Government of India Bhabha Atomic Research Centre Ion
Transcription
Government of India Bhabha Atomic Research Centre Ion
Government of India Bhabha Atomic Research Centre Ion Accelerator Development Division Ref: No. IADD/RA/2015/131 Subject: Invitation of Quotations for “Mechanical Design, Fabrication, assembly, inspection and supply of Alignment and support system for LEHIPA Cavities” as per tender technical specification. 1. Quotations are invited for the minor fabrication job as per the enclosed technical specifications. Tender will be processed in two parts. Supplier shall submit the technical offer and commercial offer in two separate envelops. (Please note that technical offer shall have no commercial clauses. In case, Supplier fails to observe the same, its offer will be summarily rejected). 2. Pre-bid meeting will be held on 2nd Feb (4:30 PM) at TSH lounge. 3. Both technical and commercial bids (in separate envelops) has to be submitted by12:00PM on 5th Feb 2015. 4. No FIM will be supplied by the BARC. 5. Taxes and excise duties shall be quoted separately. Form AF/H if required shall be provided. 4. The quotation must reach Head, IADD, Van-de-Graff Bldg, BARC on or before 05/02/2015 at 1200 hrs and must be sent in a sealed envelope superscribed with the reference number and due date given above. 1. The quotations and the envelopes must be addressed to: Head Ion Accelerator Development Division, Van-de-Graff Bldg, BARC Trombay - 400085 2. The bidder should furnish the VAT, PAN and TIN numbers in their quotations without which the quotation will be rejected. 3. Head, IADD, Van-de-Graff Bldg, BARC reserves the right to accept/reject any or all quotations without citing any reason. 4. The bidder shall take an insurance policy against any material issued to him by the purchaser. 5. The fabrication work shall be subject to inspection by our representative. The finished components shall not be dispatched prior to the approval by our representative. Components that do not meet the desired geometric tolerances and other technical specifications will not be accepted. 6. The bidder shall deliver the finished components within 6 weeks from the date of is sue o f Work Order. The finished components and the scrap from the free issue material shall be delivered by the bidder at Van-de-Graff Bldg, BARC. 7. In case any further clarification is required, the bidders may contact at phone no. 25593598 Enclosures: 1. Technical Specification Tender Specifications for: Mechanical Design, Fabrication, assembly, inspection and supply of Alignment and support system for LEHIPA Cavities Mechanical Design, Fabrication, assembly, inspection and supply of Alignment and support system for LEHIPA Cavities Alignment and support system for LEHIPA Cavities (ASSLC): The Alignment and support system that will be developed under this PO will be used in the Low Energy High Intensity Proton Accelerator (LEHIPA) cavities. Support system provides a specific position to an object as well as provides mechanism for movement to change its coordinates. Whether it is machining operations, optics or nuclear experiments there is need of high precision locating system of varying nature according to need. Six-strut support is one of the popular methods which is versatile, accurate, and easy to install and use. LEHIPA cavities require stringent alignment and may need frequent adjustment. It needs to be supported at a fixed position accurately. The necessary design parameters are mechanical strength, positioning, alignment along beam path, resolution and range of movement. The design must fulfill all the given needs. The LEHIPA cavities need support, accurate alignment and adjustment in position. Six-strut support is very commonly used support system. The main objective is to design strut which 1. Provide support (without yielding/ buckling) to the LEHIPA cavities. 2. Raise the center of the LEHIPA cavities to 1.2 m (nominal) from the ground. 3. Give a alignment range of ± 10 mm in orthogonal directions and 2o in rotation. 4. Give a resolution of approximately 100μm (per 1/4th revolution of the collar. A typical alignment structure used for accelerators Page 2 of 5 Mechanical Design, Fabrication, assembly, inspection and supply of Alignment and support system for LEHIPA Cavities Table 1: Main ASSLC Parameters machining precision Machining accuracy of various parts of ASSLC Total allowance on height of top surface from ground surface with nominal height of struts Positioning accuracy of position of pins Perpendicularity of pins on the frame Total allowance for backlash in thread Clearance between LM guide and LM block ±20 µm Nominal ht ±200mm ±10 µm ±50µm 100 µm 5 µm or less I. SCOPE OF WORK The supplier has to deliver four numbers of six-strut type of ASSLC. a. b. c. d. Based on the reference inputs that are provided by the BARC, supplier shall prepare the mechanical design and solid model of ASSLC using solid-works. Manufacturing drawings shall be generated using this solid-works model. Before initiating manufacturing activities, these drawings and models must be submitted to BARC for approval. Procurement of raw materials from the reputed manufacturer as per, but not limiting to, the Error! Reference source not found. for all the components of the ASSLC has to be done by supplier. (No free issue material to be provided by the indenter). Testing of all the raw material as per the relevant ASTM standards. All test reports must be submitted to the indenter for the approval of material. Precision machining of all the components of the ASSLC. Machining should to be done ONLY on the high-precision, CNC machines. Components are listed below: e. 3 4 Component Frame(with screw jacks and support wheels) Struts(collor, intermediate rings and split nuts) I section Rod ends 5 LM guide 1 2 Material No. Mild steel 4 SS304L 24 SS304L 4 THK make NOS 16T and NOS (24+24)for use, 22T (4+4) spare Total (28+28) THK make, Model no - HSR 8(with 16 blocks) 30LRSS 6 f. g. h. i. j. k. CF-Rotatable Blank Flange SS304L 8 All the components of the ASSLC should be in stress-relived condition. Any operation, as and when required to achieve the same shall be the supplier’s responsibility. Corrosion resistant painting has to done on Frame (mild steel). The capacity of each support wheel should be 250kg or more. Metrology of all individual ASSLC components using a CMM. Assembling of all components of ASSLC should be demonstrated in front of indenter. The supplier is responsible for safe storage of all components in all intermediate stages, particularly with a view to avoiding nicks and scratches on the surfaces of the ASSLC components, and also to avoid surface contamination. Page 3 of 5 Mechanical Design, Fabrication, assembly, inspection and supply of Alignment and support system for LEHIPA Cavities l. Chemical composition test (by government approved lab) of CF-Rotatable Blank Flange as per the relevant ASTM standards to be done on all the flanges to confirm their grade and test report (of all the flanges) to be submitted for approval. Transportation of finished ASSLC has to be done to BARC, Trombay by the supplier. m. II. ACCEPTANCE CRITERIA Acceptance of each six struts support system segment will be in several steps, as detailed below: a. Drawings. All pre-machining / final drawings must have approval of the indenter before any machining can be taken up. b. Machining of struts. Once struts are machined, its functionality will be checked in the presence of the indenter. Only when indenter confirms that all the geometrical dimensions and surface finish have been maintained as per drawings, the components can be accepted for further assembly. c. Machining of frame, SS plate and other mounting assembly components. After machining of these components the supplier will provide the inspection report to the indenter for clearance. Once the indenter confirms that all the geometrical dimensions have been maintained as per drawings, then the components can be accepted for alignment. III. MATERIALS All the materials used for this work shall be fresh and of standard quality conforming to relevant ASTM standards and shall be procured from the reputed suppliers only. In no case reworked, refined or repaired materials shall be used as the starting material for any fabrication step. The materials undergoing fabrication procedures shall be protected against damage/distortion by mishandling, scratches, denting or effects of weather. Fasteners and fixture materials All the fasteners for use in this work shall be made of stainless steel materials conforming to IS-1367/ASTM A193 and from high-strength grade. IV. Quality Control 1. Quality Control for Materials All materials procured and used by the Supplier shall conform to the applicable material specifications. Materials conformity shall be checked with the accompanying mill and laboratory test reports/certificates and if required, additional checks shall be conducted by accredited laboratories. 2. Quality Control for dimensional accuracy & surface finish Reference temperature for specified dimensions of ASSLC is 250C. For inspection measurements, the read out values shall be adjusted to this requirement. Page 4 of 5 Mechanical Design, Fabrication, assembly, inspection and supply of Alignment and support system for LEHIPA Cavities (a) Dimensional accuracy of the ASSLC components shall be checked on a calibrated coordinate measurement machine (CMM), of accuracy better than 10% of the specified tolerance. (b) Surface finish of the components shall be checked with the calibrated roughness checking tester/meter for roughness value 1micron Ra of to those specified in the approved drawings. The measuring device shall be calibrated/ checked with the use of standard surface finish gages. V. QUALIFICATION OF SUPPLIER Tender will be process in two parts. Supplier shall submit the technical offer and commercial offer in two separate envelops. (Please note that technical offer shall have no commercial clauses. In case, Supplier fails to observe the same, its offer will be summarily rejected.) It is essential for Supplier to have the experience of developing high precision support and alignment system for accelerator applications. In this connection, supplier shall submit copy of purchase order along with the technical offer. In case, Supplier fails to observe the same, its offer will be summarily rejected. ------------------------- Page 5 of 5