th BIG-EU Interoperability Workshop Der 4. BIG-EU Interoperability Workshop, allgemein bekannt als das BACnet European Plugfest, wird von ABB gesponsert und organisiert. Das dreitägige Event wird vom 22. bis 24. April 2009 stattfinden und wurde von der BIG-EU ins Leben gerufen, um die fehlerfreie Interoperabilität von BACnet-Produkten und die Über wachung des BACnet-Standards zu ermöglichen. Das Event wird in der ABB Antriebsfabrik in Helsinki, Finnland stattfinden. The 4th BIG-EU Interoperability Workshop, more commonly referred to as the BACnet European Plugfest, is being sponsored and organized by ABB. The three day event, from 22nd to 24th April 2009, is initiated by BIG-EU in order to enable a flawless interoperation of BACnet products and the observance of the BACnet standard. The event will be held at ABB’s drives factory in Helsinki, Finland. Das BIG-EU Plugfest 2009 treibt die Verbesserung der Interoperabilität von BACnetGeräten voran, indem es um die 30 Hersteller und Händler einer breiten Palette von BACnet-Geräten zusammenbringt. Die Anzahl der BACnet Spezialisten, Entwickler und Ingenieure aus den USA und Europa, die beim diesjährigen europäischen Plugfest anwesend sein werden, wird voraussichtlich die 60 überschreiten. Das Plugfest bietet den Teilnehmern ein exzellentes Forum um individuelle Produkte und neue Funktionalitäten miteinander in MultiVendor-Systemen zu testen. Zudem bietet das Event den teilnehmenden Firmen die Chance, die neuesten Informationen zum BACnetStandard und den Konfor- mitätstests zu erhalten und damit sicherzustellen, dass die Mitglieder der BACnetCommunity alle zusammen an einem harmonischen Protokoll arbeiten. „Das BACnet Protokoll ist dynamisch und wird ständig weiterentwickelt. Das stellt natürlich eine Herausforderung für die Entwickler von BACnet-Geräten dar. Aber vor allen Dingen eröffnet es spannende Möglichkeiten für kreative, innovative Produkte und Lösungen in der Gebäudeautomation. Die BACnet Community ist offen und ihr gemeinsames Ziel ist es, das Bewusstsein für BACnet zu erweitern und noch mehr benutzerfreundliche Geräte zu entwickeln,“ erklärt Teemu Heikkilä, einer der BACnet Experten bei ABB. Der 4. BIG-EU Interoperability Workshop wird in ABBs Tellus Gebäude in Helsinki, Finnland stattfinden. The 4th BIG-EU Interoperability Workshop will be held at ABB’s drives factory in Helsinki, Finland. The BIG-EU Plugfest 2009 promotes the further improvement of BACnet devices interoperability by bringing together some 30 manufacturers or vendors of a multitude of BACnet devices. The number of European and U.S. BACnet specialists, developers and engineers at this year’s European Plugfest is estimated to exceed 60. The Plugfest offers the participants an excellent forum for testing individual products and new functionalities with each other in multi-vendor systems. The event also gives the participating companies the chance to obtain the latest information on the BACnet standard and conformance testing, ensuring that the members of the BACnet community are all working together towards a harmonized protocol. “The BACnet protocol is dynamic and under continuous development. This generates challenges for developers of BACnet devices but, above all, opens up exciting new opportunities for creating innovative products and solutions in building automation. The BACnet community is open and the community’s joint objective is to create awareness of BACnet and develop even more user-friendly products,” explains Teemu Heikkilä, one of ABB’s BACnet experts. Teemu T Heikkilä teemu.t.heikkila@ fi.abb.com Tel.: +358-50-332 3734 BACnet Europe Journal 10 03/09 67 ABB standard drives for HVAC – fluent in native BACnet – IP & MS/TP Frequenzumrichter für die Gebäudetechnik – beherrschen fließend BACnet – IP & MS/TP ABB standard drives for HVAC. 20 000 BACnet installations worldwide. HKL-Frequenzumrichter von ABB. 20 000 BACnet Installationen weltweit. Here’s why ABB standard drives for HVAC applications really Das sind die Gründe, warum HKL-Frequenzumrichter von ABB wirklich make a difference: den Unterschied machen: • Suitable for standard induction motors rated from 0,75 to • Für Standard-Asynchronmotoren mit einer Nennleistung von 355 kW (1 to 550 HP) 0,75 bis 355 kW (1 bis 550 HP) geeignet • Native BACnet embedded as standard • BACnet standardmäßig integriert • Direct connection to BACnet MS/TP networks – • Direkte Ankopplung an BACnet MS/TP-Netzwerke - kein Gateway no add-ons needed • Snap-on router as option - enables integration to BACnet/IP networks • BTL approved B-ASC (Application Specific Controller), conforms to ISO 16484-5:2007 Visit us at www.abb.com/drives notwendig • Aufsteckbarer Router ermöglicht Anbindung an BACnet/IP-Netzwerke • BTL-Zulassung B-ASC (Application Specific Controller), erfüllt ISO 16484-5:2007 Besuchen Sie uns im Internet unter www.abb.de/motors&drives E-Mail: [email protected] BACnet Interest Group Europe BACnet Forum Beijing – Chinesisches Normenkomitee ist Gastgeber Host is Chinese Standard Committee In Anlehnung an den großen Erfolg des ersten BACnet China Journals im Juni 2008 freuen wir uns das erste BACnet Forum Beijing, am 20. Oktober 2009 in Beijing, anzukündigen. Gastgeber des Forums in China ist das Chinesische Nationale Normenkomitee für digitale technische Anwendungen in Gebäuden und Wohnsitzen. Das Normenkomitee ist ein Regierungsinstitut zur Festlegung von Gebäudeautomationsstandards. Hier wird an der Standardisierung von BACnet-Technologien für die chinesische Gebäude automation gearbeitet. Auf dem BACnet-Forum Beijing sollen die fortschritt- lichen BACnet-Technologien aus den USA und Europa auf dem chinesischen Markt eingeführt werden. Die Zielgruppe des Forums sind chinesische Experten, die sich mit der BACnet-Technologie beschäftigen – Betreiber, Investoren, Berater, Entwickler, Hersteller, Systemintegratoren, Spezifikatoren, Eigentümer und Nutzer. Interessierte Systemanbieter sind aufgerufen, ihre BACnet Lösungen in Beijing vorzustellen. Following the great success of the first issue of the BACnet China Journal in June 2008, we are delighted to announce the first BACnet Forum Bei- jing, in Beijing on 20th October 2009. The host of the forum in China is the Chinese National Standard Committee of Digital Technique Application of Building and Residence, who is a government institute for setting building automation standards. It is working for standardizing of BACnet technology for building automation in China. In BACnet Forum Beijing, the advanced BACnet technology and products from USA and Europe will be introduced to the Chinese market. The target group of the forum are aimed at Chinese experts involved with BACnet technology whether operators, inves- tors, consultants, developers, manufacturers, system integrators, specifiers, owners or users. Interested systemprovider are asked to apply for a presentation of the BACnet solutions in Beijing. Feng Gao Tel.: +49- 2 31-42 78 67 31 Fax. +49- 2 31-42 78 67 32 E-Mail: [email protected] Grenzlose Integration – BACnet in Mailand BACnet in Milan – Boundless Integration In Mailand wurden die Weichen für eine BACnet Interest Group Italy gestellt. Am 4. Dezember 2008 trafen sich die italienischen BACnet Anwender zum zweiten BACnet Forum in Mailand. 80 Experten aus allen Bereichen der Gebäudeautomation diskutierten über Neuigkeiten rund um den BACnet Standard ISO 16484-5. Auf der begleitenden Ausstellung demonstrierten sie die Vorteile der Interoperabilität. Franco Anzioso, FIAT Research Center, stellte bedarforientiertes Energiemanagement mit BACnet vor. Franco Anzioso, FIAT Research Center, presented integrated energy demand management with BACnet. Energieeffizienz und Energiemanagement mit BACnet waren die meist diskutierten Themen des Forums. Durch neue Normenzusätze wird das Potenzial von BACnet noch größer. Das Forum in Mailand bot einen Mix aus akademischen Beiträgen und praxisbezogenen Anwenderberichten. So wurde sowohl über den aktuellen Markt der Building Automation in Italien, über die neuesten Forschungsergebnisse rund um das Energiemanagement als auch über den praktischen Einsatz von BACnet in Italien referiert. Den Abschluss bildete eine engagierte Diskussion über die Zukunft von BACnet in Italien. „Wir wollen die Zukunft der Gebäudeautomation in Italien aktiv gestalten“, so das Fazit von Antonio Catalano, dem italienischen Repräsentaten in der europäischen BACnet Interest Group (BIG-EU). Wie die italienische BACnet Gruppe ihre weitere Arbeit konkret gestaltet wird Thema eines weiteren Treffens in Mailand im April sein. In Milan the course is set for a BACnet Interest Group Italy. On December 4, 2008, the traditional Italian BACnet users met at the 2nd BACnet Forum in Milan. 80 Experts from all areas of building automation discussed news around the BACnet standard ISO 16484-5. At the accompanying exhibition they demonstrated the advantages of interoperability. Energy efficiency and energy management with BACnet were the most discussed topics. Due to new additions to the standard BACnet’s potential grows even more. The Forum in Milan provided a mix of academic lectures and realistic user reports. This ensured lectures about the current market of building automation in Italy, about newest research results on energy management as well BACnet Europe Journal 10 03/09 69 BACnet Interest Group Europe as about the practical application of BACnet in Italy. At the end a dedicated discussion about BACnet’s future in Italy took place. “We want to actively create the future of building automation in Italy“, states Antonio Catalano, the Italian representative at the European BACnet Interest Group (BIG-EU). How precisely the Italian BACnet Group will arrange its work will be subject to yet another Meeting in Milan in April. LOYTEC www.loytec.com L-INX Automation Server Visualization OPC XML/DA Server Alarming Scheduling BACnet Forum Wien/Vienna Trending Notification Remote Access ������ Calculation L-Web Clients Auf dem ersten österreichischen BACnet Forum kündigte Bill Swan die Ergänzungen zum BACnet Standard an. At the first Austrian BACnet Forum Bill Swan annouced the enhanced BACnet standard. BACnet Kalender – Calendar of BACnet Events Datum Date Ort Location Veranstaltung Event 10.14.03.2009 Frankfurt, D ISH 2009 22.24.04.2009 Helsinki, FI BIG-EU Interoperability Workshop 2009 23.24.06.2009 BACnet/ VDI Training: Stuttgart, D Gebäude automation mit BACnet Stuttgart, D pre-testing Workshop 29.30.09.2009 Düsseldorf, D BACnet/ VDI Training: Gebäude automation mit BACnet 20.10.2009 Beijing, Cn 25.26.06.2009 Kontakt Information Jochen Willems, MarDirect GbR, Dortmund, D., [email protected] Teemu T. Heikkila, ABB, Helsinki, FI, [email protected] Frank Schubert, MBS GmbH, Krefeld, D., frank.schubert@ mbs-software.de Hans R. Kranz, HAKIngenieurberatung Haustechnik Automation Kranz, Forst, D., [email protected] Frank Schubert, MBS GmbH, Krefeld, D., frank.schubert@ mbs-software.de Thomas Kurowski, WSPlab, Stuttgart, D., [email protected] Frank Schubert, MBS GmbH, Krefeld, D., frank.schubert@ mbs-software.de Hans R. Kranz, HAKIngenieurberatung Haustechnik Automation Kranz, Forst, D., [email protected] BACnet Forum Bejing The Big 5 Dubai, UAE Common Booth BACnet Forum Madrid, E Madrid Feng Gao, MarDirect GbR, [email protected] BIG-EU Office, Dortmund, D, [email protected] BIG-EU Office, Dortmund, D, [email protected] 25.27.01.2010 Orlando/ USA AHR Expo 2010 Common Booth BIG-EU Office, [email protected] 9. 12.02.2010 Paris, F interclima + elec home&building Maguy de Mercurio, Association BACnet France, Paris F, [email protected] 11.16.04.2010 Frankfurt, D Light + Building 2010 BIG-EU Office, [email protected] 23.26.11.2009 2009 2010 w 70 BACnet Europe Journal 10 03/09 Central Data Logger WLAN Router SQL DB Internet/Intranet Wired/Wireless Router, Firewall OPC XML-DA LonMark® or BACnet® System The L-INX Automation Server for BACnet® networks or LonMark® systems hosts customized pages with dynamic content. With its embedded visualization, automation functions, remote access, OPC XML/DA Server, e-mail notification, and SQL compatibility, L-INX is the perfect solution for the connected real estate and for managing buildings of any size. LOYTEC electronics GmbH, Blumengasse 35, 1170 Wien, Austria [email protected] • Tel.: +43 (1) 40208050 • Fax: +43 (1) 4020805 - 99 L-INX is a trademark of LOYTEC electronics GmbH. LonMark and the LonMark Logo are managed, granted, and used by LonMark International under a license granted by Echelon Corporation. BACnet is a registered trade mark of the American Society of Heating, Refrigerating and Air Conditioning Engineers, Inc. (ASHRAE). networks under control TM Expert in Building Automation [IRC] SOLUTION : HVAC - Light - Sunblind - Single BACnet® device - IR & RF extra small multi sensor (presence & lux level) - Multi-functions remote controller - RJ digital links MULTI-ENERGY ECO-PERFORMANCE SOLUTION Modular and well-suited Z.A. Les Andrés B.P.5 - 69126 Brindas - France Tél : +33 (0)4 78 45 60 77 - Fax : +33 (0)4 78 45 22 33 www.acelia.eu … see you there. 10.–14.03. ISH 2009 Stand 10.2, A75 … wir sehen uns. Our current products and systems also stand for energy efficiency and cost effectiveness. At ISH 2009 we will show you how to save energy and optimize your installation with our: DDC4000 automation system, BMR bus module controller, RCN-L room controller, MD15 mini motor actuator or the Neutrino-GLT building management system. Kieback&Peter remaining faithful to its traditions. Then and now Damals wie heute „Spart Kohle – spart Arbeit“. So warb Kieback&Peter früher. Auch unsere aktuellen Geräte und Systeme stehen für Energieeffizienz und Wirtschaftlichkeit. Auf der ISH 2009 zeigen wir Ihnen, wie Sie mit dem Automationssystem DDC4000, dem BMR, Raumreglern wie dem RCN-L, dem Kleinstellantrieb MD15 oder der Neutrino-GLT Energie sparen und Ihre Anlagen optimieren können. Kieback&Peter bleibt guten Traditionen treu. www.kieback-peter.de Kieback&Peter GmbH & Co. KG, 12347 Berlin, Germany, Tel.: +49 30 600 95-0, E-Mail: [email protected]