May 2013 - Big Tree Outdoor
Transcription
May 2013 - Big Tree Outdoor
May 2013 BIG FESTIVE SALE 2013 2013 July Ramadan 10 July – 7 Aug Aug Sept Oct Nov Hari Raya Malaysia Day Hari Raya Haji Deepavali & School Holiday Begins 8 & 9 Aug 16 Sept 15 Oct 2 Nov & 16 Nov onwards The campaign period starts from Ramadan 2013 stretching all the way to Deepavali 2013 – covering all major festivities & holidays FESTIVE TRAFFIC AT NORTH-SOUTH EXPRESSWAY NORTH-SOUTH EXPRESSWAY 1040 Savings RM 100,781 1.4 x ROI Value-Add Package 1040 x 5 sites Freeway Coverage Northern – 13 sites Southern – 7 sites Media No. of Sites Rental (RM) 6% GST (RM) Production (RM) 137,850 8,271 60,000 46,000 2,760 20,000 TOTAL (RM) 183,850 11,031 2013 FESTIVE RATE (RM) 125,000 7,500 Display Size Duration (mths) Lighting (RM) Total (RM) N/A 274,881 80,000 N/A 274,881 41,600 N/A 174,100 COMMENCEMENT: 1 July 2013 to 30 November 2013 (5 months) North-South Expressway 15 10ft x 40ft Value-Add 10ft x 40ft Billboards 5 10ft x 40ft 5 months TOTAL SAVINGS (RM) 100,781 NORTH SOUTH EXPRESSWAY 1040 State Site No Location Add Size Available NORTH PS1000 KM125.25 (nb-offside) Ladang Bertam I/C - Sg. Petani Selatan I/C 10x40 01/07/2013 NORTH PS0794 KM344.20 (nb) Sungkai I/C-Bidor I/C 10x40 03/08/2013 NORTH PS1025 KM338.95 (nb) Bidor I/C - Tapah I/C 10x40 01/07/2013 NORTH PS0565 KM384.10 (nb) Behrang - Slim River 10x40 01/07/2013 NORTH PS1041 KM404.0 (nb-offside) Lembah Beringin I/C - Tanjung Malim I/C 10x40 01/07/2013 NORTH PS1051 KM420.55 (nb-offside) Lembah Beringin I/C - Bukit Beruntung I/C 10x40 01/07/2013 NORTH PS1140 KM438.5 (sb-offside) Bukit Beruntung I/C - Rawang I/C 10x40 01/07/2013 NORTH PS1028 KM402.60 (sb) Slim River I/C – Behrang I/C 10x40 01/07/2013 NORTH NSH-061 KM224.50 (sb-offside) Perspg Changkat Jering menuju ke Perspg Kuala Kangsar 10x40 01/07/2013 NORTH PS1017 KM209.7 (sb) Taiping I/C - Changkat Jering I/C 10x40 01/07/2013 NORTH PS0798 KM128.70 (sb) Ladang Bertam I/C - Sg. Dua I/C 10x40 01/07/2013 NORTH PS0265 KM128.70 (sb) Ladang Bertam I/C - Sg. Dua I/C 10x40 01/07/2013 NORTH PS0980 KM76.60 (sb) Pendang-Gurun 10x40 01/07/2013 SOUTH PS0349 KM137.80 (nb) Yong Peng Utara I/C-Pagoh I/C 10x40 01/07/2013 SOUTH PS0607 KM38.20 (nb) Kulai I/C to Sedenak I/C 10x40 01/07/2013 SOUTH PS0614 KM17.30 (sb) Senai I/C - Skudai I/C 10x40 01/07/2013 SOUTH PS0963 KM132.06 (sb) Pagoh - Yong Peng Utara 10x40 01/07/2013 SOUTH PS0577 KM113.80 (sb) Pagoh - Yong Peng Utara 10x40 02/08/2013 SOUTH LK0052 KM24.55 (sb) Linkedua - Tuas 10x40 01/07/2013 SOUTH LK0056 KM26.9 (nb) Gelang Patah - Senai 10x40 01/07/2013 # all sites listing are subject to changes NORTH-SOUTH EXPRESSWAY 2060 Savings RM 96,373 1.3 x ROI Freeway Coverage Northern – 3 sites Central – 3 sites Southern – 3 sites East – 1 site Media No. of Sites Duration (months) Rental (RM) 6% GST (RM) Production (RM) Lighting (RM) Total (RM) 5 months 167,333 10,040 120,000 12,000 ( 2 sites) 309,373 TOTAL 167,333 10,040 120,000 12,000 309,373 2013 FESTIVE RATE (RM) 132,500 7,950 62,550 10,000 213,000 Display Size COMMENCEMENT: 1 July 2013 to 30 November 2013 (5 months) • • • • NSE –Northern x 3 NSE -Southern x 3 Central x 3 East Coast x 1 10 20ft x 60ft TOTAL SAVINGS (RM) 96,373 NORTH-SOUTH EXPRESSWAY 2060 State Site No Size Lighting Available NORTH PS0484 KM414.80 (nb) Rawang I/C - Tanjung Malim I/C 20x60 No Immediate NORTH PS0426 KM1.10 (sb) Bukit Kayu Hitam-Jitra Utara 20x60 No Immediate NORTH PS0440 KM102.60 (sb) Sg. Petani Utara I/C - Sg. Petani Selatan I/C 20x60 No Immediate CENTRAL GT0015 KM18.8 (nb) Guthrie Highway 20x60 No Immediate CENTRAL EL0144 KM25.30 (sb) Dari persimpangan Putrajaya menuju ke persimpangan KLIA 20x60 Yes Immediate CENTRAL PS0722 KM15.35 (sb-offside) Dari Persimpangan DamansaraPersimpangan Subang 20x60 No Immediate SOUTH SEL-165 KM296 (sb) 'Kg. Teras Jernang/KL-Seremban H`way/Bangi 20x60 Yes Immediate SOUTH PS0360 KM148.10 (sb) Tangkak I/C - Pagoh I/C 20x60 No Immediate SOUTH BGT-073 Kampung Teras Jernang/KL-Seremban Highway 20x60 No Immediate EAST BT0380 KM97.50 (eb) Lebuhraya Pantai Timur 20x60 No Immediate Location Add NORTH-SOUTH EXPRESSWAY OHB Media No. of Sites Savings RM 108,273 1.4 x ROI Rental (RM) 6% GST (RM) Production (RM) Lighting (RM) Total (RM) 167,333 10,040 98,400 22,500 (3 sites) 298,273 TOTAL (RM) 167,333 10,040 98,400 22,500 298,273 2013 FESTIVE RATE (RM) 106,000 6,360 58,890 18,750 190,000 Display Size Duration (mths) COMMENCEMENT: 1 July 2013 to 30 November 2013 (5 months) • Kepala Batas (JKR0033) • Sg Petani Selatan (JKR0442) • Bukit Tagar (PS0913) • Ayer Keroh (BT0438) • Yong Peng Selatan (PS0364) 5 Various 5 months TOTAL SAVINGS (RM) 108,273 NORTH-SOUTH EXPRESSWAY OHB State Site No NORTH JRK0033 NORTH Location Add Display Size Lighting Available KM39.45 Di Jejambat dari persimpangan Kepala Batas menuju ke persimpangan Alor Setar Utara 7x120x2p No 15/05/2013 JKR0442 KM112.40 Sg. Petani Selatan I/C - Ladang Bertam I/C 7x120x2p Yes Immediate NORTH PS0913 KM419.55 Bukit Tagar I/C 10x120x2p No 15/05/2013 SOUTH BT0438 KM184.80 Ayer Keroh I/C - Jasin I/C 10x120x2p Yes 01/07/2013 SOUTH PS0364 KM94.50 Yong Peng Selatan I/C 7x120x2p Yes 01/07/2013 KLANG VALLEY METRO OHB Media No. of Sites Savings RM 83,770 1.4 x ROI Rental (RM) 6% GST (RM) Production (RM) Lighting (RM) Total (RM) 5 months 157,000 9,420 42,850 22,500 (4 sites) 231,770 TOTAL (RM) 157,000 9,420 42,850 22,500 231,770 2013 FESTIVE RATE (RM) 94,000 5,640 26,560 21,800 148,000 Size Duration (mths) COMMENCEMENT: 1 July 2013 to 30 November 2013 (5 months) • Jln Damansara/ SPRINT (SP/OHB/13-2) • East West Link/ Mid Valley (BT0479) • Salak Selatan (BT0473) • Jln Pudu/ Jln Tun Perak (ST0544/45) • Ampang Point (PL0013) 5 Various TOTAL SAVINGS (RM) 83,770 KLANG VALLEY METRO OHB Site No SP/OHB/13-2 #BT0479 BT0473 # ST0544/45 PL0013 Location Add Display Size Lighting Available 10x125x1p Yes Immediate East West Link/ Tmn Desa menuju ke Mid Valley Megamall 7x45x1p No Immediate Besraya Highway, Salak Selatan menuju ke KL 6x100x2p Yes Immediate Jalan Pudu/ Jln Tun Perak 6x80x2p Yes Immediate Jalan Ampang menuju ke Ampang Point 7x80x1p Yes Immediate KM2.6, Jln Damansara/ TTDI Bypass (KL to PJ view) # protrusions not permissible KLANG VALLEY 1040 Savings RM 93,700 1.4 x ROI Media No. of Sites Display Size Duration (mths) Rental (RM) 6% GST (RM) Production (RM) Lighting (RM) 120,000 7,200 32,000 7,500 (4 sites) Total (RM) COMMENCEMENT: 1 July 2013 to 30 November 2013 (5 months) KLANG VALLEY Value-Add • 10ft x 40ft Billboards • Lightbox @ KLCAT 8 10ft x 40ft 5 months 2 4 10ft x 40ft 6ft x 4ft 241,700 60,000 3,600 11,400 N/A TOTAL (RM) 180,000 10,800 43,400 7,500 241,700 2013 FESTIVE RATE (RM) 110,000 6,600 24,150 7,250 148,000 TOTAL SAVINGS (RM) 93,700 KLANG VALLEY 1040 State Site No KEPONG 11-1014-6-96s DAMANSARA SP/96s/11-3 SETAPAK Location Add Size Lighting Available On Sides of OHB at Jln Sg. Buloh/Jln Kepong,near Kompleks Desa-Site 6 10x40 Yes 15/05/2013 At the OHB, KM0.55, Kayu Ara Intersection (Damansara Jaya), Sprint 10x40 Yes Immediate UP0133 Jalan Usahawan/ Jalan Usahawan 5, Setapak 10x40 No 15/05/2013 KUCHAI LAMA BT0490 Di laluan alternatif Jln Kuchai Lama ke Jln Kelang Lama 10x40 No Immediate SHAH ALAM UP0044 Jalan Subang / Jalan Kerjaya, Shah Alam 10x40 No 15/05/2013 KUALA LUMPUR WGT-124 Jln Maharajalela/Jln Syed Sulaiman, Kuala Lumpur 10x40 Yes 15/05/2013 MRR2 UP0131 Jalan Genting klang / Lebuhraya Lingkaran Tengah II 10x40 No 15/05/2013 PUCHONG BT0492 Jalan Puchong/ Jalan Kinrara, Puchong 10x40 No 15/05/2013 WANGSA MAJU UP0564 Jalan 34/26 / Jalan 42/26 berhampiran Rampai Court, Wangsa Maju 10x40 No Immediate KLANG BT0466 Prsn Jln Pekan Baru / Jln Kawasari 6 berhampiran SK(1) Jln Batu Tiga Klang 10x40 Yes 01/06/2013 REGIONAL 1040 Main Market Centres Northern – 4 sites Central – 6 sites Southern – 2 sites East – 2 sites Savings RM 211,030 1.5 x ROI Other Towns Northern –2 sites Southern –2 sites East –2 sites Media No. of Sites Display Size Duration (mths) Rental (RM) 6% GST (RM) Production (RM) Lighting (RM) Total (RM) COMMENCEMENT: 1 July 2013 to 30 November 2013 (5 months) Main Market Centres 14 10ft x 40ft 5 months 210,000 12,600 56,000 18,750 (10 sites) 297,350 Other Towns 6 10ft x 40ft 5 months 55,500 3,330 24,000 N/A 82,830 Value-Add • Digital @ KKIA • Digital @ KIA 6 6 Various 5 months 60,000 3,600 8,000 N/A 71,600 TOTAL (RM) 325,500 19,530 88,000 18,750 451,780 2013 FESTIVE RATE (RM) 171,676 10,301 40,023 18,750 240,750 TOTAL SAVINGS (RM) 211,030 REGIONAL 1040 State Site No Location Add Lighting Size Available Yes 10ft x 40ft Immediate No 10ft x 40ft Immediate Jln Air Itam/Before Han Chiang School/Right No 10ft x 40ft Immediate Pasir Puteh/Jln Leong Boon Swee, Perak Yes 10ft x 40ft 15/05/2013 Jln Sg Buloh/Junction to Bandar Utama, Kuala Lumpur No 10ft x 40ft 15/05/2013 MAIN MARKET CENTRES Simpang Jalan Tuanku Abd Rahman Putra & Jalan Pekan Melayu, Alor Setar Di Jalan Masjid dekat stesen kecil TNB dan Kompleks Cayman City Point, Sg Petani KDH UP0204 KDH UP0217 PEN PP-067 PRK PRK-034 WP KL-099 WP WGT-124 Jln Maharajalela/Jln Syed Sulaiman, Kuala Lumpur Yes 10ft x 40ft 01/07/2013 SGR KUR0077 On Sides of OHB at Jln Sg. Buloh/Jln Kepong,near Kompleks Desa-Site 3 Yes 10ft x 40ft Immediate SGR KUR0079 On Sides of OHB at Jln Sg. Buloh/Jln Kepong,near Kompleks Desa-Site 5 Yes 10ft x 40ft 15/05/2013 SGR KUR0087 Jln Utara (near FINAS & Sek. Rendah Sri Petaling) Site 1 Yes 10ft x 40ft Immediate SGR KUR0101 Yes 10ft x 40ft Immediate JHR UP0274 Yes 10ft x 40ft 15/05/2013 JHR UP0272 Yes 10ft x 40ft 15/05/2013 PHG CGT-052 Persimpangan Jln Sultan Abu Bakar ke Kuantan/Kanan No 10ft x 40ft 15/05/2013 PHG UP0320 Di Persimpangan Jalan Mahkota/ Jalan Merdeka, Kuantan Yes 10ft x 40ft 15/05/2013 Jln Kerjaya near Orchid Farm & slip road towards Jln Subang (Glenmarie) Tepi Jln Yahya Awal Berhampiran Taman Rekreasi Hutan Bandar, Johor Bahru Persimpangan Jln Abad/Jln Kebun Teh Lama berdekatan RISDA, Johor Bahru # all sites listing are subject to changes REGIONAL 1040 State Site No Location Add Lighting Size Available No 10ft x 40ft Immediate No 10ft x 40ft 15/05/2013 OTHER TOWNS Per Jln Siakap berhpr Kompleks Sukan Sony Seberang Jaya menuju ke Pusat Bdr Butterworth Jalan Slim River- Tg Malim Berhampiran Kawasan Rawat Dan Rehat, Slim River PEN PP-084 PRK UP0196 JHR UP0287 KM9, Jalan Besar Batu Pahat ke Muar/ Kg. Bagan, Batu Pahat No 10ft x 40ft 15/05/2013 JHR UP0297 Jalan Besar Sp. Renggam- Johor Bahru berhampiran AW Pottery, Simpang Renggam No 10ft x 40ft 15/05/2013 PHG UP0333 Berhampiran SHELL, jalan besar Karak ke Kuantan, Mentakab No 10ft x 40ft 15/05/2013 PHG UP0360 Simpang Empat, Jalan Besar Kampung Raja, Besut No 10ft x 40ft Immediate No Various Immediate Value Add KK KUCHING - • • Digital @ KKIA Digital @ KIA # all sites listing are subject to changes SPECTACULAR Media Savings RM 299,551 1.4 x ROI No. of Sites Display Size Duration (mths) Rental (RM) 6% GST (RM) Production (RM) Lighting (RM) Total (RM) COMMENCEMENT: 1 July 2013 to 30 November 2013 (5 months) • Ipoh (AGT-146) • KLIA (EL0171) • JB (PS0922) 3 60ft x 40ft 5 months 412,501 24,750 128,000 45,000 610,251 Value-Add – KJ LINE • BULKHEAD @ KL Sentral • ADTRACK @ KLCC, M.Jamek 1 2 12ft x18ft 5ft x10ft 5 months 75,000 4,500 11,600 N/A 91,100 TOTAL(RM) 487,501 29,250 139,600 45,000 701,351 2013 FESTIVE RATE (RM) 264,000 15,840 81,960 40,000 401,800 TOTAL SAVINGS (RM) 299,551 SPECTACULAR Site No Display Size Lighting Available NSE/ Ipoh – Tambun Farm, Perak 20xx80x2p Yes Immediate EL0171 KM A4.55(nb) Lebuhraya ELITE 60x40x2p Yes Immediate PS0922 KM4.8 (sb) Plaza Tol Kempas – Skudai I/C, Johor Bahru 60x40x2p Yes 01/07/2013 12ft x18ft 5ft x10ft N/A Immediate AGT-146 Location Add Value-Add - • • BULKHEAD @ KL Sentral ADTRACK @ KLCC, M.Jamek GO DYNAMIC Festive season – targeting the ‘Balik Kampung’ crowds, travelers, shoppers & commuters High Penetration, prompting purchases and creating buzz East Malaysia Airport – more than 10mil ‘Balik Kampung’ travelers during the festive period Digital Network– innovative and creative messages enable to grab full attention from the public across all platform Klang Valley– Increase brand awareness during the busiest period around town during this festive month GO DYNAMIC DIGITAL @ TRANSIT DIGITAL @ KLCC & THE CURVE DIGITAL @ KKIA & KIA GO DYNAMIC – INVESTMENT SUMMARY Media No. of Sites Duration (mths) Size Rental (RM) 6% GST (RM) Production (RM) Lighting (RM) Total (RM) 24,540 (Digital Content & System Mngt) N/A 445,540 COMMENCEMENT: 1 July 2013 to 30 November 2013 (5 months) Kelana Jaya & Ampang Line 9 various 165,000 12,000 Suria KLCC Escalator Lobbies (14 units) & The Curve Retail Floor (10 units @ 5 standee) 24 various KKIA & KIA Baggage Halls (16 units) 16 63” 5 mths 144,000 100,000 TOTAL (RM) 409,000 24,540 12,000 N/A 445,540 2013 FESTIVE RATE (RM) 200,000 12,000 0 N/A 212,000 SAVINGS (RM) 233,540 * Production does not include Content Development (RM4,000 per content/RM8,000 for Cubig) GO DYNAMIC (SHOPPING DEAL) CUBIG DIGITAL SERIES KLCC & THE CURVE Located within the landmark Twin Towers, it is easily accessible through the LRT and main roads like Jln Tun Razak and Jln Ampang Approximately 3,500,000 traffic count per month Located in the affluent residential and commercial development within Mutiara Damansara . Walk-in traffic approx. 2.2 million a month GO DYNAMIC (SHOPPING DEAL) – INVESTMENT SUMMARY Media No. of Sites Duration (mths) Size Rental (RM) 6% GST (RM) Production (RM) Lighting (RM) Total (RM) 23,640 (Digital Content & System Mngt) N/A 429,640 COMMENCEMENT: 1 July 2013 to 30 November 2013 (5 months) Cubig Digital Series @ Bukit Bintang Suria KLCC Escalator Lobbies (14 units) & The Curve Retail Floor (10 units @ 5 standee) 3 various 5 mths 24 12,000 250,000 various 144,000 TOTAL (RM) 394,000 23,640 12,000 N/A 429,640 2013 FESTIVE RATE (RM) 245,000 14,700 8,300 N/A 268,000 SAVINGS (RM) 161,640 * Production does not include Content Development (RM4,000 per content/RM8,000 for Cubig) TRANSIT & SHOPPING MALL KELANA JAYA LINE AMPANG LINE SURIA KLCC KELANA JAYA LINE & AMPANG LINE - Targeting more than 9.98 million commuters per month, high recall rate advertising SURIA KLCC - Approximately 3.5 million traffic count per month, Shoppers are affluent professionals with an average income of RM 7,00 Media No. of Sites Size Duration (mths) Rental (RM) 6% GST (RM) Production (RM) Lighting (RM) Total (RM) 24,300 43,850 2,000 475,150 COMMENCEMENT: 1 July 2013 to 30 November 2013 (5 months) Transit Kelana Jaya & KL Sentral VLB 25 units 5ft x 3ft Transit Ampang Line Horizontal Panels 25 units 5ft x 10ft Shopping Malls KLCC, The Curve, The Spring, Alamanda 4 units (1 mall x 1 unit) 5ft x 3ft 187,500 5 mths 187,500 30,000 TOTAL (RM) 405,000 24,300 43,850 2,000 475,150 2013 FESTIVE RATE (RM) 200,000 12,000 38,000 FOC 250,000 SAVINGS (RM) 225,150 KLANG VALLEY PACKAGE ( JLN BANGSAR & AKLEH) Value-Add Package Lightbox @ AKLEH Jalan Bangsar is well-known for its affluent residential suburb surrounded by commercial buildings, F&B outlets, shopping malls with a private hospital nearby as well . Traffic count: 1.4 million. AKLEH links the affluent highdensity population of Ampang to Jalan Sultan Ismail, the heart of the golden triangle in downtown KL. Traffic count: 1.8 million Media No. of Sites Rental (RM) 6% GST (RM) Production (RM) Lighting (RM) Total (RM) 112,500 5,280 32,000 N/A 125,280 16,800 432 6,000 N/A 23,808 TOTAL (RM) 129,300 7,758 38,000 N/A 149,088 2013 FESTIVE RATE (RM) 82,200 4,932 37,088 N/A 111,500 Duration (mths) Size COMMENCEMENT: 1 July 2013 to 30 November 2013 (5 months) Pillar Wrap – Jln Bangsar (SectionA) Value-Add Lightbox – AKLEH (PL0049 – PL0060) 5 Various 5 mths 12 6ft x 4ft SAVINGS (RM) 37,588 GO KUCHING • • • Spectacular OHP: Creating a stand separating you from the clutter. Good for branding exercise, creating the image of an industry leader. Double-sided OHP welcomes all that arrives and bid farewell to those that are leaving Kuching. An iconic landmark once you arrive in Kuching. Digital Screens: after Immigration Halls (Arrival) Media No. of Sites Rental (RM) 6% GST (RM) Production (RM) Lighting/C M (RM) Total (RM) 210,000 12,600 26,000 7,500 256,100 50,000 3,000 4,000 4,240 61,240 TOTAL (RM) 260,000 15,600 30,000 11,740 317,340 2013 FESTIVE RATE (RM) 146,000 8,760 25,740 7,500 188,000 Duration (mths) Size COMMENCEMENT: 1 July 2013 to 30 November 2013 (5 months) Spectacular OHP / Arch– Jln Lapangan Terbang Digital Screens – After Immigration Hall (Arrival) 1 OHP 6 screens 10’ x 100’ (2sided) 5 mths 50” vertical SAVINGS (RM) 129,340 GO KOTA KINABALU • • External Pillar Wraps: Your ad welcomes all while queuing up for taxi and/or pick up point (Arrivals). Visible from the new wing retail shops. Average waiting time of 15 minutes (depending on traffic). Digital Screens: in waiting halls and also free-duty shopping area (Departures). Media No. of Sites Rental (RM) 6% GST (RM) Production (RM) Lighting/CM (RM) Total (RM) 50,000 3,000 17,500 N/A 70,500 50,000 3,000 4,000 4,240 61,240 TOTAL (RM) 100,000 6,000 21,500 4,240 131,740 2013 FESTIVE RATE (RM) 60,000 3,600 17,500 4,240 85,340 Duration (mths) Size COMMENCEMENT: 1 July 2013 to 30 November 2013 (5 months) External Pillar Wrap – Public Concourse, Arrival 5 pillars Digital Screens – In Waiting Halls, Departure 10 screens 15’ x 12’ 5 mths 50” vertical SAVINGS (RM) 46,400 NOTES TO ADVERTISER: • “Big Festive Sale 2013” is valid for incharge date not later than 15 July 2013. • Availability of sites/packages are based on first come first serve basis and subject to confirmation at the time of booking. • Big Tree reserves the right to offer alternative media as value-add in the event of non-approval from the authorities or non-availability of media at time of booking. • Package rate is not applicable for renewal/extension. Renewal will be based on new rate. • Production cost is based on inkjetprint and does not include special effects/protrusions. Additional cost shall apply for such design. Inkjetprint materials can last for period of 8-10 months. Payment Terms • Rental & Lighting – Two (2) equal payments in advance. • Production – 1st 50% prior to commencement of production, balance payable upon installation. • Big Tree reserves the right to vary terms and conditions.
Similar documents
Raya Package 15 May 14.pptx
Vertical Light Box @Alamanda & Curve Value Add Vertical Light Box @ KJ Line
More information