CPCCCA3013A Install lining, panelling and moulding
Transcription
CPCCCA3013A Install lining, panelling and moulding
CPCCCA3013A Install lining, panelling and moulding Element of Competence 1: Plan and prepare 2: Prepare surface for lining/panelling 3: Install lining/panelling 4: Cut and fix standard architrave mouldings 5: Clean up Notes Location of Element Volume Chapter 1: Basics of 1: Work health and safety Construction & 4: Trade calculations and Framing drawing 5: Carpentry hand tools and basic timber joints 2: Advanced Construction & Carpentry Skills 2: Advanced Construction & Carpentry Skills 2: Advanced Construction & Carpentry Skills 2: Advanced Construction & Carpentry Skills Section Full chapter Full chapter Worksheets & Tasks Book Chapter Questions/Tasks 1 1 Completed 1 4 Q: 1, 2, 3, 4, 5, 10 1 5 Q: 1, 2, 4, 5, 6, 7, 8, 9, 10 6: Electric power tools 7: Timber fastenings Personal protective equipment (pg.53) Measuring and marking equipment (pg.53) Hand saws (pg.56) Chisels (pg.61) Basic timber joints (pg.63) Hammers (pg.67) Bench planes (pg.68) Workbench (pg.75) Clamps (pg.78) Full Chapter Full chapter 1 1 6 7 Q: 1, 3, 5, 6, 7, 8, 9, 10 All questions 1: Work health and safety Full chapter 2 1 Completed 5: Internal fixing Interior wall sheeting (pg.40) Timber panelling (pg.41) Wet area lining systems and waterproofing Interior wall sheeting (pg.40) Timber panelling (pg.41) 2 5 Nil 2 2 6 5 Q: 5 Nil Trims (pg.49) Mouldings (pg.124) Joining mouldings (pg.125) 2 2 5 9 Q: 7, 8, 9, 10 Q: 8, 9 15 Q: 8, 9, 10 6: Internal linings 5: internal fixing 5: internal fixing 9: Curved work and mouldings 2: Advanced 15: Approaches to Legislation and sustainability (pg.198) 2 Construction & sustainability in Sustainability practices on the building site (pg.199) Carpentry Skills construction Sustainability terminology (pg.200) Pre-Requisite unit: CPCCOHS2001A Apply OHS requirements, policies and procedures in the construction industry Construction Series, Bonnici et al, Copyright © McGraw-Hill Education Australia Pty Ltd There is no specific instruction within any of the relevant chapters to address element 5 from this unit Minimal information regarding the preparation for and installation of wall linings and panelling. A full chapter (6) is dedicated to the preparation and installation of plasterboard which is not a specified material in the install lining, panelling and moulding unit. Construction Series, Bonnici et al, Copyright © McGraw-Hill Education Australia Pty Ltd