Q Construction Company Profile
Transcription
Q Construction Company Profile
COMPANY PROFILE DORMA NZ, HEAD OFFICE, PATIKI RD Core Values Our Company Core values revolve around three key words that every action Q Construction takes must measure up to. These words are: Integrity, Pride, and Enjoyment. Integrity Pride Enjoyment Our top level goal is always to build with integrity by being honest and open with our clients, consultants & subcontractors. We recognise that without a high level of trust, the vital relationships that can make or break a project will dissolve. We instill in all our site staff and management a sense of self achievement and personal responsibility to provide a feeling of personal pride for each and every person who works on a Q Construction project. It’s personal pride in a job well done, whatever the task. We understand that each stakeholder in a project has a job to do. However we also know that if people enjoy what they do, they’ll be happier, healthier and achieve more. For most of us, work is a big part of life and life is for enjoying. That’s why at Q Construction we always do our best to make every job enjoyable, so all who work with us will have a good time doing it. These three core values are a reflection of the good old fashioned values of hard work & trust which we have based our business on. When we add in our combined experience, careful planning, and a ‘can-do’ attitude, we believe we have created a very strong and appealing business model. This is the reason why, we at Q Construction, now have a sound base of repeat clients that know and trust our company, and enjoy the building process with us. 3 The Q Group Q Construction is part of Q Group which includes Q Interiors and Q Maintenance. Across the group there is a wealth of skills and resources and these can be shared across the group as and when required. Through this structure we are able to carry out multiple projects simultaneously with project values ranging from $100 to $20 million. Within Q Group there are 27 employees and staff range in competency from trade qualified carpenters, through to quantity surveyors, site managers and senior management. Our Staff As a company we strive for the very best, and we demand the same of all our staff. Each member has core skills and capabilities they bring to the Construction Process, and excel at the core objectives of any construction project – quickly understanding the vision for the project and the way the many unique parts come together to create a finished project – to the highest standard each and every time. At Q Construction what sets us apart is our investment in people. People are the key to our success in business. At Q we back our people with the resource to overcome those challenges required to succeed. 4 What sets us apart We are 100% privately owned & operated, both directors taking personal pride in every project that Q delivers, striving to always exceed Client & Consultant’s expectations. Q Construction assists its clients by providing a single point of contact, handling project management, cost control, on site management of all the various complex undertakings of a Construction Project. Our personnel have extensive construction experience. We understand the importance of interface management and ensure effective communication at all project levels. Depending on our role, we can provide our clients with a full design & build service, adding design development and value engineering to our range of services. We have particular strengths in quickly understanding the vision of the project, developing the most time & cost efficient methodology so that we can offer our clients the best complete package. Above all, we are determined to become a top-class construction firm by developing into a total solution provider that uses experiences accumulated from various projects around the world to develop and provide value to customers. BIDVEST, COOLSTORES, WHANGAREI In my dealings with Q, I have found them to be professional at all times, with a genuine desire to deliver high quality workmanship and to meet client imposed deadlines. They have proved easy to work with as a client, but equally, have conveyed the impression that all sub-trades are held to account and expected to meet the same high standards expected of Q Construction staff. Phil Struckmann, BIDVEST BLUM SHOWROOM & WAREHOUSE, AVONDALE The Q Team - Directors TONY EASTLAND Managing Director Tony has been part of the construction industry for over 21 years. He completed a Bachelor of Construction Management and a Management Cadetship with Mainzeal Property and Construction early in his career. Tony then worked in a number of different roles within the construction industry, gaining a broad knowledge of the parts each play. Tony spent 2 years working in the UK as a Design Manager, returning to New Zealand in 2004 and then founded Q Construction in 2005. His construction experience includes power stations, high rise hotels, apartments, coolstores, industrial food processing lines, hospitals, prisons, school swimming pools, high end residential and office fitouts. BRENDAN GRAY Commercial Director Brendan has been in the construction industry for over 21 years. He completed a Bachelor of Quantity Surveying, and his early days in construction were as a labourer for his builder father learning the ropes, then in cadetship programs with Rider Hunt and Mainzeal Construction. During this time, Brendan worked on a number of high profile Auckland construction projects including: the Sky City Casino and Sky Tower, BellSouth then Vodafone’s nationwide cellular network rollout, shopping complexes, heavy industrial warehousing, and commercial buildings. Brendan also worked in London for 8 years on a number of high profile and very substantial projects, including the refurbishment of the House of Commons, Big Ben Tower, £200million extremely high end apartments built right on the River Thames, and a number of high rise office buildings in Central London. 7 The Q Team JOHN RYDWANSKI - Contracts/Project Manager John has over 36 years Commercial Construction experience and, during that time, worked as a Senior Quantity Surveyor, Senior Project Manager, Commercial Manager and currently as Contracts Manager. As Contracts Manager he has overall responsibility for all aspects of the construction project under his control and the performance of the project team. DAVE KING - Project Manager David has over 25 years of experience in the construction industry having completed a carpentry apprenticeship in 1990. David’s trade background is a strength when it comes to project buildability and planning, he also has a keen interest in implementing Q Construction health and safety procedures on all our sites. David has worked on a wide variety of projects including multi storey, public sector, new build commercial, new build apartments, industrial cool store and food processing lines. David’s ability to successfully interact with all parties associated with given projects ensures successful outcomes achieved. David King adds considerable experience and is a very valuable asset to Q Construction. His wisdom and skills are called upon by all staff who value his expertise in all construction matters. SHANE WRIGHT - Project Manager Shane is a trade qualified Project Manager. He began his working life as a apprentice, and progressively worked his way to becoming a Project Manager. Shane has extensive experience in the construction of new builds along with the refurbishment of existing buildings. Shane likes to run a happy and smooth site where everyone involved understands what is expected of them and enjoys the process. Subcontractors enjoy working on Shane’s sites because he works with them to achieve the results Q expects. Shane’s strengths are his construction knowledge, problem solving ability and his ability to get a project up and running smoothly while successfully orchestrating the individual trade’s participation. 8 SITE MANAGERS Q employs 10 site managers, all with different experience and skill sets. QUANTITY SURVEYORS Q employs 5 full time project Quantity Surveyors. CENTRAL PARK DRIVE OFFICES, HENDERSON BIDVEST NZ, HEAD OFFICE, VERISSIMO DR Tony and Brendan have very capable office support staff and site construction managers, and the company has been an important key to project success for our clients. Phil Meyer-Smith, PETER SWAN LIMITED Construction Services Q Construction have a wide range of construction options for any given application, we cover all aspects of construction from the commercial construction of major warehouses & coolstores to the design & build of alpine lodges. First-and-foremost we are a builder, with commercial construction being the foundation of our business. We have extensive knowledge of the following; The Q Group has 3 specific divisions to cover all aspects of construction: CONSTRUCTION Office Buildings Industrial Buildings Warehouses Food Processing Line Buildings Coldstores & Coolstores Chillers Loading Depots Office Fitouts Retail Car Dealerships & Showrooms School Halls & Pools Design & Build INTERIORS MAINTENANCE We work in partnership with key subcontractors and suppliers that deliver very high quality products and services as, and when, we need it. This close working relationship with our supply chain gives our clients an advantage, as it enables Q Construction to deliver the highest level of workmanship while maintaining the momentum of a project. 11 Recent Project Experience CENTRAL PARK DRIVE OFFICES, HENDERSON CENTRAL PARK DRIVE OFFICES 91-93 Central Park Dr, Henderson 91-93 Central Park Drive was a negotiated project with Canam Corporate, the building owner. The structure was built on concrete piles, with reinforced concrete foundations, columns, slabs, precast suspended floor slabs and a structural steel frame. The building is finished in a combination of precast panels, aluminium cladding, horizontal long run, aluminium windows and louvres. It is a three storey mixed use building, built on the side of a hill. Multi tenanted and completed with carparks and contour landscaping. Q Construction also secured the fitout of the anchor tenant, Debtworks. COMPLETION: January 2014 VALUE: $5.2 million CLIENT: Canam Corporate / Graeme Cameron P: 09 836 2554 CONSULTANT: Paul Rosnell, VRL Architects P: 09 307 5457 Q TEAM:Tony Eastland, Dave King, Tai Flavell, Nicholas Redgwell 13 AOTEAROA FISHERIES, OTAHUHU AOTEAROA FISHERIES Bell Avenue, Otahuhu Upgrade and extend existing food processing plant and associated office/amenity/production areas. The works were carried out whilst the facility remained fully operational. Contract works included full refurb of existing office and staff amenity areas, extension to existing production area to incorporate both a new receival room and associated loading docks and yard. Office upgrade included a fully vented reclad system to all external walls, several architectural finishes have been incorporated into new external finishes. The construction of new lift shaft to incorporate passenger lift for accessible access, revised office layouts, new amentiies and staff facilities. Structural upgrade to 2nd floor included removal of load bearing walls to allow new staff amenities to be created. Process area works included the conversion of existing space to temperature controlled chiller, extension to the existing receival area, site works to facilitate 3 no. new loading docks, new ‘red-line’ entry to food processing area. COMPLETION: September 2014 VALUE: $2.7 million CLIENT: David Cossey, Aotearoa Fisheries Ltd P: 09 307 5457 CONSULTANT: Peter Swan Ltd, Phil Meyer-Smith P: 09 373 5880 Q TEAM:Tony Eastland, Dave King, Kirsty Phillips, Tai Flavell 15 BIDVEST HEAD OFFICE AND DISTRIBUTION CENTRE, AUCKLAND Bidvest NZ has been involved in more than 14 construction projects over the past 10 years – these have been completed by a mix of large, well known industry players, and smaller, niche market operators. The projects handled by Q Construction sit comfortably at or near the top of this list, for customer satisfaction and quality of construction. I would thus have no hesitation in recommending Q Construction. Phil Struckmann, BIDVEST BIDVEST WAREHOUSE AND OFFICE Verissimo Dr, Auckland Airport A large format office, warehousing, coolstore & distribution centre for Bidvest’s ever expanding portfolio.17m high stud, coolstores, chillers and ELA, this will be Bidvest’s flagship distribution centre; a large temperature controlled distribution centre complete with offices and yard areas. The construction of this building included a traditional distribution centre format, consisting of post tension concrete floor slabs, precast tilt slabs, structural steel frame, PIR panels, and profiled metal cladding and roofing. The Building comprised the following key elements: Freezer Area: 1650m2 Stud Height: 12.5m Chiller Area: 950m2 Stud Height: 11.5m Drystore Area: 2700m2 Stud Height: 12m ELA Area: 875m2 Stud Height: 8.5m Office Area: 120m2 Stud Height: 5.5m Plantroom Area: 100m2 Stud Height: 5.5m Yards Area: 6200m2 Total Building Area: 6,395m2 COMPLETION: March 2014 VALUE: $10 million CLIENT: Phil Struckmann P: 09 520 8056 CONSULTANT: Phil Meyer-Smith, Peter Swan Limited P: 093735880 Q TEAM:Tony Eastland, Dave King, Kirsty Phillips, Brett Dance 17 CAPITAL SMART REPAIRS, PENROSE CAPITAL SMART REPAIRS Penrose New purpose built precast warehouse and office for a highly innovative and technologically smart car repair business. Capital S.M.A.R.T Repairs specialise in performing high quality repairs to drivable vehicles that have sustained low to medium collision damage. That allows them to service over 3,000 bookings per week and repair over 110,000 cars per year. Through their use of innovative technologies, digital capability and efficient processes, their customers are able to seamlessly book their repair into S.M.A.R.T via an integrated solution with the insurer. COMPLETION: September 2014 VALUE: $1.5 million CLIENT: Jason Wong, DNZ Property Fund P: 09 913 1123 CONSULTANT: Quenten Pilgrem, Williams Architects P: 09 966 6994 Q TEAM:Tony Eastland, John Rydwanski Kirsty Phillips, Brett Dance 19 BNZ WARKWORTH, WARKWORTH BNZ WARKWORTH Neville Street, Warkworth Stage 1 includes demolition of the existing building, and construction of a new building, which is to be tenanted by BNZ, a new café and office spaces upstairs. The building structure is reinforced concrete piles, steel frames and precast panels. Stage 2 involves the earthquake strengthening of a heritage building and refurbishments and fitout for new tenant. Stage 3 will be a new building to the rear which is constructed in the same theme as Stage 1. COMPLETION: January 2015 VALUE: $3.5 million CLIENT: Tipling Trust, Grant & Jan Tipling CONSULTANT:Grant de Vine (Project Manager) M: 021 422 823 Rowe Battens Architects Q TEAM:Tony Eastland, Shane Wright, Nick Bolt 21 BLUM SHOWROOM & WAREHOUSE, AVONDALE BLUM SHOWROOM & WAREHOUSE 621 Rosebank Road, Avondale This project involved the new construction of the Blum NZ head office, showroom, warehouse, along with the alteration and fitout of two existing buildings, both occupied by tenants during construction. The new building has a very contemporary design and significant demolition was required at the end of the existing warehouse to allow the new building to be constructed within the existing envelope. The result was an award winning project achieving the NZIA Commercial Award, and Property Council Best in Category. COMPLETION: April 2010 VALUE: $4.8 million CLIENT: Michael Hawkins P: 09 820 5051 CONSULTANT: Simon Williams, Williams Architects P: 09 966 6999 Q TEAM:Tony Eastland, Dave King, Tai Flavell 23 DORMA WAREHOUSE & OFFICE, AVONDALE DORMA WAREHOUSE AND OFFICE Build P, Patiki Road This building was designed by Williams Architects Ltd in conjunction with Property For Industry to ensure that this was the benchmark for others to replicate in Avondale’s Industrial zone. Modern building products such as aluminium louvres, stack bond blockwork, and sunshield glazing were used to achieve the desired look. The project also achieved a 4 Star Green Building rating, which validated the careful selection of materials and minimal waste. COMPLETION: May 2009 VALUE: $2.1 million CLIENT: David Chafer M: 0219 969 6205 CONSULTANT: Simon Williams, Williams Architects P: 09 966 6999 Q TEAM:Tony Eastland, Brett Dance 25 BREWCRAFT WAREHOUSE & OFFICE, ALBANY BREWCRAFT WAREHOUSE & OFFICE 328 Rosedale Road, Albany Construction of this 10m high stud warehouse, on a greenfield site, squeezed between two existing warehouses, was completed in 2009. The client required a quick design phase turnaround, which we were able to achieve. Systems include a dangerous goods store rated to class 1 flammable liquids and a fire sprinkler system capable of coping with such products. The building is finished externally with Alucabond cladding and long run roofing. The main internal stair is ground and polished concrete with stack bonded polished block work walls. COMPLETION: July 2009 VALUE: $1.7 million (Design and Build) CLIENT: Property for Industry P: 09 307 8312 CONSULTANT:Peter Swan Ltd P: 09 373 5880 Q TEAM:Brendan Gray, Shane Wright 27 TEGEL FOODS, HENDERSON, AUCKLAND TEGEL FOODS - PROJECT CHISEL Henderson, Auckland Project Chisel for Tegel Foods Henderson involved constructing a High Care Food Hygiene Environment with in an existing structure while the rest of the processing factory remained in operation. Q Construction, tendered and successful won the project due to their knowledge of operational food lines and the strict requirements food processing line construction. The Project involved the construction of the following: Food Processing, Cooking & Packaging Line 1275m2 Production Development Kitchen & Offices 600m2 New Plantroom88m2 The project was successfully completed on time with all parties working well together to ensure a successful result for the Client. COMPLETION: June 2012 VALUE: $4.8 million CLIENT: David Taylor – Tegel Foods P: 09 977 9063 CONSULTANT: Phil Meyer-Smith, Peter Swan Limited P: 09 373 5880 Q TEAM:Tony Eastland, Dave King, Shane Wright 29 I don’t hesitate to recommend Q for any job they try for as I am confident the Team they have is a good one and a formula for success. Zane Bailey, TEG Projects Q CONSTRUCTION LTD 19 Shamrock Drive Kumeu, Auckland, PO Box 132, Kumeu, Auckland 0841 P +64 9 412 5233 F +64 9 412 5234 E [email protected] www.qconstruction.co.nz