CPCCCA3013A Install lining, panelling and moulding

Transcription

CPCCCA3013A Install lining, panelling and moulding
CPCCCA3013A Install lining, panelling and moulding
Element of
Competence
1: Plan and
prepare
2: Prepare
surface for
lining/panelling
3: Install
lining/panelling
4: Cut and fix
standard
architrave
mouldings
5: Clean up
Notes
Location of Element
Volume
Chapter
1: Basics of
1: Work health and safety
Construction &
4: Trade calculations and
Framing
drawing
5: Carpentry hand tools
and basic timber joints
2: Advanced
Construction &
Carpentry Skills
2: Advanced
Construction &
Carpentry Skills
2: Advanced
Construction &
Carpentry Skills
2: Advanced
Construction &
Carpentry Skills
Section
Full chapter
Full chapter
Worksheets & Tasks
Book
Chapter Questions/Tasks
1
1
Completed
1
4
Q: 1, 2, 3, 4, 5, 10
1
5
Q: 1, 2, 4, 5, 6, 7, 8, 9,
10
6: Electric power tools
7: Timber fastenings
Personal protective equipment (pg.53)
Measuring and marking equipment (pg.53)
Hand saws (pg.56)
Chisels (pg.61)
Basic timber joints (pg.63)
Hammers (pg.67)
Bench planes (pg.68)
Workbench (pg.75)
Clamps (pg.78)
Full Chapter
Full chapter
1
1
6
7
Q: 1, 3, 5, 6, 7, 8, 9, 10
All questions
1: Work health and safety
Full chapter
2
1
Completed
5: Internal fixing
Interior wall sheeting (pg.40)
Timber panelling (pg.41)
Wet area lining systems and waterproofing
Interior wall sheeting (pg.40)
Timber panelling (pg.41)
2
5
Nil
2
2
6
5
Q: 5
Nil
Trims (pg.49)
Mouldings (pg.124)
Joining mouldings (pg.125)
2
2
5
9
Q: 7, 8, 9, 10
Q: 8, 9
15
Q: 8, 9, 10
6: Internal linings
5: internal fixing
5: internal fixing
9: Curved work and
mouldings
2: Advanced
15: Approaches to
Legislation and sustainability (pg.198)
2
Construction &
sustainability in
Sustainability practices on the building site (pg.199)
Carpentry Skills
construction
Sustainability terminology (pg.200)
Pre-Requisite unit: CPCCOHS2001A Apply OHS requirements, policies and procedures in the construction industry
Construction Series, Bonnici et al, Copyright © McGraw-Hill Education Australia Pty Ltd
There is no specific instruction within any of the relevant chapters to address element 5 from this unit
Minimal information regarding the preparation for and installation of wall linings and panelling.
A full chapter (6) is dedicated to the preparation and installation of plasterboard which is not a specified material in the install lining, panelling and
moulding unit.
Construction Series, Bonnici et al, Copyright © McGraw-Hill Education Australia Pty Ltd