BIM for Operations Doug Wood © Copyright IBM Corporation 2011
Transcription
BIM for Operations Doug Wood © Copyright IBM Corporation 2011
BIM for Operations Doug Wood [email protected] © Copyright IBM Corporation 2011 Building a Smarter Planet Doug Wood BIM Software Architect IBM Cloud and Smarter Infrastructure CTO’s Office [email protected] 2 11/7/2014 Building a Smarter Planet IBM and BIM? IBM supports the facility owner IBM sells two industry leading applications for facility owners/operators Maximo TRIRIGA - Enterprise Asset Management Work Management (CAFM) - Workspace management (IWMS) Energy/Environmental Management Real estate and capital project management IBM Southbank Lab London 3 11/7/2014 Building a Smarter Planet Maximo Asset Management • Asset Management – Facilities, Operations, IT, Fleet – Assets, Locations, Failure Reporting, Condition Monitoring, Meters • Work Management – Preventive, Corrective, Projects, Emergency, Safety Plans – Work Hierarchies, Planning, Status, Assignments, Actual Metrics • Procurement Management – PR’s, PO’s, Receipts, Invoices • Materials Management – Items, Storerooms, Inventory, Reorder, Issues, Returns • Contract Management – Master, Purchase, Warranty, Lease/Rental, Labor Rate • Service Management – Self Service Requests & Status – Platform for asset owners, asset managers and service providers • Next Generation Architecture – J2EE Platform – Standards-based – Service Oriented Architecture (SOA) 4 11/7/2014 MAXIMO ASSET MANAGEMENT Building a Smarter Planet Who uses Maximo? Asset Intensive Organizations 11 of the 12 largest PHARMACEUTICALS companies in the world are using Maximo 7 of the 10 largest AUTOMOTIVE companies in the world are using Maximo 8 of the 10 largest OIL & GAS companies in the world are using Maximo 11 of the 20 largest diversified UTILTY companies are using Maximo 11 of the 12 major AEROSPACE & DEFENSE companies in the world are using Maximo 9 of the 15 busiest AIRPORTS in the world are using Maximo 6 of the 10 largest ENERGY companies in the world are using Maximo 5 11/7/2014 Building a Smarter Planet TRIRIGA – Integrated Space Management and Energy Management Role-based Applications IBM TRIRIGA Real Estate Manager IBM TRIRIGA Capital Project Manager Portfolio Planning Program Management IBM TRIRIGA Facilities Manager IBM TRIRIGA Workplace Operations Manager IBM TRIRIGA RE Environmental Sustainability Manager Space Management Contact Center CO2 Emission Tracking Utility Tracking Site Selection Fund Management Space Chargeback Service Management Transaction Management Scope Management Space Requests Warranty Management Waste Disposal Lease Administration Cost Management Strategic Planning Preventive Maintenance Water Consumption Lease Accounting Schedule Management Move Management Facility Assessment AR Tenant Tracking Resource Management Reservation Management Payment Processing Quality Management Personnel Provisioning Security/Key Management Green Opportunities Tracking Client Requests Vendor Engagement CAD Management Inventory Management Capital Planning Procurement LEED/BREEAM Certification Energy Star Integration Resource Planning IBM TRIRIGA Core Components Geographies People Receiving Customer Self Service Reporting Locations Specifications Invoicing News WPM Metrics Organizations Assets Requests Graphics GIS Mapping Vendors Contracts Tasks Document Management GANTT Schedules Building a Smarter Planet Why does the owner/operator care about BIM? Owner/ operator data requirements communicated to design build process Reduced labor and improved accuracy in building commissioning Reduced time to plan and assign work orders Integration of CAFM, IWMS, and building operational systems Consistent data across build portfolio support cross portfolio insights Reduced cost and lead time for renovation Architects/ Engineers gain visibility to actual building performance 7 11/7/2014 Building a Smarter Planet BIM reduces cost of hand-over and building commissioning NIST Survey (2004) Inefficiency Costs : $15B/yr 66% borne by Owners $0.23/ existing SF/year 8 11/7/2014 Building a Smarter Planet BIM increases operational efficiency Facilities operating costs Sandia National Labs “straw man” survey Using BIM, if you could get all needed information in 5 minutes, how much time would that save? Response: • Up to 2 hours per work order (WO) 2 hrs x $50/hr = $100/WO WO/yr = ~ 24,000 Potential savings: $2.4 M/year Custodial Pest control/refuse collection Recycling costs Roads/Grounds Landscaping/snow-ice removal Utilities Plant operations and energy Reoccurring Maintenance and Repair Work orders (source : FRPC Real Property Inventory – Users Guidance FY09) 9 11/7/2014 Copyright 2011 by Birgitta Foster – Used with permission Building a Smarter Planet BIM Lifecycle Operations Project Management As Maintained model drive capital planning and renovation Planning Capital Planning Cost Schedule Design and Construction Design Intent Engineering Construction “As Built” Condition Based Assessments Model data in COBie Format (or IFC) flows into CAFM and IWMS systems starting with design intent “As Maintained” Operations and energy cost Facilities and Space Management 11/7/2014 Initialize BCS form As-Built model Real-time energy and efficiency metrics Integrated in context viewer Field data 10 Building Control System Integration In-context visualization improves efficiency of maintenance planning and execution Building a Smarter Planet Is this your current data flow? Design Design Intent Design Model Specification Inspection and manual update Bid Model Engineering FAB Models Construction Construction “As Built” Unified Clash Detection Model Construction Management System ? ? ? CAD Export Proprietary data load by vendor Hand-over Model ? Operations Walk through inventory and manual data entry Building Control System 11 Product Documentation 11/7/2014 IWMS CAFM/CMMS Services supported Import Equipment Schedules Building a Smarter Planet The goal is to capture date once when it is first created or encountered and to propagate it to all systems and stakeholders. This requires: • • • 12 11/7/2014 Business process that allow all stakeholder to articulate data requirements Interconnects software systems that allow data to flow from point of capture to consumer in digital format. Data standards that provide a common language among all systems and stake holders. Building a Smarter Planet Hand-over challenges • • • • Lack of understanding of the data required for operations Lack of understanding of the capabilities and needs of the operational systems (CAFM, IWMS, BCS) Construction and commissioning information is not communicated to owner Portfolio vs project approach The building operator should have a representative on the BIM team. They should Connecting Roles and Tools helps eliminate information loss INFORMATION Define what data is required for operations and how it is to be used Provide the organization's data standards Get the hand-over data requirements into the BIM Execution plan Capture the required data as its generated not at the end of the projects Make the data available to the owner when you have it Goal: Close this gap Review Design for Maintainability What equipment has perfumed well in the owners environment? (From the product catalog) Is access to the equipment adequate and safe? Is there sufficient space around the equipment to work TIME PHASE Planning Design ROLE OEM Operator Operator TOOL 11/7/2014 Operations Architect/Engineer Contractor Communicate the capabilities of operational systems such as CAFM and IWMS 13 Construction Design Tools Operational Systems Building a Smarter Planet Project vs. Portfolio • The AEC Industry has a project centric view of buildings • Each project is unique with its own team contract approach, and data standards • Owner has a portfolio centric view • Example: • Major US university has 1800+ building over 2000 sq ft • US government agencies have portfolios of buildings ranging from several hundred to tens of thousands • All those building exist together in the owners CAFM and IWMS systems • The Owner needs consistency in their CAFM system across the portfolio • If the owner has established standards for location/room names, equipment names and classification, the project should use them • If not, the project team needs to work with the owner to establish standards or select acceptable industry standards, • Hand-over has to bridge the gap 14 11/7/2014 Building a Smarter Planet Digital Handover will overwhelm the owner with data Hand-over data before BIM The transition from paper based hand-over to digital hand-over can overwhelm the operator with unfiltered unstructured data. What the owner wants for hand-over Hand-over data After BIM The model needs to be filtered when hand-over data is generated. Hand-over data should only include: • All floors and spaces • Only assets that have: • • • 15 11/7/2014 • • Significant capital cost Maintenance requirements that require tracking Regulatory requirements Product data for all included assets Attribute meaningful to the FM process Building a Smarter Planet Agreements required for a successful Digital hand-off For which asset will data be provided? For each class of assets, What set of attributes are expected? What classification hierarchy will be used? Is hand-over data expected in a standard format such as COBie How is Equipment names? When is the data expected? - If there is to be more than one drop, what data is required for each drop? Is digital product and maintenance documentation part of the Hand-over package? - If not, how are these files to be organized and delivered What System will the owner use to store and manage these files? How and when are barcodes assigned? 16 Building a Smarter Planet Hand-over becomes a process not an event The building operator can bring data into operational systems as soon as %100 design. “Virtually” operate the facility prior to hand-over to insure that all presses are in place at handover Shared data enables shared business processes and collaboration Capture operational activity before hand-over including: System turn-on/Warrantee start date Pre hand-over maintenance activities - Construction Management System 11/7/2014 Construction CAFM/IWMS Systems Shared Process 17 Shared Data Bid Model “As Built” Building a Smarter Planet Design Model • • • • • Floors and Spaces (Facility, Floor, Space) Equipment Schedule (Component) Equipment design specification (Type) Definition of building systems (System) Definition of space zones (Zone) %50 of hand-over data available Bid Model • Equipment make and model %75 of hand-over data available Data exchange during construction Product Data (From manufacturer) • • • • • • Manufacture, Model number Equipment actual specification Product documentation (pdf) Maintenance Procedures Preventive maintenance schedule Parts manifest Installation COBie Tables: • Asset Tag – What item is install at each location? • Type, Job, Spare, Resource Commissioning • • • • Installation data Warrantee start data Asset Tag Commissioning issues Hand-over • Pre hand-over maintenance • Commissioning issues resolution • Final documentation %100 of hand-over data available 18 Owner FM teams participates in commissioning process. CAFM system is directly updated on site via mobile Data: Asset Tag, Install date, issues owner needs to track Building a Smarter Planet Product catalog Product Description Make and Model Specifications Product documentation Maintenance procedures Parts List 3D model maintenance best practices Warrantee Contracts • Custom Maintenance Procedures • Other documentation Product Catalog • • • • The product catalog provide a single repository for all data about products used in the owners building portfolio. It includes both static vendor data and operational experience. The insights gained from a cross portfolio view of product performance drive capital planning, product selection and maintenance decisions. Analytics Total Cost of ownership Comparative product performance Repair/Replace? Maintain/Run to failure? Condition based maintenance thresholds Energy Usage Maintenance Costs Actual maintenance performed Operational Life Aggregated data from Actual Performance 19 • • • • • Building a Smarter Planet Design Design Intent Model Evolution Design Model The model should evolve from design concepts o operations without an data loss recapture or reentry. Specification Engineering Bid Model Construction Unified Clash Detection Model Field data Operations Model Building Control System COBie IWMS CAFM/CMMS Product Catalog Operations Retrofit 11/7/2014 “As Maintained ” Construction Management System Document Management Construction 20 “As Built” FAB Models Building a Smarter Planet Questions? 21 11/7/2014 Building a Smarter Planet BACKUP 22 11/7/2014 Building a Smarter Planet Building Information Model Extensions for Maximo Why BIM for Facilities Management? Reduced labor and improved accuracy in building commissioning Architects/ Engineers gain visibility to actual building performance Reduced cost and lead time for renovation Reduced time to plan and assign work orders Owner/ operator data requirements communicated to design build process What’s Included? COBie data import 3D BIM Viewer Integration Maximo extensions for BIM data Available on the ISM Library ISM Library 23 11/7/2014 http://www.ibm.com/software/ismlibrary?NavCode=1TW10MA44. Building a Smarter Planet What is COBie? An Actress? Construction Operations Building information exchange A Spreadsheet An Open Standard managed by BuildingSmart A Relational data model A Contract Specification that allows owners to specify what data is required at hand-over 24 11/7/2014 Building a Smarter Planet UK Government is mandating multiple COBie drops 25 11/7/2014 Building a Smarter Planet BIM import architecture General IFC Source AutoDesk Revit Industry Foundation Classes IFC Export Publically available IFC to COBie Converters COBie Schedule COBie Maximo Application Web Upload Maximo server file system COBie source COBie to Maximo Mapping COBie Maximo Import location Facility Location and COBie import project Floor Location Space Location • IFC http://www.iai-tech.org/ifc/IFC2x4/beta3/html/index.htm Component Location and Asset • gbXML http://www.gbxml.org/ • COBie http://www.wbdg.org/resources/cobie.php • OMNIClass http://www.omniclass.org/ System System (Category configurable) Zone System (Category configurable) Type Product (New for COBie support), Item Attribute Specifications for: Location, Asset, Product, Item Contact Person, Company, Company Contact Document Attachment Job Job Plan, InvVendor, PM, ProductJob (New) Resource Toolitem, Job Plan Tools Spare Product parts (New) 26 11/7/2014 Standards COBie Certified COBie Parser Analysis and Import http://buildingsmartalliance.org/index.php/newseve nts/proceedings/cobie2011challenge Marketing POC Technical POC name: Kim Woodbury name: Doug Wood phone: (978) 899-2644 email: [email protected] email: [email protected] Maximo DB Building a Smarter Planet Work order viewer integration Selecting the facility to display in the viewer Many ways to search and create a selection list Tree has list of all assets and locations associates with the work order and shows path to top Selecting an item in the tree displays and highlights it in the viewer 27 11/7/2014 Add or remove selection list from work order