Company Profile - OptiPower Projects
Transcription
Company Profile - OptiPower Projects
Company Profile 239 Broadlands Road Strand 7140 RSA Tel: +27 (21) 845 6745 Fax: +27 (21) 845 5264 www.optipower.net OptiPower Projects (Pty) Ltd was initiated and registered in 2001 by the current CEO Andre Swart. OptiPower also achieved the “Transmission” and “Distribution” Black Economic Empowerment Status on Eskom’s vendor list. (Eskom Megawatt Park) as a SMME, Vendor No: 11045781, and also achieved the Approval on the Western Cape Supplier Database, incorporating the City of Cape Town and Western Cape Provincial Government, Registration No: OPTI004TRW, As well as eThekwini (Durban) and many various other municipalities. The aspiration and drive to provide a Quality turn-key solution to all aspects within the High, Medium and Low voltage Powerline, Substation and Fibre Optic networks industry, is a commitment enforced by OptiPower’s top management. The company is committed to uplifting previously disadvantaged communities and firmly believes in the continuous training of its whole workforce, hence investing generously by embracing the South African Governments SD&L initiatives. All the permanent Site Personnel are trained in many statutory requirements such as Eskom’s ORHVS, Occupational Health and Safety certification to enable them to work to the Safety Standards that empowers the individuals as authorized persons on Substations, Overhead Powerlines and Fibre Optics. Optipower also have its own in-house Engineering department that offers Assistance in design and specialized construction solutions to its customers. Background Motivation to enter the industry was due to the lack of Broad-based Black Economic Empowered Companies within the Western Cape, and to contribute and pass the experience gained from decades of transmission line related project participation within ABB South Africa. The company started off with the installation of Overhead and underground Fibre Optics cables and advanced to turnkey construction of Powerlines and Substations. OptiPower's Mission: Committed to maintain our position as a market leader, through sustainable growth, excellent customer service and dedicated team work, while providing a challenging, rewarding and safe working environment for our employees. OptiPower's Vision: Incrementally increasing our Revenue, Assets and profitability through improved productivity, strong leadership, and upliftment of our employees, without compromising on Health and Safety, Environmental and Quality. Our Core Business consists of: Construction of MV and HV Substations (Distribution and Transmission). Construction of Overhead and Underground Fibre Optic networks including testing and fault finding (OPGW, ADSS). Assist in Design of Fibre Optic on existing Powerlines (OPGW & ADSS) Construction of Photovoltaic Farms Other area’s that we specialize in: Assessments, Refurbishment and Maintenance of MV and HV Power Lines (Distribution and Transmission). Assessments and Refurbishment of MV and HV Substations (Distribution and Transmission). Demolishing of existing HV Substations and Power Lines MV Reticulation Networks. Core Business Construction of MV and HV Power Lines (Distribution and Transmission). Company Organogram Management Team • • • • • • • • • • • • • • • • • • • • • • • • • • • • Puller Winch: Tema 5t; twin conductor capability 1 Puller Tensioner 5t; twin conductor capability 1 Puller Tensioner 8 & 9ton; ZECK - Triple conductor Capability 2 Tensioner 9ton; ZECK - Triple conductor Capability 3 Puller 16Ton ZECK 3 Tesmec Puller 3.5 ton 1 Tesmec Tensioner 3.5 ton 1 Zeck Tensioner 4 ton 1 Zeck Puller 4 ton 1 Tesmec Press 130t 10 Compression Dies 150 Mobile Drum stands - Hydraulic 25 Running blocks, 400 Slings, 3000 Pilot rope (12mm 4km; 16mm 8km; 18mm 8km & 22mm 8km) Water tanks – Truck mounted 4 Samag, Truck, 190, 4x4, c/w 12t crane 4 General Purpose 4x4 Truck, 1517, c/w 10t crane 15 General Propose Double Diff, 22-19; 12t, c/w 15ton 4 20-25Ton Rough Terrain Mobile Cranes 4 45t Rough Terrain Mobile Cranes 1 75t Rough Terrain Mobile Cranes 2 90t All Terrain Mobile Crane 3 Bobcat 3 Bulldozer 4 Unimog 3 MAN 4x4 Truck, c/w 14t crane 2 TRUCK TRACTOR Horses 8 Truck with Crane 4x4 30 Truck without Crane 25 LDV, 4 x 4, 1t 75 • • • • • • • • • • • • • • • • • • • • • • • • • • • • Tractor 4x4 6 12m Trailer, c/w 34t crane 3 Personal carriers 25 Ablution Trailer 28 Lowed Trailer 6 5-30 ton Trailer 10 6m Trailer (16ton) 4 Low bed (32ton) 2 JCB 24T/33T Excavator 2 Excavator 20t; PC200-5 2 Foundation V-Blocking Props 85sets Shuttering 850m³ Complete Rock Drill incl. 2 Compressor (Dia 100mm / 400mm) Auger Drill - Truck Mounted (Dia100mm to 500mm) 2 4x4 digger loader 10 4x4 – 4.5m³ Self Batching Concrete Mixer 5 4x4 – 6m³ Concrete mixers 4 Cherry Picker (10m Reach/ 500kg) 3 Vibrating Rammers 30 Compressor 250CFM + Jack Hammers & Drills 10 complete set Generators 8 Safety equipment. 15 Sets Earthing sets 24 Splicing and OTDR Testing Equipment 3 complete set Recordable Dynamometer 4 Site Accommodation for 700 people 4x4 Tele handlers 5 (Offices, Barracks, Cravans, Toilettes, Stores etc…) We have fully trained Tension Stringing/Regulation teams available, consisting of Site Managers, Site Foreman, Operators and Linesmen. Even though the majority of Linesmen are generally contract workers, they are subjected to all training required by OSH, Construction regulations, law, and Clients requirements. Plant & Equipment • • • Qualified Engineers ORHVS Authorized FOA Certified Technicians Qualified SHEQ Officers x7 x12 x3 x12 Qualified Staff OptiPower Head office consists of in excess of 7000m2 Industrial lands with 600m2 under roof stores and offices in Strand, Western Cape: 239 Broadlands Road Industrial Area. Geographically this office services the Western Cape, Eastern Cape, Orange Free State & Northern Cape. This office houses: OptiPower CEO Office Operations Directors Office All accounts and HR Project management - Secondary Bid proposals – Secondary Depot and Stores - Primary In Gauteng, we have a 2.2 Ha land, in easy access to OR Tambo International Airport, that have been developed to suit our depot yard and professional office requirements and serve our client base in the Johannesburg metropolis. Address: 136 Empire Rd, Bartlett. This office services Gauteng, Mpumalanga, Kwazulu Natal, NW Province & Limpopo This office houses: • • • • • Director’s office for Projects Director’s office for Bid Proposals Project management - Primary Tender / Bid proposals – Primary Depot and Stores - Secondary OptiPower Operates in all areas of South Africa , and are currently constructing in neighbouring African countries as well. Premises & Presence • • • • • • Auditors Accounts & Financials OptiPower is audited by AF Gatonby & Co, and outsource all accounting work to Technical Financial Services. Our Internal accounts department handle all basic accounting work, Debtors & Creditors. We have a valid and cleared Tax Certificate. Overhead Transmission Lines from Distribution (33kV) to the higher transmission voltage levels (400kV). • The vast majority of experience gained from previous contracts, whilst in the employment of Eskom and ABB, ranging from Engineering, Project Management to Site Management. • A few recent projects participated and completion by OptiPower includes: • • • • • • • • • • • 132kV Mizpah Masinga (Eskom) 400kV Gautrain Tower heightening (Eskom) 132kV Firgrove – Lourensriver (Eskom) 66kV Vryheid - Riviersonderend (Eskom) 220kV Gingindlovu Loop In / Out (Eskom) 66kV Bluedowns Esethu Line (Eskom) 66kV Mpilo Line (Eskom) 400kV Ingula Loop In Project (Eskom) 400kV Eros Vuyani (Eskom) 400kV Hendrina Gumeni (Eskom) 132kV Melkhout Kouga (Eskom) Powerlines Portfolio • High Voltage Transmission & Distribution Overhead Lines Company City Of Cape Town Year 2007 Eskom Transmission 2008 /2009 Eskom Distribution Eastern Region 2008 / 2009 Eskom Distribution Western Cape 2009 Eskom Distribution Western Cape 2010 Eskom Distribution Western Cape 2010 Mr. Miliswa Beqezi +27 21 980 3966 Eskom Distribution Western Cape 2010 Ms Miliswa Beqezi +27 21 980 3966 2010 / 2011 Mr. Bheki Hlengwa +27 83 944 6288 Eskom Distribution Western Cape 2011 Mr. Nico Schoeman +27 83 658 9990 CVG Consulting Engineers (Eskom) 2011 Mr. R. van Greunen +27 31 764 3301 Eskom Transmission PDP Division Contract City of Cape Town: 132kV Twin Conductor, Double Circuit Koeberg - Aurora, and Grassridge : Re-Insulation of Various 400kV Lines, in the Western Cape Region Mizpah – Masinga: 132kV Line 50km, Rough terrain Croydon Olive Estate: 132kV Twin Conductor, Double Circuit –N2 Crossing Firgrove – Lourensriver : 132KV – Double Circuit Monopole Line – Twin Kingbird Mpilo-Spine: Supply & construction of a new 3.5km 66kV Single Circuit Monopole Line - Works through Khayelitsha informal settlement Bluedowns Esethu: Supply & construction of a new 4km 66kV Double Circuit Monopole Line Ingula – Venus: Loop-In 400KV Overhead Transmission Line – Quad Zebra - Part of the Ingula pump storage scheme development Vryheid – Riviersonderend: 50km Single Circuit 66kV Line - Through Cape winelands 275kV Turn-In Lines at Gingindlovu and 275 / 88 / 22 / 11kV Substation Works – Works through Sugar cane plantation Powerline Experience Reference Mr. Edgar Capes +27 21 9187097 Mr. Piet Greyling +27 21 915 2111 Sugan Naidoo +27 31 710 5293 Mr. Max Jacobs +27 21 980 3918 Mr. Max Jacobs +27 21 980 3918 High Voltage Transmission & Distribution Overhead Lines Company Reference Eskom Transmission Bellville 2012 Roger Peense +27 21 915 9205 Eskom Transmission PDP Division 2012 / 2013 Sugan Naidoo +27 31 710 5293 Eskom Transmission PDP Division 2014 Wimpie White +27 11 800 5979 Eskom Distribution Eastern Cape & Aurecon 2014 Johan van der Westhuizen +27 43 721 0900 Contract Foundation refurbishment: Aries - Kokerboom 400kV Line – Switching Stay wire under live conditions Eros – Vuyani Section B: 400kV Transmission Line , 70km trough extremely rough terrain, most difficult Tx Line to date in South Africa Hendrina Gumeni Section B - 400kV Transmission Line , 40km Passing through mine colliery – Currently under construction. Melkhout – Kouga 132kV Line Phase 2 - 20km. This project forms part of the Kouga Wind farm and development project. – Currently under construction Powerline Experience Cont.… Year MIZPAH – MSINGA 132kV LINE: Build a Kingbird 132kV Line from the existing (Tower 33) Double Circuit Line located 10.7km from Mizpah Substation to the new Masinga Substation INGULA 400kV TURN IN LINE: The construction of a 400kV, 11.5km, From Ingula Pump Storage Scheme to Turn In Point (Intersection of Majuba Venus 400kV Line) EROS VUYANI 400kV LINE: The construction of a 400kV, 77km, From Tower #211 to Vuyani Substation VRYHEID – RIVERSONDEREND 66kV LINE: The construction of a 66kV Monopole Line, 40km, From Vryheid to Riversonderend Substation • • • • • • • Duinzicht Substation Upgrade (Petro SA) Khayelitsha Substation Refurbishment (Eskom) Mpilo Substation 66kV/11kV (Eskom) Klapmuts Substation 132kV/66kV (Eskom) Vredeluslus 132kV/33kV (Eskom) Hermanus Substation (Eskom) Substations Portfolio • • • • • • OptiPower Projects initially launched the Sub-station Division in 2007, and its first substation project (Duinzicht Substation) was completed within the same year. Subsequently various turnkey substation projects were completed successfully. This division has received high accolades from clients on its substation design department’s experience. Turnkey construction of Substations from 11kV to 400kV. Upgrading of existing substations Refurbishment List of substations projects completed to date include: High Voltage Transmission & Distribution Overhead Lines Company Eskom Distribution Western Cape Eskom Distribution Western Cape Eskom Distribution Western Cape & Aurecon Reference Contract 2008 Mr. Eric Gilfillan +27 11 638 3230 Duinzicht Substation: 66kV Feeder bays install and commission for generating Plant at Petro SA – Mosselbay. 2008/2009 Ms Miliswa Beqezi +27 83 522 1986 Khayelitsha 132kV Substation: Installation and Commissioning of new Equipment 2011 Ms Miliswa Beqezi +27 83 522 1986 2011 / 2012 Dirk Weideman +27 21 526 6917 Eskom Distribution Western Cape 2012 / 2013 Shantal Gordon +27 27 213 3944 ABB South Africa 2013 Colin Elliot +27 10 202 5179 Mpilo Substation: Installation and Commissioning of 66kV Upgrade Klapmuts 132kV Substation: Complete supply and construct greenfield substation, 2x 20MVA. Contract in Klapmuts, Near Paarl Vredelus132kV Substation: Complete supply and construct greenfield substation, 1x 10MVA 132/11kV and 1x 10MVA 132/22kV. Contract in near Vredendal in the Northern Cape. Hermanus Substation – Substation electrical and mechanical works Group5 / Iberdrola 2013 Alberto Lopez - Pando Novoa +34 91 713 3307 KLIPHEUWEL SUBSTATION - Complete supply and construct greenfield substation for Dassiesklip Windfarm. Group5 / Iberdrola 2013 / 2014 Alberto Lopez - Pando Novoa +34 91 713 3307 Eskom Distribution Eastern Cape 2014 Vuyisile Lloyd +27 83 749 6570 NOBELSFONTIEN SUBSTATION - All electro mechanical Works for Noblesfontein wind farm. Currently constructing Melkhout Capacitor Bank - Control room, platform Extension and preparation of capacitor Bank Bay – Project in Humansdorp – Project currently under construction Substation Experience Anglo American Year High Voltage Transmission & Distribution Overhead Lines Company Year Reference 2014 Brandon Naidoo +27 11 800 3515 ABB South Africa 2013 / 2014 Colin Elliot +27 10 202 5179 Substation Experience Cont... Eskom Transmission Contract Grassridge Substation – Construction of 132kV Feeder bay. Project is in Port Elizabeth- Currently under construction Witkop Substation – Complete supply and construct greenfield substation, 2x 20MVA. Contract in Polokwane. Currently under construction KHAYELITSHA SUBSTATION - Installation and Commissioning of 66kV Upgrade MPILO SPINE - Supply & construction of a new 3.5km 66kV Monopole Line & Refurbishment of 66kV Substation KLAPMUTS SUBSTATION – Complete Construction of 132kV Substation VREDELUS SUBSTATION – Complete Construction of 132kV / 11kV Substation KLIPHEUWEL / DASSIESKLIP SUBSTATION – Construction of 132/22kV Step-Up Substation for Iberdrola • • Fibre Optics Portfolio • • • • • • • • OptiPower Projects initially started out as its core business to install fibre optics on overhead lines OptiPower has ensured that we skill ourselves with trained and experienced staff which are certified by the Fibre Optic Association of South Africa (FOA). Teams are readily available for any emergency repairs and maintenance. Turnkey Installation of all Fibre Optic Types Specialist Splicing and Testing Emergency repair work Fibre Optic Design Work Fault locating Patching Assisting in the Commissioning of Fibre Optic network with an approved specialist Fibre Optics (OPGW & ADSS) Year Eskom 2007 Eskom 2007 Eskom 2008/2009 Eskom 2009 Eskom 2009/2010 Eskom 2009/2010 Eskom 2010 Eskom 2011/2012 Eskom 2012 Eskom 2012 Reference Mr. Neil Bodger +27 82 895 1363 Contract Mizpah- Masinga Project: 132KV S/C 45km; Extreme Difficult Terrain Mr. Sugan Naidoo +27 82 784 2491 Gautrain Project 275kV D/C: New Strain Structures; OPGW; Increase Height for Gautrain Project. Mr. Attie van Wyk +27 82 887 2070 Mr. Pine Pienaar +27 21 980 3911 Mr. Egon Davids +27 82 553 7090 Mr. Mansoor Barday +27 21 980 3911 Mr. Jeffrey Jacobs +27 21 915 1148 Mr. Naj Moodley +27 11 800 4446 Mr. Derrick Woolley (HERMES) +27 827699270 Mr. Vince De Bruin (MERCURY) +27 836330843 Laurianne Van Zyl +27 82 493 7585 Stellenbosch – Lyndoch: Supply, installation and testing of OPGW Acacia - Montague Gardens: Supply, installation and testing of OPGW Briers: Supply, installation and testing of Supply, installation and testing of 6km OPGW Romansrivier - Boskloof : Design, Supply, installation and testing of OPGW Acacia – Ascot Substation: design, supply, install & testing of a 4.77km greased OPGW Supply, delivery off-loading & installation of fibre optic cable at Mercury, Perseus & Zeus Substation Hermes – Mercury 400Kv Line: Remove existing redundant OPGW, install free issue OPGW, test & install hardware for OPGW OPGW on Windmill 3 - Paarl 66kV line Fibre Optic Experience Company Fibre Optics (OPGW & ADSS) Year Reference Mr. Attie van Wyk +27 82 887 2070 Mr. Ted Brander +27 21 763 5615 Mr. Mansoor Barday +27 21 980 3911 Mr. Ryan De Leeuw +27 21 980 3911 Mr. Pine Pienaar +27 21 980 3911 Eskom 2008 City Of Cape Town 2009 Eskom 2009 Eskom 2009/2010 Eskom 2010 Eskom 2010 Mr. Ebrahim Ismail +27 21 980 5475 Broadband Infraco 2010 Mr. Rama Pillay +27 11 235 1678 Eskom 2011 Eskom 2012 Eskom 2013 Mr. Irvin Tyambetyu +27 73 723 0275 Aldrey Africa +27 22 713 5200 +27 83 953 2559 Nevin Nel +27 41 994 8620 Contract George – Blanco: Supply, installation and testing of ADSS 66kV Double circuit 16km City of Cape Town: Supply, installation and testing of ADSS Fibre install over informal settlement Knysna – Eastford: Design, supply, installation and testing of ADSS 5.2km Stikland – Eversdal: Design, supply, installation and testing of ADSS 7.2km Serepta – Belhar: ADSS Replacement 5.5km Acacia third transformer bay project Substation – supply, installation, splicing, testing & commissioning of Fibre Optic cable Grahamstown: Fibre Optic installation & testing & handover for 2km of underground & 10km of aerial construction Helmond Substation: Installation of 11kV cables & terminals, Supply & installation of Fibre Optic Cable Design, Supply, installation and testing of ADSS Fibre Optic Cable between Wellington-Windmill substation Neptune – Aloe Glen – Royston :Supply, installation and testing of ADSS Fibre Fibre Optic Experience Cont.… Company COPPERBELT ENERGY CORPORATION OPGW (OPTICAL FIBER GROUND WIRE) INSTALLATION - Installed approximately 520km of OPGW to replace a section of the Current Guard wire, which runs along CEC’s 220kv and 66kV power network throughout the Copperbelt. Grahamstown ADSS - Perform Design Engineering work, Fibre Optic installation & testing & hand-over for 12km of underground & 20km of Aerial construction Ascot Acacia 66kV OPGW - DESIGN, SUPPLY, INSTALLATION AND TESTING OF A 10KM GREASED OPGW EQUIVALENT TO CHICKADEE CONDUCTOR BETWEEN ACACIA – ASCOT SUBSTATION 66KV LINE HERMES – MERCURY 220 kV OPGW - Remove existing redundant OPGW; Install free issue OPGW; Supply and Install hardware for OPGW on the Hermes- Mercury 400kV Line. The line length is approximately 50km, gantry to gantry. In Mid 2013, OptiPower Projects were approached by ABB South Africa to assist in the construction of Soutpan PV Farm Scope of work included the following: – – – • • Install of Steel Footing (Including all foundation drilling) Install complete tracker system Install all PV panels and wiring Due to our resilience on site ABB South Africa had furthered our scope to include civil works and Collector blocks OptiPower is currently generating the capacity and resources to form a specialized unit to continue in the construction of PV Farms and the associated works PV Farm Portfolio • • Soutpan Photovoltaic Farm – Complete construction of all trackers and PV Panels, Including Civil Works and collector system. Our Clients • Ashley Soobramoney +27 83 558 0527 [email protected] • Andre Swart +27 83 300 6399 [email protected] • Willie van der Merwe +27 83 560 5730 [email protected] • Kevin Mc Cabe +27 82 562 3920 [email protected]