Mochovce NPP Units 3 and 4 How to get an entrance
Transcription
Mochovce NPP Units 3 and 4 How to get an entrance
How to get an entrance permit to SE-MO34 SAFETY RULES Follow the basic principles of safety culture at work: STOP - THINK - ACT - REVIEW Worksite access conditions Suppliers and their motor vehicles participating in completion of the Mochovce NPP Units 3 & 4 (SE-MO34) can access the premises: Personal Protective Equipment Entrance Information Hard hat 1. Based on a fi lled-in and approved application for temporary entrance permit for persons with a document proving completion of training in order to perform works resulting from a contract. Ear plugs 2. Based on a filled-in and approved application for drivingin a contractor’s vehicle with an enclosed copy of the certificate of roadworthiness. Safety goggles 3. Request shall be submitted by a person appointed for processing the entrance permits in SE-MO34 (Administrative zone, building K II, ground floor, room No. 3). Badge 4. Time for processing the request is max. 5 days from the day of delivery of the request to the entrance permit office. Waistcoat Gloves 5. Persons requesting permit are photographed in order to issue the entrance card in the premises of the Permit Issue Dept. (Administrative zone, building K II, ground floor, room No. 3), but only after processing the application. 6. Entering person shall confi rm takeover of the temporary entrance permit for a „CONTRACTOR“ by the signature when taking the card over. 7. Validity of the temporary entrance permit for a supplier is limited by validity of the training and particularly a) 1 year for a supplier’s employee; b) 6 months for a supplier’s supervising employee; c) if the period defined in contract is shorter than in the letters a), b), the temporary permit would be valid only till the end of the contracted period. 8. If the entrance permit ID card is lost or damaged, the new ID card will be issued only after fi lling and approval of ID card lost report and payment of 20 € by a person who took the ID card over. Loss of entrance permit ID card shall be immediately reported to the phone number 036 637 8520, 8551! Safety shoes No entrance with Restriction Main risks IMPORTANT PHONE CONTACTS Mochovce site Fire and Rescue Service Integrated Rescue System Fire and Rescue Service Emergency Rescue Police Chief Coordinator of Occupational Health Mochovce Emergency room Mochovce NPP Units 3 and 4 036 636 2222 112 150 155 158 0908 750 341 036 636 2662 Issued by: Slovenské elektrárne, a member of Enel Group, Infocentrum, 935 39 Mochovce, Slovakia, © 2010 Units 1&2 19 19 19 13 9 MO34 Site MOCHOVCE 1 & 2 40 17 18 6 EMO12 Main gate 2 Administrative building 3 Operational building 4 Turbine hall of nuclear island I 5 Nuclear island I 6 Auxiliary building of nuclear island I 7 Diesel generator building I 8 Cooling towers I 9 Auxiliary boiler plant 10 Fire brigade station 11 Medical centre 12 Workshops 13 Chemical water treatment plant 10 12 19 1 7 16 5 15 4 3 11 2 8 8 8 8 1 30 31 14 37 38 28 21 20 32 41 29 MO34 Administrative zone 22 23 MO34 Warehouses 24 25 27 26 39 Slovenské elektrárne, a member of Enel group, are the largest electricity and heat generating company in Slovakia. The mission of the company is to generate, supply and trade electricity in safe, reliable, effective and competitive way at continuous reduction of negative impact of electricity generation on environment. MO34 Basic Data each unit will generate power of 440 MWe Unit 3 of NPP Mochovce will be commissioned in 2012 and Unit 4 in 2013 33 34 Safety is our top priority 36 4000 people will work at the construction during the peak period 35 Units 3&4 14 Gate I – entrance to MO34 site 22 KIII – MO34 15 Turbine hall of nuclear island II 23 16 Nuclear island II KIV – Infocentre, Enel Ingegneria e Innovazione 24 KV – VUJE 17 Auxiliary building of nuclear island II 25 DEZ, ENERGO INVEST 18 Diesel generator building II 26 19 Cooling towers II 20 21 31 Police 32 PPA Control 33 SKODA Slovakia JAVYS 34 PPA Unimo 27 DOS 35 EURO Building KI - PPA Control, ISK, SKODA JS, VUJE, Sigma, Modřanska potrubni, Vitkovice Power Engineering, Chemcomex, EGP Invest, NPP Communications 28 SKODA Slovakia 36 29 ISKE Gate 4 – entrance to MO34 Administrative zone KII – MO34 30 ENSECO 37 You are obliged to move into dedicated gathering point or shelter after declaring a radiation event. Contractors` changing rooms II 39 Contractors` Unimo 40 Contractors` Unimo 41 Cargo gate P Parking lot In-door gathering point Shelter Main suppliers of the MO34 completion: Nuclear Island: Atomstrojexport, ENSECO, Inžinierske stavby Košice, ŠKODA JS, VÚJE Conventional Island: Enel Engegneria e Innovazione Instrumentation and Control System: Areva-Siemens Contractors` changing rooms I METHOD FOR DECLARING AN EXTRAORDINARY EVENT General threat: Signal – warning sound signal and spoken information (attention: radiation event) Starting of the event - 2-minute fluctuating tone End of the event - 2-minute constant tone (end of threat) 38 Test of sirens: Signal – warning sound signal and spoken information (attention: siren test) Starting of the event - 2-minute constant tone End of the event - 2-minute constant tone (attention: end of siren test) Follow instructions of persons ensuring evacuation in case of evacuation during an extraordinary event. Operation of MO34 will prevent generation of 5 million tons of CO 2 emission every year