How to link the FABs and SESAR? Maurice Georges, Director, DSNA EUROPEAN
Transcription
How to link the FABs and SESAR? Maurice Georges, Director, DSNA EUROPEAN
How to link the FABs and SESAR? Maurice Georges, Director, DSNA ATC Global Amsterdam, March 8th, 2011 EUROPEAN COMMISSION How to link FABs and SESAR ? Maurice Georges, CEO DSNA 8 March 2011 Direction générale de l’Aviation civile Direction des services de la Navigation aérienne www.developpement-durable.gouv.fr Ministère de l'Écologie, du Développement durable, des Transports et du Logement DSNA – the French ANS provider 2,700,000 IFR Flights controlled 500,000 movements in Paris-CDG 10,000 IFR Flights on peak day 5 ACCs and 81 Control Towers 8000 staff, including 4,500 ATCOs M€ 1500 total costs € 67 : En-route Unit Rate Member of SESAR and FABEC Direction générale de l’Aviation civile Direction des services de la Navigation aérienne 3 How to link FABs and SESAR ? Operations and Performance Technical Roadmaps Financing and Governance Direction générale de l’Aviation civile Direction des services de la Navigation aérienne 4 Introduction SESAR and FABs : two mechanisms established in the SES framework : SESAR : to develop the new generation European air traffic management systems FABs : to optimize the provision of air navigation services, in a performancedriven context and to stimulate cooperation between ANSPs Major European ANSPs like DSNA are involved both in SESAR and FABs The question arises “How to create/reinforce the synergy between SESAR and FABs” Presentation will focus on three aspects : Operations and performance Technical roadmaps Financing and governance Direction générale de l’Aviation civile Direction des services de la Navigation aérienne 5 Operations and performance SESAR operational concept has built on FABs from day one -> SES II will be organised on 3 levels : local / FABs / network FABs shall support Enhanced Network Operations Traffic flow and queue management : extended AMAN and synchronization (e. g. Frankfort/Paris/London vs. MAASTRICHT), AMAN-DMAN integration, Improved ATFCM flexibility and advanced FUA, Advance operability between systems SESAR operational outputs require full ATCOs and ATSEPs involvement -> FABs shall be the next generation level for enhanced HR management & negociation Direction générale de l’Aviation civile Direction des services de la Navigation aérienne 6 Technical roadmaps DSNA (and other major ANSPs) need 5 to 10 years to converge to IP1 and IP2 SESAR is consistent with FABs timeframe Implementation of systems must contribute to reach performance targets at FAB level : One FAB model does not fit all : FAB brings the “european diversity” into SESAR, while maintaining minimum homogeneïty Direction générale de l’Aviation civile Direction des services de la Navigation aérienne 7 Financing and Governance SESAR deployment scheme currently under discussion -> major issues at stake regarding finance and governance FABs shall create financing solidarity between big and small ANSPs Each ANSP member of SESAR shall consider itself as responsible of SESAR implementation in its FAB -> FABs are a prerequisite for ensuring a seamless and continuous deployment of SESAR Direction générale de l’Aviation civile Direction des services de la Navigation aérienne 8 Conclusion SESAR and FABs shall both contribute to SES objectives : SESAR, through developing and validating common practices, operational concepts, architecture, roadmaps… FABs, through implementing new concepts and systems resulting from SESAR activities SESAR Master Plan updates have to reflect the ability of FABs to harmonize and deploy new system Role of FABs in the financing and governance of SESAR deployment : an essential contributor to deliver the expected improvement in performance Direction générale de l’Aviation civile Direction des services de la Navigation aérienne 9