T-Foil Vapor Barrier & Insulation Hanging System
Transcription
T-Foil Vapor Barrier & Insulation Hanging System
T-Foil Vapor Barrier & Insulation Hanging System Standard T-Foil Specification: Insulation Holder / Hanging System Polypropylene/Scrim/Kraft - White Foil/Scrim/Kraft - Foil 69# liner board Polypropylene Side Exposed: What is T-Foil? T-Foil is an all-in-one vapor barrier and insulation hanging system. This all-in-one system is installer friendly, does not compress Flame Spread 10 Smoke Developed 35 ASTM E-84/Ul 723 Foil (polyester) Side Exposed: Flame Spread 10 Smoke Developed 40 ASTM E-84/Ul 723 Permeance-ASTE E 96 .02perm perforated ASTM E96 Procedure A insulation, allows for ventilation, packaged for easy transport and can Details be manufactured to suit your specific job requirements. • • • • • • • • Varying drop card sizes: 4” to 18” Allows for proper ventilation and air flow Vapor Barrier UL tested T-Foil is packed 5/30’ pieces per roll equaling 300 sq ft. This hanging system does not compress insulation Great for wooden structures T-Foil is available in White, Black or Foil Facing Manufactured in Vancouver, WA T-Foil installed: 2’ on center with 12” drop card Example of T-Foil installation before and after Manufactured by: Your Source for High Quality T-Foil www.T-Foil.com • 360.635.1963 2600 NE Andresen Road, Suite 100 · Vancouver, WA 98661 · Email: [email protected] · Fax: 360.693.7811 T-Foil Vapor Barrier & Insulation Hanging System Standard T-foil Staple with 508-C minimum when stapling drop card to trusses Mass insulation installed Use Ace 70001 staples only to staple bottom every 4 inches No other acceptable T-Foil lnstallation Requirements • Always verify square foot requirements before ordering and order in 300 sf increments • T-Foil can be ordered to handle up to R49 insulation material • W hen stapling drop card to trusses, make sure to use a 508-C quality staple and staple every 5 inches • When stapling bottom overlapping section, make sure to use ACE 70001 staples only • W hen stapling bottom overlapping section, make sure vapor barrier is overlapped 1 inch and stapled every 4 inches • Make sure to account for correct air space/ventilation requirements • Make sure moisture content is not excessive when installing T-Foil Any questions regarding T-Foil installation please call JAS Enterprises at: (360) 635-1963 www.T-Foil.com • 360.635.1963 2600 NE Andresen Road, Suite 100 · Vancouver, WA 98661 · Email: [email protected] · Fax: 360.693.7811