How to realize TEMPUS PLM Master

Transcription

How to realize TEMPUS PLM Master
How to realize TEMPUS PLM
Master
-Partnership :
- Siemens PLM Software – GO PLM Academic Sofwtare
- ITS ( Prague, Ljubljana, Belgrade ) – Services
With
- University of Cyril and Methodius,
- University of Novi Sad ( Industrial Engineering and Management )
- University of Zagreb – Faculty of Mechanical Engineering and Naval
Architecture
- University of Split – Faculty of Electrical Engineering, Mechanical
Engineering and Naval Architecture
PLM Master – Input/Output/Market
Customers :
PLM Master :
• PLM versus Traditional
process
Barchelor Students who know : • How to use tools in
concurrent/team environment
• How to use Individula tools for :
in company processes by
• 3D Modeling,
using PLM Tools,
• 2D Drafting,
• How to reingineer
• CAM,
traditional processes via
• CAE
using PLM Tools,
• How to use computers for General • To find obstacles in
purposes :
traditional processes
• Numerical Calculations,
• Specific applications ( process
planning, eng. Calculations, CMM…. )
• Large global Enterprises who has
PLM Tools implemented
• Large domestic companies that
want to become global.
• Small and midium companies that
need to reingeneer, to survive in
global competition :
• Design for Manufacturing
loop
• > 30 ( 50 ) people in
premanufacturing phase (
Sales, Processes, Logistic,
Quality, Documentation… )
• Very small companies :
• Up to 30 ( 50 ) people in
premanufacturing phase
Strana 2
© 2009 Industrial Technology Systems, s.r.o.
.
What will PLM Master bring to customers
Concept
Design Initial Design
Traditional
Product
Development
process
Integrated
Product
Development
27%
3%
20%
Data
Distribution
Design Testing and Revisions
55%
13%
22%
15%
5%
40% Time Savings
Engineers with finished PLM Master will know :
a.HOW to CHANGE TRADITIONAL to Integrated or
b.HOW to immedatelly SKIP into INTEGRATED
Strana 3
3
© 2009 Industrial Technology Systems, s.r.o.
Organisation of PLM Master
Theoretical part :
• Concurrent processes in product development :
• Concurrent 3D Design,
• Requirements and Design
• Planning task and design
• Company processes
Practical lab :
4
3
1
• Workflows – Optimization and Automation:
• Standards and Workflows,
• Optimization of workflows
• Workflow definition
2
Strana 4
© 2009 Industrial Technology Systems, s.r.o.
Engineering Process Management
• Strukturovana a řizena data popisujici produkt
• Automaticka aktualizace dle aktivit provedenih v CADu
• Manipulace s konfigurace mimo CAD
• Sprostředkovaní všech dat oddělení mimo konstrukcy
• Data are structured around the product Structure
• Automatic reflection of change in CAD to the structure
in Design BOM ( Bill of Materials )
• Data are in controlled envrinment ( Data Base ) versions, revisions, validity
• Changing configuration outside of CAD
• Opening design data to OTHERS and using them via
Lifecycle 3D visualizatio
Teamcenter
Managemnt
Assembly
Quality
Process Planing
Strana 5
Configuration Change
Documentation
© 2009 Industrial Technology Systems, s.r.o.
Engineering Process Management
Ø Jednostavan i pregledan pristup podacima
Ø Brza manipulacija
Ø Kontrolisani pristup
Part Number/Rev
Ø Objekti
Ø
Ø
Item/Revision, CAD
model, drawing,
assembly, docs, …
Where used, where
referenced,
Strana 6
…
© 2009 Industrial Technology Systems, s.r.o.
Relation Browser - Views
Ø References
Ø Where used
Strana 7
© 2009 Industrial Technology Systems, s.r.o.
Hardware/Software/Personalrequirements
Teamcenter Administrator
DataBase and
TC Appication Server
LAN
• Adminstration of Data Base,
• Administration of Users/Roles,
• To update modules,
• To keep lab working
ORACLE or
MS SQL
8GB RAM
Mirrored O/S , App disk 150GB
Mirrored Data disk(s) 750GB
Strana 8
© 2009 Industrial Technology Systems, s.r.o.
Visualization
Ø Full usage of 3D model
Ø Movie
Complexity of Solution
SKLOP
Změny konfigurace
Strana 9
Number of users
© 2009 Industrial Technology Systems, s.r.o.
Različiti izvori informacija
- polagano odlučivanje, gubljenje vremena
Requirements
Management
Strana 10
Project Management
Product Data
Management
© 2009 Industrial Technology Systems, s.r.o.