Key information for builders and cablers Supply internal and external conduit paths:
Transcription
Key information for builders and cablers Supply internal and external conduit paths:
Key information for builders and cablers Internal Conduit Supply internal and external conduit paths: Notes Internal Conduit Min. 100mm radius bends Min. 100mm radius bends ALL CONDUIT FITTINGS MUST BE GLUED. ALL CONDUIT FITTINGS ORANGE CONDUIT MUST MUST NOT BE BE GLUED. USED. 1 x P23 Conduit (builder to supply) 1 x P23 Conduit (builder to supply) ORANGE CONDUIT MUST NOT BE USED. GPO GPO Min. 300mm Min. 300mm Floor Slab 1. Use Rigid White P23 Communications Conduit ONLY 2. Use no more than 3 x 90º bends 1. Use Rigid White P23 Communications between draw points. The bend radius Conduit ONLY of each bend must be no less than 2. Use no more than 3 x 90º bends 300mm or more. between draw points. The bend radius of each bend must be no less than Quick Acronyms 300mm or more. PCD - Premises Connection Device NTD - Network Termination Device Quick Acronyms PSU - Power Supply Unit PCD Connection FGL -- Premises Finished Ground LevelDevice NTD - Network Termination Device PSU - Power Supply Unit FGL - Finished Ground Level Notes 100mm - 140mm horizontal separation 100mm - 140mm horizontal separation Min. 100mm radius bend Min. 100mm radius bend 1 x P23 Conduit (builder to supply) 1 x P23 Conduit (builder to supply) Floor Slab Min. 300mm set back from building corner Min. 300mm set back from building corner Wall Cavity Min. 410mm height from finished ground level Min. 410mm height from Min.ground 300mmlevel radius bend finished FGLradius bend Min. 300mm • Use rigid white P23 telecommunications conduits (23mm Internal Diameter) in the trench and within the house. Glue all joints using solvent cement • Ensure the conduits run as straight as possible • Install drawstrings in both conduits • Fix all conduits securely using conduit saddles ZOOM SECTION or similar • Provide a power point (GPO) within 1500mm ZOOM SECTION of the Network Termination Device (NTD) location Partradius of 300mm • Each bend of the street conduit must radius bend (<45º) be no less than 300mm Part of 300mm radius bendof (<45º) • Each bend radius the internal conduit must be no less than 100mm • Use no more Full than300mm 3 x 90º (max) bends between draw points radius bend Full 300mm radius bend NBN Co minimum Premises Connection Device (PCD) separations: FGL Street Conduit Street Conduit Minimum 250mm from services including: •Electricity, gas or water meter enclosures •Water taps or downpipes Wall Cavity Minimum 1.5m side clearance from gas cylinders* *Check with your local Authorities for their separations Notes 1. Use Rigid White P25 Communications Conduit ONLY Notes 2. Use Use Rigid no more than 3 xCommunications 90º bends 1. White P25 betweenONLY draw points. The bend radius Conduit of each bend must be no less than 2. Use no more than 3 x 90º bends 300mm or more. between draw points. The bend radius of each bend must be no less than 300mm or more. Quick Acronyms PCD - Premises Connection Device NTD - Network Termination Device Quick Acronyms PSU - Power Supply Unit PCD - Premises Connection Device FGL - Finished Ground Level NTD - Network Termination Device PSU - Power Supply Unit FGL - Finished Ground Level NTD Enclosure Ventilation Alert: If the NTD is to be enclosed, then ventilation is required. Refer to NBN Co Residential Preparation and Installation Guide: SDUs and MDUs for specifications. PSU PSU ZOOM SECTION NTD ZOOM SECTION NTD NBN Co to supply: PCD PCD Floor Slab FGL Floor Slab • The service cable to the PCD location Partdrop of 300mm • The PCDradius bend (<45º) Part of 300mm • The internal fibre optic cable from the PCD radius bend (<45º) to the NTD • The NTD Full 300mm • The Power Supply radius Unit bend (PSU) Full 300mm • All the fibre optic cables radius bend FGL Wall Cavity Unmaintained copy. For most recent version, refer to: www.nbnco.com.au/assets/documents/key-information-for-builders-and-cablers.pdf Wall Cavity For more details and installation options refer to: NBN Co Residential Preparation and Installation Guide: SDUs and MDUs www.nbnco.com.au/assets/documents/preparation-and-installation-guide-for-sdus-and-mdus.pdf Bangers & Tash Pty Ltd Job#: NBN463 Colours: Trim size: 0000 (h) x 0000 (w) mm NBN equipment installed within the home – wall space reservations Premises Connection Device (PCD) 565 mm Network Termination Device (NTD) Power Supply Unit (PSU) SYSTEM STATUS BATTERY POWER REPLACE BATTERY ALARM SILENCE 325 mm ALARM SILENCE BATTERY EMERGENCY USE Layout example only – for other configurations refer to NBN Co Residential Preparation and Installation Guide: SDUs and MDUs Outside Your Premises Inside Your Premises Preparing new developments for the NBN It’s important that builders and cablers talk to new homeowners about the telecommunications services they may want to access in their homes and provide guidance on where NBN equipment, phone and data outlets should be located. Both fixed line internet and telephone services will be delivered over the NBN. The NBN Co equipment should be located where it is convenient to connect telephone as well as computers and internet TV. It’s important to remember that if customers want to utilise applications like IPTV via Smart TVs in their living room and telework via HD video conferencing in their office they should consider fixed cabling in the home to connect these devices. Requesting equipment pre-installation BEDROOM 1 To enable a smooth and efficient connection to the National Broadband Network (NBN), builders should order a pre-installation of the in-home equipment supporting NBN access. Builders call 1800 OUR NBN or email [email protected] to request ‘NBN equipment pre install’ and arrange an appointment date. BATHROOM Computer FAMILY ROOM/ STUDY LIVING TV The following is required: • Development name • Premises address/location PHONE POINT DATA POINT POWER POINT BEDROOM 2 DINING KITCHEN • Confirmation power will be available LAUNDRY • Number of premises • Confirmation that the conduits are in place • Preferred date for the NBN equipment pre installation NBN Co will be in contact to confirm the date and time for the NBN equipment pre installation. NBN Equipment BEDROOM 3 ENTRANCE Internal Conduit Path GARAGE PCD For more information: The diagram above is an example only Phone 1800 OUR NBN (1800 687 626) Visit our website at: www.nbnco.com.au/newdevelopments Email us at: [email protected] This document is subject to copyright and must not be used except as permitted below or under the Copyright Act 1968 (Cth). You must not reproduce or publish this document in whole or in part for commercial gain without the prior written consent of NBN Co. You may reproduce and publish this document in whole or in part for educational or non-commercial purposes as approved by NBN Co in writing. This document is intended as an informational guide only. NBN Co does not warrant that the processes and information outlined in this document comply with all (or any) applicable laws, codes of practice or standards. The recipient must exercise its own judgement as to how best to perform the activities described in this document in a safe way, and so as to meet the requirements of all applicable laws, codes of practice and standards. The contents of this document should not be relied upon as representing any NBN Co’s final position on the subject matter of this document, except where stated otherwise. NBN-NEWDV-BCA4-MAY13 www.nbnco.com.au