REMEMBER TO SWITCH OFF THE AUTOPILOT
Transcription
REMEMBER TO SWITCH OFF THE AUTOPILOT
ERRV Installation Approach & 500m Zone Pre-Entry Checklist REMEMBER TO SWITCH OFF THE AUTOPILOT 500m Vessel Installation Always approach, on the “Drift Off” side on a tangent to 500m zone until all these checks are confirmed and endorsed. Always Exercise extreme caution approaching Installations If the answer is NO to any of these questions “Stop the Job” 1. 2. 3. 4. 5. 6. 7. 8. 9. Is the weather within Industry safe working limits & suitable for planned work? Suitable planned approach angle to the 500m safety zone allowing for clearance offset in the eventuality of unforeseen circumstances, using parallel indexing? Confirmed that no other vessels or operations are taking place inside the 500m zone which may affect operations? Confirmed the vessel is not carrying out any maintenance work that could affect capabilities? All manoeuvring systems tested including changeover between, Primary, Secondary/Emergency control positions and modes? Is the Bridge (2 man) and Engine room (1 man) manned correctly? Bridge established / confirmed communications with the Engine Room? Confirmed the Power Management is suitable in the event of main system failure? Confirm location of propulsion Emergency stops and check date of last function test with Engineer? 10. Disengaged the Autopilot? 11. Function tested the primary & secondary/Emergency steering controls? 12. Are Rescue Craft ready for immediate deployment? 1 NS 106 ISSUE 2 REV2 Choose an item. Choose an item. Choose an item. Choose an item. Choose an item. Choose an item. Choose an item. Choose an item. Choose an item. Choose an item. Choose an item. Choose an item. ERRV Installation Approach & 500m Zone Pre-Entry Checklist 13. Crew briefed on intended operation(s)? 14. Checked the Installations Data Card for any no entry / restricted areas and planned suitable entry and exit? Radar set up suitably utilising Variable range rings and bearing markers? Present and anticipated weather and tidal conditions to maintain drift off position? Communications between vessel and installation confirmed? Confirmed location and number of men in work party/ies? 15. 16. 17. 18. 19. Confirmed No Smoking or Hot work on Deck? 20. Permission to enter 500m zone been given by the installation? Checklist completion been recorded in the deck logbook with times & copy saved on file? 21. Signed Officer of Watch Signed Certificated Watch Keeper Time Date Choose an item. Choose an item. Choose an item. Choose an item. Choose an item. Choose an item. Choose an item. Choose an item. Choose an item. Click here to enter text. Click here to enter a date. REMEMBER OVERSIDE COVER CAN BE JUST AS AFFECTIVE AT 500M. STOP THINKING CLOSE STANDBY 2 NS 106 ISSUE 2 REV2