Iron ore concentration plants PROJECT SUMMARY
Transcription
Iron ore concentration plants PROJECT SUMMARY
Project summary Kaunisvaara project, Sweden Northland Resources Kaunisvaara- Iron Ore Project, Sweden • 5 million tons per year of high grade Iron Ore Concentrate • Commissioning: - 2012 Line 1 - 2014 Line 2 • Approx. contract value 350 MUSD, 2 © Metso Date Author Title Kaunisvaara- Flowsheet 3 © Metso Date Author Title Kaunisvaara 4 © Metso Date Author Title Source: http://www.northland.eu/sv-se/projekt/kaunisvaara INTERNAL Kaunisvaara Site 5 © Metso Date Author Title Kaunisvaara- Scope of Supply Basic and detail engineering, project management, site management, site supervision, training, erection, commissioning 6 Main Metso process equipment: Other process equipment: • • • • • • • • • • • • • • • • • • • • • • • Primary crushers, MK54-75 Apron feeders SAG mills, 34’ Vertimills, VTM3000 Multislope screens Grizzly screens Magnetic separators Flotation cells, RCS200 Screw classifiers Slurry pumps Pressure filter, VPA 2040-54 © Metso Date Author Title Conveyors Cyclones Agitators Thickeners, HDT Air compressors Vibrating feeders, Big bag handling system Flotation air blowers Steelworks and plateworks Wearplate, rubber Piping Electrical instrumentation and automation Kaunisvaara- Timeline Time Line Design Engineering Study by Metso May 2008 Basic Eng. Contract Jan 2011 Long Lead Items Feb 2011 Main Contract Metso April 2011 Metso Access to Site April 2012 Mech Completion Line 1 Nov. 2012 First production of Iron ore concentrate Dec, 2012 Mech Completion Line 2 7 © Metso Date Author Title Q2 2014 Kaunisvaara Process Guarantees Grade Recovery Capacity Feed Capacity Comminution Moisture content in conc. 8 © Metso Date Author Title Kaunisvaara – LCS Involvement Integration with LCS • Early involvement from LCS in design, include global experience from LCS in how to improve plant design in order to minimize down time. • LCS involvement in erection and commissioning gives smooth transfer from project to operations. • Per ton basis for LCS contract for maintenace of all equipment • Lower Capex due to spare and wears included in LCS (for example mill liner handler) • Higher plant availability • Lower overall operating costs 9 © Metso Date Author Title The End 10 © Metso Thank You © Metso