Convergence on Value Chain Enhancement for Rural Growth

Transcription

Convergence on Value Chain Enhancement for Rural Growth
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural
Growth and Empowerment Project (CONVERGE)
Design completion report
Main report and appendices
Document Date: 30-Dec 2014
Project No. 1547
Report No:
[Insert report number]
Asia and the Pacific Division
Programme Management Department
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Table of Contents
Currency equivalents
iii
Weights and measures
iii
Abbreviations and acronyms
iv
Map of the CONVERGE area
vi
Executive Summary
vii
Logical Framework
xiv
I.
II.
III.
IV.
Strategic context and rationale
1
A.
Country and Rural Development and Poverty Context
1
B.
Rationale
3
Project description
5
A.
CONVERGE area and target group
5
B.
Project Strategy
8
C.
Development objective and impact indicators
9
D.
Outcomes/Components
9
E.
Lessons learned and adherence to IFAD policies
14
Project implementation
16
A.
Approach
16
B.
Organizational framework
16
C.
Planning, M&E, learning and knowledge management
19
D.
Financial management, procurement and governance
21
E.
Supervision
22
F.
Risk identification and mitigation
23
Project costs, financing, benefits and sustainability
24
A.
Project costs
24
B.
Project financing
24
C.
Summary benefits and economic analysis
25
D.
Sustainability
25
Appendices
Appendix 1:
Country and rural context background
27
Appendix 2:
Poverty, targeting and gender
31
Appendix 3:
Country performance and lessons learned
37
Appendix 4:
Detailed Project description
43
Appendix 5:
Institutional aspects and implementation arrangements
51
Appendix 6:
Planning, M&E and learning and knowledge management
61
Appendix 7:
Financial management and disbursement arrangements
63
Appendix 8:
Procurement
91
i
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 10:
Economic and Financial Analysis
103
Appendix 11:
Draft Project implementation manual
107
Appendix 12:
Compliance with IFAD policies
109
Appendix 13:
Contents of the Project Life File
115
Appendix 14:
Agreed Action Plan and Timetable for IFAD Financing
116
Appendix 15:
Good Governance Framework
119
List of Figures
1.
2.
3.
Map of Project CONVERGE
Project CONVERGE Management and Implementation Structure
Funds Flow Chart
List of Tables
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
Logical Framework
Estimated project costs
Proposed project financing in USD
Philippines Country Data
2009 Official Statistics
ARC Clusters and Priority Crops
Target Group
Management Roles and Responsibilities
Project Management Staffing
Assessment of the Organizational Capability Training Needs
Project’s proposed procurement arrangements Procurement Accounts by Year
Procurement Plan for First 18 months
Cost Sharing Arrangements for Value Chain Investments
Financial and Economic Analyses – Rates of Return and Benefit Cost Ratios
Agreed Action Plan and Timetable for IFAD Financing
ii
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Currency equivalents
Currency Unit
=
Philippines Peso (PHP)
US$1.0
=
PHP 43.5
1 kilogram
=
1000 g
1 000 kg
=
2.204 lb.
1 kilometre (km)
=
0.62 mile
1 metre
=
1.09 yards
1 square metre
=
10.76 square feet
1 acre
=
0.405 hectare
1 hectare
=
2.47 acres
Weights and measures
iii
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Abbreviations and acronyms
ADSDPP
ARB
ARC
ARC-VIP
ADB
AFMA
ALDA
AMAS
APP
AWPB
B:C R
BTr
CADC
CADT
CAR
CARP
CHARMP-2
CLOA
CIP
CIS
COSOP
CRS
DA
DAR
DBM
DENR
DF
DOF
DTI
DOST
DPWH
FAO
FMR
GDP
GWPB
HDI
INREMP
IPs
IPRA
IRR
I-SHARED
LGU
MAO
MARO
MDGs
M&E
M&E/KM
MFI
MinDA
MIS
MIT
MoA
MoU
NCA
NIA
NCI
Ancestral Domain Sustainable Development and Protection Plan
agrarian reform beneficiary
Agrarian Reform Community
Agrarian Reform Cluster-Value-chain Investment Plan
Asian Development Bank
Agriculture and Fisheries Modernization Act
ARC Level of Development Assessment
Agricultural Marketing Assistance Service
Annual Procurement Plan
Annual Work Plan and Budget
Benefit Cost Ratio
Bureau of Treasury (Department of Finance)
Certificate for Ancestral Domain Claim
Certificate for Ancestral Domain Title
Cordillera Administrative Region
Comprehensive Agrarian Reform Programme
Second Cordillera Highland Agricultural Resource Management Project
Collective Certificates of Landownership Award
Communal Irrigation Project
Communal Irrigation Scheme
country strategic opportunities programme for 2010-2014
Catholic Relief Services
Department of Agriculture
Department of Agrarian Reform
Department of Budget and Management
Department of Environment and Natural Resources
Development Facilitator (DAR)
Department of Finance
Department of Trade and Industry
Department of Science and Technology
Department of Public Works and Highways
Forward Obligation Authority
farm to market road
Gross Domestic Product
Global Work Plan and Budget
Human Development Index
Integrated Natural Resource Management Project
Indigenous Peoples
Indigenous Peoples Rights Act
Internal rate of Return
Integrated Smallholders Agricultural and Rural Enterprise Development
local government unit
Municipal Agriculture Office
Municipal Agrarian Reform Officer
Millennium Development Goals
Monitoring and Evaluation
Monitoring and Evaluation/Knowledge Management
microfinance institution
Mindanao Development Authority
management information system
Municipal Development Team
Memorandum of Agreement
Memorandum of Understanding
Notice of Cash Allocation
National Irrigation Authority
National Convergence Initiative
iv
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
NCIP
NEDA
NGO
NMCIREMP
NPMO
NPSC
NSCB
ODA
OMA
OPAPP
OPIF
PADCC
PBAS
PCT
PDP
PIM
PO
PPMO
RaFPEP
RB-COSOP
RbME
RCT
RIMS
RPMO
RuMEPP
SAFDZ
SARO
SOE
SSO-FAP
SUC
TOR
UMFI
UNDAF
UNDP
USAID
WA
WMCIP
National Commission on Indigenous Peoples
National Economic and Development Authority
Non-Government Organisation
Northern Mindanao Community Initiatives and Resource Management Project
National Project Management Office
National Project Steering Committee
National Statistics Coordination Board
Official Development Assistance
Organisation Maturity Assessment
Office of the Presidential Adviser on the Peace Process
Organisational Performance Indicator Framework
Philippine Agricultural Development Commerce Corporation
performance-based allocation system
Provincial Convergence Team
Philippine Development Plan, 2011-2016
Project Implementation Manual
People’s Organisation
Provincial Project Management Office
Rapid Food Production Enhancement Programme
results-based country strategic opportunities programme
Results-based M&E
Regional Convergence Team
Results Impact Management System
Regional Project Management Office
Rural Microenterprise Promotion Programme
Strategic Agriculture and Fisheries Development Zones
Special Allotment Release Order
Statement of Expenditure
Support Services Office- Foreign Assisted Projects (DAR)
State University and College
Terms of Reference
Upland Market Foundation
United Nations Development Assistance Framework
United Nations Development Programme
United States Agency for International Development
Withdrawal Application
Western Mindanao Community Initiatives Project
v
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Map of the CONVERGE area
vi
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Executive Summary
Introduction
1.
In pursuit of the poverty reduction and agricultural development thrusts of the Government, the
Department of Agrarian Reform (DAR), with technical assistance from the International Fund for
Agricultural Development (IFAD), formulated and submitted to the National Economic and
Development Authority (NEDA), the Project CONVERGE to help improve productivity and income of
th
ARBs in 11 ARC Clusters in Regions 9, 10 and Caraga. On 29 November 2012, the NEDA Board
th
during its 9 meeting, approved Component A of Project CONVERGE or the Participatory Analysis
and Planning to Link Smallholder Farmers to Existing Value Chain Systems Component and
authorised DAR to use regular funds under the 2013 General Appropriations Act for the preparation of
investment plans that will serve as basis for decision by the NEDA Board to provide funds for the
implementation of the investment projects.
th
2.
On 20 May 2013, the Department of Budget and Management (DBM) approved the request of
DAR to use a portion of its Program Beneficiaries Development (PBD) funds under FY 2013 Budget
for PHP 27.29 million for the implementation of Component A. Hence, DAR engaged the services of
eligible and qualified consultants to provide technical assistance to prepare feasibility studies and
investment plans and for nine priority commodities in the 11 Agrarian Reform Community (ARC)
th
clusters. DAR submitted the completed feasibility studies and investment plans to NEDA on 14
January 2014.
3.
This revised project proposal contains investment plans for 11 commodities/agribusiness
projects prepared with the active participation of the target beneficiaries and with technical assistance
from value-chain consultants and the Department of Trade and Industry (DTI). The target
beneficiaries themselves identified the weaknesses and gaps and proposed appropriate packages of
activities to intensify production, improve productivity and identified the facilities and infrastructure
required. The resulting feasibility studies were the result of a participatory process involving valuechain assessment and planning, community consultations, site and stakeholders’ validation, research
and discussions with private sector companies.
Background
4.
The Government has long recognised that asset reform is a key to improving agricultural
productivity and reducing rural poverty and the Comprehensive Agrarian Reform Programme (CARP)
has been the Government’s principal comprehensive rural development programme for over twenty
years. The challenge is now how to optimise, scale up and sustain the gains made in the 2,116 ARCs,
with about 1.3 million agrarian reform beneficiaries (ARBs), and to extend the benefits to ARCs that
have yet to receive much development assistance so that they all can become part of the mainstream
rural economy. In search of a broad-based approach to reduce rural poverty, the government is
pursuing the National Convergence Initiative (NCI) to maximise resources available and synchronize
the initiatives of the three departments engaged in rural development: DAR, the Department of
Agriculture (DA), and the Department of Environment and Natural Resources (DENR). The NCI is
seen as a strategic development approach that can contribute to sustainable development in the rural
areas. Among the objectives are to: (i) promote sustainable agriculture and preserve the land
resource base; (ii) enhance the investment climate for agribusiness; and (iii) initiate climate change
adaptation and mitigation measures.
Rationale
5. The rationale for IFAD to help finance the project includes: (i) making use of the opportunities to
support the agrarian reform process and to help meet the needs of the underserved and un-served
ARBs through adopting a value-chain approach to enhance agricultural growth and agribusiness
development to maximise the benefits from the land distribution programme; (ii) support the
harmonization of the rural development efforts of DAR, DA and DENR and other agencies engaged
agri-business development to maximise the impact on rural poverty reduction; (iii) support the DAR
approach of clustering ARCs to realise economies of scale for production, access to markets and
service provision to benefit from value-chain development.
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Alignment with Government Priorities and IFAD Country Programme
6.
The project will contribute to the PDP’s goals for a competitive and sustainable agriculture and
fisheries sector through improved food security and increased rural incomes and supports the
government’s CARP. The project is part of the government’s NCI) which seeks to synchronize the
initiatives of the three departments engaged in rural development: DAR, DA and DENR and optimise
the use of resources available to support sustainable rural development. Linkages will be built with the
Department of Trade and Industry (DTI) under the Rural Micro Enterprise Promotion Programme, DA
under the Second Cordillera Highland Agricultural Resource Management Project and DENR under
the new Integrated Natural Resource Management Project, which was submitted to the IFAD
Executive Board in 2012. Lessons learned in the on-going and previous projects have been
incorporated in the design.
Project Area, Target Group and Targeting
7.
The project will target Regions IX, X and Caraga, located in the west, north and northeast of
Mindanao which are among the six poorest regions of the country. Within these three regions the
project will target 10 provinces selected using criteria that included incidence of poverty, presence of
organised ARC clusters, agricultural and agri-business development potential and availability of
services. Within these ten provinces the project will target 11 ARC clusters, including 93 ARCs in 715
barangays 48 municipalities. Selection criteria for the ARC clusters included a potential for further
agricultural and agribusiness development, availability of markets, availability of an ARC Cluster
Development Plan, commitment of the participating ARBs and availability of support services.
8.
The total size of the target group is an estimated 35,000 agricultural households including nonARC barangays and Indigenous People’s (IP) households of whom 30% are women headed
households. The major crops cultivated include coconut, rice, maize, coconut, rubber, banana, high
value vegetables, oil palm, coffee and cassava. Total area of crops in 2010 was about 216,000 ha.
Only about 7% of the land is irrigated within the ARC areas and only 5.8% of families have access to
irrigation. Many of the ARCs also have significant numbers of livestock and in particular, poultry. DAR
data indicates an average of 12 head of poultry per household overall and 1.6 head of other livestock.
Based on 2009 data the weighted average household income of the target ARCs was PHP 115,300
1
(equivalent to USD 490 per capita), of which PHP 73,500 was from Agriculture, PHP 17,000 was off
farm income and PHP 24,800 was non-farm income. This total is about 30% above the 2009 poverty
threshold for these three regions (PHP 87,500 p.a.), however, for 29% of the ARCs average income
was below the poverty line.
9.
Within the ARC clusters, the target beneficiaries will come from the above groups who are
involved in the value-chains selected, and willing and able to participate in project interventions. The
project will also target business development partners, including eligible farmers’ cooperatives and
associations (People’s Organisations or POs). This latter group can help take a leading role as
innovators in improving the returns from the existing and emerging value-chains in an enterpriseoriented development approach.
Project Strategic Focus and Strategy
10. The strategic focus of the project is rural poverty reduction through participatory value chain
development with the aim of helping improve the profitability of household farm enterprises in a
sustainable manner. The project strategy is to cluster a group of ARCs with similar agro-climatic and
socio-economic conditions to encourage business interactions among ARCs, disseminate better
technology, improve and consolidate production and marketing of commodities and establish
agribusiness so that farmers and farmers’ organisations can obtain the best prices for their products.
The objective is to enable the ARBs to become highly productive and competitive entrepreneurs and
to achieve broad-based rural economic growth. Within a cluster, development starts from the existing
ARCs where substantial development works have been implemented and expands to include other
ARCs and the non-ARC areas to spread the benefits of ARC development to greater number of ARBs
and other farmers. There exist opportunities to: (i) improve the quantity and quality of crop production
and the phasing of production to meet market demands in order to exploit comparative advantage and
earn increased profits at the farm level; (ii) add value to existing farm production through post-harvest
management; (iii) develop links within selected value chains between producers and buyers and input
1
Based on an exchange rate of PHP 43.5 per USD 1 and for 5.4 people per household.
viii
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
providers to enhance the profitability of the farm enterprises; and (iv) diversify incomes and minimize
risks for smallholders including women and IPs.
11. Specifically, the project will focus on the following commodities which were identified and
prioritised by the POs themselves and for which investment plans and feasibility studies have been
prepared:
Province
Zamboanga
del
Norte
Zamboanga del Sur
Zamboanga Sibugay
Bukidnon
Misamis Oriental
Camiguin
Agusan del Sur
Agusan del Norte
Surigao del Norte
Surigao del Sur
ARC Cluster
Zamboanga
del
Norte Resettlement
Cluster
Salug Valley Cluster
Name of Proposed Project
Integrated Rubber Enterprise
Salipyasin
ARC
Cluster
South
Bukidnon
ARC Cluster
Rubber Agribusiness Project
North
Bukidnon
ARC Cluster 1
MISORET
ARC
Cluster
LABACO
Cassava
Production
and
Processing Enterprise
Coconut Sugar Production
VETREBUNS ARC
Cluster
TUJAKITSAN ARC
Cluster
CLAGIBAPLA ARC
Cluster
BATA ARC Cluster
Intensified Rice Production and
Marketing
Muscovado Sugar Production
and Marketing
Abaca Fibre Production and
Marketing
Rice Production Processing
and Marketing
Abaca Fibre Production
Coconut and Bio fertilizer
Production and Marketing
Coffee Production Processing
and Marketing
Gender Strategy
12. The gender strategy includes: (i) the conduct of gender-responsive value chain analysis to
ensure that gender needs and issues will be identified during the preparation of the ARC-Value Chain
Investment Plans (VIPs); (ii) preparation of local gender action plans in collaboration with the
government agencies supporting CONVERGE and the local government units; (ii) advocate for the
incorporation of the gender action plans into the existing Gender and Development budgets of the
agencies; (iii) specific targets that 30% of the project beneficiaries and the members of the
management committees (POs etc.) will be women; (iv) promotion of equal opportunities for men and
women; and (v) M&E data and analysis is to be disaggregated to show the participation of men and
women and to show the roles of men and women in particular activities.
Development Objective
13. The overall goal of the project is to contribute to reducing the incidence of poverty in the ten
target provinces of Regions IX, X and Caraga, while the project’s development objective is that the
target group vulnerability reduced through crop diversification and increased farm income. The
expected impact and outcome indicators for the 35,000 households and 100 POs in the 11 ARC
clusters include: (i) average annual income increased; (ii) increased farm income derived from new
farming activities; (iii) increased ownership of household assets; and (iv) reduced prevalence of child
malnutrition.
Ownership, Alignment and Harmonization
14. The proposed project design is consistent with the Philippines Development Plan (PDP) 20112016, the IFAD’s strategic framework (2011-2015) and the IFAD country strategy (COSOP) for the
Philippines 2010-2014. The project supports the government’s CARP. The project is part of the
government’s NCI, which seeks to synchronize the initiatives of the three departments engaged in
rural development, DAR, DA and DENR and optimise the use of resources available to support
sustainable rural development and for an improved policy environment and governance. Project
ix
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
design complies with key IFAD policies relating to targeting, gender, Indigenous Peoples, private
sector and rural financial services. The project will complement other donors working in the same
sector, such as the Asian Development Bank, the Japan International Cooperation Agency and the
World Bank, to increase the impact of the investment from IFAD on poverty reduction and policy
dialogue with the government and other stakeholders. The project will explore different types of
partnership arrangements between the project beneficiaries and the private sector ensuring that such
arrangements are fair to farmers and ARC communities. Private sector organisations and business
development partners can help take a leading role as innovators in improving the returns from the
existing and emerging value-chains in an enterprise-oriented development approach.
Components and Outcomes
15. The project has three components; (i) Participatory Value-Chain Analysis and Planning; (ii)
Integrated Smallholders Agricultural and Rural Enterprise Development; (including the subdivision of
Collective Certificates of Landownership Award (CLOA)); and (iii) Project Management, Monitoring
and Evaluation and Knowledge Management.
Component A: Participatory Value-chain Analysis and Planning
16. Component A: Participatory Value-chain Analysis and Planning. The expected outcome of
this component will be that the value chain business development plans for selected crops are
validated and implemented resulting in improved farm income. This component will provide in each of
the 11 ARC clusters: (i) Validation of the proposals for value chain development as identified by the
feasibility studies; (ii) Identification of the gaps and inefficiencies in the value-chains and solutions and
investments required; (iv) Identification of POs (associations, cooperatives) and private sector
organisations wishing to participate and capable of participating in the value-chain development; and
(v) Updated ARC Value-chain Investment Plans (ARC-VIPs).
Component B: Integrated Smallholders Agricultural and Rural Enterprise Development
17. Component B: Integrated Smallholders Agricultural and Rural Enterprise Development.
The expected outcome of this component is improved production, value addition and marketing of the
selected agricultural commodities. Following the validation and selection of the priority value-chains
and locations, the project will facilitate and finance the development of the value-chains, with two subcomponents: (i) Support for Farm and Enterprise Development; and (ii) Investment in Rural
Infrastructure. Based on the ARC-VIPs, interested and eligible implementing agencies (POs, private
sector companies, NGOs and academic institutions) will prepare proposals for investment and/or
service provision that will support the development of the selected value chain. There will be no
specific fund allocation for each participating ARC cluster for either of the two sub-components. Funds
up to specified ceilings will be provided by DAR to finance eligible proposals. In addition, Local
Government Units (LGUs) will be responsible for proposing rural infrastructure investments that meet
agreed eligibility criteria and are critical to develop the selected value chain(s). The project will
mobilise partnerships involving private sector enterprises to develop the chains and provide the
business development services required and private sector management of these value-chains is
essential. Whenever required, the project will facilitate the subdivision of collective CLOAs as
necessary to facilitate credit provision to make the agribusiness project work. DAR will absorb the
cost of subdivision survey using its regular funds as its counterpart to the project.
Component C: Project Management, Monitoring and Evaluation and Knowledge Management
18. The expected outcome of this component is that the project is completed on time and within the
agreed budget. This component will finance the costs of project management and coordination,
compilation, reporting and M&E activities at national, regional and provincial levels. In addition, the
project will finance policy studies, stakeholders’ consultations and other events related to the planning
and implementation of the value-chain approach to agro-enterprise development, mechanisms for
convergence, and any other relevant policy studies.
Project Implementation
19. The key elements of the overall project approach are the following: (i) use of participatory value
chain development approach to enable the target beneficiaries to optimise production of their chosen
commodities, improve the profitability of household farm enterprises in a sustainable manner, improve
their market access and competiveness and generate greater profits; (ii) use of an approach of
convergence in implementing its activities under the leadership of DAR, to enhance the investment
x
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
and opportunity climate for agribusiness; (iii) use of the ARC clustering approach developed by DAR
for the provision of support to the ARCs for value chain development; (iv) implementation through the
DAR structure at national, regional, provincial and municipal levels, with the participation of the other
convergence agencies, e.g. DTI, Department of Science and Technology (DOST) and National
Commission on Indigenous Peoples (NCIP) as well as the LGUs; and (v) an emphasis on knowledge
management and learning to ensure that the experience and lessons learned are available to improve
project performance and for up-scaling and wider dissemination.
20. The project implementation period is six years. The implementation strategy will include: (i)
Geographic targeting to identify the project areas and provide a preliminary list of target commodities
based on the 11 feasibility studies and investment plans already prepared; (ii) Selection of private
sector organisations to provide marketing and/or other services that meet the proposed eligibility
criteria during the initial participatory value chain analysis and planning phase; (iii) Self-targeting by
members of the target group based on their interest in participating in project activities; (iv) Non-poor
households will be targeted through their inclusion in the POs or other types of organisations formed;
and (v) Provision of public goods, such as improved farm to market roads, rehabilitated Communal
Irrigation Scheme (CIS), post-harvest facilities, etc. Consultations were held with the NCIP, the
organisation charged with supporting the integration of IPs in the mainstream. The approach to
working with IPs as a sub-group of the target group will work within the framework of the NCIP’s
Ancestral Domain Sustainable Development and Protection Plan, as a way of involving the
community members with the local government agencies and a vehicle to strengthen capacities of IPs
in the process. This approach involves practicing the principle of free and prior informed
consultation/consent on all project activities through the provision of adequate information.
21. DAR will be the lead agency for the project implementation under the NCI. Under the
leadership of DAR, the project implementation will extend the convergence approach in implementing
its activities to involve other agencies with a potential role to play in project implementation, including
DTI, DOST and NCIP as well as the LGUs, with the aim of providing a more comprehensive and
integrated support to the rural population, including those assisted under the government’s agrarian
reform programme. Project implementation involves essentially two phases.
22. The Project Steering Committee (PSC), chaired by the Secretary of DAR, will be the project’s
policy making body. Other members will be senior officials of oversight agencies i.e. the Department
of Finance (DOF), Department of Budget Management (DBM) and NEDA, the agencies involved in
the expanded national convergence initiative as well as the Mindanao Development Authority, the
Department of Interior and Local Government (DILG) and a representative from the private sector.
The DAR will assume full supervision responsibility through a Central Project Management Office
(CPMO) based in one of the three project regions in Mindanao and part of the DAR Central Office.
There will be a Regional Multi-Stakeholders’ Committee (RMSC) in each of the three regions chaired
by the DAR’s Regional Director, to advise the regional project implementers on major policy
considerations, technical and operational issues, approve investment proposals and will ensure
participation of the region-based agencies in project implementation. There will be a Provincial Project
Management Office (PPMO) in every target province to coordinate the implementation of the project
activities in the ARC cluster. In the ARCs, a Cluster Project Operations Team (CPOT) will be
established, responsible for the implementation of the project activities at the field level. DAR will
execute a memorandum of agreement (MOA) with each of the partner implementing agencies at the
national, regional and provincial levels to specify what services and support to be provided by each
agency and how the services and support will be financed by the project. The LGUs will enter into a
MOA with DAR covering their participation in project implementation, the provision of counterpart
funds for infrastructure investment as required by the project’s financing agreement and provision of
services. The private sector (companies and firms, business organisations, financing institutions, nongovernment organisations, state universities and colleges and individual entrepreneurs) will be
encouraged to participate under MOA with DAR. Private sector organisations may act as the
consolidator/integrator, business development service providers, value-chain managers or facilitators,
or financiers.
Risks
23. There are three risks associated with the NCI at the operational level. The first is that ensuring
effective coordination among the three NCI agencies in the field will be more difficult than at national
level. Project design counters this risk with: (i) all the agencies with a role to play in the project
xi
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
implementation will be members of the PSC which is the project’s policy making body and able to
resolve inter-agency coordination issues; (ii) all implementing agencies will have a “Project
CONVERGE” Focal Point at national level through whom the project will interact with that agency at
national level; (iii) the three RMSCs with representation from all the relevant agencies to ensure
effective coordination of implementation in the regions and ARC clusters; and (iv) within the ARC
clusters, there will be CPOTs which will include the staff involved in the day to day project
implementation.
24. The second risk concerns the willingness of the private sector to be involved in the
implementation of Component B, I-SHARED which is essential for the success of the project. This risk
is addressed through: (i) component A and the participatory analysis and planning process, which will
include all potential participants, including the representatives of the private sector agencies involved
in the particular value chains under analysis; and (ii) during the value chain analysis and planning
process, publicising the availability of grants for value-chain development to match investments from
the private sector, the size of the grants available and the terms and conditions of the grants for
different interventions.
25. The third risk is associated with the weak capacity of the poorer LGUs to provide the required
counterpart funds for rural infrastructure investment. The project design counters this risk by reaching
an agreement with the government on a financing plan for the rural infrastructure investment based
on the financing ratio of 80% for the IFAD loan; 5% for the national government counterpart funds;
12% on average for the LGUs; and 3% for the beneficiary contributions. This arrangement will reduce
the risk to the minimum that the poorer LGUs would not be able to benefit from the rural infrastructure
investment financed by the project. Investments in additional road construction will only take place
after firm funding has been secured from participating LGUs. In addition, the capacity of the LGUs to
fund and undertake maintenance of the roads will be closely monitored.
Project Costs, Financing and Benefits
26.
The proposed project would cost about USD 52.53 million or about PHP 2,285 million. The
proposed project financing includes IFAD loan of USD 25.0 million (47.6%) and a Government
counterpart contribution of around USD 6.11 million (11.6%). The IFAD loan will be on Intermediate
Terms and Conditions. Beneficiary counterpart contributions (including the LGUs and participating
organisations) would account for the remaining 40.7% (USD 21.41 million). Retroactive financing of
up USD 500 000 from the IFAD loan may be available to finance the costs of the following key
rd
preparatory activities, undertaken after 3 November 2011: (i) Preparation and finalisation of the
Project Implementation Manual (PIM); (ii) Preparation of bidding documents for procurement in PY1;
and (iii) Establishment of the CPMO, RPMOs and PPMOs.
27.
The project’s target is to raise the incomes and quality of life of about 35,000 rural households
in the 11 target ARC clusters covering both ARBs and non-ARBs. The project target is that 30% of the
beneficiaries will be women (30% of the ARBs are women), and 15% IPs. Both the financial and
economic analysis show that the projects investments should provide sound benefits to the
participating households and overall an acceptable economic rate of return, of 44.6%, Net Present
value of PHP 5.2 billion and a Benefit Cost Ratio of 1.57 using a discount rate of 15%. Average target
group benefits are estimated to be an increase in real incomes of 11% and 52% compared to the
2009 levels by 2020 and 2030 respectively.
Sustainability
28. The following elements are built into the project design to help ensure that the proposed
investments and benefits are sustainable: (i) by devoting the first year of project implementation to
analysis, identification and planning of the project’s investments in priority value chains involving
famers, their organisations and the private sector will help ensure the proposed investments will be
sustainable; (ii) the experience and lessons learned from the three small value chain pilots in PY1
should contribute to ensuring that the subsequent investments are sustainable; (iii) the project has a
strong focus on the involvement of the private sector on a long-term basis to enhance the
sustainability of the investments and benefits; (iv) the project will support contractual and other types
of arrangements linking smallholders with the private sector to enable the smallholders to move up
the supply chain and receive more value addition; (v) the beneficiaries and LGUs will be involved in
providing counterpart funds for infrastructure facilities and be responsible for their operation and
maintenance; (vi) project design takes into account the knowledge, systems and practices of the IPs,
xii
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
which will also help ensure the sustainability of project interventions in areas where IPs are present;
and (vii) 18 months before the completion date, the CPMO will work closely with all stakeholders at
the national, regional, provincial and municipal levels and with ARCs and barangays to finalise an exit
strategy and sustainability plan, which should contain specific mechanisms to ensure sustainability of
the investment after the end of the project.
xiii
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Logical Framework
Narrative Summary
Goal
Contribute to reducing the
incidence of poverty in the ten
target provinces of Regions IX,
X and Caraga.
Development Objective
Target group vulnerability
reduced through crop
diversification and increased
farm income.
Outcomes and Outputs
Outcome Component A:
Value chain business
development plans for selected
crops validated and
implemented resulting in
improved farm income.
Outputs:
Market demand analysis and
value chain analysis
undertaken and ARC cluster
value chain investment plans
prepared.
Outcome Component B:
Improved production, value
addition and marketing of the
selected agricultural
commodities.
Verifiable Indicators





Means of Verification
35,000 households and 70 People’s Organisations in the 11 ARC clusters:
Increased ownership of household assets (household asset index)*
increased by 30% from baseline survey to xx by end of project (EOP).
Prevalence of child malnutrition* reduced by 30% at EOP from baseline
survey.


Assumptions/Risks
NSCB report.
RIMS baseline, midterm and completion
surveys.
 Consolidated annual
RIMS reports, baseline,
mid-term and
completion surveys.
 Annual participatory
monitoring studies/
outcome assessments.
 DAR ALDA report.

70 participating POs and other entities in the ARC clusters validated and
implemented their value-chain investment plans from PY2 -7.
At least 10% of increased farm income derived from new farming activities
by MTR and 30% by end of project.
 Project MIS and annual
outcome assessments.
 Annual RIMS report.
 Supervision Mission
(SM) reports.

Government remains committed to valuechain development.
11 updated ARC cluster prioritised value-chain investment plans (ARC-VIPs)
prepared in PY1.
11 ARC cluster value-chain investment plans (ARC-VIPs) updated each year
during PY2-7.
 Project MIS and annual
outcome assessments.
 Annual RIMS report.
 SM reports.

Highly competent value-chain staff and
consultants appointed.
In the 11 ARC clusters:
 Gross value of agricultural production of 35,000 HHs increased by 15 % at
MTR and 30% at EOP.
 8,000 HHs have entered into contractual marketing arrangements with
buyers at MTR and 16,000 HHs at EOP.
 Traffic count on project financed roads increased by 20% at MTR and by
40% at EOP.
 Average farm-gate prices in real terms for the commodities selected by the
target group members increased from baseline survey by 5% at MTR and by
10% at EOP.
 Participating business enterprises have generated additional employment for
3,000 households by EOP and 1,000 by the MTR.
 40,000 (90% of the total target group) households have improved access to
 Project MIS and annual
outcome assessments.
 Annual RIMS report.
 SM reports.





35,000 direct beneficiaries of which 50% are women and 15% IPs.
Average annual income (in constant 2009 prices) increased from PHP
17,582 in 2009 to about PHP 21,267 at EOP.
Farm income derived from new farming activities increased by10% at MTR
and by 30% at EOP.
xiv



Peace and Order in the areas covered by
the target ARC clusters
No major financial shocks, a stable
inflation rate and purchasing power of
smallholders/ producers maintained or
increasing.
No major climate shocks.
Key policy environment improved for
competitiveness of the agri-business
sector.
 Government remains committed to valuechain development.
 Businesses willing to work with farmers’,
POs etc.
 Sufficient competition allows farmers,
POs, etc. choices.
 LGUs and local communities assume
responsibility for infrastructure O&M.
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Narrative Summary

Outputs:
Services provided to improve
the production, value addition
and marketing of the selected
agricultural commodities.











Outcome Component C:
Project implementation is
completed on time, within the
agreed budget and to the
satisfaction of the beneficiaries.
Outputs:
Project managed in a timely,
cost effective, transparent and
a gender and culturally
sensitive manner.











Verifiable Indicators
rural infrastructure and production/processing facilities by EOP, 20% by MTR.
90% of project financed infrastructure and equipment is operating and
being well maintained at end of project
Target group smallholders receiving project services, increases from
5,000 in PY2 to 35,000 by EOP.
No. of business organisations/associations formed and/or assisted.
No of contract farming agreements.
No. of marketing agreements.
No. of private service providers contracted.
Around 136 km of road upgraded2
About 150 ln.m. bridges constructed.
Around 150 ha of irrigation rehabilitated/restored.
Around 3 units of water supply schemes constructed.
> 30% of the members of the management committees (POs etc.) are
women PY1-6.
> 15% of the members of the management committees (POs etc.) are IPs
PY1-6.
Project implementation is completed within 7 years and all accounts are
closed within 6.5 years.
At least 90% disbursement of IFAD Loan and Grant after 6.5 years of project
implementation.
95% of the financial and physical targets achieved, without cost overruns.
Annual expenditures are >90% of the AWPB estimates, PY1-6.
>75% of target households from PY3-6satisfied with the services provided.
Complete, accurate financial records prepared and audited annually
beginning PY1.
Adherence to planning and reporting procedures and formats PY1-6
M&E activities are timely, efficient and gender and culturally responsive PY16.
Annual dissemination of lessons learned/knowledge from project
implementation PY4-6.
46 contract and 239 DAR regular staff are in post with qualifications and
experience appropriate for their terms of reference PY1-6.
At least 30% of the project staff are female PY1-6.
2
Means of Verification
Assumptions/Risks
 Project MIS and annual
outcome assessments.
 Annual RIMS report.
 SM reports.

 Project MIS and annual
outcome assessments.
 SM reports.


Effective coordination through the NCI.
All implementing partners adhere to the
financing agreements, project
implementation guidelines as specified in
the MOAs





Timely fund flows from the Loan and
Grant Accounts through the DAs to the
Project Accounts at all levels.
Government and LGU counterpart funds
and beneficiary contributions provided in a
timely fashion.
Project progress reports.
SM reports.
M&E reports.
Audit reports.


Levels of trust in ARCs adequate for
establishing effective POs, binding
contracts etc.
Adequate TA is provided.
Assumption: Of the total allocation of USD 11.4 million for Investments in VC Related Rural Infrastructure, 96% will be invested in farm to market roads and bridges; 3% in rehabilitation of irrigation
schemes; and 1% in water supply. Investments for storage and drying facilities will be funded under the Farm and Value Chain Enterprise Development Sub-component.
xv
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
I.
Strategic context and rationale
A.
Country and Rural Development and Poverty Context3
Country Background, Economy and Poverty
1.
The Philippines is an archipelago of over 7,100 islands with a total land area of about 300,000
km2 and is located 800 km from the Asian mainland between the islands of Taiwan and Borneo. In
2009 the population was 92.2 million and growing at 2.04% p.a., with 21.9 million or 23.8% living in
Mindanao (National Statistics Office 2009), the second largest island with a land area of about 95,000
km2.
2.
Since 1981 the growth in Gross Domestic Product (GDP) has averaged 3.1% p.a., but only
2.3% p.a. between 2001 and 2010. These rates of growth compare unfavourably with the growth rates
of several high performing Asian economies. With strong external payments performance, due in part
to the growing remittances from overseas workers, international reserves had risen to USD 62.4
billion in December 2010, sufficient to finance 10.3 months of imports of goods and services. As a
result of the strong external liquidity position, the value of the PHP has remained broadly stable in
recent years and the exchange rate to the USD was about PHP 43.5 (During the Project Design).
Over the period 2004-2010, the headline inflation rate averaged 5.6%. In 2010, Gross National
Income per capita was USD 4,002 (Purchasing Power Parity in 2008 USD).
3.
The Human Development Index (HDI) places the country in the medium HDI category. In
2010, the HDI for the Philippines was 0.638, whereas in 1998 the HDI was 0.744, which shows that
over those 12 years, development efforts were unable to improve the human development status of
th
the country. In terms of HDI, the Philippines ranks 97 among 169 countries. The country’s Gender
Development Index decreased from 0.768 in 2005 to 0.742 in 2008. Likewise, the Gender
4
Empowerment Measure fell from 0.590 in 2005 to 0.560 in 2008 .
4.
The poverty incidence decreased slightly from 21.1% of families in 2006 to 20.9% in 2009, but
with population growth, the number of poor families rose from 3.67 million to 3.86 million in the same
period. Poverty incidence and the numbers of poor people are now higher than in 2003. The northern
and western part of the island of Mindanao consists of three of the six poorest regions in the country
(out of 17) and accounts for 18% of all those living below the national poverty line. Farmers and
fishermen were the poorest groups in the country with a poverty incidence of 44% and 50%
respectively in 2006. In 2008, 32% of children less than five years old were stunted and nearly 7%
were wasted. The failure to reduce poverty in recent years reflects underinvestment and the slow
growth of per capita incomes, high population growth and dependency rates, natural disasters and
inflationary pressures mainly from rising fuel and food prices. In addition, nationally income inequality
remains high with a Gini Coefficient of 0.448. Despite the recent lack of progress in reducing the
incidence of poverty, the Philippines Development Plan (PDP) 2011-2016 envisages that the country
can still achieve the Millennium Development Goal (MDG) poverty reduction targets by 2015.
Agriculture and Natural Resources Sector
5.
From 2004 to 2010, the agriculture and fisheries sector contributed an average of 18.4% to
GDP and the sector grew at an average rate of 2.6% p.a. This performance was significantly below
the target of the Medium-Term Philippine Development Plan, 2004-2010. The sector employs about
11.8 million people, or about 35% of the total work force. Including the whole agricultural value chain,
the sector contribution to GDP and total employment rises to 35% and 50% respectively. According to
the 2002 agricultural census, there are 4.8 million farms covering 9.7 million ha. In 2010, the crop subsector accounts for 45% of the agricultural sector, followed by fisheries (27%), poultry (15%) and
livestock (13%). In order of value of production, paddy, coconut, maize, bananas, mango, sugar cane
and pineapple are the seven most important crops. Others important crops include rubber, cocoa,
coffee and vegetables. Paddy, maize and coconut together account for the majority of the land use
(including double cropping) covering 10.4 million hectares in 2010.
3
Data on GDP, poverty etc. is taken from the Philippine Development Plan 2011-2016 prepared by National Economic and
Development Authority (NEDA).
4
The source is the UNDP, Human Development Report, 2010.
1
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
6.
Between 2004 and 2010, the exports of the agriculture and fisheries sector rose from USD
2.5 to 4.1 billion but even so, the Philippines is the only net agricultural importer among comparable
ASEAN members. The country has a revealed comparative advantage not only for the exported
agricultural commodities such coconut oil, fresh bananas and pineapples but also for sugar, abaca,
papaya, dried tropical fruits and fresh vegetables. Major agricultural imports are cereals, including rice
and agricultural inputs (fertilizers and machinery).
7.
The growth of total factor productivity in agriculture has remained at a low level 0.2% p.a. over
the last two decades compared with 1.0 p.a. in Thailand, 1.5% p.a. in Indonesia and 4.7% p.a. in
China. Despite positive growth and gains in productivity in some sub-sectors, there has been no
change in the welfare of almost 6.4 million farmers and others engaged in the sector. Rising
productivity and efficiency in the sector are critical to maintaining the affordability of food and
purchasing power, especially among the poor. Therefore, the sector’s development is vital for
achieving inclusive growth and poverty reduction as well as attaining the MDG targets. In addition,
development efforts need to focus on ensuring that the sector is not only highly profitable but also
resilient to climate change, environmentally friendly and sustainable.
Policies and Development Plans
8.
National planning and policy making is based on five-year Development Plans and the PDP
was published in late May 2011. The PDP’s goals for a competitive and sustainable agriculture and
fisheries sector include: (i) improved food security and increased rural incomes; (ii) increased sector
resilience to climate change risks; and (iii) an enhanced policy environment and governance.
9.
Key elements of the first goal of the PDP strategy for improved food security and increased
rural incomes are threefold. First, to diversify production, improve rural infrastructure and facilities,
develop markets, strengthen extension services and improve the sector’s credit access. Secondly, to
increase investments and employment across efficient value-chains, through measures that include
market development, localised agricultural promotion and development, increased value addition,
horizontal and vertical integration of production and marketing and focus resources on high value
crops. Finally, to transform the Agrarian Reform Beneficiaries (ARBs) into viable entrepreneurs by
providing assistance to improve land productivity, adding value to their production, engaging in offfarm enterprise development, strengthening their organisations to develop and manage agricultural
enterprises, providing access to credit and providing physical infrastructure, e.g., farm to market roads
and irrigation facilities.
10.
The second goal of the PDP is the promotion of environmentally friendly and sustainable
production systems including: (i) use of the farming systems approach; (ii) promoting good agricultural
practices and varieties that can tolerate climate variability; and (iii) ensuring that extension staff are
able to raise farmers’ knowledge and capacity to adopt climate sensitive technologies.
11.
The third goal of the PDP is an improved policy environment and governance, which includes
the National Convergence Initiative (NCI), which aims to rationalize and improve the provision of
agricultural services to farmers. Under the NCI in which the Department of Agrarian Reform (DAR),
the Department of Agriculture (DA) and the Department of Environment and Natural Resources
(DENR) are the key agencies, although other agencies are expected to participate in line with their
mandates.
12.
Favourable factors exist to make for the country to break out of its perennial condition of
widespread rural poverty, inequity and lagging human development. These factors include a healthy
external payments situation, years of trade reform leaving an industrial sector fairly undistorted by
subsidies and heavy protection, a stable currency, low inflation and positive political developments.
National Convergence Initiative
13.
In search of a more broad-based approach to reduce rural poverty, the government is
pursuing the NCI to maximize resources available and synchronize the initiatives of the three
departments engaged in rural development: DAR, DA, and DENR. The NCI is seen as a strategic
development approach that can contribute to sustainable development in the rural areas. Through the
NCI, the three rural development agencies are undertaking joint planning, programming and
budgeting as well as monitoring and evaluation. The objectives are to: (i) accelerate the completion of
the Comprehensive Agrarian Reform Programme Extension with Reforms in 2014; (ii) rationalize land
use policies and strengthen the system of land property rights; (iii) promote sustainable agriculture
and preserve the land resource base; (iv) enhance the investment climate for agribusiness; (v)
2
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
promote sustainable upland development and forest management; and (vi) initiate climate change
adaptation and mitigation measures.
Comprehensive Agrarian Reform Programme
14.
The Government has long recognized that asset reform is a key to improving agricultural
productivity and reducing rural poverty. The Comprehensive Agrarian Reform Programme (CARP)
has been the Government’s principal comprehensive integrated, area based rural development
programme for over twenty years. By June 2010, DAR had launched 2,116 Agrarian Reform
Communities (ARCs), covering about 1.3 million agrarian reform beneficiaries. Of this total, 1,279
ARCs or 60% had been provided with basic infrastructure, capacity building, agricultural improvement
and livelihood support through various foreign assisted projects covering some 852,000 ARBs.
Resources mobilized by DAR amount to a total of PHP 76.6 billion (equivalent to USD 1.78 billion at
the current exchange rate) in loans and in grants, from bilateral and multi-lateral sources from 60
foreign-assisted projects. DAR has confirmed that while the land distribution programme led by the
agency will end in 2014, the support services to the ARBs will continue beyond 2014 in accordance
with the Section 21 of Republic Act (RA) 9700.
15.
Various impact studies for DAR foreign-assisted projects show that the ARC Development
strategy has contributed to the development of ARBs. These studies cited increases in household
income levels ranging from 22-43%. As a result, poverty levels were also reduced by about 3-7%.
Output per hectare of palay increased by 42-61%. However, the challenge is how to optimize, scale
up and sustain the gains made in these ARCs and to extend the benefits to other ARCs so that they
all can become part of the mainstream economy.
16.
As a strategy to include more ARBs in the development process, DAR has adopted the ARC
clustering approach, with one or more clusters established in a province. An ARC cluster includes a
group of ARCs with similar agro-climatic and socio-economic conditions and the area between and
surrounding these groups of ARCs. The aim is to encourage business interactions among ARCs,
disseminate better technology, improve and consolidate production and marketing of commodities
and establish agribusiness so that farmers and farmers’ organisations can obtain the best prices for
their products. The objective is to enable the ARBs to become highly productive and competitive
entrepreneurs and to achieve broad-based rural economic growth. Within a cluster development starts
from the existing ARCs where substantial development works have been implemented and expands
to include other ARCs and the non-ARC areas to spread the benefits of ARC development to greater
number of ARBs and other farmers.
B.
Rationale
17.
The rationale for IFAD to help finance the project includes: (i) making use of the opportunities
to support the agrarian reform process and to help meet the needs of the underserved and un-served
ARBs through adopting a value-chain approach to enhance agricultural growth and agribusiness
development to maximise the benefits from the land distribution programme; (ii) support the
harmonization of the rural development efforts of DAR, DA and DENR and other agencies engaged
agri-business development to maximise the impact on rural poverty reduction; (iii) support the DAR
approach of clustering ARCs to realise economies of scale for production, access to markets and
service provision to benefit from value-chain development.
18.
As part of the NCI, in late May 2011, NEDA endorsed a project proposal of Convergence on
Value-Chain Enhancement for Rural Growth and Empowerment – “Project CONVERGE” prepared
jointly by the DAR, DA and DENR for IFAD financing. There is a strong rationale for IFAD to support
the proposed project. First, the project can assist DAR by investing in selected ARC clusters where
there has been limited investment, the incidence of poverty is still high, but where there is a potential
to improve the livelihoods of the ARBs and other smallholders. At present, only about 65% of the
ARBs have received substantial assistance and only 49% of the estimated development requirements
based on the individual ARC Development Plans have been addressed so far. The investment gap for
support services in ARCs alone is an estimated PHP 87 billion (USD 2.0 billion). In this regard, IFAD
assistance can support agrarian reform by adopting a value-chain approach to enhance agricultural
growth and agribusiness development to maximise the benefits from the land distribution programme.
The underserved and un-served ARBs, including the new farmer beneficiaries, require support
services to provide more opportunities for sustainable economic growth that is resilient to climate
variability, increase the productive capacities and competitiveness of ARBs, and improve the living
3
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
conditions in the rural areas. Such an approach supports the strategy of the PDP for the twin goals of
improved food security and increased rural incomes and increased sector resilience to climate change
risks.
19.
Second, the project provides an opportunity for IFAD to support the harmonization of the rural
development efforts of DAR, DA and DENR and so to pave the way to rationalise the division of work
among the three rural development agencies as proposed under the NCI. The proposed project also
provides an opportunity for IFAD to assist in developing and operationalizing the NCI concept further
by including other agencies e.g. Department of Trade and Industry (DTI), Department of Science and
Technology (DOST) and the National Commission on Indigenous Peoples (NCIP) in agri-business
development. IFAD already has experience of working with DTI under the Rural Micro Enterprise
Promotion Programme (RuMEPP).
20.
Third, the project can assist DAR in providing support services to the ARBs by supporting
DAR’s approach to the clustering of ARCs. This clustering of ARCs is designed to realise economies
of scale for production and marketing in support of a value-chain approach and enables the inclusion
of non-ARB smallholders and builds on the experience gained from two previous IFAD assisted
projects, i.e. the Northern Mindanao Community Initiatives and Resource Management Project
(NMCIREMP) and the Western Mindanao Community Initiatives Project (WMCIP), which both
supported earlier phases of the agrarian reform programme in the project area.
Policy Alignment
21.
The proposed design is consistent with PDP’s concept of inclusive growth, a major element of
which is the reduction of mass poverty and the focus on improving profitability at the household level
in ways that are sustainable also aligns well with the focus of the PDP.
22.
The proposed project design supports two of the three strategic objectives of the IFAD
5
country strategy (COSOP) , i.e. to improve sustainably the livelihoods of poor upland households,
including Indigenous Peoples’ (IPs) communities and ARBs in the 20 poorest provinces; and to
enable the entrepreneurial poor in selected areas, including the project’s three target regions, to
improve the value chains of agribusiness systems for the benefit of poor rural farmers. The project
design also supports the key crosscutting issues from the COSOP, including: (i) gender
mainstreaming in development programmes; (ii) policy dialogues; and (iii) support for decentralization.
The COSOP also supports the Government’s policies for NCI.
23.
In addition, the proposed project design aligns well with IFAD’s strategic framework (20112015). IFAD will pursue its goal of improving food security and reducing the incidence of rural poverty
by concentrating on eight thematic areas of secure access to natural resources; climate change
adaptation and mitigation; improved agricultural technologies and effective production services; more
comprehensive financial services; integration into value chains through competitive agricultural input
and produce markets; rural enterprise development and off-farm employment opportunities; technical
and vocational education and training; and empowerment of rural poor people through effective and
sustainable rural producers’ organisations.
24.
The IFAD policies relevant to the project include: Targeting – Reaching the Rural Poor;
Gender Plan of Action; Engagement with Indigenous Peoples; Rural Enterprise, Private Sector
Development and Partnership; Climate Change; and Rural Finance; and Prevention of Fraud and
Corruption. The project design has reflected these policies and lessons learned in the IFAD country
programme.
25.
Through the Foreign Assisted Projects Support Office (FAPsO), DAR has the experience and
capacity to coordinate the development assistance provided by various multilateral and bilateral
development agencies. It has several on-going foreign assisted projects and has benefitted from over
60 such projects.
IFAD’s Comparative Advantage
26.
IFAD’s comparative advantage comes from the experience gained in the Philippines from the
following activities that remain relevant for the proposed project:
5
The third strategic objective relates to the management of coastal resources, which is not the focus of this project.
4
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report

Targeting poor and vulnerable groups dependent on highly fragile ecosystems in Mindanao,
including IPs and women and using participatory and innovative approaches to promote their
livelihood improvement.

Investing in rural development (agriculture, infrastructure, rural finance and enterprise
development) which meet local needs and facilitates economic development.

Working in close partnership with the convergence agencies (DA, DAR and DENR) and other
government agencies, e.g. the National Economic and Development Authority (NEDA),
Department of Finance (DOF), Department of Budget Management (DBM), NCIP, DTI, DOST
and the participating Local Government Units (LGUs).

Building institutional partnerships with other external development agencies to increase the
impact of the investment from IFAD on poverty reduction and policy dialogue, e.g. with ADB
for the Second Cordillera Highland Agricultural Resource Management Project (CHARMP-2)
and the new Integrated Natural Resource Management Project (INREMP), which will be
submitted to the IFAD Executive Board in April 2012.
II.
Project description
A.
CONVERGE area and target group
Project Area, Poverty and Targeting
27.
Mindanao is the second largest of the 7,100 islands of the Philippines with a total land area of
2
101,998 km and a population of 21.9 million or 25% of the Philippine population. The island has a
range of tropical and sub-tropical climates depending on the altitude and latitude, but fortunately lies
outside the typhoon belt. The climate change predictions for the period 2020-2050 foresee a
decreasing trend in terms of extreme rainfall in Mindanao and widespread warming in most parts of
the country with an increase in the number of days with maximum temperatures in excess of 35°C in
all parts of the country, and a decline in the number of cold days. Projected mean seasonal
temperatures are expected to rise by 0.5-0.9°C by 2020 and 1.2-2.0°C by 2050. In the last six
decades the annual mean temperature has increased by 0.57°C with many extreme weather events
recorded. The island of Mindanao has a wide range of soil types depending on the underlying
geology. Mindanao is a major supplier of the country’s food and raw materials. It produces the
following proportions of the country’s agricultural production100% of the rubber, 88% of pineapples,
81% of bananas, 75% of coffee, 60% of coconut and 53% of corn. The other crops (paddy, mango
and sugarcane, etc.) account for less than 50% of the production from Mindanao’s agriculture sector.
Regions
28.
The project will target three Regions of IX, X and Caraga (XIII), located in the west, north and
northeast of Mindanao. The three target regions are among the six poorest regions of the country with
the following 2009 incidence of poverty: Caraga (39.8%) which is the poorest region in the country,
while Region IX (36.6%) is ranked third and Region X (32.8%) sixth. In total, these three regions
account for 18% of the nation’s poor families. Using other measures of income poverty, namely the
income gap, poverty gap and severity of poverty, these three regions all have values that are worse
than the national average.
Provinces
29.
Within these three regions, the project will target 10 provinces. The selection criteria included
incidence of poverty, presence of organised ARC clusters, agricultural and agri-business development
potential and availability of services. The selected provinces are as follows: Zamboanga del Norte,
Zamboanga del Sur and Zamboanga Sibugay (Region IX); Misamis Oriental, Camiguin and Bukidnon,
which is divided into two operational divisions of North Bukidnon and South Bukidnon, (Region X);
and Agusan del Norte, Agusan del Sur, Surigao del Sur and Surigao del Norte in Region Caraga. All
the selected provinces selected have poverty rates higher than the national average and five are
among the 20 poorest provinces out of a total of 80 in the country and all include a high proportion of
municipalities with high levels of poverty.
ARC Clusters and Municipalities
30.
All the ARC clusters in the ten provinces were evaluated to identify those suitable for project
assistance. The criteria used included potential for further agricultural and agribusiness development,
5
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
availability of markets, availability of an ARC Cluster Development Plan, commitment of the
participating ARBs and availability of support services. Within each province, the project will target
one ARC cluster, whereas one in each of the two operational divisions in Bukidnon of Region X.
31.
The 11 clusters selected are as follows: (i) Region IX - Zamboanga del Norte, the Zamboanga
Del Norte ARC Settlement Cluster; Zamboanga del Sur, the Salug Valley ARC Cluster, and
Zamboanga Sibugay, the Salipyasin ARC Cluster; (ii) Region X - Misamis Oriental, the MISORET
ARC Cluster; for Camiguin the LABACO ARC Cluster, for North Bukidnon, the North Bukidnon ARC
Cluster; and for South Bukidnon, the South Bukidnon ARC Cluster; and (iii) Region Caraga - Agusan
del Norte, the TUJAKITSAN ARC Cluster; Agusan del Sur, the VETREBUNS ARC Cluster; Surigao
del Norte, the CLAGIBAPLA ARC Cluster; and Surigao del Sur, the BATA ARC Custer.
32.
The total population is about 770,000 within the ARC clusters and nearby non ARC
barangays, comprising a total of 144,000 households (average size 5.4 people). Allowing for IPs
households not included in these figures, the total number of households is an estimated 150,000.
The ARC clusters are predominately agricultural with about 90% of households being farmers, or
landless employees whose livelihoods depend largely on agriculture. Thus about 35,000 rural
households will be in a position to benefit from the project of which 31% are headed by women,
other smallholders and landless households and 5,000 IPs households not included in the other
6
categories .
33.
In the target clusters there are 48 municipalities of whom 32 (64%) recorded poverty levels in
excess of 50% in 2009, while the range was from 27-68%. In terms of their internal revenue
allocations, 16% are in Class 1 (the highest category), 20% in each of Classes 2 and 3, 24% in Class
4, 16% in class 5 and 4% in Class 6.
34.
In addition, the target clusters contain 93 ARCs located in 715 barangays. DAR uses the ARC
Level of Development (ALDA) ranking to assess the stage of the development of the ARCs. The
majority, 49 (53%), of the ARCs in the 11 clusters are in Class 5, the highest development category,
with a further 23 (25%) in Category 4.
35.
Based on 2009 data the weighted average household income of the target ARCs was PHP
7
115,300 (equivalent to USD 490 per capita), of which PHP 73,500 was from Agriculture, PHP 17,000
was off farm income and PHP 24,800 was non-farm income. This total is about 30% above the 2009
poverty threshold for these three regions (PHP 87,500 p.a.), however, for 29% of the ARCs average
income was below the poverty line.
People’s Organisations
36.
There are 238 Peoples’ Organisations (POs), most formed with DAR assistance and with a
total membership of 35,671 or 60% of the total number of ARBs. DAR measures the maturity of POs
using Organisational Maturity Assessment (OMA), which is a component of the ALDA and gauges the
strength of POs. A highly mature PO is rated as 5. Of the 227 POs in the targeted ARC clusters,
which had their OMA in 2010, 12% had reached a maturity level of 4 and 30% were categorized as
level 5. At the other end of the scale, 30% were assessed as level 1.
37.
The average membership of a PO is about 150 families and most are too small to realise any
economies of scale in their activities; many are multi-purpose cooperatives. Almost all POs met
reported a lack of finance and a significant number are inactive. A significant number of POs have
failed due to mismanagement, inappropriate handling of funds and lack of necessary skills for
managing the organisation and associated projects. However, there are ARB organisations that have
matured and can manage community programmes that meet the needs of their members, but need
further assistance to become fully market oriented organisations. In places several POs have banded
together to realize the benefits of pooling their resources so as to obtain assistance from outside.
38.
The existing ARC development and business plans focus on POs, either associations or
cooperatives, as drivers of the ARC development, even though these often lack maturity and capacity.
Only a minority currently have the maturity and capacity to participate actively in the management of
value-chains. When targeting POs for participation in the project’s activities, the following criteria will
apply: a membership that is currently engaged in producing the selected commodity and resident in
6
A more accurate figure for the number of IPs households should be available in 2012 when the NSO will release the IPs
Census conducted in 20. which included ethno linguistic variables in the survey.
7
Based on an exchange rate of PHP 43.5 per USD 1 and for 5.4 people per household.
6
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
the ARC cluster; and an agreement that where relevant project beneficiaries will be 30% women and
15% IPs, a minimum OMA rating of 4 (where POs do not have an OMA rating, a satisfactory record of
capital build-up), no outstanding loan repayments and a capacity to repay any new loan and sustain
their business.
ARC Cluster Development and Agribusiness Development Plans
39.
To arrive at a preliminary list of the value-chains that the project could target in each ARC
8
cluster, several criteria were used, namely : future production capacity, market potential, the
availability of suitable technologies and potential impact (food security and employment). Depending
on the ARC cluster, the selected commodities were as follows: Region IX - coconut, maize, rice and
rubber; Region X - maize, cassava, vegetables, coconut, banana, abaca, rice, lanzones and
sugarcane; and Region Caraga - banana, coconut, rice, maize, rubber, oil palm, nipa and rice, abaca
and coffee.
Target Group
40.
Overall the target group is estimated to be 150,000 households. The target beneficiaries will
be those involved in the value-chains selected and willing and able to participate in project
interventions. This group includes the ARBs, other smallholders, unemployed or underemployed rural
youth, IPs, women and business development partners, including eligible POs. This latter group can
help take a leading role as innovators in improving the returns from the existing and emerging valuechains in an enterprise-oriented development approach. Participatory household wealth ranking is one
of the methods to be used during the project implementation. The logframe indicators focus only on
the direct beneficiaries. Overall the target is that least 30% of those benefiting from project activities
will be women and 15% IPs. Project monitoring will ensure that there is a fair distribution of benefits to
the rural poor.
i. Agrarian Reform Beneficiaries
41.
Under the Agrarian Reform Programme, the ARBs have received land. The major crops
cultivated include coconut, rice, maize, rubber, banana, high value vegetables, oil palm, coffee and
cassava. Total area of crops in 2010 was about 216,000 ha. Only about 7% of the land is irrigated
within the ARC areas and only 5.8% of families have access to irrigation. Many of the ARCs also have
significant numbers of livestock and in particular, poultry. DAR data indicates an average of 12 head
of poultry per household overall and 1.6 head of other livestock.
42.
However, their average annual household income in 2009 was 30% above the poverty line.
When shocks come in terms of death, sickness, crop failure, etc., their incomes are insufficient as the
typical ARB has no savings to draw upon to meet unexpected expenses. Even in normal times, this
level of income is insufficient to provide any collateral for any borrowing needed prior to harvest so the
ARBs become indebted to the local private money lenders and traders. ARBs are heavily involved in
community-related activities. Although they may have attended skills training sessions, they are
unable to adopt improved technologies because of a lack of dispensable income for investment.
However, some have demonstrated an entrepreneurial aptitude and will be a focus for the proposed
project to enable them to attain a higher level of economic development.
ii. Other Smallholders
43.
The second target sub-group are the smallholders who are not recipients of the government’s
land distribution programme but are located within the ARC Cluster, in both lowland and upland areas.
Some are tenants, but others are owners of small areas of land, with holding sizes of less than five
hectares. This group is very similar to the ARBs in terms of income, sources of livelihood etc.
iii. Rural Youth
44.
The third target sub-group is the under-employed or unemployed rural youth, who work as
agricultural or other wage labourers. Some have become members of existing community
organisations. This group has been neglected but recently there have been appeals to encourage the
youth not to leave the agricultural areas as many of the farmers are old and younger farmers need to
be trained.
8
Annex 2 has the results of the analysis while Working Paper 2 provides further details.
7
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
iv. Indigenous Peoples
45.
The IPs are the fourth sub-group to be assisted by the project and most of them located in
their ancestral domains where their Certificates of Ancestral Domain and Ancestral Land Titles have
been or are being processed by NCIP. Most IPs are from the Subanen, Manobo, Higaonon, Mamanua
and Mandaya tribes. There are 18 municipalities in the target ARC clusters where the NCIP reported
the presence of IPs. Working Paper 1 lists the municipalities where the IPs live. IPs depend mainly on
upland cultivation, mostly rubber, abaca, upland and traditional rice varieties, banana and highland
vegetables and collection of non-timer forest products. Livestock such as pigs, goats and chickens are
reared for home consumption, tribal festivities and rituals. IPs have established tribal organisations
with the support of government agencies such as the NCIP, DENR, DA and DAR. The IPs are now
asserting their rights and privileges, reviewing the Indigenous Peoples Rights Act (IPRA) which
protects them and embarked on the process of formulating their Ancestral Domain Sustainable
Development and Protection Plans (ADSDPP). Some of these plans have been agreed with NCIP,
while the others are still in the process of being drafted. There are now concerted efforts to recognize
the IPs’ traditional systems of governance and cultural practices. Assistance to an IPs group cannot
be sustainable, if it is not channelled through their traditional system of governance. The free, prior
and informed consent (FPIC) is an empowering process for the IPs groups especially for projects
which are externally-oriented.
46.
During the beneficiary consultations in the nine ARC clusters visited during the project design,
the discussions focussed on current production activities, existing issues and problems, suggestions
and recommendations for future development, validation of data, possible project roles and gathering
additional information.
47.
NCIP and DAR are in the process of identifying the overlaps between the land distributed to
the Agrarian Reform Beneficiaries and that claimed by the IPs within the target ARCs. DAR and NCIP
will incorporate their existing streamlined guidelines for FPIC into the Project Implementation Manual.
This process includes dissemination of the IPRA.
v.
Women
48.
Women are a target sub-group. Women have demonstrated success in handling funds and
managing organisations and are 30% of the ARBs. In terms of land distribution, there is a growing
trend for DAR to make women the recipients of the land distributed. Women have become
increasingly involved in development. Many community organisations have women members and
leaders and women are often elected to positions of trust e.g. as treasurers and are the most active in
community-related activities. Women need to gain more skills to become better managers.
Gender Strategy
49.
The gender strategy includes: (i) the conduct of gender-responsive value chain analysis to
ensure that gender needs and issues will be identified during the preparation of the ARC-VIPs; (ii)
preparation of local gender action plans in collaboration with the government agencies supporting
CONVEREGE and the local government units; (ii) advocate for the incorporation of the gender action
plans into the existing Gender and Development budgets of the agencies; (iii) specific targets that
30% of the project beneficiaries and the members of the management committees (POs etc.) will be
women; (iv) promotion of equal opportunities for men and women; and (v) M&E data and analysis is to
be disaggregated to show the participation of men and women and to show the roles of men and
women in particular activities.
B.
Project Strategy
50.
The strategic focus of the project is rural poverty reduction through participatory value chain
development with the aim of helping improve the profitability of household farm enterprises in a
sustainable manner. The project strategy is to cluster a group of ARCs with similar agro-climatic and
socio-economic conditions to encourage business interactions among ARCs, disseminate better
technology, improve and consolidate production and marketing of commodities and establish
agribusiness so that farmers and farmers’ organisations can obtain the best prices for their products.
The objective is to enable the ARBs to become highly productive and competitive entrepreneurs and
to achieve broad-based rural economic growth. Within a cluster, development starts from the existing
ARCs where substantial development works have been implemented and expands to include other
ARCs and the non-ARC areas to spread the benefits of ARC development to greater number of ARBs
8
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
and other farmers. There exist opportunities to: (i) improve the quantity and quality of crop production
and the phasing of production to meet market demands in order to exploit comparative advantage and
earn increased profits at the farm level; (ii) add value to existing farm production through post-harvest
management; (iii) develop links within selected value chains between producers and buyers and input
providers to enhance the profitability of the farm enterprises; and (iv) diversify incomes and minimize
risks for smallholders including women and IPs.
C.
Development objective and impact indicators
51.
The overall goal of the project is to contribute to reducing the incidence of poverty in the ten
target provinces of Regions IX, X and Caraga. The expected impact indicators for the 35,000
households and 70 People’s Organisations in the 11 ARC clusters include: (iii) ownership of
household assets (household asset index) increased by 30% from baseline survey at end of project
(EOP); and (ii) Prevalence of child malnutrition reduced from baseline survey by 30% at EOP.
52.
The project’s development objective is that the target group vulnerability reduced through
crop diversification and increased farm income. The relevant indicators are: (i) 35,000 direct
beneficiaries of which 50% are women and 15% IPs; (ii) Average annual income (in constant 2009
prices) increased from PHP 17,582 in 2009 to about PHP 21,267 at EOP; and (iii) Increased farm
income derived from new farming activities increased by10% at MTR and by 30% at EOP.
D.
Outcomes/Components
53.
The project has three components: (i) Participatory Value-Chain Analysis and Planning; (ii)
Integrated Smallholders Agricultural and Rural Enterprise Development; and (iii) Project Management,
Monitoring and Evaluation. Capacity building and gender mainstreaming will be an integral part of
project-financed activities.
Component A: Participatory Value-Chain Analysis and Planning
54.
The expected outcome of this component is that value chain business development plans for
selected crops validated and implemented resulting in improved farm income. The outcome indicators
include: (i) 70 participating POs and other entities in the ARC clusters validated and implemented their
value-chain investment plans from PY2 -7; and (ii) At least 10% of increased farm income derived
from new farming activities by MTR and 30% by end of project. The major expected outputs are (i) 11
updated ARC-VIPs prepared in PY1; and 11 ARC-VIPs updated each year during PY2-7.
55.
This component will serve as the building block for the succeeding value chain and rural
enterprise investments in the target ARC clusters. This component will provide for each of the ARC
clusters: (i) Validation of priority commodities and market analysis of the potential of the major
commodities for future value chain development based on the 11 feasibility studies already
undertaken (one for each ARC cluster); (ii) Prioritisation of the commodities for project support and
identification of the “anchor value chain” and the “secondary” enterprises; (iii) Identification of the gaps
and inefficiencies in the value-chains and solutions and investments required; (iv) Identification of POs
(associations, cooperatives) and private sector organisations wishing to participate and capable of
participating in the value-chain development; and (v) Preparation of updated Agrarian Reform Cluster
Value Chain Investment Plans for review and inclusion in the global/annual work plans and budgets
by the PPMOs and RPMOs.
56.
There are also some value chain studies of “regional champion commodities” such as rubber,
banana, seaweeds and cacao, which can be used to help develop appropriate site-specific ARC
cluster business plans. The existing ARC development and business plans focus on POs, either
associations or cooperatives, as drivers of the ARC development, even though they often lack the
9
maturity as measure by their OMA scores and capacity needed. Only a minority have the maturity
and capacity to participate actively in the management of value-chains at present.
57.
Plan preparation will involve representatives from the target group, the POs and private sector
organisations that could subsequently support the value-chain developments (e.g. through contract
9
OMA gauges the strength of people’s organizations on a score 1-5, with a highly mature PO being rated as 5. Working Paper
1 includes the data from 227 POs in the targeted ARC clusters: the classification in percentages was: 1-30%, 2-12%, 3-16%, 412% and 5- 30%.
9
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
farming, joint ventures, management contracts etc.). The following key elements will guide the
participatory approach to preparing the value chain investment plans.
58.
First, the proposed interventions to develop the value chains must meet market requirements
10
(local, national and/or international ) with the resources available and be profitable to the participants.
The activities must not compromise the environment or gender equity. Second, a participatory
approach to value chain development is designed to ensure sustainability and involvement of target
groups and key partners from within and outside the ARC clusters. Third, while the proposed
approach is inclusive and geared towards poverty alleviation, the potential to generate and sustain
economic benefits will determine the selection of target value chains and groups. Fourth, capacity
building will receive emphasis to ensure that small-scale producers/processors can adapt to market
changes. Finally, the value chain approach should become “mainstreamed” into the strategic planning
process of the target groups, POs, and the ARC cluster.
59.
This component will strengthen the capacity for value-chain analysis and planning of the
implementing agencies and partners, including the private sector organisations, and mature and
capable POs and will prepare Agrarian Reform Cluster Value Chain Investment Plans (ARC-VIPs).
60.
Component Implementation: Implementation will require some short-term consultancy
support, including possible involvement of research and development institutions who have the
required expertise in selected commodities and value chain analysis, and support from DA, DTI and
the private sector to undertake these tasks and provide “on the job” training to the project’s valuechain facilitators and the implementing agencies and to lead the analysis and preparation of the ARCVIPs. In addition, DA and its regional offices will provide technical support for investment planning for
the selected value chain developments, while DENR and its regional office would help ensure that the
value chain developments will be in line with good practices for environmental and natural resources
management. DOST and DTI will provide support in new technology development and rural
microenterprise development. The feasibility studies should help ensure a more sustainable
implementation of component B as well as making the project adhere more closely to the
convergence framework and strategy. Implementation of this component involves the following steps:
(i) Recruitment of the project’s value chain staff (central, regional and provincial) and short-term value
chain consultants: (ii) A training needs and institutional capacity assessment for the staff of the
implementing agencies, including DAR, DA and DENR (mainly for managing conflicts between
environment and natural resource management and value chain development) and their counterparts
at the regional, provincial and municipal levels, followed by the provision of necessary training; (iii)
Validation of the proposals contained in the 11 feasibility studies and conduct additional studies when
needed; (iv) Conduct a market analysis and value-chain analysis for other commodities/chains
(secondary crops or enterprises) if required; (v) Conduct multi-stakeholder validation-planning
workshops for priority chain/s; and (vi) Develop the updated ARC-VIPs. Annex 4 provides further
details, while Working Paper 4 includes draft terms of reference (TOR) for the consultants and value
chain facilitators.
Component B: Integrated Smallholders Agricultural and Rural Enterprise Development (ISHARED)
61.
The expected outcome of this component is improved production, value addition and
marketing of the selected agricultural commodities. The outcome indicators are that: (i) Gross value of
agricultural production of 35,000 households increased by 15 % at MTR and 30% at EOP; (ii) 8,000
households have entered into contractual marketing arrangements with buyers at MTR and 16,000
households at EOP; (iii) Traffic count on project financed roads increased by 20% at MTR and by 40%
at EOP; (iv) Average farm-gate prices in real terms for the commodities selected by the target group
members increased from baseline survey by 5% at MTR and by 10% at EOP; (v) Participating
business enterprises have generated additional employment for 3,000 households by EOP and 1,000
by the MTR; (vi) 40,000 (90% of the total target group) households have improved access to rural
infrastructure and production/processing facilities by EOP, 20% by MTR; and (vii) 90% of project
financed infrastructure and equipment is operating and being well maintained at EOP.
62.
The outputs are that services are provided to improve the production, value addition and
marketing of the selected agricultural commodities. The relevant indicators include: (i) Target group
smallholders receiving project services, increases from 5,000 in PY2 to 35,000 by EOP; (ii) Number of
10
Using IFAD’s global knowledge as well as updating domestic market information.
10
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
business organisations/associations formed and/or assisted; (iii) number of contract farming
agreements; (iv) Number of marketing agreements; (iii) Number of private service providers
11
contracted; (v) About 136 km of road upgraded and 150 ln.m. bridges constructed; (vi) About 150
hectares of irrigation rehabilitated/restored; (vi) 3 units of water supply schemes constructed; (viii) >
30% of the members of the management committees (POs etc.) are women PY1-6; and (ix) 15% of
the members of the management committees (POs etc.) are IPs PY1-6.
63.
The component has two linked sub-components: (i) Farm and Value Chain Enterprise
Development; and (ii) Investment in VC Related Rural Infrastructure. Investments in Farm and Value
Chain Enterprise Development will be financed by the project on a cost sharing basis with the private
sector. Project funds will be provided to match the contribution from private sector participants to
finance eligible proposals on a first come, first served basis. There will be no specific fund allocation
for each of the participating ARC clusters for either of the two I-SHARED sub-components. Annex 4
has further details. In addition, the project will assist project beneficiaries to access funds from the
banking and micro-finance sectors.
i.
Sub-component: Farm and Value Chain Enterprise Development
64.
Following the selection of the value-chains and locations as described above, the project will
facilitate and finance, on a cost sharing basis with the private sector, the development of the selected
12
value-chains . The project will support activities to facilitate the creation of appropriate business
models and the institutional structures required to enable the smallholders and their organisation to
engage in value addition and enterprise development. Private sector management of these valuechains is essential. “Commodity champions” can help in developing these commodities with the
support from government agencies e.g. DA, DTI, DOST. The aim is to enable the target beneficiaries
to optimise production of their chosen commodities, improve their market access and competiveness
and generate greater profits. The use of dilapidated and antiquated equipment is one reason for the
low value addition through processing, quality improvement and product differentiation. DAR will also
cause the subdivision of collective CLOAs when and where necessary, as determined by the farmer
beneficiaries to be important to make production and agribusiness work.
65.
Farm Production. As part of the development of the selected value chains, opportunities
exist to improve the quantity and quality of production at the farm level, and the phasing of production
13
to meet market demands. The project will finance the initial costs of inputs (seeds, seedlings ,
fertilizers etc.), tools and equipment, as grants on a cost sharing basis, capacity building for the
farmers and the provision of technical and farm management advice on a continuing basis and other
services, including product testing, soil analysis etc. Farmer training measures could involve farmer
field schools, use of village-based farmer technicians, farm study visits, demonstrations and field
days, provision of brochures and use of radio programmes. Subject matter will include production
technologies and management, adaptation to the threats from climate change (e.g. use of crop
varieties that are resistant to floods or drought, higher average temperatures, changes in rainfall
patterns etc.), environmental awareness raising and good agricultural practices.
66.
This approach could involve the private and/or public sector agencies. Private sector
involvement could come from the extension personnel employed by the buyers or consolidators.
Public sector involvement could include the DAR Development Facilitators (DFs), the technical staff of
the Local Government Units (e.g. agriculture and environment) and the Agricultural Training Institute.
The project will prepare a directory of extension workers during the project start-up period to facilitate
the provision of these services.
67.
Value Addition and Diversification. Most of the commodities produced in the ARC clusters
are traditional crops with limited value addition. Thus, the returns at the farm level are low. The project
aims to add value to the farmers’ share in the value-chains through product differentiation, value
addition and diversification. Project financed interventions will be through the provision of matching
grants when there is a clear opportunity to improve profitability for target group members based on the
11
Assumption: Of the total allocation of USD 10.66 million for Investments in VC Related Rural Infrastructure, 60% will be
invested in farm to market roads; 20% in rehabilitation of irrigation schemes; 10% in storage; 5% in drying pavement and 5% in
water supply.
12
Working Paper 2 explains why it is likely that the project rather than a private sector enterprise(s) will act as the value chain
facilitator(s).
13
Purchased from existing nurseries or from farmer owned nurseries established with project finance (matching grant).
11
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
value-chain analysis that includes an assessment of the profitability of various market options or a mix
of options.
68.
Opportunities exist to build on existing enterprises such as coco-sugar, coffee hulling, and
rubber processing and to develop other enterprises to augment and diversify incomes and minimize
risks especially where significant numbers of women and IPs are involved. For example, rubber has
been selected as the anchor commodity in Salipyasin cluster in Sibugay Province.
69.
Vertical, horizontal and other upgrading strategies to enhance value addition include the
provision of project assistance for product development, branding, packaging, logistics,
certification/accreditation, technology upgrading including equipment upgrading and organisational
development through training (including post-harvest handling and storage, food safety and product
quality). All these activities will focus on meeting market requirements. The project will also finance
equipment associated with the provision of post-harvest facilities such as solar driers and other types
of processing equipment, which meet the eligibility criteria as matching grants.
70.
Market and Investment Facilitation. In addition to value addition and diversification, there
are opportunities whereby smallholders can link directly with agribusiness firms without engaging in
value addition, such as the vegetable contract farming operations of Norminveggies or the
smallholders involved with Cavendish banana and palm oil industries. Where the value chain analysis
identifies opportunities, the project will develop linkages within the value chain particularly between
producers and buyers and input providers that will enhance the profitability of the farm enterprises.
Assistance in consolidating supplies to meet volume and frequency requirements of buyers and
investors is a part of this process.
71.
Assistance provided under this sub-component will include support for improving and/or
14
extending the existing market information systems , conduct of trade fair, business and investors’
forum and assistance in negotiations with buyers and investors for leasehold, contract growing, joint
venture or marketing arrangements.
72.
Various agencies involved in enterprise development such as DA (e.g. Agribusiness Lands
Investments Centre), DTI, DENR, and DOST have initiated activities in market and investment
facilitation. The project will make use of their expertise, as part of the Convergence Initiative, to avoid
overlaps, augment limited resources and provide a more integrated package of services in the priority
chains to be developed.
73.
Provision of Finance. Agricultural production, rural enterprise expansion and agri-business
development all require capital investment, while the ARBs, other smallholders and POs all lack funds
for investment in either fixed or working capital. The project will adopt a combination of approaches to
address this need depending on the location, the commodity involved, availability and accessibility of
funds and agreements between the lenders/buyers/sellers. First, the private sector enterprises
involved in the value-chain may provide the funds required to finance the farmers’ inputs and working
capital. Second, the project will provide matching grant funds to farmers, POs and private sector
organisations that meet strict eligibility criteria for investment required in production, post-harvest
facilities, enterprise establishment and/or marketing. Third, the project can assist eligible farmers and
POs to access grant funds from other sources, e.g. government agencies and other projects. Fourth,
the project will help develop the capacity of viable farmers’ organisations, so they can access finance
from the formal banking sector, government’s finance institutions, e.g. the Land Bank of the
Philippines, the Development Bank of the Philippines, and micro-finance institutions (MFIs). Finally,
the project will work with the financial institutions to develop appropriate financing packages and
products for the value-chain initiatives of the ARC clusters, including those undertaken by the
smallholders. These tasks will require the assistance of a rural financial services consultant.
(i) Sub-component: Investment in Value Chain Related Rural Infrastructure
74.
High post-harvest losses are due to poor post-harvest infrastructure facilities, while the poor
condition of many rural roads increases transport costs and reduce the prices received by the
farmers. A further factor that reduces the returns to the farmers is the lack of functioning irrigation
schemes. Together, these factors combined and low yields result in low farm incomes. In view of this,
14
The texting of the world-market rubber prices weekly by DTI seems to work effectively and assists the cooperatives when
requesting bids from the traders. Market information systems must be simple and accessible to the farmers.
12
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
to support strategic and critical value chains, the project will invest in rural infrastructure sub-projects
that meet the eligibility and prioritisation criteria. All project investments in rural infrastructure will be to
support value chain development. The identification and selection of the rural infrastructure
investment will be based on participatory planning process in consultation with the target ARCs and
target group members.
75.
The eligible infrastructure are farm to market roads (including where necessary bridges and
drainage crossings), the rehabilitation/restoration of Communal Irrigation Systems (CIS), including
15
investments in water harvesting and management , provision of post-harvest facilities – storage,
auction centres etc., and the provision of water supplies required by the processing of local produce
for value chain development. Eligibility criteria include location within the target ARC cluster, the use
of design criteria that conform to national standards, compliance with agreed unit cost ceilings,
availability of counterpart funds from the local governments and beneficiaries as specified in the
project financing plan and project financing agreement and appropriate arrangements for operation
and maintenance of the completed infrastructure. Irrigators’ Associations and farmer
groups/associations respectively will operate and maintain the CIS and post-harvest facilities, e.g.
storage, while LGUs will maintain the farm to market roads. Working Paper 3 has further details.
76.
Component Implementation. Project staff, including the DAR Development Facilitators, the
project’s value chain specialists and other staff, and staff from the other convergence agencies and
partner organisations will require training in value chain facilitation prior to the start of implementation.
The training will include the principles and practices of facilitating and coordinating effective
implementation of value chain interventions and how to effectively facilitate links between the ARBs
and other organisations involved in the chains. Training will be preceded by a training needs analysis
based on their roles in the project and their background on value chain development facilitation.
Working Paper 4 has further details including the scope of work for the consultants who will undertake
the needs assessment and training.
77.
Based on the ARC-VIPs to be prepared during PY1, interested and eligible implementing
agencies (POs, private sector companies, NGOs and academic institutions) will be invited to prepare
proposals for investment and/or service provision in the 11 ARC clusters. The eligibility criteria for
financing non-infrastructure value-chain development, e.g. farm and enterprise development and
value chain equipment proposals include: (i) Consistency with the value chain investment plan
priorities; (ii) Provision of counterpart investment from eligible partner organisation; and (iii) Promotion
of equal opportunities for men and women. The project value chain specialists from the Provincial
Project Management Offices (PPMOs) will facilitate this process and work with interested parties to
prepare the necessary proposals/feasibility studies for submission to the Regional Project
Management Offices (RPMOs). Formats for these proposals will be included in the PIM.
78.
Pending a new government policy on the cost sharing arrangements between the national
th
and local governments after the temporary suspension of the policy on 19 September 2011 through
the Office of the President of the Republic of the Philippines under a Memorandum Order No. 24, the
agreed financing plan for the rural infrastructure (civil works) investment for the project is based on the
financing ratio of 80% for the IFAD loan; 5% for the national government counterpart funds; 12% for
the LGUs; and 3% for the beneficiary contributions. This arrangement will reduce the risk to the
minimum that the poorer LGUs would not be able to benefit from the rural infrastructure investment
financed by the project. Investments in additional road construction will only take place after firm
funding has been secured from participating LGUs. In addition, the capacity of the LGUs to fund and
undertake maintenance of the roads will be closely monitored.
79.
The Integrated Natural Resources and Environmental Management Programme (INREMP) to
be implementation by DENR will cover the provinces of Bukidnon and Misamis Oriental in Region 10,
which would provide investment in rural infrastructure similar to this project. It is important that the
Central Project Management Office (CPMO) and the RPMO in Region 10 and the PPMOs in the two
provinces will closely coordinate with DENR/INREMP to avoid duplication in this regard and also seek
complementarity with the ADB financed Capacity Development Technical Assistance in the two
provinces. In addition, LGUs will be responsible for proposing the rural infrastructure investments that
are critical for the development of the selected value-chains. Implementation of the infrastructure sub15
The maximum area for a CIS is 1,000 hectares; for irrigation development, the project could support investments in water
harvesting and management.
13
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
projects will use the existing procedures followed by the LGUs. Annex 5 includes the eligibility criteria
16
for POs, private sector companies, NGOs, and academic institutions and Annex 4 the details of the
proposed financing arrangements for the non-infrastructure and infrastructure investments. Specialists
at the RPMOs will undertake an initial review of the non-infrastructure and infrastructure proposals
which will be submitted to the Regional Multi-Stakeholder Committee (RMSC) for approval. Annex 5
includes the composition of the RMSCs and their two sub-committees, one for infrastructure and one
for non-infrastructure investments. The project will enter into a memorandum of Agreement (MOA)
with the implementing organisations. Working Paper 2 includes an example of a MOA between DAR
and Catholic Relief Services for a value chain investment proposal.
Component C: Project Management, Monitoring and Evaluation and Knowledge Management
80.
The expected outcome of this component is that the project is completed on time (i.e. six
years and with all accounts closed within 7.5 years) and within the agreed budget (USD 45.2 million)
and to the satisfaction of the beneficiaries (>75% satisfaction rate). The relevant outcome indicators
are: (i) Project implementation is completed within six years and all accounts are closed within 6.5
years; (ii) At least 90% disbursement of IFAD Loan and Grant after 6.5 years of project
implementation; (iii) 95% of the financial and physical targets achieved, without cost overruns; (iv)
Annual expenditures are >90% of the AWPB estimates, PY1-6; and (v) >75% of target households
from PY3-6 satisfied with the services provided.
81.
The output is that the project is managed in a timely, cost effective, transparent manner and a
gender and culturally sensitive manner. The relevant indicators include: (i) Complete, accurate
financial records prepared and audited annually beginning PY1; (ii) Adherence to planning and
reporting procedures and formats PY1-7; (iii) M&E activities are timely, efficient and gender and
culturally responsive PY1-6; (iv) Annual dissemination of lessons learned/knowledge from project
implementation PY4-6; (v) 46 contract and 239 DAR regular staff are in post with qualifications and
experience appropriate for their terms of reference PY1-6; and (vi) At least 30% of the project staff are
female PY1-6.
82.
This component will finance the costs of project management and coordination, compilation,
reporting and monitoring and evaluation activities at national, regional and provincial levels. This
component will also finance the costs of the contracted project staff based in the Central Project
Management Office (CPMO) in Mindanao, the three Regional Project Management Offices (RPMOs)
and in the 11 Provincial Project Management Offices (PPMOs), honorariums for the DAR regular staff
assigned to the project, the costs of equipment, vehicles, short-term consultants, training and
operating costs, preparation of project manuals and contracts for studies etc. Further, the project will
finance policy/case studies and stakeholders’ consultations related to the planning and
implementation of the value-chain approach to agro-enterprise development, mechanisms for
convergence, and any other relevant studies. The studies envisaged could include those related to: (i)
ways of consolidating the production of smallholders to achieve economies of scale in production and
marketing, appropriate business models, contractual and legal arrangements; and (ii) innovative ways
of engaging the private sector in the provision of rural infrastructure to support value-chain
development. The project will support innovative approaches, replication of good practices and
documentation of lessons learned from the project based on effective monitoring and evaluation
(M&E), including baseline and impact studies, and mid-term and project completion reviews.
83.
With pilot investment activities in PY1, the hiring and/or secondment of the project staff,
including the value chain specialists and the procurement process for the recruitment of the team of
consultants who will conduct the value chain analysis and planning and capacity building should start
before project effectiveness to avoid implementation delays (see Annex 14).
E.
Lessons learned and adherence to IFAD policies
84.
The lessons learned that are most relevant to the design of the project come from the
following sources: (i) two IFAD financed projects that DAR implemented in the proposed project area
namely WINCIP and NMCIREMP; (ii) the two phases of CHARMP, in the Cordillera Autonomous
Region implemented by DA, the second of which is on-going; and (iii) an IFAD thematic study of the
experience of 22 pro-poor value chain development projects of which IFAD funded ten.
16
Section III. B includes the proposals for partnerships with the private sector.
14
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
85.
These IFAD projects in the Philippines have focused on the poor and vulnerable sectors of
the society and have shown that with appropriate strategies, improvement of the lives of these people
is possible even in a short period of time. Project interventions should give special emphasis to
developing technical and managerial know-how, providing market access and access to production
capital for poor households. Therefore, project support should not be limited only to institutional
support, technology and inputs for demonstrations and trials. The projects show that active
participation by the beneficiaries and their continuous interactions with the implementing agencies
(national line agencies, NGOs and LGUs) were key to project success. In communities where strong
sense of ownership is built, technologies are replicated and expanded and infrastructure is properly
maintained. As a result, the project will involve the target beneficiaries from the planning phase and
throughout the whole project cycle. Regular community planning, review and updating will enable the
communities to continuously update and address their development priorities.
86.
The Ancestral Domain Sustainable Development and Protection Plan (ADSDPP) preparation
process has proved to be useful in the planning and implementation of IPs community projects. The
project can make use of this process in those areas with IPs that have yet to complete the ADSDPP
preparation process. It is a good way of involving the community members with the local government
agencies and a vehicle to strengthen capacities of IPs in the process.
87.
A key lesson is that rural development interventions will be effective if the agencies involved
adopt a convergence strategy for implementation. Convergence can elicit greater community
participation and ownership. As the project sites cut across areas and sectors under the responsibility
of various agencies, e.g. DENR (upland and forest areas), DAR (ARCs and ARBs), DA (agricultural
technology development), NCIP (IPs), LGUs (rural infrastructure), convergence will be needed for
effective project intervention.
88.
Based on the experience of CHARMP, the role of NGOs should focus on community
mobilisation, training and monitoring and evaluation.
89.
LGU involvement in past project implementation has contributed to greater efficiency and
effectiveness of the project interventions. Their involvement will continue in the proposed project as
co-financiers for the rural infrastructure investments. This practice provides a promise for
sustainability of the project benefits after the end of the project since the LGUs will then be
responsible for the operation and maintenance of the sub-projects.
90.
Functional coordinating mechanisms facilitate project implementation and will be a feature of
the proposed project. The meetings of the existing Barangay Development Teams, and the project’s
proposed coordination arrangements at central, regional and ARC cluster levels are mechanisms for
sharing knowledge, providing feedback to the implementers and for resolving problems. In addition, it
also facilitates the participation of stakeholders at various levels.
91.
Supporting farming households that become entrepreneurial requires funding. The self-help
approach has limitations when it comes to providing the larger amounts of capital needed for
entrepreneurial activities. As a result, the project design focuses on providing matching grants for
investments and helping this group to become good potential clients of MFIs and the formal banking
sector. The project design also includes some assistance to MFIs and the rural banks to develop
financial products that are suitable for these farming households.
92.
Project design includes mechanisms that would enable the benefits of the project to be
sustained and takes into account and builds on indigenous knowledge, systems and practices. These
elements come respectively from the experience of WINCIP and NMCIREMP and CHARMP.
17
93.
The IFAD thematic study found that there are four essential elements that need to underlie
the design of pro-poor value-chain projects and which the project design incorporates namely: (i)
Good governance; (ii) Realising higher farm-gate prices; (iii) establishing strong, inclusive farmers’
organisations; and (iv) An effective outreach to women and the poorest. The approach and processes
included in the design of this project incorporates the relevant best practices identified by the IFAD
thematic study (Annex 3). In this way the project can contribute to reducing the incidence of poverty
among the ARBs and other members of the rural communities living in the target ARC clusters (e.g.
non ARB smallholders, IPs, women and rural youth).
17
Pro-Poor Rural Value-Chain Development, Thematic Study; Vineet Raswant and Ravi Khanna with the assistance of Tamara
Nicodeme, Policy and Technical Advisory Division, Programme Management Department, IFAD, July 2010.
15
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
94.
Project design complies with key IFAD policies in relation to targeting, gender, IPs, private
sector participation and rural finance as described in Annex 12.
III. Project implementation
A.
Approach
95.
This project will use a convergence approach in implementing its activities under the
leadership of DAR. The NCI combines the efforts of three national government agencies involved in
the agriculture, agrarian reform and natural resource sector, namely DA, DAR and the DENR with the
aim of providing more comprehensive and integrated support to smallholders and others in the rural
areas. The project implementation will extend the concept of convergence to involve other agencies
with a potential role to play in project implementation, including DTI, DOST and NCIP as well as the
LGUs.
96.
The project implementation involves essentially two phases. In the first year, the project will
use the 11 feasibility studies as well as existing World Bank value chain analysis (banana, maize and
rice) as the basis for validating beneficiaries’ interest. Activities in the crops validated by the
beneficiaries will start in those communities expressing interest in them. In tandem with the canvasing
of participants and the feasibility studies, the project will identify an appropriate package of activities to
intensify production, improve productivity, and to determine the need for access to markets, roads,
irrigation and other marketing infrastructure to support these crops. Once experience has been gained
with activities pertaining to the selected crops, the project can consider adding other crops/farming
activities of interest to the beneficiaries. This process will involve a simple market demand analysis
and if found that there is ample demand, followed (if necessary), by a simplified value chain analysis
to consider what support should be provided to points along the selected chains for which the project
will provide investment funds. PY2-6 will be the main investment phase of the project in developing
the selected value-chains with project support, winding down during the last year of the project.
97.
The key elements of the overall project approach are the following: (i) Implementation through
the DAR structure at national, regional, provincial and municipal levels, with the participation of the
other convergence agencies using existing government staff to the maximum extent possible; (ii) Use
of the ARC clustering approach developed by DAR for the provision of support to the ARCs for value
18
chain development ; and (iii) An emphasis on knowledge management and learning to ensure that
the experience and lessons learned are available to improve project performance and for wider
dissemination.
98.
The implementation strategy will include: (i) Geographic targeting to identify the project areas
and provide a preliminary list of target commodities for further assessment at the start of the project
for value chain development; (ii) Selection of private sector organisations to provide marketing and/or
other services that meet the proposed eligibility criteria (Annex 5) during the initial participatory value
chain analysis and planning phase; (iii) Self-targeting by members of the target group based on their
interest in participating in project activities; (iv) Non-poor households will be targeted through their
inclusion in the POs or other types of organisations formed; and (v) Provision of public goods, such as
improved farm to market roads, rehabilitated CIS, post-harvest facilities, etc.
99.
Consultations were held with the NCIP, the organisation charged with supporting the
integration of IPs in the mainstream. The approach to working with IPs as a sub-group of the target
group will work within the framework of the NCIP’s Ancestral Domain Sustainable Development and
Protection Plan, as a way of involving the community members with the local government agencies
and a vehicle to strengthen capacities of IPs in the process. This approach involves practicing the
principle of free and prior informed consultation/consent on all project activities through the provision
of adequate information.
B.
Organizational framework
Overall Framework
100.
DAR will be the lead agency for the project implementation under the NCI which will also
involve DA, DENR as well as other agencies including DTI and DOST. DAR, through the Support
18
Section II. A includes the criteria for the selection of the 11 ARC clusters and their locations.
16
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Services Office Foreign Assisted Projects (SSO-FAP), has the necessary institutional capacity and
structure to undertake this role, as well as the experience gained from implementing over 60
externally funded projects, including two recently completed IFAD projects that were implemented
satisfactorily in Mindanao. DAR has staff at all levels of government, down to the municipal level with
the Municipal Agrarian Reform Officers (MARO), and a Development Facilitator (DF) assigned to each
ARC within the 11 ARCs. These staff are available and has the capacity to work with the beneficiaries
given necessary orientation in terms of the project’s approach and capacity building support.
101.
DA and DENR should have the capacity to provide technical backstopping to support field
level implementation. The same applies to DTI and DOST etc. The responsibility for agricultural
extension services has been devolved to the municipalities. The staffing and capacity of the Municipal
Agriculture Office (MAOs) varies with the higher category LGUs having the greatest capacity. The
MAOs could have a role in project implementation as agricultural technicians in support of the DAR
DFs, who have expertise in community development. Similarly, the municipalities have a Municipal
Environmental Officer and infrastructure engineers. All these staff will work as and when needed as
members of the Cluster Project Operations Teams (CPOTs). Annex 5 includes the management
structure, the roles, responsibilities of the project management units, an Agency Capability and
Training Needs Matrix, while Working Paper 4 includes the scope of work of key staff.
National Level
102.
The Project Steering Committee (PSC), chaired by the Secretary of DAR, will be the project’s
policy making body. Other members will be senior officials of oversight agencies (DOF, DBM and
NEDA), the other agencies involved in the expanded national convergence initiative: DA, DENR, DTI,
DOST and NCIP as well as other agencies, the Mindanao Development Authority, the Department of
Interior and Local Government (DILG) and a representative from the private sector. The members of
the PSC will be responsible for providing support and coordination to the project implementation
under their respective mandates. The PSC will also approve the project’s Annual Work Plans and
Budgets (AWPBs), Annual Procurement Plans (APP) and the project implementation guidelines
(PIM). The CPMO will submit the draft PIM to IFAD for review.
103.
The DAR, as the project’s lead agency, will assume full supervision responsibility through a
Central Project Management Office (CPMO) based in one of the three project regions in Mindanao
and part of the SSO-FAP in the DAR Central Office. The SSO-FAP already has a liaison officer
responsible for liaising with IFAD for the IFAD supported projects, the oversight agencies and national
government agencies involved in the national convergence initiatives. The CPMO will coordinate with
other implementing agencies and partners. It will prepare implementation guidelines and consolidate
regional AWPBs, procurement plans, physical and financial reports, withdrawal applications and
audits. The CPMO will serve as the PSC secretariat and the National Project Director will act as the
Committee’s secretary.
104.
The CPMO will provide overall direction and directly supervise project implementation in
Regions IX, X and Caraga. A competent and experienced Project Director will head the CPMO, and a
finance officer, both DAR staff members, will have full signing authorities and other responsibilities
delegated by the DAR Central Office. The Project Director will be accountable to the PSC Chair or
his/her designate and will be assisted with day to day operations by a Project Manager. The CPMO
will have nine staff, including the following contract staff: Project Manager, Value Chain Specialist,
M&E/KM Officer, MIS and Finance and Administration Assistant. In addition, all implementing
agencies will have a “Project Converge” Focal Point at national level through whom the project will
interact with that agency at national level.
Regional Level
105.
There will be a Regional Multi-Stakeholders’ Committee (RMSC) in all three regions covered
by the project. The RMSC will be chaired by the DAR’s Regional Director with representation from DA
and DA agencies, Philippines Coconut Authority (PCA), Fibre Industry Development Authority (FIDA),
DENR, NEDA, DTI, DOST, NCIP, Department of Public Works and Highways (DPWH), DILG,
National Irrigation Authority (NIA) and from the private sector and the beneficiaries. LGUs will serve
as resource persons when the RMSC is reviewing their proposals prior to approval. The RMSC will
advise the regional project implementers on major policy considerations, technical and operational
issues, and will ensure participation of the region-based agencies in project implementation. Two
subcommittees, one for infrastructure and the second for value chain development, will review and
approve the infrastructure and value chain proposals and the investments. To ensure continuity of
17
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
committee membership, members of the RMSC should be senior staff, with permanent alternates
nominated and designated as the agency’s representatives.
106.
The DAR Regional Director will head the Regional Project Management Office (RPMO)
established in Regions IX, X and Caraga. Together with the Regional Director, one finance staff from
the DAR regional office will have signing authorities. The RPMO will supervise and provide technical
support to project implementation in the ARC clusters in the region. It will prepare the regional
AWPBs, manage project funds, undertake procurement for the region, handle monitoring and
evaluation/knowledge management (M&E/KM) activities in the region and submit the required reports
and audits to the CPMO. Each RPMO will have 12 staff including the following specialists: valuechain, rural infrastructure, institutions/gender, M&E/KM and finance and administration.
Provincial Level
107.
There will be a Provincial Project Management Office (PPMO) in every target province with
nine staff and including the following specialists: value chains, M&E/KM and finance and
administration. Under the leadership of the DAR Provincial Agrarian Reform Officer II, the PPMO will
coordinate the implementation of the project activities in the ARC cluster. The PPMO will prepare the
ARC cluster AWPB and procurement plans, and be responsible for project monitoring and reporting of
progress to the RPMO.
ARC Cluster Level
108.
In the ARCs, a Cluster Project Operations Team (CPOT) will be established, responsible for
the implementation of the project activities in the ARC clusters. A MARO will head the CPOT with
membership from the DAR’s Development Facilitators (DFs), LGUs (e.g. Municipal Agriculture Officer,
Municipal Engineer, Municipal Planning and Development Officer, Municipal Environment and Natural
Resources Officer), NCIP Service Centre’s Officer, DENR’s Community Environment and Natural
Resources Officer (CENRO), the private sector, and other implementing agencies as necessary.
Composition of the CPOT will depend on the types of project activities and investments in the ARC
clusters and there may be more than one CPOT working in an ARC cluster.
109.
The Municipal Engineers and Municipal Planning and Development Officers will prepare the
infrastructure proposals and undertake the feasibility studies as required, with the Rural Infrastructure
Engineers in the RPMOs providing the technical assistance needed. If the Regional Engineers are
unable to provide the assistance need by the LGUs, the RPMOs can hire the engineering services
needed on a short-term basis. The Development Facilitators (DFs) from DAR are already working
directly with people’s organisations (POs) in the ARCs to strengthen these organisations. The
Gender/Institutional Development Specialists from the RPMOs will train the DFs and provide the
necessary technical guidance required by the DFs.
Memoranda of Agreement with Other Agencies and LGUs
110.
DAR will execute a memorandum of agreement (MOA) with each of the partner implementing
agencies at the national, regional and provincial levels to specify what services and support to be
provided by each agency and how the services and support will be financed by the project. The LGUs
where investment in rural infrastructure will occur will enter into a MOA with DAR covering their
participation in project implementation and the provision of counterpart funds as required by the
19
project’s financing agreement . The MOA between DAR and the LGUs will include a general
provision to cover project investments, including provision of services and other support, but not
limited only to rural infrastructure. The LGUs may also enter into agreements with concerned national
agencies such as the DPWH and the NIA, among others, for the provision of technical assistance for
design and implementation of rural infrastructure sub-projects.
Partnerships with the Private Sector
111.
For this project private-public partnerships are essential for value-chain development; thus the
private sector (companies and firms, business organisations, financing institutions, non-government
organisations, state universities and colleges and individual entrepreneurs) will be encouraged to
participate under MOA with DAR. Private sector organisations may act as the consolidator/integrator,
business development service providers, value-chain managers or facilitators, or financiers. The
19
The cost sharing arrangements between national government and LGUs has been suspended and a new proposal is due by
30th November 2011. In the event that there is a new cost sharing agreement the Financing Agreement can be revised during
the Mid-Term Review to reflect the changes.
18
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
project will explore different types of partnership arrangements between the project beneficiaries and
the private sector ensuring that such arrangement are fair to farmers and ARC communities. Selection
of private sector organisations involved in the implementation of the component will be on the basis of
complying with the eligibility criteria, submission of an expression of interest and a proposal to provide
investment funds which the project will match in line with the proposed financing arrangements.
Annex 5 includes the criteria for selecting business enterprises, POs, NGOs and academic institutions
that wish to participate in implementing the project.
Links with other initiatives
112.
The project will complement other external development agencies working in the same sector,
such as the AsDB, the Japan International Cooperation Agency and the World Bank, to increase the
impact of the investment from IFAD on poverty reduction and policy dialogue with the government and
other stakeholders. IFAD will also work with government programmes, such as the NCI, for an
improved policy environment and governance. The project will explore different types of partnership
arrangements between the project beneficiaries and the private sector ensuring that such
arrangements are fair to farmers and ARC communities. Private sector organisations and business
development partners can help take a leading role as innovators in improving the returns from the
existing and emerging value-chains in an enterprise-oriented development approach. Linkages will be
built with, e.g. with DTI under the Rural Micro Enterprise Promotion Programme (RuMEPP), ADB for
the Second Cordillera Highland Agricultural Resource Management Project (CHARMP-2) and the new
Integrated Natural Resource Management Project (INREMP).
Policy engagement
113.
The project will finance policy/case studies for policy dialogues and consultations with the
relevant national and local institutions and other stakeholders related to the planning and
implementation of the value-chain approach to agro-enterprise development, mechanisms for
convergence and any other relevant studies. The studies envisaged could include those related to: (i)
ways of consolidating the production of smallholders to achieve economies of scale in production and
marketing, appropriate business models, contractual and legal arrangements; and (ii) innovative ways
of engaging the private sector in the provision of rural infrastructure to support value-chain
development.
C.
Planning, M&E, learning and knowledge management
Planning
114.
At start-up, the project will review the logical framework drafted during the project design
process and prepare a multi-year plan, the Global Work Plan and Budget (GWPB) for achieving
project objectives and targets. Those participating in this process will be the project staff and
stakeholders (representatives of beneficiaries, private sector etc.) from the national and regional
levels. The PSC will approve the GWPB.
115.
Preparation of the Annual Work Plans and Budgets (AWPBs) will be participatory and start at
the ARC cluster level, involving representatives from the ARCs, CPOTs and PPMOs. The starting
point for the AWPBs will be the GPWB, ARC-VIPs, results of the annual project assessments, the
reports of supervision missions and the project’s regular M&E reports. However, as the formulation of
the ARC-VIPs will occur in PY1, the first AWPB will be based on the GWPB.
116.
The RPMOs will consolidate the provincial AWPBs into a Regional AWPB. Subsequently, the
CPMO will consolidate the Regional AWPBs into a National AWPB. The consolidated AWPB will be
submitted to IFAD for endorsement and no objection and subsequently to the PSC for approval.
117.
Working Paper 5 includes appropriate formats for planning and budgeting, which are aligned
with the government’s planning and budgeting formats, while the time table for preparing the AWPBs
is aligned with the government’s annual budgeting process.
Monitoring and evaluation
118.
M&E System. The project will have a results-based M&E system, which will include a
management information system (MIS), and will report the status of project implementation and
progress in terms of: (i) outputs; (ii) outcomes; and (iii) impact. The computer-based MIS which will
include the project’s M&E and financial databases will be installed at the PPMOs, RPMOs and CPMO.
The software and MIS will be linked to DAR’s MIS. The M&E system will be based on the logical
19
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
framework and aligned with the Department of Budget and Management’s (DBM) Organisational
Performance Indicator Framework (OPIF), NEDA’s Results-based M&E (RbME) and IFAD’s RIMS.
The project will adhere to the prescribed procedures and forms instituted by the Regional Project
Monitoring and Evaluation System of the Regional Development Council.
119.
The overall M&E system will consist of regular reports and process monitoring by the CPMO
based on data provided by the regional and provincial project management offices and implementing
agencies, and based on the project’s physical progress data and financial accounts maintained by the
CPMO and regional/provincial offices. Indicators to be monitored will include those in the project’s
logical framework, IFAD RIMS, and the other indicators as required by the DBM’s OPIF and NEDA’s
RbME. The M&E system will be gender and IPs responsive not only in terms of participatory data
gathering, but will include also a gender and culture responsive data analysis and reporting of results.
A crucial factor for the analysis will be that the data is disaggregated to show the participation of men
and women and to show the roles of men and women in particular activities, e.g. how are women and
men participating and managing projects, what are the benefits to men and women, how are the
needs of men and women being addressed, the extent of gender equality and indicators that measure
women's empowerment.
120.
At project start-up the SSO-FAP will recruit a consultancy to design the results-based
monitoring system and MIS, including a GIS-based system, for mapping the commodities and other
relevant data in target ARC clusters. Also during PY1, the SSO-FAP will hire consultants to undertake
a baseline survey to cover all indicators of the logical framework, including the RIMS indicators.
20
Subsequently, the project will undertake mid-term impact survey and completion impact survey to
cover all indicators of the logical framework, including the RIMS indicators. There is no data at this
stage for the absolute numbers for household assets index and child malnutrition. Therefore, these
indicators should be converted into absolute numbers once the baseline results are available. The
same will apply to farm gate prices for specific crops.
121.
IFAD and the government will conduct a mid-term review to assess the performance and
progress of the project, the achievements, constraints and initial impact of the project in relation to the
expected project objective and continued validity of the project design; make necessary design
changes; and recommend amendments to the Project Financing Agreement. A project completion
review (PCR) will be conducted before project completion.
122.
Monitoring and Evaluation and Knowledge Management Units (M&E/KM) will be
established in each of the CPMO, RPMOs and PPMOs, with responsibility for the M&E and KM in
their respective areas. The CPMO M&E/KM unit will have overall responsibility for the project’s M&E
and KM. The M&E/KM units will collaborate with the M&E units or M&E focal persons of the
implementing agencies and partners.
Learning and knowledge management
123.
The project’s M&E/KM Units will also take charge of knowledge management. Project
knowledge will be mainly generated through the M&E system. These regular M&E activities will be
complemented with studies on the special features of the project. These may take the form of case
studies, documentation of systems, photo and video documentation, field stories, etc. Results from
these studies will be disseminated to project management, the implementing agencies at all levels,
community participants, and other project stakeholders. Knowledge sharing will be undertaken by the
project during the annual assessments and planning fora, through publications, the project website
and other appropriate forms of communication. In this respect, the project will prepare a knowledge
management cum communication plan as part of the M&E plan. Working Paper 5 has further details.
124.
At the country programme level, the project will participate in knowledge sharing platforms
managed by the IFAD Philippines Country Office, including Annual Country Programme Review,
Knowledge and Learning Market and “virtual” information sharing through the IFAD Country
Programme Facebook page and the IFAD-Asia Philippines portal. Annex 6 has some further details.
125.
Information Flows. The information gathering and reporting flow will follow the project’s
management structure. At the ARC clusters, the DAR DFs with the assistance of a team of ARC
20
There is a possibility that annual RIMS outcome surveys will replace the mid-term survey. Conduct of annual outcome
surveys would not be a new exercise for DAR which has used this methodology to measure outcomes of their foreign-assisted
projects, including the IFAD assisted NMCIREMP.
20
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
monitors will have responsibility for data gathering and reporting to the M&E staff in the PPMO. The
private sector value chain enterprises participating in the project will report on the progress of their
engagement in the ARC clusters using reporting forms prescribed by the project and referred to in
their MOA. These enterprises will submit their reports to the MARO, heading the CPOT, who will
forward the report to the PPMO. The PPMOs will consolidate the M&E reports and submit them to the
M&E staff in the RPMOs who will consolidate the provincial reports and will submit the reports to the
M&E staff in the CPMO. The CPMO M&E officer will consolidate the regional reports and prepare a
unified project report. Working Paper 5 has further details.
126.
M&E Plan. After the project design completion mission, the SSO-FAP will start preparing an
M&E plan. The plan will show, among others: (i) how M&E system will support decision making and
learning/knowledge management; (ii) how the project’s M&E will link with the OPIF, RbME, and RIMS;
(iii) the performance indicators: outputs, outcomes, impact; (iv) what data/information to gather (as
indicated in the logical framework, with data related to the selected value-chains); (v) who will gather
and consolidate the data; (vi) what formats to use; (vii) what type of reports to prepare for different
users; (viii) the timing and frequency of reporting; and (ix) roles and responsibilities of all key
stakeholders involved in M&E and learning/knowledge management. Working Paper 5 has further
details and Annex 6 includes further details of the OPIF, RbME and RIMs.
D.
Financial management, procurement and governance
127.
The Department of Finance will be the Representative of the Borrower, i.e. the Republic of the
Philippines and the signatory to the Project Financing Agreement. The financial management of the
project will follow the government systems, rules and regulations on receipts and disbursements of
proceeds from loans and grants in so far as it is consistent with IFAD’s standard disbursement
procedures. The Philippine New Government Accounting System uses a standard chart of accounts,
adopts the one fund concept with one set of books of accounts and appropriate ledger accounts for a
specific project using the project or the responsibility centre code, and produces financial reports
which conform to International Accounting Standards. Separate fund accounting will be applied to the
project funds. The Bureau of Treasury (BTr) through DAR will maintain two Designated Accounts (one
for the loan and one for the grant) to which funds from the IFAD Loan and Grant will be transferred
upon receipt of Notice of Cash Allocation (NCA) from the DBM. The NCA is an advice that cash is
credited to the accounts of the DAR.
128.
The DAR through the CPMO will be responsible for overall management of project funds
which includes the oversight of project operations, finance and procurement, providing implementation
support to the project implementers; review and consolidation of project annual work plans and
budgets (AWPB); physical and financial reports and audits; and consolidation of Statement of
Expenditures (SOEs) and withdrawal applications. The RPMOs and the PPMOs will in turn be
responsible for project funds that they will receive for the implementation of the project within their
respective offices/jurisdictions and in accordance with the AWPB.
129.
The CPMO will formulate project guidelines based on the Project Implementation Manual
(PIM) for the preparation and implementation of the AWPBs and procurement plans; preparation of
financial reports; proper documentation of financial transaction; accounting and safekeeping of
records; preparation and submission of withdrawal applications through the SSO-FAP, receipt and
disbursement of project funds, etc. Such guidelines will be consistent with the Government’s and
IFAD policies, systems and procedures.
130.
The Regional and Provincial Project Managers will prepare and implement their AWPBs and
disburse project funds within the limits of their delegated authorities. They will exercise signing
authorities delegated to their respective positions/offices under DAR General Memorandum Order No.
1-2011, i.e. region PHP 5.0 million (USD 115,000) and province PHP 2.0 million (USD 46,000). There
will be cases where the authorized limit particularly at the Regional Level is insufficient to cover the
cost of proposed contracts; when requested and justified, the DAR Central Office will provide a waiver
or delegate authority for the Regional Director to approve such contracts.
131.
The project has been included in DAR 2012 budget. The project has also been included in the
DAR Budget Strategy for the entire project period submitted to the DBM which will receive approval
once the Investment Coordination Committee approval process is complete. Annex 7 includes the
details of the Fund Flow and disbursement procedures.
21
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Audit
132.
The project audit will follow the IFAD’s “Guidelines on Project Audits (Borrowers’ Use)”. Annual
financial reports for the project funds will be prepared following the usual accounting and auditing
rules and regulations. Auditors from the Commission on Audit assigned to the disbursing offices will
conduct the annual audit of project accounts and transactions as prescribed in auditing rules and
specified in the financing agreement with IFAD. The audit report will be made available to IFAD and
Government within six months after the end of each fiscal year. Annex 7 includes the draft Audit TOR.
Procurement
133.
The project will follow the government’s procurement regulations (RA 9184) using the latest
Implementing Rules and Regulations to the extent that they are consistent with IFAD’s Procurement
Guidelines. The RA 9184 and its Implementing Rules and Regulations have been harmonized with
the procurement procedures of most foreign funding institutions and are acceptable to IFAD.
Generally, the RA and IFAD Procurement Guidelines have the same methods of procurements,
although some procurement thresholds differ. When there are divergences between the RA and the
IFAD Procurement Guidelines, the IFAD Guidelines will take precedence. Annex 8 includes details of
the proposed procurement methods.
134.
The CPMO will take the lead in procuring most of the bulk items of the required goods and
services. Other items will be procured at the Regional Offices. DAR has undertaken many foreign
assisted projects and has an advanced level of capability as far as procurement is concerned. Bids
and Awards Committee are established in the Central and Regional offices following the procedures
prescribed in RA 9814 and the associated Implementing Rules and Regulations.
135.
To avoid delays in implementing the pilot value chain interventions and the value chain
analysis and planning activities, there is a particular need to fast track the hiring and/or secondment of
the project staff and recruitment of consultants.
Governance
136.
IFAD has a zero-tolerance policy in respect of fraudulent, corrupt, collusive or coercive
actions. Where an investigation performed by IFAD, the borrower or another competent entity, has
determined that fraudulent, corrupt, collusive or coercive actions have occurred in projects financed
through its loans and grants, and IFAD will enforce sanctions in accordance with the provisions of
applicable IFAD rules and regulations and the Financing Agreement. Project implementation will
follow the PIM, which will have provisions for address the potential risks for corruption by
implementing agencies.
137.
In addition, the design incorporates the following “demand side” measures for good
governance. The first set relates to disclosure provisions: (i) Making publicly available all key
documents; (ii) Notifying promptly all bidders of the contract awards and the summary of the
evaluation of all bids; (iii) Allowing representatives of the end-users to attend the public bid openings;
(iv) Making available the details of all contracts awarded; and (v) Making available the date of request
for all contract payments and the date of each payment, with explanation of the reason for any delays.
The second set of measure is the standardisation of certain items, e.g. (i) Use of standard wording in
advertisements; (ii) Agreement on the newspapers in which specific advertisements will be placed; (iii)
Use of standard bidding and contract documents and request for proposals (for consultancy service),
with no further changes to be made without IFAD’s prior approval; and (iv) Publication of prices paid
for items in different locations. The third set of measure is a complaints handling mechanism (and the
use of sanctions), whereby ARBs and others can channel complaints or inquiries e.g. through the use
of mobile phone text messaging. Complaints and inquiries will be systematically recorded and
answered. The project will also post complaints on the project’s website so that case processing will
be more transparent. Designated staff at the CPMO, RPMOs and PPMOs will handle complaints and
respond in a timely manner.
138.
The arrangements for IFAD’s direct supervision, the M&E, financial management,
disbursement and procurement systems and audit are all designed to ensure that corruption in any
form does not occur. Annex 15 is the Project’s Good Governance Framework.
E.
Supervision
22
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
139.
Project supervision during the first 12-18 months will focus on ensuring that there are no
delays in project start-up and address any bottlenecks that may occur. Supervision will focus
specifically: (i) The various aspects of overall project management to ensure that the GWPB is
prepared and approved and that the PY1 AWPB is operational; (ii) The PIM, which will be prepared by
the CPMO following the design completion mission and before project start-up is in use; (iii)
Assessment of the project institutional arrangements and project management and coordination
related issues; (iv) Assessment of the results of the validation of the priority crops of interest to the
POs and review of the need for market demand and value chain analysis for additional crops; (v)
Assessment of the implementation of the pilot value chains to gain lessons, as a failure to undertake
these activities in a timely fashion will delay project implementation and/or lose the benefits learned
from the initial stages of the pilots; (vi) Review of terms of reference of the project value-chain staff
and consultants and making and agreeing changes, if necessary; (vii) Re-examining the need for
subsidies and review options for cost recovery through the use of guarantees for bank loans to
participating enterprises and the ability of famers to obtain production credit; (viii) The project
accounting and internal controls are in place at central, regional, provincial levels and within the ARC
clusters; (vi) The bank accounts have been opened and the initial deposit received from IFAD; (ix) A
functioning M&E/KM system has been set up; (x) The initial procurement of goods and services,
especially that of the project management staff and value-chain consultants, is completed in a timely
fashion; and (xi) The training relating to various aspects of project management, e.g. financial
management, procurement, physical and financial reporting, etc. is being implemented. By
concentrating on these subjects, the delays that often affect the start-up of IFAD projects can be
avoided or addressed before they lead to significant delays.
140.
Annually, IFAD and NEDA will conduct a full supervision and implementation support mission
jointly with the government and a post-supervision mission 6-9 months later depending on progress.
Expertise required will include: (i) A value-chain specialist familiar with Mindanao and value-chains
that have provisionally been identified during project design; (ii) A rural infrastructure specialist; (iii) A
fiduciary review specialist familiar with both IFAD and government procedures responsible for
financial management, loan and grant disbursement and procurement; and (iv) A community
development specialist from time to time. Staff members from IFAD, the DAR SSO-FAP and NEDA
will also be on the missions.
F.
Risk identification and mitigation
141.
There are three key government policies that are essential for project implementation. The
first is the policy that supports value chain development as an element of the government’s strategy
for improving food security and farm incomes. The second is the NCI. The third is the National
Government and LGU Cost Sharing Policy. The first two policies are prominent elements of the PDP
and as such unlikely to change in the foreseeable future. In addition there is a high level of political
commitment to the NCI. Therefore, the project should not face risks at the policy level for the first two
policies.
142.
However, there are three risks associated with the NCI at the operational level as envisaged
in the project design. The first is that the three NCI agencies will be unable to provide the type of
coordinated approach that is needed to make the NCI effective. While the policy may be in place at
the national level, ensuring effective coordination in the field will be more difficult. This risk is
compounded by the fact that the convergence envisaged under this project includes agencies other
than DAR, DA and DENR, e.g. DTI, DOST, NCIP etc. Project design counters this risk with several
measures. First, all the agencies with a role to play in the project implementation will be members of
the PSC which is the project’s policy making body and able to resolve inter-agency coordination
issues. In addition, all implementing agencies will have a “Project Converge” Focal Point at national
level through whom the project will interact with that agency at national level. Second, the design
includes the three RMSCs with representation from all the relevant agencies to ensure effective
coordination of implementation in the regions and ARC clusters. Third, within the ARC clusters, there
will be CPOTs which will include the staff involved in the day to day project implementation, namely
the MARO and the DAR DFs, and the staff of the relevant LGU offices, Planning, Engineering and
Agriculture as and when needed.
143.
The second risk concerns the willingness of the private sector to be involved in the
implementation of Component B, I-SHARED which is essential for the success of the project. This risk
23
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
is addressed in the project design in two ways through component A and the participatory analysis
and planning process, which will include all potential participants, including the representatives of the
private sector agencies involved in the particular value chains under analysis. During the value chain
analysis and planning process, publicising the availability of grants for value-chain development to
match investments from the private sector, the size of the grants available and the terms and
conditions of the grants for different interventions. This process depends on the appointment of
suitable key staff and consultants.
144.
As for the National Government and LGU Cost Sharing Policy, the major risk is associated
with the weak capacity of the poorer LGUs to provide the required counterpart funds for rural
th
infrastructure investment. On 19 September 2011, the Office of the President of the Republic of the
Philippines issued a Memorandum Order No. 24 to temporarily suspend the Cost Share Policy.
Pending a new government policy on the cost sharing arrangements between the national and local
governments, the project design counters this risk by reaching an agreement with the government on
a financing plan for the rural infrastructure (civil works) investment based on the financing ratio of 80%
for the IFAD loan; 5% for the national government counterpart funds; 12% on average for the LGUs;
and 3% for the beneficiary contributions. This arrangement will reduce the risk to the minimum that
the poorer LGUs would not be able to benefit from the rural infrastructure investment financed by the
project.
IV. Project costs, financing, benefits and sustainability
A.
Project costs
145.
Estimated project costs, including contingencies are shown in the table below and further
elaborated in Annex 9 and Working Paper 6. Overall, the proposed project would cost about USD
52.53 million (PHP 2,285 million) over a six year implementation period. This figure includes taxes
and duties estimated at USD 5.96 million or 11% of total costs.
(PHP Million)
Local
Foreign
Total
Com ponents
A. Participatory Value-Chain Analysis and Planning
B. Integrated Sm allholders Agricultural and Rural Enterprise Developm ent1
1. Farm and Value Chain Enterprise Development
2. Value Chain Related Rural Infrastructure
Subtotal
C. Project Managem ent, M&E and Know ledge Managem ent
1. M & E and Know ledge Management
2. Project Management
Subtotal
Total BASELINE COSTS
Physical Contingencies
Price Contingencies
Total PROJECT COSTS
%
% Total
Foreign Base
Exchange Costs
(USD Million)
Local Foreign Total
30.2
7.8
38.0
0.70
0.18
0.87
20
2
1,006.6
350.4
1,357.0
348.0
206.9
554.9
1,354.6
557.3
1,911.9
23.14
8.05
31.19
8.00
4.76
12.76
31.14
12.81
43.95
26
37
29
63
26
89
61.6
90.2
151.9
1,539.1
53.9
45.7
1,638.7
12.3
31.4
43.7
606.4
21.2
18.7
646.3
74.0
121.6
195.6
2,145.5
75.1
64.4
2,284.9
1.42
2.07
3.49
35.38
1.24
1.05
37.67
0.28
0.72
1.00
13.94
0.49
0.43
14.86
1.70
2.80
4.50
49.32
1.73
1.48
52.53
17
26
22
28
28
29
28
3
6
9
100
4
3
106
146.
Price contingencies have been included at 3% as agreed with NEDA. Physical contingencies
have been computed at 3.5% of base cost on all items. In USD terms, physical contingencies amount
to USD 1.73 million and price contingencies to USD 1.48 million, resulting in total contingencies of
USD 3.21 million (6.5% of Total Base Costs).
B.
Project financing
147.
Proposed project financing in USD is set out in the table below.
Com ponents
A. Participatory Value-Chain Analysis and Planning
B. Integrated Sm allholders Agricultural and Rural Enterprise Developm ent1
1. Farm and Value Chain Enterprise Development
2. Value Chain Related Rural Infrastructure
Subtotal
C. Project Managem ent, M&E and Know ledge Managem ent
1. M & E and Know ledge Management
2. Project Management
Subtotal
Total PROJECT COSTS
IFAD Loan
Am ount
%
Governm ent
Am ount
%
LGUs
Am ount
%
Beneficiary/Prop
Am ount
%
Total
Am ount
For.
Exch.
%
Local
(Excl. Duties &
Taxes) Taxes
0.58
63.5
0.34
36.5
-
-
-
-
0.92
1.8
0.19
0.65
0.09
11.78
10.86
22.63
35.6
79.0
48.3
1.72
1.05
2.77
5.2
7.6
5.9
2.01
1.47
3.48
6.1
10.7
7.4
17.56
0.37
17.93
53.1
2.7
38.3
33.07
13.74
46.81
63.0
26.2
89.1
8.49
5.10
13.60
20.63
7.01
27.64
3.95
1.62
5.58
0.93
0.86
1.80
25.01
50.9
29.0
37.4
47.6
0.90
2.10
3.00
6.11
49.1
71.0
62.6
11.6
3.48
6.6
17.93
34.1
1.83
2.96
4.80
52.53
3.5
5.6
9.1
100.0
0.31
0.76
1.07
14.86
1.41
2.01
3.43
31.71
0.11
0.18
0.30
5.96
148.
Financing comprises: (i) IFAD loan of USD 25.0 million (47.6%); (ii) National Government
counterpart of around USD 6.11 million (11.6%); (iii) LGU financing of USD 3.48 million (6.6%); and
24
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
(iv) funds or contributions in kind from proponents and beneficiaries of about USD 17.93 million or
(34.1%). The estimated average cost per actual beneficiary (189,000) is around USD 300 per person,
or around USD 1,615 per household, including all investment and recurrent costs. The IFAD loan will
be on Intermediate Terms and Conditions.
149.
The project has been included in DAR 2014 and 2015 budget. The project has also been
included in the DAR Budget Strategy for the entire project period submitted to the DBM which will
receive approval once the Investment Coordination Committee approval process is complete, which
will be an assurance in the Project Financing Agreement.
150.
Retroactive financing of up USD 500 000 from the IFAD loan will be available to finance the
rd
costs of the following key preparatory activities, after 3 November 2011: (i) Preparation and
finalisation of the PIM; (ii) Preparation of bidding documents for procurement in PY1; and (iii)
Establishment of the CPMO, RPMOs and PPMOs. The government will provide funds to pre-finance
the costs of these activities prior to the Date of Effectiveness. These activities and associated detailed
budget should be included in the draft AWPB for 2015.
C.
Summary benefits and economic analysis
151.
The objective of the project is to raise incomes within the project area through improvement of
value chains for those products that can be profitably and sustainably produced in the area by the
targeted beneficiaries. There are about 150,000 rural households in the 11 target ARC clusters
comprising ARBs, other smallholders, rural youth and IPs. Participation in the project is potentially
open to all rural households in the 11 clusters, while the actual numbers participating will depend on
both the demand for project services by rural households and the capacity of the project to deliver,
given its resources. It is estimated that about 35,000 rural households will benefit directly from the
project, including 3,000 jobs to be generated by the project in the value adding sub-sector. Additional
benefits will come from the project’s capacity building programme, e.g. strengthened capacity to
participate in value chain and rural enterprise development and improved capacity of the
implementing agencies to target and manage poverty reduction and rural development programmes in
a gender sensitive and participatory manner. The project’s road investments are also likely to benefit
some additional households i.e. households who would not also benefit from the value chain
improvements.
152.
The main incremental outputs following project investment in the target ARC clusters would
come from the priority products selected by the feasibility studies (coconut sugar, rice, rubber, coffee,
abaca, muscovado sugar, coconut and bio fertilizer and cassava.). The likely benefits at the farm level
would stem from increased production, more value added at the farm level and higher prices as a
result of both quality improvement and more efficient marketing.
153.
The likely magnitude of the financial and economic impact of the project has been assessed
by the 11 feasibility studies. All the studies give attractive financial benefit cost ratios to rural
household and show sound economic returns. Based on these feasibility studies, the amount of
funding available and the estimated cost of implementing the project, the overall economic rate return
is 44.6%, and the Net Present Value @15% PHP 5,218 million. This rate of return is well above the
NEDA hurdle of 15%.
154.
Based on the feasibility studies, net project financial benefits will be about PHP 747 million
per year by 2020 and peak at nearly PHP 3,470 million ten years later when the full income from the
rubber planted under the project will be realised. It is not clear what proportion of the households
living in the project area are likely to share in the net benefits or what proportion of the net benefits will
accrue to these rural households, as some of the net benefits will accrue to non-project participants,
including road users not engaged in value chain development and the various agribusiness
participants. If 60% of the benefits accrue to the rural households and 35,000 benefit, the annual
income impact on these households in real terms would be average of about PHP 12,800 per year by
2020 and peak at about PHP 59,500: a real income increase of about 11% by 2020 and 52% by 2030
over the 2009 levels.
D.
Sustainability
25
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
155.
The following elements are built into the project design to help ensure that the proposed
investments and benefits are sustainable. First, the completion prior to project approval of 11 detailed
and participatory feasibility studies for investment in the priority commodity of each ARC cluster will
help ensure the proposed investments will be sustainable and avoid delays in project implementation.
Secondly, the project design has a strong focus on the involvement of the private sector on a longterm basis to enhance the sustainability of the investments and benefits. With such an involvement,
there is a much greater chance of the investments made by the project being sustainable, especially,
if these project investments are matched by investment from the private sector. Thirdly, the project’s
support for farmers’ organisations (POs, cooperatives and associations) with the required
management and financial capacity will enable them to enter into contractual arrangements with the
private sector. At the same time, the project would support new types of arrangements that can link
smallholders with the private sector to enable the smallholders to move up the supply chain and
receive more value addition. This approach is designed to help existing farmers’ organisations
become sustainable and significant players in their chosen value chains as well as creating new types
of links between smallholders and the private sector. Such an approach should benefit all the
smallholder members of these various organisations. Fourthly, the beneficiaries and LGUs will be
involved in providing counterpart funds for infrastructure facilities and be responsible for their
operation and maintenance. Participatory planning involving the beneficiaries, LGU financial
contributions to the investment costs and beneficiary responsibility for the O&M of the CIS/CIP are all
parts of this approach. LGUs that have not maintained farm to market roads financed under other
projects will not be eligible for project assistance. Fifthly, project design takes into account the
knowledge, systems and practices of the IPs, which will also help ensure the sustainability of project
interventions in areas where IPs are present. Finally, 18 months before the completion date, the
CPMO will work closely with all stakeholders at the national, regional, provincial and municipal levels
and with ARCs and barangays to finalise an exit strategy and sustainability plan for review by IFAD,
which should contain: (i) Specific mechanisms to ensure sustainability of the investment after the end
of the project; (ii) Summary of benefits from the project investment, major policy and operational
issues and lessons learned; and (iii) Recommendations for policy support (e.g. requirement for
budgetary support from agencies or LGUs), technical support required and administrative
arrangements after the end of the project.
Innovation and Scaling Up
156.
The project will be the first foreign assisted project under DAR to support the NCI. The
project’s investment is quite small when compared to the growth needed to make a serious dent in
rural poverty in Mindanao. However, the project could be catalyst for improving household incomes
and attracting further investment for scaling up to fully realise the potential benefits from the
comparative advantage that Mindanao has in key agricultural commodities.
26
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 1: Country and rural context background
Appendix 1: Country and rural context background
I.
POLICY ENVIRONMENT
Philippine Development Plan 2011-2016
1.
National planning and policy making is based on five-year Development Plans and the
Philippine Development Plan (PDP) 2011-2016. The focus of the PDP is inclusive growth, which is
defined as “growth that is enough to matter given the country’s large population, geographical
differences and social complexity. It is substantial growth that creates jobs, draws the majority into the
economic and social mainstream and continuously reduces poverty”. Low growth, weak employment
generation and persistently high inequality are the immediate reasons for the failure of inclusive
growth in the country to date. The underlying structural causes include: (i) inadequate infrastructure:
(ii) major gaps and lapses in governance; and (iii) inadequate levels of human development. Factors
that provide a good opportunity to break out of its perennial condition of poverty, inequity and lagging
human development, include a healthy external payments situation, years of trade reform leaving an
industrial sector fairly undistorted by subsidies and heavy protection, a stable currency and low
inflation and positive political developments.
National Convergence Initiatives
2.
A Joint Memorandum Circular signed by the three agencies in December 2010 adopted a
shared Policy and Implementation Framework for the NCI. This enables the three agencies (DA, DAR
and DENR) to collectively respond to the common mandate of increasing income, improving
productivity and generating employment in rural communities through the “ridge-to-reef” development
approach towards inclusive growth and sustainable rural development.
3.
Priority convergence sites and prospective agro-enterprise projects have been identified to
improve agriculture and facilitate agri-business investments in the three target regions (and
elsewhere) involving the three agencies in cooperation with local government units (LGUs), nongovernment organizations (NGOs), People’s Organizations (POs) and the private sector.
Agriculture and Fisheries Modernization Act and Strategic Agriculture and Fisheries
Development Zones
4.
The Agriculture and Fisheries Modernization Act (AFMA) of 1997 (Republic Act 8435) aims to
modernize the agricultural and fishery sectors by promoting a technology-based industry to enhance
profitability by ensuring equitable access to assets, resources and services, and promoting highervalue crops, value-added processing, agribusiness activities, and agro-industrialization. It also seeks
to empower people’s organizations, cooperatives and NGOs.
5.
AFMA provides trade and fiscal incentives to qualified enterprises engaged in agriculture and
fisheries (including cooperatives, associations and consolidators) by granting exemption from
payment of tariff duties on all types of imported agricultural and fishery inputs, equipment and
machinery until December 2015 (RA 9281).
6.
Implementation of the AFMA is now being made operational in the Strategic Agriculture and
Fisheries Development Zones (SAFDZ). DA has prepared regional and provincial SAFDZ plans and
maps delineating production, agro-processing and marketing zones within the network of protected
areas for agricultural and agro-industrial development at the regional, provincial and municipal levels.
SAFDZ Plans include the agrarian reform areas and define the role and contribution of Agrarian
Reform Communities (ARCs) in the overall strategy to jumpstart agriculture development in the
various municipalities and provinces.
II.
COMPREHENSIVE AGRICULTURAL REFORM PROGRAMME (CARP)
7.
The Government has long recognized that asset reform is a key to improving agricultural
productivity and reducing rural poverty. As a response, the Comprehensive Agrarian Reform
Programme (CARP) was adopted in June 1988 to address asset inequities by redistributing about 5.1
million hectares of agricultural lands to three million beneficiaries. The area of land distributed to date,
27
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 1: Country and rural context background
is about 4.1 million hectares benefitting some 2.4 million farmers, who can form the base for a more
dynamic agriculture sector and provide an incentive for others to invest in agriculture.
Agrarian Reform Communities Development Strategy
8.
Provision of CARP support services has been primarily through ARC development, a strategy
adopted first in1993, which aims to increase productivity and incomes through a comprehensive,
integrated, area-based approach to building rural communities. ARC development aims to provide a
package of services to empower people’s organizations, improve basic infrastructure and social
facilities, improve the agricultural technology used, and promote agribusiness development and rural
enterprises. This area focused approach involved support services delivery in priority areas to
improve farm productivity and develop the capability of farmers to become efficient agricultural
producers and entrepreneurs as well as land distribution.
Financial Assistance for ARC Development
9.
Since 1992, Official Development Assistance (ODA) has been a major source of finance for the
support services programme for ARCs and ARBs. Resources mobilized by DAR total PHP 76.6 billion
(equivalent to USD 1.78 billion at the current exchange rate) for 60 foreign-assisted projects (FAPs) in
loans and in grants, from bilateral and multi-lateral sources (e.g. Asian Development Bank, European
Union, International Fund for Agricultural Development, United Nations Development Programme,
World Bank and bilateral agencies including the governments of Belgium, Canada, Italy, Japan, and
Sweden. In the ten years up to 2009 the agriculture, agrarian reform and natural resources sector has
accounted for 18% of the average net loan commitments, the second highest after infrastructure,
63%. In terms of grants the sector accounted for 18% of the total, third behind social reform and
community development (39%) and governance and institutional development (32%).
10.
Through ODA, about 60% of the ARCs have experienced socio-economic improvement and
more opportunities for economic growth. However, considering the huge development requirements of
the ARCs, only about 65% of the ARBs have received substantial assistance and only 49% of the
estimated development requirements based on ARC Development Plans have been addressed so far.
The underserved and un-served ARBs, including the new farmer beneficiaries require support
services to open more opportunities for economic growth, increase the productive capacities and
competitiveness of ARBs, and improve the living conditions in the rural areas. Based on estimates,
the investment gap for support services in ARCs alone stands at about PHP 87 billion.
28
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 1: Country and rural context background
PHILIPPINES COUNTRY DATA
Land area (km2 thousand) 2008 1/
Total population (million) 2008 1/
Population density (people per km2) 2008 1/
Local currency Philippine Peso (PHP)
298
90.35
303
Social Indicators
Population growth (annual %) 2008 1/
Crude birth rate (per thousand people) 2008 1/
Crude death rate (per thousand people) 2008 1/
Infant mortality rate (per thousand live births) 2008 1/
Life expectancy at birth (years) 2008 1/
Total labour force (million) 2008 1/
Female labour force as % of total 2008 1/
Education
School enrolment, primary (% gross) 2007 1/
Adult illiteracy rate (% age 15 and above) 2008 1/
GNI per capita (USD) 2008 1/
GDP per capita growth (annual %) 2008 1/
Inflation, consumer prices (annual %) 2008 1/
Exchange rate: USD 1 = 43.50 PHP as of June 2011
Economic Indicators
1.8
25
5
26
72
37.88
38
112
6
GDP (USD million) 2008 1/
GDP growth (annual %) 1/
2000
2008
Sectoral distribution of GDP 2008 1/
% agriculture
% industry
% manufacturing
% services
Malnutrition prevalence, height for age (% of children under 5)
2008 1/
Malnutrition prevalence, weight for age (% of children under 5)
2008 1/
Health
Health expenditure, total (as % of GDP) 2007 1/
Physicians (per thousand people) 1/
Population using improved water sources (%) 2006 1/
Population using adequate sanitation facilities (%) 2006 1/
Agriculture and Food
Food imports (% of merchandise imports) 2008 1/
Fertilizer consumption (hundreds of grams per ha of arable
land) 2007 1/
Food production index (1999-01=100) 2007 1/
Cereal yield (kg per ha) 2008 1/
Land Use
Arable land as % of land area 2007 1/
Forest area as % of total land area 2007 1/
Agricultural irrigated land as % of total agric. land 2007 1/
n/a
28
166 909
6
3.8
15
32
22
53
Consumption 2008 1/
General government final consumption expenditure (as %
of GDP)
Nutrition
Daily calorie supply per capita
1 890
2
9
Household final consumption expenditure, etc. (as % of
GDP)
Gross domestic savings (as % of GDP)
10
77
13
28
Balance of Payments (USD million)
Merchandise exports 2008 1/
Merchandise imports 2008 1/
3.9
n/a
93
78
49 025
59 170
Balance of merchandise trade
-10 145
Current account balances (USD million)
before official transfers 2008 1/
after official transfers 2008 1/
Foreign direct investment, net 2008 1/
-11 884
3 897
1 144
11
1,412.4
127
3 334
17
23
n/a
a/ Indicator replaces "Total expenditure" used previously.
1/ World Bank, World Development Indicators database CD ROM 2010-2011
29
Government Finance
Cash surplus/deficit (as % of GDP) 2008 1/
Total expense (% of GDP) a/ 2008 1/
Present value of external debt (as % of GNI) 2008 1/
Total debt service (% of GNI) 2008 1/
-1
17
37
7
Lending interest rate (%) 2008 1/
Deposit interest rate (%) 2008 1/
9
4.5
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 2: Poverty, targeting and gender
Appendix 2: Poverty, targeting and gender
1.
The three target regions are among the six poorest regions of the country with the following
incidence of poverty: Caraga (39.8%) which is the poorest region, while Region IX (36.6%) is ranked
third and Region X (32.8%) sixth. In total, these three regions account for 18% of the nation’s poor
(families). Using other measures of income poverty, namely the income gap, poverty gap and severity
21
of poverty these three regions all have worse values than the national average .
Region
Table 1: 2009 Official Poverty Statistics
Poverty Incidence
No. of Poor Families
% Share to Total
Poor
2009
2009
2009
PHILIPPINES
20.9
3,855,730
100
Caraga
39.8
187,278
4.9
Region IX
36.6
242,285
6.3
Region X
32.8
275,433
7.1
Zamboanga del Norte
52.9
109,745
2.8
Agusan del Sur
51.2
57,189
1.5
Surigao del Norte
47.9
50,404
1.3
Zamboanga Sibugay
43.2
40,067
1.0
Camiguin
36.4
8,793
0.2
Surigao del Sur
36.3
42,269
1.1
Bukidnon
33.0
70,072
1.8
Agusan del Norte
27.3
37,416
1.0
Misamis Oriental
26.3
73,239
1.9
Zamboanga del Sur
26.2
88,154
2.3
Source: 2009 Official Poverty Statistics of the Philippines’, National Statistical Coordination
Board (NSCB).
2.
All the provinces selected by DAR for the proposed project have poverty rates higher than the
national average and five are among the 20 poorest provinces in the country (out of a total of 80). Of
the target provinces Zamboanga del Norte (Region IX) with a poverty incidence of 52.9% is both the
province with the highest incidence of poverty and the one with the highest number of poor families.
Agusan del Sur (51.2%) and Surigao del Norte (42.9%) both located in Caraga Region have the
second and third highest incidence of poverty, while Zamboanga Sibugay in Region IX (43.2%) ranks
sixth and Camiguin (36.4%) in Region X ranks nineteenth.
3.
A review of the NSCB 2009 Philippine Poverty Statistics for the three regions shows that in
Agusan del Sur 93% of the municipalities has a poverty incidence of 50% or more, while in
Zamboanga del Sur and Zamboanga Sibugay the figure is 89%. Of the other target provinces the
figures are: Surigao del Norte and Surigao del Sur, 79%; Zamboanga del Norte, 63%; Camiguin, 60%;
Agusan del Norte, 58%; and Bukidnon, 50%. In Misamis Oriental only 20% of the municipalities have
a poverty incidence above 50%; however the target project area is in the uplands where poverty
incidence is higher than in the lowlands. Working Paper 1 provides further details.
I.
TARGETING
Provinces
4.
In addition to a poverty incidence above national average (based on NSCB 2009), the
following criteria were used to confirm the suitability of the ten target provinces; (i) presence of
organized ARC Clusters; (ii) identified potential for enhanced agricultural and agribusiness
development; (iii) availability of public and/or private agribusiness service providers; (iv) commitment
21
These three regions are those with the highest income gap: Region IX, 30.8%; Caraga, 30.5%; and Region X,
29.9%, while the national average is 25.7%. The same trend is also seen in the poverty gap data, where the same regions
have the highest ratios; Region Caraga, 12.1%, Region IX, 11.3% and Region X, 9.8%, while the national average is 2.7%.
In terms of the severity of poverty, the same trend is observed: Caraga, 5.0%; Region IX, 4.8%; and Region X, 4.1% where
the national average is 2.0%.
31
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 2: Poverty, targeting and gender
of participating LGUs to cost share in the project investment; and (v) availability of support services of
the involved implementing agencies at the provincial level.
Agrarian Reform Community (ARC) Clusters
5.
All the ARC clusters in the ten provinces were evaluated using the following eligibility criteria
to identify those suitable for project assistance: (i) identified potential for enhanced agricultural and
agribusiness development; (ii) accessibility and availability of local market centres; (iii) availability of
ARC Cluster Development Plan, with an agribusiness development plan; (iv) commitment of the
participating ARBs to contribute equity to the project investment, in cash or in-kind; (v) availability of
implementing agencies to provide support services at the municipal and ARC levels.
6.
Based on this analysis 11 ARC Clusters in 10 provinces meet the eligibility criteria. These
clusters cover 92 ARCs, 50 municipalities and 510 barangays. The total population is 773,106 in
144,732 households; 59,217 are ARB households of which 18,500 are households where a woman is
the ARB. In addition, there are an estimated 76,912 IPs (about 15,000 households) from sixteen tribes
22
in the ARC clusters . Working Paper 1 includes the breakdown of population by ARC cluster.
Criteria for Assessing Agribusiness Potential of Value-chains
7.
To arrive at a preliminary list of the value-chains that the project could target in each ARC
23
cluster several criteria were used . First, Production Capacity: (i) the area must be suitable for
expanding production and remain suitable in the event of anticipated changes in climate; and (ii) the
commodity must be a priority for the ARC Cluster, municipality and province. Second, Market
Potential; (i) the existence of forward and backward linkages to maximize the marketability of the
commodity; and (ii) good production growth relative to the municipal, provincial, regional and national
rates. Third, Sustainability: the products or technologies must be available and environmentallyfriendly to ensure sustained production and sales. Fourth, Potential Impact in terms of job creation
and food security. Table 2 below show the proposed ARC Clusters and the priority crops.
Project Sites
Region IX
Zamboanga del
Norte
Table 2: ARC Clusters and Priority Crops
Proposed ARC Clusters
Municipalities Covered
3 ARC Clusters
17 Municipalities
Zamboanga del Norte
Godod, Tampilisan, Salug ,
ARC Resettlement
Leon Postigo
Cluster
Zamboanga del
Sur
Salug Valley ARC Cluster
Zamboanga
Sibugay
Region X
Misamis Oriental
Salipyasin ARC Cluster
Camiguin
Camiguin ARC Cluster
Catarman, Guinsilaban,
Mahinog, Mambajao, Sagay
North Bukidnon
North Bukidnon ARC
Cluster
Libona, Manolo Fortich
4 ARC Clusters
MISORET ARC Cluster
Dar-DA-DENR –
convergence area
Aurora, Dumingag, Josefina,
Mahayag, Molave, Ramon
Magsaysay, Tambulig
Kabasalan, Naga, Ipil,Titay, RT
Lim, Tungawan
19 Municipalities
Balingasag, Lagonglong, Salay,
Binuangan, Sugbongcogon,
Kinoguitan
22
Priority Crops
4 Major Crops
 Rubber
 Corn
 Coconut
 Rice
 Rice
 Corn
 Coconut
 Rubber
 Rice
9 Major Crops
 Coconut
 Banana
 Corn
 Vegetables
 Abaca
 Coconut
 Banana
 Lanzones
 Cassava
 High value
crops
A more accurate figure should be available in 2012 when the NSO will release the IP Census conducted which
included ethno linguistic variables in the survey.
23
Working Paper 2 provides further details.
32
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 2: Poverty, targeting and gender
Project Sites
South Bukidnon
Region
CARAGA
Agusan del
Norte
Proposed ARC Clusters
South Bukidnon ARC
Cluster
Municipalities Covered
Kadilingan, Damulog, Kibawe,
Dangcagan, Kitaotao, Don
Carlos
4 ARC Clusters
14 Municipalities
TUJAKITSAN ARC
Cluster
Tubay, Jabonga,
Kitcharao, Santiago
Agusan del Sur
VETREBUNS ARC
Cluster
Veruela, Trento , Bunawan,
Sta. Josefa
Surigao del
Norte
CLAGIBAPLA ARC
Cluster
Gigaquit, Claver,
Bacuag, Placer
Surigao del Sur
BATA ARC Cluster
Barobo, Tagbina
10 Provinces
11 ARC Clusters
50 Municipalities
Priority Crops
(assorted)
 Yellow corn
 Sugarcane
 Corn
 Rice
9 Major Crops









Abaca
Coconut
Rice
Banana
Rice
Corn
Rubber
Oil Palm
Coconut based
 Rice – based
 Nipa – based
 Coffee
 Coconut
 Abaca
13 Major Crops
Note: ARC Clusters were evaluated by DAR using eligibility criteria and the major crops similarly
prioritized by DAR using a template for assessing agri-business potential of commodity value-chains,
July, 2011, (see Working Paper 2).
8.
During PY1 a detailed participatory and gender sensitive value-chain analysis and planning
exercise will be undertaken in each of the ARC clusters to prioritize chains identified in the ARC
cluster development plan for value chain analysis and development. This process will: (i) identify the
anchor chain and the “secondary” enterprises based on the results of the assessment of agribusiness
potential; (ii) conduct value chain analysis for the priority crop or chain in the cluster; (iii) replicate
value chain analysis for other commodities/chains (secondary crops or enterprises); (iv) conduct multistakeholder validation-planning workshops for priority chain(s); and (v) develop ARC-Cluster Value
chain investment plans (ARC-VIP). Working Paper 2 has further details.
Targeting People’s Organizations
9.
The total number of POs which are either cooperatives or rural-based organizations is 238.
These organizations have a total of 21,354 men and 14,309 women members. Working Paper 1 lists
these organizations. Some of these organizations have matured and with the assistance of various
government agencies can provide some services. However, others have failed due to
mismanagement, inappropriate handling of funds, and lack of necessary skills for managing the
organization and associated projects. As a result these organizations have varying levels of
organizational maturity as expressed by their Organizational Maturity Assessment (OMA) ranking with
42% being in Categories 4 and 5, the two highest categories. Similarly, the ARCs were these POs
are situated have varying levels of development (ARC Level of Development Assessment or ALDA).
Working Paper 1 includes further details.
10.
When targeting POs for participation in the project’s activities the following eligibility criteria
will apply: (i) the members have their farms and residences in the ARC cluster; (ii) members are
currently engaged in production of the prioritized commodity; (iii) an agreement that when relevant
and appropriate project beneficiaries will be 30% women and 15% Indigenous Peoples (IPs); (iii) an
OMA rating of 4 or 5 but where POs do not have an OMA rating a satisfactory capital build-up; (v)
33
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 2: Poverty, targeting and gender
outstanding loans being repaid with sources of funds available to pay these loans; and (vi) a
demonstrated capacity to repay new loans and sustain their business.
11.
The targeting mechanism will have to be monitored and evaluated during the life of the
project; hence the monitoring and evaluation system of the project will have to incorporate this
concern.
II.
TARGET GROUP
12.
In the eleven ARC clusters, in ten provinces, the target group are the ARBs, other
smallholders, IPs, unemployed rural youth, rural women and their organisations working in partnership
with entrepreneurs and other market players. Targeting will take place during the value-chain analysis
and planning phase in the first year of implementation. Table 3 below presents a summary of the
composition of the target group, while Working Paper 1 provides further details of the groups that
make up the target group.
Regio
n
Barangay
s
Populatio
n
Regio
n IX
Regio
nX
Regio
n
Carag
a
Total
243
299,017
138
234,817
134
239,272
515
773,106
III.
Table 3: Target Group
Household ARBs
Womens
Headed
ARB
Household
s
55,141 23,30
6,070
1
47,160 14,51
5,502
3
46,444 21,40
6,928
4
144,372
59,21
7
18,500
Other
Agricultur
al
Household
s
17,645
No. Of IP
Households
15,091
5,000
14,862
6,500
47,598
15,000
24
3,500
GENDER MAINSTREAMING
13.
The rural women consulted during the design mission raised the following points. First,
women are no longer the women of the past who just stayed at home uninvolved in community
development or livelihood activities. In most barangays, around 80-90% of women is involved in
micro-finance schemes, livelihood activities, participates in community development and is involved in
leadership roles in various capacities. Only around 10% of the women are socially excluded by reason
of age, health, remoteness of their location and who are the very poor or destitute needing welfare
services rather than participating in development activities.
14.
Second, women are ready and seek more involvement in development activities. Third,
women request equal treatment with men. Life is hard and women need to be treated fairly.
Interaction with women needs to be increased and the standards of their business activities improved
to enable them to meet the demands of the market. These findings highlight the need for the project to
mainstream gender concerns throughout the project’s activities.
15.
As a result women will be involved in all phases of project implementation. Gender concerns
will no longer be a soft accommodation of women but a professional responsibility of those managing
all aspects of project implementation. M&E will provide evidence-based reporting of the benefits and
other impacts on women. Gender needs and issues need to be part of the value-chain analysis and
planning activities under Component A.
24
Assumes five people per household and is an approximate estimate as the number of IPs is a rough estimate pending the
availability of more precise data in 2012.
34
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 2: Poverty, targeting and gender
16.
The Government has mandated a gender budget in all agencies and identified gender focal
persons in these agencies. However, it has been widely observed, that the use of the gender budget
does not address gender needs properly and the gender focal persons have not been properly
trained. Since the project will have a strategic focus on convergence, the project will establish a
gender network among the government’s gender focal persons in the convergence agencies so that
the effort in tracking the milestones in achieving the MDG goals can be a shared responsibility and
efforts to ensure gender-responsiveness of the project can be a focus of the network.
17.
Gender mainstreaming is now a professional responsibility ensuring that women and men
relate fairly and justly to each other as equals in matters concerning project implementation. It will be
made clear that there will be gender equitable allocation of project resources, gender-balance in the
participation in project activities and gender-fair involvement and participation in project structures at
all levels. The project staff assigned for mainstreaming gender concerns will be middle to senior
managers; it will no longer be a token assignment. Project resources will be made available to equip
the women and build their skills for a more dynamic participation in project implementation. Overall
the Project will have a target that 30% of the beneficiaries will be women and 15% IPs.
35
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 2: Poverty, targeting and gender
Annex 1: Targeting Criteria
Provinces
1. Poverty incidence above national average (based on NSCB 2009 data).
2. Presence of organised ARC Clusters.
3. Identified potential for enhanced agricultural and agribusiness development.
4. Availability of public/private agribusiness service providers.
5. Commitment of participating LGUs to cost share in the project investment.
6. Availability of support services of the involved implementing agencies at the provincial level.
Agrarian Reform Community (ARC) Clusters
1. Identified potential for enhanced agricultural and agribusiness development.
2. Accessibility and availability of local market centres.
3. Availability of ARC Cluster Development Plan, with an agribusiness development plan.
4. Commitment of the participating ARBs to provide equity in cash or in-kind in the project
investment.
Availability of support services of the involved implementing agencies at the municipal and ARC
levels.
LGUs which have not maintained properly the roads that were turned over to them for maintenance
will be unable to access project funds for investment in farm to market road improvements.
Commodities for Value Chain Development
1. Production Capacity
Area
Priority level of the crop in the cluster, municipality and province
Yield/productivity
2. Market Potential
Extent of forward and backward linkages
Production growth relative to municipal, provincial, regional and national rates
3. Sustainability (Products or Technologies available are environment friendly)
4. Impact
Job generation
Food security
36
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 3: Country performance and lessons learned
Appendix 3: Country performance and lessons learned
th
1.
IFAD started its operations in the Philippines in 1978. As of June 30 2011, IFAD had
provided loans and grants to 12 government projects, of which nine have closed and three are
ongoing. The total IFAD commitment (loans and grants) to the government is about USD 168.90
million.
2.
Two of the closed projects operated in parts of the target regions proposed for this project.
These projects were the Western Mindanao Community Initiatives Project (WMCIP), which operated
in Region IX (Zamboanga del Norte, Zamoanga del Sur and Zamboanga Sibugay), and the Northern
Mindanao Community Initiatives and Resource Management Project (NMCIREMP), covering parts of
Region X (Misamis Oriental and Bukidnon) and Caraga Region (Agusan del Sur, Agusan del Norte,
Surigao del Norte, Surigao del Sur and Dinagat Islands).
The three ongoing projects are Rural Micro Enterprise Promotion Programme (RuMEPP –
IFAD Loan No. 661-PH and IFAD Grant No. 782-PH); the Second Cordillera Highland Agricultural
Resource Management Project (CHARMP-2 IFAD Loan No. 749-PH and IFAD Grant No. 1030-PH);
and Rapid Food Production Enhancement Programme (RaFPEP - IFAD Loan No. 767-PH and EC
Contribution Agreement DCI-FOOD/2009/209-973).
3.
4.
The following paragraphs describe the recent performance of the country programme
compared to the targets included in the COSOP (2009).
25
5.
Strategic Objective 1: Access to land and water resources in the poorest 20 provinces
for poor upland households, especially for IPs and ARBs. Two of the ongoing IFAD projects
directly support the upland poor: (i) CHARMP-2, which covers six provinces with a high concentration
of IPs; and (ii) RaFPEP, which has enabled paddy farmers in upland areas to access better quality
seed. The new Integrated Natural Resource Management Project (INREMP) which will be submitted
to the IFAD Executive Board in April 2012, and to be co-financed with the Asian Development Bank,
will target nine poor provinces covering 82 municipalities where 75% of the 224,000 households are
IPs.
The NCIP’s lack of technical capacity to implement the Indigenous Peoples Rights Act and
boundary conflicts are the major risks. CHARMP-2 has used NGOs to help strengthen the NCIP and
operates in areas where boundary conflicts have been resolved. There is also a risk of shortage of
irrigation water for the Communal Irrigation Schemes. RaFPEP and INREMP both include mitigating
measures for watershed management and soil and water conservation.
6.
7.
Strategic Objective 2: Access to markets and rural financial services for the poor to
improve the value-chains of agribusiness systems. RuMEPP has so far assisted 22,395 individual
micro entrepreneurs in 19 poor provinces. It has provided: (i) business development services; and (iii)
microfinance resources through the Small Business Guarantee and Finance Corporation for onlending to Micro-finance Institutions (MFIs) and rural micro-enterprises. CHARMP-2 has so far trained
2,324 rural households for livelihood/value chain activities in six provinces in CAR. RaFPEP has
provided better quality seed to over 200,000 families in the provinces covered by the Government’s
Rice Self Sufficiency Plan 2009-2013.
8.
The risks of supporting micro-finance and micro-enterprise development include: (i) possible
policy reversals on issues like the removal of the caps on interest rates; (ii) possible over liquidity in
some areas and under funding in others e.g. for the rural poor; (iii) institutional re-alignment when the
Land Bank of the Philippines entered the micro-finance sector, while the privatisation of the Peoples’
Credit and Finance Corporation remains unresolved; and (iv) Government unwillingness to use loan
funds for the promotion of micro-enterprises and capacity building for micro-entrepreneurs. RuMEPP
and CHARMP-2 include policy dialogues in their interventions to provide an enabling environment for
growth of micro-enterprise and micro-finance in the rural areas.
25
Philippines - County Programme Issues Sheet, May 2011.
37
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 3: Country performance and lessons learned
9.
A major risk in the implementation of rural infrastructure sub-projects that support the
attainment of Strategic Objective 2 has been the cost sharing arrangements between the National
Government and the LGUs which was suspended in September 2011. Many, LGUs, especially the
lower class ones were unable to provide their share of the investment costs, thereby delaying project
implementation and loan disbursement. IFAD carried out a review of the National Government-LGU
cost sharing arrangements to support changes in the policy and the Government is due to propose
th
new arrangements for cost sharing between the national and local governments by 30 November
2011.
10.
The third Strategic Objective relates to the management of coastal resources, and a project
related to this objective will be formulated in 2012.
In May 2011 the rating in terms of the programme’s contribution to the COSOP results
management framework was assessed as 5, or satisfactory, for all four subject areas: (i) increased
incomes; (ii) improved food security; (iii) empowerment; and (iv) aid effectiveness agenda.
11.
LESSONS AND INSIGHTS FROM IFAD ASSISTED PROJECTS
26
12.
Targeting Mechanism. The projects have focused on the poor and vulnerable sectors of
society. Empowering this group is a big challenge for the implementing agency, but the projects have
shown that with appropriate strategies improvement of the lives of these people is possible even in a
short period of time, transforming some smallholders from subsistence farmers to entrepreneurs.
Since institutional credit only caters for the enterprising poor, project interventions should give special
emphasis on developing technical and managerial know-how, providing market access, and access to
production capital for poor households. Project support should not be limited to institutional support,
technology and inputs for demonstrations and trials.
13.
Participatory Approaches. The projects show that active participation by the beneficiaries
and their continuous interaction with the implementing agencies (national line agencies, NGOs and
LGUs) were keys to project success. These approaches strengthened the efforts of all stakeholders in
the development process. The participatory approach was initiated by identifying priority sub-projects
that address actual needs and problems and their subsequent inclusion in barangay and municipal
development plans. This approach enhanced the sense of ownership of the sub-projects initiated. In
communities where strong sense of ownership is instilled, technologies are replicated and expanded
and infrastructure is properly maintained.
14.
Future projects should, therefore, involve the target beneficiaries from the planning phase and
throughout the whole project cycle. Regular community planning, review and updating enable the
communities to continuously update and address their development priorities.
15.
In terms of IP participation, the ADSDPP preparation process has proved to be useful in the
planning and implementation of community projects. Project experiences highlight the importance of
respecting indigenous traditions and practices, while ensuring the long term protection of their
ancestral lands and the natural resources. The ADSDPP preparation process is good way of involving
the community members with the local government agencies and a vehicle to strengthen capacities of
IPs in the process.
16.
Convergence Strategy. The various needs of the sites targeted by both WMCIP and
NMCIREMP highlighted the need for convergence. The regular face-to-face project coordination
meetings involving the implementing institutions at the regional, provincial and municipal levels
developed inter-agency relationships built on trust, confidence and accountability, and are an
important practice for other projects to follow.
17.
Rural development interventions will be more effective if the rural development agencies
adopt a convergence strategy for implementation. Convergence can elicit greater community
participation and ownership. As the project sites cut across areas and sectors under the responsibility
26
This section and the following one are based on an analysis undertaken by DAR and included in their proposal for
Project CONVERGE.
38
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 3: Country performance and lessons learned
of various agencies e.g. DENR (upland and forest areas), DAR (ARCs and ARBs), DA (agricultural
technology development), NCIP (IPs), LGUs (rural infrastructure), convergence will be needed for
effective project interventions.
18.
NGO Participation. NGOs helped achieve the objectives of NMCIREMP by strengthening the
capacities of the community organizations and institutions. Contributions from NGOs were in two
areas: (i) community mobilization and organizational development; and (ii) facilitation of technical
services for the preparation of project proposals, and business development services. These have
resulted in stronger social cohesion and improved capacities in planning, management and
implementation of community-based and household projects, and in training community development
volunteers who would continue assistance to the community after project termination.
19.
As experienced in CHARMP, the engagement of NGOs in facilitating community participation
was productive but “their role may be limited to community mobilization, training and monitoring and
evaluation”.
20.
LGU Participation. For several reasons, the participation of LGUs is a crucial part of the
participatory development approach: (i) providing counterpart funds for infrastructure investments; (ii)
providing local offices for technical support; (iii) monitoring and evaluation; and (iv) ensuring the
sustainability of project interventions.
21.
The establishment of local project offices helped project implementation and provided the
opportunity to enhance the skill and competence of local government personnel in the management of
development projects. LGU involvement in project implementation has contributed to greater
efficiency and effectiveness of the project interventions. This practice provides a promise for
sustainability of the project benefits after the end of the project since the LGUs will now bear the
responsibility for the looking after the sub-projects.
22.
Functional coordinating mechanisms facilitate project implementation. Regular meetings of
the Barangay Development Teams, Municipal Development Teams and Provincial Coordination
Committees are mechanisms for sharing knowledge, providing feedback ad resolving problems and
concerns. Likewise, it also facilitates the participation of stakeholders at various levels.
23.
Sustained Availability and Accessibility of Credit Support. Supporting farming
households that become entrepreneurial requires funding. The self-help approach has limitations
when it comes to providing the larger amounts of capital needed for entrepreneurial activities.
24.
Mainstreaming Development Projects for Sustainability. Both WMCIP and NMCIREMP
were successful in improving the productivity of the beneficiaries. Like any development project, the
IFAD projects are time-bound, hence the need to ensure that sustainability mechanisms are in place
in the respective agencies that would enable the benefits of the project to be sustained.
25.
Use of Indigenous Knowledge, Systems and Practices. Project design should take into
account and build on indigenous knowledge, systems and practices. Under the CHARMP, the
Indigenous Knowledge, Systems and Practices of the various tribes in Cordillera Autonomous Region
proved to be appropriate models for the implementation of the natural resource management under
the reforestation sub-component.
27
Value Chain Development. The thematic study
identified “best practices” which suggest
that closer attention to a number of critical aspects could contribute to reducing rural poverty, the goal
of this project, through pro-poor value-chain development by: (i) selecting chains/products in which
the poor already participate; (ii) analysing the chains with a view to identifying policy issues that may
impede the development/marketing of that particular commodity; (iii) incorporating a suitable targeting
strategy that seeks to achieve the social objectives and yet meet the commercial objectives of
mutually beneficial arrangements; (iv) selecting the most appropriate governance option; (v) selecting
appropriate partners when working with the private sector or service providers; (vi) enhancing chain
26.
27
Pro-Poor Rural Value-Chain Development, Thematic Study; Vineet Raswant and Ravi Khanna with the assistance of
Tamara Nicodeme, Policy and Technical Advisory Division, Programme Management Department, IFAD, July 2010.
39
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 3: Country performance and lessons learned
efficiency to secure sustainability; (vii) facilitating access to price information and promoting trustbuilding; (viii) monitoring closely the impact on the designated target group(s); (ix) paying adequate
attention to sustainability issues; and (x) identifying risks and addressing them. In addition, for valuechain projects to be sustainable, the commodities produced and sold need to be those demanded by
the markets, and the principal governing institutions, well managed and financially strong.
IMPACT OF IFAD ASSISTED PROJECTS
27.
Results from NMCIREMP and WMCIP monitoring and impact assessments show that these
two projects have had significant impacts on the lives of the households living in the marginal areas in
three regions of Mindanao. A total of 74,500 households benefited, including ARBs, fishing
households, other upland farmers and IPs living in unproductive and inaccessible areas which lack
social and economic facilities.
28.
Both projects brought about increases in annual household incomes ranging from 50-75% for
WMCIP beneficiaries. For NMCIREMP, the average increase in annual income was around 19% from
PHP 60,319 in 2004 to PHP 71,778 in 2009.
Empowerment of men and women, including IPs, made the realization of the projects’ goal
possible. Specifically, for WMCIP, around 81 cohesive and gender sensitive communities, 103 LGUs
and 129 community-based organizations were able to engage in programme and project planning and
the mobilization of resources for their priority projects. Around 7,950 farming households adopted
improved farming technologies and natural resource management systems. A total of 7,533
households engaged in on –and off – farm enterprises and 4,486 households engaged in other
enterprises. All these project undertakings enabled the beneficiaries to improve their productivity,
hence, increase their income.
29.
30.
NMCIREMP which had a wider geographical coverage with a greater number and mix of
beneficiaries was able to realize its objectives in terms of land tenure and education for the IPs.
Specifically, the receipt conversion of the Certificate for Ancestral Domain Claim (CADCs) into
Certificate of Ancestral Domain Title (CADT) has provided land tenure security to the 3,725 IP
inhabitants in 14 CADCs. This process has also empowered the IPs to prepare their ADSDPP,
develop and maintain good working relationships with their respective local governments.
31.
Another significant benefit from the project was the increase in attendance in primary
education specifically in non CADC areas where the SIKAT education was introduced. Those who
had some elementary education increased from 35-53 % between 2004 and 2009.
32.
Likewise, the CHARM projects of DA have yielded positive impacts in terms of rural poverty
reduction with increases in the communities’ physical assets following land titling. In addition,
improvements to roads, irrigation and water supply schemes, have provided a greater availability of
food due to higher yields from irrigation, access to markets because of road improvements and social
benefits from improved or new water supply schemes.
33.
Project results indicate that participatory approaches, skills and individual capacity
development, productivity improvements and technology dissemination are all important and must be
improved further when designing poverty reduction projects including the need to formulate more
sustainable approaches and schemes for strengthening of POs, promotion of enterprises and linking
them to markets.
LESSONS HIGHLIGHTED BY ODA PORTFOLIO REVIEWS 2009 AND 2010
28
34.
NEDA undertakes annual reviews of the ODA portfolio of loans and grants . Key findings of
the 2009 and 2010 reviews which are relevant for the proposed project are the following. First, delays
in project start-up due to a delay in hiring project management personnel, the lack of a project
28
During discussions with the project design mission senior NEDA officials recommended that IFAD should not engage in
co-financing arrangements with other external development agencies as this increased delays in project processing and
implementation. The ongoing experience of INREP supports the NEDA recommendation.
40
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 3: Country performance and lessons learned
implementation manual (PIM) and the lack of budget and positions for the projects’ technical staff.
Second, budget and fund flow bottlenecks. Third, a prolonged procurement process. Fourth, problems
related to LGU participation due to difficulties with the application of the national LGU cost sharing
arrangements and weak LGU project management capacity. Fifth, low utilization of credit facilities as
the demand for credit has been lower than expected and because of the difficulties in complying with
the conditions of the financing institution. Finally, other problems have included weak project
management, changes in key personnel, poor participation and cooperation by the stakeholders and
poor cooperation between the implementing agency and the financing agency.
35.
The proposed project design process will seek to address these issues, where relevant, by
instituting appropriate action during the design phase. The project design does not include a line of
credit, but does involve the target group in the planning and implementation processes. Government
is due to propose new arrangements for cost sharing between national government and LGUs (see
above).
36.
During implementation the IFAD Country Project Office will ensure that there is good
cooperation between IFAD and DAR and the other implementing agencies, and assist project
management by providing appropriate implementation support.
41
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 4: Detailed project description
Appendix 4: Detailed Project description
INTRODUCTION
1.
Based on the DAR proposal and the priorities identified during visits to the regions, provinces
and ARC clusters in 2011 the project will have the following three components: (i) Participatory ValueChain Analysis and Planning; (ii) Integrated Smallholders Agricultural and Rural Enterprise
Development (I-SHARED); and (iii) Project Management, Monitoring and Evaluation and Knowledge
Management. Capacity building, environment and natural resource management, and gender
mainstreaming will be an integral part of project-financed activities.
2.
This Annex describes the three components and the proposed implementation arrangements.
The Annex was prepared prior to the allocation of funds by the NEDA Board to implement the initial
value chain development planning and the commissioning of the 11 feasibility studies, one per ARC
cluster. As a result some of the activities for Component A – Participatory Value Chain Analysis and
Planning has already been carried out, or are currently being implemented. As the process of
planning and implementing value chain development is a continuous one no attempt has been made
to revise this Annex and exclude the activities already completed.
COMPONENTS
Participatory Value Chain Analysis and Planning
3.
This component will prepare plans for priority value-chains using a participatory and genderresponsive approach and train a core of value chain analysts. It will involve the following steps.
Step1: Validation and prioritize chains identified in the cluster plan for market demand and
value chain analysis and development
4.
DAR regional and provincial offices have prioritized the value chains identified in the ARC
cluster plans. Some of the criteria used for prioritizing clusters also assess the agribusiness potential
such as access and presence of business development service providers and level of LGU support.
Table 2 in Annex 2 includes the list of priority commodities for each of the 11 target ARC clusters.
Working Paper 2 has the details of this analysis.
5.
In the first year (12-18 months), the project will use the existing World Bank value chain
analysis covering banana and corn along with rice as the basis for validating beneficiaries’ interest.
Activities in the crops validated by the beneficiaries will start in those communities expressing interest
in them. In tandem with the canvasing of participants, the project will identify an appropriate package
of activities to intensify production, improve productivity, and to determine the need for access to
markets, roads, irrigation and other marketing infrastructure to support these crops. The aim is to
validate and review the preliminary analysis of potential priority commodities prepared during the
project design and identify the champion and secondary value chains in each of the 11 target ARC
clusters in ten provinces for which the project will provide investment funds. In addition, the project will
implement three pilot value chain development activities (vegetables, coco-sugar and coffee) to gain
experience which can guide project implementation in the following years. The next five years will be
the main investment phase of the project in developing the selected value-chains with project support,
winding down during the last year of the project (PY7).
Step2: Identify the anchor chain and the “secondary” enterprises based on the results of the
assessment of agribusiness potential
6.
While it is important to focus the development of the “anchor or champion commodity”, it is
also essential to identify secondary commodities/crops in order to diversify sources of income thereby
minimizing risks brought about by variability in prices, weather and seasonality of crops.
7.
Secondary enterprises may include: (i) a major crop/enterprise other than the proposed
anchor commodity/crop; (ii) crops that are intercropped with the anchor crop; (iii) rural based
enterprises for increasing household incomes (e.g. processed pineapple in Misamis Oriental and
South Bukidnon or processed calamansi in Sibugay province).
43
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 4: Detailed project description
Step 3: Conduct market demand and value-chain analysis for additional priority crop or chain
in the cluster
8.
Once experience has been gained with activities pertaining to the initially selected crops, the
project will consider adding selectively other crops/farming activities of interest to the beneficiaries as
expressed in the cluster development plans. Prior to doing so, the project will conduct a simple market
demand analysis and if found that there is ample demand, this will be followed (if necessary) by a
simplified value chain analysis to consider providing support to other immediate points along the
selected chains for which the project will provide investment funds.
9.
A team of consultants will be hired to conduct market demand and value-chain analysis for
the additional priority chains in each cluster identified in steps 1 and 2 in close coordination with the
value chain specialists assigned at the Central Project Management Office (CPMO) and at the
Regional Project Management Offices (RPMOs). The output of the value-chain analysis will be
presented in multi-stakeholder workshops for validation and planning with the stakeholders in the
chain. These include separate workshops with producers and buyers/input providers and a
convergence (multi-stakeholder) workshop involving all actors in the chain such including producers,
buyers, input providers, government, NGOs, IPs and women’s groups. Working Paper 4 includes the
terms of reference for the analysis and planning consultants.
Step 4: Train a core of value-chain analysts and planners
10.
Project staff and those from the other convergence agencies will receive on the job training to
conduct value chain analysis and to apply this knowledge when analysing the secondary value chains
in each ARC cluster.
11.
The same team of consultants who conduct the value-chain analysis for the “anchor or
champion” commodities will train project staff and those from the other convergence agencies to
conduct the value-chain analysis, facilitate the multi-stakeholder workshops to validate analysis and
consult with key actors of the chain and develop the value-chain investment plan.
12.
Participants in this training will include: (i) PMO staff (value chain specialists and monitoring
and evaluation (M&E) specialists) at the national, regional and provincial levels, representatives from
the DAR at the national, provincial and municipal offices particularly from the Beneficiaries
Development and Coordination Division; (ii) other members of the convergence team at the national,
regional, provincial and municipal levels (DAR, DA, DENR, Department of Trade and Industry (DTI),
Department of Science and Technology (DOST), etc.), NCIP; and (iii) others e.g. representatives of
POs, NGOs, women group, etc.). The training provided would be preceded by a training needs
analysis,
13.
The participants in this training will form the core group for value-chain planning, coordination
and evaluation for each cluster (provincial level). This core group will: (i) assist the team of
consultants in conducting the workshops (validation/planning multi-stakeholder workshops) for the
“anchor or champion” chains; (ii) conduct the value chain analysis and planning for the secondary
value chains and incorporate this analysis into the cluster value chain investment plan; (iii) coordinate
implementation of the subsequent investment in the value chains ; (iv) monitor and evaluate the
results; (v) feed evaluation results or the lessons learned that include gaps and opportunities to
improve the chain to the target producer groups (ARBs) and update value chain development and
investment plans.
Step 5: Replicate value-chain analysis in other commodities/chains (secondary crops or
enterprises)
14.
The participants when trained will replicate the value chain analysis and planning exercise for
the secondary chains. The time needed to conduct this analysis and planning should not divert the
focus of the staff from facilitating the investment in the anchor or champion commodities. If investment
in the anchor or champion commodity requires much staff time, then the analysis and planning for the
secondary chains should be postponed until the second year of project implementation.
Step 6: Conduct multi-stakeholder validation-planning workshops for priority chain/s
15.
The results of the all value chain analysis will be presented to multi-stakeholder workshops.
These workshops aim to: (i) provide feedback from the key actors in the value chain on the results of
44
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 4: Detailed project description
the value-chain analysis particularly the strategic issues and proposed strategies; (ii) develop the
strategies and action plans together with the key actors in the value chain particularly members of the
main target group (ARBs, other smallholders, IPs, women and rural youth) in order to foster
ownership of the value-chain development and investment plan; (iii) integrate value-chain plans into
the strategic planning process of producer organizations.
16.
Participants of this workshop will be those from within the cluster and outside the cluster
involved in the value chain, namely the producers, buyers, input providers, and government and
NGOs. Workshops can be designed to manage conflicting interests of these participants. For
example, it can start with a workshop with buyers, input providers and investors followed by
producers, NGOs and government group on a different day. A multi-stakeholder workshop to include
all groups can be held subsequently.
Step 7: Develop ARC-Cluster Value-Chain Investment Plans
17.
Based on the analysis and consultation-validation workshops, the consultants and project
staff will prepare ARC-cluster value-chain investment plans (ARC-VIPs) and prepare proposals to
access project funds as matching grants. Proposals for M&E of the implementation of the plans will
also be developed.
Integrated Smallholders Agricultural and Rural Enterprise Development (I-SHARED)
Discussion of the Approach
18.
The ARC-VIP outlines the interventions to develop the value chains in the ARC cluster. The
value chain facilitator coordinates implementation and facilitates efficient and effective implementation
of interventions in the chain. The decisions are made by the key actors in the chain – the private
sector which includes the producers, input providers and the buyers. A key role of the facilitator is to
ensure that the interventions link producers to profitable markets and include developing an
environment conducive to doing business. In some cases, an industry champion from the private
sector has spearheaded the development of value chains and this approach will be examined, to
assess whether it is appropriate in the context of developing the target ARC clusters. While this
approach reinforces partnership with the private sector, there are few “champions” who have the time
to lead the development of clusters involving a multitude of small-scale producers and it is likely that
the project will have act as the value-chain facilitator.
19.
An alternative strategy is for the project to explore possible partnership arrangements
particularly in terms of the provision of technical assistance for production and for market linkages.
Existing examples of this type of approach include: (i) Norminveggies for vegetables which employs a
cluster strategy to organize production and buys or links producers to markets that include both wet
and institutional markets; (ii) Catholic Relief Service (CRS) (vegetables, rice, coffee, etc.), which also
employs a cluster strategy and links producers to institutional markets; (iii) Manok Mabuhay which
provides a package of services (including finance) for broiler contract growing from production to
market; and (iv) Cocoaphil (cacao) which provides technical assistance and buys cacao. These types
of partnership would involve a contract or a memorandum of agreement (MOA).
20.
In the likely absence of adequate private sector facilitators to link producers to markets, the
project will recruit a core of value chain facilitators and staff at national, regional and provincial levels.
The CRS approach cluster approach (small groups of farmers about 8-10 per group) has shown some
degree of effectiveness in terms of strengthening capacity of farmers to make engage in profitable
ventures. The project can recruit service providers who have proven track record in linking small-scale
producers with profitable markets to provide the training and technical support needed. The
advantage of the proposed value chain approach is that the first phase involves a full blown value
chain analysis with data to back up profitability of market options (channels/chains).
21.
Working Paper 2 includes further details of these arrangements and as an example, an MOA
between CRS and DAR for acting as a value-chain facilitator.
Value Addition and Diversification
22.
Vertical, horizontal and other upgrading strategies to enhance value addition include
assistance with the following: product development, branding, packaging, logistics (post-harvest),
45
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 4: Detailed project description
certification/ accreditation, technology upgrading including equipment upgrading and organizational
development through training (including post-harvest handling and storage, food safety and product
quality) and provision of business advisory services.
23.
The ARC-VIPs will identify opportunities where investment can add value to and/or diversify
income sources for the priority chains (anchor and secondary chains). This analysis will identify the
relative profitability of supplying the various markets assessed. Market requirements in terms of
product quality (grades, varieties, etc.), packaging, etc. will also be specified. In order to meet these
requirements, the project can provide matching grant funds to finance activities identified as viable
investments with benefits accruing to the target group. The project can also leverage funds from the
other government agencies. For example, the DTI and DOST support the development of organic rice
in Salug ARC cluster in Zamboanga Norte. However, the types of activities that can be funded by the
project are discussed below.
Product Development
24.
The project will fund initial product development activities to meet market requirements. The
products can be both existing and potential products. The project will fund existing products that need
improvement in terms of quality. These may include new product designs or product formulation (e.g.
new flavours for calamansi concentrate) and training to improve quality, or upgrade technology, etc.
The project can also assist the development of new products. These activities may include product
testing, market studies, provision of some inputs and supplies/small equipment (less than
PHP 10,000) to produce the initial processed products, etc. Business development service providers
or individual consultants will be hired for these activities.
Branding and Packaging
25.
Based on the results of the value chain analysis, branding and packaging for existing and
potential products can be supported. These include cases when existing products are being
positioned to tap new markets and require branding e.g. for supplying supermarkets, or other retail
outlets, or for new product such as organic rice in Salug ARC cluster or processed pineapple products
from South Bukidnon and MISORET ARC clusters. The project will: (i) hire marketing and product
specialists on a short-term basis to support brand development; (ii) purchase the labels and
packaging materials for the initial batch of branded products; and (iii) provide training on how to
use/pack the new packaging materials and labels.
Certification and Accreditation
26.
To tap new markets, certification and accreditation are necessary. However, before
certification is implemented as a strategy, it is important to assess how it can improve profitability. For
example, in the case of organic certification (e.g. rice in Salug ARC cluster), it would be important to
ensure that the organic rice from this cluster will have a market that is willing to pay a higher price and
that this is profitable for the producers, in view of the additional costs and/or potentially lower yields. In
addition, the project can finance further studies if the details from the value chain analysis are
inadequate. Assistance to secure Bureau of Food and Drugs accreditation for processed food
products can also be assisted. These activities would include training on good manufacturing
practices and other activities to meet accreditation/certification requirements, production lay-out, etc.
The project will hire the consultants required.
Technology and Equipment Upgrading
27.
Producers are often unable to take advantage of market opportunities because of the lack of
access to efficient technology or equipment. Production of muscovado sugar in South Bukidnon ARC
cluster did not succeed because of several factors which included inadequate technology and
equipment. The mechanical rice dryer in the Salug ARC cluster is defective with low quality rice and a
low percentage recovery, the result. The project can support repairs of existing equipment if feasible
compared to buying a replacement with a cost not exceeding USD 1,000. The project will finance
feasibility studies to assess any proposed large capital investments recommended to develop a chain
(e.g. rubber processing). While capital investment is minimized when using a low level of technology
e.g. in the case of muscovado sugar in MISORET ARC cluster, the quality and volume requirements
of the supermarkets where such products are usually sold require a medium scale technology such as
that used by producer organizations in Sultan Kudarat and Bacolod.
46
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 4: Detailed project description
Business Advisory Service and Organizational Development
28.
Improving the capacity of organizations undertaking value-adding activities may be needed to
meet market requirements and maintain competitiveness. Planning based on the results of the value
chain analysis could involve existing organizations engaged in producing processed products such as
coco-sugar in Misoret cluster or semi-processed rubber and processed calamansi products in
Salipyasin ARC cluster. The ARC-VIP process will identify priority interventions that include training
covering business processes and organizational development e.g. financial and marketing
management (e.g. product costing and pricing, sales management), and post-harvest management.
The project will finance these activities including the engagement of business development service
providers.
29.
In addition, there may be a need to organize producer groups for processing. The project will
support organizational development activities to ensure that the processing enterprise becomes
competitive including studies, meetings and workshops to map out details of the process of group
processing. Subjects to be covered include protocols on the supply of raw materials (volume,
frequency, responsible producers/suppliers, schedule/timing, incentives and disincentives, sharing of
benefits/ income in group processing) and marketing of processed products (pricing, contracts, etc.).
Market and Investment Facilitation
30.
The majority of the farmers in the ARC clusters lack a clear understanding of market
requirements particularly beyond that of the agents and traders who buy their produce. Farmers have
limited information about alternative market options, prices, costs, profitability and risks involved. In
some cases farmers know the requirements of the market and could increase profitability but do not
have the resources to address the gaps to meet these requirements. For example, the producers of
coco-sugar could meet the demand of the exporter if they had enough working capital to pay for their
raw materials or the cassava farmers can double their net price (less transport cost), if there was a
good farm to market road.
31.
In addition, there are opportunities where producers in the ARC clusters can link with large
multinational and agribusiness firms and palm oil industries. While the existing leasehold
arrangements maybe the best option given the lack of access to working capital, inadequate
infrastructure facilities and in some cases, aging ARBs, it is important to provide opportunities for
improving the contractual terms in favour of the farmers. In addition, there are cases where leasehold
arrangements can provide greater benefits to farmers compared with their existing farm enterprises.
However, transaction costs are high for large companies to deal with individual producers.
32.
Market and investment facilitation is one of the key functions of the value chain facilitator and
Working Paper 2 describes examples of this type of activity e.g. Norminveggies (vegetables), CRS
(vegetables, coffee, rice, cassava, calamansi), PDAP (rice and seaweeds), Manok Mabuhay, KFI
(rubber) and Upland Marketing Foundation (UMFI) (coco-sugar, muscovado and rice), COCOPhil
(cocoa in Zamboanga del Norte), Davao Agricultural Ventures Corporation/Del Monte Philippines
(pineapple production in Bukidnon), and Alter Trade/Dole Philippines/Sumifru (Cavendish banana for
export in Surigao del Sur). Some of these groups have already been involved in the target ARC
clusters.
33.
Various agencies involved in enterprise development such as the DA (e.g. Agribusiness
Lands Investments Centre), DTI, DENR, and DOST have initiated activities in market and investment
facilitation. Effective coordination of these agencies by the project is important to minimize overlaps,
augment limited resources and provide a more integrated package of services in the priority chains to
be developed.
34.
Based on these issues and opportunities, this activity aims at developing and enhancing
linkages between actors in the chain particularly between producers and buyers and input providers.
Market and investment facilitation interventions will be based on the results of the value-chain
analysis to ensure that they are implemented to meet market requirements and enhance profitability
of enterprises.
47
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 4: Detailed project description
35.
Assistance provided under this component can include improving market information systems,
holding trade fairs, organising market matching activities, business and investors’ forum, and
providing assistance to farmers in negotiations with buyers and investors for leasehold, contract
growing, joint venture or marketing arrangements. Most often the problem related to market
facilitation relate to the volume of production. If farmers cannot be clustered around a particular
commodity, they will not have the volume of production that the buyers need and will lack any power
to negotiate.
Market Information Services
36.
The ARC cooperatives in Zamboanga use the world market price of rubber sent out by SMS
by DTI when agreeing the weekly sales prices with the buyers and this system seems to work
effectively. Market information systems must be simple and accessible to farmers. Initial market
information for this type of system will come from a variety of sources e.g. international sources,
wholesale and retail markets, buyers, government agencies etc. However, timely dissemination (via
SMS or fax where email is not available) of market information should be a feature of market
information systems. The project can support the hiring of a short-term consultant to review the
existing market information services, the needs of the smallholders and update the existing systems
that can support the development of the ARC priority chains. The value-chain specialists at the CPMO
and RPMOs will work with the consultant to develop the system and ensure updating of information.
Market Matching
37.
The DA has identified an eight-step process for providing market matching services as
29
follows : (i) Survey/listing of potential seller groups: identification of prospective farmers’
cooperatives/ associations in the target municipalities and the volume and type of agricultural
products and agro-based processed products they can supply – producers’ groups supported by the
project could be used; (ii) Survey/listing of potential buyer groups: identification of potential buyers
(i.e. wholesalers, processors, exporters, etc. who are already in barangays) and the volume, type and
quality requirements for raw and processed agricultural products; (iii)Table-matching of buyer and
seller groups: initial parings of compatible buyer and seller groups prior to the actual buyer-seller
meetings and forming forward contracts; (iv) Implementation arrangements of market encounters: final
consultation with both the buyer and seller groups regarding detailed arrangements such as time,
venue and detailed information required for formulating contracts; (v) Actual conduct of marketencounters: information exchange, initial bidding workshop, and preliminary discussion for possible
contract arrangement; (vi) Facilitation of market-matching forward contract arrangement: ironing out of
the details of the contract and acceleration of the signing of the contract; (vii) Monitoring of and
mediation on market-matching forward contract implementation: monitor the progress of the
implementation on a regular basis, and serve as the mediator between the two groups; (viii)
Documentation and evaluation of market-matching contract outcomes: prepare reports to include
volume, value, type and quality of products traded, deviations from the contract agreement,
recommendations on how to improve succeeding contracts.
38.
The Agribusiness Marketing Assistance Service (AMAS) of the DA can help in marketmatching activities, as can DTI which also conducts market-matching activities particularly for
processed food and handicrafts. The project will assist the entire process of market-matching
including providing funding for the conduct of trade fairs and market fora at the regional and national
levels.
Investment Facilitation
39.
The ARC-VIPs will outline the requirements to develop the chains in the 11 ARC clusters that
will require capital from both the private sector and government agencies. Theoretically, transaction
costs and risks faced by investors without intervention from development agencies are higher. This is
because small farmers and enterprises have limited assets, are fragmented and face various
inefficiencies in the production and marketing of their products since they are unable to achieve
economies of scale in their operations. Thus, there is an incentive for the private sector to invest in the
29
Source: Department of Agriculture, Cordillera Highland Agricultural Resource Management Project (CHARMPP)
General Manual of Operation (Agribusiness and Marketing).
48
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 4: Detailed project description
11 ARC clusters when there are associated development interventions in place. The key is effective
facilitation.
40.
To support investment facilitation, the project will finance the preparation of investment
proposals for investment identified in the ARC-VIPs to attract investors (using project staff and/or
short-term consultants). In addition, value chain specialists in the CPMOs and RPMOs will make an
inventory of the various types of contractual arrangements in use e.g. contract growing, joint ventures,
leasehold arrangements, marketing contracts, etc. for various crops particularly those relevant to the
priority chains identified.
41.
The Philippine Agricultural Development and Commercial Corporation (PADCC) will also be
used to help facilitate investment into the 11 ARC clusters. PADCC is the agribusiness investment
and corporate development arm of DA. Their mandate involves promotion of business partnership and
acts as a facilitator of investors engaged in agribusiness-production, processing and marketing. The
value chain specialists at CPMO and RPMOs will work closely with PADCC in forging partnerships
with private and other development agencies to support the investment requirements as specified in
the value chain investment plans. These include the conduct of investment fora, development of
investment proposals, etc.
Financing Value Chain Investment
42.
Financing of value chain investments under the project would be based on a set of rules to be
detailed in the Project Implementation Manual (PIM). Broadly this will involve 100% financing of
studies, and technical preparation work. For farm or local level investments, the whole cost is counted
as a project cost, with the financing shared, 80% coming from the proceeds of the IFAD Loan and
20% from the beneficiaries, proponent or LGU. For larger scale activities undertaken by integrators,
which are not at the village level, with the financing shared 50% from the proceeds of the IFAD loan
and 50% from the proponent. The maximum total investment per sub-project would be the equivalent
of USD 1,500 per household with the proportions from the project and private sector dependent of the
type of investment. Appendix 1 has more details.
43.
The first supervision mission will re-examine the need for subsidies and review options for
cost recovery through the use of guarantees for bank loans to participating enterprises and the ability
of famers to obtain production credit.
Investment in Rural Infrastructure
Accessibility seems to be the priority for investment in infrastructure to support value-chain
developments. Other infrastructure required, include the rehabilitation/restoration of existing
communal irrigation schemes (CIS) and the construction of post-harvest facilities. Issues identified
with past foreign assisted infrastructure investments have included: (i) the problem of LGUs providing
their counterpart contributions for infrastructure investment under the previous national government
and LGU cost sharing arrangements; (ii) the poor maintenance of some roads financed under
previous foreign assisted projects in the target LGUs; and (iii) changes in the development priorities
with changes in the municipal and provincial leadership during project implementation. The project will
not finance sub-projects where the
44.
LGU has not maintained roads for which they are responsible.
45.
Specific criteria for farm to market roads (FMR) include: (i) all rehabilitated roads must
connect to another all-weather road of equal or superior standard, and serve agri-business
establishments or areas of high value crop production, or link to a market site; (ii) maximum cost of
USD 145,000 per road sub-project; and (iii) a maximum costs per bridge sub-project shall not exceed
USD 275 per household served.
46.
For irrigation schemes the criteria include: (i) the potential irrigable area must be at least 30
ha and the system must serve a minimum of 15 farming households from the ARC; (ii) a CIS must
have the potential of achieving a cropping intensity of 175%; (iii) organizational deficiencies within the
49
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 4: Detailed project description
Irrigation Association (IA) must be addressed prior to any investment in CIS infrastructure
improvements and the socio-cultural and organizational aspects taken into account; (iv) the National
Irrigation authority (NIA) must provide written approval where the CIS has amortization payments
owing and a tripartite Memorandum of Agreement (MOA) between the NIA, the Project and the
concerned LGU formulated, prior to the start of work; (v) all irrigation sub-projects must obtain or
renew their a water permit from the National Water Resources Board; (vi) investment in water
harvesting and water management structures can be included; (vii) the beneficiaries and their IA will
operate and maintain the rehabilitated scheme with their agreement to this a prerequisite for the
receipt of project assistance; and (viii) the maximum development cost will be USD 1,850 per hectare
for the rehabilitation or expansion of existing facilities.
47.
For post-harvest facilities criteria include: (i) new buildings or structures will be financed, but
the repair, completion or extension of unfinished buildings/structures can be considered only where
they were originally financed without support from government or an NGO; (ii) the facilities must
benefit at least 25 farming households and serve a minimum of 50 hectares of land producing rice,
corn and/or high value crops; (iii) existing solar dryers will not be repaired/rehabilitated although
extensions will be considered providing that existing sections are repaired/rehabilitated to the same
standard using community funds (that will not be considered as sub-project equity); (iv) the facilities
will be located close to an all-weather road leading from the production area to a marketing centre; (v)
community buildings and structures (other than post-harvest facilities) will have the potential to benefit
a minimum of 50 households in the ARC: (vi) all buildings and structures must be located on public
land or on land owned by the PO or donated by a private landowner with no cost included as part of
the cost sharing; (vii) the maximum development cost will be USD 13 per m2 for solar dryers and
USD 172 per m2 of floor area for multi-purpose buildings; and (viii) the famers’ organization will
manage these facilities and operate an appropriate maintenance system.
48.
For rural infrastructure, 70% of the cost would come from the IFAD loan, about 10% from the
National Government (the tax element) and about 20% from the LGU (normal for roads) or
beneficiaries or both (normal for irrigation). Appendix 1 has more details.
49.
Investments in additional road construction will only take place after firm funding has been
secured from participating LGUs. In addition, the capacity of the LGUs to fund and undertake
maintenance of the roads will be closely monitored.
50.
Working Paper 3 includes the design specifications for FMRs, irrigation schemes, and postharvest facilities. The sub-project development process is consists of ten stages or phases that will be
common to all types of infrastructure sub-projects: (i) sub-project identification; (ii) validation of the
sub-project request; (iii) issuance of notice to conduct feasibility study/detailed engineering; (iv) preengineering works; (v)
sub-project
document
packaging;
(vi)
pre-implementation;
(vii)
implementation; (viii) completion/financial reconciliation; (ix) turn-over and acceptance; and (x)
operations and maintenance.
Project Management, Monitoring and Evaluation and Knowledge Management
51.
Implementation and coordination will be consistent with the DA-DAR-DENR Convergence
initiatives to ensure a positive impact and the sustainability of the proposed interventions (see Annex
5).
50
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 5: Institutional aspects and implementation arrangements
Appendix 5: Institutional aspects and implementation arrangements
I.
CONVERGENCE
30
1.
In line with the National Convergence Initiatives (NCI), this project will use a convergence
approach in implementing its activities. The NCI combines the efforts of three national government
agencies involved in the agriculture, agrarian reform and natural resource sector, namely the Department
of Agriculture (DA), the Department of Agrarian Reform (DAR), and the Department of Natural Resources
and Environment (DENR). One of the NCI objectives is to “enhance the investment and opportunity
climate for agribusiness”, which is the focus of this project.
2.
DAR will have overall responsibility for implementing the project and will use its existing structures
at national, regional, provincial and municipal levels to implement project activities. Together with DAR,
the DA and DENR will have responsibilities both in policy direction and implementation, and will be
members of the Project Steering Committee (PSC) and the Regional Multi-Stakeholders’ Committee
(RMSC).
3.
Initially, the following DA agencies have been identified as having a role in project implementation:
(i) the Agricultural Training Institute; (ii) AMAS; (iii) PADCC; and (iv) specific commodity related agencies
such as the Philippine Coconut Authority and the Fibre Industry Development Authority. The DENR will be
involved in project investments related to agro-forestry, nursery and plantations establishment, and in
providing technical advice related to climate change.
4.
Other agencies also support the development of agrarian reform communities (ARCs) and will have
a role in project implementation as part of the project’s convergence approach. The agencies are: (i) DTI,
e.g. for product packaging and market/private sector linkage; (ii) DOST, e.g. provision of technical support
in processing of agricultural products; (iii) NCIP, for handling IP concerns; (iv) NIA, for providing technical
assistance for the rehabilitation of communal irrigation systems; and (v) the Department of Public Works
and Highways (DPWH), for the construction of farm to market roads. Other government agencies
identified which may possibly contribute to implementing the project are: the Mindanao Development
Authority (MinDA), Office of the Presidential Adviser on the Peace Process (OPAPP) and the Department
of Social Welfare and Development.
5.
Inclusion of additional government agencies into expanded convergence teams will be subject to
the agency meeting the following selection criteria: (i) ability to provide support for the development of the
value-chain as required by the ARC cluster value chain investment plans (ARC-VIPs); (ii) availability of
expertise and resources required at the regional or provincial levels; (iii) a signed memorandum of
agreement (MOA) between DAR and the concerned agency covering the support to be provided.
6.
The project will have convergence teams at the regional and ARC levels. The RMSC is part of the
project’s management structure, while the Cluster Project Operations Teams (CPOTs) will serve as the
coordinating mechanisms for the delivery of government services to the ARC clusters (Appendix 1 shows
the project management structure).
II.
PARTNERSHIP WITH THE PRIVATE SECTOR, NGOs AND
ACADEMIC INSTITUTIONS
7.
For this project, private-public partnerships are essential for value-chain development; thus the
private sector (companies and firms, business organizations, financing institutions, non-government
organizations, state universities and colleges, people’s organizations and individual entrepreneurs will be
encouraged to participate. Private sector organizations may act as the consolidator/integrator, business
development service providers, value-chain managers, or financiers. The project will explore different
types of partnership arrangements between the project beneficiaries and the private sector ensuring that
such arrangement are fair to the farmers and ARC communities.
30
In December 2010 DA, DAR, DENR signed a joint memorandum circular (JMC) adopting a shared policy and
implementation framework for the NCI.
51
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 5: Institutional aspects and implementation arrangements
8.
Selection of private sector organizations involved in the implementation of the component will be on
the basis of complying with the eligibility criteria, and submission of expression of interest and a proposal.
9.
Eligibility Criteria for Business Firms/Companies will include the following:
(i)
(ii)
(iii)
(iv)
(v)
(vi)
(vii)
(viii)
(ix)
(x)
(xi)
(xii)
10.
Eligibility criteria for POs will include the following:
(i)
(ii)
(iii)
(iv)
(v)
(vi)
11.
Members have farms and residences in the ARC cluster;
Members are currently engaged in the production of the prioritized commodity;
An Organizational Maturity Assessment (OMA) rating of 4 or 5, but where POs do not have
an OMA rating evidence of a satisfactory capital build-up;
Any loans are being repaid and there are sources of funds available to pay these loans;
A demonstrated capacity to repay any new loans and sustain their business; and
An agreement that when relevant and appropriate, project beneficiaries will be 30% women
and where applicable, 15% Indigenous Peoples (IPs).
Eligibility Criteria for NGOs will include the following:
(i)
(ii)
(iii)
(iv)
(v)
(vi)
12.
Filipino registered, or for joint venture companies, with Filipinos as the majority shareholders;
Agriculture, agricultural processors or agribusinesses;
Availability of the expertise required with sufficient capacity to carry out the assigned tasks;
Familiarity with the project sites;
A minimum of five years of operations, with products or services directly related to the value
chain concerned;
Availability of sufficient, reliable and well maintained machinery and equipment, for the
assigned tasks;
A sound financial position as reflected in its audited balance sheets and profit and loss
accounts for the last five years;
Reputation for fair dealing and empathy with poor smallholders, IPs and women;
Sound and well regarded company management with established structure and procedures
for quality control, and with qualified and experienced individuals in key managerial positions;
Familiarity with the use of gender-sensitive approaches and a commitment to a genderbalance when selecting staff for the assigned tasks;
Ability to pass the eligibility standards during the technical evaluation of bids;
Complies with the relevant environmental regulations as required by the government and
recognized international control bodies.
Registration with the Philippine government securities and exchange commission (SEC) or
other recognized government bodies;
Services offered are related to agriculture and/or enterprise development;
A minimum of five years experience in areas directly related to agriculture and/or enterprise
development;
A minimum of five years work experience with poor smallholders, IPs, and women;
Sound operations and financial management as reflected in the list of previous (last five
years) and current personnel, and financial statements for the last five years; and
Availability of certificates from previous partners demonstrating a satisfactory contract
performance.
Eligibility Criteria for academic institutions will include the following:
(i)
(ii)
(iii)
Registration with the appropriate government authority/body;
Services offered are related to agriculture and/or enterprise development;
Research and training activities during the previous five years and currently ongoing are
related to agriculture and /or enterprise development; and
52
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 5: Institutional aspects and implementation arrangements
(iv)
Availability of researchers with applied knowledge and practice related to agriculture and/or
enterprise development, and with experiences of working with poor smallholders, IPs and
women.
III.
MANAGEMENT STRUCTURE, ROLES AND RESPONSIBILITIES AND
CAPACITY BUILDING
13. Appendices 1, 2 and 3 show the project’s management structure, roles and responsibilities of each
level of the project’s management structure, and number of staff required (seconded and on contract).
Working Paper 4 includes the staff TOR.
14. Based on the initial training needs identified by the NCI agencies (Appendix 4), the project will hire
consultant(s) to conduct a capability/training needs assessment of project management personnel. The
consultant will prepare a capability building plan for project and other staff of the NCI agencies for
activities related to value-chain development. The project will use the IFAD grant funds for this capacity
building.
53
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 5: Institutional aspects and implementation arrangements
Annex 1: Project CONVERGE Management and Implementation Structure
Project Steering Committee (PSC)
Chair: DAR: Members: DA, DENR, NCIP, DTI,
DOST, DOF, NEDA, DBM, MDA, DILG, VC
Private Sector (VCPS); Observer: IFAD
Implementing Partners:
Government Agencies (e.g. DA,
DENR, NCIP, DTI, DOST)
NGOs, UCs, Private Sector
Implementing Partners:
Government Agencies (e.g. DA, DENR,
NCIP, DTI, DOST)
NGOs, SUCs, Private Sector
Implementing Partners:
Government Agencies (e.g. LGU,
DENR, NCIP, DTI, DOST)
NGOs, SUCs, Private Sector
DAR Support Services Office
Foreign Assisted Projects
----------------------------------------------------------------Central Project Management Office (CPMO) *
Head: DAR Project Director, Project Manager
Staff: Value Chains, Finance and Admin,
M&E/KM, MIS, Short Term Consultants (STC)
Total: 9 excluding STCs
Mindanao-based
Regional Project Management Office
(RPMO) – one per region (3)
Head: DAR Regional Director
Staff: Value Chains, Fin/Admin, Infra,
Insti/Gender, M&E/KM, others
Total: 12
Provincial Project Management
Office (PPMO) - one per province
(11)
Head: DAR PARO II: Staff: Value
Chains, Admin/ Finance, M&E/KM;
others: Total: 9
Regional Multi-Stakeholders’ Committee
(RMSC) – one per region (3)
Chair: DAR
Members: DA, DENR, NEDA, DBM, NCIP,
DTI, DOST, DPWH, DILG, NIA, PCA, FIDA,
DILG, VCPS Rep, Beneficiary Rep; with
LGUs as resource persons when needed
Two Sub-Committees - Infra and Value
Chains
Cluster Project Operations Teams
(CPOT)
Team Head: MARO
Memberships depends on activity: DFs,
LGUs (MAO, MPDC, ME, MENRO),
CENRO, NCIP, VC PS
Agrarian Reform Community (ARC) Clusters
ARBs, other smallholders, rural youth, IPs, women, People’s Organizations and business development partners
Line function
Staff function
Coordination function
Note: VC PS = firms/organizations from the private sector participating in the project’s value chain
development activities.
54
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 5: Institutional aspects and implementation arrangements
Annex 2: Management Roles and Responsibilities
Level
Central
Organizational Unit
Project Steering
Committee (PSC)
Central Project
Management Office
(CPMO)
Regional
Regional MultiStakeholders’
Committee (RMSC)
Regional Project
Management Office
(RPMO)
Summary of Roles/Responsibilities
 Provide policy guidance
 Approve project implementation guidelines, global and annual
work plans and budgets and procurement plans
 Review and approve proposals regarding adjustments to
plans, budgets, etc.
 Resolve implementation issues that cannot be resolved by
implementing agencies
With the assistance of DAR FAPsO:
 Coordinate with IFAD, oversight agencies
 Serve as PSC secretariat
 Submit required documents to IFAD and oversight agencies
 Facilitate fund withdrawal and transfer to the implementing
agencies
 Prepare budget for integration into DAR’s annual budget for
Government approval
 Coordinate with other implementing agencies
 Give overall guidance on project implementation (e.g.
preparation of implementation guidelines, financial guidelines,
procurement guidelines, etc.)
 Oversee operations, finance and procurement, and provide
implementation support to project implementation
 Review and consolidate project annual work plans and
budgets, physical and financial reports and audits
 Consolidate and process withdrawal applications
 Provide overall M&E and KM function
 Review, approve and ensure quality of infrastructure and
value-chain sub-project proposals:
Review and approve (technical feasibility, financial viability, etc.);
(i) Infrastructure sub-projects committee composed of
NEDA, DENR, DA, DILG, and DAR as chair, other
agencies (DPWH, NIA, NCIP) as necessary
(ii) Value-chain sub-projects committee composed of
NEDA, DENR, DA, VC PS, DAR as chair, other agencies
(DTI, DOST, FIDA, PCA, etc.) as needed
 Provide technical advice to RPMO
Note: LGU representatives serve as resource persons
during proposal approvals
Note: Membership in the RSMC to be designated permanent
(regular and alternate)
 Oversee project implementation in the provinces under the
NCI
 Coordinate with the NCI agencies and others as necessary
 Review and recommend VC, infrastructure and other
investment subprojects for approval by RMSC
 Consolidate provincial annual work plans and budgets and
procurement plans
 Approve and manage funds use and procurement at the
regional level (within limits of RD authority)
 Oversee and supervise M&E/KM at the provincial level
 Coordinate with PPMOs, ARC-clusters, regional implementing
agencies and the other NCI agencies
 Consolidate PPMO/ARC cluster reports
 Facilitate internal audit
55
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 5: Institutional aspects and implementation arrangements
Level
Provincial
Organizational Unit
Provincial Project
Management Office
(PPMO)
ARC
Cluster
Cluster Project
Operations Teams
(CPOT)
Summary of Roles/Responsibilities
 Oversee project implementation in the ARC cluster
 Arrange technical support for project implementation in the
ARC clusters in the region from the NCI agencies and others
as necessary
 Review/prepare VC, infrastructure and other investment
subprojects for submission to RPMO
 Prepare annual work plans and budgets and procurement
plans
 Approve and manage funds use and procurement at
provincial level (within limits of PARO authority)
 Manage M&E/KM
 Coordinate activities in the various ARCs
 Consolidate ARC reports (physical/financial)
 Facilitate internal audit
 Mobilize concerned LGU departments and units (e.g. MPDC,
MAOI, ME, Budget) responsible for implementing the project
under the partnership with LGUs
 Ensure that the ARC value-chain and other investment plans
are prepared and submitted as required
 Ensure that project services are delivered in a timely fashion
to target ARBs, IPs, women and youth in the ARCs within the
cluster
 Monitor project implementation and prepare ARC reports
within the cluster and submit on time as required
 Assist the PPMOs with project assessments and studies (e.g.
OMA of POs, economic benefit studies, etc.) and IFAD
missions
Note: Membership in CPOT is dynamic, depending on the
activities in the ARC cluster. There can be more than one
CPOT in a cluster. CPOT is headed by the MARO.
56
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 5: Institutional aspects and implementation arrangements
Annex 3: Project Management Staffing
Management Unit
Central Project
Management Office
(CPMO)
Subtotal
Regional Project
Management Office:
Region IX, X, Caraga
(RPMO)
Subtotal
Provincial Project
Management Office: 11
Provinces
(PPMO)
Subtotal
Cluster Project
Operations Teams:
number dynamic
(CPOT)
Staffing Requirement
DAR Project Director
Project Manager
National Value Chain Specialist
M&E/KM Officer
Finance/Admin Officer
MIS Specialist
Finance/Admin Assistant
Drivers
Regional Director
Project Coordinator
VC Specialist
Institutional/Gender Specialist
M&E/KM Specialist
Rural Infra Specialist
Finance/Admin Officer
Accountant
Planning/Budget Officer
Cashier
Bookkeeper
Driver
Provincial AR Officer (PARO)
Project Coordinator
VC Staff
M&E/KM Staff
Accountant
Admin Assistant
Cashier
Bookkeeper
Driver
Municipal Agrarian Reform Officers
(MAROs)
Development Facilitators (DFs)
LGU Counterparts: Municipal
Planning and Development
Officers, Municipal Engineers, etc.
Other counterparts: NCIP Service
Centre Officer, CENRO, etc.
Subtotal
TOTAL
No. of
DAR
Staff
1
DAR
Staff %
of Time
40%
No. of
Contract
Staff
Total
22
-
1
1
1
1
1
1
1
2
9
3
3
3
3
3
3
3
3
3
3
3
3
36
11
11
11
11
11
11
11
11
11
99
50
TBD
91
TBD
TBD
TBD
TBD
141
239
0
46
141
285
1
1
3
1(3)
1(3)
1(3)
1(3)
1(3)
1(3)
18
1(11)
1(11)
1
1
1
1
1
1
6
1(3)
1(3)
1(3)
1(3)
1(3)
-
100%
100%
40%
100%
60%
40%
60%
100%
40%
100%
1(3)
18
1(11)
1(11)
1(11)
1(11)
1(11)
1(11)
1(11)
77
50
50%
50%
60%
70%
100%
91
TBD
80%
60%
*
Not included in the totals are the NCI Liaison Officers, members of the PSC, RMSC, and staff of
other implementing agencies and partners that may be assigned to implement project activities.
57
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 5: Institutional aspects and implementation arrangements
Annex 4: Assessment of the Organizational Capability and Training Needs
Organisation
1. Department
of Agrarian
Reform
(DAR)
Strengths
 Lead implementing agency the
Comprehensive Agrarian Reform
Programme Extension with Reforms
(CARPER), RA 9700
 ARC development strategy.
 Supportive management and competent
staff from the national down to
municipal offices
 Functional organizational structures and
mechanisms at the national, regional,
provincial, municipal and barangay
levels
 Strong partnership and coordination
with partner agencies, LGUs, NGOs,
POs, etc.
 Capability to organize and mobilize
ARBs in ARCs
 Established performance-related
organization and management systems,
e.g. ALDA, OMA
2. Department of Agriculture (DA)
2.1.Agricultural
 Training and extension arm of DA
Training
 Strong partnership with IRRI and
Institute
Telecom Service Providers, NGOs,
(ATI)
SUCs, other NGAs and LGUs at the
national and regional levels
 Modules for training on production,
processing and social technologies
 Available training centres and trainers
in every region
 Institutionalized national Techno Gabay
Programme
 Assistance to LGUs for Farmers
Information and Technology Centres:
web information accessibility.
2.2.Agribusiness
 Strong links with the private sector
Weaknesses


Possible Contribution to Project
CONVERGE
Implementation of land
Assessment of the
Organizational Capability
and Training Needs
distribution under CARPER
will end in 2014;
continuation of support
services functions will need
to continue
Implementation of the
government’s rationalization
plan may result in deletion of
some permanent positions











Difficulty in harmonizing
extension services from
other bureaus of the
department
Lack of manpower due to
DBM’s Circular on freezing
the hiring of new personnel
and not filling up of vacant
positions
Low budget allocation

Limited qualified personnel


58



Training Needed to Implement
Project CONVERGE
Participatory planning and social
preparation
Capability building and social
mobilization training for beneficiaries.
Conduct/implementation of Results
M&E, i.e. participatory monitoring
Setting up and strengthening of
convergence mechanisms at the
cluster, provincial and regional levels
Organizing ARBs and other
smallholders for enterprise development
and capacity building
Contract facilitation, including legal
advice, with LGUs, POs and civil
society at the municipal and provincial
levels
Establishing agricultural extension
system at the municipal and provincial
levels
Monitoring, evaluation and quality
assurance
 Value chain analysis/studies and
business planning
 Skills training on enterprise-based
organizing/business development
services
 Agribusiness and post-harvest
management training programme
for extension staff and farmers
operators
 Facilitation and negotiation skills
 Data base management
 Procurement Guidelines (RA 9184
and IFAD guidelines)
 Quality assurance principles,
procedures, and guidelines for
infrastructure and agricultural
enterprise facilities
 Value-chain-based M&E
 Financial and economic analysis of
projects for the RMSC Sub-Project
Approval Committee
Technical assistance through training,
farm business advisory services, techno
demonstrations and social technologies
Regional Training Centre staff as
resource person, facilitators and
trainers
Counterpart personnel to implement
the project
Extension methods such as: training of
trainers; farmers’ field schools; school
on the air; farmers’ contact centre; on
line courses; rice nutrient management;
farmers’ farm school
 Updated capability building
trainings related to: Value Chain;
Project Management; M& E;
Entrepreneurial Training;
Marketing and Agro-Ecotourism
Agribusiness advisory and market
 Value Chain Analysis/Studies
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 4: Detailed Project description
Organisation
and
Marketing
Assistance
Service
(AMAS)
2.3.Philippine
Agricultural
Developmen
t and
Commercial
Corporation
(PADCC)
3. Department
of
Environment
and Natural
Resources
(DENR)
Strengths
(agribusiness firms)
 Wide experience and network in market
promotion of agricultural products
 Direct interaction with farmers and
fishermen at the barangay level through
Barangay Food Terminals
Weaknesses

 Government’s lead promotion agency
for agricultural/ agribusiness investment
 Expertise in agribusiness land
investment promotion, servicing project
and business development, trade
marketing, contract facilitation and
project negotiation
 Wide network of business development
service providers, private investors and
national/international investment
promotion agencies
 Focal point for the NCI for sustainable
rural development

 Primary agency for environment and
natural resources with mandate to
formulate policies and implement
programmes, including licensing and
regulation of all natural resources
 Organizational structure which invests
in commercial development of
innovative use of natural resources,
marketing business ventures, and
financing of private sector implemented





Possible Contribution to Project
CONVERGE
to conduct supply/value
chain analysis
Lack of personnel to handle
the Agriculture and Fishery
Modernization Act, and of
well-trained staff to perform
various tasks, i.e. data
collection, computer
processing and analysis,
M&E
Scarcity of human and
financial resources to
implement, facilitate and
monitor agribusiness
projects
No direct regional
counterpart
Need to course through the
Regional Field Units
Ineffective and
inappropriately allocated
human, information and
financial resources
Ineffective distribution,
management, if not, nonavailability of information
Lack of appropriate
allocation and effective
management of buildings,
59











Training Needed to Implement
Project CONVERGE
information and development services
to agribusiness entrepreneurs
Market/product promotion, links
Market facilities, i.e. Agri-pinoy Trading
Centre, barangay and municipal food
terminals
Investment matching and enterprise
development and industry consultations
 Market Research (basic and
advanced analytical tools in market
research)
 Strengthening market information
system – for farmers and
fishermen efficient and timely
access of market information
services
Technical assistance for agribusiness
investments, project/business
development, trade marketing
arrangement, marketing contract
negotiations
Providing complementary human
resources for agribusiness projects
Matching agricultural producers with
market players/investors
 Enhancement of business
development services trainings of
focal persons
 Higher versions of ARC-GIS for
central and regional GIS focal
persons
 Orientation and more advanced
training for agricultural value chain
development and management
among Project CONVERGE
implementers
 Enhancement of customized M&E
Framework for Project
CONVERGE
 Market analysis, evaluation of
market partners/players and
development of upstream value
chains for sustainable agribusiness
economies
 Project orientation
 Training managing conflicts
between environment and natural
resource management and value
chain development to understand
better the institutional contributions
to convergence
Conduct environmental assessments
Implement the National Greening
Programme which streamlines DENR’s
initiatives
Development of upland farms e.g.
rubber
Reforestation of grasslands etc. and
rehabilitation of coastal and mangrove
areas in community-managed areas
Rehabilitation of degraded priority
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 5: Institutional aspects and implementation arrangements
Organisation
Strengths
natural resources development projects
 One of the largest government agencies
with presence down to the community
level
 Responsible for all policies, tenure
arrangements and guidelines of
community-based forestry projects
Weaknesses


Possible Contribution to Project
CONVERGE
offices, vehicles, computers,
etc.
Lack of an effective overall
policy for the environment
Lack of appropriate
legislation and effective
enforcement of the existing
laws
60

watersheds and protected areas
Maintenance and protection of trees
and established plantations
Training Needed to Implement
Project CONVERGE
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 6: Planning, M&E and knowledge management
Appendix 6: Planning, M&E and learning and knowledge management
1.
The PSC will approve the project’s AWPB and APP and will submit them to IFAD for review and
issuance of no objection 45 days before the start of the calendar year of implementation.
2.
I.
MONITORING AND EVALUATION
31
3.
The DBM uses OPIF in the context of public expenditure management, which covers all levels of
the public sector from the national government to the local government level. In this framework, the DBM
uses the budget as an instrument for ensuring the desired results. The three convergence agencies, DA,
DAR and DENR, have agreed their results-based organizational performance frameworks with the DBM.
4.
NEDA, as an oversight agency, monitors and evaluates the contribution of foreign assisted
projects in achieving the objectives of the government’s medium term development plans, currently the
32
PDP 2011-2016. NEDA uses RbME in the conduct of its M&E oversight function. Every foreign assisted
project is required to submit ODA reports (in 10 forms) on a quarterly basis. To improve the capacity of
government agencies to implement the RbME, IFAD has provided a grant to NEDA (Grant Number: 1235NEDA PH) to finance technical assistance and institutional strengthening for NEDA and the implementing
agencies.
5.
The IFAD RIMS requires the reporting of three levels of results reporting: level 1 (outputs), level 2
(outcomes) and level 3 (impact). Level 1 and level 2 results are reported annually, while every project
conducts a RIMS impact survey (level 3) at the start (baseline), mid-term and at the end of the project.
RIMS is not new to DAR since its previous IFAD-assisted project, NMCIREMP submitted RIMS reports
annually and conducted a RIMS impact survey at the mid-term and end of the project.
6.
At project start-up the Foreign Assisted Projects support Office (FAPsO) of DAR will hire
consultants to design the results-based monitoring system and MIS, including a GIS-based system, for
mapping the commodities and other relevant data in target ARC clusters (Working Paper 4 includes the
TOR). Also during PY1, the FAPsO will hire consultants to undertake a baseline survey to cover all
indicators of the logical framework, including the RIMS indicators. It is expected that the assignment will
take six months, with the procurement process starting prior to the date of effectiveness. Subsequently,
33
the RIMS mid-term impact survey and completion impact survey will be part of the project’s mid-term
and project completion surveys. The RIMS has a standard set of questions, methodology, software and
required reporting format. In addition, special studies to measure lessons learned, outcomes and impact
will be also conducted (see the section on learning and knowledge management). There is no data at this
stage for the absolute numbers for household assets index and child malnutrition, before the baseline
survey is done at project year 1. Therefore, these indicators should be converted into absolute numbers
once the baseline results are available. The same will apply to farm gate prices for specific crops.
7.
The OPIF’s indicators are based on the department’s logical framework (Working Paper 5 includes
the logical frameworks for DA, DAR, and DENR as agreed with the DBM), while NEDA’s RbME indicators
are based on the project’s logical framework approved by the government’s Investment Coordinating
Committee (ICC), chaired by NEDA during the project design process. The RIMS and RbME focus more
on outputs, outcomes and impact, while OPIF has a greater emphasis on input/activity and output
indicators.
8.
The computer-based MIS which will include the project’s M&E and finance databases will be
installed at the PPMOs, RPMOs and CPMO. The software and MIS will be linked to DAR’s MIS.
Developing the project MIS will be contracted to a consultant at project start-up. A MIS staff in the CPMO
will be assigned to manage the system.
31
DBM. 2007. The Organizational Performance Indicator Framework (OPIF). http://www.dbm.gov.ph/OPIF_2007/OPIF.pdf
RbME is being implemented through NEDA Board Resolutions Nos. 3 & 7, Series of 1999. It is an instrument for
development managers at the project-level, as well as at the implementing and oversight agencies, to monitor and evaluate project
performance based on results/outcome/impact of project performance.
33
There is a possibility that annual RIMS outcome surveys will replace the mid-term survey. Conduct of annual outcome
surveys would not be a new exercise for DAR who used this methodology to measure outcomes of their foreign-assisted projects,
including the IFAD assisted NMCIREMP.
32
61
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 6: Planning, M&E and knowledge management
II.
LEARNING AND KNOWLEDGE MANAGEMENT
9.
In addition to its regular M&E functions, the project’s Monitoring and Evaluation/Knowledge
Management (M&E/KM) units will also take charge of knowledge management. Knowledge management
will be an essential part of the TOR of the staff responsible for M&E. Project knowledge will be mainly
generated through the M&E system. Regular reports, especially six-monthly and annual progress reports,
will include details of the problems encountered, solutions implemented, lessons learned and the way
forward. These reports are important for supporting project management in making management
decisions.
10.
Regular M&E activities to generate lessons learned will be complemented with studies on the
special features of the project. These may take the form of case studies, documentation of systems, photo
and video documentation, field stories, etc. Since this is the first value-chain project undertaken by IFAD
and the government using the convergence approach, topics of special interest may include: (i)
convergence; (ii) ARC clustering for value-chain development; (iii) the value-chains of traditional and
emerging crops; and (iv) arrangements for linking producers with markets. Results from these studies will
be disseminated to project management, the implementing agencies at all levels, community participants,
and other project stakeholders.
11.
The project will ensure that there are mechanisms and platforms for generating, capturing and
sharing of knowledge within the project. Knowledge sharing will be undertaken by the project during the
annual assessments and planning fora, through publications, the project website etc. In this respect, the
project will prepare a knowledge management cum communication plan to be prepared as part of the
M&E plan at the start of the project (Working Paper 5).
12.
At the country programme level, the project will participate in two knowledge sharing platforms
managed by the IFAD Philippines Country Office. First, is “face-to-face” interaction through the: (i) Annual
Country Programme Review which is a sharing of project implementation problems, solutions and lessons
between IFAD projects; and (ii) Knowledge and Learning Market, which is a national gathering of all IFAD
partner agencies and other national development agencies focused on thematic issues and concerns and
held from time to time. Second, is “virtual” information sharing through the IFAD Country Programme
Facebook page and IFAD-Asia Philippines portal.
13.
The project should contribute articles to the IFAD Asia-Pacific newsletter, and participate in
regional gatherings where the project can learn from others and contribute its own experiences.
62
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 7: Financial Management and disbursement arrangements
Appendix 7: Financial management and disbursement arrangements
I.
FLOW OF FUNDS
1.
Following IFAD Designated Account procedures, the DOF (BTr) through the DAR will open and
maintain two Designated Accounts (DAs) in USD with a government financial institution acceptable with
IFAD, one to receive the proceeds from the loan and another for the grant proceeds. The DBM will issue
authority to BTr (upon receipt of the Certification on the receipt/deposit from IFAD issued by BTr based on
the Credit Advice from the depository bank) to incur obligations and to disburse, namely the Special
Allotment Release Order (SARO), and the Notice of Cash Allocation (NCA), to transfer funds to the DAs.
The Authorised Allocation of the DAs for the IFAD loan and grant will be up to six months of IFAD’s share
of the eligible project expenditures according to the approved AWPBs.
2.
In addition to the two DAs, DAR will open and operate 34 project bank accounts in PHP as shown
in the flow of funds chart (Appendix 1) as follows (all accounts to be interest bearing current accounts to
be operated on the basis of two signatories):

DAR’s Central Office (3): Three (3) Pass-Through Accounts, one for the IFAD Loan, one for the
IFAD Grant and one for the National Government Counterpart Funds, to be operated by DAR’s
FAPsO – Administrative and Finance Department. DAR’s FAPSO – Administrative and Finance
Department will transfer funds from the Designated Accounts to the Pass-Through Accounts in
equivalent PHP and effect full funds transfer without additional documentary requirements, by
way of sub-allotment to the Project accounts at the CPMO and subsequently from the CPMO to
the RPMOs and from the RPMOs to the PPMOs.

CPMO (3): Three accounts, one for the Loan, one for the Grant and one for the National
Government Counterpart Funds. The CPMO will transfer funds to the three RPMOs. The CPMO
will also disburse funds in accordance with the AWPB for costs of staff, technical assistance,
training, operating costs, special studies, capacity building and investments. It may also disburse
funds either as direct payment or in the form of advances as provided in the MOA entered into
with implementing agencies and partners.

RPMOs (6): Two accounts for each of the three RPMOs, one for the Loan and one for the
National Government Counterpart Funds. The RPMOs will transfer funds to the 11 PPMOs. The
RPMOs will also disburse funds in accordance with the AWPB for costs of staff, technical
assistance, training, operating costs, special studies, capacity building and investments. It may
also disburse funds either as direct payment or in the form of advances as provided in the MOA
entered into with implementing agencies and partners.

PPMOs (22): Two accounts for each of the 11 Provinces, one for the Loan and one for the
National Government Counterpart Funds. The PPMOs will also disburse funds in accordance
with the AWPB for costs of staff, technical assistance, training, operating costs, special studies,
capacity building and investments. It may also disburse funds either as direct payment or in the
form of advances as provided in the MOA entered into with implementing agencies and partners.
3.
Disbursements from these PHP project accounts will follow government policies and procedures
and according to the approved AWPBs. Disbursements from these PHP accounts by the DAR/CPMO will
follow the procedures of the DBM and in accordance with the Government’s accounting and auditing rules
and procedures and will be included in the PIM. Appendix 1 is the Funds Flow Chart.
4.
DAR Central Office through the SSO-FAP will ensure that the project AWPB is included in the
Department’s budget proposal submitted to the DBM for the preparation of the annual budget
appropriations by filling up the required DBM Budget Preparation forms. The costs included in the project
AWPB must be within the ceiling provided in the Forward Obligation Authority (FOA) approved for the
project. If a special budget is necessary, DAR Central Office will likewise prepare and submit the
necessary documents to the DBM. The AWPB will include both the foreign and counterpart funds.
5.
The SSO-FAP will coordinate with IFAD on the timely submission of withdrawal applications,
Statement of Expenditures (SOE) and the required supporting documents and accordingly release of
funds by IFAD. It will monitor the receipt of funds by the depository bank and notify BTr to facilitate
issuance of the required Certification for the release of funds by the DBM and the transfer of funds to the
DAs.
63
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 7: Financial Management and disbursement arrangements
6.
The SSO-FAP will facilitate transfer of the funds from the DAs to Pass-through Accounts and from
the Pass-Through Accounts to the Project Accounts of the CPMO following the prescribed national
accounting and auditing regulations.
7.
Funds will be released by the CPMO to the three RPMOs, which in turn will release funds to the
PPMOs in accordance with the AWPB and upon submission of liquidation/disbursement reports and
supporting documents of previously released funds. Release of funds will be through the issuance of suballotment advice/notice of transfer of cash and/or funding cheque, as may be applicable following the
prescribed national accounting and auditing regulations.
8.
Funds for activities to be undertaken by other implementing agencies, e.g. DA, DENR, DTI, DOST
and LGUs, will be the subject of a MOA with DAR CPMO, RPMO or PPMO depending on the scope of the
activities according to the AWPB and their authority limits. The MOA will specify the considerations,
activities and conditions for the payment or release of funds including the documentary requirements for
the provision and liquidation of advances. Payments will be made by DAR through the issuance of check
from the appropriate project account.
II.
DISBURSEMENT OF PROJECT FUNDS
9.
The project will use mainly IFAD’s Designated Account disbursement procedures. If necessary it
may also use the other methods of disbursement like the Direct Payment or Reimbursement. IFAD’s
standard disbursement procedures as prescribed in its Loan Disbursement Handbook will be followed in
the disbursement and replenishment of loan and grant proceeds in the DAs. In case of direct payment,
corresponding national procedures on such method of disbursements will be followed, that is the issuance
of Non-cash Availment Authority by DBM.
10.
The project will use the following disbursement methods under the transaction based
disbursement procedure:

Reimbursement: IFAD may reimburse the Borrower for expenditures eligible for financing in
accordance with the Financing Agreement (eligible expenditures), as retroactive financing, that
the Borrower has pre-financed from its own resources for the Project Start-up Costs.

Advance: IFAD may advance loan proceeds into a Designated Account (DA) operated by the
Borrower through DAR to finance eligible expenditures as they are incurred and for which
supporting documents will be provided at a later date. Replenishment of the DA will be by way of
withdrawal applications (WAs) submitted regularly by DAR.

Direct Payment: IFAD may make payments at the borrower’s request, directly to a third party
e.g. supplier, contractor and consultant for eligible expenditures.

Special commitment: This modality is used for eligible project expenditures related to items
imported by project implementing agencies under a letter of credit requiring the issuance of
guarantees for reimbursement to negotiating banks by IFAD.
11.
Disbursements relating to activities undertaken by or at the central level will be the concern and
responsibility of the CPMO. Disbursements for local activities will be administered by the concerned
RPMO or PPMO provided that amounts are with the limits of their authorities.
12.
Statements of Expenditure (SOEs) will cover all categories of expenditure, for amounts not
exceeding USD 100 000. SOEs will be prepared by the disbursing offices. Provincial SOEs will be
submitted to and consolidated by their respective RPMO and the SOEs of RPMOs will be consolidated by
the CPMO.
13.
The Borrower through DAR should apply for replenishment of the DAs on a quarterly basis or
once the amount withdrawn reaches at least one third of the amount advanced, if this occurs sooner. The
Withdrawal Applications should be submitted promptly once the monthly and/or quarterly statement is
received from the bank in which the DAs are held and bank fund balance is reconciled. The replenishment
applications documenting the expenditures from the DAs must be submitted regularly and any ineligible
amounts must be promptly refunded to the DAs or otherwise justified through the submission of evidence
that other eligible expenditures have been financed from the Borrower’s own resources. The CPMO will
submit the SOEs and withdrawal applications to the DAR-FAPSO for onward submission to IFAD.
64
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 7: Financial Management and disbursement arrangements
14.
Each WA will be supported by copies of supporting documents or SOEs and DA Account
Reconciliation Statement. The CPMO, RPMO and PPMO will:

Make payment from their respective accounts for all eligible Project expenditures according
to the approved Project AWPBs.

Obtain and keep receipts for all Project expenditures.

Prepare and maintain accounts and records of all Project expenditures, reflecting all Project
expenditures by Project component/activity and disbursement categories.

Consolidate and process, on a timely basis, records of eligible Project expenditures and
withdrawal applications for submission to DAR-FAPSO for forwarding to IFAD for
reimbursement or replenishment of the DAs.

Record properly and keep in safe condition details of all transactions relating to the Project to
be made available to the supervision missions and independent auditors.
15.
For reporting eligible expenditures paid from the designated account and requesting for
reimbursement, the following Supporting Documents for Disbursement will be required:

SOEs will be accepted for eligible project expenditures less than USD 100,000 or its
equivalent.

Full documentation including records evidencing eligible expenditures (e.g. signed contract,
invoices) are required for any expenditure exceeding the above limit.

WA for direct payments. Purchase records providing evidence of eligible expenditures
(such as copies of contracts, purchase orders, supplier’s invoice and receipts, etc.) will be
submitted together with withdrawal applications setting out clear payment instructions.

WA. Based on the disbursement reports prepared and submitted by the Finance staff of each
of RPMO and PPMO, withdrawal application will be prepared and consolidated by the finance
staff of CPMO and submitted to the SSO-FAP for the final signature and onward submission
to IFAD.

For such SOE withdrawals, the relevant supporting documents need not be submitted to
IFAD, but will be retained by the Borrower for inspection and review by representatives of
IFAD during supervision missions, who will report specifically in the Supervision Report their
findings subsequent to such inspection. All original records providing evidence of the
expenditures will be retained by the Borrower and/or the Implementing Agencies until ten
years after the closing date for withdrawals.

Should the IFAD’s supervision missions find that certain disbursements have been made
which are not justified by the supporting documentation, or are ineligible, IFAD will have the
right to withhold further advances to the DAs. IFAD may exercise this right until the
Borrower/Recipient has refunded the amount involved or (if IFAD agrees) has submitted
evidence of other eligible expenditure that offset the ineligible amounts.

Minimum withdrawal from the Loan and Grant Accounts: The minimum size of each
withdrawal application is USD 20,000 for the Loan and USD 20,000 for the Grant or its
equivalent.
16.
The control of soft expenditures is related to how controls of fuel, training, per diems etc. should
operate. The purpose is to ensure that all such expenses are properly authorized and that appropriate
documentary evidence is available to support the expenditures. The controls related to soft expenditures
shall include but not be limited to:
17.

Procedures and controls for Budgeting and Acquitting of Expenditures for Workshops. This
will include, for example, selection criteria for participants, controls on attendance, controls
against budgeted expenditures, and the Finance Section undertaking verification (including
where applicable spot checks).

Procedures for controls of fuel and vehicle log books.

Maintenance and monitoring of advance records.
Expense items under the various components of project will be incurred and disbursed as follows:
65
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 7: Financial Management and disbursement arrangements
No.
1.
1.a
1.b
1.c
1.d
2.
2.1
2.1a
2.1.b
2.1.c
2.1.d
2.1.e
2.2
2.2 a
Component/subcomponent/Items of Expenditures
Participatory Value Chain Analysis and Planning
Technical assistance (national consultants) and
related expenses
Regional workshops
Local surveys/interviews/meetings
Special Studies
Integrated Small Holder Agriculture and Rural
Enterprise Development (I-SHARED)
Support to Farm and Enterprise Development
Technical Assistance (national/regional)
Information Materials
Gender Strategic Activities
Value-chain related Capability Building (To be applied
for and availed by proponents/ stakeholders in the
approved value-chain)
Investment in Farm and Enterprise Development (To
be applied for and availed by proponents/
stakeholders in the approved value-chain)
Investments in VC related Rural Infrastructure and
Equipment
Investment in Rural infrastructures (to be applied for
and availed/undertaken by LGUs
2.2.b
Investment in Value-chain Equipment (to be availed
POs, LGUs and other proponents)
3.
Project Management
3.a
Policy studies and development (in-house by service
providers)
Project staff training and capacity building
(assessment and activities)
Vehicles and ICT Equipment
3.b
3.c
Office
Concerned
As per AWPB
CPMO
RPMO
PPMO
CPMO/RPMO
Within their signing authorities
RPMO/PPMO
CPMO/RPMO
PPMO
CPMO
CPMO/RPMO
As per AWPB
CPMO/RPMO
Approved by RMSC
CPMO/RPMO
Approved by the RMSC; Subject
NG-LGU cost sharing scheme,
national policy/rules
Approved by RMSC; subject to
guidelines to be formulated
during implementation
CPMO/RPMO
As per AWPB
CPMO
Approved by the Steering
Committee
Subject to existing government
rules on acquisition of vehicles
and equipment
DAR CENTRAL
OFFICE BAC
As per AWPB
National Project Staff and related operating expenses
Regional Project Staff and related operating expenses
Provincial Project Staff and related operating
expenses
III.
Based on plan approved by the
RMSC
CPMO
Recurrent costs: Salaries and operating expenses
A.
B.
C
Conditions/Remarks
CPMO
RPMO
PPMO
FINANCIAL ACCOUNTING AND AUDITING
18.
The project will be audited annually. The auditors will be required to visit the project areas, review
the procedures used and check sample transactions to confirm that: (i) goods and services were obtained
locally or from the Fund’s Member States; (ii) they were within the project and category description defined
in the Financing Agreement; (iii) they were procured in accordance with the provisions of the Financing
Agreement; (iv) payments were made or due for goods, works and services that were provided after the
date of signing the Financing Agreement or any date specified for retroactive financing and before the
grant closing date; and (v) withdrawal applications were in an acceptable form and accompanied by
satisfactory supporting documentation. TOR for the annual audit is attached.
19.
The project audit will follow the IFAD’s “Guidelines on Project Audits (Borrowers’ Use)”. Within 90
days after the Effective Date, the CPMO will appoint, with the prior approval of IFAD, an independent and
external auditor selected by the CPMO (Commission on Audit) in accordance with the procedures and
criteria set forth in the IFAD’s “Guidelines on Project Audits (Borrowers’ Use)”, as may be amended from
time to time, to audit the Consolidated Financial Statements relating to the Project for the first Fiscal year
66
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 7: Financial Management and disbursement arrangements
st
covering the period from the date of effectiveness of the Loan until 31 December. Thereafter, as soon as
practicable but in no event later than 90 days after the beginning of each succeeding fiscal year, the CPMO,
with the prior approval of IFAD, will confirm such auditor’ appointment or so appoint a new independent and
external auditor for each succeeding fiscal year. The CPMO will have the Consolidated Financial Statements
relating to the Project audited each Fiscal Year by such auditor in accordance with the International
Standards on Auditing until the Loan Closing Date, in accordance with Section 9.03 of the IFAD’s General
Conditions. In addition to the audit report on the Consolidated Financial Statements, the auditors will provide
a separate opinion on each of: (i) the operations of the certified statements of expenditure; (ii) the operations
of the Designated Accounts for the IFAD loan and grant; (iii) the operations of Project Accounts; and (iv) the
operations of the government counterpart funds. The auditor will provide a management letter, addressing
the adequacy of the accounting and internal control systems. The CPMO will submit to IFAD through DARFAPSO the reply to the management letter of the auditor within one month of receipt thereof. The CPMO
through DAR-FAPSO will deliver the above-mentioned items to IFAD within six months of the end of each
such Fiscal Year.
67
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 7: Financial Management and disbursement arrangements
Annex 1: Funds Flow Chart
National
Government
Counterpart
Fund (PHP)**
IFAD Loan
Proceeds*
Designated
Account for the
IFAD Loan
(USD)
Taxes &
Duties
Project Accounts in PHP
(1 for Govt Fund and 1 for
IFAD Loan) at Central
Project Management
Office (CPMO)
Costs for staff, training,
operating costs, procurement of
vehicles, ICT Equipment
Cash Advances to
central and regional
Implementing Partners
(DA, ATI, DENR,
DOST, etc.) based on
MOAs and regular
liquidation and physical
and financial reporting.
Pass-Through Accounts
Three (one for the loan, one for the grant
and one for the National Government
funds) in PHP
Operated by the DAR Central Office to
transfer funds from DBM to the CPMO in
accordance with the approved project
budget
Project Accounts in PHP for
Regional Project Management
Office (RPMO)
Total 6: two for each (1 for
Govt Fund and 1 for IFAD
Loan) of Reg IX, X and Caraga
Costs for staff, training,
operating costs and other
investment costs implemented
at the regional level
Project Account in PHP for
Provincial Project Management
Office (PPMO) (Total 22: two
for each target province for
Govt Fund and IFAD Loan)
IFAD Grant
Proceeds*
Designated
Account for
the IFAD
Grant (USD)
Local Government
Counterpart Fund
(PHP)
Beneficiary
Contribution in
cash or in kind
Consultancy
Services,
Training, Studies
Project Account in PHP for
Grant at Central Project
Management Office
(CPMO)
Costs for staff, training,
operating costs and other
investment costs implemented
at the provincial level
Cash Advances to provincial
Implementing Partners (DA, ATI,
DENR, DOST, etc.) based on
MOAs and regular liquidation and
physical and financial reporting.
Cash Advances to Cluster Project Operations Team (CPOT), LGUs, Implementing Partners (DA, ATI,
DENR, DOST, etc.) based on MOAs and regular liquidation and physical and financial reporting
Costs for staff, training, operating costs, and
investment activities implemented by LGUs, CPOT
and municipal level Implementing Partners
Payment of
contracts
Value Chain
related Rural
Infrastructure
In accordance
with the agreed
financing plan
Services to the target group: 135,000 agricultural households, ARBs, other upland smallholders, rural youth, IPs, women, People’s Organizations and business development
partners in the 11 ARC clusters.
* Through Bureau of Treasury and Department of Budget and Management.
** Guidelines will be provided in the Project Design Report.
Total 36 bank accounts:
Designated Accounts: 2, one for the IFAD loan and one for the IFAD grant.
Pass-Through Account: 3 (one for the loan, one for the grant and one for the National Government Counterpart Funds) operated by the DAR Central Office.
Project accounts for the IFAD loan: Total 15 (one for CPMO, one for each of the three RPMOs, one for each of the 11 PPMOs.
Project account for the IFAD Grant: 1 for the CPMO.
Project Accounts for the Government Financing: Total 15, one for CPMO, one for each of the three RPMOs, one for each of the 11 PPMOs.
Total number of Project Accounts: 31, 16 for the IFAD Financing and 15 for the Government Financing.
68
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 7: Financial management and disbursement arrangements
Annex 2: Draft Letter to the Borrower
LETTER TO THE BORROWER
Draft
This Draft Letter to the Borrower (LTB) summarises the main methods and procedures governing loan
administration as well as those related to the supervision of the project activities by IFAD. This draft
LTB needs to be agreed upon at the wrap-up meeting of the Appraisal Mission. The agreed draft will
be issued by the Fund to the Government of the Philippines after execution of the Loan / Grant
Agreement.
Excellency
Authorized Representative of the Borrower/Recipient
Insert the address here
[ Date ]
Mr. Secretary,
Subject: Letter to the Borrower
Country: Philippines
IFAD Financing: Loan number ------ and/or Grant number -------Project: Project Converge
1.
Reference is made to the Project Financing Agreement (hereinafter referred to as the Loan
Agreement) between the Government of the Republic of the Philippines (hereinafter referred to as
“the Borrower”) and the International Fund for Agricultural Development (IFAD) dated -------------. This
letter provides additional instructions on the methods and procedures for Disbursement, Procurement,
Financial, and other reporting, and Audit, related to the above Financing.
2.
As referred to in the General Conditions for Agricultural Development Financing dated 30 April
2009 (hereinafter called “the General Conditions”) the Loan account will be credited with Special
Drawing Rights (SDR) ----- amount in words ----- (SDR ---- figure ----) upon the date of entry into force
of the Loan Agreement, and the Grant account will be credited with Special Drawing Rights (SDR) ---- amount in words ----- (SDR ---- figure ----) upon the date of entry into force of the Financing
Agreement, in accordance with the provisions of the Financing Agreement and Section 4.01 of the
General Conditions.
3.
This letter summarises the main methods and procedures governing loan administration as
well as those related to the supervision of the project activities by IFAD. We enclose IFAD’s Loan
34
Disbursement Handbook (LDH) , which includes standard information, model forms and instructions,
as more fully described therein, to facilitate the withdrawal of financing proceeds and maintenance of
appropriate project records.
Disbursement Procedures
4.
There are four standard procedures which may be used for withdrawal of financing proceeds
based on approved AWPBs :
(i)
(ii)
(iii)
(iv)
34
Advance Withdrawal or replenishment to the Designated Account
Direct Payment
Special Commitment
Reimbursement
Copy available on IFAD’s website www.ifad.org.
69
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 7: Financial management and disbursement arrangements
The forms, instructions, information and explanatory notes on their preparation and operation are
provided in the LDH.
5.
Eligible Expenditures shall be incurred during the Project implementation period, which
expires on the Project Completion Date), the ---- the anniversary of the date of entry into force of the
Financing Agreement, except for a limited amount of expenditures to meet the costs of winding up the
Project which may be incurred after the Project Completion Date but before the Loan/ Grant Closing
Date. The Loan/Grant Closing Date for receipt of withdrawal requests is six months after the Project
Completion Date.
6.
Disbursement Conditions are provided in Section E.3 of the Financing Agreement and are as
follows:
(i)
The Government will have opened the Designated Account-Loan and Designated
Account-Grant with the Central Bank or any other bank acceptable to IFAD.
(ii) DAR will have opened their Operational Project Accounts.
(iii) DAR would have appointed the Project Director and established the Central, Regional
and Provincial Project Management Offices and appointed key project staff.
(iv) DAR will have prepared an AWPB (including Procurement Plan for the first 18 months)
for the first year of project operation, and obtained IFAD’s approval for this AWPB.
7.
The Financing Proceeds shall not be used to finance taxes or duties of any kind whatsoever,
as stipulated under Section 11.01 of the General Conditions. If the Fund determines at any time that
financing proceeds have been applied towards paying for taxes, the same shall be refunded to the
Fund by the Borrower/ Recipient, in compliance with Section 11.02 of the General Conditions.
Designated Accounts
8.
(a)
Section 4.04 (d) of the General Conditions, provides that designated accounts should be
protected against set off, seizure or attachment on terms and conditions proposed by the Borrower/
Recipient and accepted by the Fund. In accordance with the approved project design document, the
Borrower/Recipient has agreed the following designated accounts be opened as soon as possible
after entry into force of the Financing Agreement, to be utilised for project operations:
a. Designated Account denominated in US Dollars, referred to as the ‘Designated Account-Loan’, to
be opened and maintained in the Central Bank or any other Bank proposed by the Borrower and
accepted by the Fund, for the purpose of financing the Project;
b. A Designated Account denominated in US Dollars, referred to as the ‘Designated Account-Grant’,
to be opened and maintained in the Central Bank or any other Bank proposed by the Borrower
and accepted by the Fund, for the purpose of financing the Project;
c.
Operational Project Accounts (referred to as Project Accounts) denominated in Philippine Peso
(PHP), to be maintained by DAR in a bank acceptable to the Fund;
d. The ceiling agreed to be the Fund’s reasonable limit for the Designated Account-Loan is US
Dollars 2.5 million and for the Designated Account-Grant is US Dollars 200,000). Under exceptional
circumstances, based on a request from the Borrower, the Fund may revise the agreed ceilings and
communicate to the Borrower accordingly. The Fund may advance all or any part of this ceiling as an
initial advance to the Designated Accounts, based on a Withdrawal Application from the Borrower,
within a reasonable time from the execution of the Financing Agreement. Such initial advance shall be
transferred by the Department of Budget Management to the operational accounts maintained by
DAR, at central and regional levels, within 15 days of receipt thereof, in the ratio of donor funding to
each account. However, no transfers shall be made to the operational accounts until the operational
accounts are opened and the Central, Regional and Provincial Project Management Offices
established.
70
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 7: Financial management and disbursement arrangements
(e)
The Department of Budget Management, on behalf of the Borrower, shall be fully
authorized to operate and manage the Designated Accounts in 8 (i) and (ii) above;
(f)
Additionally, counterpart funding as provided in Section B. 6 of the Financing Agreement
shall be deposited by the Borrower/Recipient directly into the Designated Accounts in 8 (iii) above in
accordance with customary national procedures for development assistance. For such purpose, the
Borrower /Recipient shall make budgetary allocations, annually in advance for each Fiscal year, equal
to the counterpart funds committed for the relevant year in the AWPB.
Instructions for Withdrawal
9.
Explanatory notes and forms to be used for the preparation of the withdrawal application for
disbursement procedures are provided in the LDH.
10.
Article IV, Section 4.04(b) of the General Conditions requires that, before withdrawal can
commence, IFAD receive from the Ministry of Finance exact title of the Borrower’s designated official
representative, a letter designating the name(s) of official(s) authorised to sign withdrawal
applications, together with their authenticated specimen signature/s. A sample form of the
authorization letter is provided in the LDH. If there are changes with respect to the authorised
signatories, IFAD should receive a new authorisation, in the same format, inclusive of the date from
which such change has effect. This will ensure uninterrupted processing and expeditious payment of
withdrawal applications. It is agreed that the Project Director of the Central Project Management
Office (CPMO) authorised by the Undersecretary of DAR for Support Services shall be the authorized
signatory for Withdrawal Applications and the alternate signatory will be the Finance Officer of the
CPMO authorised by the Assistant Secretary for Finance, Management and Administrative Office of
DAR. Withdrawal Applications will be compiled by DAR based on inputs received from the other
Implementing Agencies.
11.
The minimum size of each withdrawal application is US Dollars twenty thousand for the Loan
(USD 20,000.00) and US Dollars twenty thousand for the Grant (USD 20,000.00) or its equivalent, or
such other amount as IFAD may designate from time to time.
12.
Withdrawal application are to be prepared in the English, duly completed and signed, as
prescribed in the LDH, together with all required supporting documentation, should be sent to :
International Fund for Agricultural Development (IFAD),
Via Paolo Di Dono 44,
00142 Rome, Italy
Attn.: Country Programme Manager
13.
A copy of the withdrawal application without supporting documents should be sent to the
Loans and Grants Section of Financial Services Division, IFAD, Via Paolo di Dono 44, 00142 Rome –
Italy. It is recommended that withdrawal applications and necessary supporting documents be sent
by the Borrower to IFAD by courier post in order to expedite the withdrawal process. Queries
regarding a particular withdrawal application should be directed to IFAD, Country Programme
Manager, Programme Management Department (PMD). Once approval of the PO has been provided
by the PMD Regional Division, queries regarding payment status and value date of payments should
be directed to IFAD, Loans and Grants Section of the Financial Services Division.
Statement of Expenditure
14.
The LDH provides details on the use of the Statement of Expenditure (SOE) facility for
withdrawals of certain types of expenditures from the loan account. For such SOE withdrawals, the
relevant supporting documents need not be submitted to IFAD, but shall be retained by the Borrower
for period inspection by representatives of IFAD during supervision missions, who will report
specifically within the Supervision Report, their findings subsequent to such inspection. All original
records evidencing the expenditures shall be retained by the Borrower/Recipient and/or the
Implementing Agencies until 10 years after the closing date for withdrawals. It shall be the
71
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 7: Financial management and disbursement arrangements
responsibility of the Borrower/ Recipient to produce these records for verification whenever called for
by the Fund.
15.
The Borrower and the Fund have agreed that for presentation of SOE, thresholds as follows,
are to be applied:
(i)
For all categories of expenditures for amounts not exceeding US Dollars one hundred
thousand only (USD 100,000.00).
16.
Threshold above may be amended during the course of project implementation, subject to
prior agreement between the Borrower/Recipient and the Fund, and under communication by IFAD to
the Borrower/Recipient.
17.
In accordance with Annex III, Para 8 of the “IFAD Guidelines on Project Audits (for Borrowers’
Use)”, all expenditures disbursed on the basis of SOEs should be audited annually by an Independent
Auditor, and a separate opinion of the Auditor in respect of the SOEs must be included in the
certified audit report which must be submitted to IFAD.
The Annual Work Plan and Budget (AWPB) and Procurement Plan
In accordance with provisions of Section 7.01 (a) (iv) and (b) of the General Conditions, the lead
implementing agency [DAR] shall be responsible for providing the Fund with a consolidated and
approved Draft AWPB, which includes an 18-month Procurement Plan. The AWPB and Procurement
Plan shall be a consolidation of the individual AWPBs and Procurement Plans prepared by each of
the three Regions and at central level. The AWPBs shall be in line with the approved Global AWPB.
Such consolidated and approved Draft AWPB shall be submitted to the Fund for review and comment
no later than 45 days prior the beginning of the relevant project year. If the Fund does not comment
on the Draft AWPB within 30 days of receipt, the AWPB shall be deemed acceptable to the Fund and
the AWPB shall be adopted in the form accepted by the Fund. Adjustments may be proposed by the
Implementing Agencies through the Project Steering Committee during the project year with
acceptance criteria following the same procedure as for the Draft AWPB above. The AWPB shall be
processed following the Borrower’s normal legislative procedures for externally funded projects.
Allocation of Financing Proceeds
18.
Paragraph 1 of Schedule 2 of the Loan Agreement and Schedule 1 of the Financing
Agreement set forth the categories of eligible expenditures to be financed out of the proceeds of the
Financing, as well as the allocation of amounts per category and the percentages of expenditures to
be financed by the IFAD financing under Loan and Grant respectively.
Procurement of Goods, Civil Works and Consulting Services
19.
Procurement will follow the Philippine Government’s Procurement Reformed Act (GPRA) or
RA 9184 as implemented following the latest Implementing Rules and Regulations to the extent that
they are consistent with IFAD’s Procurement Guidelines. Where there are differences, the IFAD
Guidelines will take precedence. It is important to note that Procurement shall be undertaken only
during the Project Implementation Period. We enclose for your use a copy of IFAD’s Procurement
Guidelines. A current list of IFAD member states as eligible sources of procurement is provided in the
LDH.
Procurement Methods
20.
As provided in Appendix I, paragraph 1 of IFAD’s Procurement Guidelines, each procurement
plan shall include the proposed contracts, methods of procurement and related IFAD review
procedures. The methods of procurement to be used for this Project are discussed in detail in
Attachment to this Letter.
Review of Procurement Decisions by IFAD
21.
For the purposes of Appendix I, paragraph 2. of IFAD’s Procurement Guidelines, the Borrower
and IFAD have agreed that the following shall apply:
72
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 7: Financial management and disbursement arrangements
(i)
The award of any contract for goods and works estimated to cost more than
USD 250 000 and for consulting services estimated to cost more than USD 100,000
shall be subject to prior 1
(ii) review by IFAD.
(iii) The aforementioned may be modified from time to time as notified by the Fund to the
Borrower / Recipient.
22.
With respect to any contract for goods, civil works and consulting or other services valued at
over US Dollars twenty Thousand Only, the Borrower shall furnish two certified or conformed copies
of such contract to IFAD for the Attention of the IFAD Country Programme Officer, together with the
analysis of the respective bids and the recommendations for award, promptly after its signing and
prior to the submission to IFAD of the first application for withdrawal of funds from the Loan/Grant
Accounts in respect of such contract. For all contracts for goods, works and services valued at over
USD 20,000.00, two certified or conformed copies of the relevant contracts shall be submitted to
support the respective WA and SOE.
23.
Before agreeing to any material modification or waiver of the terms and conditions of any
contract for procurement or granting an extension of the stipulated time for the performance of such
contract, or issuing any change order under such contract (except in cases of extreme urgency) that
would increase the cost of the contract by more than 10% of the original price, the Borrower shall
have the renewed terms concurred to by the CPMO.
24.
All contracts should be listed in the Register of Contracts, to be maintained by each
Implementing Agency, with the dates of approvals as provided by the CPMO. Please ensure the
Register is updated and submitted to the IFAD Country Programme Manager on a monthly basis, as
this report facilitates the review and approval of payment requests on contracts. The sample form to
be used and instructions are detailed in the LDH. In addition, a copy of the CPMO’s approval, to the
contract award together with the Contract Monitoring Record, sample of which is provided in the LDH
is required as supporting documentation to each relevant withdrawal application.
Programme Reviews, Periodic Assessments and Reporting
25.
IFAD will communicate with you regarding the timing of the Project Start-up Mission. During
project start-up IFAD will address issues related to all financial, administrative, technical and other
issues, including arrangements required for starting the Project activities. In addition, the mission,
together with the Project Staff, will review the proposed Annual Work Plan and Budget (AWPB),
updated Procurement Plan, as well as schedules of projected expenditures and disbursements.
Recommendations will be made regarding the responsibilities of each party, i.e. the
Borrower/Recipient, the Project Coordinating Agency (namely the Department of Agrarian Reform)
and the other two main Implementing Agencies (namely, the Department of Agriculture and the
Department of Environment and Natural Resources) and IFAD, and the required actions to be taken.
The mission will discuss in detail the practical aspects of loan and grant administration matters with
the Project Staff directly involved in disbursements and procurement as well as provide explanations
on the practices that will be followed during the project supervision.
26.
Periodic technical field reviews and assessments will be undertaken by IFAD Supervision
Missions at intervals agreed with the Borrower. The main purpose of these missions is to assess the
project implementation status, review fiduciary aspects, identify operational problems and propose
corrective actions. The Supervision Missions will prepare and submit to the Borrower/ Recipient issueoriented technical supervision reports on project progress, implementation problems and loan and
grant administration matters.
27.
The Borrower/Recipient and the Fund agree to the following timelines for installation of
systems reviews and reports during implementation.
(i)
In pursuance of Section 8.02 (a) of the General Conditions, each Implementing Agency
shall install, not later than 180 days from the date of execution of the Financing
Agreement, and maintain an appropriate information management system in accordance
73
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 7: Financial management and disbursement arrangements
with the Fund’s Guidelines for Project Monitoring and Evaluation, to continuously monitor
the Project during its life.
(ii) In pursuance of Section 8.03 of the General Conditions, the Project Coordinating Agency
shall submit to the Fund, a six monthly Consolidated Progress Report, in a format
acceptable to the Fund. These reports shall contain quantitative, qualitative and financial
information stipulated by the Fund from time to time and shall be submitted not later than
31 August and 28 February for the semesters ending on 30 June and 31 December
respectively, of each Project Year. The Consolidated Progress Report shall draw
information from Progress Reports received by the Project Coordinating Agency from
each Implementing Agency.
(iii) In pursuance of Section 9.04 of the General Conditions, the Project Coordinating Agency
shall prepare and submit to the Fund, a six monthly Consolidated Financial Statements,
in formats acceptable to the Fund. These reports shall contain shall be submitted not
later than 31 August and 28 February for the semesters ending on 30 June and 31
December respectively, of each Project Year.
Financial Reporting and Auditing
28.
Article IX of the General Conditions references financial requirements for separate financial
reporting and records for the project, financial statements, auditing and other financial reports and
information, inclusive of timeframes for submission to the Fund as follows:
i.
ii.
The Borrower/Recipient shall deliver yearly financial statements within three months of the
end of each fiscal year.
The Borrower/ Recipient shall have the financial statements relating to the project audited by
the Commission on Audit as the Supreme Audit Institution of the Philippine Government and
submitted to IFAD within six months of the end of each fiscal year. The audit shall be
conducted according to International Auditing Standards or other auditing standards
acceptable to the Fund. The auditor shall express clear opinions on the Project Financial
Statements, eligibility of expenditure claimed from the Fund through Withdrawal Applications,
adequacy of supporting documentation for expenditure claimed through SOEs, adequacy
and timeliness of counterpart funding, adherence of procurement transactions to the relevant
national regulations and to IFAD’s Procurement Guidelines, operation of the Designated
Accounts, ownership, condition and usage of Project Assets. The Auditors shall also submit
a Management Letter, which identifies weaknesses, if any, in internal control systems
suggests measures to improve these systems. The Borrower’s response to the Management
Letter of the Auditor is required to be submitted to the Fund, within one month of receipt
thereof.
29.
Apart from reference in the LDH detailed requirements are provided in the “IFAD Guidelines
35
36
on Project Audits (for Borrower’s Use)” and the “IFAD Operational Procedures for Project Audit” ,
as both may be amended from time to time.
30.
Each Implementing Agency will maintain basic accounting records for the Project including
Cash Books, Ledgers, Advance Register etc., as per Government of the Philippines Regulations.
They will also maintain adequate supporting documentation for all project related expenditure. The
CPO will have full access to these records and these records will also be subject to scrutiny by
internal/ external auditors and IFAD Supervision Missions.
37
31.
As you may be aware the Fund has adopted a zero-tolerance policy towards fraudulent,
corrupt, collusive or coercive actions which have occurred in projects financed through its loans
and/or grants. Where it determines through an investigation that such practices have occurred, the
35
36
37
Copy available on IFAD’s website www.ifad.org
Copy available on IFAD’s website www.ifad.org
“IFAD Policy on Preventing Fraud and Corruption in its Activities and Operations” is available on IFAD’s website
www.ifad.org
74
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 7: Financial management and disbursement arrangements
Fund has a range of sanctions at its disposal in accordance with the provisions of applicable IFAD
rules and regulations and legal instruments. “Zero tolerance” means that IFAD will pursue all
allegations falling under the scope of this policy and that appropriate sanctions will be applied where
the allegations are substantiated. This policy applies to IFAD-funded activities whether supervised
directly by the Fund or by a cooperating institution. The Fund will continue to improve its internal
controls, including controls inherent in or pertaining to its project activities, so as to ensure that it is
effective in preventing, detecting and investigating fraudulent, corrupt, collusive and coercive
practices. The Fund shall take all possible actions to protect from reprisals individuals who help
reveal corrupt practices in its project or grant activities and individuals or entities subject to unfair or
malicious allegations. This policy is in line with the policies adopted by the other international financial
institutions.
32.
A copy of this letter is being sent for information to the Implementing Agencies and concerned
government offices. If you have any queries regarding matters detailed in the foregoing, please do not
hesitate to contact.
Accept, Mr. Secretary, the assurances of our highest consideration.
Kevin Cleaver
Assistant President
Programme Management Department
75
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 7: Financial management and disbursement arrangements
Attachment: Procurement Methods
The project will follow the Philippine Government’s Procurement Reformed Act (GPRA) or RA 9184 as
implemented following the latest Implementing Rules and Regulations to the extent that they are
consistent with IFAD’s Procurement Guidelines. When there are divergences, the IFAD Guidelines
shall precede.
The method of procurement must be mentioned in the Procurement Plan, and approved by IFAD in
advance. Any change in the method of procurement must be approved by IFAD.
Procurement of Goods: Each contract for goods estimated to cost USD 25,000 or more shall be
procured through National Competitive Bidding and for each contract for goods to cost less than USD
25,000 procurement shall use National Shopping procedures.
Procurement of Works: Each contract for works estimated to cost USD 25,000 or more shall be
procured through National Competitive Bidding and for each contract for works to cost less than USD
25,000 procurement shall use National Shopping procedures.
Direct Contracting will be limited to the following scenarios and will require IFAD’s concurrence for
each case:
(i)
(ii)
(iii)
(iv)
Where an extension to an existing contract for goods or works is required under 25% of
the existing contract in value.
Where the equipment required is proprietary, there is only one source and no
alternative exists.
Where there is a need to standardise upon existing equipment and to achieve
compatibility in spare parts.
In cases of emergency, where urgent delivery is required.
Procurement involving community participation: In accordance with the IFAD Procurement
Guidelines, procurement with community participation is not a distinct method of procurement and
therefore requires the same adherence to all principles and standards set out in the IFAD
Procurement Guidelines. Under the term “community participation”, the community may play one or
more of the following roles during project implementation: (i) as a provider of goods, works or services
directly to the project; and (ii) as the implementing agency undertaking procurement for the project.
Procurement of Services: For each contract for the selection of consultancy services estimated to
cost: (i) USD 20,000 equivalent or more will use Quality and Cost Based Selection (QCBS); and (ii)
USD 20,000 equivalent or below will follow Selection Based on Consultants Qualification method. The
selection of individual consultants will follow Selection Based on Consultants Qualification method.
Sole Source Selection will be limited to the following scenarios and will require IFAD’s concurrence for
each case. The scenarios are: (i) for tasks that are a natural continuation of previous work carried out
by the consultant; (ii) where rapid selection is essential (for example, in an emergency situation); (iii)
for very low value assignments costing less than USD 2,000; and (iv) when only one firm is qualified
or has the necessary experience for the assignment.
Review of Procurement Decisions: The award of any contract for goods and works estimated to
cost more than USD 250 000 and for consulting services estimated to cost more than USD 100,000
shall be subject to prior review by IFAD where IFAD will issue a No Objection Letter. The prior review
procedure is detailed in IFAD’s Procurement Guidelines and will be undertaken directly by IFAD.
76
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 7: Financial management and disbursement arrangements
Annex 3: Audit - Draft Terms of Reference
I.
BACKGROUND
38
1.
Project Converge is funded by IFAD through a loan amounting to USD 32.2 million and a
grant worth USD 0.8 million with financial contributions from the Government of the Philippines of
USD ... million, the LGUs of USD ... million and beneficiaries of about USD ... million. The Project
Financing Agreement became effective on _____________________ with a project completion date
on ______ ____________ and a loan closing date on __________________.
2.
The Financing Agreement provides that within 90 days of the Effective Date, the Borrower
through the Lead Agency, the DAR, will appoint independent auditors, in this case, the Commission
on Audit (the National Supreme Audit Institution) to audit the Financial Statements relating to the
Project for the first Fiscal Year. The first Fiscal Year audit will cover the period from the date of
st
effectiveness of the Loan until 31 December of that year. The Borrower will submit to the IFAD the
audit reports within six (6) months from the end of each fiscal year.
3.
In addition to the annual audit reports on the financial statements, the auditors shall provide:
(i) an opinion on the certified statements of expenditures and the operation of the Designated
Accounts (DAs) and Project Accounts (PAs); and, (ii) a separate management letter, addressing the
adequacy of the accounting, reporting and internal control systems.
4.
The objective of the audit is to enable the auditor to express a professional opinion on:

The financial position of the at the end of each fiscal year (31 December) and of the
funds received and expenditures incurred for the same period as reported in the
Project Financial Statements (PFS), including an opinion on the statements of
expenditure (SOE) and the DAs and PAs.

The project books of accounts and records provide the basis for the PFS and have
been adequately maintained.
st
5.
The audit will be carried out in accordance with International Auditing Standards and tests
and reviews will cover the following, with reference to their alignment to the financing agreement: (i)
use of external and counterpart funds; (ii) procurement of goods, services and consultancies; (iii)
adequacy of supporting documentation, records and accounts; (iv) operation of the DAs and PAs; and
(v) that project accounts have been prepared consistently reflecting a true and fair view of the
financial state of the project at the year end.
6.
The PFS which the auditor will finalize will include: (i) source and disposition of funds
statement and balance sheet; (ii) yearly and cumulative SOEs by withdrawal application and
expenditure category; (iii) reconciliation of the DAs and PAs; and (iv) consolidated financial
statements of CMPO, RPMOs and PPMOs.
7.
There will be a reconciliation showing the amounts shown as being received by the Project
and those shown as being disbursed by IFAD.
8.
The audit will review the eligibility of expenditures claimed under SOEs and used as a basis
for the WAs. Any ineligible expenditure amounts that have been reimbursed will be noted. A
referenced listing of individual SOE withdrawal applications will be attached to the PFS and total
withdrawals under SOE procedures will be part of the reconciliation statement.
9.
The audits of the DAs and PAs will cover deposits, replenishments, interest and the balances
at the year end. Specifically, the Auditor must form an opinion on the compliance with IFAD
procedures and the financing agreement – specifically examining: (i) eligibility of withdrawals; (ii)
operation of the accounts; (iii) adequacy of internal controls; and (iv) the use of correct conversion
rates from USD to PHP.
38
The detailed long version of the audit TOR will be included in the PIM.
77
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 7: Financial management and disbursement arrangements
As part of the opinion on the project’s financial statements, the audit report will also include an
opinion on the SOEs and the DAs and PAs indicating the extent to which these procedures can be
relied upon as a basis for disbursements under the project.
10.
11.
The Auditor will provide a Management Letter which will identify any deficiencies in the
projects procedures and systems and make recommendations for improvement; it will also include
any other matters that might materially impact project implementation.
78
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 7: Financial management and disbursement arrangements
Terms of Reference - External Audit (Long Version)
A.
39
BACKGROUND
1.
Project Converge is funded by IFAD through a loan amounting to USD 32.2 million and a grant
worth USD 0.8 million with financial contributions from the Government of the Philippines (GOP) of
USD x.x million, LGU counterpart of USD x.x million and Beneficiaries of about USD xx.x million. The
Project Financing Agreement became effective on _____________________ with a project
completion date on ______ ____________ and a loan closing date on __________________.
2.
The Financing Agreement provides that within 90 days after the Effective Date, the Borrower
through the Lead Agency DAR shall appoint independent auditors in this case the Commission on
Audit (as the National Supreme Audit Institution) to audit the Financial Statements relating to the
Programme for the first Fiscal Year. The first Fiscal Year audit will cover the period from the
effectivity of the Loan until The Borrower shall submit to the IFAD the audit reports within six (6)
months from the end of the each financial year covering 1 January to 31 December.
3.
In addition to the annual audit reports on the financial statements, the auditors shall provide: (i)
an opinion on the certified statements of expenditures and the operation of the Special Accounts; and
(ii) a separate management letter, addressing the adequacy of the accounting, reporting and internal
control systems.
4.
The Project’s overall goal is to contribute to reducing the incidence of poverty in the ten target
provinces of Regions IX, X and Caraga. The project’s development objective is that the target group
benefits from profitable and sustainable investments in producing, adding value to and marketing of
selected agricultural products. The project has three components: (i) Participatory Value-Chain
Analysis and Planning; (ii) Integrated Smallholders Agricultural and Rural Enterprise Development;
and (iii) Project Management, Monitoring and Evaluation. Capacity building and gender
mainstreaming will be an integral part of project-financed activities.
Component A: Participatory Value-chain Analysis and Planning
5.
The expected outcome of this component will be that the implementing agencies, private sector
organisations, and mature and capable POs can analyse value-chains and plan value-chain
development that can benefit the target group.
Component B: Integrated Smallholders Agricultural and Rural Enterprise Development
6.
The expected outcome of this component is the effective participation of the target group in the
selected value chains (production, value addition and marketing) where opportunities exist to exploit
comparative advantage and improve profitability sustainably.
7.
Following the selection of the value-chains and locations, the project will facilitate and finance
the development of the value-chains, with two sub-components: (i) Support for Farm and Enterprise
Development; and (ii) Investment in Rural Infrastructure and Equipment. The project will mobilize
partnerships involving private sector enterprises to develop the chains and provide the business
development services required; private sector management of these value-chains is essential.
Component C: Project Management and Policy Development
8.
The expected outcome of this component is that the project is completed on time and within the
agreed budget.
9.
This component will finance the costs of project management and coordination, compilation,
reporting and M&E activities at national, regional and provincial levels. In addition, the project will
finance policy studies, stakeholders’ consultations and other events related to the planning and
39
The Detail Long Version of the TOR- External Audit will be included in the Project PIM
79
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 7: Financial management and disbursement arrangements
implementation of the value-chain approach to agro-enterprise development, mechanisms for
convergence, and any other relevant policy studies.
10. The 10 targeted provinces using criteria that include incidence of poverty, presence of
organised ARC clusters, agricultural and agri-business development potential and availability of
services are as follows: Zamboanga del Norte, Zamboanga del Sur and Zamboanga Sibugay (Region
IX); Misamis Oriental, Camiguin and Bukidnon, divided into two operational divisions of North
Bukidnon and South Bukidnon, (Region X); and Agusan del Norte, Agusan del Sur, Surigao del Sur
and Surigao del Norte in Region Caraga. All the selected provinces selected have poverty rates
higher than the national average and five are among the 20 poorest provinces in the country (out of a
total of 80) and all include a high proportion of municipalities with high levels of poverty.
11. The 11 clusters selected as follows: (i) Region IX - Zamboanga del Norte, the Zamboanga Del
Norte ARC Settlement Cluster; Zamboanga del Sur, the Salug Valley ARC Cluster, and Zamboanga
Sibugay, the Salipyasin ARC Cluster; (ii) Region X - Misamis Oriental, the MISORET ARC Cluster; for
Camiguin the Camiguin ARC Cluster, for North Bukidnon, the Libona-Manolo Fortich ARC Cluster;
and for South Bukidnon, the South Bukidnon ARC Cluster; and (iii) Region Caraga - Agusan del
Norte, the TUJAKITSAN ARC Cluster; Agusan del Sur, the VETREBUNS ARC Cluster; Surigao del
Norte, the CLAGIBAPLA ARC Cluster; and Surigao del Sur, the BATA ARC Custer.
12. The total population in the 11 clusters is 773,106 in 144,372 households; 59,217 households of
these are ARB households of which 18,500 are households where a woman is the ARB. In addition,
there are 40,456 other smallholders and an estimated 14,250 IP households from sixteen tribes in the
ARC clusters, giving total number of 113,923 (about 113, 900) target group households, equal to 79%
of the population in the 11 ARC clusters.
13. In the target clusters there are 50 municipalities of whom 32 (64%) recorded poverty levels in
excess of 50% in 2009, while the range was from 27-68%. In terms of their internal revenue
allocations, 16% are in Class 1 (the highest category), 20% in each of Classes 2 and 3, 24% in Class
4, 16% in class 5 and 4% in Class 6.
14. In addition, the target clusters contain 92 ARCs located in 469 out of the total of 515 barangays.
DAR uses the ARC Level of Development (ALDA) ranking to assess the stage of the development of
the ARCs. The majority, 49 (53%), of the ARCs in the 11 clusters are in Class 5, the highest
development category, with 23 (25%) in Category 4.
Project Implementation
15. DAR, through the Foreign Assisted Projects Support Office, is the lead agency for project
implementation and has the necessary staff at all levels of government, down to the municipal level to
implement the project. Implementation occurs under the NCI, which will also involve DA, DENR as
well as other agencies including DTI and DOST, with project coordination mechanisms at all levels,
which also involves the oversight agencies e.g. the National Economic and Development Authority
(NEDA) and Department of Budget Management (DBM) at national and regional levels.
Planning, budgeting and reporting follows a bottom up processes with consolidation at provincial,
regional and national levels. Project knowledge is mainly generated through the M&E system. Regular
M&E activities is complemented with studies on the special features of the project, with knowledge
disseminated through various appropriate mechanisms
5. Financial Management
16. The project’s financial management follows the Government of the Philippine’s systems, rules
and regulations on receipts and disbursements of proceeds from loans and grants in so far as it is
consistent with IFAD’s standard disbursement procedures. The project follows the Philippine
Procurement Law (RA 9184) as implemented following the latest Implementing Rules and Regulations
(provided they are not inconsistent with IFAD’s Procurement Guidelines (September 2010). The
Philippine Procurement Law and its Implementing Rules and Regulations has been harmonized with
80
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 7: Financial management and disbursement arrangements
the procurement procedures of most foreign funding institutions and has been deemed acceptable by
ADD, WB and IFAD.
6. Disbursement Arrangements
In line with the Government’s budgeting system, receipts from the IFAD loan and grant will be
deposited in Designated Accounts (one for the Loan and one for the Grant) for the project in the
Bureau of Treasury (BTr), Department of Finance (DOF). Project Accounts is set up at the national,
regional and provincial levels, with budget advances to the implementing agencies, clusters and
LGUs, to receive the proceeds of the loan, the grant and the government counterpart funds. Utilization
of project funds, including the proceeds from the IFAD loan and the IFAD grant and the Government
counterpart contribution, requires that they are covered or within the Executing Agency’s appropriation
for the year.
B.
SCOPE OF WORK AND OBJECTIVES OF THE AUDIT
17. The auditor will audit the project financial statement (PFS) covering the period from effectivity
date of the loan until 31 December _______________, including all project expenditures and records
of transactions, and review the financial management system and internal controls of the project
implementation at the national, regional and provincial levels. The project books of accounts and
records provide the basis for preparation of the PFS and have been maintained to reflect all financial
transactions in respect of the project . The Audit will be conducted in accordance with International
Standards on Audit, the “Guidelines on Project Audits” (for Borrowers’ Use)” of IFAD and relevant
national standards.
18. The objectives of the audit are to verify the project financial statement, identify weaknesses in
financial management systems and internal controls, review compliance with loan covenants relating
to financial matters, make recommendations for improvement of accountability.
19. This audit report will be shared with internal and external parties, including relevant government
executing and implementing agencies at the national, regional and provincial levels and other parties
involved in monitoring the accountability of the Project Converge implementation.
Guiding Principles of Audit
20. The auditor will compile audit technical guideline before execution of audit. The guideline
covers standardization of audit methodology, procedures and working paper such as questionnaire
and audit schedules.
21.
The reference documents to be used for the audit include the following:






IFAD’s General Conditions for Agricultural Development Financing of 1998.
The Project Financing Agreement dated __________________.
The IFAD Guidelines on Project Audits (for Borrowers’ Use) of 2003.
The IFAD Guidelines on Procurement.
Project Appraisal Documents
Draft Programme Implementation Manual.
C.
Terms of Reference
22.
The audit will cover the period from the date of Effectiveness of the IFAD Financing to 31
December ___________________.
23.
The appointed auditor will undertake the following terms of reference:

Express a professional opinion on the financial position of Project Converge at the end of the
fiscal year and on the funds received and expenditures incurred for the fiscal year ending 31
December ________________, as reported in the PFS, including an opinion on the certified
81
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 7: Financial management and disbursement arrangements

24.
statements of expenditure (SOEs) and the operation of the Special Accounts (SA), Project
Accounts (PA) and the Borrower’s counterpart funds, with a separate management letter,
addressing the adequacy of the Project’s accounting and internal controls systems.
Special attention will be paid to establishing that:
 All external funds have been used in accordance with the conditions stipulated in the
Project Financing Agreement, with due attention to economy and efficiency, and solely for
the purposes for which the financing was provided.
 Counterpart funds have been provided by the government (Department of Agrarian
Reform) and used in accordance with national or organizational financial regulations, with
due attention to economy and efficiency, and solely for the purposes for which they were
provided.
 Goods, services and civil works financed out of project funds have been procured in
accordance with provisions of the Financing Agreement and/or government regulations.
 All necessary supporting documents, records and accounts have been kept in respect of
all project expenditures, including expenditures reported via SOEs.
 Consistency should exist between the project books of accounts and the reports
presented to the auditor and IFAD.
 The SA and PA have been used in accordance with the provisions of the Financing
Agreement.
 The government counterpart funds have been used in accordance with the regulations of
the government.
 Project records and accounts have been prepared in accordance with consistently
applied Generally Accepted Accounting Principles and relevant national standards and
give a true and fair view of the financial status of the programme at the end of the fiscal
year.
The auditor will conduct a review of the following:





Economy, efficiency and effectiveness in the use of project resources, including IFAD
financing and government counterpart funds.
Achievement of planned project targets and results.
Legal and financial obligations and commitments of the project and the extent of compliance
or non-compliance with the Financing Agreement and relevant government regulations.
System and procedures such as improvements in accounting, information technology or
computer systems, and operations that may be under development on which the auditor’s
comment are necessary to ensure effective controls.
Other activities on which an auditor may consider it appropriate to report.
Project Financial Statements
25.
The PFS will include the following:






A consolidated statement of Receipts and Payments (expenditures) which should disclose
separately IFAD’s funds, government counterpart funds, beneficiary contribution and other
sources of funding for each of the executing and implementing agencies at the national,
regional and provincial levels.
Balance sheet showing as a minimum accumulative disbursement of funds from all sources,
bank balances and other assets.
Yearly and cumulative SOEs by withdrawal application and category of expenditures.
Reconciliation of the SA and PA.
A summary of the accounting policies and all explanatory notes needed for a clear
presentation of the project financial statements at the end of the reporting period.
Reconciliation between the amounts shown as received by the project and those shown as
being disbursed by IFAD should be attached as an annex to the PFS. As part of that
reconciliation, the auditor will indicate the procedure used for disbursement. SA and PA
funds, letters of credit, special commitments, reimbursement or direct payment and indicate
whether the expenditure is fully documented or uses the SOE format.
82
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 7: Financial management and disbursement arrangements
Statements of Expenditure (SOEs)
26.
In addition to the audit of the PFS, the audit will include a review of SOEs used for submitting
withdrawal applications. The auditor will carry out sample tests and reviews of the SOEs.
Expenditures under SOEs will be carefully compared for eligibility with the Project Financing
Agreement and the Letter to the Borrower (loan and grant disbursement handbook) and with
reference to the Project Appraisal Documents for guidance when necessary. Where ineligible
expenditures are identified as having been included in withdrawal applications and reimbursed,
auditors will note these separately. A schedule listing individual SOEs under each withdrawal
application by reference number and amounts should be attached to the PFS. The total withdrawals
under the SOE procedure should be part of the overall reconciliation of IFAD disbursements
described above.
Special Accounts (SA) and Project Accounts (PA)
27.
The auditor is also required to audit the activities of the SA and PA associated with the
programme, including the Authorized Allocation or Initial Deposit, replenishments, interest that may
accrue on the outstanding balances and the year-end balances. The auditor will provide an opinion on
the degree of compliance with IFAD procedures and the balances of the SA and the PA at year end.
The audit should examine: (i) the eligibility of withdrawals from the SA and the PA during the period
under review; (ii) the operation of the SA and the PA in accordance with the Project Financing
Agreement; (iii) the adequacy of internal controls within the project management appropriate for this
disbursement mechanism; and (iv) the use of correct exchange rate(s) to convert local currency
expenditures to United States dollars and vice versa.
Field Audit
28.
In order for the Project Converge Managements to get engaged in the process of the audit,
the auditor regional office will assign an audit team consisting of a team leader and two team
members for each Project Regional and Provincial Office.
29.
The audit procedures will cover review of internal control procedures, observation,
confirmation for all transactions and analysis on financial transactions and physical observation.
30.
The audit will be implemented simultaneously at all levels of implementation, starting at the
National down to Regional and Provincial Offices. Based on samples, audit should also be
implemented at the field level to clarify findings that is related to project beneficiaries. The audit of
beneficiaries’ accounts will include also verification of efficiency and effectiveness of the actual
physical outputs in terms of cash, civil works or other benefits accrued to the beneficiaries and their
use.
31.
The management audit review is measured by the expenditures and activity of staff in the
Project Management at all levels. The use of human resources, goods and services procured by the
staff will be assessed with a cost-benefit analysis taking in consideration the principles of efficiency,
effectiveness and social equity and in terms of the achievements made by the beneficiaries facilitated
by the Project.
Quality Assurance
32.
The auditor will guarantee that team designation is referred to International Standards on
Audit. COA will develop quality assurance by providing weekly progress reports through emails and
arranging field visit to two sample locations to confirm that there would not be any unsolved problem.
Consultation on the Draft Audit Opinions
33.
The auditor will arrange consultations on the draft audit opinions at national, region and
province levels with authorized Project Management officers to discuss Project’s responses to the
draft management letter and recommendations. The recommendations prepared by the auditor should
83
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 7: Financial management and disbursement arrangements
be discussed prior to final statement including method and follow up action schedule to be included in
the audit report and management letter.
Population and Samples
34.
The audit is implemented through desk and field reviews of accounts, statement of
expenditures, financial records and other documentation, through physical observation of the
documentation maintained by the project offices for all transactions at national, regional and provincial
offices and field level and interviews to establish adequacy of accounting and internal controls,
including the internal audit mechanism for monitoring expenditures and other financial transactions
and enduring safe custody and appropriate utilization of Project assets. Analysis of secondary data
incorporated in financial reports and progress reports of the Project Management.
Audit Procedures
35.
In reviewing the programme accounts and financial statements, the auditor will:






Verify that generally accepted accounting standards have been consistently applied and
indicate any material deviation from these standards and the effect of such deviation on the
annual financial statements.
Assess the adequate financial management systems, accounting systems and internal
controls for monitoring and reporting expenditures and other financial transactions
(commitments, reviews, approvals, payments and accounting) and ensure safe custody and
optimal use of the programme financed assets and document any instances where controls
are lacking or need strengthening.
Determine whether the project management has maintained adequate documentation for all
transactions; e.g. procurement documents, contracts, suppliers invoices, letters of credit and
evidence of payment and ascertain that expenditures were properly authorised and in
compliance with legal requirements.
Verify the numerical accuracy of statements and accounts.
Verify that disbursement requests for expenditures submitted to IFAD are eligible for financing
under the loan agreement and identify clearly any ineligible expenditures.
Carry out a physical verification of any significant assets (vehicles, computers, software etc.)
purchased and confirm their existence and use for exclusive programme purposes.
Corrupt, Fraudulent, Collusive and Coercive Practices
36.
In preparing audit planning and implementation activities, the auditor will identify any serious
weaknesses of internal controls which caused discrepancies. When the audit takes place, and when
the auditor identify any corrupt, fraudulent, collusive and coercive practices which requires IFAD’s and
government’s due attention immediately, the auditor will submit report concerning their findings on any
of such activities in a separated report. In the matter, the auditor will engage the concerned authorities
to clarify, investigate and undertake appropriate actions.
37.
In addition to the above, the auditor will identify any misappropriation of funds or fraudulent
actions with are not in consistent with the relevant Financial Rules and Regulations and Acts as
defined by the Government of the Philippines.
38.
“Corrupt practices” means the offering, giving, receiving or soliciting, directly or indirectly, of
anything of value to influence the actions of a public official in the procurement process or contract
execution.
39.
“Fraudulent practices” means a misinterpretation or omission of facts in order to influence a
procurement process or the execution of the contract.
40.
“Collusive practices’’ means a scheme or arrangement between two or more bidders, with or
without the knowledge of Government of the Philippines designated to establish bid prices artificially,
non-competitive levels.
84
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 7: Financial management and disbursement arrangements
41.
“Coercive practices’’ means harming or threatening to harm directly or indirectly, persons or
their property to influence their participation in a procurement process, or to affect the execution of the
contract.
42.
Examples of conditions which required immediate IFAD and government consideration are
findings of illegal or rule breaking practices such as activities to obtain personal commercial interest,
immoral behaviour, disorder financial transaction, fake invoices or fake documents, activities to lose
documents, or practices which intentionally mislead.
Audit Schedule
43.
The Implementation of Audit will take place from xx to xx 20____ or xx workings days as
follows:
Activity
1
2
3
4
5
6
7
9
10
11
Time
Institution Involved
Working
Days
COA
HQ
Schedule and Methodology
Design Tentative Audit Manual
Workshop of Audit Manual and Audit
preparation
5
5
3
√
√
√
Field Audit
Quality Assurance from COA HQ
Exit Conference
Field Team Review & Reporting
Report Consolidation & Translation
Draft Final Report
Final Report
Total Works Days
25
COA
Regional
Office
Location
Project
√
√
√
√
√
√
√
3
5
7
3
5
58
D.
√
√
√
Quezon City
Quezon City
Quezon City
and
region______
Project area
Project area
Project area
Project area
Quezon City
Quezon City
Quezon City
OUTPUT
44.
The Output of Audit on Financial Statement of the Project Converge is an Independent
Auditor Report and a management letter as follows:
Independent Audit Report
45.
The Independent Audit Reports will include the auditor’s certification and opinion, signed by
the auditor and dated on the letterhead of Commission on Audit (COA). The audit report - addressed
to the Project Director of the Project Converge with a copy to the DAR FAPSO. The Auditor’s opinion
will be a clear and definite and should identify what accounting principles have been applied
(International Accounting Standards or Generally Accepted Accounting Principles or relevant national
standards) in the preparation and presentation of the financial statement.
46.
The Auditor will review, inter alia, eligibility of expenditures under the IFAD financing,
compliance with financial reporting requirements, comparison of the results shown in the financial
statements with the targets set in the annual work plan and budget and financial covenants in the
Project Financing Agreement and its amendments, overall project’s financial performance i.e. actual
versus budgeted, adequacy of internal control mechanisms of the Project, presentation with respect to
the use of IFAD funds versus funds from the government and other sources, satisfactory use of funds
and eligibility of expenditure items under the statement of expenditures (SOE) procedures for
disbursements, compliance with loan covenants, maintenance of SA and PA, reconciliation and use of
the SA and PA, follow up on actions noted in the previous year’s recommendations of the Auditor, if any,
compliance with procurement procedures as stipulated in the Programme Financing Agreement and
treatment of payment for taxes and duties.
85
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 7: Financial management and disbursement arrangements
47.
The Independent Audit Reports on Financial Statement of the Project Converge should be
presented in Quezon City in English versions including separated opinion on adequacy of financial
statement as follows:








Consolidated Annual and Actual Project Expenditures and Sources by component and
category.
Consolidated Cumulative Project Expenditure and Financing and Summary of Sources by
component and category including counterpart funds.
The operation and the utilisation of the Special Account and the Grant Bank Account.
The operation and the utilisation of the government counterpart funds.
The operation of the IFAD financing and government counterpart funds through the
treasury accounts for the operations of READ at national, provincial and district
levels.
The verification of the Statement of Expenditures (SOE), substantiated by supporting
documentation and adequate accounting records.
Procurement action undertaken by the Programme at all levels.
Balance - Sheet.
48.
The Auditor’s report should point out any problems and irregularities identified during the audit
and make recommendations for improvement.
Audit Opinion
49.
As part of the opinion on the PFS, the audit report will include an opinion an opinion on the
certified statements of expenditure (SOEs) and the operation of the Special Account (SA), Project
Account (PA) and the Borrower’s counterpart funds.
Management Letter
50.
The auditor will provide a separate management letter which will identify deficiencies in the
programme accounting records, procedures, financial management systems and internal controls and
make appropriate recommendations for improvement. The management letter will also include any
other significant matters that come to the auditor’s attention and might have material impact on project
implementation. The central Project Management Office will submit to the IFAD the reply to the
management letter of the auditors within one month of receipt thereof. Management letter will describe
the following information:







Records of transactions, financial management system, procedures and internal controls
maintained by Project offices at national, regional and provincial levels.
Verify fixed-asset data maintained by the Project, including changes such as increasing and
decreasing assets. The audit will verify the frequency of fixed asset verification.
Assessment on Financial Management of the Project, including their accounting system,
financial management and internal controls.
Assessment on special accounts and project accounts transaction, such as (i) correctness of
special account and/or withdrawal if any and account of counterpart fund from GOP; (ii)
Transaction of Loan Withdrawal implemented based on Statements of Expenditure (SOE)
including auditor opinions; (iii) transfer period from IFAD account to Special Account (loan);
(iv) Detailed Cumulative and Annual Withdrawal Application by withdrawal application and
category including proposed withdrawal application, received withdrawal application and its
methodology; (v) Interest existed due to outstanding balances; (vi) adequacy of internal
control based on disbursement mechanism; and (vii) accurate exchange rate applied from
PHP to USD.
Review of procurement actions undertaken by the Project and documentation in this regard.
Verify physical inventory and assets against contracts for procurement of goods and good
delivered.
Opinions towards adequacy of accounting system and internal control to monitor expenditure
transactions and other transactions, and security of program assets.
86
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 7: Financial management and disbursement arrangements




51.
The implementation of Project in accordance with the implementation arrangements outlined in
the IFAD-reviewed Project Implementation Manual (PIM) and also operational changes which
was not presented therein, but requires the amendments to the PIM.
The activities undertaken are part of the approved AWPB and the approved Procurement Plan.
Procurements actions which have not complied with in prior review requirements as outlined in
Schedule 4 of the Financing Agreement.
on availability and/or changes of key personnel at all levels which has a material impact on the
operations of the Project
The Management letter will covered reviewed in Project Management at all level on:








Overall performance of Project Management at all levels.
Accountabilities of Project Implementers.
Feasibility of the Project’s organization structure at every level.
Adequateness and optimization of personnel and working facilities.
Working relationship among organizations related to the project, Project management, and
other implementing institutions.
Implementation of the duties and function of personnel in every organization unit.
Implementation of the Project’s ME system, project reports and documentation.
Review and verification of previous observation status and follow-up actions taken by Project
including outstanding observation and follow-up taken.
52.
The auditor will prepare follow up actions which will be implemented by coordinators as
response to findings of previous year’s audit report and management letter, including the
recommendations and programme progress report.
53.
The format of management letter will follow the outline below:







Executive Summary.
Introduction.
Background.
Objectives and Scope of Audit.
Evaluation on internal control.
Evaluation on program performance.
Findings, recommendations and
implementation schedule).
E.
responses
(including
improvement
and
Financing
54.
The implementation of the audit will be financed by the Project Budget FY 20_____. The
estimated budget is PHP____________________________ with detailed as follows:
No
1
2
3
Description
Formulation of Project Converge Audit
Operating Guidelines
Socialization of Project Audit Operating
Guidelines
Implementation of Project Audit Operating
Guidelines
Total:
87
Amount (PHP)
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 7: Financial management and disbursement arrangements
F. Sample Audit Report
(FOR AN UNQUALIFIED OPINION)
Auditor's report to:
a) Certification of Statement of Expenditure
We have audited the accompanying Statement of Expenditure (SOE) IFAD Project Converge
with project number _________ for the period ____________________ to 31 December
_________________ .
We conducted our audit in accordance with International Standards of Auditing (ISA). Those
standards require that we plan and perform the audit to obtain reasonable assurance about
whether the SOE is free of material misstatement. An audit includes examining, on a test basis,
evidence supporting the amounts and disclosures in the SOE. An audit also includes assessing
the accounting principles used and significant estimates made by management, as well as
evaluating the overall presentation of the SOE. We believe our audit provides a reasonable basis
for our opinion.
In our opinion, the SOE presents fairly (unqualified (positive audit opinion), in all material
respects the expenditure of __________ [insert amount in US$] incurred by the project and
audited by us for the period __________________ to 31 December _________ in accordance
with Philippine Government and IFAD accounting requirements.
Or (qualified - a negative audit opinion)
In our opinion, the SOE, except for the reasons indicated above in paragraphs (1), (2), (3), etc.,
presents fairly in all material respects the expenditure of __________[insert amount in US$]
incurred by the project which we have audited for the period _____________ to 31 December
_____________ in accordance with the Philippine Government and IFAD accounting
requirements.
The total net financial impact of this qualified opinion is _________ [insert
amount in US$].
Or (disclaimer - a negative audit opinion)
We were unable to obtain sufficient appropriate audit evidence and accordingly are unable to
express an opinion on the statement of expenditure of __________ [insert amount in US$]
incurred by the project and audited by us for the period _________________ to 31
December________. The total net financial impact of this disclaimer opinion is_______ [insert
amount in US$]. Note: The total amount indicated should be the amount of the SOE.
Or (adverse - a negative audit opinion)
We noted material differences between _________ and the statement of expenditure. As such,
we do not express an opinion on the statement of expenditure, of __________ [insert amount in
US$] incurred by the project and audited by us for the period _________________ to 31
December ________________. The total net financial impact of this adverse opinion is_______
[insert amount in US$].
b) Certification of Statement of Uses and Application of IFAD Funds
We have audited the accompanying Statement of Uses and Application of IFAD Funds (“the
statement”) of the IFAD project number _________ as at 31 December ______________. The
statement is the responsibility of the management of the project. Our responsibility is to express
an opinion on the statement based on our audit.
We conducted our audit in accordance with International Standards of Auditing. Those standards
require that we plan and perform the audit to obtain reasonable assurance about whether the
statement is free of material misstatement. An audit includes examining, on a test basis, evidence
supporting the amounts and disclosures in the statement. An audit also includes assessing the
accounting principles used and significant estimates made by management, as well as evaluating
the overall presentation of the statement. We believe our audit provides a reasonable basis for
our opinion.
In our opinion, the Statement presents fairly (unqualified (positive audit opinion), in all material
respects the Fund balance of the project amounting to ____________ [insert amount in US$] as
at 31 December ______________ in accordance with IFAD requirements.
88
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 7: Financial management and disbursement arrangements
Date of issuance:__________________________
AUDITOR'S NAME (Please print): __________________
AUDITOR’S SIGNATURE: ________________________
STAMP AND SEAL OF COA: _________________________
Note: Audit opinions must be one of the following: (a) qualified, (b), unqualified, (c) adverse, or (d)
disclaimer. If the audit opinion is other than “unqualified” the audit report must describe both the
nature and amount of the possible effects on the financial statements (NET FINANCIAL IMPACT).
II.
Definition of Audit Opinions
Unqualified (Clean or positive) Opinion
An unqualified opinion should be expressed when the auditor concludes that the financial statements
give a true and fair view or are presented fairly, in all material respects, in accordance with the
applicable financial reporting framework.
Qualified Opinion – a negative audit opinion
A qualified opinion should be expressed when the auditor concludes that an unqualified opinion
cannot be expressed but that the effect of any disagreement with management, or limitation on scope
is not so material and pervasive as to require an adverse opinion or a disclaimer of opinion. A
qualified opinion should be expressed as being ‘except for’ the effects of the matter to which the
qualification relates.
Disclaimer of opinion – a negative audit opinion
A disclaimer of opinion should be expressed when the possible effect of a limitation on scope is so
material and pervasive that the auditor has not been able to obtain sufficient appropriate audit
evidence and accordingly is unable to express an opinion on the financial statements.
Adverse – a negative audit opinion
An adverse opinion is expressed by an auditor when the financial statements are significantly
misrepresented, misstated, and do not accurately reflect the expenditure incurred and reported in the
financial statements.
An adverse opinion is expressed when the effect of a disagreement is so material and pervasive to
the financial statements that the auditor concludes that a qualification of the report is not adequate to
disclose the misleading or incomplete nature of the financial statements.
II. Classification of possible causes of Audit Findings
1.
2.
Lack of/or inadequate policies/procedures/guidelines
Lack of/or inadequate guidance/supervision a the project level
3.
4.
Inadequate guidance/monitoring at IFAD country office level
Lack of/or insufficient resources (specify: financial, human or, technical
resources)
Inadequate planning
Inadequate training
Human error
Intentional overriding of internal controls
Inadequate management structure
5.
6.
7.
8.
9.
89
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 8: Procurement
Appendix 8: Procurement
I. INTRODUCTION
II.
The Philippine Government’s Procurement Reformed Act (RA 9184) and its Implementing Rules
and Regulations set public bidding as the standard method of procurement for amounts exceeding
PHP 500,000 (or USD 11,000) for national government agencies (with different thresholds for LGUs of
different income classes). For PHP 500,000 or less, National Government Agencies can procure goods
and services through shopping or small value procurement under certain circumstances and conditions.
Under circumstances specified in the rules and regulations, procurement may be through alternative
methods, which include the following: (i) limited source bidding; (ii) direct contracting; (iii) repeat order; (iv)
shopping; or (v) negotiated procurement.
III.
IFAD Procurement guidelines on the other hand requires International Competitive Bidding (ICB)
for procurement of Goods for more that USD 200,000; USD 1.0 million for Civil Works; and USD 100,000
for Services. For amounts less than these thresholds, the national thresholds or amounts specified in the
Project Financing Agreement will apply. PROJECT PROCUREMENT
IV.
Procurement of Goods. For this project, each contract for goods estimated to cost USD 25,000
or more will be procured through National Competitive Bidding and for each contract for goods to cost less
than USD 25,000 procurement will use National Shopping procedures.
V.
Procurement of Works. For this project, each contract for works estimated to cost USD 25,000
or more will be procured through National Competitive Bidding and for each contract for works to cost less
than USD 25,000 procurement will use National Shopping procedures.
VI.
Direct Contracting will be limited to the following scenarios and will require IFAD’s concurrence for
each case:
(i)
(ii)
(iii)
(iv)
Where an extension to an existing contract for goods or works is required but with a value
of less than 25% of the value of the existing contract.
Where proprietary equipment is required, there is only one source and no alternative
exists.
Where there is a need to standardise upon existing equipment and to ensure compatibility
in terms of spare parts.
In emergencies where urgent delivery is required.
VII.
Procurement involving community participation. In accordance with the IFAD Procurement
Guidelines, procurement with community participation is not a distinct method of procurement and it
therefore requires the same adherence to all principles and standards set out in the IFAD Procurement
Guidelines for the method of procurement involved. To follow procurement involving community
participation in this project, the CPMO will ensure the following:
(i)
(ii)
(iii)
(iv)
Ensure that all documents and records are available in English as may be required for
purposes of audit and review.
Provide appropriate procedures for regular monitoring and audit of community procurement
activities, including the retention of relevant records by the CPMO, RPMOs and PPMOs.
Define the relationships, roles and responsibilities between the CPMO, RPMO and PPMO
and the community, including a clear exit strategy for the completion of the project
interventions.
Ensure proper handover of assets to the community.
VIII.
Under the term “community participation”, the community may play one or more of the following
roles during project implementation:
As a provider of goods, works or services directly to the project
91
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 8: Procurement
IX.
Communities are permitted to undertake works or provide goods or services to the project where
community participation is: (i) either part of the implementation arrangements described in the Project
Design Report; (ii) or it is agreed with IFAD that this represents a cost-effective and practical alternative to
external procurement, even if not part of the implementation arrangements described in the Project Design
Report. IFAD will also consider factors such as fostering ownership, the sustainability of project activities,
effective operation and maintenance of a project financed investments, and the overall risk/reward
equation.
X.
Generally, agreement will only be granted where it can be demonstrated that such goods, works
or services have been or could be successfully provided or produced by the community. As a provider of
goods, works or services, a community may act either on a commercial basis under contract, or as a
provider of part or all of the beneficiary community’s contribution to the project.
As the implementing agency undertaking procurement for the project
XI.
Communities or informal groups may be brought together to act as implementing agencies to
undertake project-procurement. Where this is the case, their role will include:
(i) Competitive contracting using any of the agreed procurement methods; and
(ii) Supervision of a contracted provider of works, goods or services.
XII.
Procurement of Services. For each contract for the selection of consultancy services estimated
to cost: (i) USD 20,000 equivalent or more will use the Quality and Cost Based Selection (QCBS) method;
(ii) USD 20,000 equivalent or below will follow the Selection Based on Consultant Qualification (CQ)
method. The selection of individual consultants will follow the Selection Based on Consultant Qualification
(CQ) method.
XIII.
Sole Source Selection will be limited to the following scenarios and will require IFAD’s concurrence
for each case. These scenarios are: (i) for tasks that are a natural continuation of previous work carried out
by the consultant; (ii) where rapid selection is essential (for example, in an emergency situation); (iii) for
very low value assignments costing less than USD 2,000; and (iv) when only one firm is qualified or has
the necessary experience for the assignment.
XIV.
Review of Procurement Decisions. The award of any contract for goods and works estimated to
cost more than USD 250,000 and for consulting services estimated to cost more than USD 100,000 shall
be subject to prior review by IFAD where IFAD will issue a No Objection Letter (NOL). The prior review
procedure is detailed in IFAD’s Procurement Guidelines and will be undertaken directly by IFAD.
XV.
In the implementation of the Project, IFAD funds, loan and grant, will be used to hire contractual
project staff, procure consultancy services, and service providers for training and workshops. The Project
will also procure 16 vehicles, desktop computers and laptops; and the usual goods for operation and
maintenance. The procurement of 16 vehicles, desktop computers and laptops will be undertaken at the
DAR Central Office through its Bids and Awards Committee.
XVI.
Prior to procurement of vehicles, DAR needs to submit to DBM for its concurrence and
assessment of the status of its existing vehicles at the national, regional and provincial levels: number of
vehicles, condition of the vehicles and justification for the required vehicles to be used exclusively for the
project at the Central, Region and Province levels. The Government Counterpart Funds will finance taxes
and duties and honoraria for the government staff working for the project by way of Executive Orders
issued by DAR. The two tables below provide a summary of the project’s proposed procurement
arrangements and procurement accounts by year.
92
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 8: Procurement
(USD Million)
Procurem ent Method
Sub-Borrow er's
National
Consulting
Equipm ent [End
Com petitive Services:
Local
Direct
User's
Bidding
QCBS
Shopping Contracting Preference]
A. Civil Works
N.B.F.
Total
12.2
(9.8)
2.0
(1.1)
2.7
(0.8)
-
-
-
-
-
-
-
-
-
-
0.5
(0.3)
8.2
(2.5)
-
0.8
E. Studies
-
-
-
-
-
F. Technical Assistance
-
-
-
-
G. Training & Capability Building
-
0.9
(0.8)
-
0.9
(0.5)
16.3
(4.9)
1.0
(0.9)
0.3
(0.1)
-
-
-
-
H. Vehicles & Office Equipment
0.5
(0.2)
-
-
-
-
-
-
-
-
J. Contracted Project Staff
-
-
1.7
(1.3)
0.0
(0.0)
0.1
(0.0)
-
-
-
K. Assigned Government Staff
-
-
-
2.0
(2.0)
-
-
0.8
12.2
(9.8)
3.4
(1.9)
27.2
(8.2)
1.8
(0.9)
0.3
(0.1)
0.9
(0.8)
1.7
(1.3)
0.5
(0.2)
0.1
(0.0)
2.0
(2.0)
0.8
L. Operation & Maintenance
-
-
-
-
-
1.5
1.5
17.5
(11.9)
0.9
(0.8)
20.3
(7.6)
2.0
(2.0)
8.7
(2.7)
3.1
-
52.5
(25.0)
B. VC Facilities & Equipment
C. Agricultural & Processing Inputs
D. Local Services
I. Workshops
Total
-
-
-
-
_________________________________
Note: Figures in parenthesis are the respective amounts financed by IFAD Loan
(USD Million)
2015
1. Civil Works
2. VC Facilities & Equipment
3. Agricultural & Processing Inputs
4. Local Services
5. Studies
6. Technical Assistance
7. Training & Capability Building
8. Vehicles & Office Equipment
9. Workshops
10. Contracted Project Staff
11. Assigned Government Staff
12. Operation & Maintenance
Total
(v)
Totals Including Contingencies
2016
2017
2018
2019
2020
2.4
1.9
0.3
0.1
0.2
0.5
0.5
0.1
0.2
0.1
0.1
6.7
1.7
0.6
17.4
0.5
0.1
0.2
0.5
0.4
0.2
0.3
21.8
5.5
0.3
3.0
0.5
0.0
0.2
0.3
0.4
0.1
0.3
10.5
4.8
0.0
1.8
0.2
0.0
0.1
0.2
0.3
0.1
0.3
8.0
0.2
0.0
1.6
0.1
0.0
0.1
0.2
0.3
0.1
0.3
2.9
0.0
1.5
0.2
0.0
0.0
0.1
0.3
0.1
0.3
2.7
Total
12.2
3.4
27.2
1.8
0.3
0.9
1.7
0.5
0.1
2.0
0.8
1.5
52.5
PROCUREMENT PLAN FOR FIRST 18 MONTHS
st
st
XVII. The Draft Procurement Plan for the first 18 months from 1 July 2015 to 31 December 2016
in USD ('000) is attached and will be submitted by DAR together with the AWPB for PY1 as a condition
precedent to the first withdrawal of funds as provided in the Financing Agreement.
93
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 8: Procurement
No.
1
2
3
4
Planned Procurement
Activities
Unit
No.
Unit cost
USD’000
Estimated
Base Cost
USD’000
Procurement
Method
IFAD
Review
Type
Responsibl
e Agency
Vehicles and Equipment:
Vehicles
No.
11
26.44
396.6
NCB
NOL
SSO-FAP/
CPMO
Desktop Computer
No.
16
1.38
22.1
NCB
Post Review
Laptop
No.
32
1.03
33.1
NCB
Post Review
Other Equipment
No.
4
3.52
14.1
LCL
Post Review
SSO-FAP/
CPMO
SSO-FAP/
CPMO
CPMO/
RPMO
Sub-Total Vehicles and
Equipment
Investment in VC Related
Infrastructure( rural roads, ,
irrigation, public water
supplies) 1/
Investment in VC Equipment
transport, packaging
equipment, drying equipment,
handling equipment for coco
sugar, rubber processing
facility 1/
Investment in agricultural
equipment/inputs(seeds,
fertilizers, chemicals, tools,
harvesting equipment, fencing
and cultivators)
Sub Total Value Chain
Development
Technical Assistance &
Procurement Process
Bid
Prep.
from/to
Bid
Opening
&
Evaluation
from/to
Contract
Sign
Date
Delivery
Date
2 Jul31 Aug
15
2- 31
Jul 15
2- 31
Jul 15
2- 31
Jul 15
2- 29 Sept
15
12-Oct15
12-Dec15
1- 7 Aug
15
1- 7 Aug
15
1- 7 Aug
15
17-Aug15
17-Aug15
17-Aug15
31-Aug15
31-Aug15
31-Aug15
1 Apr
13 - 31
May
16
2 July
13 - 31
Aug 15
3 Jun 13 31 Jul 15
10-Aug16
14-Dec16
3 Oct 13 –
30 Nov 15
10-Dec15
10-Oct16
3 Oct 13 –
30 Nov 15
10-Dec15
10-Oct16
465.8
ls
-
-
1,655.2
NCB
NOL/PR
RPMO/
PPMO
ls
-
-
2,875.5
NCB 60%,
LCL 25% SBP
15%
NOL/PR
CPMP/
RPMO
ls
-
-
18,274.1
NCB 10%,
LCL60% SBP
30%
NOL/PR
RPMO/
PPMO
22,804.8
94
2 July
13 - 31
Aug 15
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 8: Procurement
No.
Planned Procurement
Activities
Local Services
Technical Assistance
Secondary Crop Value Chain
Planning
Travel Expenses
Consultants in Training of VC
Facilitation & Implementation
Expenses for VC Training
Consultants
Technical Consultants Manila
based for VC implementation
Economic & Business
Consultants
Consultant in Value Chain
Financing Facilitation
Consultant in Value Chain
M&E
Operating Expenses of
Consultants
Professional services for RI
Investigations
Detailed Preparation of RI
Designs
Support to Value Chain
Implementation (facilitation
etc.)
VC-Gender Needs
Assessment
VC Gender Mainstreaming
Workshops
VC Gender Studies
Unit
PersonDay
Person
Trip
Person
Day
PersonMonth
Person
Month
PersonMonth
PersonMonth
PersonMonth
cons
moth
ls
No.
Unit cost
USD’000
Estimated
Base Cost
USD’000
IFAD
Review
Type
Responsibl
e Agency
36.0
QCBS
Post Review
PPMO
2- 31
Oct 15
1- 30 Nov
15
17-Dec15
29-Nov16
22.0
0.303
6.7
QCQS
Post Review
PPMO
120.0
0.3
36.0
QCBS
Post Review
5.0
1.471
7.4
QCBS
Post Review
4.598
138.0
QCBS
Post Review
RPMO/
PPMO
RPMO/
PPMO
RPMO/
PPMO
RPMO/
PPMO
RPMO/
PPMO
RPMO/
PPMO
RPMO/
PPMO
RPMO/
PPMO
RPMO/
PPMO
RPMO/
PPMO
2- 31
Oct 15
2- 31
Oct 15
2- 31
Oct 15
2- 31
Jul 15
2- 31
Oct 15
2- 31
Oct 15
1- 31
Sep 15
1- 31
Sep 15
1- 31
Sep 15
1- 31
Sep 15
2- 20
Jul 15
1- 30 Nov
15
1- 30 Nov
15
1- 30 Nov
15
1- 31 Aug
15
1- 30 Nov
15
1- 30 Nov
15
1- 31 Oct
15
1- 31 Oct
15
1- 31 Oct
15
1- 31 Oct
15
21- 31 Jul
15
17-Dec15
17-Dec15
17-Dec15
31-Aug15
17-Dec15
17-Dec15
17-Nov15
17-Nov15
17-Nov15
17-Nov15
31-Jul15
29-Nov16
29-Nov16
29-Nov16
31-Dec16
31-Oct16
31-Mar16
30-Apr16
31-Dec16
31-Mar16
30-Jun16
31-Dec16
RPMO/
PPMO
RPMO/
PPMO
RPMO/
PPMO
SSO-FAP
2- 31
May15
2- 31
May15
2- 31
May15
1- 30
1- 30
June15
1- 30
June15
1- 30
June15
1- 31 May
15-Jul15
15-Jul15
15-Jul15
17-Jun-
29-Nov15
29-Nov15
29-Nov15
31-Dec-
30.0
4.598
115.0
QCBS
Post Review
25.0
6.0
4.598
27.6
QCBS
Post Review
8.0
4.598
QCBS
Post Review
QCBS
Post Review
QCBS
Post Review
QCBS
Post Review
LCL
Post Review
QCBS
Post Review
QCBS
Post Review
QCBS
Post Review
Direct Hire
Post Review
36.8
69.0
0.759
52.3
-
204.6
ls
-
341.0
ls
-
442.4
Cluster
2.211
11.0
Cluster
24.3
2.437
11.0
Cluster
Person-
Procurement Process
0.30
120.0
26.8
4.023
11.0
National Project Manager
Procurement
Method
44.3
2.177
95
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 8: Procurement
No.
Planned Procurement
Activities
MIS Specialist
Finance/Administrative
Assistant
Driver
National Value Chain
Specialists
M&E/KM Specialist
Value Chain Analysis Staff
Value Chain Analysis Staff
Institutional/Gender Staff
Finance/Admin Officer
Bookkeeper
Provincial M&E/KM Specialists
Special Studies on VC crops
Unit
Month
PersonMonth
PersonMonth
PersonMonth
PersonMonth
PersonMonth
PersonMonth
PersonMonth
PersonMonth
PersonMonth
PersonMonth
PersonMonth
Study
No.
Unit cost
USD’000
18.0
Estimated
Base Cost
USD’000
39.2
1.177
18.0
IFAD
Review
Type
Responsibl
e Agency
Direct Hire
Post Review
SSO-FAP
Direct Hire
Post Review
SSO-FAP
Direct Hire
Post Review
SSO-FAP
Direct Hire
Post Review
CPMO
21.2
0.687
18.0
12.3
0.308
18.0
24.0
Procurement
Method
1.862
5.5
44.7
1.379
Direct Hire
Post Review
CPMO
1.172
24.9
25.8
Direct Hire
Post Review
RPMO
66.0
1.011
66.6
Direct Hire
Post Review
PPMO/
22.0
1.011
22.2
Direct Hire
Post Review
54.0
0.867
46.8
Direct Hire
Post Review
54.0
0.411
22.2
Direct Hire
Post Review
198.0
0.460
91.1
Direct Hire
Post Review
5.747
74.7
LCL
Post Review
RPMO/
PPMO
RPMO/
PPMO
RPMO/
PPMO
RPMO/
PPMO
RPMO/
PPMO
18.0
22.0
13.0
5
Sub-Total Technical
Assistance & Local Services
Training and Workshop
Capacity and Training Needs
Assessment - Senior Project
Participants
Training - DAR Project Staff
Procurement Process
Apr 15
1- 30
Apr 15
1- 30
Apr 15
1- 30
Apr 15
1- 30
Apr 15
1- 30
Apr 15
1- 30
Apr 15
1- 30
Apr 15
1- 30
Apr 15
1- 30
Apr 15
1- 30
Apr 15
1- 30
Apr 15
1- 30
Apr 15
15
1- 31 May
15
1- 31 May
15
1- 31 May
15
1- 31 May
15
1- 31 May
15
1- 31 May
15
1- 31 May
15
1- 31 May
15
1- 31 May
15
1- 31 May
15
1- 31 May
15
1- 31 May
15
15
17-Jun15
17-Jun15
17-Jun15
17-Jun12
17-Jun15
17-Jun15
17-Jun15
17-Jun15
17-Jun15
17-Jun15
17-Jun15
17-Jun15
16
31-Dec16
31-Dec16
31-Dec16
31-Dec16
31-Dec16
30-Jun16
30-Jun16
31-Dec16
31-Dec16
31-Dec16
31-Dec16
31-Dec15
1- 30
June
15
1- 30
June
15
1- 31 July
15
17-Aug15
31-Oct
-15
1- 31 July
15
17-Aug15
31-Oct15
2,036.4
Lump
sum
1.0
ls
2.0
11.034
11.0
LCL
Post Review
SSO-FAP
28.414
56.8
LCL
Post Review
SSO-FAP
96
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 8: Procurement
No.
Planned Procurement
Activities
Unit
Training - DA Project Staff
ls
Training - DENR Project Staff
ls
No.
Unit cost
USD’000
2.0
28.138
Estimated
Base Cost
USD’000
56.3
Procurement
Method
Responsibl
e Agency
LCL
IFAD
Review
Type
Post Review
12.690
12.7
LCL
Post Review
SSO-FAP
SSO-FAP
1.0
Region 9 – VC survey,
meetings, workshops for
secondary crop
Region 10 - VC survey,
meetings, workshops for
secondary crop
Region Caraga - VC survey,
meetings, workshops for
secondary crop
VCA and Planning Workshops
for Secondary Crops Region 9
Crop/
Cluster
4.0
2.703
10.8
LCL
Post Review
PPMO
Crop/
Cluster
8.0
2.703
21.6
LCL
Post Review
PPMO
Crop/
Cluster
8.0
2.703
21.6
LCL
Post Review
PPMO
Workshop
2.0
3.586
7.2
LCL
Post Review
PPMO
VCA and Planning Workshops
for Secondary Crops Region
10
VCA and Planning Workshops
for Secondary Crops CARAGA
Workshop
4.0
3.586
14.3
LCL
Post Review
PPMO
Workshop
4.0
3.586
14.3
LCL
Post Review
PPMO
-
-
46.0
LCL
Post Review
PPMO
Policy studies
ls
Sub-Total Training, Policies
and Workshop
1/ It depends on the outcome of value chain studies
Abbreviations:
NCB=National Competitive Bidding
LCL= Local Shopping
QCBS = Quality and Cost-Based Selection
PR = Post Review
272.6
97
Procurement Process
1- 30
June
15
1- 30
June
15
1- 30
June
15
1- 30
June
15
1- 30
June
15
1- 30
June
15
1- 30
June
15
1- 30
June
15
1- 30
June
15
1- 31 July
15
17-Aug15
31-Oct15
1- 31 July
15
17-Aug15
31-Oct15
1- 31 July
15
17-Aug15
31-Oct15
1- 31 July
15
17-Aug15
31-Oct15
1- 31 July
15
17-Aug15
31-Oct15
1- 31 July
15
17-Aug15
31-Oct15
1- 31 July
15
17-Aug15
31-Oct15
1- 31 July
15
17-Aug15
31-Oct15
1- 31 July
15
17-Aug15
31-Oct16
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 8: Procurement
No.
Planned Procurement
Activities
Unit
No.
Unit cost
USD’000
Estimated
Base Cost
USD’000
Procurement
Method
SSO-FAP = Support Services Office – Foreign Assisted Projects DAR
CPMO= Central Project Management Office
RPMO= Regional Project Management Office
PPMO= Provincial Project Management Office
98
IFAD
Review
Type
Responsibl
e Agency
Procurement Process
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 9: Project cost and financing
Appendix 9: Project cost and financing
I.
PROJECT COSTS
1.
Estimated project costs, including contingencies, and the phasing, are shown in the two tables
below and are further elaborated in Working Paper 6. Overall, the proposed project would cost about
USD 52.53 million (PHP 2,285 million) over a six year implementation period. This figure includes
taxes and duties estimated at USD 5.96 million or 11% of total costs.
(USD Million)
Com ponent
2015
A. Participatory Value-Chain Analysis and Planning
B. Integrated Sm allholders Agricultural and Rural Enterprise Developm ent1
1. Farm and Value Chain Enterprise Development
2. Value Chain Related Rural Infrastructure
Subtotal
C. Project Managem ent, M&E and Know ledge Managem ent
1. M & E and Know ledge Management
2. Project Management
Subtotal
Total BASELINE COSTS
Physical Contingencies
Price Contingencies
Inflation
Local
Foreign
Subtotal Inflation
Devaluation
Subtotal Price Contingencies
Total PROJECT COSTS
Taxes
Foreign Exchange
Com ponent
Taxes
Foreign Exchange
II.
2.
PROJECT FINANCING
The proposed project financing is shown overleaf.
99
2017
Base Cost
2018
2019
2020
Total
0.43
0.28
0.10
0.03
0.02
0.01
0.87
4.75
0.17
4.91
17.53
2.15
19.68
3.50
5.62
9.12
2.00
4.55
6.56
1.80
0.23
2.04
1.55
0.10
1.65
31.14
12.81
43.95
0.27
0.78
1.05
6.39
0.22
0.23
0.45
0.68
20.64
0.72
0.24
0.39
0.63
9.85
0.34
0.38
0.39
0.77
7.36
0.26
0.23
0.39
0.62
2.67
0.09
0.35
0.39
0.75
2.41
0.08
1.70
2.80
4.50
49.32
1.73
0.03
0.01
0.04
0.04
6.66
0.31
0.11
0.42
0.42
21.78
0.23
0.11
0.33
0.33
10.53
0.23
0.12
0.35
0.35
7.97
0.12
0.04
0.16
0.16
2.93
0.13
0.04
0.18
0.18
2.67
1.05
0.43
1.48
1.48
52.53
0.76
1.94
2.55
5.62
0.29
0.66
0.26
0.63
5.96
14.86
2015
A. Participatory Value-Chain Analysis and Planning
B. Integrated Sm allholders Agricultural and Rural Enterprise Developm ent1
1. Farm and Value Chain Enterprise Development
2. Value Chain Related Rural Infrastructure
Subtotal
C. Project Managem ent, M&E and Know ledge Managem ent
1. M & E and Know ledge Management
2. Project Management
Subtotal
Total BASELINE COSTS
Physical Contingencies
Price Contingencies
Inflation
Local
Foreign
Subtotal Inflation
Devaluation
Subtotal Price Contingencies
Total PROJECT COSTS
2016
2016
1.20
0.90
3.36
2.66
(USD Million)
2017
Base Cost
2018
2019
2020
Total
0.43
0.28
0.10
0.03
0.02
0.01
0.87
4.75
0.17
4.91
17.53
2.15
19.68
3.50
5.62
9.12
2.00
4.55
6.56
1.80
0.23
2.04
1.55
0.10
1.65
31.14
12.81
43.95
0.27
0.78
1.05
6.39
0.22
0.23
0.45
0.68
20.64
0.72
0.24
0.39
0.63
9.85
0.34
0.38
0.39
0.77
7.36
0.26
0.23
0.39
0.62
2.67
0.09
0.35
0.39
0.75
2.41
0.08
1.70
2.80
4.50
49.32
1.73
0.03
0.01
0.04
0.04
6.66
0.31
0.11
0.42
0.42
21.78
0.23
0.11
0.33
0.33
10.53
0.23
0.12
0.35
0.35
7.97
0.12
0.04
0.16
0.16
2.93
0.13
0.04
0.18
0.18
2.67
1.05
0.43
1.48
1.48
52.53
0.76
1.94
2.55
5.62
1.20
3.36
0.90
2.66
0.29
0.66
0.26
0.63
5.96
14.86
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 9: Project cost and financing
Expenditure Accounts by Financiers
(USD Million)
IFAD Loan
Am ount
I. Investm ent Costs
A. Civil Works
B. VC Facilities & Equipment
C. Agricultural & Processing Inputs
D. Local Services /a
E. Studies
F. Technical Assistance /b
G. Training & Capability Building
H. Vehicles & Office Equipm ent
1. Vehicles
2. Office Equipment
Subtotal
I. Workshops
Total Investm ent Costs
II. Recurrent Costs
A. Contracted Project Staff
1. Salaries & Allow ances - CPMO
2. Salaries and Allow ances RPMO and PPMO staff
Salaries & Allow ances RPMO
Salaries & Allow ances PPMO
Subtotal
Subtotal
B. Assigned Governm ent Staff /c
1. Honoraria CPMO Staff
2. Honoraria Regional & Provincial Staff
Honoraria RPMO staff
Honoraria PPMO staff
Subtotal
Subtotal
C. Operation & Maintenance
1. CPMO Operating Expense
2. RPMO Operating Expense
Subtotal
Total Recurrent Costs
Total PROJECT COSTS
Governm ent
%
Am ount
%
LGUs
Am ount
Beneficiary/Prop
%
Am ount
%
Total
Am ount
Local
(Excl. Duties &
Taxes) Taxes
For.
Exch.
%
9.79
1.87
8.17
0.85
0.10
0.75
1.29
80.0
55.0
30.0
47.3
30.0
80.0
75.0
0.61
0.34
0.68
0.95
0.23
0.19
0.43
5.0
10.0
2.5
52.7
70.0
20.0
25.0
1.47
0.51
1.50
-
12.0
15.0
5.5
-
0.37
0.68
16.88
-
3.0
20.0
62.0
-
12.24
3.40
27.23
1.80
0.32
0.94
1.72
23.3
6.5
51.8
3.4
0.6
1.8
3.3
4.89
1.02
6.81
0.48
0.06
0.28
0.52
5.87
1.97
17.16
1.10
0.22
0.55
1.00
1.47
0.41
3.27
0.22
0.04
0.11
0.21
0.14
0.03
0.17
0.03
23.02
35.0
35.0
35.0
25.0
47.7
0.27
0.05
0.32
0.09
3.83
65.0
65.0
65.0
75.0
7.9
3.48
7.2
17.93
37.2
0.41
0.07
0.49
0.12
48.26
0.8
0.1
0.9
0.2
91.9
0.29
0.05
0.34
0.02
14.43
0.07
0.02
0.09
0.08
28.05
0.05
0.01
0.06
0.01
5.79
0.56
100.0
-
-
-
-
-
-
0.56
1.1
-
0.56
-
1.02
0.42
1.43
1.99
100.0
100.0
100.0
100.0
-
-
-
-
-
-
1.02
0.42
1.43
1.99
1.9
0.8
2.7
3.8
-
1.02
0.42
1.43
1.99
-
-
-
0.14
100.0
-
-
-
-
0.14
0.3
-
0.14
-
-
-
0.22
0.44
0.65
0.80
100.0
100.0
100.0
100.0
-
-
-
-
0.22
0.44
0.65
0.80
0.4
0.8
1.2
1.5
-
0.22
0.44
0.65
0.80
-
1.99
25.01
46.6
47.6
0.33
1.15
1.48
2.27
6.11
100.0
100.0
100.0
53.4
11.6
3.48
6.6
17.93
34.1
0.33
1.15
1.48
4.26
52.53
0.6
2.2
2.8
8.1
100.0
0.09
0.34
0.43
0.43
14.86
0.20
0.68
0.88
3.67
31.71
0.04
0.13
0.17
0.17
5.96
_________________________________
\a Includes studies, training, facilities hire etc.
\b Includes both nationally sourced and international TA.
\c Government support staff w orking on the Project for a significant part of their time get an honorarium equivalent to 25% of their gross salary
3.
The table below shows the financing by year and includes the budget costs for 2013 and 2014
that were approved by the NEDA Board in May 2012.
Overall Funding by Year - PHP millions
Year
Foreign Loan
2013
2014
2015
133.92
2016
359.60
2017
283.91
2018
217.86
2019
51.70
2020
40.99
Total
1,087.98
Philippines
27.90
41.00
155.58
587.85
174.18
128.62
75.64
75.08
1,265.85
Total
27.90
41.00
289.50
947.44
458.09
346.49
127.34
116.07
2,353.82
Notes: (i) Philippine funds include those funds approved in May 2013 by
the NED Board for project related expenditures in 2013 and 2014.
(ii) Philippines includes NG, LGUs and beneficiaries in 2015-2020.
4.
Financiers. The various financiers for the total costs of CONVERGE are:
 IFAD, which will provide USD 25.0 million in the form of a loan, will finance a proportion of
each of the investment expenditure categories. IFAD will not finance the cost of any duties or
taxes. In particular, the IFAD loan will finance: (i) an average of 55% of the cost of value
chain related, facilities and equipment; (ii) 80% of the costs of the rural infrastructure
investments; (iii) an average of 30% of the cost of farm inputs and enterprise development;
(iv) 35% of project vehicles and office equipment; (v) 100% of costs of the contract staff
100
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 9: Project cost and financing
required to manage and implement the project but which are unavailable in the current
complement of DAR personnel in the central, regional and provincial offices; (vi) 85% of the
costs of technical assistance; and (vii) 75% of the costs of training and capability training.

The National Government will finance the honoraria of existing DAR staff participating in the
management and operation of the project. The Government will provide an honorarium of
25% of the salaries of the personnel who will be significantly involved in project
implementation. This will be incremental Government expenditure and so it is treated as part
of project cost. The Government will also finance incremental operation and maintenance
costs. They will also pay honoraria to the members of the Project Steering Committee and
the Regional Convergence Teams. The computation of staff cost is based on the salary rates
effective from July 2012. The National Government will also finance the project’s operating
and maintenance costs and a varying proportion of the other costs e.g. workshops 75%,
studies 70%, vehicles and office equipment 65%, value chain facilities and equipment 10%
and civil works 5%.

The costs of local services will be financed 47% by IFAD and 53% by the national
Government.

The LGUs using project funds for value chain related infrastructure will provide counterpart
funding. In the absence of a new policy on cost sharing it is assumed that LGUs will provide
12% of the cost of public infrastructure (mainly farm to market roads) and of irrigation
schemes and 15% of the costs of value chain facilities and equipment as well as a small
percentage of the costs of agricultural and processing inputs (5.5%).

Farm level beneficiaries and participating private sector firms will contribute towards
investments in inputs, buildings and equipment that will be used for production, processing or
marketing and distribution within project supported value chains, an average of 20% of the
costs of value chain facilities and equipment and overall 62% of the costs of agricultural and
processing inputs. Guidelines on cost sharing for private sector value chain investment are
set out in Chart B below.

Possible cost sharing arrangements (project and proponent) for the various types of
investment are shown in Chart B below.
Cost Sharing Arrangements for Value Chain Investments
TYPE OF
INVESTMENT
ACTIVITY
Small scale local value
adding for existing crops
e.g. coffee hulling, solar
drying, coco-sugar, village
level storage
TYPE OF SUPPORT



Promotion of Specific
Crops and Marketing

Assistance in design,
provided directly by the
project using own or hired
in resources e.g.
consultants, PCA, DA etc.
Paid 100% by Project
Grant support for
investment in local facilities
and equipment at 80% of
cost
Up to two years
TA/facilitation provided
through project, either
directly or under sub
contract
Assistance in design –
project resources + hired in
101
OPERATING RULES

Activity undertaken by a group of ARB
entrepreneurs or an ARB based agency e.g.
PO. If PO, it must have OMA 4 or 5.

Funding to require that the investment is
consistent with the VC analysis and
includes: (i) detailed design which shows
sound benefits; (ii) ARB or beneficiary PO
to be sound ex ante; (iii) beneficiary or LGU
contribution of 20% is available (in cash or
kind - but kind would not include land
value or ROW). Items funded – buildings
and equipment – 80%.

Initial working capital for marketing may
require a link to an FI. This would be
facilitated by project.

Accounting: Equipment cost, depreciation
etc. to be accounted for based on gross
cost with grant element explicitly shown in
POs P&L and balance sheet over 5 -10
years.

Needs detailed design in line with VC
analysis (anchor or secondary) including
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 9: Project cost and financing
TYPE OF
INVESTMENT
ACTIVITY
Systems requiring VC
investment – e.g. Oil palm,
rubber, vegetables.
TYPE OF SUPPORT





Integrating ARCs with
the Market System
Covers support for
facilities only partially
relating to ARC cluster –
e.g. cold storage facilities
and refrigerated transport
used only partially for ARB
cluster.




consultants if needed. Hired
in consultants funded 100%
Facilitation at farm level
100%
Grant support for cluster
specific investment based
on an MOU 80%
Grants for farm level capital
investment based on
standard cost
Material elements of first
round inputs provided
Cost sharing with
agribusiness promoter
Assistance in design –
project resources + hired in
consultants if needed. Hired
in consultants funded 100%
ARC level infrastructure or
VC equipment (80%)
Grants to support
incremental investment
related to ARC clusters but
built outside ARCs (50%)
Grants for facilitation
(100%).
102
OPERATING RULES
identification of willing competent partner(s)
– details of arrangements to be covered by
a binding MOA.

Farm or ARC level investment in marketing
infrastructure funded 80%

Would also fund 100% of contracted
facilitation costs

On-farm tree crop investment (new/re
planting) to be funded at 80% for 3 years
based on standard costs, including labour –
disbursement geared to tree establishment
meeting technical standards.

Initial working capital for the first cycle of
annual crops or shorter period crops, e.g.
vegetables would be provided in kind as a
grant for materials.

Incremental extension/management costs
of co-operating agribusiness to be funded at
50% over a maximum of three years, based
on budget and monitorable outputs

Incremental working capital for marketing
would be responsibility of commercial
partner – project would facilitate to the
extent possible, including through grant
supported feasibility study preparation.

Needs detailed design in line with VC
analysis (anchor or secondary) including
identification of willing competent partner(s)
– details of arrangements to be covered by
a binding MOA.

Farm or ARC level investment in marketing
infrastructure funded 80% as above.

Contracted facilitation costs at the farm
level funded at 100%.

Incremental working capital would be
responsibility of commercial partner –
project would facilitate to the extent
possible, including through grant supported
feasibility study preparation.
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 10: Economic and financial analysis
Appendix 10:
Economic and Financial Analysis
I.
BACKGROUND
1.
The proposed project will be implemented over six calendar years with the “preimplementation activities” occurring during the first year to determine the priority value-chains for
investment in each of the 11 ARC clusters, which cover 50 municipalities and 91 ARCs. In total it is
estimated that there are about 150,000 households living within the area to be covered by the project,
of which about 135,000 are poor rural households. These include ARB households, other small
holders and IP households, about 30% of these households are headed by women.
2.
Most ARBs and other smallholders have small areas of land of 1-5 ha with the cropping
patterns reflecting the agro-climatic situation in that particular ARC cluster. Depending on the location
the major crops cultivated include coconut, rice, corn, rubber, banana, high value vegetables, oil palm,
coffee and cassava. Total area of crops in 2010 was about 216,000 ha or 1.6 ha per household. Only
about 7% of the land is irrigated and only 5.8% of families have access to irrigation.
3.
Based on 2009 data from DAR's annual ALDA survey of all its ARCs, the weighted average
income of those ARCs to be included under the project was PHP 115,300 per household 40
(equivalent to USD 490 per capita for an average family of 5.4 people), of which PHP 73,500 was
from Agriculture, PHP 17,000 was off farm income and PHP 24,800 was non-farm income. These
figures together represent an average total income of just above the 2009 poverty threshold for these
three regions which was equivalent to PHP 87,500 per annum. Average household income was below
the poverty line in 29% of the ARCs.
II.
PROJECT DESIGN
4.
The aim of the project is to raise incomes within the project area through improvement of
value chains for those products that can be profitably and sustainably produced in the area by the
targeted beneficiaries. The first component, Participatory Value Chain Analysis and Planning, involves
a planning process in each of the ARC clusters for the key commodities/ crop(s) identified in the
feasibility studies for each ARC cluster. As a result of this, the types of investment required and the
facilitation needed to implement improved value chains will be determined and agreed.
5.
Implementation of the selected investments is the second Project Component, Integrated
Smallholders Agricultural and Rural Enterprise Development (ISHARED). Enhancement of the value
chains within this component will involve facilitation, training and investment in several elements of
different value chains including investment in: (i) Production (irrigation, tree crops, livestock, first
round working capital); (ii) Improved crop handling at the farm level - harvesting systems, post-harvest
facilities, storage, local level grading and packing, organization of bulking and transport; (iii)
Processing or value adding at the farmer group or village level (e.g. coco sugar manufacture, drying
and hulling coffee, ribbed rubber sheet production); (iv) Enhancing marketing infrastructure, including
rehabilitation of farm to market roads, investment in transport facilities, improved systems of market
information and buyer seller matching.
6.
The choice and locations for actual ARC investments will be made based on demand, with
specific investments being financed by the project, following an approval process, that would require
the proposed investment: (i) To be economically and financially viable, taking account of its whole
cost; (ii) To be technically feasible; and (iii) To have realistic proposals for a sound management
system with acceptable agreements between the various participants in place.
III.
PROJECT BENEFITS
7.
The main incremental outputs following project investment in the target ARC clusters would
come from the priority crops selected as a result of the feasibility studies undertaken for each ARC
cluster. The likely benefits at the farm level would stem from increased production, more value added
at the farm level and higher prices as a result of both quality improvement and more efficient
marketing.
40
Based on an exchange rate of PHP 43.5 per USD 1.00.
103
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 10: Economic and financial analysis
8.
Participation in the project is potentially open to all rural households in the 11 clusters; actual
numbers participating will depend on both the demand for project services by rural households and
the capacity of the Project to deliver, given its resources. It is estimated that about 35,000 rural
households will benefit directly from the project, including 3,000 jobs to be generated by the project in
the value added sub sector. Additional benefits will come from the project’s investment in rural
infrastructure (e.g. farm to market roads, public water supply schemes) that are not part of the
investments identified by the 11 feasibility studies, capacity building, (e.g. strengthened capacity to
participate in value chain and rural enterprise development) and improved capacity of the
implementing agencies to target and manage poverty reduction and rural development programmes in
a gender sensitive and participatory manner.
IV.
FINANCIAL AND ECONOMIC EVALUATION
9.
The likely financial and economic benefits have been assessed by: (i) Preparing detailed
feasibility studies for the value chain investments proposed by each of 11 ARC clusters that the
project will target covering, the technical, financial, management and economic aspects of the
proposal; and (ii) Analysing the likely economic returns from investments as part of the project. The
analyses focus on the financial and economic rates of return and the benefit cost ratios calculated
using a 15% discount rate as the assumed opportunity cost of capital. The results of these analyses
were included in the submissions prepared by DAR/NEDA for review by the Investment Coordination
Committee and were part of the project document approved by ICC and subsequently the NEDA
Board. The detailed Excel files are in the Project File (see Annex 13) and are summarised in the
41
tables following .
Financial and Economic Analyses – Rates of Return and Benefit Cost Ratios
Financial Analysis
ARC Cluster
Commodity
FIRR %
NPV@
15%
PHP m
B:C
Ratio
Economic Analysis
EIRR
%
NPV@
15%
PHP m
B:C
Ratio
Zamboanga del Norte
Resettlement Cluster
Integrated
Enterprise
Rubber
36.2
1,441.7
1.42
43.3
1,584.4
1.49
Salug Valley Cluster
Intensified
Rice
Production and Marketing
49.7
72.0
1.55
38.4
48.0
1.37
Salipyasin ARC Cluster
Rubber
Project
Agribusiness
71.4
3,527.0
1.91
79.7
3,602.2
1.95
North Bukidnon ARC
Cluster 1
Cassava Production and
Processing Enterprise
73.4
27.0
1.16
58.7
17.3
1.11
South Bukidnon ARC
Cluster
Muscovado
Sugar
Production and Marketing
24.8
4.0
1.18
33.5
7.1
1.38
LABACO
Abaca Fibre Production
and Marketing
33.1
2.6
1.14
34.1
2.0
1.11
MISORET ARC Cluster
Coconut
Production
79.5
220.8
1.28
65.1
140.1
1.18
TUJAKITSAN
Abaca Fibre Production
32.8
3.7
1.08
33.9
3.6
1.08
ARC
Sugar
41
During the initial project design phase in 2011 and subsequently in the revisions made in 2012 crop production and
51marketing models was prepared to support the project proposals and these were included in the original version of
Working Paper 7. The analysis in the feasibility studies has superseded those analyses as project approval has been based on
those analyses. From a review of the analyses in the feasibility studies it is not clear that where relevant what allowances
have been made for the without project situation.
104
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 10: Economic and financial analysis
Financial Analysis
ARC Cluster
Commodity
FIRR %
NPV@
15%
PHP m
Economic Analysis
B:C
Ratio
EIRR
%
NPV@
15%
PHP m
B:C
Ratio
Cluster
VETREBUNS
Cluster
ARC
Rice
Processing
Marketing
Production
and
30.6
5.1
1.29
45.7
8.7
1.68
CLAGIBAPLA
Cluster
ARC
Coconut and Bio fertilizer
Production and Marketing
32.8
9.9
1.19
38.9
12.9
1.30
Coffee
Processing
Marketing
69.1
48.1
1.16
77.2
51.2
1.17
50.8
5,362
1.60
57.0
5,477.5
1.64
-
-
-
19.1
89.2
1.26
-
-
-
44.6
5,218.4
1.57
BATA ARC Cluster
Production
and
TOTAL
Various
TOTAL PROJECT
Rural Infrastructure
42
10.
Total ex-farm value of agricultural production produced pre project is of the order of PHP 1520 billion (USD 345 - 460 million) annually. While some will be for family consumption, probably at
least half would be sold. Consequently, quite a small percentage increase in output price overall as a
result of improved marketing, brought about by the project's focus on value chain analysis would have
a large impact on the aggregate amount of income received by farmers. The main incremental
benefits from the project would stem from additional production of and value added to agricultural
products. Value chain development would also reduce costs in some cases e.g. though better roads
and hence lower vehicle operating costs. Benefits from improved quality would generally be reflected
in higher prices. Better organized farmer marketing would increase farmers' bargaining power thereby
raising the farmers; share of the price paid by the consumer and also reduce the cost of marketing
and waste, particularly post-harvest losses.
11.
The likely overall financial returns shown by the feasibility studies are attractive as the rates of
return and benefit cost ratios are high. For some of the likely investments under the project e.g.
planting crops that have a long gestation periods estimating their financial rate of return is a good
measure of their likely impact and attractiveness to beneficiaries, but in other cases, particularly
where the project's impact is to improve marketing or quality, it is more useful to look at Benefit: Cost
Ratios at financial prices (discounted by an 15% (opportunity cost of capital as specified by NEDA). It
is clear that with the proposed level of support to value chain development, well run schemes will
almost certainly provide sound financial benefits to those involved in them.
12.
To undertake an economic evaluation the prices in the financial analyses were converted to
economic prices, using Economic Conversion Factors. The methodology used is described above.
13. Total ex-farm value of agricultural production produced pre project is of the order of PHP 15-20
billion (USD 345 - 460 million) annually. While some will be for family consumption, probably at least
half would be sold. Consequently, quite a small percentage increase in output price overall as a result
of improved marketing, brought about by the project's focus on value chain analysis would have a
large impact on the aggregate amount of income received by farmers. The main incremental benefits
from the project would stem from additional production of and value added to agricultural products.
Value chain development would also reduce costs in some cases e.g. though better roads and hence
lower vehicle operating costs. Benefits from improved quality would generally be reflected in higher
prices. Better organized farmer marketing would increase farmers' bargaining power thereby raising
42
Includes all project management costs in the calculation of the NPV and IRR.
105
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 10: Economic and financial analysis
the farmers; share of the price paid by the consumer and also reduce the cost of marketing and
waste, particularly post-harvest losses.
14. The likely overall financial returns shown by the feasibility studies are attractive as the rates of
return and benefit cost ratios are high. For some of the likely investments under the project e.g.
planting crops that have a long gestation periods estimating their financial rate of return is a good
measure of their likely impact and attractiveness to beneficiaries, but in other cases, particularly
where the project's impact is to improve marketing or quality, it is more useful to look at Benefit: Cost
Ratios at financial prices (discounted by an 15% (opportunity cost of capital as specified by NEDA). It
is clear that with the proposed level of support to value chain development, well run schemes will
almost certainly provide sound financial benefits to those involved in them.
15. To undertake an economic evaluation the prices in the financial analyses were converted to
economic prices, using Economic Conversion Factors as described in WP 7. All of the feasibility
studies and separate infrastructure investments give sound economic returns (before taking account
of project management and other indirect costs) as shown in Table. After taking into account project
management and other the indirect costs, the project shows an economic rate of return of 44.6%, a
net present value @15% of PHP 5,218.4 million and a benefit cost ratio of 1.57 (discounting benefits
and costs at 15%). Based on the sensitivity analysis below, the results are robust. The project would
still be viable if all costs increased by 20% and benefits were 20% lower.
Sensitivity Analysis
D
B
e
e
c
n
r i e
e n f
a
i
s
t
e
s
0%
5%
10%
15%
20%
0%
45%
41%
37%
34%
31%
Increase in Costs
5%
10%
41%
37%
37%
34%
34%
30%
31%
28%
28%
25%
15%
34%
31%
25%
25%
22%
20%
31%
28%
25%
22%
20%
16. Returns to Households. Based on the feasibility studies, net financial benefits will be about
PHP 747 million per year by 2020 and peak at nearly PHP 3,470 million ten years later when the full
income from the rubber planted under the project will be realised. It is not clear what proportion of the
households living in the project area are likely to share in the net benefits or what proportion of the net
benefits will accrue to these rural households, as some of the net benefits will accrue to non-project
participants, including road users not engaged in value chain development and the various agribusiness participants. If 60% of the benefits accrue to the rural households and 35,000 benefit, the
annual income impact on these households in real terms would be average of about PHP 12,800 per
year by 2020 and peak at about PHP 59,500: a real income increase of about 11% by 2020 and 52%
by 2030 over the 2009 levels.
106
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 11:Draft Project Implementation Manual
Appendix 11:
Draft Project implementation manual
I.
INTRODUCTION
1.
To ensure smooth start-up and implementation of the project, DAR (with consultancy assistance)
will prepare the Project Implementation Manual (PIM) which will be agreed with IFAD, before the start of
PY1 and before any withdrawal applications can be submitted to IFAD. Preparation of the PIM will start
after the visit of the design completion mission, with the final modifications made following the financing
negotiations between IFAD and the Government. The PIM will be discussed during the start-up
workshops. The PIM should be simple but sufficiently informative so that the users can easily follow the
procedures. The use of diagrams and flow charts will make the contents easier to understand.
II.
OUTLINES
2.
The PIM will be in three volumes: Volume 1 Overall Project Implementation; Volume 2 Value Chain
Development; and Volume 3 Rural Infrastructure Investment.
3.
Volume 1, Overall Project Implementation, will include the following topics:

Introduction and purpose of the manual.

Summary of the project concepts and principles.

Detailed explanation of the project components, sub-components, and activities (Annex 4,
additional material from the relevant Working Papers in the Project Life File, Annex 13) and
to include detailed eligibility criteria for project financing of the investments included in the
ARC-VIPs.

Project organizational structure (from Annex 5).

Project implementation arrangements at national, regional, provincial, municipal and ARC
levels.

Responsibilities of staff of the project implementing agencies at various levels including:
TOR for key programme staff, TA and studies (from the Working Papers).

Project planning arrangements to include participatory planning at the community level.

Annual participatory planning processes and procedures.

Municipal, provincial, regional and national level planning processes and procedures,
preparation of AWPB including project activities, budgets and implementation
responsibilities, reporting formats and schedules.

Financial management procedures and reporting (from Annex 7, plus additional information
from DAR, DBM etc. and IFAD sources where necessary).

Procurement procedures, procurement management and reporting (from Annex 8).

4.
Monitoring and evaluation system and knowledge management including instruments for
data collection and analysis (from Annex 6 and Working Paper 5).
Volume 2, Value Chain Development, will include the following topics:

Introduction and background to project’s value chain concepts and approaches: clusters,
value chain networks and ARC clusters.

Key elements and principles of the value chain analysis and development approach.
 Prioritization of chains for value chain analysis and development.
 Identification of anchor chain and the “secondary” enterprises.
 Value chain analysis and planning for the priority crop or chain in the cluster.
 Training a core of value chain analysts and planners.
 Replicating value chain analysis and planning for other commodities/chains
(secondary crops or enterprises).
 Conducting multi-stakeholder validation-planning workshops for priority chain/s.
 Developing ARC-cluster value chain investment plans (ARC-VIPs).
 Eligibility criteria for project financing, including environmental safety concerns.

Implementing value chain development interventions - upgrading strategies.
107
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 11:Draft Project Implementation Manual

Value chain development interventions.
 Integrated smallholders’ agricultural and rural enterprise development.
 Support for Farm and Enterprise Development.
 Farm production.
 Value addition and diversification.
 Market and investment facilitation.
 Rural finance facilitation.
 Investment in rural infrastructure and equipment.

5.
Value Chain Development Modes of Implementation.
 Modes of implementation.
 Contracting business development service provider for value chain development
facilitation.
 Implementation Arrangements and procedures, including environmental safety
concerns.
Volume 3, Rural Infrastructure Investment, will include the following topics:




Value chain infrastructure documentation:
Sub-project design specifications, including technical standards for all types of
construction.
Technical documentary requirements.
Legal documentary requirements, including MOA covering responsibilities of the
beneficiaries (e.g. POs) during identification, design planning, construction and for
O&M.
Technical appraisal to review and approval process.
Eligibility criteria for project financing, including environmental safety concerns.
Capacity building required by the IAs and their membership









Value chain infrastructure execution, completion and turn-over.
Implementation structure, execution and supervision.
Reporting, monitoring and evaluation.
Quality control.
Work suspension and resumption.
Variation orders.
Penalties, sanctions and remedial measures.
Completion, turn-over
Arrangements for O&M.
Defects Liability Period.




108
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 12: Compliance with IFAD policies
Appendix 12:
Compliance with IFAD policies
I.
COMPLIANCE WITH IFAD POLICIES
The IFAD policies relevant to the project include: Targeting – Reaching the Rural Poor; Gender
Plan of Action; Engagement with Indigenous Peoples; Rural Enterprise, Private Sector Development and
Partnership, Climate Change; and Rural Finance and Prevention of Fraud and Corruption. The project
design has reflected these policies and lessons learned in the IFAD country programme.
1.
The project’s approach to targeting the poor is based first on an area targeting approach i.e.
targeting poor regions and provinces and providing a preliminary list of target commodities for value chain
development. In addition, the municipalities in the ARC clusters have high levels of poverty, while the
average incomes of the ARBs in the 11 ARC clusters is scarcely above the poverty line.
2.
3.
Apart from geographic targeting described above which identifies the project areas two other
methods of targeting will be employed: (i) selection of private sector organizations to provide marketing
and or other services that meet the proposed eligibility criteria; and (ii) self-targeting by members of the
target group based on their interest in participating in project activities.
4.
The findings of the design mission highlight the need for the project to mainstream gender
concerns throughout the project’s activities. As a result women will be involved in all phases of project
implementation with gender needs included as part of the value-chain analysis and with M&E providing
evidence-based reporting on the benefits and other impacts on women.
5.
Gender mainstreaming will aim to ensure that women and men relate fairly and justly to each
other as equals in matters concerning project implementation. The gender strategy for the project
includes: (i) the conduct of gender-responsive value chain analysis to ensure that gender needs and
issues will be identified during the preparation of the ARC-VIPs; (ii) preparation of local gender action
plans in collaboration with the government agencies and the local government units; (iii) advocate for the
incorporation of the gender action plans into the existing Gender and Development budgets of the
agencies; (iv) specific targets that 30% of the project beneficiaries and the members of the management
committees (POs etc.) will be women; (v) promotion of equal opportunities for men and women; and (vi)
M&E data and analysis is to be disaggregated to show the participation of men and women and to show
the roles of men and women in particular activities.
The project’s approach to IPs is also entirely consistent with IFAD’s policy on IPs. During the visits
to the ARC clusters, the design team’s socio-economist consulted with IPs on their needs and the status
of the preparation of their ASSDPPs; with some already approved and others still being prepared. There
were also consultations with NCIP, the government agency charged with supporting the implementation of
the government’s policies such as the Indigenous Peoples’ Rights Act.
6.
7.
Consultations were held with the NCIP, the organization charged with supporting the integration of
IPs in the mainstream. The approach to working with IPs as a sub-group of the target group will work
within the framework of the NCIP’s Ancestral Domain Sustainable Development and Protection Plan, as a
way of involving the community members with the local government agencies and a vehicle to strengthen
capacities of IPs in the process. This approach involves practicing the principle of free and prior informed
consultation/consent on all project activities through the provision of adequate information.
8.
Project design includes IPs as a target sub-group. Overall IPs account for approximately 10% of
the population of the 11 ARC clusters and the target is that IPs should account for 15% of the project’s
beneficiaries. Project activities involving IPs will take into account their traditional cultural practices and
ensure that the principle of free and prior informed consultation/consent is followed for all project activities
through the provision of adequate information and consultation.
9.
Project implementation will require private sector involvement. Implementation will support
investment operations that will support private-sector development in the 11 ARC clusters and
partnerships with the private sector that will lever additional investments and knowledge for rural areas. As
such these operations are consistent with IFAD’s Private-Sector Development and Partnership Strategy.
109
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 12: Compliance with IFAD policies
The project’s involvement with rural financial services is entirely consistent with IFAD’s rural
finance policy. The project is not a financial services project and will not include a line of credit for onlending to the beneficiaries. However, the proposed value chain development activities will assist the
members of the target group and their organisations to become eligible as borrowers from the MFI and
banking sectors and also to assist the MFI/rural banking sector to be able to provide appropriate financial
projects for members of the target group and their organizations.
10.
II.
ENVIRONMENT AND SOCIAL REVIEW NOTE
Environmental and Social Issues
Increased agricultural production has received priority over environmental protection in the
Philippines. Environmental concern for the agricultural resource base has been heightened due to factors
such as the inappropriate use of modern farm techniques, deforestation, conversion of prime agricultural
land for urban development, cultivation of marginal upland areas, depletion of fishery resources and
potential adverse impacts of climate change.
11.
12.
In Region IX environmental issues are concentrated in the Sibuguey Valley in Zamboanga
Sibugay and Salug Valley in Zamboanga del Sur where recurring flooding is a problem
damaging/destroying crops, rice land, properties and basic infrastructure facilities. High rural
unemployment, poverty and low wealth creation; inefficient and ineffective delivery of services; weak
governance; inadequate spatial, physical and economic integration exacerbate the environmental
problems.
13.
In Region X the specific regional challenges are: (i) pockets of poverty; (ii) inadequate socioeconomic support systems; (iii) weak administrative support system; and (v) threatened national
resources. The region’s growing population has been exerting increasing pressure on its natural resources
resulting in the depletion of its forest cover and other resources. Greatly reduced natural water-recharge
capacities of the watersheds has been leading to the lowering of the water table, the frequent flooding in
low lying areas can be traced to the denudation of the forest cover. Logging and mining activities in the
upland areas also threaten precious water resources in the lowlands, especially the fishery resources of
major bays. Panquil and Murcellagos Bays, two of the most productive bays are threatened by siltation
and the dumping of mine tailings.
14.
In Caraga Region the forest cover decreased by 45% between 1987 and 2003. Reforestation is
underway with the private sector as the major player. Social issues include water borne diseases, and
security of tenure in the housing sector
15.
The target ARC clusters are far from the demand centres for organic products e.g. Metro
Manila. Distance increases marketing costs which is compounded by the lack of market information,
expensive organic certification and limited access to finance to invest in the development of organic
products such as packaging and branding. At the same time some farmers apply excessive amounts of
fertilizers that make the soil severely acidic or use excessive applications of pesticides.
16.
Overall. Cavedish banana, pineapples for export and palm oil are three commodities that can be
further developed with project assistance. These products use a plantation system to achieve economies
of scale. However, a plantation system can threaten biodiversity and create environmental problems. For
example, aerial spraying of Cavendish banana is banned in some areas in Region XI because of its threat
to the environment and human health. However, the plantation system promotes efficiency and
productivity thereby enhancing competitiveness. Such trade-offs must be carefully considered given the
lack of alternative profitable enterprises for some clusters (e.g. BATA-Barobo Tagbina Cluster in Surigao
del Sur, CARAGA) and ARBs (e.g. senior citizens).
17.
Most ARBs have limited bargaining power even as members of POs. This is a multi-dimensional
issue that is rooted in the lack of access to finance, poor infrastructure facilities and limited market
information. Traders dictate the price and not market forces because they provide credit to farmers whose
produce has been bought even before harvest. Poor infrastructure limits the number of buyers in rural
market centres (trading posts) and some collude to dictate prices. Some farmers interviewed have no
access to timely market information due to poor communication facilities particularly in remote areas.
Potential Social and Environmental Risks
110
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 12: Compliance with IFAD policies
18.
Rural Infrastructure Investment - This sub-component poses some environmental risks and
calls for safeguards to be incorporated in the design of each development activity. Enumerated below are
the respective issues and mitigations for the sub-component.
19.
Communal Irrigation Systems - Environmental impacts of irrigation improvements are the
changes in quantity and quality of soil and water following the provision of irrigation and the ensuing
effects on natural and social conditions downstream of the irrigation scheme. The adverse hydrological
effects can include: a reduction in the downstream river discharge, an increase in the evaporation in the
scheme area and groundwater recharge, a rising water table, and increased drainage flows. The potential
adverse effects on soil and water quality are indirect and complex, including water logging and soil salinity,
leading to a reduction in agricultural production, whereas the subsequent impacts on natural, ecological
and socio-economic conditions can be complex. Adverse health impacts and increased costs due to water
borne diseases are an example as is a build-up of nitrate levels in drinking water supplies. Including
adequate drainage is a measure to counter these adverse impacts.
20.
The reduced downstream river discharge may cause: reduced downstream flooding,
disappearance of ecologically and economically important wetlands or flooded forests, reduced availability
of industrial, municipal, household, and drinking water, reduced fishing opportunities due to overextraction of water for agriculture. Fish populations, the main source of protein and overall life support
systems for many communities especially in the Caraga Region, may also be threatened reducing
discharge into the Agusan Marsh, which may have various consequences.
21.
Further, since the project will only support rehabilitation and restoration of Communal Irrigation
schemes, which by definition are small, but also may be some small-scale drip irrigation schemes the
impact will be minimal and will include adequate measures to counter the potentially adverse impacts (see
Working Paper 3) and no further scoping is needed.
22.
Farm to Market Roads. ARCs often lack adequate road access which is essential for value chain
development of the priority commodities and other enterprises in the ARC clusters. There are potential
negative physical and biological impacts during the construction phase which require mitigation. However,
given the scale of the works proposed negative impact on the surrounding water resources can be
avoided by following good construction practices. Any negative biological impacts can similarly be
avoided. Indirect socio-economic benefits come from providing some additional local employment
opportunities, while any potential negative impacts should be avoidable with good planning and the use of
good construction practices. When in use and being properly maintained there are major benefits, both
socio-economic and physical. Annex 2 Working Paper 3 has further details.
Post-Harvest Facilities – Technical specification for the materials to be used shall not threaten
endangered timber species for form works, or pose health hazards. A proper waste disposal plan should
be incorporated in the design; segregation of biodegradable waste from non-biodegradable waste should
also be given utmost emphasis during operation and maintenance. Following construction it is important to
salvage the remnants of construction like cement bags, excess steel bars that are prone to rust, nails,
formworks, saw dust, etc. These are just few of the activities needed to avoid respiratory illnesses and
injury.
23.
24.
When making a proposal there is a need to define the ownership of the area where the facilities to
be erected. In most cases the farmer organization (e.g. PO or association) will be the owner and
responsible for the operation and maintenance of the facilities. Working Paper 3 provides samples of
documents to be used in this aspect.
Environmental Category
9. The project is classified as Category “B” for the following reasons and no further data collection is
necessary. First, the design provides for investment in small-scale rural infrastructure identified by
community empowerment and facilitation processes; including FMR construction, the rehabilitation of CIS,
and the construction of scattered, small-scale village post-harvest facilities. Most will have no negative
environment impact due to their small-scale and construction that will avoid any negative environmental
impact e.g. erosion, pollution of water resources etc. In all cases pertinent laws and government
regulations for environmental impact assessments and relevant IFAD guidelines would be followed during
the course of investment planning, design, construction and operation and maintenance in order to ensure
incorporation of any necessary environmental mitigation measures and their implementation.
111
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 12: Compliance with IFAD policies
10. Second, the project’s main emphasis will be on capacity building in poor village and on improved
livelihoods and increased incomes by improving product quality and market linkages. Neither of these
directly impinges upon the environment. The project’s awareness raising activities will increase community
consciousness of the need to follow sustainable production practises.
11. Third, the encouragement of intercropping and mixed cropping, together with conservation agriculture
techniques, green manuring and composting will improve soil conservation and reduce erosion with
beneficial environmental impacts. In addition, the introduction of more intensive methods of animal rearing
will improve productivity of the grazing areas and use of concentrates and help return nutrients to the
cultivated land through collection and use of manure.
12. Fourth, limiting interventions in marine fisheries to support for obtaining greater value from the
existing catch it is hoped that this will not encourage increased capture, rather improve livelihoods
obtained from present catch volumes.
Design and Implementation Features
13. Protecting and preserving the environment is an integral part of the value chain approach and overall
design of the project. The criteria applied to prioritize chains in the ARC clusters include environmental
concerns. A criterion for sustainability is included to ensure that the value chains to be developed will have
no adverse effects on the environment to ensure the sustainability of the economic benefits derived from
agribusiness ventures. In addition, a criterion on using available environment friendly technologies is also
included.
14. The project is designed to provide an integrated package of services to develop the chain. For
example, if the chain for organic rice is found to be a profitable venture based on the value chain
assessment, a package of interventions will be provided. This includes assistance in production
technology, organic certification, branding, packaging and others. There is no incentive for farmers to
produce products that help preserve the environment if these products are not profitable. The project is
designed to help explore opportunities, help assess profitability of these types of products and provide
assistance to promote these products and enhance profitability for adoption of farmers. The design
includes mitigation/adaptation measures to reduce vulnerability and risks of climate change and variability,
preparation and use of environmental management plans, use of integrated pest management techniques,
and support for community environmental education and training.
15. The mitigation measures include value chain development to be resilient to climate change,
environmentally friendly and sustainable; training to include management, adaptation to the threats from
climate change and environmental awareness; promotion of environmentally friendly and sustainable
production systems, e.g. use of the farming systems approach and promoting good agricultural practices
and varieties that can tolerate climate variability; and involving DENR and its local offices to ensure value
chain development will be in line with good practices for environmental and natural resources
management.
Environmental Monitoring
16. The project is focused on community-based implementation, including participatory monitoring
aspects. Environmental monitoring will be part of the programme M&E system.
17. Special attention and care will be given to the design, construction, maintenance and monitoring of
FMR involving POs and LGUs, and LGUs and Irrigators’ Associations for the CIS. These groups will
actively participate in implementing, monitoring and sustaining the programme’s interventions.
18. Key environmental indicators included in the logical framework and M&E system are: (i) market
linkages developed for organic products; (ii) area of land under technologies that promote sustainable
agriculture; (iii) number of mature POs participating in value chain development using sustainable
agriculture techniques; (iv) improved farm to market roads being maintained; and (v) land under CIS
constructed/restored.
Consultations with Beneficiaries
19. The IFAD Design Mission conducted beneficiary consultations across the three regions from the
th
st
period 9 – 21 June 2011. The purpose of the beneficiary consultations was to elicit the views and
112
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 12: Compliance with IFAD policies
suggestions of the beneficiaries in terms of their current conditions and realities; determine their
expressed development needs; validate data and information; and conduct of ocular inspections of
proposed areas.
20. There were 13 consultations where 882 beneficiaries and project stakeholders participated consisting
of women, 47% and men 53%. Working Paper 1 includes the numbers attending each consultation. The
participants where a cross section of ARBs, other smallholders, cooperative officers and members, IPs,
product buyers/market outlets and Development Facilitators, Municipal Agrarian Reform Officers and
Provincial and Regional Officials of DAR and LGU staff. At each location groups of stakeholders (e.g.
ARBs, IPs DAR field staff, LGU officials etc.) interacted separately with a member of the six person design
mission.
21. Depending on those present, the consultations revolved around current production activities, existing
issues and problems, suggestions and recommendations for future development, validation of data and
data collection, possible project roles, and for the rural infrastructure a site inspection to look at their
pressing infrastructure needs. In addition some on-going livelihood projects were also visited.
References
1.
Zamboanga Peninsula Regional Development Plan (2004-2010), NEDA, Region 9
2.
Northern Mindanao Regional Development Plan (2004-2010), NEDA, Region 10
3.
Caraga Regional Development Plan (2004-2010), NEDA, Region Caraga
4.
Mindanao Strategic Development Framework (2011-2020), NEDA
5.
Philippine Development Plan (2011-2016), NEDA
6.
Indigenous Peoples/ Ethnic Minorities and Poverty Reduction-Philippines, ADB
June 2007.
113
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 13: Contents of the Project Life File
Appendix 13:
1.
DOCUMENTS
The following project design related documents are available in the Project Life File:

Revised Project Proposal: Convergence on National Value-Chain Enhancement for Rural
Growth and Empowerment (Project CONVERGE), prepared by Department of Agrarian
Reform in collaboration with the Department of Agriculture (DA) and Department of
Environment and Natural Resources (DENR), May 2011

Aide-mémoire of the design mission

Aide-mémoire of the design completion mission

Programme Design Report (including 15 Annexes)

Working Papers 1-3 prepared by the project design mission, have been used to help
prepare the project design described in the Project Design Report and the Annexes.
These Working Papers include much background material but not all the proposals in
these Working Papers have been included in the project’s design
6.
2.
Contents of the Project Life File

Working Paper 1: Poverty, Targeting and Gender Mainstreaming

Working Paper 2: Value-chain and Market Development

Working Paper 3: Rural Infrastructure
The Addendum to Working Paper 2 and Working Papers 4-7 prepared by the project
design completion mission provide information that elaborates the information that is
included in the Project Design Report and the Annexes. After the conclusion of the ICC
Review Process and subsequent approval of the project by the NEDA Board Working
Papers 6 and 7 were revised to reflect the changes made during the government review
process.

Addendum to Working Paper 2: Value Chain and Market Development

Working Paper 4: Institutional Aspects and Implementation Arrangements

Working Paper 5: Monitoring and Evaluation and Knowledge Management

Working Paper 6: Project Costs and Financing

Working Paper 7: Financial and Economic Analysis

Detailed excel files for the economic and financial analysis prepared by DAR/NEDA

IFAD Financing Agreement

Letter to the Borrower

Detailed Audit Terms of Reference
Other relevant documents include:

IFAD Country Strategic Opportunities Programme (COSOP) for the Republic of the e
Philippines 2010-2014
115
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 14: Agreed Action Plan and Timetable for IFAD Financing
Appendix 14: Agreed Action Plan and Timetable for IFAD Financing
Task/Activity
Wrap-up meeting of Design
Completion Mission
Confirmation of agreement
to the Aide-Mémoire
Preparation of the Revised
Project Design Report
Distribute Revised Project
Design Report
Government review process
Responsible Agency
Outputs
Project Design Review and Approval Process
DAR (Central and
Aide-Mémoire agreed by all parties, with five
Regions IX, X and
Annexes: Organisational Structure, Roles
Caraga), DA, DENR,
and Responsibilities and Staff Numbers;
NEDA, DBM, DOF
Proposed Cost Sharing Arrangements for
the Value Chain Investments and Flow of
Funds; Action Plan Prior to Project Start-up;
a Preliminary List of Assurances for
Negotiations; and a Draft Letter to the
Borrower
IFAD and DAR in
Letters of confirmation of agreement to the
consultation with NEDA, Aide-Mémoire exchanged between the
DBM
Government and IFAD
Project Design
Revised Project Design Report submitted to
Completion Mission
IFAD
IFAD and DAR
Revised Project Design Report submitted to
government for NEDA/ICC review
NEDA/ICC
Review of the Revised Project Design
Report by the government
Quality Assurance Review
IFAD
Government approval
process
Preparation of Report and
Recommendation of the
President
Submit draft Project
Financing Agreement
NEDA Board
Negotiations in Manila
Government and IFAD
IFAD
IFAD
Any substantive changes agreed will be
incorporated into the Project Design Report
which will be communicated to the
government
Project design approved by Government
Report and Recommendation of the
President submitted to Executive Board (EB)
members
Draft Project Financing Agreement and
invitation to negotiations sent to the
Government for review and preparation for
Negotiations.
Negotiated Text of Project Financing
Agreement and Minutes of Negotiations
initialled and signed
Approval by the EB of IFAD, and DOF, DAR,
NEDA and DBM informed of the decision
Submit the project to the
IFAD
Executive Board of IFAD for
approval
Finalise Project Design
IFAD
Project Design Report finalised based on the
Report to incorporate
results of the financing negotiations
changes agreed during loan
negotiations
Preparation and Approval of the Project Implementation Manual (PIM)
Prepare Draft Project
DAR
A draft of the Manual based on the
Implementation Manual
annotated outline in the Draft Project Design
Report, including formats for the Memoranda
of Agreement (MOA) and submitted to IFAD
for review and comment
Review of the draft PIM
IFAD
PIM reviewed with comments from IFAD
submitted to DAR
Finalisation of the PIM
DAR
Final version of the PIM prepared with IFAD
comments reflected in the final PIM
43
Schedule
nd
2 November
2011 in Manila
th
By 30
November
43
2011
Mid-December
2011
Early January
2012
From second
week of
January 2012
to October
2014
th
26 January to
rd
3 February
2012
th
17 October
2014
th
By 8 January
2015
Early January
2015
Late January
2015
April 2015
st
31 May 2015
st
1 November
th
2011-29
February 2015
th
15 March
2015
th
15 April 2015
If no confirmation received by the deadline, it means that the government or IFAD agrees to the contents of the signed
aide memoire.
116
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 14: Agreed Action Plan and Timetable for IFAD Financing
Task/Activity
Signing of Project Financing
Agreement
Fulfilling Conditions
precedent to withdrawal of
the IFAD Financing, as
provided in the Project
Financing Agreement
Start Up Workshop
Establish the Project
Steering Committee (PSC)
Establish the Central Project
Management Office (CPMO)
Establish the Regional MultiStakeholders’ Committees
(RMSCs)
Establish the Regional
Project Management Office
Coordination Offices
(RPMOs)
Establish the Provincial
Project Management Office
Coordination Offices
(PPMOs)
Setting up the financial
management system
Setting up the systems for
M&E, reporting and impact
assessment
Prepare the assessment of
existing vehicle inventories
for approval and
specifications for vehicles
and major purchases of
office equipment
Responsible Agency
Outputs
Conditions for Effectiveness
DOF and IFAD
Project Financing Agreement countersigned
by President of IFAD and authorised
representative of the Borrower
Conditions Precedent to Withdrawals
DAR, DOF/BTr, DBM,
All Conditions precedent to withdrawal as
IFAD
provided in the Project Financing Agreement
met and evidence submitted to IFAD and
accepted
IFAD, DAR
Clear understanding of project strategy,
approaches, activities, management
structure, institutional and implementation
arrangements, planning and budgeting
procedures, financial management,
procurement and loan disbursement
procedures, reporting and M&E/KM
(including the RIMS)
Agreed project implementation strategy and
schedule
Project Management Staffing and Systems
DAR
The PSC will have representatives from all
national agencies involved in project
implementation and chaired by DAR
DAR
Office established and staff seconded by
DAR, who will work full-time on project
activities and will stay in position until the
MTR
DAR in Regions (IX, X
Committees established with a membership
and Caraga)
from all regional agencies involved in project
implementation, including beneficiary
representatives and chaired by DAR
Two Sub-Committees established:
Infrastructure and Value chains
DAR in Regions (IX, X
Offices established in the three regions
and Caraga)
under the DAR Regional Directors with 6
staff seconded by DAR in each office who
will work full-time on project activities and
will stay in position until the MTR
DAR in the 10 project
11 offices established under the DAR
provinces with two in
PAROs2 with 7 staff seconded by DAR who
Bukidnon (south and
will work full-time on project activities and
north)
will stay in position until the MTR
DAR
Sound financial management system,
including fund flow procedures,
disbursements, internal controls, accounting
procedures and physical and financial
reporting procedures established at central,
regional, provincial, municipal and barangay
levels
DAR with IFAD
An effective and functioning system of M&E,
assistance
physical and financial reporting and impact
assessment (including the RIMS) set up with
clear procedures and formats; training in the
M&E operations provided to the concerned
staff
Procurement of Goods, Services and Civil Works
DBM, DAR CPMO and
Government approves the procurement of
RPMOs
the proposed vehicles and final
specifications prepared and approved at
regional and central levels for review by
IFAD
117
Schedule
th
By 30 June
2015 in Rome
th
By 30 June
2015
July/August
2015 pending
fulfilment of
conditions
precedent to
withdrawals
st
By 1 June
2015
st
By 1 June
2015
st
By 1 June
2015
st
By 1 June
2015
st
By 1 June
2015
st
By 31 August
2015
st
By 1 January
2016
st
By 1 June
2015
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 14: Agreed Action Plan and Timetable for IFAD Financing
Task/Activity
Prepare terms and reference
for the Value Chain
Consultancy
Prepare bidding documents
for major PY1 procurement
of goods and services
Responsible Agency
DAR CPMO and
RPMOs
Prepare terms and reference
for undertaking
baseline/RIMS survey
Advertising, tendering of
procurement of goods,
services and negotiation of
contracts
Award of negotiated
contracts
DAR and IFAD
Prepare a proposal for
retroactive financing of key
project start-up activities
DAR
Clarify the extent to which
the land allocated to the
ARBs overlaps with that
claimed by IP groups
DAR CPMO and
RPMOs
DAR CPMO and
RPMOs
DAR CPMO and
RPMOs
Outputs
Final terms of reference prepared and
approved at provincial and central levels for
review by IFAD
All bidding documents ready for tendering
following the procurement procedures in the
Project Financing Agreement and submitted
to IFAD for prior review and approval
Final terms of reference prepared and
approved at the central level for review by
IFAD
Procurement process is completed up to the
stage of completion of negotiation of
contracts
Schedule
st
By 1 June
2015
Contracts awarded
After meeting
the conditions
precedent to
withdrawals
Other Pre-project Activities
A proposal for the retroactive financing from
the IFAD loan of key activities e.g.
preparation and finalisation of the PIM,
preparation of bidding documents etc. for
procurement in PY1, establishment of the
CPMO, RPMOs and PPMOs etc. submitted
for inclusion in the Project Design Report
DAR and NCIP
For those clusters where there are IPs
prepare maps showing the location of any
areas where land allocated to ARBs
overlaps that claimed by IPs as part of their
ancestral domain.
118
st
By 1 June
2015
st
By 1 June
2015
th
By 30
September
2015
th
9 November
2011
st
1 February
2012
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 15: Good Governance Framework
APPENDIX 15:
Good Governance Framework
In all instances, the Financing Agreements will be the overriding legal document. The Government’s
procurement policies, procedures and documentary requirements under Philippine Republic Act 9184
will be applicable to the extent that is consistent with the Procurement Guidelines of the IFAD.
119
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 15: Good Governance Framework
No.
1a
Issues/Risks
Action to Mitigate Risks/ Responsible Entity
Targets/Frequency
Risks of corruption and
fraud
The Department of Agrarian Reform (DAR) as lead agency will use its Bid and Award Committee – BAC
at the Central-, Regional, and Provincial levels to ensure that the procurement process is in accordance
with the Government’s Standard Operating Procedure and Procurement Guidelines under RA 9184. The
BAC will at all stages of the procurement process, invite, in addition to the representative of the
Commission on Audit, at least two observers to sit in its proceedings, one from a duly recognized private
group in a sector or discipline relevant to that particular procurement, and the other from a NGO with no
direct or indirect interest in that contract. The observers will ensure the propriety of the procurement
process including documentation and will report to DAR CPMO any deviation and/or irregularities from
procurement rules and regulations. Procurement policy and procedures will be provided in the Project
Implementation Manual (PIM).
Procurement financed by the project funds will be undertaken by the CPMO, RPMOs and PPMOs within
the authority limits of officials of each office. Each office’s BAC will prepare bidding documents, advertise,
call and evaluate bids and approve the award.
Throughout the duration of the
project for every procurement which
requires a submission to the BAC
for review, evaluation and award.
 Collusion during
bidding process
 Biased bid evaluation
 Suppliers/contractors
1b
offering incentives for
favourable treatment
Ensure transparent and
efficient procurement
Throughout the duration of the
project.
Based on the Procurement Plan, CPMO will request NOL from IFAD for procurement of goods and works
valued at USD250,000 or more and of consultants services valued at USD100,000 or more for each
procurement reaching this threshold.
1c
Strengthen staff
capacity at all levels
and avoid inadequate
or delayed
Procurement Plans
Procurement: the project will be subject to a higher level and expanded scope of ex-post reviews by IFAD
to include checks for indicators of collusion, end-use deliveries, and procedural compliance, among other
measures.
CPMO will ensure that the BAC officials are provided with adequate guidance and training for the
procurement process in line with RA 9184 and that the staff involved in the project are appointed by an
Executive Order and contractual staff and officials of the project are hired timely for the implementation of
the Procurement Plan.
Prepare and implement procurement training programme for the Regional and Provincial Level in line with
the provisions of the Project Implementation Manual.
1d
Reduce risk of informal
payments by
contractors, suppliers
and consultants
At least once a year
CPMO, RPMO, PPMO and BAC
officials involved in the process,
appointed under an Executive Order
upon effectiveness of the financing
agreement.
Project to closely monitor and review procurement conducts, and where necessary, take measures to
improve procurement procedures based on lessons learnt from each successive procurement activity.
CPMO will conduct procurement
training for the Regional and
Provincial staff at the inception of
the Project.
All contractors, suppliers and consultants – firms or individuals – bidding for contracts under the project
shall submit a sworn statement attesting compliance to the responsibilities of a Prospective or Eligible
Bidder as provided in Section 17.7 of the IRR - Responsibility of Prospective or Eligible Bidder.
Throughout the project period
At all levels during the procurement
and payment processes throughout
project duration.
The details of 17.7.1; 17.7.2; 17.7.3 in the IRR. 17.7.4 states: Before submitting their bids, the bidders are
120
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 15: Good Governance Framework
No.
Issues/Risks
Action to Mitigate Risks/ Responsible Entity
Targets/Frequency
deemed to have become familiar with all existing laws, decrees, ordinances, acts and regulations of the
Philippines which may affect the contract in any way. However, in cases where the cost of the awarded
contract is affected by any applicable new laws, ordinances, regulations or other acts of Government
promulgated after the date of bidding, a contract price adjustment shall be made or appropriate relief shall
be applied on a no loss-no gain basis, provided such is not covered by the contract provisions on price
adjustment.
1e
Insufficient procedures
1f
Procurement Plan
Procurement personnel caught for soliciting and/or accepting bribes can be criminally and administratively
penalized under any or all of the following laws:
 PD No. 46 – Prohibition against Gifts
 RA No. 9184 – Government Procurement Reform Act (Sections 65-71)
 RA No. 3019 -Anti-Graft and Corrupt Practices Act (Section 9)
 RA No. 6713 – Code of Conduct and Ethical Standards (Section 11)
 RA No. 7080 – Plunder Law (Section 2, as amended by R.A. No. 7659)
 Revised Penal Code (Articles 210, 211, 211-A, 212)
 RA No. 1379 – Law on Unexplained Wealth (Section 2)
 RA No. 9184 also provides for the imposition of civil liabilities upon conviction that may either consist of
restitution for the damage done or the forfeiture in favour of the government of any unwarranted benefit
derived from the act or acts in question or both at the discretion of the courts. All procurement contracts
covered by the said law requires the inclusion of a provision for liquidated damages which shall be
payable in case of breach thereof.
The CPMO, RPMO and PPMO staff and officials are to adhere strictly to the procedures and guidelines
set forth in the Financing Agreements, the Procurement Guidelines and PIM that covers competitive
bidding and national shopping.
Preparation of realistic initial 18 month Procurement Plan, guided by the Procurement Guidelines, as part
of the AWPB.
Preparation of annual Procurement Plan as part of the AWPB.
2a
Ensure strong internal
controls at central,
regional and provincial
levels.
Follow the detailed procedures in the PIM, which cover:
 financial policies and standards;
 elements of internal control;
 financial accounting system, ledgers, journals;
 bank accounts and credit/grant withdrawals;
 Project expenditure, payroll, petty cash, advances; and
 Financial Management reports, audit, counterpart funds withdrawals.
DAR to second/recruit required staff to strengthen Financial Management and Procurement capacity in
121
Throughout Project duration.
An initial 18 month procurement
plan prepared by DAR CPMO,
th
Annually thereafter by 15
November
Throughout Project duration.
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 15: Good Governance Framework
No.
Issues/Risks
Action to Mitigate Risks/ Responsible Entity
Targets/Frequency
the Central, Regional and Provincial Level. .
2b
Strengthen financial
management capacity
Staff in all level to receive hands-on training and technical assistance from consultants recruited under the
Project. The Government and IFAD Procurement Guidelines will be used under the Project as well as
relevant provisions of the Financing Agreement.
CPMO, RPMOs and PPMOs
Throughout Project duration.
CPMO to closely monitor and review financial management conduct and make necessary improvements
as required.
2c
Provide internal audit
capacity at central,
regional and provincial
levels.
2d
External audit.
2e
Minimize cash
transactions.
2f
Planning of training,
workshops and study
tours.
There will be an in-depth and intensive supervision by IFAD in the initial years to ensure the successful
implementation of the financial management arrangements and at least one on-site financial management
visit either as part of the annual supervision mission or through a separate monitoring mission
complemented by desk-based review of Interim Financial Report (IFRs).
The DAR is establishing an Internal Audit Office to conduct pre-audit or prior review of financial
documentation and adherence to financial policies and procedures.
The Internal Audit Office will provide guidance and training to internal audit staff and assist with internal
auditing at all levels.
Adopt the Terms of Reference (TOR) for external audit as provided in the PIM.
 All progress payments to contractors, suppliers and consultants – firms, individuals, national and
international – to be made by cheque or bank transfer. Retain evidence for audit and IFAD supervision
and post review missions.
 Projects will be permitted to open project accounts in commercial banks for project disbursements.
Include training and workshop is in the AWPB, including:
(i) Detailed costs estimates;
(ii) Eligibility rules for attending training, workshops and study tours. Participants must:
 be engaged in work relevant to the training;
 be competent in the English language;
 report on and share their experiences for the benefit of the project.
(iii) Evidence that training, workshops, study tours and other similar activities:
 are in line with project aims and objectives;
 meet identified needs within the sub-component plans;
 have budget in line with planned expenditure.
122
Twice a year during the Supervision
and Implementation Support
Missions and also during any Post
Supervision missions.
CPMO, RPMOs and PPMOs,
throughout Project duration.
CPMO will enter into a MOU with
the Commission on Audit (COA) as
the supreme audit institution of the
Government to undertake the
annual project audits.
CPMO, RPMOs and PPMOs
throughout Project duration.
CPMO with RPMOs and PPMOs.
Once a year and included in the
AWPB.
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 15: Good Governance Framework
No.
Issues/Risks
Action to Mitigate Risks/ Responsible Entity
Targets/Frequency
(iv)
Cost guidelines to be established for selected training/workshop activities:
venue rental with refreshments/meals;
sound and projection equipment hire;
stationery/hand-outs ;
project-specific training and workshop materials;
simultaneous translators;
Photocopying, reproduction, translation.
(v)
Define evidence to be submitted by attendees for reimbursement of expenses which may include:
 proof of attendance for period claimed with signed statement by the organizer or host;
 proof of travel by air – ticket stubs, travel agent’s receipt, airline boarding passes;
 receipted hotel bills (for proof of stay);
 receipts for incidental travelling expenses;
 invoices and receipts for venue rental, food and beverage, sound/ projection equipment, hire of
simultaneous translator, stationery and handouts, use of photocopying facilities.
 evidence of payments to be kept for attendees’ per diem and allowances.
Project to reconcile operating expenses to staff or field offices within one week of the end of each month.
No further advances to be paid until previous advance reconciled and cleared against documentary
evidence.
Finance staff in CPMO, RPMOs and
PPMOs, once a month
Throughout Project duration.
Project staff to disclose in writing any private and public affiliations or personal interest before becoming
involved in any project-related transaction, such as contract award or decision making.
CPMO to ask for and retain written
disclosure from the staff.
A sworn affidavit to be submitted by the bidder of compliance with the Disclosure Provision under Section
47 of the Procurement RA 9184 in relation to other provisions of R.A. 3019
Section 47. Disclosure of Relations
In addition to the proposed contents of the Invitation to Apply for Eligibility and to Bid as mentioned under
Section 21 of the IRR, all bids shall be accompanied by a sworn affidavit of the bidder that it is not related
to the head of the procuring entity by consanguinity or affinity up to the third civil degree. Failure to
comply with the aforementioned provision shall be a ground for the automatic disqualification of the bid in
consonance with Section 30 of this IRR-A. For this reason, relation to the head of the procuring entity
within the third civil degree of consanguinity or affinity shall automatically disqualify the bidder from
participating in the procurement of contracts of the procuring entity. On the part of the procuring entity,
this provision shall also apply to any of its officers or employees having direct access to information that
may substantially affect the result of the bidding, such as, but not limited to, the members of the BAC, the
Technical Working Group, the BAC Secretariat, the members of the CPMO, RPMOs and PPMOs and the
designers of the project. On the part of the bidder, this provision shall apply to the following persons:
a) If the bidder is an individual or a sole proprietorship, to the bidder himself;
BAC to include in the required bid
documents. For every procurement
throughout project duration.






2g
3a
3b
Delayed or non-existent
reconciliation of
advances for operating
costs and expenses
Minimize possible
conflict of interest
among project staff.
Enhance transparency
through greater public
disclosure of project
information.
123
CPMO to arrange disclosure of
procurement information on Phil
GEPS.
Republic of the Philippines
Convergence on Value Chain Enhancement for Rural Growth and Empowerment Project (CONVERGE)
Design completion report
Appendix 15: Good Governance Framework
No.
Issues/Risks
Action to Mitigate Risks/ Responsible Entity
b)
c)
d)
3c
Lack of information and
transparency
4
Provide overall
complaints and
grievances mechanism
covering all aspects of
the project.
5
Require all project staff
to adhere to a Code of
Ethical Conduct.
Reinforce Code of
Ethical Conduct with
sanctions for fraudulent
and corrupt activity by
project staff,
contractors, suppliers
and consultants.
6
7
Monitoring of Results
Framework.
If the bidder is a partnership, to all its officers and members;
If the bidder is a corporation, to all its officers, directors, and controlling stockholders; and
If the bidder is a joint venture, the provisions of items (a),(b) or (c) of this Section shall
correspondingly apply to each of the members of the said joint venture, as may be appropriate.
 Disclosure provisions: (i) making publicly available all key documents; (ii) notifying promptly all bidders
of the contract awards and the summary of the evaluation of all bids; (iii) allowing representatives of the
end-users to attend the public bid openings; (iv) making available the details of all contracts awarded;
and (v) making available the date of request for all contract payments and the date of each payment,
with explanation of the reason for any delays.
 Standardisation of certain items, e.g. (i) use of standard wording in advertisements; (ii) agreement on
the newspapers in which specific advertisements will be placed; (iii) use of standard bidding and
contract documents and request for proposals (for consultancy service), with no further changes to be
made without IFAD’s prior approval; and (iv) publication of prices paid for items in different locations.
To be included in the PIM, a well-defined complaints handling mechanisms and procedures with staff of
DAR and the provinces designated to handle complaints and inquiries to be systematically recorded and
responded to properly in a timely manner.
Complaints handling mechanism (and the use of sanctions), whereby ARBs and others can channel
complaints or inquiries e.g. through the use of mobile phone text messaging. Complaints and inquiries will
be systematically recorded and answered and posted on the project’s website.
Targets/Frequency
Project to provide copies of the relevant laws and articles on Code of Ethical Standards for Government
Officials and Employees (RA 6713) to all Project staff, including contracted staff. Project will maintain
signed declaration of receipt of these documents by all Project staff, including contracted staff.
IFAD to apply sanctions available in its general and project-specific legal agreements, including the IFAD
Policy for preventing fraud and corruption adopted in December 2005. Sanctions against unintended
recipients of loan/credit/grant proceeds may include:

letter of reprimand, debarment, conditional non-debarment, debarment with conditional release and
restitution;

ineligibility, either indefinitely or for a period of time, to receive IFAD loan/grant proceeds or otherwise
participate in any IFAD funded projects;

suspension or cancellation of un-disbursed loan amount, or repayment of misused amounts, if a
recipient has failed to take timely action to redress fraudulent, corrupt, collusive, coercive or
obstructive practices.
The project will establish an operational M&E system from the ARC clusters to the national level to
monitor and report on project activities and performance across the results chain (including financial and
physical progress).
124
CPMO, RPMOs, PPMOs staff,
throughout Project duration.
CPMO, RPMOs, PPMOs staff,
throughout Project duration will
handle complaints and respond in a
timely fashion.
Include all CPMO, RPMO and
PPMO staff.
CPMO, RPMO and PPMO to
disseminate sanctions with the Code
of Ethical Conduct.
IFAD
Throughout project duration.
CPMO throughout project duration.