Unparalleled sector leadership West Angelas
Transcription
Unparalleled sector leadership West Angelas
Unparalleled sector leadership West Angelas James Petty General manager– West Angelas Operations Financial community visit 8 June 2011 Safety is our core business value Please observe the following rules during your visit: • • • • • Follow the advice of your tour guide; visitors are to be escorted at all times When advised, wear: safety glasses, hard helmet, reflective vest Wear seat belts when provided No smoking inside buildings or vehicles Jewellery not permitted to be worn on site i.e. rings, earrings (except for studs) In an Emergency, your tour guide will lead you to the nearest Muster Point 2 Pilbara operations: mines, rail network and ports Cape Lambert Dampier 80 Mt/a 145 Mt/a Dampier Mesa A Mesa J Robe Valley ~30 Mt/a Nammuldi ~5 Mt/a Brockman #2 Marandoo ~8 Mt/a Brockman #4 ~22 Mt/a ~15 Mt/a S10 Yandicoogina ~52 Mt/a Hope Downs 1 Mt Tom Price ~30 Mt/a ~28 Mt/a Paraburdoo Eastern Range PCE ~22 Mt/a West Angelas Channar ~29 Mt/a ORE-TYPE Brockman Marra Mamba Pisolite 3 The people of West Angelas • • • • • • • 11% Aboriginal employment 12% female employment Engagement of Traditional Owners – road/village maintenance Successful Work Ready Program – hired 10 people Two Rio Tinto Indigenous mentors on site First Indigenous Family Day Cultural awareness training for West Angelas from the Gobawarrah Mindurarra Yinhawanga communities Source: Truckloads of joy as families drop in (2010, May 19), The West Australian, p.11. 4 Operations overview Village • • • • Fly-in / fly-out operation 1041 room village – ~750 Rio Tinto, ~200 contractors, ~100 project/shutdown Swimming pool, cricket nets, tennis court, gymnasium Wet mess / dry mess Equipment Haul trucks • 10 x 730E Komatsu (190t) trucks • 28 x 830E Komatsu (220t) trucks • 5 x 930E Komatsu Autonomous trucks Loading units • 4 x excavators, 2 x shovels 5 • 5 x loaders West Angelas: close-up aerial photograph of plant area Rail Loop Administration Buildings & HME Workshop Process Plant & CV 50 Stockyard North Waste Dump West Pit North West Pit South (AHS Mining Area) Centre Pit North Centre Pit South South Waste Dump 6 Site production performance Performance was impacted by extremely wet weather in Q1 Total Material Moved Saleable Ore Production (Mt, 12 months to May 2011) (Mt, 12 months to May 2011) 3 12 10 2 8 6 1 4 2 - May-11 Apr-11 Mar-11 Feb-11 Jan-11 Dec-10 Nov-10 Oct-10 Sep-10 Aug-10 Jul-10 Jun-10 May-11 Apr-11 Mar-11 Feb-11 Jan-11 Dec-10 Nov-10 Oct-10 Sep-10 Aug-10 Jul-10 Jun-10 0 7 Technology – Autonomous Trucks Partnership to develop the Autonomous Haulage technology with Komatsu Project objective: • Rio Tinto’s ‘Mine of the Future™’ programme – explore and develop the use of Autonomous haulage technology in mining operations Progress: • AHS operations successfully deployed in to different mining areas to support West Angelas production plan • All project milestones were met, with Phase 1 being successfully completed in August 2010 Next Steps: • Phase II is currently being implemented – doubles the number of trucks to 10 – a fully automated haulage system in the Junction South East pit at 8 Yandicoogina Technology - Automated Drills Project objective: • Single operator capable of controlling multiple drill rigs remotely from Perth • Consistency in drilling outcomes and drill utilisation • Reduce training time to become expert operators • Flexible operator assignment between operations Progress: • Currently 3 drills commissioned and under trial • Autonomous Control Vehicle (multiple drill command centre) in operation on site • Multiple autonomous rig drilling system to be commissioned and operational during 2011 Next steps: • Phase II planning is underway 9 Summary • • • • Safety is our core business value Experienced, diverse team capable of continuing to deliver tonnes Significant ore reserves exist for future development Making technology work 10 Enjoy a safe visit to West Angelas 11