Com4Offshore - ESA`s ARTES Applications

Transcription

Com4Offshore - ESA`s ARTES Applications
05.02.2015
Dr. Stephan Holsten
Com4Offshore – Interactive Communication and Monitoring
System for Offshore Wind Energy
ESA ARTES Applications Workshop 2015, Geneva
The setting
Planned capacity of Offshore Wind in Europe and Germany
 Europe moves towards a fully
decarbonized power system by 2050.
 EU targets renewable energies to
provide 20% of Europe's energy supply
by 2020 (“20-20-20 targets”).
 Offshore Wind Power is a key pillar of
electricity source in the future.
 Offshore Wind Energy is able to
provide base load power.
 The Offshore Wind Energy deployment
has just begun.
„Germanys wind mills produced 9 Billion kWh per
month in December 2014, more than all German
nuclear power plants together in one month in
2013 (8 Billion kWh).“
Der Spiegel (01.01.2015)
© OHB System AG
European Commission (2015): European Atlas of the Seas
http://ec.europa.eu/maritimeaffairs/atlas/maritime_atlas/
2
Contact: Dr. Stephan Holsten - Email: [email protected]
Offshore Wind Market
Dimensions of the market
 Investment costs per wind park (80 x 5 MW turbines):
ca. 1.5 billion €
 Construction time: ca. 2 years per wind park
 Daily charter rates:
up to 100,000 – 250,000 € per vessel
 Over 20 vessels of various types can be located
simultaneously within the wind park
 Several hundred employees are working on different
vessels, installation barges or fixed offshore platforms
User Overview
crew transfer per heli
service engineer
wind park coordination:
- Offshore Construction Manager
- Marine Warranty Surveyor
 Adverse weather and sea state conditions
 Potential savings through reduction of construction time
(improvement of the installation logistics and construction
processes) per wind park:
50 - 75 million €
Source: Fichtner & Prognos (2013): “Cost reduction potential of offshore wind
energy in Germany”
© OHB System AG
3
installation engineer
tug boats
crew transfer per vessel
Guard vessel
cable-laying ship
transportation by ship and bargs
additional user:
- Maritime Rescue Coordination Centre (MRCC)
- Central Command for Maritime Emergencies
Contact: Dr. Stephan Holsten - Email: [email protected]
Availability of satellite communication means
No terrestrial
communication
networks
available
Wind farm areas
during the
GSM/3G
coverage
construction phase.
Wind farm areas (red), GSM/G3 coverage (yellow/orange), German Exclusive Economic Zone (dark blue)
Source: GSMA™, GSM Association, http://maps.mobileworldlive.com/
© OHB System AG
4
Contact: Dr. Stephan Holsten - Email: [email protected]
Main user needs
Information sharing
 Tailored and flexible planning tools
 Delays of single process steps can have effects on the whole
supply chain
 „Who and what is where and when?“
 Optimization of processes by digitalization of operational
procedures and permanent access to information
© Siemens PN201307-07
© OHB System AG
© DPA
© Siemens PN201301-07
5
Contact: Dr. Stephan Holsten - Email: [email protected]
Com4Offshore – ARTES 20 Feasibility Study
Integrated Offshore Communications and Business Support Services
 Satellite based public service (“Hot-Spot“) supporting the communication needs of the different user
groups in offshore wind farm areas
 Providing technically and economically optimal solution to the users irrespective of their location by
combining wireless, mobile and satellite network technologies.
 Access communications services, sensor devices & software applications for offshore construction
activities
GEO satellites
Ku-/Ka-Band
1 - 100 Mbit/s
Logistics Support
Services
- Planning
- Monitoring
- Operations
© OHB System AG
Surveying Data Services
6
Contact: Dr. Stephan Holsten - Email: [email protected]
Com4Offshore ARTES 3-4 Demonstration Project
Overall Goal:
Establishing Com4Offshore as Service Provider
for Integrated Offshore Solutions
 Communication Services
 Approx. 40 vessels already
equipped with partner´s Satcom
solution
 Business Support Services
 Prototype for mobile devices for
daily reporting and situational
awareness dashboard already
tested in offshore environment
© Global Tec 1
 Logistics Support Services
 Partner already involved in the
supply chain management of
current construction projects
© OHB System AG
© MediaMobil
7
© Global Tec 1
Contact: Dr. Stephan Holsten - Email: [email protected]
The Team
Associated Partner:
Co-funded by:
Many thanks for your attention!
© OHB System AG
8
Contact: Dr. Stephan Holsten - Email: [email protected]