Date Address
Transcription
Date Address
Date ____________________________ Name (adjoining owner) __________________________________________ Address __________________________________________ Dear Sir / Madam (adjoining owner) Protection Work and Work Program at _______________________________________ (site address) You may be aware that construction of a ______________________________ will soon be underway at the above property. As part of these works program, we need to provide your property with some level of protection. For that reason, in accordance with Part 7 of the Building Act 1993, please find enclosed a ‘Protection Work Notice’ (Form 3) and a copy of a ‘Protection Work Response Notice’ (Form 4) for the above works. Before we begin construction we will take a number of digital photographs of your house to help us detect any damage caused by our works. These will be kept on file so if any damage occurs we will be able to ascertain who is responsible. Please note that we will repair any damages caused by the construction of the new works. Construction is scheduled to start in ___________________ and should be completed by ______________. Whether you agree, disagree or require further information about our protection work, you need to fill the Form 4, indicating your response, then sign & date the form and return it to our office and to Michael Shaw at Red Textas Building Surveyors (428a New Street, Brighton 3186) within 14 days. We hope you agree with our protection work and look forward to receiving a Form 4 from you shortly. Yours faithfully, Signature: _________________________ Name: _________________________ (Owner / Builder / Agent) Form 3 Protection Work Notice Building Act 1993, Building Regulation 2006, Regulation 602(c), 602 (3) To: (Adjoining Owner): (Contact person, phone number, Postal address and postcode) Relevant Building Surveyor: Michael Shaw / Red Textas Consulting Building Surveyors 428a New Street, Brighton VIC 3186 From: (Owner / Agent): (Contact person, phone number, Postal address and postcode) In accordance with Section 84 of the Building Act 1993, I give notice of my intention to carry out building work and request your agreement to the proposed protection work. Property details (Building Work Site) Address Lot/s, LP/PS Adjoining property (Neighbour’s Site) Volume / Folio Address Lot/s, LP/PS Volume / Folio Location of the protection work Date and time to carry out the protection work Duration that the protection works will remain: Nature of the proposed protection work (Nature, location, time and duration of protection works) Remove existing timber paling fence in location where boundary wall is to be erected: YES/NO A temporary secure fence will be erected inside your property around this work: YES/NO Build footings and brick wall on the title boundary line: YES/NO Build the footings and brick wall 150mm in from the title boundary (or previous fence position): YES/NO Footings designed so as not to undermine your existing footings: YES/NO Install ground sheet next to wall to protect adjoining property: YES/NO Building works (i.e. laying bricks) from your property, within the temporary fenced area: YES/NO Building works (i.e. laying bricks) ‘overhand’ from the adjoining property (our clients’ property): YES/NO Require periodic access to your property to build the footings and brick wall: YES/NO Paling fence will be securely connected to the sides of the new wall at completion: YES/NO Specify other work: …………………………………………………………………………………………………………………. ………………………………………………………………………………………………………………………………………… ………………………………………………………………………………………………………………………………………… Information accompanying this protection work notice: ………………………………………………………………………………………………………………………………………… ………………………………………………………………………………………………………………………………………… Signature of owner/agent: …………………………………… Date:………………………………… Note: 1. 2. 3. 4. 5. 6. Under section 85 of the Building Act 1993, the adjoining owner must respond to a notice under section 84 of that Act by giving to the owner within 14 days of notice under section 85 of that Act:(i) agreeing to the proposed protection work; or (ii) disagreeing with the proposed protection work; or (iii) requiring more information. Failure to respond will be taken as agreement to the proposed protection works. In case of (ii) and (iii) above, a copy of the notice under section 85 of that Act must also be given to the relevant building surveyor (see Form 4). Advisory notes for protection of adjoining property and procedure for serving notices are available at www.redtextas.com.au Pursuant to Section 93 & 94 of the Building Act, the building owner must obtain protection work insurance and carry out appropriate survey of the adjoining property prior to commencement of work. This protection work notice (Form 3) has been formatted to take into account consideration that needs to be addressed by he owner when building new walls on the boundary. Form 4 Protection Work Response Notice Building Act 1993, Building Regulation 2006, Regulation 602(c), 602 (3) To: (Owner / Agent): (Contact person, phone number, Postal address and postcode) Michael Shaw / Red Textas Consulting Building Surveyors 428a New Street, Brighton VIC 3186 Relevant Building Surveyor: From: (Adjoining owner): (Contact person, phone number, Postal address and postcode) Address building work site Address of my adjoining property: Response In accordance with Section 85 of the Building Act 1993, I hereby respond to the notice served on me by the owner under that section and: (please tick appropriate box) (Please tick box) (i) Agree to the proposed protection work. (ii) Disagree with the proposed protection work for the following reasons: __________________________________________________________________________________________________________ __________________________________________________________________________________________________________ __________________________________________________________________________________________________________ (iii) I request further information: __________________________________________________________________________________________________________ __________________________________________________________________________________________________________ __________________________________________________________________________________________________________ Signature of adjoining owner or agent: …………………………………………………Date:……………………………………………………... Note: Under section 85 of the Building Act 1993, the adjoining owner must respond to a notice under section 84 of that Act by giving to the owner within 14 days of notice under section 85 of that Act:(i) (ii) (iii) agreeing to the proposed protection work; or disagreeing with the proposed protection work; or requiring more information Failure to respond will be taken as agreement to the proposed protection works. In case of (ii) and (iii) above, a copy of the notice under section 85 of that Act must also be given to the relevant building surveyor (see Form 4).