to see more detail..

Transcription

to see more detail..
IWCF Well Control Course
(Surface & Subsea)
DAY 01
IWCF Well Control – Course Outline
Time
Subject
08.30
Course
Introduction
09.00
PRE-TEST
09.30
09.45 –
10.00
10.00
Review of
Pre-Test
Primary Well
Control &
Calculations
PVD Training Centre
Fire Alarm & Muster Point
Toilets/Smoking/Lunch
Course Outline – Registration
Complete RDF & Personal Info.
25 General Well Control
Questions to assess level of
knowledge and understanding.
PVD Well Control
Manual, Course Exercise
Book, Formula Sheet,
Pen, Pencil, Ruler
Calculator
Pre- Test Questionnaire
Instructor Methodology
LCD Projector
Answers to Pre-Test
30 Minutes to complete
Answers to Pre-Test
Hydrostatic Pressure,
APL/ECD,BHCP, SCR’s, EMW,
CLFL’s, Kick Indicators, Shut In
Methods, New PSI/New SPM,
New PSI/NewPPG
PVD Well Control
Manual
Formula Sheet
API RP 59
Whiteboard
WCM Section 1 & 2 & 3
&4 &5
Formula Sheet
API RP 59
Lunch Break
Secondary
Well Control
&
Calculations
14.00
14.15
Training Tools
Coffee Break
12.00
12.45
Topics
KMW, Kick Gradient, Pressure
Regimes, Permeability, Porosity,
Shut In Calculations
PVD Well Control
Manual
Formula Sheet
API RP 59
Whiteboard
WCM Section 1 & 6
Formula Sheet
API RP 59
Coffee Break
Simulator
Training
Session
15.00
Line Up, Take SCR’s, CLFL’s,
Drill, Kick, Shut In , Record
Information
CS Simulator
Coffee Break
15.15
Kill Sheet
16.30
Review
Email : [email protected]
How to complete a Kill Sheet
Kill Sheet
Calculator
Formula Sheet
Simulator Exercise Kill
Sheet on screen
Review of day, homework
assignment.
Web: www.pvdtraining.com.vn
DAY 02
Time
Subject
Topics
Training Tools
Instructor Methodology
08.00
Review
Review of homework
Homework
Homework Answers
08.30
Start Up &
Shut Down
How to start up & shut down a
Surface/Subsea kill operation.
Effects of CLFL, Time Lag.
09.00
09.15
Coffee Break
Drillers’
Method of
Well Control
1st Circulation, 2nd Circulation,
Constant BHCP,Behaviour of
Gas, Pit Volumes, Surface/Casing
Shoe Pressures, CLFL,
Advantages & Disadvantages
10.00
PVD Well Control
Manual
Whiteboard
WCM Section 6
Coffee Break
10.15
Wait &
Weight
Method of
Well
Control
11.00
Simulator
Kill
Methods
12.00
Start Up/Surface Line Strokes,
ICP – FCP, BHCP, Gas
Behaviour, Pit Volumes, CLFL,
Advantages & Disadvantages,
Trapped Gas Below BOPs
Driller’s Method
Wait & Weight Method
PVD Well Control
Manual
Whiteboard
WCM Section 6
Simulator Kill Sheet
CS Simulator
Simulator Kill Sheet
Lunch Break – Simulator in Practise Mode – Instructor Available
Well Control
Problems
13.00
Formation
Strength
14.00
Plugged Nozzle, Washed Nozzle,
Plugging Choke, Washing Choke,
Leaking Pump.
PVD Well Control
Manual
Whiteboard
WCM Section 6
LOT/FIT, MAASP, MAMW.
PVD Well Control
Manual
Handout
Whiteboard
PPT. Presentation
WC Manual Section 1
Coffee Break
Gas
Migration
14.15
Whiteboard
Impermeable
Gas Cap
& Slugs
15.00
Gas Migration in a shut in well,
Volumetric Method of Well
Control, Volume to Bleed
Impermeable Gas Cap
Slug Calculations & BHP
PVD Well Control
Manual
Formula Sheet
Formula Sheet
Whiteboard
WCM Section 3 & 6
Formula Sheet
Whiteboard
Coffee Break
15.15
Subsea
Marine Riser
Assembly
Riser Margin, Riser Collapse,
Overburden Stress Gradient,
Diverting & Riserless drilling
16.00- 16.30
Review
Review of day, homework
assignment.
Email : [email protected]
Formula Sheet
PVD Well Control
Manual
Whiteboard
WCM Section 8
Web: www.pvdtraining.com.vn
DAY 03
Time
Subject
Topics
Training Tools
Instructor Methodology
08.00
Review
Review of homework
Homework
Homework Answers
08.45
Accumulator
Unit
Components & Function
API RP 53
Accumulator Diagram
API RP 53
PVD Well Control
Manual
Accumulator O/Head
Whiteboard / API RP 53
WCM Section 7
Accumulator
Bottles
Calculating usable fluid volumes /
Surface bottles.
Subsea BOP Accumulator Bottle
Calculations
Formula Sheet
Bottle Diagram Handout
Bottle O/Head
Whiteboard
Hydril Supplement
Diagram Handout
PVD Well Control
Manual
O/Head
Whiteboard
WCM Section 7
Annular
Preventers
10.00
Components / Function
Hydril GK & GL (secondary
chamber), Cameron D
Coffee Break
Ram
Preventers
Components, Locking Devices,
Weep Holes, Ram Assemblies,
Secondary Seal.
Hydril Supplement
PVD Well Control
Manual
O/Head
Whiteboard
WCM Section 7
Safety Valves
FOSV, Gray Valve, Float Valve,
Drop in Dart & Landing Sub
PVD Well Control
Manual
O/Head
Whiteboard
WCM Section 7
Mug Gas
Separator
Vent Line, Liquid Mud Seal,
Blow Through Pressure,
Hydrate Inhibitors
PVD Well Control
Manual
Whiteboard
Chalk & Talk
WCM Section 7
Testing
Test Plugs, Pressure Test
Frequency, Minimum Test &
Closing Requirements
PVD Well Control
Manual
API RP 53
O/Head
Whiteboard
API RP 53,
WCM Section 7
Subsea
BOP’s
Subsea Marine Riser Assembly,
LMRP, FailSafe Valves,
Indirect Hydraulic Subsea
Operating system
PVD Well Control
Manual
Handout
O/Head
Whiteboard
SPM Valve, Shuttle Valve
WCM Section 8
Flanges &
Ring Joint
Gasket
Flanges working pressure,
nominal bore size.
Gaskets selection and usage
PVD Well Control
Manual
O/Head
Whiteboard
WCM Section 7
10.15
12.00
Handout
Lunch Break
12.45
Practical
Assessments
Commence Practical Assessments
on CS50 simulator
16.30
Review
Review of day, homework
assignment.
Email : [email protected]
Students to work through
assigned workbook
exercises
Instructor to conduct
practical assessments and
assist students when time
permits.
Web: www.pvdtraining.com.vn
DAY 04
Time
Subject
Topics
Training Tools
Instructor Methodology
08.00
Review
Review of homework
Homework
Homework Answers
08.30
Cont.
Practical
Assesmments
Practical Assessments on CS
simulator
Students to work through
assigned workbook
exercises
Instructor to conduct
practical assessments and
assist students when time
permits.
12.00
Lunch Break – Simulator in Practise Mode if necessary
Continue with Practical Assessments if necessary
13.00
16.00
Or commence review and revision
Review all remaining exercises with students, give the students a practise Kill Sheet exercise under
exam conditions and revise any subjects as requested. Explain the written examination procedure and
protocol. Explain good examination techniques i.e. checking
DAY 05
Time
Subject
Topics
08.00
Written
Examinations
Pre-amble Equipment
Principles & Procedures Papers
08.30
–
09.30
Equipment
Test
Paper
Surface and Subsea Equipment
Duration 1 Hour
09.30
09.45
12.15 max
Exam Resources
IWCF Invigilator
Calculator
Stationary
Formula Sheet
Invigilator to write start
and finish times and to
ensure examination
protocol is followed.
Coffee Break
Principles &
Procedures
Test Paper
Email : [email protected]
Surface and Subsea Principles and
Procedures
Duration – Depends on Type &
Level
Calculator
Stationary
Formula Sheet
Invigilator to write start
and finish times and to
ensure examination
protocol is followed.
Web: www.pvdtraining.com.vn