Spanish demo
Transcription
Spanish demo
COAATIEM-Colegio Oficial de Aparejadores y Arquitectos Técnicos de Madrid 26th February 2015, Madrid Spanish demo building Jose Manuel Tofiño Arrogante Alberto Toledo Corral EASEE Retrofitting DEMOS Gdansk (Poland) Milan (Italy) Madrid (Spain) Meeting, Madrid, February, 25th-26th , 2014 Spanish DEMO Building • • • • Located in Batres (Madrid) Ownership: mid-age Spanish family Construction period: 60s External opaque envelope: o 1 foot brick wall o Outer surface revoked with Tyrolean plaster o Inner surface revoked with gypsum plaster U-value of opaque envelope: 1,88 W/m2K COAATIEM-Colegio Oficial de Aparejadores y Arquitectos Técnicos de Madrid 26 February 2015, Madrid Survey of the Building • The survey of the as-built was devoted to: • derive plans, elevations and sections (2D) • derive a BIM model (3D) • Both 2D and 3D support the design of the retrofitting • Survey strategy: • 3D map of the façade through laser scanning • Superficial measurement of Tª, H and heat flow. • Instruments: • Datalogging with SIM card. • 18 superficial sensors • 3 exterior sensors • 3 interior sensors COAATIEM-Colegio Oficial de Aparejadores y Arquitectos Técnicos de Madrid 26 February 2015, Madrid Survey of the Building • By thermografic infrared imaging cameras we are seeing the homogeneity of the wall and the existence of thermal bridges. • By the BIM methodology we can simulate our house with energy analysis and solar studies. COAATIEM-Colegio Oficial de Aparejadores y Arquitectos Técnicos de Madrid 26 February 2015, Madrid Monitoring façade process_01 The objective is to collect data through out several sensors before and after the retrofitting works we are going to do on a house façade in Madrid. The façade has 24 m2 (8 meters long x 3 meters high). The duration of monitoring will be of 12 months, covering the 4 annual seasons. Data to be measured and collected will be of Humidity, Temperature and heat flow. • Starting from a brick Wall that hasn´t got cavity wall. COAATIEM-Colegio Oficial de Aparejadores y Arquitectos Técnicos de Madrid 26 February 2015, Madrid Monitoring façade process_01 ACTIONS TO DO: 1. To obtain a 3D map of the facade through laser scanning to assess homogeneity of the wall. 2. Superficial measurement of temperature and humidity and heat flow. Measurement the temperature and humidity of the air. COAATIEM-Colegio Oficial de Aparejadores y Arquitectos Técnicos de Madrid 26 February 2015, Madrid Monitoring façade process_01 T0-T8: exterior sup. Wall. T9-T11: exterior Tª. T12-T14: interior Tª T15-T24: interior sup. Wall. COAATIEM-Colegio Oficial de Aparejadores y Arquitectos Técnicos de Madrid 26 February 2015, Madrid Monitoring façade process_02 ACTIONS TO DO: 1. Construction the cavity Wall by dry thin partitions, type knauf or pladur. 2. Superficial measurement of temperature, humidity and heat flow. We want to keep the sensor inside the cavity wall to evaluate the performance when the rest of elements will be added. 3. Stuff the cavity Wall by perlite filler. 4. Superficial measurement of temperature, humidity and heat flow. COAATIEM-Colegio Oficial de Aparejadores y Arquitectos Técnicos de Madrid 26 February 2015, Madrid Monitoring façade process_02 • Cavity wall performance and • Injection of perlite filler within the cavity. COAATIEM-Colegio Oficial de Aparejadores y Arquitectos Técnicos de Madrid 26 February 2015, Madrid Monitoring façade process_02 T0-T8: exterior sup. Wall. T9-T11: exterior Tª. T12-T14: interior Tª T15-T24: interior sup. Wall. COAATIEM-Colegio Oficial de Aparejadores y Arquitectos Técnicos de Madrid 26 February 2015, Madrid Monitoring façade process_02 T0-T8: exterior sup. Wall. T9-T11: exterior Tª. T12-T14: interior Tª T15-T24: interior sup. Wall. COAATIEM-Colegio Oficial de Aparejadores y Arquitectos Técnicos de Madrid 26 February 2015, Madrid Monitoring façade process_03 ACTIONS TO DO: EXTERIOR PARTITION WITH INSULATION PANELS 1. 2. Exterior partition with insulation panels. Superficial measurement of temperature, humidity and heat flow (all even inside the cavity Wall). COAATIEM-Colegio Oficial de Aparejadores y Arquitectos Técnicos de Madrid 26 February 2015, Madrid Monitoring façade process_03 EXTERIOR PARTITION WITH INSULATION PANELS - Study of different solutions: COAATIEM-Colegio Oficial de Aparejadores y Arquitectos Técnicos de Madrid 26 February 2015, Madrid Monitoring façade process_03 EXTERIOR PARTITION WITH INSULATION PANELS - Final solution: COAATIEM-Colegio Oficial de Aparejadores y Arquitectos Técnicos de Madrid 26 February 2015, Madrid EASEE THANK YOU COAATIEM-Colegio Oficial de Aparejadores y Arquitectos Técnicos de Madrid 26 February 2015, Madrid