Adaptable buildings - Bunnings Warehouse

Transcription

Adaptable buildings - Bunnings Warehouse
TRADE
JUNE 2013
It warrants buying the best
AEG innovation now extends
to new warranties
The new tools of the trade
Introducing Full Boar
Compliance Corner
Helping you to reduce the
burden of compliance
Adaptable buildings
Now there's a solution
Cool tips on how to battle
the hot and the cold…
Earn learning points
WITH TRADE ISSUE
What a summer we had and now, in the middle of winter, keeping warm
has once again come onto the agenda. Keeping cool in summer is one
thing but winter presents its own challenges. Many of our homes are not
insulated resulting in lower internal temperatures. This isn’t good for one’s
health, or one’s overall living environment. That is why in this – our first
anniversary Trade Issue – we’ve focused on a number of matters related
to insulation and keeping the perfect ambient temperature. We cover the
options for insulating existing buildings and for ensuring new buildings
comply with code clause H1; thermal efficiency.
• Comprehend and apply knowledge of the regulatory
environment of the building construction industry
• Organise and manage building projects
• Establish design briefs and scope of work and prepare
preliminary design
• Apply technical knowledge of construction methods and practice
• Demonstrate knowledge of current building and trade practice
Once you have read this edition
of Trade Issue remember to
keep a record of your learning.
1 hour of learning = 1 point
We also look at the different forms of insulation that are available and
describe how you can establish compliance with H1 for new buildings.
While this is an issue for new structures, it isn’t the case with existing
buildings. Nevertheless, it is important to remember that a building
#
LBP competencies covered in this edition
welcome
consent is required where un-insulated exterior walls are to be insulated.
Many people are not aware of this requirement or the impact of
unconsented work on insurance. As you’ll see, there are plenty of options
when insulating buildings.
Earthquake matters are still making headlines and Trade Issue is no
exception. While seismic activity in the Canterbury region appears to be
reducing, the broader effects are not. Government has just completed its
consultation on the upgrading requirements for all non-residential,
multi-unit and multi-storey residential buildings. You will also have seen
or heard the adverts explaining the changes to household insurance.
We also announce our new Adaptable Building Solutions range, the ideal
solution for farm buildings, workshops or factories. If the words
‘flexibility’ and ‘functionality’ strike a chord, this system will work
wonders for you.
See the new range on display at the Mystery Creek Fieldays at Hamilton.
Bunnings sites at G105 and G107 will showcase the Adaptable Building
Solution along with the latest from AEG, Ryobi and much, much more.
Contents
03 It warrants buying the best
06 Building Essentials
12 Welcome to compliance corner
15 Out with the old and in with the new
16 James Hardie – Tough like us
GIB – Bonus offer
08
Adaptable
building
solutions
04
New products
Finally, as always, I welcome your comments and feedback. In the
meantime I wish you a busy and prosperous winter.
Des Bickerton
Commercial Manager
The opinions expressed in Trade Issue are not necessarily those of Bunnings. Although every effort has been made to ensure
the accuracy of the information, the reader remains responsible for the correct selection and use of tools, materials and systems
as well as following any law or code mentioned in this issue.
2
14
The hot topic
of temperature
control
10
Building scene
It warrants
buying the best
AEG is a symbol of quality and performance. Combine this
with a warranty extension developed just for the trade and
the proposition is simply the best.
Since 1887, German brand AEG has been a
power house of innovation and development.
When you’re buying AEG you’re buying the
best. That alone justifies having AEG on the
job with you but to make matters even better
AEG Powertools has announced it will
dramatically increase the length of its trade
warranty. Now the company is offering customers
a total of 6 years on their power tools and 3 years
on their batteries and chargers. Without question
this is the best trade warranty on the market.
and chargers. The extended warranty will give
you additional peace of mind and confidence that
you’re covered should anything untoward happen.
Bunnings is proud to have AEG as part of our
product portfolio and even more so now that
they are offering such a sound guarantee of
product support.
We’ve got you covered
Taking advantage of this offer involves a simple
‘two-step’ process. After purchase you will be invited
to create a user account on the AEG Powertools
website. Once there it is simply a matter of
registering the power tools/batteries/chargers
by scanning in a purchase receipt.
The warranty extension gives you the option to
extend your warranty from the standard 3 years
available on power tools and 1 year on batteries
The beauty of having the receipt on file electronically
removes the need to file it – and find it – at a later
date. The risk of receipt fading is also eliminated.
Technology innovators
AEG has invested heavily in upgrading technology
in their 18V Cordless range. This includes the
introduction of brushless motors, fix tec tool free
interchangeable blades, higher-amperage batteries
and a broader range of skins including the new
Omni Pro interchangeable head Multi-Tool.
There’s a lot of innovative new product in the
pipeline. It’s going to be a very exciting year for
AEG Powertools in New Zealand and, by definition,
for people who want quality and performance in
what they bring to the job.
The AEG Powertools extended warranty is
offered in addition to all other rights and
remedies provided under the New Zealand
Consumer Guarantee Act 1993.
To learn more, simply go to aegpowertools.co.nz
3
new
TOOLS OF THE TRADE
Introducing Full Boar, the new range of industrial
grade heavy duty tools aimed at the professional.
86783
Full Boar provides trade quality tools that tradesmen can always rely upon to get the job done. The new Full Boar
brand offers a jack hammer, demolition breaker, brick saw, compactor, compressor and a rammer. All tools
incorporate a functional design, excellent specifications and powerful outputs at great prices.
TECH SPECS
433
$
91
Pavement Breaker
Rated Voltage: 230-240V 50Hz
Rated Power: 2050W
Impact Energy: 50J
Impact Rates: 1,030bpm
Tool Holder: 28mm Hex
Net Weight: 29.1kgs
Package:Kitbox (with wheels)
+ Brown Box
EXCL. GST
SKU00233923
Full Boar Demolition Hammer
Designed for breaking and chipping light concrete,
block and masonry products. This unit is light weight
and easy to handle in and around the work area.
• Powerful 1500W motor supplies enough energy for
all breaking needs
• Delivers 40J of impact energy ideal for all kinds of
demolition work
• Tool-free bit change allows for fast and easy accessory changes
• Rubber grip handles for increased user comfort and safety
• Lock on trigger switch reduces user fatigue when used over
extended periods
• Carry case for ease of carry and storage
Demolition Hammer
Rated Voltage:
240V/50Hz
Rated Input:
1500W
Impact Rate:
1150 bpm
Impact Energy: 40J
Tool Holder:
Hex
Breaking Capacity: Up to 150mm Create
Net Weight:
12.9kgs
Packaging Type: BMC+Colour Box
$
EXCL. GST
SKU00233926
Full Boar Pavement Breaker
Big enough to handle all of your serious demolition
applications including breaking thick commercial
driveway concrete, curbs, bitumen roadway etc.
This high powered/high impact rated pavement
breaker will handle anything you put in front of it.
The anti-vibration system helps to lower vibrations
even on the toughest of jobs.
• Symmetric heavy duty design for tough works
• Anti-Vibration System ensures lower vibration
• Impact force of 50 Joules suitable for all
kind of work
• Heavy duty transmission chain provides higher
stability and longer tool life
• Wheeled Kitbox for easy storage and convenient
mobility in and around the worksite
Demolition Breaker
Rated Voltage:
230-240V 50Hz
Rated Power:
1750W
Impact Energy:
45J
Impact Rates:
1,300bpm
Break Capacity:
200mm Masonry
Accessories Fitment: 30mm Round Hex Shaft
Weight:
15.1 Kg
Package:
BMC with Colour Box
34348
$
EXCL. GST
SKU00233918
Full Boar Demolition Breaker
Enough grunt to break up heavy duty concrete slabs, brick walls, driveways,
pathways etc. The double anti-vibration system reduces fatigue.
• Double Anti-Vibration System ensures lower vibration while performing tough jobs
• Extensive Soft Grip helps reduce fatigue when long time working
• Auto-stop Carbon Brushes helps prevent damage to the tool
• New Symmetric and Ergonomic Design makes it much more comfortable for users
• Die Cast Magnesium Gear Housing enables lightweight and quick heat elimination
• Power Indication Light allows the user to know immediately when cable breaks
4
4346
$
EXCL. GST
SKU00228457
SMART Carbide blade – 032CB1
•Excellent for precise tile grout removal
•Shape allows reach right into corners
•Doesn’t damage the tiles
•Made in USA
•Lifetime guarantee
EXCL. GST
SKU00230896
SMART FANG blade – 035HCT1
•Heat treated hard pointed teeth, increase
life and keeps sharp for longer
•Super thin for fast cutting
•Universal shank – suits all common trade brands
•Made in USA
•Lifetime guarantee
3904
$
SMART Carbide blade – 032CB1
•32mm wide
•42mm reach
•1pc packet
SMART FANG blade – 035HCT1
•35mm wide
•54mm cutting depth
•Coarse cutting
•1pc packet
3035
$
TECH SPECS
EXCL. GST
SKU00228452
SMART Nail Buster Extreme blade
– 044BMT1
•The ultimate “wood with nails” blade
•Titanium coated teeth increase life by reducing friction
•Super thin for fast cutting
•Made in USA
•Lifetime guarantee
47739
$
BOSCH GOL 26 D KIT
EXCL. GST
SKU00312321
•Large aperture allows more light for a sharper image
•Collimator and bubble vial are built into the housing
for greater durability
•Magnification of 26 x
•Comes complete with Heavy Duty Tripod
SMART Nail Buster Extreme blade
– 044BMT1
•44mm wide
•54mm depth of cut
•1 pc packet
SMART Nail Buster blade – 032BM1
•32mm wide
•42mm cutting depth
•1pc packet
BOSCH GOL 26 D KIT
•360 degree unit of measure
•Levelling accuracy 1.6mm / 30m
•Working range up to 100m
•Dust and splash protection (IP54)
BOSCH GPL 3 3 Point Laser
•Provides plumb and level projection
•Self levelling pendulum system
•Levelling accuracy 0.3mm/m
•Levelling time 4 seconds
•Working range 30m
•Operating time 24hrs runs off
3 x 1.5 AA batteries
25913
$
EXCL. GST
SKU00312309
BOSCH GPL 3 3 Point Laser
•Plumb and level point projection with single button
control with auto pendulum lock when switched off
for safe transportation
•Single diode projects all points for superior accuracy
•Robust over moulded housing – water and dust proof
•Compact size, pouch fits easily on a tool belt
•Easy field calibration – maintains accuracy
ESTWING Sure Strike Hammer 20oz
•20oz all steel hammer
•Head and handle forged one-piece carbon steel
•Injected moulded cushion grip grey and blue
•Smooth face, curved claw
ESTWING Sure Strike Hammer 20oz
•Injected moulded cushion grip
•Curved claw for easy leverage when pulling nails
•30mm striking smooth face for fine finishing
2607
$
EXCL. GST
SKU00228625
SMART Nail Buster blade – 032BM1
•Bi-metal “wood with nails” blade
•Suitable for cutting a variety of building materials
•Universal shank – suits all common trade brands
•Made in USA
•Lifetime guarantee
4346
$
EXCL. GST
SKU00226301
5
essentials
BUILDING
every day low prices on everything you use every day
®
320W
Multi Tool
Variable speed dial.
$
SKU00307119
1350W
1/2" Router
SKU00978469
150mm
Bench Grinder
180W. Protective
shields & tool rest.
SKU00270647
258
70
SKU00387739
EXCLUDES GST
$
43cc
Petrol Post
Hole Digger
$
39087
EXCLUDES GST
216
52
$
43391
EXCLUDES GST
119
$
190W. SKU00540297
207
83
EXCLUDES GST
SKU00208531
1/3 Sheet
Orbital Sander
EXCLUDES GST
$
18V Drill
Combo Kit
Dewalt Planer
SKU00494348
$
232
17
EXCLUDES GST
260mm
Slide Compound
Mitre Saw
SKU00474853
57
EXCLUDES GST
$
60783
EXCLUDES GST
Terms and Conditions: Not all services and products featured are available in all stores, but may be ordered. See in store for product availability. Shelf prices may be lower than advertised to ensure lowest prices every day.
s
Laser Distance
Measurer
40m range. Capable of area
& volume calculations.
Pythagoras function.
Utility Knife
Metal handle.
SKU00131776
8
$ 68
$
8m Xtreme
Tape Measure
SKU00162394
EXCLUDES GST
SKU00231164
3474
17217
$
EXCLUDES GST
EXCLUDES GST
+
+
+
Handsaw
500mm. 8tpi.
SKU00319180
8
100mm Vice
$ 67
1 tonne jaw
capacity. Swivel
base sold separately.
$
SKU00206409
EXCLUDES GST
5216
EXCLUDES GST
144 Pce
Socket Set
1/2" metric & imperial.
Chrome vanadium steel.
16435
$
SKU00228307
EXCLUDES GST
20oz Hammer
Angled face, 180º side
nail pull. SKU00163226
$
4346
EXCLUDES GST
Radio / MP3
Ear Muffs
Class 5. AM/FM Radio. LCD
display & aux cable included.
Insulation
Safety Kit
Protection from glass
wool fibres & dust.
SKU00230774
$
21
72
EXCLUDES GST
Respirator
For painting, solvents
& most agricultural
chemicals.
SKU00216042
$
6954
EXCLUDES GST
SKU00319397
12087
$
EXCLUDES GST
We reserve the right to restrict the purchase of commercial quantities. All prices are exclusive of GST. Bunnings Trade Promise terms and conditions apply. See trade desk for details. Prices valid to Saturday 31st August 2013.
Adaptable buildings
– now there's a solution!
In human terms, the ability to adapt is crucial for success
and survival. Commercial buildings – from farm structures to
factories – are no exception. “Buildings can be added to
over time to create extra
spaces for living, working
or storing.”
The introduction of the Adaptable Building Solutions range continues
Bunnings’ commitment to deliver innovation and new product lines.
Available nationwide, this new range of portal style buildings offers flexibility
and functionality rolled into one. Utilising Laminated Veneer Lumber (LVL)
framing, it allows the structure to be built with a completely clear span.
Meaning there are no inconvenient structural pillars inside the footprint
of the building.
Des Bickerton, Bunnings’ Commercial Manager, says the range is easily
scalable, enabling customers to add on additional sections. “They’re the
perfect solution for stabling or workshops through to large factories. The
clear span construction is also ideal for aircraft or automotive application.”
As with all structural Buildings it requires a permit and if to be used as
a Dwelling will need to meet the requirements necessary to comply with
the building code.
Starting at 12m wide x 18m long the standard range building can extend
to 15m wide and as long as 30m. Heights range from 3.6m to 4.8m. This,
says Des Bickerton, allows additional space within the building by adding
a mezzanine floor for use as offices, living and accommodation or as
additional storage space.
Longrun zincalum Custom Orb Endura wall cladding is standard with
zincalum Trimlin/Plumdek Endura for the roof. Coloursteel and H3.2
utility ply is optional. Two roller doors are also standard and range in
size from 3.6m height x 4.8m wide for the 3.6m high building through
to 4.8m high x 4.8m wide for the 4.8m high option.
Though the LVL solution has a wide range of applications it complements,
says Des Bickerton, the Farm Building Offer Bunnings launched in
October 2011.
8
Don't miss Bunnings at Fieldays – 12th-15th June 2013
“Flexibility and functionality
make the Adaptable
Building Solutions range
a real winner.”
“Value and adaptability provide real benefits to our farming clients. Delivering
this in a larger building portal format is also going to find favour. We’ve found
that our range of kitset and custom designed buildings have found a real niche
down on the farm. Being able to work with existing suppliers and channels has
meant Bunnings have been able to deliver an exceptional value farm building
range throughout the country.”
Get to know your
Account Managers
Profiling Matt Jenkins
Being three quarters of the way through his pilots licence, Matt’s
a bit of a high flyer at home as well as work! Matt started out on
the tools, but soon found he preferred building relationships with
people rather than houses. With Bunnings for 6 years, he really
enjoys helping his customers deliver the best results.
Naenae
Phone 027 243 1932
Bunnings Trade Account Managers
NORTHERN REGION
Area Sales Manager
Matt Cardey
027 652 5268
CENTRAL REGION
Area Sales Manager
Tim Trowell
027 200 2034
Bunnings at its Best
While you're at Fieldays drop in to the Bunnings sites and see the Adaptable
Building Solutions purpose-built shed. It demonstrates exactly the flexibility
and versatility these innovative new buildings offer.
Also on site will be the latest AEG and Ryobi ranges to give you the chance
to see and try all the latest power tools in action. Plus much much more at
sites G105 and G107.
SOUTHERN REGION
Area Sales Manager
Troy Taylor
027 200 2032
East Tamaki
Trade Centre/Manukau
Sam Marcel
027 498 1796
Napier/Hastings
Ian Sill
027 490 6529
Wini Ryan
027 246 2003
New Plymouth
Danny McVicar
027 246 2011
East Tamaki
Trade Centre/Papakura
Kent Silby
027 289 5576
Hawera
Grant Cambie
027 445 2917
Laurie Stowers
027 246 2010
Tony DeCleene
021 528 840
Feilding
Rowan P Ellison
027 446 1786
Palmerston North
Vanessa Linton
027 445 0957
Kaikohe
Michael Eyre
027 475 5019
Pukekohe
Carla Hira
027 246 2015
Whangarei
Matt Oliver
027 499 0812
Te Aroha
Richie Blake
027 230 8569
Kauri
Steve Jeffery
027 473 2516
Whangamata
Kevin Pennell
027 436 0293
Silverdale
Mark Laing
027 246 2002
Barry Leighton
027 493 2018
David Turner
027 445 0955
Waikato
Alan Miller
027 499 7165
Paul Eynon
027 445 0954
Glenfield/Silverdale/
North Shore
Jon Copeland
027 703 1076
Forrest Jin
027 484 2591
North Shore
Scott Godkin
027 431 8504
North Shore/Glenfield
Alan Zhang
027 246 2001
East Tamaki
Trade Centre/Henderson
Denis Richardson
027 498 1948
Henderson/Mt Roskill
Greg Dalley
027 200 1964
East Tamaki
Trade Centre/Botany
Ashley Chetty
027 498 1942
Mark Haddon
027 453 7211
Joanne Smith
027 436 9902
East Tamaki Trade Centre
Derek Wang
027 459 1734
Hamilton
Darren Mayo
027 246 2008
Te Awamutu
Gary Dunlop
027 457 9979
Cambridge
Bruce Robertson
027 475 8661
Te Puke
Dean Cubis
027 487 2697
Whakatane
Greg Diemar
027 490 4302
Rotorua
Andrew Chadwick
027 246 2006
Mark Canning
027 498 7136
Gisborne
Terry Pointon
027 445 4375
Taupo
Mel Hoverd
027 435 9054
Mike Bush
027 492 9019
Howard Yates
027 246 2012
Naenae
Matt Jenkins
027 243 1932
Heinz Baker
027 442 0234
Brian Williams
027 442 5467
Gary Sim
027 246 2014
Derek Rodger
027 102 041
Blenheim
Stuart Washington
027 481 0557
Nelson
Mark Culverwell
027 652 5271
Dunedin
Aubrey Gray
027 459 1738
Hornby Christchurch
Trade Centre
Martyn Hugo
027 240 8950
Jeff Scott
027 503 6046
Chris Sunman
027 260 2468
Ashburton/Hornby
Christchurch Trade Centre
Shaun Parker
027 702 2129
9
scene
BUILDING
by Rodney Dickens
National upturn may have stalled prematurely
Interest rates are the most powerful driver of upturns and downturns in residential
building and it can take up to 12 months for changes in mortgage interest rates to
impact on the national number of consents for new dwellings. Given the timing of
the fall in mortgage interest rates last year, the national number of consents for new
dwellings should have a bit more upside over the next few months. But the upturn
may have stalled prematurely.
The numbers of dwelling and section sales reported by REINZ generally provide
advance warning of what is likely to happen to the number of consents for new
dwellings over the subsequent 5-6 months. Both dwelling and section sales
should have increased more over the last few months as a lagged response
to the fall in mortgage interest rates last year. But as the chart shows, dwelling
sales have increased a bit more but section sales have largely drifted sideways.
Upside to interest rates delayed
The high NZ dollar is largely why the Reserve Bank has signaled it won’t start hiking
the OCR until the second half of 2014 despite near double digit house price inflation,
although an earlier start to hikes can’t be ruled out. This implies mortgage interest
rates may be reasonably stable for another year, allowing the improvement in net
external migration to drive a bit more upside in consents for new dwellings.
However, the high cost of sections and new housing remains a constraint.
Unaffordable new housing, especially for first home buyers, continues to keep the
level of residential building below historical average levels. This is why Housing
Minister Nick Smith’s campaign to get down new housing costs is so important,
although I am a bit dubious of how much progress he will make given the different
approach favoured by the likes of the Auckland City Council.
Insurance bottlenecks hampering rebuilding
Statistics NZ reported only 57 quake-related consents for new dwellings for March,
which is little different from the numbers for January and February. This implies the
rebuilding in Canterbury has stalled. Insurance bottlenecks and to a lesser extent the
slow processing of consents by the council continue to delay rebuilding.
However, the total number of consents for new dwellings in Canterbury has
continued to rise in recent months. This has probably been aided by insurance
companies paying a moderate proportion of people with quake-damaged properties
in cash. Some of these people are likely to be building on new sections, with these
consents not included in the official quake-related numbers.
Number of Consents for New Dwellings
Total Dwellings
Apartments
Non-apartments
Monthly
Annual
Monthly
Annual
Monthly
Annual
Jan-11
867
15,427
90
987
777
14,440
Feb-11
973
15,025
89
1,063
884
13,962
Mar-11
1,087
14,611
40
1,028
1,047
13,583
Apr-11
927
14,138
34
971
893
13,167
May-11
1,139
13,917
66
1,010
1,073
12,907
Jun-11
995
13,539
60
1,013
935
12,526
Jul-11
1,170
13,236
130
940
1,040
12,296
Aug-11
1,509
13,516
179
1,083
1,330
12,433
Sep-11
1,246
13,500
122
1,145
1,124
12,355
Oct-11
1,238
13,615
89
1,210
1,149
12,405
Nov-11
1,384
13,529
109
1,093
1,275
12,436
Dec-11
1,127
13,662
148
1,156
979
12,506
Jan-12
1,098
13,893
198
1,264
900
12,629
Feb-12
1,204
14,124
62
1,237
1,142
12,887
Mar-12
1,559
14,596
165
1,362
1,394
13,234
Apr-12
1,230
14,899
138
1,466
1,092
13,433
May-12
1,372
15,132
68
1,468
1,304
13,664
Jun-12
1,277
15,414
118
1,526
1,159
13,888
Jul-12
1,478
15,722
235
1,631
1,243
14,091
Aug-12
1,513
15,726
140
1,592
1,373
14,134
Sep-12
1,520
16,000
186
1,656
1,334
14,344
Oct-12
1,639
16,401
168
1,735
1,471
14,666
Nov-12
1,658
16,675
39
1,665
1,619
15,010
Dec-12
1,381
16,929
232
1,749
1,149
15,180
Jan-13
1,312
17,143
58
1,609
1,254
15,534
Feb-13
1,542
17,481
142
1,689
1,400
15,792
Mar-13
1,475
17,397
16
1,540
1,459
15,857
Source: Statistics New Zealand
REINZ Section Sales and Dwelling Sales
Rolling 3 month average numbers
1,200
Sections, Ihs
Dwellings, rhs
12,200
1,000
11,200
10,200
900
9,200
800
8,200
700
7,200
600
6,200
500
5,200
400
4,200
300
3,200
2,200
200
*Rodney Dickens runs Strategic Risk Analysis, a property and economic research company.
13,200
1,100
Jan-92 Jan-95 Jan-98 Jan-01 Jan-04
Jan-07 Jan-10 Jan13
Visit Rodney’s website www.sra.co.nz to sign up for free property and economic reports
10
e
Every issue of Trade Advice will cover a number
of topics that effect how we as an industry
go about our daily business. If you have any
subjects you would like to discuss or have a
case history you would like to share email
us at [email protected]
RUSS,
TEAM MEMBER
advice
TRADE
Managing the fallout
from building failure
An ambitious work programme is being
proposed to lessen the risk of building
collapse and subsequent loss of life.
performance a building needs to meet 1/3rd of New Zealand Building Code
B1 (structure) performance requirement. This is often referred to as 33% NBS.
It will, however, cost money to achieve this level of structural upgrade.
Inevitably a tradeoff between cost and performance needs to be considered.
To that end Government has proposed that:
• Building owners obtain a seismic capacity
assessment of their building within 5 years.
One of the positive outcomes following the Christchurch earthquakes was
the convening of a Royal Commission tasked with making some sense of
the causes that led to the tragic loss of life.
• The results of these assessments will
be recorded on a Council held
public register, and
As part of its response to the recommendations that have been produced
by this inquiry, the Government has proposed an ambitious work programme
in relation to handling all earthquake prone non-residential buildings or
multi-unit and multi-storey residential buildings.
• All necessary structural upgrade work
is completed within 15 years.
Some flexibility in keeping buildings strong
In terms of definitions, the Building Act says that an earthquake prone
building is one that, in a moderate earthquake, would be likely to collapse
causing death or injury or damage to another property. This definition also
includes barns, warehouses and bridges but does not apply to residential
buildings unless the building comprises two or more levels and contains
three or more household units.
Within this proposal, there is some flexibility. For instance some buildings,
such as farm buildings, might be exempt from these upgrade requirements.
In turn other buildings, such as those located on critical transport routes, might
need to be upgraded more quickly. It is the Government’s expectation, however,
that by the end of the 15 year period all non-exempt earthquake prone buildings
would have been strengthened or demolished.
Conservative estimates calculate that there are between 15,000 and 25,000
buildings that would be considered earthquake prone. In an ideal world all
these buildings would be able to withstand a moderate earthquake without
sustaining major damage. It has been estimated that to achieve this level of
The consultation period has now closed and the Government’s consideration of
the submissions will be revealed in due course. In the meantime it’s important to
remember that owners of earthquake prone buildings are already subject to the
local Councils earthquake-prone building.
11
Nationally this has created some level of inconsistency. When the 2004 Building
Act came into force, each Council was required to develop and implement its
own policy as to how it would identify, record and, where necessary, manage
earthquake prone buildings. Government was concerned that there has been no
nationally consistent policy around buildings with a structural performance that
is less than 33% NBS and it is anticipated that this work will address this issue.
Those areas where earthquakes are considered more likely, such as Wellington,
have policies that adopt a more active approach to identifying earthquake prone
buildings. In these areas, councils have undertaken a desktop, qualitative initial
evaluation. The focus of this evaluation was to compare the current performance
with the NBS and where it was less than 34% it was recorded as earthquake prone.
As a result many building owners in the larger metropolitan areas will already be
aware of the status of their building. This might not be the case in smaller,
provincial towns.
Once a building is identified as earthquake prone then the local council is able to
set a timeframe for the necessary upgrade.
While the local earthquake prone policy may exert demands on the building owner,
applications for a building consent (especially if it involves a change of use) could
trigger a structural upgrade.
“There are some discrepancies
in policy making as some
parts of New Zealand are
more earthquake prone
than others.”
But will the benefits always outweigh the costs?
Trade Issue is committed to helping you
reduce the burden of compliance plus draw
your attention to key determinations that can
help the way you do business.
By way of definition, determinations are binding decisions made by Ministry
of Business, Innovation and Employment (MBIE) that have arisen as a result
of a dispute, usually between a council and a customer. While each decision
is site specific the discussion is always applicable to other building situations.
They can provide alternative methods for you to manage your compliance and
your interaction with your local council.
The one under the spotlight is a Schedule 1(k) exemption. Using this exemption
can make good business sense. Many of you will already know about Schedule 1;
that is work for which a building consent is not required. Schedule 1(k) is a clause
in this schedule that allows an individual council to exempt work not covered as a
right in this schedule.
It is a good compliance management tool but to
date has been underused and poorly understood.
An individual council can issue
a schedule 1(k) exemption where
it considers that:
(i) The building work will
almost certainly be undertaken
in accordance with the building
code, this is called a schedule 1(k)(i)
exemption or
Some argue that structurally upgrading a building will deliver a number of benefits
including a reduction in risk to people and other property. Other benefits could
include improved tenancy rates on the basis that prospective tenants will select
non-earthquake prone over earthquake prone buildings. In turn banks will be
more likely to lend on strengthened buildings, therefore these buildings have
a market premium.
(ii) Where failure to comply with the building
code would be unlikely to endanger people
or damage other buildings, this is called a
schedule 1(k) (ii) exemption.
However, the actual cost of the upgrade may not deliver an adequate return
on this investment. Furthermore, and paralleling the leaky building experience,
the scarcity of the skills to carry out this work will translate to escalating costs.
Where building work is minor and low risk in nature and where the
benefits of requiring a building consent do not exceed associated
compliance costs.
And what about our heritage buildings?
The loss of so many of Christchurch’s older buildings is a reminder that
despite being a new country we do have a heritage that we need to protect.
To that end heritage buildings, in particular, need to be upgraded in a way
that maintains their historic integrity. New Zealand has about 7,160 listed heritage
buildings covered by the earthquake prone building requirements. These include
wharves, flagpoles, wharenui and bridges. In many cases these buildings are not
in private ownership and so collectively we face the cost of the upgrade and the
risk of not upgrading it.
Whatever the outcome of Government’s deliberations, there are no easy answers
and clearly there will be dissenting views. The time allowed for structural upgrades
to take place will ultimately determine the number of buildings that are strengthened
and the number that are demolished.
12
Welcome to
Compliance Corner
Or as outlined by MBIE
Obviously obtaining a schedule 1(k) exemption will provide business benefit
since it means that a building consent is not required. The positives are in cost
and time savings since you won’t be waiting for inspections.
The case of the farm outbuilding
In February of this year a determination was issued that related to an application
made to the Waipa District Council for a schedule 1(k) exemption. The owner
wished to construct a farm implement shed on his property. The person in question
is a structural engineer and the building was to be situated 200m from the nearest
boundary and 150m from the nearest dwelling. On that basis the owner considered
that consent was unnecessary since it was unlikely to endanger any person or
property in the event of failure.
However, the Waipa District Council did not accept that it should be covered
under schedule 1(k)(ii). Their view was that the proposed work was not minor
or low risk in nature.
Furthermore they refused to issue a schedule 1(k)(i) exemption because they did
not consider that the application provided sufficient detail for it to assess that the
resulting building work was likely to comply with the code.
In order to make this decision they required documentation that was as detailed
as if a building consent application was to be made.
The determination concluded that:
1. The council gets to choose what type of exemption is the right one. That is
whether the building work is most likely to meet the building code, and so
the building consent process will not add any value or that if the building work
does not meet the code it will not have an effect on anyone or any
other property.
2. The type of information that you would need to provide when making
a schedule 1(k) application is more than provided by the owner in this
instance, but is less than the information required when applying for a
building consent.
3. The information required is summarised as:
Schedule 1(k)(i) exemption
• Evidence of competence
and prior experience
• Complexity of proposed work
relative to competence
• Independent QA programme
Schedule 1(k)(ii) exemption
• Location of proposed work
• Use of building work
• Proximity to other buildings
• Level of risk to life and property
Making schedule 1(k) work for you
The process to follow when considering schedule 1(k) exemption is summarized in
the following flowchart.
Identify the
building project
Will it
predominantly be
used by people
NO
Will it be situated
close to
other buildings
or property
NO
What is the
impact/risk to life
or property in the
event of failure
YES
Schedule 1(k)(i)
exemption
> MINIMAL
MINIMAL
Schedule 1(k)(i)
exemption
What projects might be candidates for exemption?
Examples that would be suitable for a schedule 1(k)(i) exemption,
that is compliance with the building code is almost assured include:
• Bridges and other large engineering projects
• Buildings overseen by independent engineer or other skilled
and experienced professional
• Repetitive building work where independent quality assurance
demonstrate that it is highly unlikely that the work will not comply
with the building code, for instance large marquees, bouncy castles
Examples suitable for a schedule 1(k)(ii) exemption include:
• Farm or out buildings
• Signage
As you would expect there are fewer projects suitable for the schedule 1(k)(ii)
exemption. Where compliance with the building code is unimportant, in general
it won’t be covered by the Building Act at all.
Prepare application package
to include:
• Resources consent
documentation (if appropriate)
• Plans detailed enough to
show what is to be built and
where located
• Document covering
complexity of project
• Documentation company
history and evidence of
competence of company/
practitioners (e.g. portfolio)
• Independent QA process for
this project.
Prepare application package
to include:
• Plans detailed enough to show
what is to be built and where
located
• Documented assessment of risk
and outcome in event of failure
• Any evidence of company
competence, QA and building
work (optional).
To be safe read the full determination (number 2013/008 on
www.dbh.govt.nz But if you want more help talk to Louise or
Kevin at The Building Business or go to www.dbh.govt.nz
13
Out with the old
and in with the new
The hot topic of
temperature control
New building code clauses mean that old fire
management practices have gone up in smoke.
With winter here creating a warmer, dryer and
overall healthier environment is once again a
burning issue.
On April 1st last year, a new set of Fire Building Code clauses – also known as C
docs – were released. Included with these was a new set of acceptable solutions for
handling a range of situations stemming from fire. These changes were highlighted
in the November 2012 Trade Issue article Where There’s Smoke Also Expect Fire.
In order to ease the transition from having to adopt the new clauses, a period of
grace meant that compliance with the fire related code clauses could be achieved
using either set of documents and either set of acceptable solutions.
That period ended on April 1st 2013 meaning that old clauses have now been
superseded by the new.
Clause C3
Fire affecting areas
beyond fire source
Functional and
performance objectives
Clause C4
Movement to place
of safety
Functional and
performance objectives
Clause C5
Access and safety for
firefighting operations
Functional and
performance objectives
Clause C6
Structural stability
Functional and
performance objectives
Acceptable solution C1/AS7
Functional and
performance objectives
Insulation – why it works
Acceptable solution C1/AS6
Clause C2
Prevention from
fire occurring
Acceptable solution C1/AS5
Functional and
performance objectives
Acceptable solution C1/AS4
C1
Objectives of clauses 2-6
Clause C4
Structural stability during fire
Acceptable solution C1/AS3
Seded
Clause 3
Functional and
super performance
Spread of fire
objectives
From there effective heating and cooling – in order to retain the ambient temperature
– can only be achieved if your building is well insulated and has reduced airflow.
Again, there are many ways of achieving this but in simple terms it is about
maintaining air tightness by blocking off all air leakage points.
Acceptable solution C1/AS2
Functional and
performance objectives
Acceptable solution C1/AS1
Clause C2
Means of escape
Acceptable solution C1/AS1
Functional and
performance objectives
To achieve this is sometimes a tall order. International studies, for example, talk
of an optimum ambient internal room temperature of 20 – 22°C. When you consider
Met Service figures that say that the national average maximum temperature ranges
from a summer high between 20-30°C to a winter low between 10-15°C, getting the
balance just right is often easier said than done.
The reality is the only way to maintain a comfortable temperature in all climates –
and without adopting expensive passive house technology options – is by using
heating and cooling devices. Be they heat pumps, air conditioning or simply
opening a window.
Comparing the old with the new
Clause C1
Outbreak of fire
One of the joys of being ‘civilised’ is the ability to control ambient temperatures
thereby creating the sort of ideal environment we want where we work or live.
This now means that for new building work, compliance must be demonstrated
using the 2012 fire code clauses. Only the new set of acceptable solutions may be
considered as relevant and suitable documentation.
In essence the changes were made to reinforce the objective of the New Zealand
Building Code clause C (protection from fire) designed to:
• Safeguard people from an unacceptable risk of injury or illness caused by fire
• Protect other property from damage caused by fire
• Facilitate fire fighting and rescue operations
Again, to make sure you’re totally up with the play either re-read the November
article or visit www.mbie.govt.nz.
Insulation is one of the elementary ways to battle the elements. It reduces
unwanted heat loss or gain and can decrease the energy demands of heating
and cooling systems
To achieve this, the entire building envelope, ideally, should be insulated,
• Ceiling / roof (roof cavity if skillion roof)
• External walls
• Joinery (Glazed windows and doors)
• Floors (whether concrete floor slab or suspended timber floors)
But how you insulate a building depends on whether it is a new building
or an addition or alteration to an existing building.
For new buildings the relevant code clause is H1 (thermal efficiency)
and the required performance is defined as follows:
H1.3.1 The building envelope enclosing spaces where the temperature
or humidity (or both) are modified must be constructed to
(a) provide adequate thermal resistance; and
(b) limit uncontrollable airflow.
In turn, there are two NZ Standards that relate to residential buildings –
• NZS 4214: 2006
Methods of determining the total thermal resistance of parts of buildings
• NZS 4218: 2004
Energy efficiency-housing and small building envelope
You can use any method you want to achieve compliance, but your method
needs to be accepted by the local Building Consent Authority. They need to
be satisfied on reasonable grounds that what you propose will meet the
performance requirements of H1.
Consider this
The main factors that the designer needs to consider when planning on temperature
management techniques and options are:
1. The relevant climate zone – New Zealand is divided into three climate zones
(See map to your right)
2. The total window area in relation to the total wall area
3. The window area orientation east and southwest
14
4. Skylight area
Retrofitting existing buildings
5. Non CA-Rated down lights
The situation for existing buildings is a little different. Retrofitting insulation in
an existing building is not about achieving compliance with H1 but it is about
improving the quality of the internal environment. The reality is that achieving
compliance for an existing building would involve expensive renovation work
including the installation of double-glazing.
6. Construction materials
7. Construction methods (design)
Methods for achieving compliance
There are three accepted methods for establishing compliance.
Methods Description
Tools
Schedule
NZS 4218 is the acceptable solution for
NZBC clause H1
Deemed to comply provided the designer
inputs the correct construction detailing,
applicable tables and factoring the correct
climate zone.
• BRANZ house insulation guide
• NZS 4214: 2006
• DBH, code words guidance
documents
• ww.design-navigator.co.nz
• Web search “H1 schedule
method”
Calculation
Acceptable solution. The calculation
method maybe adopted where the
schedule method may limit design
considerations. The designer may relax
some of the R-value requirements
because they have compensated with a
higher R-value elsewhere in the building.
• BRANZ house insulation guide
• NZS 4214: 2006
• DBH, code words guidance
documents
• www.design-navigator.co.nz
• Web search “H1 calculation
method”
Verification method based on material
selection, use of passive design for
solar gain and retention etc. Most
effective method with alternative
materials and design
• NZS 4214: 2006, verification
method
• DBH code words, issue 2006
Modeling
Timber-Framed House Construction
R-values in Compliance with H1
Roof
R 2.9
Walls
R 1.9
Floor
R 1.3
Heated floorsR 1.9
Windows R 0.26
Skylights R 0.26
However it is worth the effort as owners say the difference experienced by
insulating external walls is huge.
Then there is the question of which products to use. There is a huge selection
of products to choose from and your ultimate choice will depend on a number
of factors including:
• Cost
• Level of sustainability
• Personal preference
Zone 1
Zone 2
Zone 3
Ministry of Business, Innovation and Employment has advice on what to
consider when installing insulation in external walls: www.dbh.govt.nz/retrofitting
-insulation-guidance. This guidance defines the relevant performance clauses and
outlines factors that need to be considered. These factors include the building, the
level of maintenance as well as the environment. If you have any doubts or
questions it would pay to talk to your local Building Consent Authority (BCA).
• Method of installation
The methods you choose will be dependent on the building, the products
and preference.
Zones 1 and 2
But where insulation is retrofitted the requirements of s112 apply (refer to Trade
Issue June 2012). Installing insulation in the ceiling and under floor does not
require a building consent, but if insulation is being installed in external walls
then a building consent is required. The reason for this is that installing insulation
fundamentally changes the moisture management performance of the wall.
Remember that when applying for a new building consent you would normally
nominate the preferred insulation product because at the building consent stage
the type and R-value of insulation must be notated on the plans and appended
to the specifications. This information provides the BCA the grounds upon which
to establish compliance with H1.
If you want ‘hot off the Press’ information about how to keep your cool
when making insulation decisions talk to your Bunnings Account Manager.
Zones 3
Roof
Walls
R 2.0
Floor
R 1.3
Heated floorsR 1.9
Windows R 0.26
Skylights R 0.31
Map of climate zones. Figure 1: The schedule method.
The R-values shown in this diagram are for the complete building element, (e.g. Roof or wall),
not just the insulation product. The R-values of the complete building element is different to
the insulation R-value. The extent of that difference depends on the construction details.
We cover the full range of insulation options and so we suggest that you talk
to your Account Manager when making your selection. By working with you,
we can make sure that the chosen products meet all your requirements.
Trade Advice comes to you courtesy of Louise Swann
and Kevin Brunton from The Building Business.
The Building Business helps home owners, companies, local and central government
in building act compliance issues. Refer to www.thebuildingbusiness.co.nz for ideas
on how to work with the Building Act.
Create your
COMFORT ZONE
Spend $1000* on Bradford insulation and/or Edmonds ventilation
products from a Bunnings store over the promotion period:
1st of May – 31st of July 2013 and get a FREE sleeveless vest for
winter. While stocks last.
*$1000 inc GST. Can be more than one transaction over the promo period (you must
send all invoices). More than one entry will be accepted (for each multiple of $1000)
up to a maximum of 5 jackets per entrant. If required sizes are depleted, we will send
you the next closest size. To redeem your vest you will need to complete a redemption
form available in store or online at www.bradfordinsulation.co.nz
Free
FREE WINTER VEST PROMO
Tough like us.
We’re always close
at hand when you
need support.
Made for New Zealand.
A pristine look that lasts.
Scyon® Axon® Panel
Scyon® Axon® Panel is a vertically grooved
panel with a 133mm or 400mm wide groove
pattern that looks sharp and uniform.
Pre-primed and easy to install, Scyon®
Axon® Panel is a pristine look that lasts.
NOW with grained profile.
Advanced
Material
Technical
Support
Sustainable
Made In NZ
Certified
& Tested
Advanced Material
Made from an advanced lightweight cement
composite with heavy duty performance,
Scyon® Axon® Panel is resistant to damage
from fire, moisture and rot1. It is also easy to
cut and gun-nailable.
1
Fire
Resistant
Rot
Resistant
Easy To Cut
Gun-Nailable
Damage
Resistant
When installed and maintained correctly and to the extent set out
in the James Hardie literature current at the time of installation.
For more information on Scyon® Axon® Panel
ASK JAMES HARDIE or visit www.scyon.co.nz
Whatever the size of your project, any delay can be costly. That’s why we
make it as easy as possible to get hold of the GIB® Support Team. Our
professional team of experienced builders, building engineers and technical
sales representatives means you can get the support you need when you
need it, on-site or on the phone. Plus you’re fully covered with the GIB®
Product and System Warranty.
Call the GIB® Helpline on 0800 100 442 during business hours.
Or to find out more, visit gib.co.nz
Spend $800 excl. GST or more on
any Scyon® Axon® Panel at Bunnings
between 1st – 30th June 2013
and you’ll enter the draw to win
Spend $100 excl. GST or more on any
GIB® Compound products at Bunnings
between 1st – 30th June 2013 and
you’ll enter the draw to win
1 of 5 Paslode Nail Guns valued at $836!
1 of 35 Bluetooth Headsets!
Terms and Conditions: Promotion runs from 1st – 30th June 2013. To be eligible for the prize you must spend
$800 (excl. GST) or more on any Scyon® Axon® (excl accessories) at a Bunnings store. All eligible customers will be
drawn at the conclusion of the promotion and the prize will be sent during July. There are 5 prizes to be won.
Offer open to trade account holders only and there is a limit of one prize per customer account. The prize is
non-refundable, non-transferable or redeemable for cash and will not be available for pick-up at the time of purchase.
Terms and Conditions: Promotion runs from 1st – 30th June 2013. To be eligible for the prize you must spend
$100 (excl. GST) or more on any GIB® Compound products at a Bunnings store. All eligible customers will be
drawn at the conclusion of the promotion and the prize will be sent during July. There are 35 prizes to be won.
Offer open to trade account holders only and there is a limit of one prize per customer account. The prize is
non-refundable, non-transferable or redeemable for cash and will not be available for pick-up at the time of purchase.