View Submission
Transcription
View Submission
Application Number 77w- 35.2 .. . ' Project Sponsor of /A Box Number . . . . . DeJbdhhfi 1. '' 1 PUBLIC SERVICE COMMISSION STAFF TECHNICAL STAFF ...: -SI- PROJECZ-SPONSOR: September 3,1997 F Town'*ofDelbarton ,<. I. PROJECT SUMM WATER SYSTEM LINE EXTENSION, REPLACE PORTIONS 0 ABANDON EXISTING TREATMENT PLANT. Re: Town of Delbarton Page 2 6. Inconsistencies: None noted other than to point out that 0 4 of the preapplication form. Expenses were not listec on page 7. Operation and Maintenance Expenses: Adequate. Could be lower, depending upon the resale rate established for Mingo County PSD. The dramatic increase in labor cost is not supported. 8 . Engineering Agreement : Not Applicable. infrastructure review TOWN OF DELBARTON CASH FLOW ANALYSIS YEAR ENDED JUNE 30,1996 97W-352 Per Application Before Project Per Application with Project adjustment Per Staff Analysis 1 $ 2 $ $ 3 $ AVAILABLE CASH Operating Revenues 11,912 56,060 56,060 OPERATING DEDUCTIONS Operating Expenses 10,872 42,919 42,919 Total Cash Requirements Before Debt Service 10,872 42,919 42,919 DEBT SERVICE REQUIREMENTS Interest on Long Term Debt Bond Retirement Principal $ Interest Subtotal (B) Reserve Account @ 15% Renewal & Replacement Fund (2.5%) Total Debt Service Requirement ------------------- Remaining Cash --------------------- 7,417 1,258 Percent Coverage (A) / (B). c* C:\OFFICE\QPW\QP-FILES\INFRASTR\DELBARTO.W62 1 1 PUBLIC SERVICE COMMISSION OF W.VA. MEMORANDUM TO : AMY SWANN FROM : SANDRA NEAL EXECUTIVE SECRETARY DATE : August 25, 1997 SUBJECT : INFRASTRUCTURE APPLICATION BY TOWN OF DELBARTON Water Extension Upgrade for Delbarton 97W-352 Today, I have received the above referenced infrastructure application. Please immediately assign this application to the appropriate technical staff for review. Staff must have its written report to Meyishi Blair on or before September 4, 1997. MB/esk cc: Meyishi Blair, Esq. 7/96 Series 111 WEST VIRGINIA INFRASTRUCTURE AND JOBS DEVELOPMENT COUNCIL PRELIMINARY APPLICATION L ADMINISTRATIVE AND IDENTIFYING INFORMATION AND DATA: A. SPONSOR INFORMATION 2. Sponsor's Address: :. P,' -:- .m Town of Delbarton 1. Project Sponsor: -1 ;-: a w b, 0 ry P. 0. Box 730 ul B. GENERAL PROJECT INFORMATION Project Type ( Water, Wastewater) : Is the project a new system, extension or upgrade ? Water Extention/Upqrade . Project Location ( City, County, Magisterial District) : Town of Delbarton. Minso County nf nPl halftgn New customers to be served by project : 84 3. Total customers served (existing): 4. Project Description: SewlCe connection b e S __ 178 to the unserved residents of the m, D System (for new supoly), and abandon e x i s t i n s nt. 5 . Is this an emergency project as defined by 9 3 1-15A-27 Yes- N o x If Yes, explain: C. CONTACT INPORMATION 1. Contact Person: M r . Jonathan M. Fowler, P. E. 2. Contact's Address: ~aworth,&yer E, Bolevn, Inc. 325 Sixth Avenue Char1p.m. 3. Contact's Telephone Number ( 304 ) 75303 744-&;3nn - Name / Number: 2. Location: . Date Received: 4. Date of Council Action: I I I 1 D. STATE / FEDERAL ASSISTANCE SUMMARY 4. $ $ 5. $ $ 6. $ $ 7. $ $ $ TOTAL $ 1,508,000 -0- IL ENGINEERING INFORMATION AND DATA: 1. Engineering Report status - Is a copy attached 7 : Yes X No ( IfNo, application will be returned ! ) 2. status of Plans i specs : 1 Cities 3. Consulting Engineedkchitect: 4. Consultant's Address: H m r t h - I*vP~ & 325 Sixth Avenue South Charleston, WV 25303 5.Consultant's Telephone Number: Fax Number: ( 304) (304) 744-5200 744-3955 Page 2 Bolem, Inc. . L L? i Et.BUDGET AND FMANCIAL INFORMATION A.PROJECT COST SUMMARY Budnet Line Item 1. Construction Cost: cost $1,142,300 Subtotal 2. Engineering Cost: RiXWig Special Services S 30,000 s 86,000 Design Construction s 74,000 Subtotal 3. Legal cost: Project Attorney Right+f-Ways - (Legal) PSC Attorney S 2,000 1,500 s 1,500 $ Subtotal $ 190,000 s 5,000 s 42,500 s 15,ooo 4. Administrative Cost: f 35,000 Project Coordinator .. . s Accounting 7,500 Subtotal 5 . Financing Costs: Interim Fmancinn s -0-0- s 15,000 3 -0- f Capitalized Interest Bond Counsel Subtotal 6. Site, Easements and ROW Cost: Land Acauisition Costs Easement Costs s 7. Project Contingency: 500 Subtotal s Subtotal s 500 112,700 s 1,508,000 8. TOTAL PROJECT COST ~ ~~ B. PROJECT FINANC iC SUMMARY Amount Project Funds Federal Grants (Total) (1) State Grants (Total) (1) small C i t i e s Block Grant Federal Loan (1) @ for YarS StateLoan (1) 0 % for @ -- 40 Years % $ -0- $ 1,250,000 $ $ 758,000 Other Funding Sources(2) 258,000 $ $ TOTAL FUNDING PROVIDED Cost Estimates Prepared by : 1,508,000 Date Page 3 . .' ., . III C. GENERAL FINANCIAL INFORMATION SUMMARY . Sponsor's most recent fiscal year's annual audit report or financial statement, as applicable - date Isacopyattached? Yes X No Lender Balance --- I. 6 / 30 / 96 NIA Date of Mahuiiy -- --- --- Current status 2. 3. 4. Lender Date of Delinquency Current status CurrentAmOunt Proposed Project Amount 1. 2. 1 Item - -0-0- Debt Service Annual Purchased Water Cost - Annual - per Thousand Gallons 7,095.00 29,419.00 -- ---- - Purchased Wastewater Treatment Cost Annual -- 2-no --- -- - per Thousand Gallons Average rate cost per customer ** 11;25, 20.58 * * Average rate must be based on 4,500 gallons per customer per month IateofLastRateIncrease? - ( / / vledian Household Income project area: HOW Was This FigureinObtained 7 ) : Percentage Increase 12,454 a Near $ Page 4 % t i IV.JOB CREATION A. ECONOMIC CONSIDERATIONS The Town's residents consist of 1. Describe the area's economic conditions and needs for the project : '137~ P.S- p;rnnn+ of Areas are without w a t e r service. Ths-p-njwt is m-i. t-1t.h o qea-l t n future, without a t e r service thev canno t hope to a t t r a c t currentwpopulations. maintain -I q the or eyen . Describe the economic impact of the project : quality w a t e r service should business and new h a construction within the corporate limits of k l b a r i m ~ . B. JOB CREATION 1. Describe the nature and number of permanent full time and part time jobs created or retained by the project: This D r o - j e c t includes t h e h i r m q of ~ v p m o l n v . . for w a t e r denarhnent. The effect on hours of operator f o r the Minao r -o C P l a n t wi 1 1 . - I l i k e l y require the hirinq of one additional P l a n t %rator. 12. Number of Construction Jobs Created by the Project : i5 I C. BUSINESS COMMITMENTS 1. Provide a list of businesses that are committed to the project and dollar amount of commitment: 1. Name of Business 1I CodtmentAmount 2. 3. 4. 5. 2. Describe nature of business: I Page 5 ' 1 I JobsRetained 1 Jobs Created 0 . V. NON DOMESTIC WASTEWATER DISCHARGE INFORMATION DISCHARGE FLOW (MGD) AVERAGE MAXIMUM POLLUTANTS EXPECTED TO BE PRESENT' 1. 2. 3. 4. \ Describe: ~ ~~ ~~ ~ ~ ?.Is the dmharge direct or indirect 7 Direct Indirect Ifthis is an indirect discharge, name the publicly owned treatment works providing treatment: Has the wastewater treatment plant agreed to treat the non domestic wastewater ? Yes 1 Do Clean Water Act Section 307 effluent guidelines or pretreatment standards apply? Yes If yes, spec@ effluent guidelines that apply: Are guideline limitations expressed in terms of production 7 Yes If yes, provide average production rate Calculate guideline based effluent limitations : Page 6 No - NoNo - :1 V.B.AlrQuallty . Have Air Emissions increased or will they increase BS the result of the consln~ctionof a new discherge OT s o w or the rc-location of an existing mission which may be in violation of any Air Quality standards or requirements which are allowable under current emissions mndards 7 Yes No X No X If so, has an Application or Notice of Application been filed with Ofice of Air Quality? YeS Detail current status: VI. TraintngInformatlon If the project sponsor is a Public Service District or the project in any way involves service by a public setvice district identify the district board members, date and location of the most recent PSC training seminar attended. 1 Board Members Date Location I Ce-xiify, under penalty of law, h a t this document and all the attachments submitted are to the best of my knowledge and belief, true, accurate and complete. I am aware rhat there are significant penalties for submitting false information including the possibility of fme and imprisonment for known violations. Name and OEcial Title // v Acknowledged before the Subscriber by .- /OWU IWW OF (SPONSOR) A a 9U S This Day of m- I My Commission Expires /E3 t 19 27 2 I I Page 7 3 SEWER O?ERATlNC U I L N S E S Account ne IO. - (a) 1 2 COLLECTING EXPENSES Operation. Operation Sucervision and Engineering Ooeration Lam Sumlies and Ex 3 I1 4 5 12 33 6 7 8 9 D4 05 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 2t 21 2E 05.1 05.2 35.3 05 4 ml 5; I Amount Related to Projed Maintenance. Maintenance Sucewision and Engineerin Maintenance of Collecting System Plant Maintenance of Service Connections and Maintenance of Collecting and Transmission Maintenance of Slructurei and IrnDrovcrncnU Maintenance of Olher Collecting System €QUID Total Maintenance Miscellaneous: 08 PUMPING EXPENSES Ooeratim 21 22 23 24 ODcntion Supervision and Engineering Ooerationbbor RnueranU Fuel SUDD~ICI and G Maintenance. 2s 3( 31 3; 3: 3 3: 3f 3i 3' 3 4 4 4 43 44 45 3 I 47 Attachment 1 A Sheet 1 , . ._ me No - BILLING AND COLLECTING EXPENSES 780 781 5 782 6 783 7 784 4 8 9 10 785 Uncollmible Accounts Rents Total Billing and Coliecling tmnus I l l A 1 I 1 A I A I A I I I A A- B E E 8 8 8 I I I ADMINISTRATIVE A N 11 Administrative and Genen 12 790 Other Genersl Wee Salaries 13 79 1 Exotnser of Genenl Officers 16 792 15 792.1 GDenses of General Wicen 16 792.2 bmnxs of General Office E General Onice Suoplies and Excenses 17 793 18 794 I9 795 20 796 21 797 22 798 23 799 24 800 25 800.1 Emoloyees' Welfare Gocnses ' 26 800.2 Pensions ' 27 801 Miscellaneous Genenl Goenus Maintenance of Genenl h p e t t y 2a 802 29 802.1 Maintenance of Structures and lm~rwcments 30 802.2 Maintenance of Office Fumdure and E p u i ~ n m 31 802.3 Maintenance of Cunmunimion E o u i m n t 32 802.4 Maintenance 01 Miscellaneous Ropav 33 PmJm I SuDenlslon Flat Rate Insomion Meter Reading Billing Collecting ana Accounting Amount Related to 1 (a) 1 2 3 i Class Account A I A I 1 i I 1 1 I 1 I I I I i I B l a A I I l ! I A ) I A I 1 I I I I 34 35 36 37 36 39 40 41 42 43 SUMMARY OF OPERATING UPENSES 44 45 4.f 41 *e 45 51 51 5i 5: 9 5! 54 Attachment 1 A Sheet 2 4 . .. .me i Amount for year Account (a) 81 ! Maintenance 10 610 11 1 61 1 12 I 13 14 1 1 15 I 16 Malntenance Supervision and Engineering Maintenance of Collecting and lmmunding Resevoirs 613 Maintenance of Lake. River and Other Intakes 614 Mamtenance of wells and Springs 615 Mamtenance of Infiltration Galleries and Tunnels 616 Maintenance of Supply Mains 17 I 617 I 18 19 I ! Maintenance of Structures and Improvements 612 Maintenance 31 Miscellaneous Water Source Rant Total Maintenance I I 1 1 I I I I I 21 I 22 Owration 23 620. Owration Suwrvision and Engineering 24 621 Fuel for Power Production 622 Pcwer Production Labor and Expenses 1 26 -27 630 Maintenance Supervision and Engineering 631 Maintenance of Structures and Improvements ' 632. Maintenance of Power Production EquiDment 35 1 37 36 633. -.. I Maintenance of Pumping Equipment Totar Maintenance 1 I 30 39 I Total Pumping Expenses 41 Owration 42 640. Operation Supervision and Engineering 1 44 I 43 1 641. Chemicals 642. Operation Labor and Expcnses 643 Miscellaneous Expenses 48 Maintenance 49 650 50 651 Mamtenance of StNCtUreS and lmprovemcnts 652. Maintenance of Water Treatment Eauipment 51 52 I 53 I Total Operation I 34 , I Maintenance 32 33 45 I 623. Fuel or Power Purchased for Pumoing 624 Pumping bbor and Gwnses 31 i .. i I I Total Source of SUOD~YExoenso PUMPING EXPENSES 25 Amount Rebtedto Project I Total Operation 9 1 Maintenance Supervision and Engineenng I 1541 I Total Maintenance Total Water Treatment Exwnser I I I Attachment 1B Sheet 1 WATER OPLRATION AND MAINTENANCE U M N (Contiwar) S~ .ne Account (a) 4 40 TRANSMISSION AND Dl51RlBUTlON EXPENSES - Amount for year 199- ' Amount Related 10 Project 1 I 3 660 a 461 5 I 562 6 7 663 I ODeratiOn Suoer\rision and Engineering Storaee Facdttles Expenses Transmission and DlstriDution Lmes Emenses 1 23 I Maintenance 25 I I ! I I I I I I I I I I I Total Transmission and Distribution Expenses CUSTOMER ACCOUNTS EXPENSES 24 1 I I Meter Exoenses 664 Customer Installations Expenses E I 565 Mtscedamaus Eioenses 9 I 666 Qents 10 I Total Ooeration I1 I I I I I Ooeration 26 I 27 I 28 I 29 1 901 902 903 904 30 I 905 Suwrvision I I L , Meter Reading Exoenses Customer Records and Collection Exwnses Uncollectible Accounts Miscellaneous Customer Accounts Expenses I 32 I 307 Customer Service and Information Exwnses ! Owration 35 36 37 920. Administrative and General Salaries 921. Office Swolies and Other Expenses -- - _-_., _. ..-- I - - I 4I 925 Intunes and Damages 42 926 Employee Pensions and Benefits 1 43 927 FramhiseRcquirements 44 928 Regulatory Commission Expenses 45 929 Duplicate Charges Cr 46 930 I Institutional or Goodwill Advertising Expenses 47 930 2 Miscellaneous General Expenses 48 930 3 Research and Development E x w n v s 49 931 Rents - 1 1 50 I Total Ooeration ; 51 I 932 Mamtenance of General Plant 52 1 55 / Total Owration and Maintenance Eiwnser I I I I Attachment I 1B Sheet 2 SEWER INCOME STATEMENT Lmc No. Amount lor year 199- 1 Amount Related to I Propd Domestic Sewer Service Commercial Sewer Servic I Industrial Sewer Service Customers' Forfeited Discounts and Penalties Miscellaneous Se IPERATINGEXPENSES Sewerage Operating Expen 10 1 Collecting System Expenses 11 Pumping System Expenses 12 Treatment and Disposal Syst 13 14 Billing and Collecting Expenses 15 16 Administmtive and General Total Operating Lpenses DEPRECIATION EXPENSES 17 18 Net Sewer Servi 19 20 Other Income (Interest Eamed. etc.) 21 22 INCOME DEDUCT1 23 24 25 26 27 28 29 3( 3 3: 3 7 Other Charges to Income Total Deductions RESERVATIONS 0 Scheduled Bond Retirement Safety Margin Coverage De Other Reservations of Net I _.. Total Reserrations of Net Income Balance Transferred to Surplus I I Attachment 1 C WATER OPERATION AND MAINTENANCE EXPENSES I 1 I .me NO. I Class C Account (dl 34 653 Maintenance of Meters 35 36 37 38 39 40 654 Maintenance of Hydrants 41 902. Accounting and Collecting Labor 42 903 SUDDlleS and Expenses 904 Uncollectible Accounts -_ 43 k 45 655 Maintenance of Other Plant Total Transmission and Distribution Exoenses 5. Customor 9nk. E.psrurs Operation 901 Meter Reading Labor Total Customer Accounts Expenses 6. Customor s.rvlm Gpensas I Amount lor year '99- Amount Related to Project I ine IO. WATER OPERATION AND MAINTENANCE EXPENSES --..- ~-. I Class C Account iCdntinw3 tal 2 Operation 3 920 Administrative and General Salaries --- - --------- ------- ~ 923 Outside Services Employed 7 924 Property Insurance 8 925 Injuries and Damages 9 926 Employee Pensions and Benefits - ~- 10 11 927 Franchise Requirements 12 930 1 Institutional or Goodwill Advertising Experses I 13 930 2 Miscellaneous General Expenses I 14 930 3 Research and Development ExpenSeS ! 15 933 Transportation Expenses 16 Maintenance - - 928 Regulatory Commisstcn Expenses - I 935 Maintenance of General Plant -~ ! 17 I 1 Total Administrative and Genera! ~ 20 19 I Line No. Total Water Operation and Maintenance EaDenses 1 I - ChSS c II Amount I 1 Class D Account (a ) 'Y: I 29 600. Salaries and Wages 30 610. Purchased Water 31 620. Fuel or Power Purchased lor Pumping I I 3,417 32 630. Chemicals I 33 640. Supplies and Expenses 34 650. Repairs of Water Plant 1 1,173 1,010 660.Transportation Expenses i --- I I 9 .m 6 35 1 37 Total Plant Operation and Maintenance Expenses 2. 38 680. Administrative and General Salaries 40 681. Office Supplies and Other Expenses 41 ; 1 lL000 ! I I I -0-0- I -n, 500 -- I I I 40.919 I I . i:%n I 1 I I 684. Insurance Expense 686 Employees Pensions and Benefits ~ 688 Regulatory Commission Expense 45 689 Miscellaneous General Expenses ' 46 690 Uncollectlbie Accounts I I 49 50 1 33Q 682. Outside Services Employed I 44 47 --- I General Expenses 39 42 43 2.18 8 I 36 -I Amount Related Proleato I i 1. Plant Operation and Maintenance 28 ___.__ - 6 18 -. - Administrative and General Expenses 8 1 _ _.- -. Total Water Operation and Maintenance Expenses - Class D 1 10,872 1 42,919 1 Attachment 1D Sheet 2 ~~ ACKNOWLEDGMENT OF UNIFORM BIDDING PROCEDURES FOR PROJECTS W INFRASTRUCTURE AND JOBS DEVELOPMENT COUNCIL RECOMMENDED BY THE V T h e following bidding procedures, effective July 1, 1996, must b e followed on all public water and wastewater projects reviewed by the West Virginia Infrastructure and J o b s Development Council, regardless of the specific funding sources recommended: 1. The Pre-Bid Meeting, when deemed necessary, is to b e held at least 10 calendar days before t h e ,bid date. The date, time and place should b e included in the Advertisement for Bid. 2. The last addendum issued shall be received by contractors no fewer than five calendar days prior to t h e bid date. 3. Bid date will b e extended if items 1 and 2 cannot b e met. 4. Bid date will not follow a weekend or holiday unless absolutely necessary. 5. Bid openings should b e in the afternoon, when possible. 6. Equipment should b e pre-qualified by the Engineer, where feasible. 7. The following items must be submitted with the bid. 8. a. EEO Certification: Only o n e is required for all agencies. b. Acknowledgment of Receipt of Addenda. c. Bid Bond: Signed or countersigned by a W agent. d. Signed Bid. e. Federal Requirements when they are involved. Bidding Documents must include a Bid Form and a Measurement and Payment section. Each bid item must b e adequately described including how it is to be'paid and what is to be included. wed to the best of our ability. Date Date / S '79 httachment 2 WEST VIRGINIA INFRASTRUCTURE AND JOBS DEVELOPMENT COUNCIL PROJECTS Date project submitted to the Infrastructure Council 1. Project sponsor name, address, contact person(s) and telephone number: 2. Project description - attach maps or other explanatory documentation: 3. The utility or entity who will own and operate the project: 4. Identify the sources and amounts of funds being requested: 5. Briefly describe the health, environmental and/or public benefits of the project: 6. Attach an itemized estimate of the total project cost. PLEASE SUBMIT THE COMPLETED FORM TO YOUR LOCAL REGIONAL PLANNING AND DEVELOPMENT COUNCIL. Attachment 3 STATE OF WEST VIRGINIA DEPARTMENT OF HEALTH AND HUMAN RESOURCES Cecil H . Underwood Governor JOilll 0111 Sccrclnry MEMORANDUM TO: Wal Assessment Committee DEPNater Resources J?uJ&$ervice - Jerry Ray Commission Meyishi Blair I - WV Dedopment Office DEP/Abandoned Mines Bureau for Public Health FROM: Katy Mallory, PE Ofice of Bureau for Public Health DATE: August 25, 1997 cn 4 (I,‘ X a l p h Gooisby r.1 TIS,- G’) 2’ ru $:: ~ I -1 Patrick Park Donald A. Kuntz t -73 i= r/ _. ~ .( -w -r re u.5- < -ln (7: . 8 1; -,I ..-- . C) (’1 ! r-1: r-,l - p .-” *- i-fl 5 / I- PRELIMINARY APPLICATION: No.: 97W-352 Project Name: Town of Delbarton County: Mingo A copy of the above project is enclosed for your review and comment. Any comments should be FAXED to me (558-0691). If necessary, I will arrange a meeting to discuss the comments received. Our committee will provide the Funding Committee with a recommendation on the technical merits of the project which will be distributed at the Funding Committee meeting. Thank you for your expeditious review. COMMENTS ARE DUE BY SEPTEMBER 9, 1997 KM:nsf pc: S. Iliggs ~ BUREAU FOR PUBLIC HEALTH Office of Environmental Health Services 815 Quarrier Street, Suite 418 Charleston, West Virginia 25301-2616 Telephone (304) 558-2981 I I I I I I I' I I I I I I I I I I I I 4 * I ' PRELIMINARY ENGINEERING REPORT WATER SYSTEM IMPROVEMENTS TOWN OF DELBARTON MINGO COUNTY, WV August 18, 1997 PREPARED BY: (304) 713-5200 1 I I I I I I’ I I I I I I I I I I I I PRELlMINARY ENGlNEERlNG REPORT WATER SYSTEM IMPROVEMENTS TOWN OF DELBARTON MINGO COUNTY, WV , August 18, 1997 PREPARED BY: Huworth, Meyer & Boleyn, Inc., 325 Sixth Avenue South Charleston, WV 25303 (304) 744-5200 I 1 I I I I I I I I I I PRELIMINARY ENGINEERING REPORT WATER SYSTEM IMPROVEMENTS TOWN OF DELBARTON MINGO COUNTY, WV August 18, 1997 TABLE OF CONTENTS I. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 II. CURRENT AND FUTURE SITUATION . . . . . . . . . . . . . . . . . . . . . . . . . . . .2 A. B. C. D. Existing Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Population Projections and Design Flows . . . . . . . . . . . . . . . . . . . . . . Economic Conditions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Existing Environmental Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 2 3 3 EVALUATION OF ALTERNATIVES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 IV. PUBLIC PARTICIPATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6 V. CONCLUSIONS AND RECOMMENDATIONS. . . . . . . . . . . . . . . . . . . . . . . . 6 Ill. APPENDICES A-I PROJECT LOCATION MAP A-2 WATER TREATMENT SOURCE B W BUREAU OF PUBLIC HEALTH PERMIT C 1996 PSC ANNUAL REPORT D TARIFF SCHEDULE 1. Tariff enforced during period of 96 Annual report 2. Tariff recently approved by PSC I I I I I I I I I I I I I i I I I I I Table of Contents (continued) E ENVIRONMENTAL RESOURCE LETTERS 1. 2. 3. 4. 5. WV Division of Natural Resources US Fish and Wildlife Service WV Division of Culture and History US Corps of Engineers USDA Soil Conservation Service F-I COST ESTIMATES F-2 OPERATION & MAINTENANCE COST ESTIMATES 'G PUBLIC MEETING MINUTES H PROJECT SCHEDULE I PROJECT FUNDING CALCULATIONS J RESOLUTION OF ACCEPTANCE K HYDRAULIC ANALYSIS ... Ill PRELIMINARY ENGINEERING REPORT WATER SYSTEM IMPROVEMENTS TOWN OF DELBARTON MINGO COUNTY, W August 18, 1997 I. INTRODUCTION The proposed project consists of extending water service to those residents within the town's boundaries that do not currently have water service; replacing portions of the existing main lines in town; cleaning & painting the towns existing water storage tank; abandonment of the existing water treatment plant and connection to the Mingo County PSD system. (Water will be purchased from the Mingo Co. PSD) As shown on the Project Map. Line 1 originates at the intersection of WV 65 & County Route 65\5 then proceeds north on WV 65 to the northern boundary of the town. Line 2 extends service up Pigeonroost Creek (co. rt. 65\6) approximately 2700 feet. Line 3 extends off of line 1 to the East and serve the Blevins Drive area. Line 4 begins at the intersection of WV 65 & County Route 65\5 and then proceeds east on route 65\5 to the eastern boundary of the town. A connection to the Mingo County PSD's existing 8-inch line will be made at this point where a master meter and vault will be installed in order to purchase water from the Mingo County PSD. Line 5 begins at the intersection of County Route's 65\5 65\12 then proceeds south on route 65\12 (Riverside Drive) to the intersection of US 52, WV 65 and County Route 65\12. I I 1 II. CURRENT AND FUTURE SITUATION A. Existing Conditions The Town of Delbarton currently owns and operates a 50 GPM Water Treatment Plant. The plant was installed in 1984(approx.) and utilizes aeration and chlorination to process the water drawn from a 190 feet deep well. The plant's original drawings show a proposed filter, but none has been installed. The clearwell is undersized at approximately 6,000 gallons. The plant is in need of a major upgrade if it were to meet current regulations and the needs of the town. Based on conversations with local residents the quality of their water from the plant is undesirable and those that are not on the system have no plans to connect until a new plant is built or another source of supply is found. The Town served an average of 84 (of a potential 262) customers during fiscal year 1996. The water plant currently operates 8 to 9 hours per day to feed one water storage tank with a nominal capacity of 154,000 gallons. The system operates under a permit from the W Bureau of Public Health. (See APPENDIX B for information on the permit.) The 1996 Annual Report of the Town is included in APPENDIX C . This report reflects the fact that the Town experienced an average of 45% unaccounted for water loss for the fiscal year. (The range of unaccounted for water was from 30% to 63%.) This project will have a positive impact on the town's water loss problem. Thus, for the purposes of this report, it has been assumed that unaccounted for water loss will be reduced to a maximum of 20% upon completion of the proposed project. B. Population Projections and Design Flows 1. Regional Forecast of Population I 'I The Town of Delbarton, as the rest of the state of West Virginia, experienced a general decline in population through the 1980's. The Bureau of Business Research at West Virginia University in Morgantown has recently completed a statewide re-evaluation of the population trends and discovered that after eleven years of steep decline, West Virginia's population is indeed growing at a rate far above what was expected five years ago. The Bureau of Business Research. is in the process of producing a new report to accurately reflect the population trends of West Virginia over the next decade. The initial results seem to point in a direction of a growing population. This growth is predicted to be about 0.4% over the next ten years. 2 I I I I I I I I I I I I I I I I I I 2. Projected Water Flows and Usage For the purpose of this report the average monthly water use in the Town of Delbarton is estimated to be approximately 4,500 gallons per residential customer, in accordance with accepted industry standards. This usage may be adjusted to reflect the actual water usage of the residents, as such data becomes available. C. Economic Conditions The proposed project is located within the boundaries of the Town of Delbarton in Mingo County. According to the 1990 US census, the average median annual household income for the Town is $12,454. The average monthly water bill is currently $1 1.25. The funding package for this project recommends an increase of 83% which would bring the average bill up to $20.58 for 4,500 gallons. This new proposed rate is $5.01 above the 1 ID%threshold of the median income. D. Existing Environmental Conditions 1. Natural Resource Impacts Contact with the West Virginia Division of Natural Resources (WDNR) and the United States Department of the Interior, Fish and Wlldlife Service (USFSW), has been initiated concerning potential impacts to wetlands or endangered species. A copy of the contact letter can be found in APPENDIX E. 2. Archeological and Historical Impacts The West Virginia Division of Culture and History, State Historical Preservation Office (SHPO), will be presented with information regarding the location and type of improvements proposed to determine potential impacts to archeological and historical sites. A copy of the contact letter can be found in APPENDIX E. 3. Flood Plain Impacts Proposed structures susceptible to damage from flooding will be elevated above the 100 year flood level, or appropriate flood proofing will be provided. Construction of the water and sewer system improvements will have no effect on flood elevations. Flood elevation information will be obtained from the US Army Corp of Engineers (COE) and will be forwarded 3 to the appropriate funding agency based on funding source recommendations made by the Infrastructure Council. The proposed work is expected to meet the criteria for a Nationwide permit under 33 CFR 330, Appendix A, Part B(12). A copy of this contact letter is in APPENDIX E. 4. Farmland Impacts The US Department of Agriculture's Soil Conversation Service will provide information regarding the potential impact of the project on farmland conversions. Based on a preliminary review, no impact is anticipated. A copy of the agency's comments will be forwarded to the appropriate funding agencies based on the funding source recommended by the Infrastructure Council. A copy of this contact letter is in APPENDIX E. 5. Recreation and Open Space Acquisition of construction and permanent easements for operation of the proposed system extensions will be necessary. The width of these easements, where required, will be approximately 20 feet for construction and 10 feet for permanent easements. These easements will not provide an opportunity for the development of open spaces and recreation activities. There are no public parks or recreational areas within the project area. 6. Unavoidable Adverse Impacts I I 1 I a. Noise and air pollution will result from the proposed construction activities. Noise pollution can be mitigated, but not eliminated, by requiring the contractor to adequately maintain noise suppressing devices on the construction equipment. Air pollution can be similarly mitigated by requiring the contractor to comply with the Clean Air Act requirements. b. Erosion and stream sedimentation will also result from the proposed construction activities. The effect of these activities can be mitigated by requiring the contractor to install and maintain erosion control devices during construction, and will be as required as part of the NPDES storm-water permit obtained for this project. As a minimum, silt fences, prompt seeding and mulching, and prompt cleanup and site stabilization will be required. I 111. I I I I I I I I I I I I I I I I I EVALUATION OF ALTERNATIVES Three alternatives are discussed below. A cost estimate for the proposed project (alternative 2) is included in APPENDIX F-1 and O&M costs are included in APPENDIX F-2. These alternatives are based on a preliminary study that utilizes a new water plant in Delbarton for supply for alternative 3 and a connection to the existing Mingo County PSD system for supply for alternative 2. A preliminary hydraulic analysis has been developed and is included in APPENDIX K for alternative 2. Considering these details, the following alternatives are presented: Alternative 1: Do Nothing. The unserved area's of Town have been without reliable potable water for an extended period of time. Additionally, the existing water treatment plant has been out of compliance with water regulations for quite some time and is in dire need of upgrading. Delaying the proposed extensions and addressing the needs of the plant any longer increases the risk of the residents to be afflicted with a waterborne disease. Due to the potential health hazards, this alternative is not considered further herein. Alternative 2: Provide water service to the unserved area's via an extension of the Town's system and connecting to the Mingo County PSD for a new source of supply. The existing Delbarton water treatment plant is proposed to be abandoned under this alternative. This alternative is the most cost effective way to accomplish the goals of the town. The cost per customer under this alternative is approximately $8,471. Alternative 3: The Town could upgrade their own treatment facility. The most cost effective project would be the construction of a new plant that would meet current regulations and provide service to the entire community. This alternative is not recommended based on: A) The cost of a new plant would likely approach $1,000,000. This cost when added to the $1.4 million dollar line extension project, would increase the cost per new customer ratio from $8,471 to $13,944. B) This alternative would not be consistent with the overall county plan to provide reliable, regional water service. Further, with the Mingo County PSD's Ragland plant having adequate capacity to serve the Town it is not economically feasible to justify a new water treatment plant in the area. 5 I I I I I I I I 1 I I I I I I Due to the cost of this alternative it is not considered further herein. IV. PUBLIC PARTICIPATION The Town of Delbarton held a public hearing on August 18, 1997 to discuss submitting the proposed project for a Small Cities Block Grant. The town also called a special council meeting to discuss the proposed project and to vote on a Resolution accepting this report and its recomendations. Based upon public input, it is anticipated that sign-up for the water in the unserved portions of town is expected to exceed the minimum 80%. When meeting minutes have been completed copies will be included in APPENDIX G. V. C0NC LUS IONS AND RECOMMENDATl0NS Based on the information developed and provided in this report, the Town of Delbarton should implement the proposed Water System Improvements Project. It is recommended that Alternative 2 be selected to provide a reliable potable water supply. Using this alternate, the project is estimated to cost $1,508,000. (Project cost estimates are is contained in APPENDIX F-I and a project schedule has been developed and is included in APPENDIX H.) At this time we anticipate that minimal right-of-way and easements will be required for this project. To the maximum extent possible, existing public right-of-way (such as along public roads) will be used. Engineering services for this project will be procured in accordance with WVC §5G-1-1 and legal advertisements, when available, will be forwarded to the appropriate fund ing agency. A copy of the Resolution of Acceptance will be included in APPENDIX J. u I I I 6 I u I I I I I I 1 I I I I I 1 I I I I APPENDIX A-I PROJECT LOCATION MAP TOWN OF DELBARTON WATER SYSTEM IMPROVEMENTS PROJECT AREA MAP Prepared By: Haworth Meyer 8 Boleyn, Inc. APPENDIX A-2 WATER TREATMENT SOURCE I I I I I I I I I I I I I I I I I I I The water will be obtained from the Mingo County PSD Water Treatment Plant located in Ragland, Mingo County, which, according to Tom VVicker, Plant Operator, currently operates 3.5 hours per day and has a rated capacity of approximately 100 gpm. It should be noted that an extension of the Ragland area system will go on line within the next month or so, this project is expected to double the plants current pumping time to approximately 7.0 hours per day. The additional load produced by the proposed project will not require an upgrade of the plant, but will require that the plant be operated an additional 7.0 hours daily. This would increase the plants pump time to approximately 14.0 hours per day, which would require an additional shift. APPENDIX B WV BUREAU OF PUBLIC HEALTH PERMIT 'I I I I 1 I I I I I ,I I A copy of the permit is on file at the Bureau of Public Health offices located at: BUREAU OF PUBLIC HEALTH ENVIRONMENTAL ENGINEERING DIVISION 815 QUARRIER STREET CHARLESTON, WV. 25302 (304) 558-1683 Upon completion of the design of the proposed project, the plans and specifications will be submitted to the W Bureau of Health for review and, approval. I I I I I I I I I I I I I I I I I I I APPENDIX C 1996 PSC ANNUAL REPORT I--' I I I I I I I I I I I I I I I I I I WATER UTILITIES (Classes C and D) ANNUAL REPORT OF &.&a H y/ 2!670 (Address of Respondent) TO THE PUBLIC SERVICE COMMISSION OF WEST VIRGINIA FOR THE n Name, title, and telephone numAber(including area code) of the person to be contacted concerning this report: I / L / GENERAL INSTRUCTIONS particulars. Reference to returns of former years or to other reports should not be made to take the place of required entries except as otherwise specifically authorized. 1. The original of this report form properly filled out and verified should be filed by the last day of the third month following the close of the calendar or established fiscal year. One copy of the report should be retained by the respondent in its files. 7. Where information called for herein is not given, 2. This form of annual report is prepared i n conformity with the Uniform System of Accounts for Water Utilities. 3. Use black inkortypewriterfor reporting. Do not use pencil, hectograph, or other means which do not result in a permanent record. The spacing in this report is designed for typewriter. 4. 5. Items of a contrary or opposite nature (such as decreases in a column providing for net increases) should be enclosed in parentheses. Round off cents to the nearest whole dollar on all schedules except where cents are important. 6. The annual report should be complete in itself in all state fully the reason for its omission. If any schedule does not apply to the respondent such fact should be shown by the words “not a ppiicable.” 8. Whenever schedules call for comparisons of figures of a previousyear, the figures reported must be based upon thoseshown bythe annual report of the previous year or an appropriate explanation given why different figures were used. 9. if it is necessary or desirable to insert additional statements forthe purpose of further explanationof schedules, they should be made on durable paper conforming to this form in size and width or margin. Each insert sheet should bear the title of the schedule to which it pertains. ’I I I I I I I I I I I I I I I I I I I I! I I I I I I I I I I I I I I I I I I PUBLIC SERVICE COMMISSION OF WEST VIRGINIA ANNUAL REPORT FOR CLASS C AND D WATER UTILITIES LIST OF SCHEDULES Titie of Schedule Verification . . Contents . General Instructions Summary FinancialStatements IncomeStatement ................................................................... .................................................... Utility Operating Income by Departments ..................................................................... ......................................................... Retained Earnings .Unappropriated ....................................................... Non-CorporateProprietorship ........................................................... Balancesheet Retained Earnings .Appropriated 1 2 3-4 5 5 5 Balance Sheet Supporting Schedules .............................................. ...................................................................... Long-TermDebt .................................................................... Details of Sinking Funds and Other Special Funds CapitalStock 6 6 6 Water Section ............................................... .............................................. Accumulated Provisions for Depreciation and Amortization of Utility Plant: ClassC ............................................... ClassD .............................................. Operating Income .Water Department or Division .............................................. Water Operating Revenues ............................................................. Sales of Waterto General Customers .By Months ............................................. Sales for Resale .By Months ........................................................... Operation and Maintenance Expenses .Class C ............................................... ClassD .............................................. PurchasedWater ................................................................... Distribution of Salaries and Wages ....................................................... Amortization .Class C ................................................................ Taxes Other Than Income Taxes .......................................................... Statistical Information Mains&Services .................................................................. Meters&Hydrants ................................................................. CommunitiesServed ................................................................ Power. Pumpin&PurchasedWater ....................................................... Source of Supply & Reservoir ............................................................ Water Utility Plant Accounts ClassC 7-ac ClassD 7.8D 9c 9D 10 11 12 12 13.14 14 15 15 16 16 17 ia ia 19 19 General Corporate Information ................................................................ Officers and Directors or Officials ......................................................... Security Holders and Voting Powers ....................................................... Important Changes During the Year ........................................................ Identity of Respondent 111 20 21 21 22-23 Title of Schedule Page Number Sewer Section (If Applicable) Utility Plant in Service. Leased to Others and Held for Future Use . ............................................... ............................................... Reserve for Depreciation of Sewer Utility Plant ................................................. IncomeStatement ................................................................... Operating Revenues ...............: ................................................... Taxes ........................................................................... Operating Expenses .................................................................. ClassC ClassD 24-25 25 26 26 27 27 28 I .19- Year Ended inual Report of 5i6 INCOME STATEMENT (b) (a) 1 . 2 30 31 32 33 34 Increaseor (Decrease) (C) (d) (e) 11 .(gsL) //qm /2768 Total other income 2/di a c / I I 1 UL/r .I a @I / I c"JSc33~ Other Income Deductions: Miscellaneousamortization (425) Miscellaneousincome deductions (426) Total other income deductions 1 Taxes Applicable to Other Income and Deductions: Taxes other than income taxes (408 2) 35 Income taxes (409 2) 36 Income taxes deferred-net (410 2-411 2) 37 Investment tax credits - net (412 3-412 4) 38 Last Year Gains (losses) from disposition of property (422) 28 29 This Year UTILITY OPERATING INCOME Operating Revenues (400) 27 i i Sch. Page No. Account me 40. 1 1 Total taxes on other income and deductions 39 Net other income and deductions 40 41 INTEREST CHARGES Interest on long term debt (427) 42 Amortization of debt discount and expense (428) 43 Amortization of premium on debt. Cr. (429) 44 Interest on debt to associated companies (430) 45 Other interest expense (431) 1 a gfl/ 218 < z 5-83> 1 46 49 Extraordinary income (433) 50 Extraordinarydeductions (434) 51 Income Taxes, extraordinary items (409 3) 52 Total extraordinary items 53 54 263 Net Income 1 83 / I i I I I I I D I I I I I I I I I 'I I UTILITY OPERATING INCOME BY DEPARTMENTS WATER Line No. SEWER Increase (Decrease) (b) This Year (a) OTHER DEPT. (Specify) This Year increase (Decrease) (C) (d) I NOTES TO INCOME STATEMENT 1 2 This Year (e) Increase (Decrease) (9 4 I I Sch. Page No. Line 1 3 4 5 6 Balance End of Year Increase (Decrease) Less: Accumulated provision for depreciation and amortization of water plant (110) 9 2ff/+L d~OS82!.( Net water plant 7 Sewer and other utility plant 8 Less: Accumulated provision for depreciation 9 Balance Beginning of Year ag394 LOST73 I I and amortization 10 Net sewer and other plant 11 Total net utility plant ~ bo 382s 603513 - 3 7 0 94 3 8 1 8% 12 13 OTHER PROPERTY AND INVESTMENTS 14 Nonutility property (121) 15 Less: Accumulated prov. for depreciation and a m o h of 16 17 nonutility property (122) Net nonutility property 18 Other investments (124) 19 Special funds (125) 21 I I I 6 Total other prope 22 23 ND ACCRUED ASSETS 24 25 26 27 28 29 30 31 - 32 33 - Other accounts receivabl Materials and supplies (1, Prepayments (166) 34 Other current and accrue - 36 Total current and accrued assets 37 38 DEFERRED DEBITS 39 Unamortized debt discount and expense (181) 40 Extraordinary property losses (182) 41 Other deferred debits (183) ~ I I I 42 43 Total deferred debits 45 Total Assets and Other Debits ' I 3 I I I I I I I I I I I I I I I I I I I ~ , Line No. Sch. Page No. (b) Liabilities and Other Credits (a) 2 Common capital stock (201) 6 3 Preferred capital stock (204) 6 4 Other paid-in capital (207) 5 Installments received on capital stock (212) 6 7 8 Discount on capital stock (213) I I (C) Balance End of Year Increase (Decrease) (e) (d) 6 1 7 3 ~ ; ~6173.92 Capital stock expense (214). 37.q.) Retained earnings (215-216) DEFERRED CREDITS 46 47 Balance Beginning of Year / EQUITY CAPITAL 1 ' , I Total Liabilities and Other Credits I 4 I APPROPRIATED RETAINED EARNINGS (Account 215) Balance End of Year (b) Purposes of Appropriation (a) + I Particulan (a) This Year Last Year (b) (C) 83 f 27 .ine I 1 Net increase (:decrease)to retained earnings Unappropriated retained earnings (at end of period) I Particulars 276 I r ( '3 1 1 5 j ) This Year < 4n;t > Last Year I I I 5 I I I I I I I I I I I I I I I I I I I I I I - ____ me, Reconciliation of Net Income to Net Cash Provided bv Ooeratina Activities Yo 46 I I 47 I 48 Ye: Income 2%3 Adjustments to reconcile net income to net cash providea by operating activities DeDreciation and amortization 25 2 I Net deferred taxes & investment tax credits I (Gain) Loss recognized on disposition of assets (Allowance for funds used during construction) 43 50 Kl 1 Amortizationoi debt discount (Dremium) on debt 53 I (Increase) decrease in materials and supplies qp Net (1ncrease)decrease in receivables 54 1 61 ~ ~ _ _ _ __ I I (1ncrease)decrease in oreoavments Net (1ncrease)decrease in other accrued revenues & assets 55 56 57 5a 59 6; Amount for Year Increase (decrease) in accounts payable Increase (decrease) in interest accrued Net increase (decrease) in taxes accrued & taxes payable Net increase (decrease) in other accrued exDenses I Increase (decrease) in operating reserves Other adjustments 1 63 64 ' 65 66 Net cash provided by operating activities 5/5 I 5b I' I I I I I I I I A Additions Name of Fund (a) ine \io Balance Beginning of Year Principal (b) (C) Income (d) Balance End of Year Deductions (e) (0 1 2 3 4 -5 6 7 CAPITAL STOCK (Accounts 201 - 204) Class and Series of Stock I Preferred 24 I I I I I I I I I - 25 26 I 28 I 29 *Total amount outstanding without reduction for amounts held by respondent 30 Nominal Date .ine No. 37 3a Class and Series of Obligation (a) Outstanding Date of Maturity (C) of Issue (b) I I I I I Interest For Year Per Balance Sheet (d) Rate (e) I Amount (9 1 40 41 42 43 44 45 I I I 48 49 50 51 52 Total XXX uu xx WATER UTILITY PUNT ACCOUNTS 1. Report by prescribed accounts the original cost of water plant in service and the additions and retirements of such plant during the year. 2. State in a footnote the general character of any adjustments in column (e). .int No. Account Acct. No. - (a) 2 30 1 Organization 3 302 Franchises and Consents 4 303 Miscellaneous Intangible Plant Adjustments Balance End of Year (0 (d) (e) (9 2. Source of Supply Plant 6 7 310 Land and Land Rights 0 311 Structures and Improvements Collecting and Impounding Reservoirs 9 312 10 313 11 314 12 315 13 316 14 317 15 16 17 320 18 32 1 19 322 20 323 21 324 22 325 23 326 24 327 25 328 26 21 2E 330 25 331 3( 332 - Retirements Total Intangible Plant 5 31 Additions 1.Intangible Plant 1 U Balance Beginning of Year (b) 2700o .r9f 9 Ip 7 2.’fl ’ @ @ 5-5 4 96 7 WATER UTILITY PLANT ACCOUNTS (Continued) CLASS D Line Acct No No Account (a) 1 Additions (b) (C) -- 3 340 Land and Land Rights 34 1 Structures and Improvements 4 342 Distribution Reservoirs and Standpipes 5 343 Transmission and Distribution Mains 6 344 Fire Mains 7 345 Services 8 346 Meters 9 347 Meter Installations 10 348 Hydrants 11 349 Other Transmission and Distributton Plant 12 Total Transmission and Distribution Plant 14 370 Land and Land Rights 15 37 I Structures and Improvements 16 372 Office Furniture and Equipment 17 373 Transportation Equipment 18 379 Other General Equipment (9 /no0 / on0 / P f l L? -Yfl6J0 7 Other Utility Plant _ _2 1 390 Other Tangible Property 22 391 Utility Plant Purchased or Sold Tg: Utility Plant in Process of Reclassification Utility Plant Leased to Others -- 394 Property Held for Future Use 395 Construction Work in Progress 27 396 Utility Plant Acquisition Adjustments 28 397 Other Utility Plant Adjustments 20 Balance End of Year &at, Total General Plant 19 20 26 Adjustments (e) d/7/c: 6. General Plant 13 - Retirements (d) 5. Transmlssion and Distribution Plant 2 - Balance Beginning of Year Total Other Utility Plant Total Water Utility Plant 12796 7 Inn0 400 0 I CLASS D I I ACCUMULATED PROVISION FOR DEPRECIATION AND AMORTIZATION OF UTILITY PLANT (Account 110) t Particulars (a) Line No 1 I Total (b) A 4/4 z Balance Beginning of Year Other Credits (Specify) 71 I I I-: ; I arz Debits During Year Charged To: Book Cost of Plant Retired 14 Cost of Removal 15 Other Debits (Specify) . 2 17, 1 18 I -19 ?rJ 21 I I I Total Debits ! I R$359 Balance End of Year I I ? 36,+ t- I I 41 42 43 r44 I I I L. 45 f :1 t 48 9D I . I I 1 I I I I 1 I I I I I I I I I I I This Page Should Be Completed BY Respondents Operating Mom Than One utility Department of Water Division. INCOME STATEMENT WATER DEPARTMENT OR OlVlSlON Line No Sch Page No (b) Account (a) This Year (C) Increase or (Decrease) (e) Last Year (d) UTILITY OPERATING INCOME 1 2 Operating revenues (400) 3 Operating expenses 11 4 Operation and maintenance expense (401-402) 5 Depreciation expense (403) 9 6 Amortization (404-407) 16 7 8 Taxes other than income taxes (408 1) 16 13-14 Income taxes (409 1) I 9 1 Provision for deferred income taxes (410.1) 1 1 1 Income taxes deferred in prior years-Cr. (411.1) 10 11 Investment tax credits, deferred to future periods (412.1) 12 Investment tax credits. restored to operating income (412.2) 13 Total operating expenses 14 15 Operating income 16 Income from utility plant leased to others (413) 17 Gains (losses) from disposition of utility property (414) ~~ 18 19 Total operating income DISTRIBUTION OF OTHER INCOME 20 AND DEDUCTIONS 21 22 Other income 23 Other income deductions 24 Taxes applicable to other income and deductions 25 Net other income and deductions ~ 26 INTEREST CHARGES 27 Interest on long-term debt 28 Debt discount or premium .net 29 Other interest ~~~ 30 Total interest charges 31 Income before extraordinary items 32 Extraordinaryitems ~ 33 Net income 34 Balance Beginning of Year (b) Additional Information For Water Department (a) .ine No. 39 Retirement work in progress. give account title and number this balance is included in: 1 I 40 41 42 I I I Contributions in aid of constuction (271) 1 Customer advances for construction (252) 1 1 Materials and sumlies (150) ~ 43 Balance End of Year (C) Accumulated deferred income taxes (281 .283) 45 Accumulated deferred investment tax credits (255) 1 1 ~~ Prepayments(151) 44 1 10 It WATER OPERATING REVENUES (Account 400) Operating Revenues Line No. Account (a) 4 460.2 Unmetered Sales to Commercial Customers 460.3 Unmetered Sales to Industrial Customers 6 460.4 Unmetered Sales to Public Authorities 461. Metered Sales to General Customers 9 461.1 Metered Sales to Residential Customers 10 461.2 Metered Sales to Commercial Customers 11 461.3 Metered Sales to Industrial Customers 12 461.4 Metered Sales to Public Authorities 13 14 Average Number of Customers (d) 463. Public Fire Protection Service 16 464. Other Sales to Public Authorities 17 465. Sales to Irrigation Customers 18 466. Sales for Resale 19 467. Interdepartmental Sales // 4 4 Total Sales of Water W5 /A // 9 /A Total 462. Private Fire Protection Service 15 <fSL > Y.5 I Zi7f99.5 ($56> 22 2. Other Operating Revenuer 23 24 470. Forfeited Discounts 25 471. MiscellaneousService Revenues (Class C) 26 472. Rents from Water Property (C1ass.C) 27 473. Interdepartmental Rents (Class C) 28 474. Other Water Revenues 29 30 Gallons of Water Sold (OOO omitied) (e) 460. Unmetered Sales to General Customers 5 8 Increase or Decrease from Preceding Year (C) 1. !hkr Of WJtW 1 2 Amount for Year (b) Total Other Operating Revenues 3 Total Water Operating Revenues I* I I -, ,& c; I I SALES OF WATER TO GENERAL CUSTOMERS. BY MONTHS (Accounts 460-461) Month (or Other Billing Period) (a) No I 1 / 2 -3 - I c . 4 /(/ I ,t 1 Acct 460 - Unmetered I / . ! Acct 461 - Metered 1 Estimated Gallons Sold Revenue (b) Number Gallons Sold I (d) I n /- L ,I*. /4 u /cI+.4 1 - _I e I I I I i I I I I I I 'I I ~ j<qm "'l/ 8 10 11 12 13 925 n'dtal // 1 Line No Name of Other Water Utility (a) -76 . 25 I 26 I 27 20 29 30 31 1 3233 34 35 36 37 30 39 40 41 42 43 Billing Period (b) ?L?? 7,;o %/.GCG 3s a.741,957 9 /'A Gallons Sold (000 Omitted) Revenue (d) (C) 1 1 1 1 1 1 4 1 1 66 50 51 1 57 12 s+ 33 5' 9 L?./$ / L 4 I 45 I 34", / 977 970 /e 74 - I YLf 2' "0 85 /+ 3.8 0 9.; " ?bo T+ bLU' 1 3 3 974 v m ,,,x/" CLh-L 9 f r o s*.= /,kJ?.de6 7Ct-7 9A3 d - 4 -2.4)- 73 Y.3 &.' 4 / & 93 9c 0 6 7 97c3r.ll 392 535; 13 5 L // 74 < L L - y?*-*&-ic 5 of Revenue (e) 6 WATER OPERATION AND MAINTENANCEEXPENSES Class C Account (a) Line No. 1 2 3 4 Operation 7 8 9 10 11 12 13 14 15 605. Maintenanceof Water Source plant i 20 Maintenance Total Source of Supply Expenses 2. Pumping Gcpenses' Operation 620. Operation Labor 621. Fuel for Power Production 622. Fuel or Power Purchased for Pumping 623. Operation Supplies and Expenses Maintenance 625. Maintenance of Pumping Plant Total Pumping Expenses 3. Water Treatment Expenses Operation 631. Chemicals 22 23 24 25 632. Operation Supplies and Expenses Maintenance 635. Maintenanceof Water Treatment Plant Total Water Trealtrnent Expenses 4. Tmnsmissfon and Dfstributfan Expenses 26 27 Operation 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 640.Operation Labor 641. Operation Supplies and Expenses 45 46 47 48 I I 630. Operation Labor 21 44 (C) I I 600.Operation Labor 601. Purchased Water 602. Operation Supplies and Expenses 18 ' I9 Increaseor (Decrease) from Preceding Year 1. Source of Supply Expenses 5 6 16 17 Amount for Year (b) I I Maintenance 650. Maintenanceof Distribution Reservoirs and Standpipes 651. Maintenanceof Mains 652. Maintenanceof Services 653. Maintenanceof Meters 654. Maintenanceof Hydrants 655. Maintenanceof Other Plant Total Transmission and Distribution Expenses 5. Cuatomr S.PJICO Expensma Operation 901. Meter Reading Latar 902. Accounting and Collecting Labor 903. Supplies and Expenses 904. Uncollectible Accounts Total Customer Accounts Expenses 6. Cuatomor SIrVfce Experuea Operation 907.Customer Service and Information Expenses 7. Sales Promotion Erpenws 13 I I I. I I I I I I I I I I I I I i I I u I - WATER OPERATION AND MAINTENANCE EXPENSES --- Class C AccoLnt (Continued) (a) Line No ! ~ I Operation 4 I 921. Office Sumlies and Other Expenses 5 922. Administrative Expenses Transferred - Cr 6 923 Outside Services Employed 7 924 Property Insurance 8 925 Injuries and Damages 9 926. Employee Pensions and Benefits Increase or (Decrease) from Preceding Year (b) (0 I I I I I I I I 927 Franchise Requirements 11 12 Amount for Year 8. Administrative and General Expenses 2 10 I 928 Reaulatorv Cornmission Expenses I I 930.1 Institutional or Goodwill Advertising Expenses I 930 2 Miscellaneous General Expenses 13 14 930.3 Research and Development Expenses 15 933. Transportation Expenses 16 Maintenance 17 935. Maintenance of General Plant 4 Amount for Year (b) Class D Account (a) Line No. Increase or (Decrease) from Preceding Year (C) 1. Plant Operation and Maintenance 28 29 600. Salaries and Wages 30 610 Purchased Water 2 /88 +// .3 +/7 31 620. Fuel or Power Purchased for Pumping 32 630. Chemicals 33 640. Supplies and Expenses // It9 34 650. Repairs of Water Plant 12-23 f.290 7i 35 660. Transmrtation Expenses qc /L <23+.-z) 36 37 Total Plant Operation and Maintenance Expenses 73 /o (/G/C/> 2. General Expenses 38 39 680. Administrative and General Salaries / 5 0 0 40 681. Office Supplies and Other Expenses d5L 41 682 Outside Services Employed 42 43 // 73 i+/3> 684 Insurance Expense I I 686. EmDlovees Pensions and Benefits 44 688. Regulatory Commission Expense 45 689. Miscellaneous General Expenses 46 690. Uncollectible Accounts I I 47 48 M5d Total General Expenses A0 .50 , (339) Total Water Operation and Maintenance Expenses - Class D /o 8 7 L 14 ( 4 3 44> F a m 81111ng Period (b) e ;;Vendor I Gallons Purchased (000 Omitted) cost (C) (d) I I I 21 ~ 10 11 12 13 Total f Direct Payroll Distributions (b) Partglars Allocation of Amounts Charged Clearing Accounts (C) Total (d) 36 f f 33 34 35 Total Utility Plant Retirements 36 Total All Other Accounts 37 38 39 40 Clearing Accounts Total Merchandise and Jobbing Total Utility Plant Construction TOTAL SALARIES & WAGES 3 6 88 xxxxx Total number of employees at end of year, including administrative, operating. maintenance, construction and Water other employees: Sewer Dept. Total bases used in allocating to utility departments the several classes of expenses and salaries: I 15 1 I I I I I I I I I I I I I I I I I I I 1I I I I I I I I I I I I I I I I u I - L This Year Amount (b) A ~ 7 0 T t l Z d l i OACCOtlnt ~ Line No I (a) Increase or (Decrease) (C) 11 - 2 1 3 4 404 Limited.Term Utility Plant 405 Other Utility Plant 5 406 Utility Plant Acquisition Adjustments 6 7 407 Property Losses 8 9 10 Total Amortization TAXES OTHER THAN INCOME TAXES (Account 408) Particulars Other Income -~ 25 26 27 35 I I 39 I 34 I 40 41 42 43 I 44 47 I 481 49 50 I 1 I 16 I I I Kind of Pipe Line No 1 2 3 4 (CAST IRON, GALVANI COATED STEEL, CTC ) (a) P/(1 L/, t FkY 5 6 7 a 9 I I I 10 11 Services in Use Disconnected I I I I I 17 I’ I I I I I I I I I I I I I I I I I I CLASSIFICATIONOF WATER METERS AT END OF YEAR Report data for each separate water System HYDRANTS DESCRIPTION (TYPE, SIZE OF BRANCH OR VALVE OPENING, NUMBER AND SIZE OF NOZZLES. ETC.) (a) Line No. No. First of Year (b) ~ Name of Cities, Towns and Unincorporated Communities (a) Line No. J+&U 44 45 z% 1 No of Customers End of Year (b) ” 70 46 47 48 Added (0 I 18 No. End of Year (e) Retired or Removed (d) Population SeNed (C) k 7c POWER, PUMPING AND PURCHASET' 'IATER STATISTICS Omit 000s in repoitinggallons of water - 'Nater Purchased i b) Paniculars (ai Line NO 1 Gallons station pumping i i t o dist:ioutton mains. 2 January 3 4 ........................................... .......................................... March ............................................ February 12 ................................ ............................................. June ............................................. July .............................................. August ........................................... September ........................................ October ........................................... November ............................ 13 December 5 6 7 8 9 10 11 14 15 Eiecrrlr Power (C I I .... .. .. April May .............I.. Total for year .. M.rtnocls ! (d) rt.1 ................. ................. ........ ... . .. .. .. .. . . . . . .. ............. .. .. . ............ ............ ... ... .. .. .. .. ... .. ... ........... ... ................... .. .. - 16 17 18 19 - 20 21 22 23 24 25 - 26 27 - 28 29 30 31 POWER PUMPING: Electric: . 32 a. K.W.H. used 33 b. Name of company from which electric energy is purchased 34 35 36 37 SOURCE OF WATER SUPPLY a Name of River or Stream b Nameof Lake 39 c Number of Spiings 40 d Number of Wells 41 e Other. explain 42 43 44 TYPE OF SUPPLY 45 a Gravityor purnping 46 b If a combination thereof, give gallons delivered by each r yl 47 48 49 50 51 52 RESERVOIR (Provide additional sheets as necessary) a Storage capacity b Base elevation /.Go 000 J d O M Gals Type, I e , concrete, brick, wood or steel tank etc , pressure at pumps when operating pressure at pumps when not opera 1g -52 19 I I I + 5 3 I I I I I I I I I I I I I I I I I I I I I I / IDENTITY OF RESPONDENT 1. Exact name of respondent. ' fy 4LL47-tih @&/$dw 2 + L / as-b70 2. If name of respondent was changed during year, give particulars of change and date change became effective. 3. Address of principal business office at end of year 4. Name and title of officer having custody of the general corporate books of account and address of office where the general corporate books are kept. 5. Name of State under the laws of which respondent is incorporated and date of incorporation. 6. If respondent is not incorporated, give the type of organization and date organized. 7. If at any time during the year the property of respondent was held by a receiver or trustee, give (a) name of receiver or trustee, (b) date such receiver or trustee took possession, (c) the authority by which the receivership or trusteeship was created, and (d) date when possession by receiver or trustee ceased. 8. State the classes of utility and other services furnished by respondent during the year. Page 20 II I I I I I I I I I I I I I I I I I OFFICERS AND DIRECTORS OR OFFICIALS Report below theoffficersand directorsof respondent at end of year Iftherewereanychangesduringyear show title. nameand addressof previous officer or director and date of change List officers first then directors. listing twice officers who dre also dlrectors 16 State number of meetings of board of directors held during year 17 State number of directors required to constitute a quorum 18 State total amount of directors' fees paid during year ........................................................ ............................................................ ................................................................ Number of Votes at End of Year Total of votes (b) Name and Address of Security Holder (a) .ine No Other Securities With Voting Power (e) Preferred Stock (d) Common Stock (C) 29 30 I I I I I I I I I I I 31 32 33 35 36 37 38 39 40 41 I 45 I 43 .A7 I I I 48 40 49 Total Votes Represented by Above 50 Total Votes of Securities With Voting Powers 21 1 I iMPORTANT CHANGES DURING THE YEAR Hereunder give particularsconcerning the matters indicated below. Make the statements explicit and precise, and number them in accordance with the inquiries. Each inquiry must be answered. However, if the word "none" states the fact it may be used in answering any inquiry, or if information is given elsewhere in the report which answers any inquiry, reference to such other schedules will be sufficient. 1.Changes in, and additions to franchise rights; describing (a) theactual consideration given therefor, and (b) from whom acquired. If acquired without the payment of any consideration, state that fact. 2. Acquisition of othercompanies, reorganization, merger or consolidation with other companies: give names of companies involved, particulars concerning the transactions, and reference to Commission authorization, if any. 3. Purchaseor sale 01 operating units or Systems such as generating plants, transmission lines, etc; specifying items, parties, dates and also reference to Connmission authorization if any. 4. Important leaseholds acquired, given assigned or surrendered, giving effective dates, lengths of terms, names of parties, rents, Commission authorization, if any, and other conditions. I I I I I 5. Important extensiam of system giving location, new territory covered by distribution system, and dates of beginning operations. 6. Estimated increase or decrease in annual revenues due to important rate changes, giving basis of estimate and stating for each revenue classification the amounts of increase or decrease and the number of customers affected for each such classification. 7. Obligation incurred or assumed by respondent as guarantor for the performance by another of any agreement or obligation, excluding ordinary commercial paper maturing on demand or not later than one year after date of issue, and giving Commission authorization, if any. 8. Changes in articles of incorporation or amendments to charter. 9. Additional matters of fact (not elsewhere Drovided for) which the resDondent may desire to include in its reoort. 14 I 19 I I I 33 34 22 I I I' I I I I I I I I I I I I I I I I I I - IMPORTANT CHANGES DURING THE YEAR (Continued) No. I, 1 / 13 14 15 1 17 18 21 22 1 I I 1 26 I 29 30 31 32 I 34 35 36 1 I 1 I 41 42 43 I45 I I 46 I 50 1 51 52 53 54 55 56 23 II I I I I I I I I I I I I I I I I I VERIFICATION The foregoing report must be verified by the oath of the officer, or person duly designated, having control of the books and records of account of the utility. The oath required may be taken before any person authorized to administer an oath by the laws of the State in which the same is taken. OATH ss: County of makes oath and says that / (Insert here the name of the affiant) f i CnrL-’ he is (Insert here the official title of the affiant) of L (InsArt here the exact legal title or name of the utility) that he has examined the foregoing report; that to the best of his knowledge, information, and belief, all statements of fact contained in said report are true and that said report is a correct statement of the business and affairs of the above- amed utility in respect to each and every matter s , 19 .&. %G ! oand (Signature of affiant) < Subscribed and sworn to before me, a 43 6-cM + day of for the State and county above named, this 19 in and 96. My commission expires 41+; Z. 0 0 I Page 24 I I 1 I I I 1 I I I I I I I 1 I I I I APPENDIX D TARIFF SCHEDULE I II I I I I I I i I I I I I I I I I I APPENDIX E ENVIRONMENTAL RESOURCE LETTERS - I I- James L Haworth. P E Retired Fred A Meyer. P E , L A Philip Boleyn, P E , L A Bob Blankenship. P E James H Smith P E L S Bradley M Meyer. P E , L S Joseph C Pylas. P E Karen Wood ~ i Haw(orth, Meyer & Boleyn, Inc. ENGINEERS ARCHITECTS PLANNERS 325 Sixth Avenue I I I I I I Office: (304) 744-5200 South Charleston, WV 25303 i I c Fax: (304) 744-3955 August 18, 1997 Ms. Barbara Sargent Data Request Coordinator W.V. Dept. of Natural Resources Wildlife Resource Section P.O. Box 67 Elkins, W 25241 , WE: Endangered Species and Wetlands Town of Delbarton Mingo County, West Virginia Dear Ms. Sargent: We are a consulting engineering firm currently designing a water system which will extend the present service area of the Town of Delbarton. The purpose of this project is to provide water service to the unserved residents within Town by constructing a waterline as shown on the enclosed USGS Map. Tnis project will mainly be within the DOT right-of-way and placed within previously disturbed lands. Please review this project and provide us with a list of any threatened or endangered species that may inhabit the project area and any wetlands in the region in order that we can incorporate this information into our design. I We are looking toward completing this design by summer 1998. Your assistance in this matter is much appreciated. i Very truly yours, HAWORTH, MEYER & BOLEYN, INC. * fv L I I II Terry L. Myers Project Coordinator cc: John W. Preece, Mayor, Town of Delbarton envsulll .dnr 3 HMB Circle US 460 Frankfort. KY 40601 (502) 695-9800 442 Metroplex Suite 105 Nashville, TN 3721 1 (615) 834-4335 2500 Fairlane Drive Building 1. Suite 170 Monlgomery. AL 361 16 (334) 277-1002 1410 Charlestawn-New Albany Pike Suile 201 Jeffersonvilla. IN 47130 (812) 288-6961 I - James L Haworth. P E Retired Fred A Meyer. P E L A Philip Boleyn. P E , L A Bob Blankenship. P E . - James H Smith. P E L S Bradley M Meyer. P E L S Joseph C Pyles. P E Karen Wood Haworth, Meyer & Boleyn, Inc. ENGINEERS ARCHITECTS PLANNERS 325 Sixth Avenue .I I I I I I I Office: (304)744-5200 Fax: (304)744-3955 South Charleston, WV 25303 i August 18, 1997 Mr. William G. Farrar W Division of Culture & History Cultural Center Charleston, WV 25305 RE: Historical Sites Town of Delbarton Fllingo County, West Virginia Dear Mr. Farrar: We are a consulting engineering firm currently designing a water system which will extend the present service area of the Town of Delbarton. The purpose of this project is to provide water service to the unserved residents within Town. This project will mainly be within existing right-of-way and thus placed within previously disturbed areas. A project area map has been attached outlining the scope of the project on the Delbarton Quad USGS Map. Additionally, if there are any deviations from this preliminary design, your office will be notified. Please review this project and provide us with a list of any prehistoric or historic sites in the project area so that we can incorporate this information into the final design. We are looking toward completing this design by the summer 1998. Your assistance in this matter is much appreciated. I Very truly yours, HAWORTH, MEYER & BOLEYN, INC. fJy/ Terry L. Myers Project Coordinator cc: I- ,c John W. Preece, Mayor, Town of Delbarton engr\oh\mktg\terry\delbart.O02 3 HMB Circle US 460 Frankfort. KY 40601 (502) 695-9800 442 Metroplex Suile 105 Nashville, TN 37211 (615) 834-4335 2500 Fairlane Drive Building 1. Suite 170 Montgomery. AL 361 16 (334) 277-1002 1410 Charlestown-New Albany Pike Suite 201 Jeffersonville. IN 47130 (812) 288-8961 1 z i i I I I i i I i I I i I I I I D - James L. Haworth. P.E. Retired Fred A. Meyer. P.E.. L.A. Philip Eoleyn. P.E.. L.A. Bob Blankenship. P.E., 1. Haworth, M e y e r & Boleyn, Inc. ENGINEERS ARCHITECTS James H. Smilh. P E., L s Bradley M. Meyer. P E.. 1,s. Joseph C. Pyles. P.E. Karen Wood PLANNERS 325 Sixth Avenue Office: (304)744-5200 Fax: (304)744-3955 South Charleston. WV 25303 August 18, 1997 - Mr. Charles J. Kulp, Supervisor U. S. Department of the Interior Fish & Wildlife Service 315 South Allen St., Suite 320 State College, PA 16801 RE: Endangered Species List Town of Delbarton Pilingo County, West Virginia Dear Mr. Kulp: We are a consulting engineering firm currently designing a water system which will extend the present service area G: the Town of Delbarton. Tne purpose of tnis project is to provide water service to the unserved residents within Town. A project area map has been attached outlining the scope of the project on the Delbarton Quad USGS Map. Please review this project and provide us with a list of any threatened or endangered species that may inhabit the project area so that we can incorporate this information into our design. We are looking toward completing this design by summer 1998. Your assistance in this matter is much appreciated. Very truly yours, HAWORTH, MEYER & BOLEYN, INC. PrDject Coordinator cc: John W. Preece, Mayor, Town of Delbarton engr\oh\rnktg\terry\delbart.003 envsull3.f&w 3 HMB Circle US 460 Frankfort, KY 40601 (502) 695-9800 442 Melroplex Suite 105 Nashville. TN 3721 1 (615) 8344335 2500 Fairlane Drive Building 1, Suite 170 Montgomery. AL 36116 (334) 277-1002 1410 Charlestown-New Albany Pike Suite 201 Jeffersonville. IN 47130 (812) 288-8961 I - James L Haworth. P E Retired Fred A Meyer. P E , L A Philip Boleyn P E , L A -BOD Blankenship. I PE ‘ i- Haworth, Meyer & Boleyn, Inc. ENGINEERS ARCHITECTS PLANNERS 325 Sixth Avenue I I I I I I I i I I I I I I I I James t i Smith. P E . L s Bradley M Meyer. P E L S Joseph C Pyles. P E Karen Wood Office: (304)744-5200 Fax: (304)744-3955 South Charleston, WV 25303 August 18, 1997 Natural Resources Conservation Service 75 High Street Room 301 Morgantown, WV 26505 RE: Town of Delbarton Water System Improvement Mingo County, West Virginia Dear Sirs: We are a consulting engineering firm currently designing a water system which will extend the present service area of the Town of Delbarton. The purpose of this project is to provide water service to the unserved residents within Town. A project area map has been attached outlining the scope of the project on the Delbarton Quad USGS Map. Please review this project and provide us with information on prime farmland within the project area so that we can incorporate this information into our design. We are looking toward completing this design by summer 1998. Your assistance in this matter is much appreciated. Very truly yours, HAWORTH, MEYER & BOLEYN, INC Terry L. Myers Project Coordinator cc: John W. Preece. Mayor, Town of Delberton engr\oh\mktg\terry\delbart.004 envsulll .dni 3 HMB Circle US 460 Frankfort. KY 40601 (502) 695-9800 442 Metroplex Suite 105 Nashville, TN 3721 1 (615) 834-4335 2500 Fairlane Drive Building 1 . Suite 170 Montgomery,AL 36116 (334) 277-1002 1410 Charlestown-New Albany Pike Suite 201 Jeffereonville, IN 47130 (812) 288-6961 I I I I I I I I I I I I I I I I I I I P APPENDIX F-I COST ESTIMATES I Town of Delbarton I I I I I I I I I I I I I I I I ~I Water System Improvements Project Preliminary Project Cost Estimate August 1997 Description 8" C-900 Class 150 8" Ductile Iron Class 350 6 C-900 Class 150 6 Ductile Iron Class 350 2 SDR 17 Class 250 8" Gate Valve 6 Gate Valve 2 'Gate Valve Fire Hydrants Reconnection of hist. Fire Hydrants Blow-Off Valve Service Connection Installed Reconnection of existing services 314" Service Line 314 Service Line Bored 1" Service Line Bored 1 6 Bored or Jacked Steel Casing 1 2 Bored or Jacked Steel Casing 4 Bored or Jacked Steel Casing Erosion Control Traffic Control Restoration of Bisting Surface Master Meter Vault Pressure Reducing Valve Resurface Existing Water Tank Hydropuematic pump\tank Estimated Quantities 16,200 200 6,700 200 2,000 6 4 2 10 5 4 178 84 2,620 2,620 500 200 100 100 1 1 25,300 1 1 1 1 Unit cost $24.00 28.00 $16.00 25.00 12.00 650.00 500.00 350.00 2,000.00 1,000.00 600.00 400.00 350.00 8.00 22.00 23.00 125.00 110.00 85.00 25,000.00 25,000.00 5.00 20,000.00 15,000.00 75,000.00 56,000.00 Construction Cost Total kstimated Project Cost Haworth, Meyer & Boleyn, Inc. dolbortWK4 Units /LF /LF /LF /LF /LF &A /EA /EA /LA /SA /€J /EA /€J /LF /LF /LF /LF /LF /LF /LS /LS /LF /LS /LS /LS /LS Total cost $388,800.00 5,600.00 $107,200.00 5,000.00 24,000.00 3,900.00 2,000.00 700.00 20,000.00 5,000.00 2,400.00 71,200.00 29,400.00 20,960.00 57,640.00 11,500.00 25,000.00 11,000.00 8,500.00 25,000.00 25,000.00 126,500.00 20,000.00 15,000.00 75,000.00 56,000.00 $1,142,300.00 Engineering inspection Adm inistration Special Services Accounting Legal Land Bond Counsel Project Contingencies 10% $86,000.00 74,000.00 35,000.00 30,000.00 7,500.00 5,000.00 500.00 15,000.00 112,700.00 $1,508,000.00 I I I I I I I I I I I I I ~I I I I I I APPENDIX F-2 OPERATION 8 MAINTENANCE COST ESTIMATES APPENDIX F-2 Water Operations and Maintenance Expenses EXISTING 1. 2. PROPOSED Plant Operation & Maintenance A. Salaries and Wages B. Purchased Water C. Fuel or Power Purchased for Pumping D. Chemicals E. Supplies and Expenses F. Repairs of Water Plant G. Transportation Expenses $2,188 $0.00 $3,417 $1,173 $1,010 $1,228 $0.00 $10,000 $29,419 $0.00 $0.00 $1,500 $0.00 $0.00 General Expenses A. Administrative and General Expenses 6. Office Supplies and other Expenses C. Taxes $1,500 $356 $743 $1,500 $500 $950 $11,615 $43,869 TOTAL O&M The Mingo County PSD does not currently have a Sale-for-Resale rate. For the purposes of this report a $2.00 per 1000 gallon rate has been assumed. It is felt that this figure should be a conservative estimate of the cost. The WV Public Service Commission would need to perform a cost of service study before a final rate could be established. 'I I I I I The estimated annual cost to purchase water has been calculated based on the following figures: 80% of potential 178 new customers = 143 Existing Customers = 84(avg. based on 96 Annual Report) 143 + 84 = 227 customers 227 cust. x 4,50Ogal./mo. = 1,021,500 gal./mo. 1,021,500gal. x 1.2(20% water loss) = 1,225,800gal./mo. 1,225,800gal./I,000 = 1,225.8(1000)gal. 1,225.8 x $2.00/1,000gal. = $2,451.60/mo. $2,451.60/mo. x 12 = $29,419.20 Annual Cost Based on an estimated monthly water usage of 4,500 gallons, the average customer user charge for water is expected to be $20.58 per month. Project funding calculations are shown in APPENDIX I. ~I I I I I I I APPENDIX G PUBLIC MEETING MINUTES I I E I I I 1 Minutes will be inserted when made available I I I I 1 I I I I I I I I 1 I I I I I I 1 I , APPENDIX H PROJECT SCHEDULE I I I I I I I I 1 I I I ,I I I I I 1 I APPENDIX H PROJECTSCHEDULE ACTIVITY DATE Submit Preliminary Engineering (PE) Report to Infrastructure Council 8/97 Public Meeting 8/97 PE Report Approved by Infrastructure Council 9/97 Submittal for Small Cities Block Grant 10197 "Project Design Initiated 4/98 Plans and Specifications submitted to the Bureau of Public Health 8/98 Project Advertises for Bids 12/98 Bids Received 1199 Contracts Awarded 2/99 Project Construction Begins 3/99 Project CompIeted 9/99 *This date is based on SCBG approval early 1998 I I I I I I I I 1 I I I I I I I I I I APPENDIX I PROJECT FUNDING CALCULATIONS I I I I I I I I I I I I I I I I I I I APPENDIX I Project Funding Calculations Debt Service 1. Existing Debt payments per 1996 PSC Annual Report $0.00 Proposed Funding for Town's Water System Improvements Project: $1,508,000 Project Cost 2. A. Infrastructure Loan of $258,000 @ 0% for 40 years with 10% reserve: $6,450 $645 Annual Loan Payments Annual Reserve Account B. Small Cities Block- Grant of $1,250,000 Proposed Project Debt Payments: $7,095 TOTAL EXPENSES 1. Operation and Maintenance 2. Debt Service Sub-Total Expenses 10% coverage of Expenses 3. I Total Expenses I Existinq Proposed $1 1,615 $43,869 $0.00 $7,095 $11,615 $50,964 $1,162 $5,096 $12,777 $56,060 Water Operation Revenues I. Metered Sales to Residential Customers EXIST1NG PROPOSED $1 1,912 $56,060 TOTAL REVENUE $11,912 $56,060 The Increase in meter sales to residential customers include: An increase o customers on the proposed line extensions. An 83% rate increase based on an average usage of 4,500 Per customer would be required to maintain 10% coverage over annual expenses. However it is noted that this increase is based upon only 8Q% sign-up of the potential 143 customers. Proposed Revenue : 227' customers x $20,58_Average Monthly Bill) = $4,671.66/mo. x 12mos. =,,.$Sf;,OSO ---=hb-l -I - - - - -I I I I I I I I I I I I I I 1 I I I I APPENDIX J RESOLUTION OF ACCEPTANCE RESOLUTION BE IT KNOWN,that the Town of Delbarton, Mingo County, West Virginia has reviewed the Engineering Report dated August 18, 1997, and prepared by HAWORTH, MEYER & BOLEYN, Inc. Both are in full agreement with the findings of the report and will proceed with the project as set forth in the report. Resolved this 16 day of b&fi 997. Town of Delbarton ounty, West Virginia own of Delbarton Motion made to ccept the Res and recorded by Motion carried ASlkS 8- ;pA 6 in favor; <against. APPENDIX K DISCUSSION AND SUMMARY OF HYDRAULIC ANALYSIS I a I DISCUSSION AND SUMMARY OF HYDRAULIC ANALYSIS I I I 1 I I I I I I I II I I I I I The Town of Delbarton Water System Improvements Project includes five parts for the purposes of a preliminary hydraulic analysis of the proposed system. The existing town system including a 154,000 gallon water tank An extension from the intersection of W 65 & County Route 65\5 then proceeds east to the town's boundary and connects to the existing Mingo County PSD system. An extension from the intersection of County Route's 65\5 & 65\12 then proceeds south on route 65\12 (Riverside Drive) to the intersection of US 52, and WV 65 & County Route 65\12. An extension from the intersection of W 65 & County Route 65\5 then proceeds north to the northern boundary of the town. An extension from the intersection of WV 65 & County Route 6 3 6 then proceeds west up County Route 65\6 ( Pigeonroost Creek) approximately 0.5 miles . The Town's existing system is supplied by a 154,000 gallon water storage tank which is filled by the high service pumps in the existing Water Treatment Plant. A very simple model, with the new supply point modeled as a reservoir, which will be a PRV to cut the supply pressure to an HGL of 904-0', was created. This model was developed from site visits and USGS 7.5' quad maps. The nature of this model is very preliminary and will require further development for during detailed design. The constraints used within this model are described herein. The flow rates were developed by assuming each customer would use 150 gallon per day (gpd) and that this usage would, conservatively, occur over an eighteen hour period. Once the daily usage was determined it was divided by 18 to get hourly usage and then by 60 to get the nodal demands for the KYPipe model. The Hazen-Williams C-factor assumed for all pipe was 120. Elevations of nodes were determined from USGS quads. Any internal node for which the elevation was not absolutely clear, the next highest contour was utilized. Any end node for which the elevation was not absolutely clear, the contour above the next highest was utilized. (Example: if a house were located near, but below the 920' contour, the house would be assumed to be at 940' MSL) I I 1 I 1 I 1 I I I I I I I I 1 I I I The minimum pressure criteria allowed was 20 psi. To model "worst case" scenario, a 250 gpm fire flow was modeled at various locations throughout the system and the summary of the results of a 24-hour recovery of the worst fire flow is included with this sheet. A summary of the preliminary hydraulic calculations are included in this Appendix. The following is a node list: 1. Town of Delbarton 2. Pigeonroost Creek (el. approximately 800) 3. Intersection of WV 65 and US 52 4. Intersection of WV 65 and County Route 65\6 5. Pigeonroost Creek (el. approximately 840') A. Tank AA. New supply Connection The model indicated health department regulations ( 20 psi min.) would be met with one exception. This exception is the end of Pigeonroost Creek, where there may be residents whose service may be above 800' MSL. This area will likely require a Hydropneumatic station. The fire event which causes this condition occurs at node 2. Other fire events do not cause pressure problems. Job: DEL 08-13-1997 Number of Pipes: 6 Total Pipe Cost: 1 2 3 4 5 A AA 0.00 145.0 66.9 129.0 158.1 25.4 96.3 126.5 0.00 0.00 0.00 0.00 0.00 24.00 0.00 752.0 800.0 768.0 727.0 840.0 800.0, 778.0 Pump Cost information has not been specified in KYDATA KPFS :I Pg 1 I -i I c I I i I i I 1 I I I 1 I I I I I TOWN OF DELBARTON WATER SYSTEM IMPROVEMENTS NODE MAP Prepared By: Haworth Meyer 8 Boleyn, Inc.