Mochovce NPP Units 3 and 4 How to get an entrance

Transcription

Mochovce NPP Units 3 and 4 How to get an entrance
How to get an entrance
permit to SE-MO34
SAFETY RULES
Follow the basic principles of safety culture at work:
STOP - THINK - ACT - REVIEW
Worksite access conditions
Suppliers and their motor vehicles participating in completion of the Mochovce NPP Units 3 & 4 (SE-MO34) can
access the premises:
Personal
Protective
Equipment
Entrance
Information
Hard hat
1. Based on a fi lled-in and approved application for temporary entrance permit for persons with a document proving
completion of training in order to perform works resulting
from a contract.
Ear plugs
2. Based on a filled-in and approved application for drivingin a contractor’s vehicle with an enclosed copy of the certificate of roadworthiness.
Safety goggles
3. Request shall be submitted by a person appointed for
processing the entrance permits in SE-MO34 (Administrative zone, building K II, ground floor, room No. 3).
Badge
4. Time for processing the request is max. 5 days from the
day of delivery of the request to the entrance permit
office.
Waistcoat
Gloves
5. Persons requesting permit are photographed in order to
issue the entrance card in the premises of the Permit Issue Dept. (Administrative zone, building K II, ground floor,
room No. 3), but only after processing the application.
6. Entering person shall confi rm takeover of the temporary
entrance permit for a „CONTRACTOR“ by the signature
when taking the card over.
7. Validity of the temporary entrance permit for a supplier is
limited by validity of the training and particularly
a) 1 year for a supplier’s employee;
b) 6 months for a supplier’s supervising employee;
c) if the period defined in contract is shorter than
in the letters a), b), the temporary permit would be
valid only till the end of the contracted period.
8. If the entrance permit ID card is lost or damaged, the new
ID card will be issued only after fi lling and approval of ID
card lost report and payment of 20 € by a person who
took the ID card over.
Loss of entrance permit ID card shall be
immediately reported to the phone
number 036 637 8520, 8551!
Safety shoes
No entrance with
Restriction
Main risks
IMPORTANT PHONE CONTACTS
Mochovce site Fire and Rescue Service
Integrated Rescue System
Fire and Rescue Service
Emergency Rescue
Police
Chief Coordinator of Occupational Health
Mochovce Emergency room
Mochovce NPP
Units 3 and 4
036 636 2222
112
150
155
158
0908 750 341
036 636 2662
Issued by:
Slovenské elektrárne, a member of Enel Group, Infocentrum, 935 39 Mochovce, Slovakia, © 2010
Units 1&2
19
19
19
13
9
MO34 Site
MOCHOVCE 1 & 2
40
17
18
6
EMO12 Main gate
2
Administrative building
3
Operational building
4
Turbine hall of nuclear
island I
5
Nuclear island I
6
Auxiliary building of
nuclear island I
7
Diesel generator
building I
8
Cooling towers I
9
Auxiliary boiler plant
10
Fire brigade station
11
Medical centre
12
Workshops
13
Chemical water
treatment plant
10
12
19
1
7
16
5
15
4
3
11
2
8
8
8
8
1
30
31
14
37 38
28
21
20
32
41
29
MO34 Administrative zone
22
23
MO34 Warehouses
24
25
27 26
39
Slovenské elektrárne, a member
of Enel group, are the largest
electricity
and
heat
generating
company in Slovakia. The mission of
the company is to generate, supply
and trade electricity in safe, reliable,
effective and competitive way at
continuous reduction of negative
impact of electricity generation on
environment.
MO34 Basic Data
 each unit will generate power of
440 MWe
 Unit 3 of NPP Mochovce will be
commissioned in 2012 and Unit 4
in 2013
33
34
Safety is our
top priority
36
 4000 people will work at the
construction during the peak period
35
Units 3&4
14
Gate I – entrance to MO34 site
22
KIII – MO34
15
Turbine hall of nuclear island II
23
16
Nuclear island II
KIV – Infocentre, Enel
Ingegneria e Innovazione
24
KV – VUJE
17
Auxiliary building of nuclear island II
25
DEZ, ENERGO INVEST
18
Diesel generator building II
26
19
Cooling towers II
20
21
31
Police
32
PPA Control
33
SKODA Slovakia
JAVYS
34
PPA Unimo
27
DOS
35
EURO Building
KI - PPA Control, ISK, SKODA JS, VUJE, Sigma,
Modřanska potrubni, Vitkovice Power Engineering,
Chemcomex, EGP Invest, NPP Communications
28
SKODA Slovakia
36
29
ISKE
Gate 4 – entrance to MO34
Administrative zone
KII – MO34
30
ENSECO
37
You are obliged to move into dedicated gathering point or
shelter after declaring a radiation event.
Contractors` changing
rooms II
39
Contractors` Unimo
40
Contractors` Unimo
41
Cargo gate
P
Parking lot
In-door gathering point
Shelter
Main suppliers of the MO34
completion:
Nuclear Island: Atomstrojexport,
ENSECO, Inžinierske stavby Košice,
ŠKODA JS, VÚJE
Conventional Island: Enel
Engegneria e Innovazione
Instrumentation and Control
System: Areva-Siemens
Contractors` changing rooms I
METHOD FOR DECLARING AN EXTRAORDINARY EVENT
General threat:
 Signal – warning sound signal and spoken information
(attention: radiation event)
 Starting of the event - 2-minute fluctuating tone
 End of the event - 2-minute constant tone (end of threat)
38
Test of sirens:
 Signal – warning sound signal and spoken information
(attention: siren test)
 Starting of the event - 2-minute constant tone
 End of the event - 2-minute constant tone (attention: end
of siren test)
Follow instructions of persons ensuring evacuation in case of
evacuation during an extraordinary event.
Operation of MO34 will
prevent generation of
5 million tons of
CO 2 emission
every year