Runway 9Râ27L Comprehensive Maintenance Project
Transcription
Runway 9Râ27L Comprehensive Maintenance Project
Chicago Department of Aviation Bi d Opportuni ty Runway 9R‐27L Comprehensive Maintenance Project for O'Hare International Airport The City of Chicago Department of Aviation has issued a bid opportunity for the following project: Runway 9R‐27L Comprehensive Maintenance Project for O'Hare International Airport Specification Number: 131388 RFQ Number: 98511 Advertisement Date: April 8, 2015 Description: The project is located at O'Hare International Airport and includes a bituminous milling and overlay of Runway 9R‐27L and adjacent taxiways, removal of existing taxiway pavement, and removal of existing airfield lighting systems and replacement with new. Pre‐Bid Conference Location: O'Hare International Airport Aviation Administration Building 10510 W. Zemke Road‐2nd Floor Conf. Rm. #1 Chicago, IL 60666 Date: April 15, 2015 Time: 10:00 AM C.S.T. Questions Due: April 16, 2015 at 5:00 PM C.S.T. Bid Opening Date: April 28, 2015 at 11:00 AM C.S.T. The bid document is available at the Bid and Bond Room, City Hall, 121 N. LaSalle Street, Room 103, Chicago, IL 60602 To view other bids with the City of Chicago, Department of Procurement Services go to: http://www.cityofchicago.org/city/en/depts/dps.html To view other bids with the City of Chicago Department of Aviation go to: http://flychicago.com/BusinessInformation/DoingBusiness/Default.aspx Forw ard th i s emai l This email was sent to [email protected] by [email protected] | Update Profile/Email Address | Rapid removal with SafeUnsubscribe™ | Privacy Policy. Chicago Department of Aviation | 10510 West Zemke Rd | Floor 2 | Chicago | IL | 60666