Project Review Deadlines - North Carolina State University

Transcription

Project Review Deadlines - North Carolina State University
Facilities Division
Projects (in order by review deadline date)
Biltmore First Floor Labs
Project Number: 201420003
Code: 41324 Item: 305
Items in Review Package:
 Drawings
 Design Narrative
Disciplines requiring review: Electrical HVAC
Plumbing Architectural Civil Structural Floor plan
changes Landscaping Fire Alarm Roofing Security
Scope of Project: Lab Renovation: Architectural, MEP,
ACM Abatement
This project will improve the quality, functionality, and
adaptability of Biltmore Hall’s first floor lab area on the
south side of the building. The complete renovation will
encompass rooms 1026, 1001, 1002, 1004, 1005, 1006,
1007, and perimeter corridor 1000. The project will involve
architectural and MEP design, including ACM abatement.
Rooms 1001, 1002, 1004, and corridor 1000 shall be
renovated into flexible lab and office space to support
future College of Natural Resources research projects. A
new east-west corridor shall be located north of the
majority of the renovated area. Room 1026 shall be
renovated to provide work space, and field & instructional
equipment storage and check out to support the college’s
teaching lab functions. Rooms 1005, 1006 and 1007 shall
be renovated to labs to support existing college research
projects.
Review documents for the CD phase are available
for review in file slot #5 in the Design Plan Review area
located in the Admin. Services III Building, 2701 Sullivan
Drive, Room 324.
Please email your comments to the Project Manager no
later than the due date for inclusion in NC State's
response to the designers.
Current Phase
Design Phase:
CD
Review Deadline Date
Comment Due Date:
Wednesday, March 25, 2015
(no later than 5:00 pm)
3/23/2015
Project Manager
David Hammock, PE,
LEED AP BD+C
NC State University
Capital Project Management
Phone: 919.515.2030
[email protected]
Facilities Division
Projects (in order by review deadline date)
Farmers Market Park and Ride Lot
Project Number: 201311118
3/23/2015
Current Phase
Design Phase:
Construction
Documents
Review Deadline Date
Comment Due Date:
Friday, March 27, 2015
(no later than 5:00 pm)
Project Manager
Edgar W. Levy, PE
Project Manager
NCSU
Design and Construction Services
2701 Sullivan Drive Suite 300,
Campus Box 7216
Raleigh, NC 27695-7216
office: (919)513-7870
[email protected]
Design Phase:
Master Planning
Comment Due Date:
Friday, March 27, 2015
Damian Lallathin
Project Manager, Engineering
North Carolina State University
Capital Project Management
Ph - 919-513-0373
Email - [email protected]
Items in Review Package:
 drawings
 project manual / specifications
 cost estimate
Project Scope Description: The documents in review
reflect recent review comments made by Duke Energy
regarding compliance with their high power line utility
easement as well as comments made by City of
Raleigh regarding removal of the storm water pond
from the project scope. The project will modify the
existing south side surface parking lot at the
State Farmers Market along Centennial Parkway in
Raleigh, North Carolina, proximate to the NCSU
Centennial Campus for a weekday park-and-ride facility.
The project will reconfigure and add to existing parking
areas; approximately 205 parking spaces. The project will
also include a bus shelter, lighting, landscaped concrete
curb and gutter, pedestrian walkways, chain link perimeter
fence and gate and an access road connection to Lake
Wheeler Road.
Review documents for the Construction Document
resubmittal are available for review in file slot #8 in the
Design Plan Review area located in the Admin. Services
III Building, 2701 Sullivan Drive, Room 324.
Please email your comments to the Project Manager, no
later than the due date inclusion in NC State's response to
the designers.
North & Central Campus Precinct
Electrical Distribution Master Plan
Project Number: 201320007
Code: 40724 Item: 312
Items in Review Package:
 Master Plan Final Report
Scope of Project: This project will develop a
comprehensive electrical system master plan for the North
and Central Campuses (Main Campus).
Plans & Specifications for the above project have been
received and are available for viewing in the Plan Review/
Library, file slot #2, located in the Administrative Services
III Building; 2701 Sullivan Drive, Room 324.
Please email your comments to the Project Manager no
later than the due date for inclusion in NC State's
response to the designer.
Facilities Division
Projects (in order by review deadline date)
GIS Needs Assessment Implementation Plan
3/23/2015
Current Phase
Design Phase:
Study
Review Deadline Date
Comment Due Date:
Wednesday, April 1, 2015
Project Manager
David Wynne
GIS Leader
NC State University
Office of the University Architect
Campus Box 7519
2701 Sullivan Drive - Suite 300
Raleigh, NC 27695-7519
[email protected]
Design Phase:
90% CD
Comment Due Date:
Thursday, April 2, 2015
(no later than 5:00 pm)
Angela Lord RA
Classroom Program Manager
Design and Construction Services
2701 Sullivan Drive, Suite 300
CB 7216
Raleigh, NC 27695-7216
919-515-8066
919-602-3458 cell
919-515-4253 fax
[email protected]
Project Number: 201422023
Items in Review Package:
 Study
 Comments Review Sheet
Project Description: To determine GIS needs in the
Facilities Division and to produce a strategic plan to
implement an enterprise GIS in support of each
departments mission.
Please review the study and provide comments. The
document for this project is attached and also available
for review in file slot #1 in the Plan Review Room located
in the Administrative Services III Building, 2701 Sullivan
Drive, Room 324.
Please email your comments to the Project Manager no
later than the due date.
EB II 1230 DELTA Classroom
Renovation
Project Number: 201411102
Items in Review Package:
 Drawings
 Construction Cost Estimate
Scope of Project: This project increases the seat capacity
of the classroom and increases and improves view angles
for students. The project includes refreshing and updating
the AV equipment in the classroom to meet current needs.
Please note that the study review time has been
accelerated to 10 business days.
Review documents for the above project are available for
review in file slot #4 in the OUA/DCS Plan review area
located in the Administrative Services III Building, 2701
Sullivan Drive, Room 324.
Please email your comments to the Project Manager no
later than the due date for inclusion in NC State’s
response to the designer.