Tennessee Gas Pipeline
Weekly System Update
November 13, 2014
Ten n e ss ee Ga s Pip e lin e I 1 00 1 Lo u is i an a Str eet I Hou s ton , T X 7 7 00 2 I w ww. ten n e s see ad v an t ag e.com
INSIDE THIS UPDATE
TGP Calendar Reminders
Tip of the Week
Storage Update
Operations Update
Outages Update
Helpful Links
DART Training (Videos)
TGP CALENDAR REMINDERS
Weekend Contacts and After-hours number: 713-420-4999
Nov 15th
Nicole Lang
Mandey Allen
Debbie Tweedy
Work
713-420-5992
713-369-9369
713-420-5289
IM
tgpnicolel
Craftyone07
tgpdtweedy
Nov 16th
Nicole Lang
Mandey Allen
Debbie Tweedy
Work
713-420-5992
713-369-9369
713-420-5289
IM
Tgpnicolel
Craftyone07
tgptweedy
TIP OF THE WEEK
DART Training (Documents)
Presentations
Chart
After Hours: 713-420-4999
Please send all suggestions and
comments on our weekly update to:
[email protected]
Thank you for your business!
Kinder Morgan has the following holidays for the remainder of 2014:
Thursday, November 27
Thanksgiving Day
Friday, November 28
Thanksgiving Day KM designated Holiday
Thursday, December 25
Christmas Day
Friday, December 26
Christmas Day KM designated Holiday
Page 2
TIP OF THE WEEK (Continue)
DART Customer Activities New Login Link – Update
As previously posted on June 27, 2014 Kinder Morgan is in the process of upgrading and
adding new servers. This Saturday night November 15, 2014 access to the old Dart
servers will be going away. Please be aware that if you are using “Dart Login (Old)” or
from Mobile Dart “Houston IDart” or “Lakewood IDart”, these connections will no
longer be available. If you are currently using “Dart Login” or from Mobile Dart “HOU
IDart –New” you will not see a change.
The IP addresses are located on the "DART Access/Firewall Rules" page under the "Help
& Information" section of our site at
http://pipeline.kindermorgan.com/StaticContentManager.aspx?control=firewallRules.
Access to the public areas of http://pipeline.kindermorgan.com does not require these
firewall rules.
If you have not already done so please forward these IP addresses to your IT department
as soon as possible in order to reduce a potential interruption of access.
For questions concerning firewall configuration please contact Skip Stallings at 713-3699067, [email protected]. For general questions concerning this
change, please contact Wade Callen at 713-369-9366,
[email protected].
Note: Technical Staff is limited over the weekend and may not be available
to assist if experience any technical issues accessing Dart.
STORAGE UPDATE
As a reminder November 30, 2014 is a Sunday and part of the Thanksgiving holiday weekend.
All December 1 online storage transfers need to be input and confirmed on or before the end
of day November 30. If you or your back-up need assistance, please contact your scheduler in
the coming week for training.
If your storage transfer is not completed on terminated or recalled contracts online, your
storage contract will be charged for being over MSQ on your invoice, and the balance will not be
automatically moved to the new contract.
All storage customers that do storage transfers need to set up a contact with an email in DART
for notification of storage transfers. Go to Business Preference, New, Select the “IMBAL
TRD/STOR TRANS” category and input the contact information including the phone number and
email. NOTE: IF THE EMAIL IS NOT SET UP FOR THE GID, THE TRANSFER WILL BE IN ERROR
AND THIS MUST BE FIXED BEFORE THE TRANSFER CAN PROCEED.
3
Page 3
Imbalance Trades
The imbalance trade period for October, 2014 trades is November 13-November 25, 2014
OPERATIONS UPDATE
The OFO Action Alert in Zone 4 downstream of Station 315 and Upstream of Station 321 on the
300 Line remains in place. Matching physical flows to scheduled volumes in these areas remain
extremely important.
The reversal project at Sta. 860 continues. This project will limit throughput through Station 847
(segment 847 FH) by approximately 195,000 Dths and Station 860 (segment 548 BH) by
approximately 221,000 Dths. The maintenance continues at on the 500 line. This project will
limit throughput through the station by approximately 415,000 Dths (Segment 542 BH). These
projects could result in restrictions through a pro rata portion of secondary out of the path
(SOP) nominations.
Anomaly remediation at MLV 101-1 to 106-1 and and the bi-directional/filter work at Sta. 200
continues. This project limits throughput through Sta. 110 by approximately 587,000 Dths
(Segment 187 BH). These projects could result in restrictions through a pro rata portion of
secondary out of the path (SOP) nominations.
Unit maintenance continues at Sta. 245. Work will limit throughput through the station by
approximately 30,000 Dths. This work could result in restrictions through a pro rata portion of
secondary out of the path (SOP) nominations.
OUTAGES UPDATE
For a full list of outages, please refer to the 2014 Maintenance & Outage Update Posting