Page 1 of 12 FORM 1 (I) Basic Information Sr. No. Item Details 1

Transcription

Page 1 of 12 FORM 1 (I) Basic Information Sr. No. Item Details 1
FORM 1
(I) Basic Information
Sr.
Item
No.
1. Name of the Project/s
2.
3.
4.
5.
6.
7.
8.
Details
Extension of Validity of EC. M/s.
Reliance Industries Limited Petroleum and Petrochemical Complex in
Multi Product Special Economic Zone in
District Jamnagar in Gujarat
S. No. in the schedule
Project activity No. 4(a) and 5(C) of the
Schedule of the EIA Notification dated
14.09.2006
Proposed capacity/area/length/tonnage to The proposal is for extension of Validity of
be
handled/command
area/lease EC. Capacities of various plants is as
area/number of wells to be drilled
approved
in the
Environmental
Clearance granted by MoEF vide F. No. J11011/149/2007-IA II (I) dtd. 30th March,
2010, copy of which is attached at
Annexure-I.
New/Expansion/Modernisation
The proposal is for extension of validity of
EC for approved New projects. Please
refer Annexure-II for the current
implementation status of the various
approved components.
Existing Capacity/Area etc.
Existing (established) refinery and
petrochemical complex is approved for
capacity of 68.2 MMTPA along with
petrochemical complex within land under
possession of RIL of 7,409 Ha.
Category of Project i.e.’A’ or ‘B’
As per the EIA Notification, 2006, the
proposed projects fall in Category ‘A’
Does it attract the general condition? If yes, Not applicable .The project is Category A
please specify
Does it attract the specific condition? If yes, Not Applicable. The proposal is for
please specify
Extension of validity of EC.
Villages: Padana
Location:
Tehsil: Lalpur;
Plot / survey / Khasra No
District: Jamnagar
Village
Gujarat
Tehsil
District
State
10. Nearest railway station/airport along with Nearest Railway Station: Kanalus
distance in kms
Distance from Railway station: 1 km
Nearest Airport: Jamnagar Airport
Distance from Airport : 25 km
9.
Page 1 of 12
11. Nearest Town, City, District Headquarters Jamnagar City is at a distance of approx.
along with distance in kms
25 kms and is also the District
Headquarter.
12. Village
Panchayats,
Zilla
Parishad,
Municipal Corporation,Local body (complete Reliance Industries Limited
postal address with telephone nos.to be Jamnagar District
Gujarat - 361 142
given)
Landline: (0288) 4012152
13. Name of the applicant
Reliance Industries Limited
Jamnagar Manufacturing Division
14. Registered Address
Maker Chamber IV , Nariman Point,
Mumbai-400021
15. Address for Correspondence
Name
Designation
Address
Pin Code
Udayabhaskar Gullapalli
Sr. Vice President & Head Corporate
Environment
Reliance Industries Limited,
7B/ II floor/ CA 18
RCP, Ghansoli
Navi Mumbai 400705
Mobile : 918452875460
Ph: 912244789038
EMail: [email protected]
[email protected]
Email
Telephone No
Fax No
16. Details of Alternative Sites examined, if any.
Location of these sites should be shown on
a toposheet.
17. Interlinked Projects
Not Applicable. This is an application for
extension of validity of the earlier granted
EC.
NIL
18. Whether separate application of interlinked Not Applicable
projects has been submitted
19. If yes, date of submission
NA
20. If no,reason
NA
21. Whether
the
proposal
involves No.
approval/clearance under: if yes details of
the same and their statue to be given
(a) The Forest (Conservation)Act,1980?
(b) The Wildlife (Protection)Act,1972?
c) The C.R.Z. Notification,2011?
22. Whether there is any Government Yes. Govt. of India order on SEZ
Order/Policy relevant/relating to the site?
23. Forest land involved (hectares)
NIL.
Page 2 of 12
24. Whether there is any litigation pending No.
against the project and/or land in which the
project is propose to be set up
(a) Name of the Court
(b) Case No.
(c) Orders/directions of the Court, if any and
its relevance with the proposed project.
(II) Activity
1. Construction, operation or decommissioning of the Project involving actions, which
will cause physical changes in the locality (topography, land use, changes in water
bodies, etc.)
Sr. Information/Checklist
No. confirmation
1.1
Yes/No
Permanent or temporary change in
land use, land cover or topography
including increase in intensity of
land use (with respect to local
land use plan)
Clearance
of
existing
land,
vegetation and buildings?
Creation of new land uses?
Yes
1.4
Pre-construction
investigations
e.g. bore houses, soil testing?
Yes
1.5
Construction works?
Yes
1.2
1.3
1.6
1.7
No
No
Demolition works?
Temporary
sites
used
for
construction works or housing of
construction workers?
1.8 Above ground buildings, structures
or earthworks including linear
structures, cut and fill or
excavations
1.9 Underground
works
including
mining or tunneling?
1.10 Reclamation works?
1.11 Dredging?
1.12 Offshore structures?
No
Yes
1.13 Production
and
manufacturing
Details thereof (with approximate
quantities
/rates,
wherever
possible)
with
source
of
information data
The land in possession is notified as
Industrial area.
Not applicable. There are no buildings
to be cleared.
No new land use is proposed to
be created.
Pre-construction investigations have
already been carried out at project
site during pre-engineering activities
Construction works are going on at
site
for
the
plants
under
implementation
Not Applicable.
Temporary labour camps have been
set-up within the project area for the
construction labour force.
Yes
No
No mining is envisaged.
No
No
No
Not Applicable
Not Applicable
Not Applicable
Yes
Details are provided in the EIA report
Page 3 of 12
processes?
1.14 Facilities for storage of goods or
materials?
submitted to the Ministry.
Yes
1.15 Facilities for treatment or disposal
of solid waste or liquid effluents?
Yes
1.16 Facilities for long term housing of
operational workers?
Yes
1.17 New road, rail or sea traffic during
construction or operation?
No
1.18 New road, rail, air waterborne or
other
transport
infrastructure
including new or altered routes
and stations, ports, airports etc?
No
1.19 Closure or diversion of existing
transport routes or infrastructure
leading to changes in traffic
movements?
No
1.20 New or diverted transmission lines
or pipelines?
Yes
1.21 Impoundment,
damming,
culverting, realignment or other
changes to the hydrology
of
watercourses or aquifers?
1.22 Stream crossings?
No
1.23 Abstraction or transfers of water
form ground or surface waters?
1.24 Changes in water bodies or the
land surface affecting drainage or
run-off?
1.25 Transport
of
personnel
or
materials
for
construction,
operation or decommissioning?
No
1.26 Long-term
dismantling
or
decommissioning or restoration
works?
1.27 Ongoing
activity
during
decommissioning which could
have
an
impact
on
the
environment?
1.28 Influx of people to an area in either
ETP and solid waste handling and
disposal facilities are being designed
and will be upgraded/established.
A township has been established
near the complex. The same will be
augmented if required.
New pipelines and transmission lines
will be established as per the
requirements and original approval.
No
No
Yes
During construction and operation
phase personnel and materials will be
transported
using
the
existing
infrastructure.
No
No
Yes
There will be temporary movement of
Page 4 of 12
temporarily or permanently?
labour, who will be housed in the
labour colonies.
1.29 Introduction of alien species?
No
1.30 Loss of native species or genetic
diversity?
1.31 Any other actions?
No
No
2. Use of Natural resources for construction or operation of the Project (such as land,
water, materials or energy, especially any resources which are non-renewable or in short
supply):
Sr.
No. Information/checklist
confirmation
Yes/No
2.1
Land especially undeveloped or
agricultural land (ha)
Yes
2.2
Water (expected source &
competing users) unit: KLD
Yes
2.3
2.4
Minerals (MT)
Construction material – stone,
aggregates, sand / soil (expected
source – MT)
Forests and timber (source – MT)
Energy including electricity and
fuels (source, competing users)
Unit: fuel (MT), energy (MW)
No
Yes
Any other natural resources (use
appropriate standard units)
No
2.5
2.6
2.7
No
Yes
Details thereof (with approximate
quantities /rates, wherever possible)
with source of information data
The site is a part of the existing JMD
complex, and is declared industrial land
in possession of RIL.
Source: Seawater after desalination.
Desalinated
water
requirement:
15,000m3/hr.
Construction material is sourced from
approved vendors.
Construction power is being sourced from
existing captive power plant. The EC
granted also has approval for setting up
captive power plant. Power requirement
for the projects will be sourced from
CPPs being set up.
No competing users for the energy / fuel.
NA
Page 5 of 12
3. Use, storage, transport, handling or production of substances
or materials, which
could be harmful to human health or the environment or raise concerns about actual or
perceived risks to human health.
Sr. Information/Checklist
No. confirmation
3.1
Yes/No
Use of substances or materials,
which are hazardous (as per
MSIHC rules) to human health or
the environment (flora, fauna, and
water supplies)
Changes in occurrence of disease
or affect disease vectors (e.g.
insect or water borne diseases)
Yes
3.3
Affect the welfare of people e.g.
by changing living conditions?
Yes
3.4
Vulnerable groups of people who
could be affected by the project
e.g. hospital patients, children, the
elderly etc.,
Any other causes
No
3.2
3.5
Details thereof (with approximate
quantities/rates, wherever possible)
with source of information data
Petroleum and petrochemicals
No
The impact would be positive impact, as
the project will create / increase
employment
both
during
the
construction and operation phase of the
project.
No
4. Production of solid wastes during construction or operation or decommissioning
(MT/month)
Sr.N
o.
4.1
Information/Checklist
confirmation
Spoil, overburden or mine
wastes
Yes/No
4.2
Municipal waste (domestic and
or commercial wastes)
Yes
4.3
Yes
4.4
Hazardous wastes (as per
Hazardous Waste
Management Rules)
Other industrial process wastes
4.5
Surplus product
No
Details thereof (with approximate
quantities/rates, wherever possible)
with source of information data
No
Yes
The existing JMD Complex has robust
Domestic waste (garbage) management
system which will also cover the
garbage generated during construction
and operation phase.
The existing Hazardous waste system
gets extended to future upcoming units
also as per approvals of GPCB
Non-hazardous waste will be disposed.
Will be handled as approved by GPCB.
Page 6 of 12
4.6
ETP biological sludge is being used as
manure for green belt development
Construction waste will be sold as scrap.
Sewage sludge or other sludge
from effluent treatment
Construction or demolition
wastes
Yes
4.8
Redundant machinery or
equipment
No
4.9
Contaminated soils or other
materials
No
4.10
Agricultural wastes
No
NA
4.11
Other solid wastes
No
NA
4.7
Yes
5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)
Sr. Information/Checklist
No. confirmation
Yes/No
5.1
Emissions from combustion of
fossil fuels from stationary or
mobile sources
Yes
5.2
Emissions
from
production
processes
Emissions from materials handling
including storage or transport
Yes
Emissions
from
construction
activities including plant and
equipment
Dust or odours from handling of
materials including construction
materials, sewage and waste
Emissions from incineration of
waste
Yes
Emissions from burning of waste
in open air (e.g. slash materials,
construction debris)
No
5.3
5.4
5.5
5.6
5.7
Yes
Details thereof (with approximate
quantities/rates, wherever possible)
with source of information data
No change in emission data from what
was approved by MoEF in EIA report.
The application is for extension of
validity of EC
Emission details are included in the EIA
report furnished earlier
All mitigation measures for minimizing
the fugitive emissions as delineated in
the EMP, already submitted are being
implemented. It will be ensured that
there will be minimum emissions from
material storage, transport and handling.
will be
will be controlled by implementing all
actions as per the EMP.
No
Will be mitigated as per EMP.
Yes
Incinerator will be designed as per the
CPCB guidelines and will have the
requisite pollution control facilities
integrated in the design.
Page 7 of 12
5.8
6.
Emissions from any other sources
No
Generation of Noise and Vibration, and Emissions of Light and Heat:
Sr. Information/Checklist
No. confirmation
Yes/No
6.1 From operation of equipment e.g.
engines, ventilation plant, crushers
Yes
6.2 From
industrial
processes
Yes
or
similar
6.3 From construction or demolition
Yes
6.4 From blasting or piling
No
6.5 From construction or operational
traffic
Yes
6.6 From lighting or cooling systems
No
6.7 From any other sources
No
Details thereof (with approximate
quantities/rates, wherever possible)
with source of information data with
source of information data
Noise management will be as per the
EMP submitted.
Noise abatement measures are planned
as per the EMP.
PPE’s will be used wherever required.
The construction activities are being
planned in such a manner such that
there is minimal noise impact on the
surrounding environment.
Not envisaged.
7. Risks of contamination of land or water from releases of pollutants into the ground
or into sewers, surface waters, groundwater, coastal waters or the sea:
Sr. Information/Checklist
No. confirmation
Yes/No
7.1 From handling, storage, use or
spillage of hazardous materials
No
7.2 From discharge of sewage or
other effluents to water or the land
(expected mode and place of
discharge)
7.3 By deposition of pollutants emitted
to air into the land or into water
7.4 From any other sources
7.5 Is there a risk of long term build up
of pollutants in the environment
from these sources?
No
Details thereof (with approximate
quantities/rates, wherever possible)
with source of information data
All preventive measures to avoid
contamination due to handling, storage,
use or spillage of hazardous materials
are being taken as delineated in the
EMP.
Return sea water and the cooling tower
blow down will be routed through the
existing diffuser in the sea for disposal.
No
No
No
Page 8 of 12
8. Risk of accidents during construction or operation of the Project, which could
affect human health or the environment
Sr. Information/Checklist
No. confirmation
Yes/No
Details thereof (with approximate
quantities/rates, wherever possible)
with source of information data
8.1 From explosions, spillages, fires
etc from storage, handling, use or
production
of
hazardous
substances
Yes
Risk Assessment Studies for storages
and chemicals were carried out and
Emergency Preparedness Plan already
in place at JMD will be updated
accordingly.
8.2 From any other causes
No
NA
8.3 Could the project be affected by
natural
disasters
causing
environmental
damage
(e.g,
floods, earthquakes, landslides,
cloudburst etc)?
No
Sufficient provisions are provided in the
design to take care of natural disasters
that are commonly known/ recorded in
the area.
9. Factors which should be considered (such as consequential development) which
could lead to environmental effects or the potential for cumulative impacts with other
existing or planned activities in the locality
Sr. Information/Checklist
No. confirmation
9.1 Lead
to
development
of
supporting
utilities,
ancillary
development
or
development
stimulated by the project which
could have impact on the
environment e.g.:
• Supporting infrastructure (roads,
power supply, waste or waste
water treatment, etc.)
•
housing development
•
extractive industries
•
supply industries
•
other
9.2 Lead to after-use of the site, which
could have an impact on the
environment
Yes/No
Yes
Details thereof (with approximate
quantities/rates, wherever possible)
with source of information data
The project will increase direct and
indirect employment opportunities in the
area. Ancillary units for maintenance
and supply of materials have a potential
for development due to the project.
No
Page 9 of 12
9.3 Set a precedent
developments
for
later
Yes
9.4 Have cumulative effects due to
proximity to other existing or
planned projects with similar
effects
Yes
(III) Environmental Sensitivity
Sr.
Areas
No.
1 Areas
protected
under
international
conventions,
national or local legislation for their
ecological, landscape, cultural or
other related value
2 Areas which are important or
sensitive for ecological reasons Wetlands, watercourses or other
water bodies, coastal zone,
biospheres, mountains, forests
3 Areas
used
by
protected,
important or sensitive species of
flora or fauna for breeding,
nesting, foraging, resting, over
wintering, migration
4 Inland,
coastal,
marine
or
underground waters
5 State, National boundaries
6
7
8
9
Routes or facilities used by the
public for access
to recreation or other tourist,
pilgrim areas
Defence installations
Densely populated or built-up area
Areas occupied by sensitive manmade land uses
(hospitals,
schools, places of worship,
community facilities)
Name/
Identity
No
Aerial distance (within 15 km.)
Proposed project location boundary
Marine
National
Park
About 8 kms. from the site in the Gulf of
Kutch.
No
NA
Gulf of
Kutch
No
Gulf of Kutch is about 8 kms. from the
site..
NA
SH 25
State Highway from Jamnagar to Okha
leads to Dwarka is about 3 Km away
from site.
No
Reliance
Township
and local
villages
Yes
NA
Approx. 2-3 kms
Hospital, school and temple are located
within RIL township.
Page 10 of 12
Page 11 of 12
Note:
1.
The projects involving clearance under Coastal Regulation Zone Notification, 2011
shall submit with the application a C.R.Z. map duly demarcated by one of the
authorized agencies, showing the project activities,w.r.t. C.R.Z.(at the stage of TOR)
and the recommendations of the State Coastal Zone Management Authority(at the
stage of EC). Simultaneous action shall also be taken to obtain the requisite clearance
under the provisions of the C.R.Z. Notification, 1991 for the activities to be located in
the CRZ.
2.
The projects to be located within 10 km of the National Parks, Sanctuaries, Biosphere
Reserves, Migratory Corridors of Wild Animals, the project proponent shall submit the
map duly authenticated by Chief Wildlife Warden showing these features vis-à-vis the
project location and the recommendations or comments of the Chief Wildlife Warden
thereon.(at the stage of EC)
3.
All correspondence made with the Ministry of Environment and Forests including
submission of application of TOR/ Environmental Clearance, subsequent
clarifications, as may be required from time to time, participation in the EAC meeting
on behalf of the project proponent shall be made by the authorized signatory only. The
authorized signatory should also submit a document in support of his claim of being
an authorized signatory for the specific project.
Page 12 of 12
ANNEXURE-I
Status of Projects Implementation
Sr.
No.
Plants granted EC vide
J-11011/149/2007-IA (II) (I)
dtd. 30th March, 2010
Name of the plant
Annexure-II
Current Implementation
Status
Capacity
(MMTPA)
I
C1 Based Units
1
Coke Gasification
8.75
2
Methanol Synthesis
0.625
3
Acetic Acid
1.00
4
Vinyl Acetate Monomer(VAM)
0.70
5
Polyvinyl Acetate (PVA)
0.35
6
Polyvinyl Alcohols (PVOH)
0.125
II
C2 Based Units
1
Multifeed Cracker Complex
3.45
2
Ethylene Oxide Derivatives
like Mono Ethylene Glycol
(MEG), Di Ethylene Glycol
(DEG) , Tri Ethylene Glycol
(TEG)
1.25
3
Polyethylene polymers like
(LDPE /LLDPE/HDPE)
0.75
Plants are under construction
at site
Projects
stage.
are
under
design
Plants are under construction
at site
III
C3 Based Units
1
Acrylic Acid & derivatives,
SAP
2
3
n-Butyl Acrylate,
n-butyraldehyde,
n-Butanol,
2-EthylHexanol
Propylene Derivatives like
Propylene Oxides, Cumene,
Phenol
0.45
0.5
0.4
4
Propylene Glycols
0.2
5
Polyols
0.25
6
Hydrogen Peroxide (H2O2)
0.32
7
PP (Non woven)
8
Polypropylene (PP)
IV
C4/C5 Based Units
1
Butyl/Halo Butyl Rubber,
ESBR, SBR,PBR, SSBR
2
Butene 1
3
Maleic Anhydride (MA)
Projects
stage.
Fumaric Acid
under
design
0.125
0.25
0.47
0.0625
Butyl Rubber Project is under
implementation and the rest
are in final engineering &
procurement stage
Project
is
under
implementation (engineering /
procurement)
0.25
Projects
stage.
4
are
0.125
are
under
design
V
1
2
C6/ C7/ C8 Based Units
Mono Nitro Benzene,Aniline,
Methylene Di
Aniline,Phosgene, Methylene
Diphenyl Diisocyanate (MDI),
Toluene Diisocyanate (TDI),
Benzene
Styrene
Paraxylene (PX),
3
0.5
Projects
stage.
are
under
design
1.0
2.5
Orthoxylene (OX)
4
PTA
1.875
5
PET
1.5
6
Polyesters Complex (POY,
PSF)
VI
Carbon Black
1.5
VII
Lube Oil Cum Refinery
Complex
8.5
VIII
Captive Power Plant
IX
JERP
Paraxylene plant is under
construction
Projects are under design
stage.
0.625
2100 MW
Projects are under design
stage.
Partially implemented
Being implemented in a phase
wise manner.
Already Implemented