School Facility and Site Information Manual
Transcription
School Facility and Site Information Manual
School Facility and Site Information Manual FIRST EDITION JUNE 30, 2011 TABLE OF CONTENTS • Introductory Section • District Information Summary……………………………….……… 1 • Elementary Schools • Academy Endeavour…………………….………………………….… 3 • Academy International……………………………………………….. 6 • Antelope Trails……………………………………………………….. 9 • Chinook Trails…………………..…………………………………… 12 • Douglass Valley………………………………………………………. 14 • Edith Wolford…………………..……………………………………. 17 • Explorer………………………………………………………………. 20 • Foothills………………………………………………………………. 23 • Frontier……………………………….……………………………….26 • High Plains………………………...…………………………………. 29 • Mountain View………………………………………………………. 32 • Pioneer ……………………………….………………………………. 34 • Prairie Hills……………………..……………………………………. 37 • Ranch Creek…………………………………………………………. 40 • Rockrimmon…………………………………………………………. 42 • School in the Woods…………………………………………………. 45 • The Da Vinci Academy………………..……………………………. 48 • Woodmen Roberts……………………..……………………………. 50 • Middle Schools • Challenger………………………………..……………………………. 53 • Eagleview………………………………..……………………………. 56 • Mountain Ridge……………..…………..……………………………. 59 • Timberview………………………..……..……………………………. 62 • High Schools • Air Academy……………………………..……………………………. 65 • Aspen Valley……………………………..……………………………. 68 • Liberty…………………………………………………………………. 71 • Pine Creek………………………………..…………………………….74 • Rampart………………………………….……………………………. 77 • Combination School • Discovery Canyon……………………..…..…………………………. 81 • Appendix • District Wide Repairs and Enhancements………………………….. 83 Introduction Academy School District Twenty Facility and Site Information Manual Summary The Facility and Site Information Manual was developed to provide administration as well as community members useful site history and current operational activities within the schools. This is the first edition of a site document of this nature. It is the districts intent to build on this document going forward with revision and future editions. The District The district, which is a fiscally independent unit of government, is served by a five member Board of Education and a United States Air Force Academy liaison. The Board serves as the taxing authority, contracting body, policy maker, and ensures that all general laws of the State of Colorado are followed in expenditures of the district’s tax dollars and approves the annual adoption and appropriation resolution of the budget. The Board is empowered to employ a chief executive officer, the Superintendent, who is responsible to the Board of Education for the daily operations of the district. The district was established in 1957 and is organized under the constitution of the State of Colorado. Under such laws, there is no authority for a school district to have a charter or to adopt local laws. The legislative power of the district is vested in the Board of Education, consisting of five members elected at large for staggered four-year terms. To provide guidance for decision making and define the purpose, Academy School District 20 operates in accordance with the following statement: The mission of Academy School District 20 is to educate every student in a safe and nurturing environment and to provide comprehensive, challenging curricular and extracurricular opportunities that meet the unique needs of every individual by expanding interests, enhancing abilities, and equipping every student with the knowledge, skills and character essential to being a responsible citizen of our community, our nation and the world. WE BELIEVE: • • • • • • • • • • • An educated citizenry is the cornerstone of a democratic republic. Every individual has innate worth and is entitled to be treated with respect. Learning is a lifelong endeavor. Every individual can learn and does so in a variety of ways. The education of each student is a responsibility shared by students, families, schools, and communities. Parents have both the right and the responsibility to choose the school, curriculum, and program(s) that best meet the needs of their student(s). The development of virtuous character is equal in importance to academic growth and critical to developing responsible citizens of our community, our nation, and the world. Whether in the classroom or at home, students achieve best in a nurturing environment where physical, intellectual, and emotional health is emphasized and safety is assured. Students must be held to the highest standards of academic achievement while recognizing the true success of our academic program is measured by the success of each student relative to his or her unique potential and individual progress. Every graduate must be fully prepared for the post-graduation path of his or her choice. Every student, staff member, and volunteer is responsible for the effective and efficient use of supplies, facilities, and financial resources. ASD20 - Facility and Site Manual 1 June 2011 The district is located approximately 5 miles north of downtown Colorado Springs, El Paso County, Colorado. It covers an area of approximately 130 square miles, which includes the United States Air Force Academy. The city has experienced continued growth since 1990, which has increased the population. According to a City of Colorado Springs 2010 estimate the population is 418,076, the second largest city in the state of Colorado second only to Denver. During the same period, the population of El Paso County has increased, according to the U.S. Census Bureau, to an estimated 2010 total of 622,371. During the 2010-2011 school year, the district served 21,888.5 full-time equivalent students. These students were housed in 18 elementary schools, 4 middle schools, 4 high schools, an alternative middle school program, an alternative high school, one K-12 campus and one K-12 charter school spread over 3 campuses. The district is anticipating serving a total of 22,115.5 full-time equivalent students during the 2011-2012 school year. Services and Programs Provided The district provides a wide variety of educational and support services to meet the needs of the children of the district and the requirements of the State of Colorado. These services include, but are not limited to, vocational programs, post secondary classes, High Trails outdoor education, programs for the talented and gifted, English as a second language, educational programming for expelled students, summer school remedial and enrichment opportunities, and services for special needs students. In addition a Home School Academy and an On-line High School were added in 2008-2009 with great success and continue to grow enrollment. The two programs expected to increase again for 2011-2012. More detailed information may be obtained by contacting the district’s Central Registry Office. Academy School District offers an extensive choice program that is open to students within as well as outside of the district. Choice schools offer programs or opportunities that may be unique to a particular building. Differences may include the school schedule or its curricular focus. Current examples of the variety of choices available include: a K-12 technology strand, K-12 International Baccalaureate strand, accelerated school, alternative high school, K-12 charter school, math/science school, arts and ideas school, Chinese language school, and a 4th grade earth/environmental full-year program. The district provides busing for 6,500 K-12 students daily utilizing the VersaTrans routing system. This is about 29% of the total student population. In addition, the district uses a Bus Service Index tool to evaluate circumstances that may require additional transportation service. Student/staff food service is provided through a contract with Sodexo Corporation. Sodexo has provided food services to the district since 1981 when its predecessor company, SAGA, was awarded the contract. ASD20 - Facility and Site Manual 2 June 2011 Elementary Schools ACADEMY ENDEAVOUR ELEMENTARY SCHOOL Grades Served: K‐5 Year Opened: 1998 3475 Hampton Park Drive Colorado Springs, CO 80920 Phone 719.234.5600 www.asd20.org Site History Original Construction Date: Original: Total 1998 Utilization Square Capacity* Footage 47,467 473 47,467 473 Historical Cost $4,027,728 $4,027,728 *Utilization Capacity is 85% of Building Design Capacity Insurance Replacement Value $10,692,067 Architect: LKA Partners Contractor: Basset Construction Ancillary Buildings Age ID #9 17 Years #10 17 Years #11 17 Years #12 17 Years #48 31 Years Size 1,440SF 1,440SF 1,440SF 1,440SF 1,440SF Utilization Capacity* 50 50 50 50 50 Condition Good Good Good Good Fair Useful Life 25 Years 25 Years 25 Years 25 Years 25 Years Other Site Enhancements Softball field on playground Land Value Site Acreage Schedule # 13.11 Acres 6303107054, 6303107053 On December 15, 1998 8.4 acres were dedicated to the district from Case International. Also on that date 1.32 acres were donated for an elementary building and 3 acres for a new administration building. The dedicated portion would be school use only. No information is on file regarding the frontage road on district property adjacent to Union boulevard. ASD20 - Facility and Site Manual 3 June 2011 ACADEMY ENDEAVOUR ELEMENTARY SCHOOL 2008-09 ACTUAL BUDGETED STAFFING** 2011 2010 SALARIES/BENEFITS Instructional Staff Administrator Office/Trades Other Total Salaries Total Benefits 37.85 2.00 2.44 42.29 40.89 2.00 0.97 43.86 OTHER EXPENDITURES Purchased Services Utilities Supplies and Materials Capital Outlay Total Other GRAND TOTAL $ Projected Student Enrollment FTE Cost per Student - FTE 2009-10 ACTUAL 2010-11 BUDGET 1,482,298 154,966 176,368 1,813,632 379,158 1,555,348 156,759 168,352 1,880,459 413,848 1,707,683 157,543 99,292 1,964,518 460,683 31,257 77,471 58,778 15,505 183,011 27,614 82,137 78,290 188,041 28,000 83,000 96,650 207,650 2,482,348 $ 2,632,851 2,375,801 437 5,437 $ 473 5,248 474 5,555 **Budgeted staffing uses Teacher Equivalents (TE) Site Condition Electrical Building Structure HVAC & Mechanical Plumbing Lighting Flooring Grounds RATING Good RATING Good RATING Good RATING Good RATING Good RATING Good RATING Good Health/safety needs will always be considered the highest priority. Major capital items that require substantial resources to complete will be included for consideration during the next G.O. Bond planning process. Other capital items will be scored using the Capital Reserve Project Designation Method for ranking and possible inclusion in the annual budget process. ASD20 - Facility and Site Manual 4 June 2011 Academy Endeavour Elementary School Deferred Capital Capital Potential Funding Source Priority Maintenance Improvement Renewal 2 4,500 Capital Reserve Description Paint portables, buildings and decks Type Building Replace portable AC units Replace roof top split system unit - 2-ton Replace carpet in corridors with VCT, replace carpet in classrooms and office. Replace gym and cafeteria floors Renovate restrooms, fixtures, exhaust fans, flooring, amenities HVAC & Mech Building 2 2 3,000 Capital Reserve 12,000 Capital Reserve Flooring 2 140,000 Capital Reserve Flooring 6 Total ASD20 - Facility and Site Manual 25,000 4,500 5 25,000 Capital Reserve 155,000 June 2011 ACADEMY INTERNATIONAL ELEMENTARY SCHOOL Grades Served: Year Opened: K-5 1998 8550 Charity Drive Colorado Springs, CO 80920 Phone 719.234.4000 www.asd20.org Site History Original Construction Date: Original: 2004 Addition Total 1998 Square Utilization Capacity* Footage 47,467 500 200 -047,667 500 Historical Cost $4,422,729 $ 124,698 $4,547,427 *Utilization Capacity is 85% of Building Design Capacity Insurance Replacement Value $10,670,048 Architect: LKA Partners Contractor: Bassett Construction Ancillary Buildings ID #14 #15 Age 17 Years 17 Years Size 1,400SF 1,400SF Utilization Capacity* 50 50 Condition Good Good Useful Life 25 Years 25 Years Other Site Enhancements Fenced Softball field and running track on playground Land Value Site Acreage Schedule # 11.15 Acres 6234101001 On December 19, 1997 11.15 acres were dedicated from LP47, LLC. The land is to be used for school use only and La Plata reviews all construction documents. ASD20 - Facility and Site Manual 6 June 2011 ACADEMY INTERNATIONAL ELEMENTARY SCHOOL 2008-09 ACTUAL BUDGETED STAFFING** 2011 2010 SALARIES/BENEFITS Instructional Staff Administrator Office/Trades Other Total Salaries Total Benefits 44.17 2.00 2.14 48.31 43.64 2.00 2.14 47.78 OTHER EXPENDITURES Purchased Services Utilities Supplies and Materials Capital Outlay Total Other GRAND TOTAL $ Projected Student Enrollment FTE Cost per Student - FTE 2009-10 ACTUAL 2010-11 BUDGET 1,863,230 168,027 159,287 2,190,544 458,056 1,912,453 168,864 170,187 2,251,504 491,327 1,896,813 169,708 171,038 2,237,559 500,066 46,261 80,811 74,635 65,085 266,792 49,766 76,681 92,492 218,939 45,000 77,000 88,942 210,942 2,961,770 $ 2,948,567 2,915,392 583 5,001 $ 601 4,928 569 5,182 **Budgeted staffing uses Teacher Equivalents (TE) Site Condition Electrical Building Structure HVAC & Mechanical Plumbing Lighting Flooring Grounds RATING Good RATING Good RATING Good RATING Good RATING Good RATING Good RATING Good Health/safety needs will always be considered the highest priority. Major capital items that require substantial resources to complete will be included for consideration during the next G.O. Bond planning process. Other capital items will be scored using the Capital Reserve Project Designation Method for ranking and possible inclusion in the annual budget process. ASD20 - Facility and Site Manual 7 June 2011 Academy International Elementary School Description Type Replace roof Building Replace rooftop split system 2 -ton unit Building Replace toilet partitions in student and adult restrooms Plumbing Deferred Capital Capital Potential Funding Source Priority Maintenance Improvement Renewal 2 257,000 Capital Reserve 6 11,000 Capital Reserve 6 Total ASD20 - Facility and Site Manual 20,000 Capital Reserve - 8 - 288,000 June 2011 ANTELOPE TRAILS ELEMENTARY SCHOOL Grades Served: Year Opened: PK-5 1992 15280 Jessie Drive Colorado Springs, CO 80921 Phone 719.234.4100 www.asd20.org Site History Original Construction Date: Original: Total 1992 Square Utilization Capacity* Footage 48,122 491 48,122 491 Historical Cost $3,848,027 $3,848,027 *Utilization Capacity is 85% of Building Design Capacity Insurance Replacement Value $10,444,307 Architect: LKA Partners Contractor: Nunn Construction Ancillary Buildings ID #48 Age 30 Years Size 1,400SF Utilization Capacity 50 Condition Fair Useful Life 25 Years Other Site Enhancements None-- Land Value Site Acreage 11.0112 Acres Schedule # 6131204024; 6131206093 Skilland Corporation originally deeded a school site on 5/24/76, subsequently went bankrupt and the replacement deed was issued by Estates at Gleneagle dated 7/2/91. The original school site traded for the current site which was deeded from Estates at Gleneagle for $75,000. The current school site was constructed on a wetlands site so the district had to develop a separate mitigation site that is behind the homes on the south side of Jessie Drive. The original deed from 1/9/92 was replaced as the area was subdivided. The drainage collection system under the existing school drains underground through an easement to the mitigation site. There have been multiple issues regarding the pedestrian access to the mitigation site and adjacent homeowners and issues related to maintenance of the mitigation site with the Corps of Engineers. Some correspondence is in the school site notebook and the district’s legal council has additional information regarding these issues. ASD20 - Facility and Site Manual 9 June 2011 ANTELOPE TRAILS ELEMENTARY SCHOOL 2008-09 ACTUAL BUDGETED STAFFING** 2011 2010 SALARIES/BENEFITS Instructional Staff Administrator Office/Trades Other Total Salaries Total Benefits 41.94 2.00 2.12 46.06 42.81 2.00 2.11 46.92 OTHER EXPENDITURES Purchased Services Utilities Supplies and Materials Capital Outlay Total Other GRAND TOTAL $ Projected Student Enrollment FTE Cost per Student - FTE 2009-10 ACTUAL 2010-11 BUDGET 1,802,919 173,287 136,862 2,113,068 456,292 1,897,831 207,893 136,134 2,241,858 502,094 1,948,690 208,932 136,339 2,293,961 527,007 50,193 98,520 86,653 2,592 237,958 59,449 72,657 89,570 221,676 50,000 73,000 62,280 185,280 2,965,628 $ 3,006,248 520 5,703 507 5,929 2,807,318 476 5,898 $ **Budgeted staffing uses Teacher Equivalents (TE) Site Condition Electrical Building Structure HVAC & Mechanical Plumbing Lighting Flooring Grounds RATING Good RATING Good RATING Good RATING Good RATING Good RATING Good RATING Good Health/safety needs will always be considered the highest priority. Major capital items that require substantial resources to complete will be included for consideration during the next G.O. Bond planning process. Other capital items will be scored using the Capital Reserve Project Designation Method for ranking and possible inclusion in the annual budget process. ASD20 - Facility and Site Manual 10 June 2011 Antelope Trails Elementary School Description Asphalt play area aging - patch cracks and seal Type Deferred Capital Capital Potential Funding Maintenance Improvement Renewal Source 1 2,500 Capital Reserve Priority Grounds Upgrade controls system including valves, wiring, network integration. Upgrade misc. gate valves to HVAC & ball valves. Upgrade pumps, evaluate expansion Mech tank and evaluate boiler condition. Balance system and clean ductwork. Replace water heater. 2 151,000 Capital Reserve Grounds 2 500,000 Capital Reserve Grounds 2 Grounds 3 12,500 Capital Reserve Building Plumbing 3 3 12,600 Capital Reserve 3,000 Capital Reserve Grounds 3 Building 4 10,000 Food Service Building 4 30,000 Capital Reserve Lighting 4 60,000 Capital Reserve Grounds 4 15,000 Capital Reserve Building envelope allowance for leaking windows, caulk, flashing, control joints, etc. Verify roof Building ladders are safe and meet code. Provide new exterior paint for building and portables. 4 25,000 Capital Reserve Plumbing 4 28,000 Capital Reserve Flooring 4 35,000 Capital Reserve Building Flooring HVAC & Replace roof top exhaust fans Mech Provide ADA door handles to all classroom doors Building 4 6 250,000 Capital Reserve 8,000 Capital Reserve 6 20,500 Capital Reserve Outdoor surface allowance; install a synthetic surface at ballfield, install soft fall playground material Asphalt and curb patch in kiss n go and faculty lot; improve landscaping East drainage swale (adjacent to play area) filling with gravel Paint portables, decks, trim, etc Replace dishwasher with HE unit Replace asphalt bus area and teacher parking lot / patch cracks and seal Verify MUA in kitchen/cafeteria. Add ventilation to copy room -tie into controls system. Provide mag holds for corridor classrooms Upgrade classroom/exterior lighting, power, and data (throughout school). Verify appropriate GFI usage, interior and exterior. Allowance to improve drainage at playfield (if no on synthetic..113-11) Replace toilet partitions Flooring allowance for cafeteria, kitchen, misc spaces. Repair/Replace roof and all roof flashings Replace carpet in the portables 43,000 Capital Reserve 9 Total ASD20 - Facility and Site Manual 85,000 Capital Reserve 28,000 27,600 11 779,000 Capital Reserve 512,500 June 2011 CHINOOK TRAILS SCHOOL Grades Served: K‐5 Year Opened: 2007 11795 Grand Lawn Circle Colorado Springs, CO 80924 Phone 719.234.5700 www.asd20.org Site History Original Construction Date: Original: Total 2007 Square Utilization Capacity* Footage 73,064 510 73,064 510 Historical Cost $14,583,730 $14,583,730 *Utilization Capacity is 85% of Building Design Capacity Insurance Replacement Value $14,682,825 Architect: Holger C. Christiansen & Partners Contractor: Nunn Construction Ancillary Buildings Age ID None‐‐ Size Classrooms Condition Useful Life Other Site Enhancements None- Land Value Site Acreage Schedule # 31.472 Acres 6225301002 On June 29, 2006 La Plata dedicated 31.472 acres for school use only. La Plata reviewed all construction documents. Eventually the site will be K-8. La Plata received an additional 3 acres of dedication credits with the city to pay for the district’s portion of the drainage fees due on the site. ASD20 - Facility and Site Manual 12 June 2011 CHINOOK TRAIL ELEMENTARY SCHOOL 2008-09 ACTUAL BUDGETED STAFFING** 2010 2011 SALARIES/BENEFITS Instructional Staff Administrator Office/Trades Other Total Salaries Total Benefits 21.79 2.00 2.07 25.86 25.87 2.00 2.09 29.96 OTHER EXPENDITURES Purchased Services Utilities Supplies and Materials Capital Outlay Total Other GRAND TOTAL $ Projected Student Enrollment FTE Cost per Student - FTE 2009-10 ACTUAL 2010-11 BUDGET 654,885 98,794 117,242 870,921 176,079 907,636 96,488 150,189 1,154,313 255,041 1,106,186 96,970 151,891 1,355,047 308,887 16,120 84,012 30,617 6,163 136,912 18,543 80,149 43,435 142,127 18,500 81,000 33,503 133,003 1,183,912 $ 171 6,923 1,551,481 $ 1,796,937 201 7,719 233 7,712 **Budgeted staffing uses Teacher Equivalents (TE) Site Condition Electrical Building Structure HVAC & Mechanical Plumbing Lighting Flooring Grounds RATING Good RATING Good RATING Good RATING Good RATING Good RATING Good RATING Good Health/safety needs will always be considered the highest priority. Major capital items that require substantial resources to complete will be included for consideration during the next G.O. Bond planning process. Other capital items will be scored using the Capital Reserve Project Designation Method for ranking and possible inclusion in the annual budget process. NO FACILITY/SITE REPAIRS OR ENHANCEMENTS LISTED AT THIS TIME ASD20 - Facility and Site Manual 13 June 2011 DOUGLASS VALLEY ELEMENTARY SCHOOL Grades Served: K‐5 Year Opened: 1958 4610 Douglass Drive United States Air Force Academy, CO 80840 Phone 719.234.4200 www.asd20.org Site History Original Construction Date: Original: 1959 Addition 1968 Addition 1989 Addition/Alterations Total 1958 Utilization Square Capacity* Footage 33,256 400 5,525 -01,400 -03,539 -043,720 400 Historical Cost $532,096 Unknown Unknown $148,500 $680,596 *Utilization Capacity is 85% of Building Design Capacity Insurance Replacement Value $9,083,033 Architect: Edward L. Bunts & F. Lamar Kelsey Contractor: Douglas Jardine Ancillary Buildings Age ID None‐‐ Size Classrooms Condition Useful Life Other Site Enhancements Playground Safety Surface Land Value Site Acreage Schedule # 19.78 Acres 7200000031 Built on land leased (November 1, 1957 – October 31, 2056) from the united States Air Force. The lease was revised in 2009 and filed under Air Academy High School. ASD20 - Facility and Site Manual 14 June 2011 DOUGLASS VALLEY ELEMENTARY SCHOOL BUDGETED STAFFING** 2010 2011 SALARIES/BENEFITS Instructional Staff Administrator Office/Trades Other Total Salaries Total Benefits 32.55 1.50 2.07 36.12 2008-09 ACTUAL 34.82 2.00 2.09 38.91 OTHER EXPENDITURES Purchased Services Utilities Supplies and Materials Capital Outlay Total Other GRAND TOTAL $ Projected Student Enrollment FTE Cost per Student - FTE 2009-10 ACTUAL 2010-11 BUDGET 1,383,872 187,379 127,891 1,699,142 365,934 1,389,426 153,634 125,671 1,668,731 371,409 1,504,316 198,373 127,250 1,829,939 408,253 22,514 29,188 90,201 580 142,483 21,129 33,944 90,601 2,056 147,730 21,000 34,000 68,085 123,085 2,207,559 $ 323 6,835 2,187,870 $ 2,361,277 341 6,416 372 6,348 **Budgeted staffing uses Teacher Equivalents (TE) Site Condition Electrical Building Structure HVAC & Mechanical Plumbing Lighting Flooring Grounds RATING Good RATING Good RATING Fair RATING Good RATING Good RATING Good RATING Good Health/safety needs will always be considered the highest priority. Major capital items that require substantial resources to complete will be included for consideration during the next G.O. Bond planning process. Other capital items will be scored using the Capital Reserve Project Designation Method for ranking and possible inclusion in the annual budget process. ASD20 - Facility and Site Manual 15 June 2011 Douglass Valley Elementary School Deferred Maintenance Capital Improvement 12,000 Capital Renewal Potential Funding Source Capital Reserve Capital Reserve Capital Reserve Description Repair north side drainage issues Repair skylight in staff lounge, rm 211 Provide solids interceptor at the art room sink Upgrade building electrical distribution, upgrade out of date panels and add circuits to classrooms Asphalt play area surfacing is very old, replace New roof, repair flashing, caulk, reboot roof protrusions Type Grounds Building Plumbing Priority 1 2 2 Electrical Grounds 2 2 Building 2 Roof drain grate missing on roof over 1968 addition Exterior painting allowance Provide ADA compliant door handles throughout school Replace grease trap Replace storefront and all exterior doors and hardware Upgrade flooring in cafeteria, restrooms, and support areas Replace parking lot (Faculty/Visitors) Replace all exterior window units Allowance for interior flooring upgrades Vacuum breakers are required at all hose bibbs and wall hydrants Provide concrete/fence enclosure for dumpsters Provide mag holds for all corridor classrooms Outdoor storage expansion Replace bathroom plumbing fixtures (lavs, urinals, toilets) Library and computer lab addition Replace skylight in staff lounge Allowance for new ceiling grid and tiles Replace toilet partitions, all restrooms Replace existing gas, water, and sanitary from building to service feed location Drainage east of playground/field and north of building Remove asphalt in front of classrooms; replace with concrete, compacted base course/boulders Replace skylights Provide synthetic turf field Replace wood doors and hardware Building Building 3 3 250 General Fund 25,500 Capital Reserve Building Building 4 4 25,000 Capital Reserve 20,000 Food Service Building 4 Flooring Grounds Building Flooring 4 4 4 4 Plumbing Grounds Building Building 6 6 6 6 750 9,000 35,000 36,400 General Fund Capital Reserve Capital Reserve Capital Reserve Plumbing Building Building Building Plumbing 6 6 6 6 6 40,000 266,500 Capital Reserve Bond Issuance 14,000 Capital Reserve 14,000 Capital Reserve 18,500 Capital Reserve Building 6 Grounds 9 Grounds Building Grounds Building 9 9 9 9 Total ASD20 - Facility and Site Manual 1,700 1,400 55,000 250,000 Capital Reserve 38,500 Capital Reserve 44,000 75,000 225,000 230,000 Capital Reserve Capital Reserve Capital Reserve Capital Reserve 75,000 Capital Reserve 15,000 Capital Reserve 37,000 52,200 550,717 16,700 16 Capital Reserve 23,500 Capital Reserve 1,121,217 Capital Reserve Capital Reserve Bond Issuance 46,000 Capital Reserve 1,099,000 June 2011 EDITH WOLFORD ELEMENTARY SCHOOL Grades Served: Year Opened: PK-5 1954 13710 Black Forest Road Colorado Springs, CO 80908 Phone 719.234.4300 www.asd20.org Site History Original Construction Date: Original: 1989 Addition 2004 Reconstruction Total 1954 Square Utilization Capacity* Footage 10,529 338 4,997 -053,063 425 53,063 425 Historical Cost $ 157,935 Unknown $6,945,011 $6,945,011 *Utilization Capacity is 85% of Building Design Capacity Insurance Replacement Value $10,706,129 Architect: MOA Contractor: Copestone Ancillary Buildings Age ID None-- Size Classrooms Condition Useful Life Other Site Enhancements None-- Land Value Site Acreage Schedule # 14.2 Acres 5206003008, 5206004007 In 1957 D38 was reorganized to form D20. At this time D20 was given this site and the school it contained. No Deed is currently at the district and D38 has no record of the transaction. On March 31, 1972 4.94 acres were donated to the district. This donation contained Lot 6-south of the elementary. On August 20, 1983 two quit claims were obtained for 1) 30; easement granted along east boundary to Williams 2) 30’ flag stem of Lot 7 deeded to the district by Williams. ASD20 - Facility and Site Manual 17 June 2011 EDITH WOLFORD ELEMENTARY SCHOOL 2008-09 BUDGETED STAFFING** 2011 ACTUAL 2010 SALARIES/BENEFITS (INCLUDES SCHOOL IN THE WOODS) Instructional Staff 36.79 38.31 1,618,466 Administrator 2.00 2.00 164,214 Office/Trades Other 2.36 2.36 136,285 Total Salaries 41.15 42.67 1,918,965 Total Benefits 425,784 2009-10 ACTUAL 2010-11 BUDGET 1,586,238 164,549 129,504 1,880,291 437,180 1,666,448 165,372 130,152 1,961,972 467,505 66,362 68,080 82,401 596 217,439 25,000 68,000 69,695 162,695 2,534,910 $ 2,592,172 OTHER EXPENDITURES (INCLUDES SITW) Purchased Services Utilities Supplies and Materials Capital Outlay Total Other 67,419 64,205 71,646 8,090 211,360 GRAND TOTAL $ Projected Student Enrollment FTE (INCLUDES SITW) Cost per Student - FTE 2,556,109 359 7,120 $ 335 7,567 312 8,308 **Budgeted staffing uses Teacher Equivalents (TE) Site Condition Electrical Building Structure HVAC & Mechanical Plumbing Lighting Flooring Grounds RATING Good RATING Good RATING Good RATING Good RATING Good RATING Good RATING Good Health/safety needs will always be considered the highest priority. Major capital items that require substantial resources to complete will be included for consideration during the next G.O. Bond planning process. Other capital items will be scored using the Capital Reserve Project Designation Method for ranking and possible inclusion in the annual budget process. ASD20 - Facility and Site Manual 18 June 2011 Edith Wolford Elementary School Description Type Replace inefficient lights with HE fluorescent fixtures; gym and exterior Electrical Deferred Capital Capital Potential Funding Source Priority Maintenance Improvement Renewal 3 8,100 Total ASD20 - Facility and Site Manual - 19 8,100 Capital Reserve - June 2011 EXPLORER ELEMENTARY SCHOOL Grades Served: Year Opened: PK–5 1989 4190 Bardot Drive Colorado Springs, CO 80920 Phone 719.234.4400 www.asd20.org Site History Original Construction Date: Original: 2003 Addition Parking Lot 1989 Square Footage 47,600 -0- Utilization Capacity* 417 -0- Historical Cost $3,850,000 $ 153,933 Total 47,600 417 $4,003,933 *Utilization Capacity is 85% of Building Design Capacity Insurance Replacement Value $10,308,200 Buildings Architect: LKA Contractor: Hughes Smith Ancillary Buildings Age Size ID #17 8 Years 1440 #16 8 Years 1440 Adventure Club Portable Utilization Capacity* 50 50 Condition Good Good Useful Life 25 Years 25 Years Other Site Enhancements None- Land Value Site Acreage 9.51 Acres Schedule #6235311012 Estimated Value $476,393 This site was a dedicated site from Briargate Venture for school use only. The deeded date was June 22, 1988 ASD20 - Facility and Site Manual 20 June 2011 EXPLORER ELEMENTARY SCHOOL 2008-09 ACTUAL BUDGETED STAFFING** 2011 2010 SALARIES/BENEFITS Instructional Staff Administrator Office/Trades Other Total Salaries Total Benefits 42.50 2.00 2.33 46.83 44.95 2.00 2.36 49.31 OTHER EXPENDITURES Purchased Services Utilities Supplies and Materials Capital Outlay Total Other GRAND TOTAL $ Projected Student Enrollment FTE Cost per Student - FTE 2009-10 ACTUAL 2010-11 BUDGET 1,939,569 145,714 131,405 2,216,688 466,329 1,916,510 150,449 132,452 2,199,411 474,075 2,042,595 151,201 134,541 2,328,337 516,036 21,437 76,680 81,170 1,699 180,986 11,729 71,176 75,442 158,347 12,000 72,000 78,340 162,340 2,831,833 $ 3,006,713 2,864,003 426 6,723 $ 452 6,265 413 7,280 **Budgeted staffing uses Teacher Equivalents (TE) Site Condition Building Structure HVAC & Mechanical Lighting Flooring Grounds Contents RATING Good RATING Good RATING Good RATING Good RATING Good RATING Good Health/safety needs will always be considered the highest priority. Major capital items that require substantial resources to complete will be included for consideration during the next G.O. Bond planning process. Other capital items will be scored using the Capital Reserve Project Designation Method for ranking and possible inclusion in the annual budget process. ASD20 - Facility and Site Manual 21 June 2011 Explorer Elementary School Description Utilization equipment - computer stations in classrooms need additional outlets Replace electrical inverter Roof covering - replace entire building Disposer not used because of drainage backups Add ventilation system to copy room Swale at NW not draining / Add concrete pan and walk cover Add outlets and data ports to meet new computer and network needs Replace exhaust fans and motors Upgrade Building electrical, add circuits, upgrade panels Window leaks at east wall - CR 125 & 128 Roof flashings - reinforce all base flashings Replace portable AC units Asphalt play area aging - patch cracks, overlay and seal Replace inefficient lighting with HE fluorescent; LMC, Gym, Halls, Music Install wheel chair access to playfield Replace flooring in portables Building envelope; new caulk, replace window and door seals, repair broken windows, seal brick cracks Allowance for concrete and asphalt repairs Add permanent walking track Upgrade ballasts and lamps in corridors and classrooms Paint portables and decks Paint miscellaneous exterior wood Install ADA compliant lever handles on all interior doors Repair/upgrade playfield 7 classroom additions Repaint exterior metal including roof Upgrade flooring in corridors, cafeteria, kitchen, classrooms, and gym Corridor doors require mag holds if school intends to continue to prop open doors Type Electrical Electrical Building Grounds HVAC & Mech Deferred Capital Priority Maintenance Improvement 1 1 1 2 Potential Funding Source 10,000 Capital Reserve 25,000 Capital Reserve 275,250 Capital Reserve Capital Reserve 2 5,000 Capital Reserve Grounds 2 7,675 Capital Reserve Electrical HVAC & Mech 2 25,000 Capital Reserve 2 37,100 Capital Reserve Electrical Building Building HVAC & Mech 2 2 2 89,000 Capital Reserve 1,750 Capital Reserve 5,125 Capital Reserve 2 13,000 Capital Reserve Grounds 2 33,500 Capital Reserve Lighting Grounds Flooring 3 4 4 Building Grounds Grounds 4 4 4 Electrical Building Building 4 6 6 Building Grounds Building Building 6 6 6 6 Flooring 6 Building 9 Total ASD20 - Facility and Site Manual Capital Renewal 1,500 21,500 25,000 12,000 Capital Reserve 25,000 Capital Reserve 25,000 Capital Reserve 35,000 Capital Reserve Capital Reserve Capital Reserve 4,500 12,500 30,000 405,500 1,964,900 Capital Reserve Bond Issuance Bond Issuance 19,750 Capital Reserve 175,000 Capital Reserve 25,000 18,500 22 Capital Reserve Capital Reserve 8,500 Capital Reserve 2,645,675 Capital Reserve 653,875 June 2011 FOOTHILLS ELEMENTARY SCHOOL Grades Served: Year Opened: K-5 1981 825 Allegheny Drive Colorado Springs, CO 80919 Phone 719.234.4500 www.asd20.org Site History Original Construction Date: Original: 1984 Addition Total 1981 Square Utilization Capacity* Footage 30,700 464 12,346 26 43,046 490 Historical Cost $3,196,000 Unknown $3,196,000 *Utilization Capacity is 85% of Building Design Capacity Insurance Replacement Value $9,312,452 Architect: LKA Contractor: Gerald Phipps Ancillary Buildings ID #18 #19 Age 17 Years 16 Years Size 1,400SF 1,400SF Utilization Capacity* 50 50 Condition Good Good Useful Life 25 Years 25 Years Other Site Enhancements None-- Land Value Site Acreage Schedule # 10.08 Acres 7312303012 The Site was dedicated by Rockrimmon Land Company on October 11, 1977. The dedication included the current school site, Parcel 2, and 5 acres on Delmonico. The 5 acres on Delmonico was sold to A. Pasquinelli and Wayne Black on June 10, 1983 for $280,000. The sale data is located in the land file under “5 acres on Delmonico”. On April 1, 1992, the district entered into a lease agreement with the city for a portion of the school site to be used by the parks department until April 1, 2081. ASD20 - Facility and Site Manual 23 June 2011 FOOTHILLS ELEMENTARY SCHOOL 2008-09 ACTUAL BUDGETED STAFFING** 2011 2010 SALARIES/BENEFITS Instructional Staff Administrator Office/Trades Other Total Salaries Total Benefits 35.70 2.00 2.01 39.71 35.78 2.00 2.01 39.79 OTHER EXPENDITURES Purchased Services Utilities Supplies and Materials Capital Outlay Total Other GRAND TOTAL $ Projected Student Enrollment FTE Cost per Student - FTE 2009-10 ACTUAL 2010-11 BUDGET 1,556,453 155,810 112,379 1,824,642 402,368 1,613,803 156,759 114,836 1,885,398 433,856 1,625,676 157,543 115,410 1,898,629 447,777 39,902 56,284 51,231 147,417 33,427 60,482 60,413 154,322 33,000 61,000 53,080 147,080 2,473,576 $ 2,493,486 2,374,427 387 6,135 $ 378 6,544 372 6,703 **Budgeted staffing uses Teacher Equivalents (TE) Site Condition Electrical Building Structure HVAC & Mechanical Plumbing Lighting Flooring Grounds RATING Good RATING Good RATING Good RATING Good RATING Good RATING Fair RATING Good Health/safety needs will always be considered the highest priority. Major capital items that require substantial resources to complete will be included for consideration during the next G.O. Bond planning process. Other capital items will be scored using the Capital Reserve Project Designation Method for ranking and possible inclusion in the annual budget process. ASD20 - Facility and Site Manual 24 June 2011 Foothills Elementary School Description Foundation in gym leaks at several locations; add perimeter drain Unit ventilators and controls are at the end of useful life Add circuits to classrooms and offices, provide circuits for AV expansions and computer room needs (include data drop adds) Upgrade building electrical distribution including panels, circuits, branch circuits and needed data outlets Expand Health Room Provide insulation on all HW under sink piping and traps Type Deferred Capital Capital Potential Funding Source Priority Maintenance Improvement Renewal Building 1 Building 1 Electrical 2 24,000 Capital Reserve Electrical Building 2 4 77,500 24,000 Capital Reserve Capital Reserve Building HVAC & Mech 4 3,500 Capital Reserve Replace portable A/C units Building envelope allowance for caulk, windows and window seals, flashing, control joints, storefront glazing, paint, fascia Building Replace fan coil units Electrical Replace folding panel partitions at gym Building 4 13,000 Capital Reserve 4 4 4 15,000 Capital Reserve 44,000 Capital Reserve 45,000 Capital Reserve Allowance for asphalt, curb and gutter and sidewalks Flooring allowance for corridors, classrooms, cafeteria, gym, and office areas Replace roof EPDM membrane, repair roof penetrations, repair flashing/caulk at parapet locations…ballast where necessary Install guardrail at storage loft over stairs to gym Replace conc walk at landscape planter near Kindergarten Remove all hold open devices from corridor doors and add mag holds and fire detection devices Replace all flush valves and faucets to electronic/battery operated units Provide ADA compliant door handles for all interior classroom doors Add softfall surface to existing playgrounds and new equipment for 2-5 playground Upgrade bathroom fixtures, flooring, and amenities Replace skylight window above entry Add smoke detectors and magnetic holds for corridor doors Paint interior Grounds 4 70,000 Capital Reserve Flooring 4 90,000 Capital Reserve Building Building 4 6 2,000 250,000 Capital Reserve Capital Reserve Grounds 6 10,000 Capital Reserve Building 6 25,000 Capital Reserve Plumbing 6 40,000 Capital Reserve Building 6 50,000 Capital Reserve Grounds Flooring Building 6 6 6 52,500 54,000 Capital Reserve Capital Reserve 10,000 Capital Reserve Building Building 6 6 Total ASD20 - Facility and Site Manual 41,000 250,000 Capital Reserve 35,000 Capital Reserve 42,000 Capital Reserve - 25 Capital Reserve 400,000 867,500 June 2011 FRONTIER ELEMENTARY SCHOOL Grades Served: PK‐5 Year Opened: 1985 3755 Meadowridge Drive Colorado Springs, CO 80920 Phone 719.234.4600 www.asd20.org Site History Original Construction Date: Original: Total 1985 Square Utilization Capacity* Footage 47,900 464 47,900 464 Historical Cost $4,015,170 $4,015,170 *Utilization Capacity is 85% of Building Design Capacity Insurance Replacement Value $10,599,314 Architect: Muir & Associates Contractor: Bassett Construction Ancillary Buildings Age ID #20 11 Years #21 31 Years #22 31 Years #23 16 Years Other Site Enhancements None Land Value Site Acreage Schedule # Size 1,400SF 1,400SF 1,400SF 1,400SF Utilization Capacity* 50 50 50 50 Condition Good Fair Fair Good Useful Life 25 Years 25 Years 25 Years 25 Years 10.86 Acres 6302301073 The site was dedicated by Briargate Joint Venture in 1983. Originally 10.857 was deeded jointly to the school district and the city. 5.856 acres was to be a school site and 5.001 acres for a city park. The district wanted a separate deed to the school site. The district deeded the park portion to the city on September 17, 1996. The deed from the city for the school portion has not been completed. The district paid to develop the park and was reimbursed by the city but there are no details on file. The joint use agreement with the city expired in 1995. ASD20 - Facility and Site Manual 26 June 2011 FRONTIER ELEMENTARY SCHOOL 2008-09 ACTUAL BUDGETED STAFFING** 2011 2010 SALARIES/BENEFITS Instructional Staff Administrator Office/Trades Other Total Salaries Total Benefits 36.79 2.00 2.41 41.20 37.14 2.00 2.42 41.56 OTHER EXPENDITURES Purchased Services Utilities Supplies and Materials Capital Outlay Total Other GRAND TOTAL $ Projected Student Enrollment FTE Cost per Student - FTE 2009-10 ACTUAL 2010-11 BUDGET 1,615,874 168,853 162,759 1,947,486 417,724 1,606,777 170,879 156,502 1,934,158 431,330 1,631,454 171,733 157,760 1,960,947 448,233 24,562 66,535 69,312 160,409 22,049 68,685 53,120 143,854 22,000 69,000 71,962 162,962 2,509,342 $ 2,572,142 2,525,619 399 6,330 $ 384 6,535 387 6,646 **Budgeted staffing uses Teacher Equivalents (TE) Site Condition Electrical Building Structure HVAC & Mechanical Plumbing Lighting Flooring Grounds RATING Good RATING Good RATING Good RATING Good RATING Good RATING Good RATING Good Health/safety needs will always be considered the highest priority. Major capital items that require substantial resources to complete will be included for consideration during the next G.O. Bond planning process. Other capital items will be scored using the Capital Reserve Project Designation Method for ranking and possible inclusion in the annual budget process. ASD20 - Facility and Site Manual 27 June 2011 Frontier Elementary School Description Apply crackfill to parking lot Replace blinds throughout the building Replace HVAC control dampers Replace portable ac units Replace single-ply roof Asphalt play areas aged - patch cracks and seal Improve drainage at service area (storm drains fill with debris) Water damage to paint at east gym wall Extend FA into portables, intercom, and ADT Windows - replace clerestory windows Replace all door hardware with ADA compliant hardware Replace evaporative media that is deteriorating East parking lot asphalt - reseal and crack fill Remove cracking tile in lobby and polish the concrete below Replace all classroom, office and corridor floor coverings Add ventilation and cooling to the lounge Replace milk cooler Replace dishwasher Replace portable carpet and paint (exterior) Replace grease interceptor Grounds allowance for parking lot crack seal and seal coat, repair sidewalks, improve drainage, repair curb and gutter Relocate vent through roof, away from air intake Exhaust hood does not have make-up air. Verify kitchen has adequate supply of make-up air. Improve drainage at building entrance - regrade and resurface, add inlets Upgrade/improve student drop off area and dumpster areas, including damaged concrete Provide wet fire suppression system Dishwasher is approaching end of service life Provide handicap access to stage Replace push button metering faucets with lever handled faucets at the main toilet groupings Need improved student drop-off/pick-up area Flagpole vent stacks away from RTU intake louvers Deferred Capital Capital Potential Funding Source Type Priority Maintenance Improvement Renewal Grounds 2 3,000 Capital Reserve Building 2 36,500 Capital Reserve HVAC & Mech 2 9,400 Capital Reserve HVAC & Mech 2 23,000 Capital Reserve Building 2 250,000 Capital Reserve Grounds 3 8,500 Capital Reserve Grounds Building Building Building 3 3 3 3 Building Building Grounds 3 3 3 Flooring 3 10,000 Capital Reserve Flooring HVAC & Mech Electrical Plumbing Flooring Building 3 97,500 Capital Reserve Capital Reserve Capital Reserve Capital Reserve Capital Reserve 15,000 28,000 34,000 52,000 4 4 4 4 4 Capital Reserve 6,700 Capital Reserve 9,500 Capital Reserve 13,000 6,000 6,000 10,000 25,000 Capital Reserve Food Service Capital Reserve Capital Reserve Food Service Grounds Building HVAC & Mech 4 6 5,660 6 12,000 Food Service Building 6 15,000 Capital Reserve Grounds Building Plumbing Building 6 6 6 9 60,000 190,000 Capital Reserve Capital Reserve 4,500 Capital Reserve Capital Reserve Plumbing Grounds Electrical 9 9 9 27,000 160,000 Total ASD20 - Facility and Site Manual 13,400 17,000 24,900 28 665,160 60,000 Capital Reserve Capital Reserve Capital Reserve Capital Reserve 9,000 Capital Reserve 526,600 June 2011 HIGH PLAINS ELEMENTARY SCHOOL Grades Served: Year Opened: PK-5 1981 2248 Vintage Drive Colorado Springs, CO 80920 Phone 719.234.4700 www.asd20.org Site History Original Construction Date: Original: 1984 Addition: Total 1981 Square Utilization Capacity* Footage 30,700 468 11,146 -041,846 468 Historical Cost $3,196,000 $ 614,040 $3,810,040 *Utilization Capacity is 85% of Building Design Capacity Insurance Replacement Value $8,798,798 Architect: LKA Contractor: Gerald Phipps Ancillary Buildings Age ID None- Size Classrooms Condition Useful Life Other Site Enhancements None- Land Value Site Acreage Schedule # 10.275 Acres 6304404011 On April 18, 1980, 10.275 acres was dedicated by Lew Christensen and Associates for school use only. ASD20 - Facility and Site Manual 29 June 2011 HIGH PLAINS ELEMENTARY SCHOOL 2008-09 ACTUAL BUDGETED STAFFING** 2011 2010 SALARIES/BENEFITS Instructional Staff Administrator Office/Trades Other Total Salaries Total Benefits 32.83 1.50 2.31 36.64 33.15 1.50 2.32 36.97 OTHER EXPENDITURES Purchased Services Utilities Supplies and Materials Capital Outlay Total Other GRAND TOTAL $ Projected Student Enrollment FTE Cost per Student - FTE 2009-10 ACTUAL 2010-11 BUDGET 1,331,580 132,145 134,680 1,598,405 341,726 1,389,335 125,631 144,552 1,659,518 373,840 1,411,498 126,259 145,750 1,683,507 388,678 24,475 67,974 60,620 9,297 162,366 20,376 67,937 61,903 150,216 20,000 68,000 55,757 143,757 2,183,574 $ 2,215,942 2,102,497 326 6,449 $ 338 6,460 334 6,635 **Budgeted staffing uses Teacher Equivalents (TE) Site Condition Electrical Building Structure HVAC & Mechanical Plumbing Lighting Flooring Grounds RATING Good RATING Good RATING Fair RATING Good RATING Good RATING Fair RATING Fair Health/safety needs will always be considered the highest priority. Major capital items that require substantial resources to complete will be included for consideration during the next G.O. Bond planning process. Other capital items will be scored using the Capital Reserve Project Designation Method for ranking and possible inclusion in the annual budget process. ASD20 - Facility and Site Manual 30 June 2011 High Plains Elementary School Description Install grab bar at back of HC toilet stall in lower boys toilet room Foundation in gym leaks in several spots, install perimeter drain Install guardrail at storage loft over stairs to gym Renovate bathrooms including fixtures, partitions, fans, amenities Upgrade building electrical distribution including panels, switches, outlets, added branch outlets, added circuits, and data outlets Provide wet fire suppression system Replace recessed fan coil units Replace VCT in cafeteria and corridors, install new carpet in the classrooms, support spaces, and offices Insulate domestic hot water piping in boiler room Replace asphalt at service drive and parking lot, repair concrete curb Install metal gate at north side access drive to control visitor traffic Install concrete retaining wall on west side of playground Type Deferred Capital Capital Potential Funding Source Priority Maintenance Improvement Renewal Plumbing 1 Building Building 1 2 111,000 1,700 Capital Reserve Capital Reserve Plumbing 2 55,000 Capital Reserve Electrical Building Electrical 2 2 2 75,000 250,000 Capital Reserve Capital Reserve 30,000 Capital Reserve Flooring Plumbing 2 3 Grounds 3 Grounds 4 3,000 Capital Reserve Grounds HVAC & Mech 4 30,000 Capital Reserve Replace gym HVAC Building envelope allowance: foundations, paint, wall repairs, caulk, insulation, fascia, soffits, flashing, window seals, windows, storefront frames and glazing Building Repaint interior surfaces currently painted Building Replace skylight and leaking windows throughout Building HVAC & Replace unit ventilators and controls Mech Extend concrete walk to "trail" on south side of building Building Install mag holds on all corridor doors Building Grounds allowance for softfall surface at playground Grounds ADA allowance for handrails and installing dual locking classroom door hardware Building General Fund 98,600 Capital Reserve Capital Reserve 2,000 74,200 Capital Reserve 4 20,000 Capital Reserve 4 4 4 25,000 Capital Reserve 37,500 Capital Reserve 49,500 Capital Reserve 4 360,000 Bond Issuance 6 6 5,500 25,000 Capital Reserve Capital Reserve 6 40,000 Capital Reserve 6 60,000 Capital Reserve Total ASD20 - Facility and Site Manual 750 2,750 31 656,200 694,800 June 2011 MOUNTAIN VIEW ELEMENTARY SCHOOL Grades Served: Year Opened: K-5 1965 10095 Lexington Drive Colorado Springs, CO 80920 Phone 719.234.4800 www.asd20.org Site History Original Construction Date: Original: Total 2004 Square Utilization Capacity* Footage 53,500 510 53,500 510 Historical Cost $6,594,085 $6,594,085 *Utilization Capacity is 85% of Building Design Capacity Insurance Replacement Value $10,811,373 Architect: LKA Partners, Inc. Contractor: Pinkard Construction Ancillary Buildings ID None Age Size Utilization Capacity* Condition Useful Life Other Site Enhancements Softball/Baseball Field Land Value Site Acreage Schedule # 10.02 Acres 6228120001 On April 19, 2002, LP47, LLC dedicated the site to the District Covenants state school use only and are in effect for 20 years unless extended. Plans must be reviewed by La Plata. ASD20 - Facility and Site Manual 32 June 2011 MOUNTAIN VIEW ELEMENTARY SCHOOL BUDGETED STAFFING** 2010 2011 SALARIES/BENEFITS Instructional Staff Administrator Office/Trades Other Total Salaries Total Benefits 45.65 2.00 2.41 50.06 2008-09 ACTUAL 45.83 2.00 2.41 50.24 OTHER EXPENDITURES Purchased Services Utilities Supplies and Materials Capital Outlay Total Other GRAND TOTAL $ Projected Student Enrollment FTE Cost per Student - FTE 2009-10 ACTUAL 2010-11 BUDGET 1,779,076 196,313 183,488 2,158,877 465,703 1,905,556 170,916 167,307 2,243,779 505,203 1,923,643 171,771 168,144 2,263,558 522,397 35,023 60,285 131,283 10,771 237,362 14,253 58,084 88,064 7,069 167,470 20,000 58,000 103,476 181,476 2,916,452 $ 2,967,431 2,861,942 548 5,223 $ 559 5,217 561 5,290 **Budgeted staffing uses Teacher Equivalents (TE) Site Condition Electrical Building Structure HVAC & Mechanical Plumbing Lighting Flooring Grounds RATING Good RATING Good RATING Good RATING Good RATING Good RATING Good RATING Good Health/safety needs will always be considered the highest priority. Major capital items that require substantial resources to complete will be included for consideration during the next G.O. Bond planning process. Other capital items will be scored using the Capital Reserve Project Designation Method for ranking and possible inclusion in the annual budget process. NO FACILITY/SITE REPAIRS OR ENHANCEMENTS LISTED AT THIS TIME ASD20 - Facility and Site Manual 33 June 2011 PIONEER ELEMENTARY SCHOOL Grades Served: K‐5 Year Opened: 1987 3663 Woodland Hills Drive Colorado Springs, CO 80918 Phone 719.234.5000 www.asd20.org Site History Original Construction Date: Original: Total 1987 Square Utilization Capacity* Footage 47,900 464 47,900 464 *Utilization Capacity is 85% of Building Design Capacity Insurance Replacement Value $10,615,713 Architect: Muir & Associates Contractor: Hensel Phelps Ancillary Buildings Utilization Age Size Capacity* ID #26 19 Years 1,440 50 #27 16 Years 1,440 50 Unknown 31Years 1,440 50 Historical Cost $5,063,257 $5,063,257 Condition Good Good Fair Useful Life 25 Years 25 Years 25 Years Other Site Enhancements None Land Value Site Acreage Schedule # 8.24 Acres 6310428045 On November 14, 1986 the site was dedicated by RDM Partnership. School land didcation restrictions and the city code apply. The district had a joint development agreement with the city for the adjacent 3.53 acre park. A current joint use agreement is not on file at the district. ASD20 - Facility and Site Manual 34 June 2011 PIONEER ELEMENTARY SCHOOL BUDGETED STAFFING** 2010 2011 SALARIES/BENEFITS Instructional Staff Administrator Office/Trades Other Total Salaries Total Benefits 46.08 2.00 2.55 50.63 2008-09 ACTUAL 45.38 2.00 2.57 49.95 OTHER EXPENDITURES Purchased Services Utilities Supplies and Materials Capital Outlay Total Other GRAND TOTAL $ Projected Student Enrollment FTE Cost per Student - FTE 2009-10 ACTUAL 2010-11 BUDGET 1,985,447 159,229 180,303 2,324,979 511,967 1,897,501 161,240 186,571 2,245,312 520,849 1,873,702 162,046 188,455 2,224,203 528,549 23,347 71,606 78,416 3,858 177,227 20,288 63,019 69,336 20,000 63,000 86,880 169,880 3,014,173 $ 455 6,625 152,643 2,918,804 $ 2,922,632 446 6,544 446 6,553 **Budgeted staffing uses Teacher Equivalents (TE) Site Condition Electrical Building Structure HVAC & Mechanical Plumbing Lighting Flooring Grounds RATING Good RATING Good RATING Fair RATING Good RATING Good RATING Fair RATING Fair Health/safety needs will always be considered the highest priority. Major capital items that require substantial resources to complete will be included for consideration during the next G.O. Bond planning process. Other capital items will be scored using the Capital Reserve Project Designation Method for ranking and possible inclusion in the annual budget process. ASD20 - Facility and Site Manual 35 June 2011 Pioneer Elementary School Description Intercom system - replace existing console and provide additional exterior speakers Gymnasium sound system / replace damaged pendant mounted speakers East parking lot asphalt - seal cracks and seal Berms around building settling. Extreme erosion adjacent to concrete stair at southwest; remove berms and stucco No ventilation in faculty lounge Upgrade fire alarm system including horn, strobe, annunciator panel, etc., portable P5/P6 Upgrade building electrical distribution (switches and outlets) Replace fiberglass shingle roof, portable P3/P4 Replace fire alarm system including horn, strobe, annunciator panel, etc., portable P3/P4 Replace exhaust hood and ansul system Replace asphalt between buildings and portables Replace carpet in all classrooms, library, support spaces, and office; replace corridor floor covering with VCT or polished concrete Cracked and loose plaster / CMU in various walls Install auto door opener at south side of building Replace bathroom exhaust fan, portable P3/P4 Replace bathroom exhaust fan, portable P1/P2 Replace window A/C unit, portable P5/P6 Replace window A/C unit, portable P1/P2 Replace window A/C unit, portable P3/P4 Replace baseboard heating units with gas fired unit Painting, interior on masonry, primer and one-coat Painting, exterior on metal, primer and one-coat Tile to carpet transitions exceed 1/2" height Renovate all bathroom interiors Upgrade bathroom fixtures; all bathrooms Provide chilled water, air cooled condenser systems, fan coil units Type Deferred Capital Capital Potential Funding Source Priority Maintenance Improvement Renewal Building 1 Building Grounds 2 3 Building HVAC & Mech 38,000 Capital Reserve 18,000 Capital Reserve Capital Reserve 3 3 5,000 9,000 Capital Reserve Capital Reserve Building 3 23,254 Capital Reserve Electrical Building 3 3 32,664 Capital Reserve 12,835 Capital Reserve Building HVAC & Mech Grounds 3 3 3 Flooring Building Building Electrical Electrical HVAC & Mech HVAC & Mech HVAC & Mech HVAC & Mech Building Building Flooring Plumbing Plumbing 3 6 6 6 6 6 6 6 6 6 6 9 9 9 HVAC & Mech 9 Total ASD20 - Facility and Site Manual 8,000 23,254 Capital Reserve 28,800 Capital Reserve 42,000 Capital Reserve 1,200 5,200 2,000 35,000 40,494 533,127 11,200 36 110,000 Capital Reserve Capital Reserve Capital Reserve 986 General Fund 986 General Fund 11,454 Capital Reserve 11,909 Capital Reserve 11,909 Capital Reserve 31,840 Capital Reserve 52,500 Capital Reserve 55,000 Capital Reserve Capital Reserve Capital Reserve Capital Reserve 739,739 Bond Issuance 393,473 June 2011 PRAIRIE HILLS ELEMENTARY SCHOOL Grades Served: Year Opened: K-5 1993 8025 Telegraph Drive Colorado Springs, CO 80920 Phone 719.234.5100 www.asd20.org Site History Original Construction Date: Original: Total 1993 Square Utilization Capacity* Footage 49,100 464 49,100 464 Historical Cost $3,324,051 $3,324,051 *Utilization Capacity is 85% of Building Design Capacity Insurance Replacement Value $10,939,368 Architect: Clifford Nakata Contractor: Hughes/Smith Ancillary Buildings ID #5 #6 #7 #8 Age 16 Years 17 Years 17 Years 31 Years Size 1,440SF 1,440SF 1,440SF 1,440SF Utilization Capacity* 50 50 50 50 Condition Good Good Good Fair Useful Life 25 Years 25 Years 25 Years 25 Years Other Site Enhancements None Land Value Site Acreage Schedule # 9.76 Acres 6301212042 On June 18, 1992 9.76 acres were dedicated by Briargate Joint Venture for school use only. Ownership was transferred on August 31, 1998 from the district to the Academy School District Building Authority as collateral for COP’s issued by the District. ASD20 - Facility and Site Manual 37 June 2011 PRAIRIE HILLS ELEMENTARY SCHOOL 2008-09 ACTUAL BUDGETED STAFFING** 2011 2010 SALARIES/BENEFITS Instructional Staff Administrator Office/Trades Other Total Salaries Total Benefits 44.52 2.00 2.44 48.96 45.46 2.00 2.44 49.90 OTHER EXPENDITURES Purchased Services Utilities Supplies and Materials Capital Outlay Total Other GRAND TOTAL $ Projected Student Enrollment FTE Cost per Student - FTE 2009-10 ACTUAL 2010-11 BUDGET 2,178,490 174,170 166,218 2,518,878 524,496 2,162,315 176,515 163,223 2,502,053 547,418 2,217,825 177,398 164,039 2,559,262 574,483 26,593 75,296 117,091 52,257 271,237 19,519 77,351 108,084 204,954 19,000 78,000 103,844 200,844 3,254,425 $ 3,334,589 3,314,611 506 6,551 $ 542 6,004 543 6,141 **Budgeted staffing uses Teacher Equivalents (TE) Site Condition Electrical Building Structure HVAC & Mechanical Plumbing Lighting Flooring Grounds RATING Good RATING Good RATING Good RATING Good RATING Good RATING Fair RATING Good Health/safety needs will always be considered the highest priority. Major capital items that require substantial resources to complete will be included for consideration during the next G.O. Bond planning process. Other capital items will be scored using the Capital Reserve Project Designation Method for ranking and possible inclusion in the annual budget process. ASD20 - Facility and Site Manual 38 June 2011 Prairie Hills Elementary School Description Replace restroom Floors Replace main and North boys restroom partitions Repair gym wall perimeter exterior drainage Repair and replace restroom floor cracks and partitions Repair gym wall subsurface water issue; install perimeter drain Provide wet fire suppression system Cracked asphalt at all lots - patch cracks; seal parking lot Add ventilation system to copy room Drainage off of building on the northwest side drains onto sidewalks Storm sewer - repair outlet pipe of inlet at southeast corner - add concrete collar and regrade ADA Allowance: Provide ADA compliant door levers, automatic access control to storefront doors Replace portable AC units Building envelope allowance: Exterior door sweeps, paint, flashing repairs, caulk, control joint repair, window seals, windows, glazing, storefront, mortar repair, graffiti seal Grounds allowance: drainage, erosion control, parking lots, curb and gutter, playgrounds, irrigation, sod; repair Interior architectural allowance: interior blinds, new cafeteria tables are needed, replace folding panel partition at gym/stage, interior door hardware. Replace carpet in all classrooms, offices, library, and support spaces; install VCT or polished concrete in corridors Folding panel partition at gym and stage is not a good sound barrier; replace Exterior lighting is inadequate. Add new parking lot lighting. Repair exterior window seals separating from brick jambs Replace sliding wood doors in classrooms Paint all interior HM doors and frames Replace existing boilers with HE boilers Replace windows throughout building Gymnasium air handling unit noise Type Flooring Building Building Deferred Capital Capital Potential Funding Source Priority Maintenance Improvement Renewal 1 45,000 Capital Reserve 1 13,000 Capital Reserve 2 5,400 Capital Reserve Flooring 2 14,000 Capital Reserve Building Building 2 2 55,000 192,000 Capital Reserve Capital Reserve Grounds HVAC & Mech 3 3 6,800 Capital Reserve Capital Reserve Building 3 7,500 Capital Reserve Plumbing 3 12,000 Capital Reserve Building HVAC & Mech 4 4 45,000 Capital Reserve 16,000 Capital Reserve Building 4 25,000 Capital Reserve Grounds 4 35,000 Capital Reserve Building 4 60,000 Capital Reserve Flooring 4 105,000 Capital Reserve Building 6 37,000 Capital Reserve Lighting 6 65,000 Capital Reserve Building Building Building HVAC & Mech Building HVAC & Mech 6 6 6 6 6 9 Total ASD20 - Facility and Site Manual 9,700 3,000 5,900 28,000 112,000 165,000 4,000 9,700 39 484,700 Capital Reserve Capital Reserve Capital Reserve Capital Reserve Capital Reserve Capital Reserve 571,900 June 2011 RANCH CREEK ELEMENTARY SCHOOL Grades Served: PK‐5 Year Opened: 2007 9155 Tutt Boulevard Colorado Springs, CO 80924 Phone 719.234.5500 www.asd20.org Site History Original Construction Date: Original: Total 2007 Square Utilization Capacity* Footage 55,500 510 55,500 510 *Utilization Capacity is 85% of Building Design Capacity Insurance Replacement Value $10,881,787 Architect: DLR Group Contractor: Bryan Construction Ancillary Buildings Utilization Age Size Capacity* ID None Historical Cost $9,532,943 $9,532,943 Condition Useful Life Other Site Enhancements None Land Value Site Acreage Schedule # 10.0 Acres 6236107025 On April 13, 2006 10 acres were dedicated to the district by Villages at Wolf Ranch, LLC. Navigation and lighting easements are included. ASD20 - Facility and Site Manual 40 June 2011 RANCH CREEK ELEMENTARY SCHOOL 2008-09 ACTUAL BUDGETED STAFFING** 2011 2010 SALARIES/BENEFITS Instructional Staff Administrator Office/Trades Other Total Salaries Total Benefits 30.51 2.00 2.00 34.51 33.07 2.00 2.00 37.07 OTHER EXPENDITURES Purchased Services Utilities Supplies and Materials Capital Outlay Total Other 2009-10 ACTUAL 1,122,996 124,920 145,763 1,393,679 310,748 1,244,824 164,307 137,222 1,546,353 360,368 1,372,781 165,129 137,908 1,675,818 400,164 17,015 68,686 80,989 13,095 63,801 61,183 2,573 140,652 13,000 64,000 61,403 138,403 2,047,373 $ 2,214,385 166,690 GRAND TOTAL $ Projected Student Enrollment FTE Cost per Student - FTE 2010-11 BUDGET 1,871,117 297 6,300 $ 324 6,319 358 6,185 **Budgeted staffing uses Teacher Equivalents (TE) Site Condition Electrical Building Structure HVAC & Mechanical Plumbing Lighting Flooring Grounds RATING Good RATING Good RATING Good RATING Good RATING Good RATING Good RATING Good Health/safety needs will always be considered the highest priority. Major capital items that require substantial resources to complete will be included for consideration during the next G.O. Bond planning process. Other capital items will be scored using the Capital Reserve Project Designation Method for ranking and possible inclusion in the annual budget process. NO FACILITY/SITE REPAIRS OR ENHANCEMENTS LISTED AT THIS TIME ASD20 - Facility and Site Manual 41 June 2011 ROCKRIMMON ELEMENTARY SCHOOL Grades Served: K‐5 Year Opened: 1972 194 Mikado Drive West Colorado Springs, CO 80919 Phone 719.234.5200 www.asd20.org Site History Original Construction Date: Original 1975 Addition 1977 Addition 1978 Addition 1989 Addition Total 1972 Square Utilization Capacity* Footage 5,723 78 11,942 163 7,800 106 7,056 97 3,687 -036,208 444 *Utilization Capacity is 85% of Building Design Capacity Insurance Replacement Value $7,752,970 Architect: LKA Partners Contractor: Fred Fletmeyer Ancillary Buildings Utilization Age Size Capacity* ID #28 8 Years 1,440 50 Historical Cost Unknown $265,000 $244,700 $221,300 $203,000 $695,000 Condition Good Useful Life 25 Years Other Site Enhancements None Land Value Site Acreage 10.67 Acres Schedule # 6307203012 On June 30, 1971 the district purchased from Rockrimmon Land Company 10.67 acres for a purchase price of $32,232. The property is to be used exclusively for school purposes. ASD20 - Facility and Site Manual 42 June 2011 ROCKRIMMON ELEMENTARY SCHOOL 2008-09 ACTUAL BUDGETED STAFFING** 2011 2010 SALARIES/BENEFITS Instructional Staff Administrator Office/Trades Other Total Salaries Total Benefits 29.29 2.50 1.62 33.41 28.76 1.50 1.62 31.88 OTHER EXPENDITURES Purchased Services Utilities Supplies and Materials Capital Outlay Total Other GRAND TOTAL $ Projected Student Enrollment FTE Cost per Student - FTE 2009-10 ACTUAL 2010-11 BUDGET 1,403,838 135,306 112,452 1,651,596 360,841 1,368,564 136,261 110,936 1,615,761 361,477 1,350,204 91,522 111,491 1,553,217 366,321 37,295 46,827 57,711 141,833 30,865 47,357 59,327 137,549 28,000 48,000 54,440 130,440 2,114,787 $ 2,049,978 2,154,270 359 6,001 $ 345 6,130 327 6,269 **Budgeted staffing uses Teacher Equivalents (TE) Site Condition Electrical Building Structure HVAC & Mechanical Plumbing Lighting Flooring Grounds RATING Good RATING Good RATING Poor RATING Good RATING Good RATING Good RATING Good Health/safety needs will always be considered the highest priority. Major capital items that require substantial resources to complete will be included for consideration during the next G.O. Bond planning process. Other capital items will be scored using the Capital Reserve Project Designation Method for ranking and possible inclusion in the annual budget process. ASD20 - Facility and Site Manual 43 June 2011 Rockrimmon Elementary School Description Utilization equipment - building has inadequate quantities of receptacles and branch circuits throughout. Provide additional outlets and circuits. Provide chilled water, air cooled condenser systems, fan coil units Air conditioners serving the computer lab and corridor are approaching the end of service life Clock program system is performing below acceptable standards; replace Panel boards in 1972/1974 areas are obsolete and should be replaced Doors - none in original building corridors - can't secure; replace all Type Deferred Capital Priority Maintenance Improvement Replace motor, 3 phase, 230V, 1HP, custodial office Painting, interior on plaster and drywall, primer and one-coat Undersized stalls in men's toilets at gymnasium; reconfigure restrooms at gymnasium Total ASD20 - Facility and Site Manual Potential Funding Source Electrical HVAC & Mech HVAC & Mech 1 60,000 Capital Reserve 1 602,995 Capital Reserve Building 2 Electrical 2 88,000 Capital Reserve Building 2 123,400 Capital Reserve 1 Domestic water piping has not been insulated; insulate Plumbing Gravel drive on east side badly deteriorated, replace with asphalt Grounds Asphalt visitor parking area; replace with full depth section Grounds Improve drainage at north side of building by regrading and resurfacing. Combine with asphalt maintenance. Asphalt playground deteriorating, replace with concrete pad Replace all single pane glazing and frames Wood siding at walls above roof level need to be restained/painted. Secure loose trim. Painting, exterior on masonry and wood, primer and one-coat Upgrade primary electrical feed Capital Renewal 12,000 Capital Reserve 30,000 Capital Reserve 3 4,000 Capital Reserve 3 14,000 Capital Reserve 3 115,000 Capital Reserve Building 3 Grounds Building 3 4 Building 6 Building Electrical 6 6 Electrical 6 1,852 Capital Reserve Building 6 31,100 Capital Reserve Plumbing 9 10,000 Capital Reserve 175,000 2,500 Capital Reserve 21,960 81,000 2,500 44 44,000 Capital Reserve Capital Reserve 13,000 1,116,955 Capital Reserve Capital Reserve Capital Reserve 310,352 June 2011 SCHOOL IN THE WOODS Grades Served: Year Opened: 4th 1999 12002 Vollmer Road Colorado Springs, CO 80908 Phone 719.495.1865 www.asd20.org Site History Original Construction Date: Original 1999 Utilization Square Capacity* Footage -0-0- Total -0- -0- Historical Cost -0$-0- *Utilization Capacity is 85% of Building Design Capacity Insurance Replacement Value $289,919 Architect: N/A Contractor: N/A Ancillary Buildings ID #29 #31 #32 Age 10 Years 31 Years 31 Years Size 1,440 1,440 1,440 Utilization Capacity* 50 50 50 Condition Good Fair Fair Useful Life 25 Years 25 Years 25 years Other Site Enhancements None- Land Value Site Acreage Schedule # 549.55 Acres 5200000294 On March 10, 1999 the district purchased from the State Land Board 10 acres for $70,000. The property transferred by Sate of Colorado Patent 8228. The state has the first right of refusal if the district wants to sell the land. On December 8, 1997 a 25 year lease (December 2022) was signed from the state land board for $250 per year. This lease is for 539.55 acres. The lease number is S42326. ASD20 - Facility and Site Manual 45 June 2011 SCHOOL IN THE WOODS Site Condition Electrical Building Structure HVAC & Mechanical Plumbing Lighting Flooring Grounds RATING Good RATING Good RATING Good RATING Good RATING Good RATING Good RATING Good Health/safety needs will always be considered the highest priority. Major capital items that require substantial resources to complete will be included for consideration during the next G.O. Bond planning process. Other capital items will be scored using the Capital Reserve Project Designation Method for ranking and possible inclusion in the annual budget process. ASD20 - Facility and Site Manual 46 June 2011 School in the Woods Description Upgrade building electrical distribution (switches and outlets) Replace service panel, 3 phase, 4 wire, 120/208V, 100 Amp Replace baseboard heating unit with heat pump Replace wood door, hollow core, frame and hardware at bathroom Painting, interior on plaster and drywall, primer and one-coat Replace steel single door, frame and hardware Type Deferred Capital Capital Potential Funding Source Priority Maintenance Improvement Renewal Electrical 3 5,328 Capital Reserve Electrical HVAC & Mech 3 6 33,450 2,653 Capital Reserve Capital Reserve Building 6 1,116 Capital Reserve Building Building 6 6 1,320 Capital Reserve 4,401 Capital Reserve Total ASD20 - Facility and Site Manual - 47 38,778 9,490 June 2011 THE DA VINCI ACADEMY Grades Served: K‐5 Year Opened: 2004 1335 Bridle Oaks Colorado Springs, CO 80921 Phone 719.234.5400 www.asd20.org Site History Original Construction Date: 2004 Square Footage Original: 56,500 Total 56,500 Utilization Capacity* 510 510 *Utilization Capacity is 85% of Building Design Capacity Insurance Replacement Value $11,547,828 Architect: Holger C. Christiansen & Partners Contractor: Nunn Construction Ancillary Buildings Utilization Age Size Capacity* ID None‐ Historical Cost $7,308,095 $7,308,095 Condition Useful Life Other Site Enhancements None Land Value Site Acreage Schedule # 10.03 Acres 6217200013 On July 29, 2002 10.03 acres were dedicated from Picolan, Inc. for school use only. Several easements are on the property. ASD20 - Facility and Site Manual 48 June 2011 THE DA VINCI ACADEMY BUDGETED STAFFING** 2010 2011 SALARIES/BENEFITS Instructional Staff Administrator Office/Trades Other Total Salaries Total Benefits 31.21 2.00 2.48 35.69 2008-09 ACTUAL 30.71 2.00 2.48 35.19 OTHER EXPENDITURES Purchased Services Utilities Supplies and Materials Capital Outlay Total Other GRAND TOTAL $ Projected Student Enrollment FTE Cost per Student - FTE 2009-10 ACTUAL 2010-11 BUDGET 1,558,406 169,687 163,570 1,891,663 437,822 1,431,237 167,787 154,797 1,753,821 419,835 1,414,617 168,626 155,571 1,738,814 426,769 28,853 64,400 82,420 1,210 176,883 27,746 62,526 68,560 1,644 160,476 27,000 63,000 59,827 149,827 2,334,132 $ 2,315,410 2,506,368 434 5,775 $ 403 5,792 375 6,174 **Budgeted staffing uses Teacher Equivalents (TE) Site Condition Electrical Building Structure HVAC & Mechanical Plumbing Lighting Flooring Grounds RATING Good RATING Good RATING Good RATING Good RATING Good RATING Good RATING Good Health/safety needs will always be considered the highest priority. Major capital items that require substantial resources to complete will be included for consideration during the next G.O. Bond planning process. Other capital items will be scored using the Capital Reserve Project Designation Method for ranking and possible inclusion in the annual budget process. NO FACILITY/SITE REPAIRS OR ENHANCEMENTS LISTED AT THIS TIME ASD20 - Facility and Site Manual 49 June 2011 WOODMEN ROBERTS ELEMENTARY SCHOOL Grades Served: Year Opened: PK-5th 1990 8365 Orchard Path Road Colorado Springs, CO 80919 Phone 719.234.5300 www.asd20.org Site History Original Construction Date: 1990 Square Footage Original: 49,100 Total Utilization Capacity* 468 49,100 468 Historical Cost $3,910,000 $3,910,000 *Utilization Capacity is 85% of Building Design Capacity Insurance Replacement Value $10,401,827 Architect: Clifford Nakata Contractor: Hughes/Smith Ancillary Buildings ID #24 Age 8 Years Size 1,440 Utilization Capacity* 50 Condition Good Useful Life 25 Years Other Site Enhancements None- Land Value Site Acreage Schedule # 12 Acres 7303401001 On February 22, 1990, 12 acres were dedicated to the district by the Peregrine Joint Venture for school use only. ASD20 - Facility and Site Manual 50 June 2011 WOODMEN ROBERTS ELEMENTARY SCHOOL 2008-09 ACTUAL BUDGETED STAFFING** 2011 2010 SALARIES/BENEFITS Instructional Staff Administrator Office/Trades Other Total Salaries Total Benefits 34.11 2.00 2.10 38.21 34.15 1.50 2.11 37.76 OTHER EXPENDITURES Purchased Services Utilities Supplies and Materials Capital Outlay Total Other GRAND TOTAL $ Projected Student Enrollment FTE Cost per Student - FTE 2009-10 ACTUAL 2010-11 BUDGET 1,425,236 187,463 147,856 1,760,555 384,248 1,433,128 189,642 148,115 1,770,885 412,244 1,442,196 146,620 149,331 1,738,147 425,064 46,367 76,667 67,392 2,787 193,213 29,780 70,443 65,406 165,629 29,000 71,000 47,300 147,300 2,348,758 $ 2,310,511 2,338,016 306 7,641 $ 324 7,249 298 7,753 **Budgeted staffing uses Teacher Equivalents (TE) Site Condition Electrical Building Structure HVAC & Mechanical Plumbing Lighting Flooring Grounds RATING Good RATING Good RATING Good RATING Good RATING Good RATING Good RATING Good Health/safety needs will always be considered the highest priority. Major capital items that require substantial resources to complete will be included for consideration during the next G.O. Bond planning process. Other capital items will be scored using the Capital Reserve Project Designation Method for ranking and possible inclusion in the annual budget process. ASD20 - Facility and Site Manual 51 June 2011 Woodmen Roberts Elementary School Description Add smoke detectors for coat rack areas in hallways Replace boiler, cast iron, gas-fired, hot water, 135 MBH, domestic hw - cyclical Intercom system replace head end and speakers Repair threshold/concrete grade at gymnasium double doors Replace clock system with wireless/satellite system and integrate with intercom alarm schedule Replace folding wall panels in classrooms Replace roof with single ply system Exterior door seals deteriorated Painting, exterior on metal, primer and one-coat Replace all parking surfaces and damaged curb Repair floor at freezer Provide chilled water, air cooled condenser systems, fan-coil units Repair spalled and chipped concrete at the lower parking lot surrounding the crosswalk area; new curb and gutter too, new striping is needed Replace door closers in poor condition Replace door hardware throughout Replace wire reinforced glass in corridors Replace windows, all Type Deferred Capital Priority Maintenance Improvement Building 1 HVAC & Mech Building 1 1 Building 2 Building Building Building Building Building Grounds Flooring 2 2 2 3 3 3 4 HVAC & Mech 4 Grounds Building Building Building Building 4 4 4 6 9 Total ASD20 - Facility and Site Manual 9,000 Capital Reserve 7,719 Capital Reserve 32,000 Capital Reserve 3,100 Capital Reserve 30,000 62,000 3,500 650 Capital Reserve Capital Reserve 282,750 Capital Reserve Capital Reserve 10,000 Capital Reserve 241,000 Capital Reserve General Fund 546,483 64,000 203,500 7,250 52 Capital Potential Funding Renewal Source 914,983 Bond Issuance 5,000 Capital Reserve 11,000 Capital Reserve 30,000 Capital Reserve Capital Reserve Capital Reserve 619,469 June 2011 Middle Schools CHALLENGER MIDDLE SCHOOL Grades Served: Year Opened: 6-8 1965 10215 Lexington Drive Colorado Springs, CO 80920 Phone 719.234.3000 www.asd20.org Site History Original Construction Date: Original: 1970 Addition 1978 Addition 1986 Addition/Remodel 1988 Addition/Remodel 1997 Addition/Remodel 2003 Addition/Remodel Total 1965 Square Utilization Capacity* Footage 54,758 914 40,423 -0747 -0-0-02,260 -02,400 -04,761 -0101,793 914 Historical Cost $1,102,860 Unknown $1,879,000 Unknown $ 222,000 $2,067,708 $ 112,724 $5,384,292 *Utilization Capacity is 85% of Building Design Capacity Insurance Replacement Value $21,520,503 Architect: Edward L. Bunts & F. Lamar Kelsey Contractor: Fred Fletemeyer Ancillary Buildings ID #36 Age 45 Years Size 1,440SF Utilization Capacity* 50 Condition Poor Useful Life 25 Years Other Site Enhancements Baseball/Softball Field Football Field Running Track Tennis Courts (Two Courts) Land Value Site Acreage Schedule # 24.59 Acres 6200000274 On December 11, 1964, 22.67 acres were dedicated by Cimarron Development Company for school use only. September 22, 1987 an additional 1.92 acres were dedicated by Briargate Joint Venture. ASD20 - Facility and Site Manual 53 June 2011 CHALLENGER MIDDLE SCHOOL BUDGETED STAFFING** 2010 2011 SALARIES/BENEFITS Instructional Staff Administrator Office/Trades Other Total Salaries Total Benefits 51.13 2.00 3.78 56.91 2008-09 ACTUAL 53.63 2.00 3.78 59.41 OTHER EXPENDITURES Purchased Services Utilities Supplies and Materials Capital Outlay Total Other GRAND TOTAL $ Projected Student Enrollment FTE Cost per Student - FTE 2009-10 ACTUAL 2010-11 BUDGET 2,126,298 195,214 347,319 2,668,831 578,362 2,242,954 266,797 326,072 2,835,823 639,860 2,373,049 268,131 327,702 2,968,882 687,361 65,119 138,741 166,282 19,306 389,448 52,384 156,131 145,296 4,290 358,101 52,000 157,000 104,237 313,237 3,833,784 $ 3,969,480 3,636,641 631 5,763 $ 635 6,037 621 6,392 **Budgeted staffing uses Teacher Equivalents (TE) Site Condition Electrical Building Structure HVAC & Mechanical Plumbing Lighting Flooring Grounds RATING Good RATING Good RATING Fair RATING Good RATING Good RATING Fair RATING Good Health/safety needs will always be considered the highest priority. Major capital items that require substantial resources to complete will be included for consideration during the next G.O. Bond planning process. Other capital items will be scored using the Capital Reserve Project Designation Method for ranking and possible inclusion in the annual budget process. ASD20 - Facility and Site Manual 54 June 2011 Challenger Middle School Descri pti on Provide eyewash station and deluge shower at Industrial Arts Studio Replace sawdust collection system No adequate sound system exists in gymnasium Crawl space piping insulation Repair/replace welding booth exhaust system 2 motorized backstops operate with jerky motion Replace AHU serving boys locker room Replace AHU serving the main office area Replace gymnasium bleachers and scoreboard Replace all door harware throughout the building Provide emergency exit sign at main office Upgrade electrical outlets in Kitchen to GFI Serving counter is missing glass sneeze guard / violates Health Dept hot food storage code. Some corridor doors missing closers/smoke seals North - significant cow trails - travel walkway should be considered Replace paint spray booth exhaust fan system Type Single solids interceptor inadequate for double sinks at Art Room. Waste piping not per code. Provide dugouts at softball field Replace all corridor doors/frames/hardware Conduct asbestos survey and abatement Upgrade and replace as necessary kiss n go and faculty access drives. Improve grade, landscaping, and safety features for bus lot/play area Replace bathroom exhaust fan Provide new lockers throughout Install new MUA unit in kitchen Vacuum breakers are required at all hose bibbs and wall hydrants Out building needs gutters to eliminate wash-out around base of building Roof overflow directly above doors at exit stair Capi tal Deferred Capital Maintenance Improvement Renewal Potential Funding Source Plumbing 1 1,952 Capital Reserve Building Building Building HVAC & Mech Electrical HVAC & Mech HVAC & Mech Building Building Building Electrical 1 1 1 16,000 25,000 40,000 Capital Reserve Capital Reserve Capital Reserve Building 2 1 10,000 Capital Reserve 1 22,000 Capital Reserve 1 40,000 Capital Reserve 1 40,000 Capital Reserve 72,000 362 2,118 Capital Reserve Capital Reserve General Fund Capital Reserve 2,300 Capital Reserve 1 2 2 2 102,000 Building 2 4,000 Capital Reserve Grounds 2 24,500 Capital Reserve HVAC & Mech Grounds 2 24,875 Capital Reserve 2 26,500 Capital Reserve 2 48,000 Capital Reserve 2 49,000 Capital Reserve 2 85,000 Capital Reserve Replace all track field event areas at football field Plumbing fixtures and flush valves outdated. ADA fixtures not present. Showers damaged. Emergency showers not installed. Dual handle metering faucets Plumbing no longer allowed. Sinks in the shop area damaged, not in use. Replace all toilet partitions Plumbing Provide new parking lot and building exterior Grounds lighting HVAC & Replace the airhandler serving the boys locker room Mech Gym floor has reached max number of sandings; repaing floor and provide for longer lasting floor Flooring finish Paint building exterior Building Replace all exterior doors Building Provide new tennis courts, post tension concrete system with new perimeter fencing. Maintain area Grounds for basketball goals Some stucco repair needed west of entry Building Recaulk exterior windows and wall expansion joints Priority 2 4,900 Capital Reserve 2 9,700 Capital Reserve 2 2 42,000 114,500 Capital Reserve Capital Reserve 2 125,000 Capital Reserve 3 4,000 Capital Reserve Building 3 6,515 Capital Reserve Plumbing 3 1,800 Capital Reserve Grounds Building Building 3 3 3 16,000 140,000 150,000 Capital Reserve Capital Reserve Capital Reserve Grounds 3 254,500 Capital Reserve Electrical Building HVAC & Mech 3 3 973 150,000 4 32,000 Plumbing 6 1,200 Capital Reserve General Fund Capital Reserve Food Service Building 6 2,500 Capital Reserve Building 6 4,000 Capital Reserve Single compartment grease interceptor not per code Building Capital Reserve Upgrade heating system to 4 pipe heating and cooling system Replace switchboard in NE boiler room 120/208V, 200 Amp New carpet for classrooms, office, and lounge. New flooring for cafeteria and vct corridors Missing brick veneer at lower level courtyard Walk-ins are missing interior coved base Only one accessible access to gymnasium…add door Total ASD20 - Facility and Site Manual 6 4,500 HVAC & Mech 6 1,000,000 Electrical 6 34,678 Flooring 6 273,000 Building Grounds 9 9 Building 9 3,400 44,500 1,969,607 Capital Reserve Bond Issuance Capital Reserve Capital Reserve 1,000 115,915 55 Bond Issuance Capital Reserve 970,751 June 2011 EAGLEVIEW MIDDLE SCHOOL Grades Served: Year Opened: 6-8 1986 1325 Vindicator Drive Colorado Springs, CO 80919 Phone 719.234.3400 www.asd20.org Site History Original Construction Date: Original: 1997 Addition Total 1986 Square Utilization Capacity* Footage 110,000 850 27,135 255 137,135 1,105 Historical Cost $10,401,000 $ 4,152,776 $14,553,776 *Utilization Capacity is 85% of Building Design Capacity Insurance Replacement Value $29,144,027 Ancillary Buildings Age ID None-- Size Classrooms Condition Useful Life Other Site Enhancements Softball/Baseball Field Tennis Courts Track/Football Field Land Value Site Acreage Schedule # 55.877 Acres 7314101002 On August 18, 1977, 74.448 acres were purchased via a promissory note from D.H. Wilson for $165,067. Two parcels were purchased – 44.025 and 19.536 acres. The deed of trust was released on February 7, 1986. On June 15, 1984 the district traded parcels of equal size with parks and recreation to acquire more desirable shaped school site. The Vindicator property of 19.536 acres has been sold. The track used by the school is partially located on park ground. It is unclear whether a joint use agreement with the parks has been signed. ASD20 - Facility and Site Manual 56 June 2011 EAGLEVIEW MIDDLE SCHOOL 2008-09 ACTUAL BUDGETED STAFFING** 2011 2010 2009-10 ACTUAL 2010-11 BUDGET SALARIES/BENEFITS Instructional Staff Administrator Office/Trades Other Total Salaries Total Benefits 77.02 3.00 4.97 84.99 77.01 3.00 4.97 84.98 OTHER EXPENDITURES Purchased Services Utilities Supplies and Materials Capital Outlay Total Other GRAND TOTAL $ Projected Student Enrollment FTE Cost per Student - FTE 3,146,225 329,396 444,628 3,920,249 849,251 3,097,735 263,236 414,557 3,775,528 866,718 3,112,748 264,552 416,630 3,793,930 892,606 91,060 200,181 198,351 51,221 540,813 76,873 201,235 193,637 13,503 485,248 76,000 202,000 142,706 420,706 5,127,494 $ 5,107,242 5,310,313 949 5,596 $ 964 5,319 911 5,606 **Budgeted staffing uses Teacher Equivalents (TE) Site Condition Electrical Building Structure HVAC & Mechanical Plumbing Lighting Flooring Grounds RATING Good RATING Fair RATING Good RATING Good RATING Good RATING Good RATING Good Health/safety needs will always be considered the highest priority. Major capital items that require substantial resources to complete will be included for consideration during the next G.O. Bond planning process. Other capital items will be scored using the Capital Reserve Project Designation Method for ranking and possible inclusion in the annual budget process. ASD20 - Facility and Site Manual 57 June 2011 Eagleview Middle School Description Install perimeter drain system, seal cold joints and apply a foundation wall materproofing membrane at new wing Downspouts drain over sidewalks, repair drainage at door 327 and pd entrances Ponding water on the west side of the building. Drainage from athletic field sitting at foundation of building. Regrade. Install new theater dimming and lighting Turf at softball field, repair grade issues Cracking in masonry bearing wall in Wood Shop. Door and frames rusting near Wood Shop Carpet squares/vinyl tile old and fraying in corridor entrances, replce with VCT or polished concrete Demo, regrade, and replace concrete entries at new wing and old bldg East parking lot asphalt-patch cracks and seal coat Kiln exhaust is inadequate, install new Upgrade all bathroom fixtures Install anchors, improve drainage and grading, alter backfill conditions at Gym exterior wall per detail plan. Replace steamer 6-burner range is approaching end of service life Replace all exterior doors, frames, and hardware Improve perimeter drainage at new addition entry locations and other problem drainage areas Renovate all bathroom interiors Replace aluminum frame and glazing at lower courtyard, cyclical Replce all wood double hung exterior windows Turf burned out at main entry. Needs to be resodded and have irrigation checked. Tennis Court Resurface Repair grading and add storm sewer along rear southeast corner in fire access Emergency generator needs a new transfer switch Type Priority Deferred Maintenance Capital Improvement Capital Renewal Potential Funding Source Building 1 Grounds 2 4,300 Building Lighting Grounds Building Building 2 2 2 2 2 15,000 Flooring 2 Building Grounds 2 3 HVAC & Mech Plumbing 3 3 Building Building Electrical Building 3 3 3 3 650,000 Capital Reserve 2,800 Capital Reserve 9,100 Food Service 161,609 Capital Reserve Building Plumbing 4 4 5,000 55,000 Capital Reserve Capital Reserve Building Building 6 6 231,831 Capital Reserve Capital Reserve Grounds Grounds 6 6 Grounds Electrical 9 9 Total ASD20 - Facility and Site Manual 200,000 Capital Reserve 25,000 55,000 150,000 Capital Reserve Capital Reserve Capital Reserve Capital Reserve 9,500 Capital Reserve 30,000 Capital Reserve 75,000 Capital Reserve Capital Reserve 4,500 7,500 Capital Reserve Capital Reserve 91,925 21,698 5,000 Capital Reserve 75,000 Capital Reserve 50,000 52,998 58 Capital Reserve 1,513,756 Capital Reserve 10,000 Capital Reserve 378,009 June 2011 MOUNTAIN RIDGE MIDDLE SCHOOL Grades Served: Year Opened: 6-8 1997 9150 Lexington Drive Colorado Springs, CO 80920 Phone 719.234.3200 www.asd20.org Site History Original Construction Date: Original: Total 1997 Square Utilization Capacity* Footage 111,400 1,040 111,400 1,040 Historical Cost $9,007,104 $9,007,104 *Utilization Capacity is 85% of Building Design Capacity Insurance Replacement Value $24,540,861 Architect: DLR Group Lescher & Mahoney Contractor: Hughes Smith, Inc. Ancillary Buildings ID #41 #42 #43 Age 19 Years 15 Years 31 Years Size 1,440SF 1,440SF 1,440SF Utilization Capacity* 50 50 50 Condition Good Good Fair Useful Life 25 Years 25 Years 25 Years Other Site Enhancements Softball Field Football Field/Track Land Value Site Acreage Schedule # 19.194 Acres 6235419002 On November 30, 1995, 19.194 acres were dedicated by LP47, LLC for school use only. ASD20 - Facility and Site Manual 59 June 2011 MOUNTAIN RIDGE MIDDLE 2008-09 ACTUAL BUDGETED STAFFING** 2011 2010 SALARIES/BENEFITS Instructional Staff Administrator Office/Trades Other Total Salaries Total Benefits 81.31 4.00 4.24 89.55 79.04 4.00 4.20 87.24 OTHER EXPENDITURES Purchased Services Utilities Supplies and Materials Capital Outlay Total Other GRAND TOTAL $ Projected Student Enrollment FTE Cost per Student - FTE 2009-10 ACTUAL 2010-11 BUDGET 3,418,455 339,361 430,138 4,187,954 919,596 3,508,330 341,139 429,728 4,279,197 978,863 3,417,929 342,845 429,975 4,190,749 982,528 114,352 169,052 217,041 500,445 96,712 175,343 202,344 474,399 96,000 176,000 195,275 467,275 5,732,459 $ 5,640,552 5,607,995 1,114 5,034 $ 1,094 5,240 1,114 5,063 **Budgeted staffing uses Teacher Equivalents (TE) Site Condition Electrical Building Structure HVAC & Mechanical Plumbing Lighting Flooring Grounds RATING Good RATING Good RATING Good RATING Good RATING Good RATING Fair RATING Good Health/safety needs will always be considered the highest priority. Major capital items that require substantial resources to complete will be included for consideration during the next G.O. Bond planning process. Other capital items will be scored using the Capital Reserve Project Designation Method for ranking and possible inclusion in the annual budget process. ASD20 - Facility and Site Manual 60 June 2011 Mountain Ridge Middle School Description Upgrade building electrical distribution (switches and outlets), portable buildings Provide public address system, portable buildings Replace gymnasium separation curtains Replace window A/C unit, portable buildings Replace inefficient lighting with HE fluorescent; gym Replace FA system for the entire school Replace carpet, roll goods in portables Replace toilet partition throughout with resin type Painting, interior on masonry, primer and one-coat Replace carpet in all classrooms, offices, library, and support spaces, remove corridor floor covering and install VCT or polish concrete Replace all existing DX Units and balance system Extend roof access hatch ladder Replace reinforced wire glass panel Replace split system A/C unit, air cooled 2.5 ton Type Deferred Capital Priority Maintenance Improvement Potential Funding Source Electrical Building Building Building 1 1 2 2 11,328 25,760 Capital Reserve Capital Reserve 12,500 Capital Reserve 12,909 Capital Reserve Lighting Building Flooring Plumbing Building 3 3 3 3 3 16,400 100,000 Capital Reserve Capital Reserve 16,162 Capital Reserve 24,136 Capital Reserve 60,000 Capital Reserve Flooring HVAC & Mech Building Building HVAC & Mech 3 4 6 6 9 Total ASD20 - Facility and Site Manual Capital Renewal 2,400 - 61 155,888 310,276 Capital Reserve 928,308 Bond Issuance Capital Reserve 8,000 Capital Reserve 15,475 Capital Reserve 1,387,766 June 2011 TIMBERVIEW MIDDLE SCHOOL Grades Served: 6‐8th Year Opened: 1988 8680 Scarborough Drive Colorado Springs, CO 80920 Phone 719.234.3600 www.asd20.org Site History Original Construction Date: 1988 Square Footage Original: 110,000 Total 110,000 Utilization Capacity* 850 850 *Utilization Capacity is 85% of Building Design Capacity Insurance Replacement Value $23,990,801 Architect: Clifford Nakata Contractor: Al Cohen Ancillary Buildings Utilization Age Size Capacity* ID #38 19 Years 1,440 50 #39 16 Years 1,440 50 #40 16 Years 1,440 50 Historical Cost $10,650,000 $10,650,000 Condition Good Good Good Useful Life 25 Years 25 Years 25 Years Other Site Enhancements Softball/Baseball Field Football Field Land Value Site Acreage Schedule # 21.812 Acres 6235419002 On April 25, 1988, 21.812 acres were dedicated by Briargate Joint Venture. Portions of the school site are located outside of the 21.812 acres on State Land Board land used under an easement agreement. Please see the Liberty High School information for further details. ASD20 - Facility and Site Manual 62 June 2011 TIMBERVIEW MIDDLE SCHOOL BUDGETED STAFFING** 2010 2011 SALARIES/BENEFITS Instructional Staff Administrator Office/Trades Other Total Salaries Total Benefits 75.15 3.00 4.69 82.84 2008-09 ACTUAL 74.65 4.00 4.69 83.34 OTHER EXPENDITURES Purchased Services Utilities Supplies and Materials Capital Outlay Total Other GRAND TOTAL $ Projected Student Enrollment FTE Cost per Student - FTE 2009-10 ACTUAL 2010-11 BUDGET 3,334,353 335,634 427,483 4,097,470 859,681 3,483,781 251,209 430,993 4,165,983 916,548 3,477,424 340,406 433,148 4,250,978 938,383 76,678 158,232 211,596 21,208 467,714 74,385 185,505 160,461 2,685 423,036 74,000 186,000 204,165 464,165 5,424,865 $ 1,021 5,313 5,505,567 $ 5,653,526 1,043 5,279 1,035 5,462 **Budgeted staffing uses Teacher Equivalents (TE) Site Condition Electrical Building Structure HVAC & Mechanical Plumbing Lighting Flooring Grounds RATING Good RATING Good RATING Good RATING Good RATING Good RATING Fair RATING Good Health/safety needs will always be considered the highest priority. Major capital items that require substantial resources to complete will be included for consideration during the next G.O. Bond planning process. Other capital items will be scored using the Capital Reserve Project Designation Method for ranking and possible inclusion in the annual budget process. ASD20 - Facility and Site Manual 63 June 2011 Timberview Middle School Description Damaged panic hardware north corridor exit, replace Replace seals and trim damaged at stage folding partition Chain link fencing failing at backstops Install 8' concrete walk for four feet along social trail on east side Add perimeter drain around gymnasiums Repair flooring in room 133 (locker room) Clock program - replace master clock and replace inoperative classroom clocks where battery powered clocks are now installed. Hollow metal frames rusting in west courtyard and entry doors; replace Replace classroom, offices, library, and support spaces carpet; replace corridors with VCT or polished concrete Replace roof with single ply system Replace inefficient lighting with HE fluorescent; Gyms Replace Tennis Courts with concrete post-tension system Repaint metal parapet cap at roof perimeter Replace steel exterior door, frame and hardware at Trailer 301 Replace steel single door, frame and hardware at Trailer 304 Roof flashings - reinforce base flashings Repaint exterior portable classroom building, #304, primer and one-coat Replace carpeting at Trailer 301 Minor curb damage at storm sewer along eastern side. Create dunpster enclosure. Main entrance storefront door, metal and glass, frame and hardware; replace Replace acoustical ceiling tile, 2'X4' in upper floor corridor Replace steel door, frame and hardware at east and west entrance Replace cracked and spalled site concrete, add concrete path from main entry to portables and repair concrete at dumpster area Improve drainage/water deterrance at the gym wall perimeter and new wing perimeter foundation wall cold joints Groundwater drainage into industrial arts other school entrances; add subsurface drainage to divert subsurface drainage facility wide; replace needed storefornt systems to address rust/deterioration Window A/C unit, repair/replace Repair flooring in all showers Replace all pushbutton faucets with new lever handle throughout Repair flooring at the base of all benches Storm sewer - clean pipe outlets on perimeter drain and 12" storm sewer Refinish interior doors and frames Repaint trailer 301 exterior Rebuild ramp to Trailer 301 per ADA codes (30' 0" run) Replace carpet at Trailer 304 Replace steel double door, frame and hardware at west side of cafeteria Replace steel single door, frame and hardware at IT entrance Replace wood deck and ramp at Trailer 304 Gymnasium sound system - does not operate satisfactorily, replace. Replace wood double hung windows throughout Emergency shower and eyewash units need to be upgraded Replace steamer Type Priority Deferred Maintenance Capital Improvement Capital Renewal Potential Funding Source Building 2 2,200 Capital Reserve Building Grounds 2 2 3,400 13,000 Capital Reserve Capital Reserve Grounds Building Flooring 2 2 2 Building 2 35,000 Capital Reserve Building 2 56,400 Capital Reserve Flooring Building 2 2 282,200 Capital Reserve 524,000 Capital Reserve Lighting 3 18,200 Capital Reserve Grounds Building 3 3 140,000 Capital Reserve 4,241 Capital Reserve Building 3 4,401 Capital Reserve Building Building 3 3 4,401 Capital Reserve 4,500 Capital Reserve Building Flooring 3 3 6,048 Capital Reserve 7,862 Capital Reserve Grounds 3 9,000 Capital Reserve Building 3 23,845 Capital Reserve Building 3 43,139 Capital Reserve Building 3 73,202 Capital Reserve Grounds 4 25,000 Capital Reserve Building 4 30,000 Capital Reserve Building HVAC & Mech Flooring 4 4 4 42,000 Capital Reserve 7,727 Capital Reserve 16,000 Capital Reserve Plumbing Flooring 4 6 Grounds Building Building 6 6 6 Building Flooring 6 6 3,500 Capital Reserve 7,862 Capital Reserve Building 6 9,293 Capital Reserve Building Building 6 6 9,401 Capital Reserve 13,648 Capital Reserve Building Building 6 6 35,000 Capital Reserve 217,863 Capital Reserve Plumbing Building 9 9 Total 4,500 114,000 ASD20 - Facility and Site Manual 64 35,600 Capital Reserve Capital Reserve 3,000 5,000 32,875 Capital Reserve Capital Reserve 3,072 Capital Reserve 13,000 59,475 Capital Reserve Capital Reserve 2,500 Capital Reserve 386,700 Capital Reserve 6,400 Capital Reserve 1,446,105 June 2011 High Schools Schools AIR ACADEMY HIGH SCHOOL Grades Served: Year Opened: 9‐12 1959 6910 Carlton Drive United State Air Force Academy, CO 80840 Phone 719.234.2400 www.asd20.org Site History Original Construction Date: Original: 1961 Renovation/Remodel 1962 Renovation/Remodel 1963 Renovation/Remodel 1972 Renovation/Remodel 1975 Renovation/Remodel 1982 Renovation/Remodel 1987 Renovation/Remodel 1989 Renovation/Remodel 1998 Addition/Remodel Total 1959 Square Utilization Capacity* Footage 54,919 1,148 14,900 -03,714 -017,912 -011,684 -041,440 -04,842 -029,951 -0-0-064,000 382 243,362 1,530 Historical Cost $ 1,307,500 Unknown Unknown Unknown Unknown $ 1,471,000 Unknown $ 1,197,000 $ 911,000 $11,464,000 $16,350,500 *Utilization Capacity is 85% of Building Design Capacity Insurance Replacement Value $50,239,352 Architect: Edward L. Bunts & L. Lamar Kelsey Contractor: M.W. Watson Ancillary Buildings Age ID None Size Classrooms Condition Useful Life Other Site Enhancements Football Field/Track – No Seating Baseball/Softball Field Football/Soccer Field/La Cross – With Stadium Seating Tennis Courts – 8 Courts Multi Purpose Practice Field Exterior Locker/Facility Center Land Value Site Acreage Schedule # 48.48 Acres 7200000033 On November 1, 1957 the site was obtained through a lease with the United Sates Air Force for a period of 99 years. The lease will expire October 31, 2056. The lease has since been amended three times. The following is a brief description on the amendments: • Amendment 1 January 1, 1988 ROW 6” sewer line • Amendment 2 May 30, 1997 High School Addition/Renovation • Amendment 3 July, 2009 Removal of Pine Valley from original Lease agreement ASD20 - Facility and Site Manual 65 June 2011 AIR ACADEMY HIGH SCHOOL BUDGETED STAFFING** 2011 2010 SALARIES/BENEFITS Instructional Staff Administrator Office/Trades Other Total Salaries Total Benefits 100.88 5.00 9.56 115.44 2008-09 ACTUAL 101.96 5.00 9.56 116.52 OTHER EXPENDITURES Purchased Services Utilities Supplies and Materials Capital Outlay Total Other GRAND TOTAL $ Projected Student Enrollment FTE Cost per Student - FTE 2009-10 ACTUAL 2010-11 BUDGET 4,947,747 452,813 727,732 6,128,292 1,276,901 4,827,238 458,286 793,117 6,078,641 1,331,791 4,902,730 460,577 797,083 6,160,390 1,383,973 200,016 155,021 259,020 54,686 668,743 193,518 178,684 295,299 33,881 701,382 193,500 179,000 180,703 553,203 8,073,936 $ 1,370 5,893 8,111,814 $ 8,097,566 1,293 6,274 1,270 6,376 **Budgeted staffing uses Teacher Equivalents (TE) Site Condition Electrical Building Structure HVAC & Mechanical Plumbing Lighting Flooring Grounds RATING Good RATING Good RATING Good RATING Good RATING Good RATING Good RATING Good Health/safety needs will always be considered the highest priority. Major capital items that require substantial resources to complete will be included for consideration during the next G.O. Bond planning process. Other capital items will be scored using the Capital Reserve Project Designation Method for ranking and possible inclusion in the annual budget process. ASD20 - Facility and Site Manual 66 June 2011 Air Academy High School Description Type Replace Horizontal blinds/window coatings in Buildings A & B Building HVAC & Upgrade controls version to the most current Mech Install elevator in D Building Building Catch basin backing up in courtyard near Building C Building Erosion and water pooling under bridge across drainage swale located on east side of interior court Grounds Install bathroom toilet partitions at boys restrooms in the team room Plumbing Wrestling Gym bathroom showers, 6 fixtures, 2 wall plumbing Storm sewer - improve courtyard drainage Provide emergency egress lighting at stadium Building D drafting, tech shop classrooms - install new drop ceilings, to include mechanical diffusers, etc. Scoreboards - replace softball and baseball scoreboards, add football for practice field Building D Computer Room - replace heat pump with Computer Room air conditioning unit Bldg A, replace main entry doors and storefrnt system Stage lighting - install new dimmer cabinet. A new dimming system and stage console. Replace floor (install maple) in small Gym, building C Building B, replace VAT with VCT at Classrooms - cyclical Upgrade interior doors and frames throughout Renovate bathrooms throughout Rubber stair treads deteriorating Replace exterior doors in B Bldg Bldg C, replace acoustical ceiling tile Deferred Capital Priority Maintenance Improvement Capital Renewal Potential Funding Source 1 17,000 Capital Reserve 1 1 2 100,000 100,000 Capital Reserve Capital Reserve Capital Reserve 2 3,500 Capital Reserve 2 3,700 Capital Reserve Plumbing Grounds Lighting 2 2 2 6,099 15,000 17,500 Capital Reserve Capital Reserve Capital Reserve Building 2 25,000 Capital Reserve Grounds 2 34,000 Capital Reserve Building Building 2 2 40,000 44,000 Capital Reserve Capital Reserve Lighting Flooring Building Building Plumbing Flooring Building Building 2 2 2 2 2 2 2 2 50,000 60,000 63,767 85,000 118,570 Capital Reserve Capital Reserve Capital Reserve Capital Reserve Capital Reserve 14,500 Capital Reserve 24,000 Capital Reserve 27,000 Capital Reserve 12,000 Replace exterior doors and frames rusting in Buildings A & B Building 2 50,000 Capital Reserve Replace partitions in Buildings A, B, C, Library, and Bldg D Fences - repair and straighten all chain link fences on site including athletic field fences Replace aluminum windows Buildings A & B Roof covering - Replace the entire roof system(s) Clean concrete drainage swale and reset drain inlet located behind stadium press box Expansion joints need sealant at Buildings A and B Repair rust occurring at Buildings A & B columns/fascia Make weight room accessible for wheel chairs, etc. Weed and remulch shrub beds Emergency shower and eyewash units provided, minimal bottle units and showers provided Renovate restroom 426, Bldg D outside of auditorium; renovation shall inslude fixtures, partitions, paint, flooring, lights, and mirrors Upgrade athletic locker rooms, fixtures, partitions, and amenities Replace softball and baseball dugouts and tennis court bleachers Replace tennis courts Replace potable water pressure regulator Building B, vinyl composition tile at corridors - cyclical Building B, replace exterior single glazed storefront Repair and refinish tennis courts Bldg C replace storefront glass Piping and Insulation - Building A/BC/D Replace existing gas, water, and sanitary from building to service feed location Buildings A/B/C/D Glycol added with no correction to system capacities Total Building 2 55,000 Capital Reserve Grounds Building Building 2 2 2 55,000 Capital Reserve 57,000 Capital Reserve 1,250,000 Capital Reserve Grounds Building Building Building Grounds 3 3 3 3 3 Plumbing 4 4,000 Capital Reserve Flooring 4 32,000 Capital Reserve Building 4 70,000 Capital Reserve Grounds Grounds Plumbing Building Building Grounds Building Building 4 4 4 4 4 4 6 6 90,000 100,000 Capital Reserve Capital Reserve Capital Reserve Capital Reserve Capital Reserve Capital Reserve Capital Reserve Capital Reserve Building 6 Building 9 ASD20 - Facility and Site Manual 67 5,000 5,600 14,000 110,000 Capital Reserve Capital Reserve Capital Reserve Capital Reserve 3,000 Capital Reserve 1,500 31,318 45,000 50,000 16,000 25,000 75,000 Capital Reserve 12,000 48,600 Capital Reserve 1,205,136 1,763,318 June 2011 ASPEN VALLEY HIGH SCHOOL Grades Served: 9‐12 Year Opened: 1997 1450 Chapel Hills Drive Colorado Springs, CO 80920 Phone 719.234.6000 www.asd20.org Site History Original Construction Date: Original: Total 1997 Square Utilization Capacity* Footage 16,600 100 16,600 100 Historical Cost $3,057,318 $3,057,318 *Utilization Capacity is 85% of Building Design Capacity Insurance Replacement Value $3,491,938 Architect: Lightle & Fennell Contractor: H.W. Houston Construction Ancillary Buildings Age ID #49 16 Years Size 1,440 SF Utilization Capacity* ‐0‐ Condition Good Useful Life 25 Years Other Site Enhancements None- Land Value Site Acreage Schedule # 2.01 Acres 6304203012 On February 20, 1997, LP47, LLC dedicated 2.01 acres for school use only. La Plata was given double city dedication credits for the site because it was previously platted as a commercial site. Shared drive with pre-school. No documentation on file. ASD20 - Facility and Site Manual 68 June 2011 ASPEN VALLEY HIGH SCHOOL BUDGETED STAFFING** 2010 2011 SALARIES/BENEFITS Instructional Staff Administrator Office/Trades Other Total Salaries Total Benefits 14.95 1.00 1.02 16.97 2008-09 ACTUAL 14.95 1.00 1.02 16.97 OTHER EXPENDITURES Purchased Services Utilities Supplies and Materials Capital Outlay Total Other GRAND TOTAL $ Projected Student Enrollment FTE Cost per Student - FTE 2009-10 ACTUAL 2010-11 BUDGET 574,287 95,071 160,505 829,863 169,475 581,207 96,169 163,801 841,177 181,721 584,113 96,650 164,620 845,383 187,173 35,409 26,665 107,166 35,041 204,281 34,704 23,257 63,878 11,651 133,490 34,000 24,000 71,023 129,023 1,203,619 $ 85 14,160 1,156,388 $ 1,161,579 89 12,993 95 12,227 **Budgeted staffing uses Teacher Equivalents (TE) Site Condition Electrical Building Structure HVAC & Mechanical Plumbing Lighting Flooring Grounds RATING Good RATING Good RATING Good RATING Good RATING Good RATING Good RATING Good Health/safety needs will always be considered the highest priority. Major capital items that require substantial resources to complete will be included for consideration during the next G.O. Bond planning process. Other capital items will be scored using the Capital Reserve Project Designation Method for ranking and possible inclusion in the annual budget process. ASD20 - Facility and Site Manual 69 June 2011 Aspen Valley High School Description Type Replace inefficirnt lighting with HE fluorescent; Lighting Lobby, multi-purpose Provide attic access stairs in lieu of classroom Building ladder HVAC & Replace heating hot water control valves Mech Priority 3 8,300 Capital Reserve 3 23,000 Capital Reserve 3 Total ASD20 - Facility and Site Manual Deferred Capital Capital Potential Funding Maintenance Improvement Renewal Source 65,000 Capital Reserve - 70 31,300 65,000 June 2011 LIBERTY HIGH SCHOOL Grades Served: 9‐12 Year Opened: 1987 8720 Scarborough Drive Colorado Springs, CO 80920 Phone 719.234.2200 www.asd20.org Site History Original Construction Date: Original: Total 1987 Square Utilization Capacity* Footage 186,000 1,148 186,000 1,148 *Utilization Capacity is 85% of Building Design Capacity Insurance Replacement Value $40,004,991 Architect: LKA Contractor: Hensel Phelps Ancillary Buildings Utilization Age Size Capacity* ID #1 16 Years 1,440SF 50 #2 16 Years 1,440SF 50 #3 17 Years 1,440SF 50 #4 6 Years 1,440SF 50 #51 31 Years 1,440SF 50 Historical Cost $17,770,000 $17,770,000 Condition Good Good Good Good Fair Useful Life 25 Years 25 Years 25 Years 25 Years 25 Years Other Site Enhancements Softball Field Baseball Field Practice Field Land Value Site Acreage Schedule # 55.225 Acres 6236301034,6235400001, 6236301035, 6233200001 49.52 acres of a Right of Way (ROW) parcel was granted by the state land board on March 14, 1986. Briargate Investment Group paid the state land board $742,810 for this ROW and received school credits from the city. ROW restricted to school use only. On July 17, 2009 the 1st amendment to ROW to settle dispute over district subleasing space for cell phone towers was settled. State land board must now participate in leases. On March 11, 1986 three additional parcels were dedicated by Briargate Joint venture to make up the entire site. The total dedicated parcels equate to 5.705 acres. Part of Timberview Middle School sits on a portion of this dedication. ASD20 - Facility and Site Manual 71 June 2011 LIBERTY HIGH SCHOOL 2008-09 ACTUAL BUDGETED STAFFING** 2011 2010 SALARIES/BENEFITS Instructional Staff Administrator Office/Trades Other Total Salaries Total Benefits 109.04 5.00 8.52 122.56 113.28 5.00 8.52 126.80 OTHER EXPENDITURES Purchased Services Utilities Supplies and Materials Capital Outlay Total Other GRAND TOTAL $ Projected Student Enrollment FTE Cost per Student - FTE 2009-10 ACTUAL 2010-11 BUDGET 5,072,557 444,710 690,739 6,208,006 1,328,911 5,137,276 439,030 761,884 6,338,190 1,417,987 5,364,583 441,225 765,693 6,571,501 1,508,532 189,553 342,099 312,213 68,779 912,644 175,194 312,252 348,632 87,944 924,022 175,000 313,000 223,336 80,000 791,336 8,680,199 $ 8,871,369 8,449,561 1,451 5,823 $ 1,544 5,622 1,545 5,742 **Budgeted staffing uses Teacher Equivalents (TE) Site Condition Electrical Building Structure HVAC & Mechanical Plumbing Lighting Flooring Grounds RATING Good RATING Good RATING Good RATING Good RATING Good RATING Fair RATING Good Health/safety needs will always be considered the highest priority. Major capital items that require substantial resources to complete will be included for consideration during the next G.O. Bond planning process. Other capital items will be scored using the Capital Reserve Project Designation Method for ranking and possible inclusion in the annual budget process. ASD20 - Facility and Site Manual 72 June 2011 Liberty High School Descripti on Upgrade hanging receptacle system in Wood Shop to GFI Replace Building PA system Replace clocks Provide concessions and PA booths for baseball and softball Upgrade building electrical distribution (switches and outlets), 40% of building Replace steel roll down door at commons Replace pool heat exchanger and pumps Varsity lockers bent, dented at top; Replace all Replace Tennis Courts Water seepage at CMU wall at east stair, peeling paint by coaches office Water from the roof of main building drains under trailers located along the south façade Renovate stairs at stage platform Replace all bathroom fixtures and upgrade floors, walls and partitions Replace 3-floor elevator Upgrade receptacle system in Boys and Girls Locker Room to GFI Provide new curtain in the gymnasium Replace valves in Pool Pump Room Push panic bars need replacement at Library and stage Recaulk all exterior brick expansion joints, windows and doors Repaint all showers Replace all blinds Replace ceiling grid and tiles in commons All HM window/door frames rusting at Pool area; replace Replace lobby clerestory windows Replace all wall pads and flooring at Wrestling Room Replace carpet/tile in all classrooms, offices, and library; replace corridor flooring with VCT or polished concrete, replace locker room and weight room flooring Replace parking lots with new full depth asphalt section Replace concrete under stadium bleachers Provide one (1) 25' X 60' portable classroom buildings, include elec, interom, FA, and data services Fire suppression system, wet pipe Add FA to Portable 4 Flush valves in pool lockers need access panels Water infiltration at Facilities shower/Gym north wall Install fly connector strips and reorient receptacles at Stage lighting Replace wood door, solid core, double door and hardware at Gym storage Replace single steel door, frame and hardware at gym to tennis courts 2-burner range is approaching end of service life, replace Replace exterior steel doors at Cafeteria/Commons Painting, interior on masonry, primer and 1 coat at Pool Replace epoxy resin floor at Cafeteria serving line and Kitchen replace/install sidewalks and access paths to upper playfields Single sewer manhole configuration does not meet code. Grease interceptor undersized and requires frequent service. Renovate girls and boys pool locker rooms Water ponding at Kitchen dock and Auditorium entrance. Add storm drain - tie into adjacent system. Repair asphalt. Replace wood door, solid core, double door and hardware at 114 & 115 Replace locker room shower fixtures, wall-mounted Steamer is approaching end of service life, replace Replace metal door, frame and hardware at Pool Pump Room and Office Replace all pool windows Repaint all exterior metal surfaces Replace panic hardware throughout building Install a deluge valve to water curtain separating the Stage from the audience Storefront door, metal and glass, frame and hardware at main entrance Replace roof Total ASD20 - Facility and Site Manual Deferred Capital Type Priori ty Mai ntenance Improvement Electrical 1 3,040 Building 1 48,360 Building 1 50,000 Capital Renewal Potenti al Fundi ng Source Capital Reserve Capital Reserve Capital Reserve Building 1 95,000 Electrical Building HVAC & Mech Building Grounds 1 1 138,750 1 1 1 Building 2 11,500 Building Building 2 2 16,000 Plumbing Building 2 2 Electrical Building Plumbing Building 2 2 2 2 2,128 7,500 9,800 13,000 Capital Capital Capital Capital Reserve Reserve Reserve Reserve Building Building Building Building Building Building Flooring 2 2 2 2 2 2 2 23,782 24,000 28,000 34,000 51,500 63,000 63,500 Capital Capital Capital Capital Capital Capital Capital Reserve Reserve Reserve Reserve Reserve Reserve Reserve Flooring Grounds Building 2 2 3 283,500 400,000 Building Building Building Building Plumbing 3 3 4 4 4 125,000 454,720 6,000 15,000 47,500 Lighting 4 50,000 Building 4 5,176 Capital Reserve Grounds Electrical Building Building 4 4 4 4 9,601 14,000 18,585 19,500 Capital Reserve Food Service Capital Reserve Capital Reserve Flooring 4 41,780 Capital Reserve Grounds 4 51,900 Capital Reserve Plumbing Building 6 6 22,000 50,000 Capital Reserve Capital Reserve Grounds 6 80,000 Capital Reserve Building Plumbing Building 6 6 6 5,176 6,420 6,700 Building Building Building Building 6 6 6 6 9,176 35,000 40,000 96,361 Plumbing 9 8,000 Building Building 9 9 63,069 10,000 Capital Reserve Capital Reserve 29,000 137,000 650,000 Capital Reserve Capital Reserve Capital Reserve Capital Reserve 14,000 Capital Reserve Capital Reserve 143,200 160,000 Capital Reserve Capital Reserve 92,500 120,000 73 Capital Reserve 1,573,639 Capital Reserve Capital Reserve Capital Reserve Capital Capital Capital Capital Capital Reserve Reserve Reserve Reserve Reserve Capital Reserve Capital Reserve Capital Reserve Capital Reserve Capital Capital Capital Capital Reserve Reserve Reserve Reserve Capital Reserve 1,250,000 3,439,085 Capital Reserve Bond Issuance June 2011 PINE CREEK HIGH SCHOOL Grades Served: Year Opened: 9-12 1998 10750 Thunder Mountain Avenue Colorado Springs, CO 80908 Phone 719.234.2600 www.asd20.org Site History Original Construction Date: Original: 2003 Addition Total 1998 Square Utilization Capacity* Footage 160,000 850 32,530 340 192,530 1,190 Historical Cost $16,015,932 $ 4,456,709 $20,472,641 *Utilization Capacity is 85% of Building Design Capacity Insurance Replacement Value $41,216,901 Architect: DLR Group Lescher & Mahoney Contractor: Hughes Smith, Inc. Ancillary Buildings ID #25 #45 #47 Age 5 Years 5 Years 16 Years Size 1,400SF 1400SF 1400SF Utilization Capacity* 50 50 50 Condition Good Good Good Useful Life 25 Years 25 Years 25 Years Other Site Enhancements Baseball Field Softball Field Practice Field Lacrosse Field with Track Land Value Site Acreage Schedule # 45.7275 Acres 6222401001,6200000530 On December 12, 1997 40.33 acres were dedicated by LP47, LLC for school use only. The district paid for all utility extensions to the school site. There is an agreement to recapture some of these costs with La Plata as development occurs along Old Ranch Road. Details are on file at the district in the La Plata file. On April 29, 2005 acres were dedicated by LP47, LLC for additional athletic fields at Pine Creek High School. ASD20 - Facility and Site Manual 74 June 2011 PINE CREEK HIGH SCHOOL 2008-09 ACTUAL BUDGETED STAFFING** 2011 2010 SALARIES/BENEFITS Instructional Staff Administrator Office/Trades Other Total Salaries Total Benefits 111.16 5.00 8.10 124.26 104.76 5.00 8.10 117.86 OTHER EXPENDITURES Purchased Services Utilities Supplies and Materials Capital Outlay Total Other GRAND TOTAL $ Projected Student Enrollment FTE Cost per Student - FTE 2009-10 ACTUAL 2010-11 BUDGET 5,032,254 489,502 778,478 6,300,234 1,390,773 4,881,645 489,857 861,130 6,232,632 1,421,108 4,601,720 492,306 865,436 5,959,462 1,391,280 174,314 308,356 309,498 4,684 796,852 187,085 306,588 290,446 14,358 798,477 180,000 307,000 246,750 10,000 743,750 8,452,217 $ 8,094,492 8,487,859 1,491 5,693 $ 1,494 5,657 1,341 6,036 **Budgeted staffing uses Teacher Equivalents (TE) Site Condition Electrical Building Structure HVAC & Mechanical Plumbing Lighting Flooring Grounds RATING Good RATING Good RATING Good RATING Good RATING Good RATING Good RATING Good Health/safety needs will always be considered the highest priority. Major capital items that require substantial resources to complete will be included for consideration during the next G.O. Bond planning process. Other capital items will be scored using the Capital Reserve Project Designation Method for ranking and possible inclusion in the annual budget process. ASD20 - Facility and Site Manual 75 June 2011 Pine Creek High School Description Replace rooftop A/C unit #19 Provide emergency egress lighting at stadium Replace carpet in classrooms, offices, library and support spaces; install VCT or polished concrete in corridors, install new gym floor Install keyed electric switch for light rigging at stage Provide new safety compliant floor for all locker rooms Replace tennis courts Provide new electric winch system for light rigging at stage Provide chilled water, air cooled condenser systems, fan coil units, delete rooftop unit replacement Deferred Capital Capital Potential Funding Source Type Priority Maintenance Improvement Renewal HVAC & Mech 1 30,000 Capital Reserve Lighting 2 17,500 Capital Reserve Flooring Electrical 2 4 Flooring Grounds 6 6 27,000 Capital Reserve 250,000 Capital Reserve Electrical 9 2,250 Capital Reserve HVAC & Mech 9 2,142,859 Total ASD20 - Facility and Site Manual 78,000 - 76 2,267,609 425,580 Capital Reserve Capital Reserve Bond Issuance 705,580 June 2011 RAMPART HIGH SCHOOL Grades Served: 9‐12 Year Opened: 1982 8250 Lexington Drive Colorado Springs, CO 80920 Phone 719.234.2000 www.asd20.org Site History Original Construction Date: Original: 1984 Addition 1986 Remodeling 2003 Addition Total 1982 Square Utilization Capacity* Footage 144,000 1,148 34,300 276 -0-034,800 276 213,100 1,700 *Utilization Capacity is 85% of Building Design Capacity Insurance Replacement Value $53,184,370 Architect: LKA Contractor: Gerald Phipps Ancillary Buildings Utilization Age Size Capacity* ID #44 16 Years 1,440 50 #53 35 Years 1,440 50 Historical Cost $10,131,000 Unknown Unknown $ 4,280,090 $14,411,090 Condition Good Fair Useful Life 25 Years 25 Years Other Site Enhancements Softball Field Soccer Field Practice Field Track/Football Field Tennis Courts Indoor Pool Land Value Site Acreage Schedule # 37.48 Acres 6303201001 On April 18, 1980 a partial dedication was done. JVRC owned approximately 130 acres. The county bought and dedicated to the city 75 acres. JVRC dedicated another 15 acres to complete the 90 acre Rampart Park. The district ended up with 37.48 acres of which 15.385 was considered a dedication. On October 8, 1993 and easement was grnted by the district to the city from Lexington to Rampart Park. Not all current joint use agreements with the Parks Department are on file at the district. ASD20 - Facility and Site Manual 77 June 2011 RAMPART HIGH SCHOOL 2008-09 ACTUAL BUDGETED STAFFING** 2011 2010 SALARIES/BENEFITS Instructional Staff Administrator Office/Trades Other Total Salaries Total Benefits 121.09 5.00 8.89 134.98 119.32 5.00 8.89 133.21 OTHER EXPENDITURES Purchased Services Utilities Supplies and Materials Capital Outlay Total Other GRAND TOTAL $ Projected Student Enrollment FTE Cost per Student - FTE 2009-10 ACTUAL 2010-11 BUDGET 5,531,149 469,214 827,760 6,828,123 1,508,217 5,395,190 470,981 840,051 6,706,222 1,530,094 5,337,999 473,336 844,251 6,655,586 1,555,957 253,025 345,012 389,507 3,870 991,414 271,985 376,550 274,198 922,733 270,000 377,000 238,121 885,121 9,159,049 $ 9,096,664 9,327,754 1,726 5,404 $ 1,635 5,602 1,581 5,754 **Budgeted staffing uses Teacher Equivalents (TE) Site Condition Electrical Building Structure HVAC & Mechanical Plumbing Lighting Flooring Grounds RATING Good RATING Good RATING Good RATING Good RATING Good RATING Good RATING Good Health/safety needs will always be considered the highest priority. Major capital items that require substantial resources to complete will be included for consideration during the next G.O. Bond planning process. Other capital items will be scored using the Capital Reserve Project Designation Method for ranking and possible inclusion in the annual budget process. ASD20 - Facility and Site Manual 78 June 2011 Rampart High School Description Provide supplemental heat for boiler room (combustion air) Replace pool heat exchanger and pumps Exterior lighting is inadequate at east parking lot; upgrade Renovate all bathroom interior Replace tennis courts Replace walk in and freezer doors Reseal gym floor Replace the generator serving the RHS pool Replace boiler, cast iron, hot water, gas fired, 990 MBH, domestic HW and storage tank, 150 gallon Replace boiler, cast iron, gas fired, steam or hot water, 750MBH, Pool Provide Control Room ventilation Revise ventilation/make-up air and heating in Darkroom Replace sidecourt basketball goals, 4 total Replace storefront door, metal and glass, frame and hardware at Main Office Steep stair to Stage platform; reconfigure Replace gym scoreboards and add 2 for small gym Upgrade all bathroom fixtures Upgrade building electrical distribution (switches and outlets) Replace circulating pump, 15 HP, filtration pump Replace circulating pump, 5HP, HHW, Pool Mechanical Room Torn wall pads at Wrestling Room, replace all wall pads Replace roll down door in commons Replace all drinking fountains in original bldg Replace blinds throughout Faucets on lavs in pool locker rooms are outdated and should be replaced Paint on steel trusses at entry and commons peeling Replace Pool drain system valves, filter pit Replace door closers and hardware throughout Replace all toilet partitions Asphalt paving at bus lanes aging - overlay; replace Replace sauna steam generator Replace all lockers, steel, medium Lenses and louvers - corridor lenses need to be cleaned and new ones added where broken Dumpster on south side of building not enclosed, enclose Replace all windows and frames throughout facility including pool Replace HVAC diffusers in Gym Ductwork Replace motor, 3 phase, 230V, 2HP, Racquetball Courts Repaint metal cap flashings and CMU walls at roof Recoat all base flashings at Pool roof Replace steel double door, frame and hardware at Mechanical Rooms All HM window/door frames at Pool area; replace Replace all PE/Athletic/Pool lockers Replace all exterior doors Add auxiliary room heater for pool boiler room Replace athletic storage facility Exterior shop yard doors rusting; replace Replace heat exchanger and pumps in pool Replace motor, 3-phase, 230V, 1/2 HP, basketball backboard Replace air compressor, 7 1/2 HP, Boiler Room Most plumbing fixtures are outdated and should be replaced with water conserving fixtures Rubber running track pitted and gouged; replace top coat Replace corridor lockers Ponding water at west playfield by commons Renovate stagnant air situation in main restrooms Replace storefront, metal and glass at stairwells Install MUA unit in kitchen/cafeteria Renovate girls and boys pool locker rooms Replace storefront, metal and glass in pool area Provide fire suppression system, wet pipe Total ASD20 - Facility and Site Manual Type Deferred Capital Priority Maintenance Improvement Capital Renewal Potential Funding Source HVAC & Mech HVAC & Mech 1 1 8,000 15,000 Capital Reserve Capital Reserve Lighting Plumbing Grounds Building Flooring Electrical 1 1 1 1 1 1 40,000 50,000 250,000 Capital Reserve Capital Reserve Capital Reserve 5,000 Capital Reserve 6,500 Capital Reserve 8,500 Capital Reserve HVAC & Mech 1 HVAC & Mech HVAC & Mech HVAC & Mech Building 1 2 2 2 10,000 10,000 15,000 300,000 Capital Reserve Capital Reserve Capital Reserve Capital Reserve Building Building Building Plumbing 2 2 2 2 15,037 15,500 30,000 94,800 Capital Reserve Capital Reserve Capital Reserve Capital Reserve Electrical Plumbing 2 2 311,355 Capital Reserve 4,023 Capital Reserve Plumbing Building Building Plumbing Building 2 2 2 2 2 8,563 9,400 10,000 12,726 19,000 Capital Reserve Capital Reserve Capital Reserve Capital Reserve Capital Reserve Plumbing Building Plumbing Building Plumbing Grounds Electrical Building 2 2 2 2 2 2 2 2 24,000 29,000 31,500 32,500 43,613 65,000 94,000 215,638 Capital Reserve Capital Reserve Capital Reserve Capital Reserve Capital Reserve Capital Reserve Capital Reserve Capital Reserve Building 3 Building 3 9,500 Capital Reserve Building HVAC & Mech 3 3 260,000 Capital Reserve 4,000 Capital Reserve Electrical Building Building 3 3 3 Building Building Building Building HVAC & Mech Building Building HVAC & Mech 3 3 3 3 4 4 4 4 Electrical Electrical 4 4 14,816 Capital Reserve 15,160 Capital Reserve Plumbing 4 75,000 Capital Reserve Grounds Building Grounds HVAC & Mech Building HVAC & Mech Building Building Building 4 4 6 6 6 6 6 6 9 100,000 Capital Reserve 200,000 Capital Reserve Capital Reserve Capital Reserve Capital Reserve Food Service Capital Reserve 16,965 Capital Reserve Bond Issuance 1,749,065 32,000 Capital Reserve 4,000 5,556 Capital Reserve 6,500 Capital Reserve 7,500 Capital Reserve 10,005 28,000 140,000 151,200 1,750 55,000 2,000 13,000 29,363 30,000 50,000 6,000 79 Capital Reserve 333,600 1,646,905 Capital Reserve Capital Reserve Capital Reserve Capital Reserve Capital Reserve Capital Reserve 9,400 Capital Reserve 14,000 Capital Reserve June 2011 Where dreams take flight… One student at a time. ASD20 - Facility and Site Manual 80 June 2011 Combination Schools DISCOVERY CANYON CAMPUS Grades Served: PK‐12 Year Opened: 2005 1810 Northgate Boulevard Colorado Springs, CO 80921 Phone 719.234.1800 www.asd20.org Site History Original Construction Date: Original Phase I: Original Phase II: Original Phase III: Total 2005 Square Utilization Capacity* Footage 84,000 510 114,039 850 173,418 1,140 371,457 2,500 Historical Cost $14,314,349 $17,012,043 $31,034,183 $62,360,575 *Utilization Capacity is 85% of Building Design Capacity Insurance Replacement Value $78,885,562 Architect: Antoine Predock/M+O+A Architectural Partnership Contractor: Gerald H. Phipps Ancillary Buildings Age ID None‐‐ Size Classrooms Condition Useful Life Other Site Enhancements Baseball Field Softball Fields Football/Soccer Fields and Track Land Value Site Acreage Schedule # 83.757 Acres 6205000043 On December 18, 2003 the land was dedicated by Pulpit Rock, LLC per city code. It was donated to the district by Pulpit Rock, LLC for school use only with all construction projects reviewed by Classic. The District paid $2,922,500 for site improvements, utilities and street assessments. ASD20 - Facility and Site Manual 81 June 2011 DISCOVERY CANYON CAMPUS 2008-09 ACTUAL BUDGETED STAFFING** 2011 2010 SALARIES/BENEFITS Instructional Staff Administrator Office/Trades Other Total Salaries Total Benefits 141.84 8.00 11.50 161.34 168.08 8.00 12.96 189.04 OTHER EXPENDITURES Purchased Services Utilities Supplies and Materials Capital Outlay Total Other GRAND TOTAL $ Projected Student Enrollment FTE Cost per Student - FTE 2009-10 ACTUAL 2010-11 BUDGET 5,096,643 581,888 870,485 6,549,016 1,412,439 5,672,465 671,551 1,283,115 7,627,131 1,689,921 6,948,592 674,909 1,358,956 8,982,457 2,037,711 191,598 459,523 369,147 8,336 1,028,604 245,610 528,289 329,813 15,188 1,118,900 245,000 529,000 343,837 1,117,837 8,990,059 $ 10,435,952 $ 12,138,005 1,509 5,958 1,748 5,970 2,117 5,734 **Budgeted staffing uses Teacher Equivalents (TE) Site Condition Electrical Building Structure HVAC & Mechanical Plumbing Lighting Flooring Grounds RATING Good RATING Good RATING Good RATING Good RATING Good RATING Good RATING Good Health/safety needs will always be considered the highest priority. Major capital items that require substantial resources to complete will be included for consideration during the next G.O. Bond planning process. Other capital items will be scored using the Capital Reserve Project Designation Method for ranking and possible inclusion in the annual budget process. NO FACILITY/SITE REPAIRS OR ENHANCEMENTS LISTED AT THIS TIME ASD20 - Facility and Site Manual 82 June 2011 Appendix • Facility Projects Listed by Priority and School District Wide Facility Repairs and Enhancements Description Replace Horizontal blinds/window coatings in Buildings A & B Install elevator in D Building Upgrade controls version to the most current Asphalt play area aging - patch cracks and seal Replace sawdust collection system No adequate sound system exists in gymnasium Crawl space piping insulation Replace gymnasium bleachers and scoreboard 2 motorized backstops operate with jerky motion Repair/replace welding booth exhaust system Replace AHU serving boys locker room Replace AHU serving the main office area Provide eyewash station and deluge shower at Industrial Arts Studio Upgrade bathroom, All fixtures Repair north side drainage issues District wide asphalt and concrete repair District wide crosswalk, fire lane, seal coat, and parking lot painting Install perimeter drain system, seal cold joints and apply a foundation wall materproofing membrane at new wing Roof covering - replace entire building Utilization equipment - computer stations in classrooms need additional outlets Replace electrical inverter Foundation in gym leaks at several locations; add perimeter drain Unit ventilators and controls are at the end of useful life Provide fire alarm system including horn, strobe, annunciator panel, etc. Add bathroom to carpentry and metal shop Provide new wet fire suppression system Replace flooring throughout Provide fresh air ventilation at plan room and upgrade HVAC Replace T12 lighting with energy efficient T8 lighting Foundation in gym leaks in several spots, install perimeter drain Install grab bar at back of HC toilet stall in lower boys toilet room Replace Building PA system Replace clocks Provide concessions and PA booths for baseball and softball Replace steel roll down door at commons Varsity lockers bent, dented at top; Replace all Upgrade hanging receptacle system in Wood Shop to GFI Upgrade building electrical distribution (switches and outlets), 40% of building Replace Tennis Courts Replace pool heat exchanger and pumps Provide public address system, portable buildings Upgrade building electrical distribution (switches and outlets), portable buildings Replace rooftop A/C unit #19 Replace main and North boys restroom partitions Replace restroom Floors Intercom system - replace existing console and provide additional exterior speakers Replace walk in and freezer doors Replace the generator serving the RHS pool Reseal gym floor Replace tennis courts Provide supplemental heat for boiler room (combustion air) Replace pool heat exchanger and pumps Replace boiler, cast iron, hot water, gas fired, 990 MBH, domestic HW and storage tank, 150 gallon Replace boiler, cast iron, gas fired, steam or hot water, 750MBH, Pool Exterior lighting is inadequate at east parking lot; upgrade Renovate all bathroom interior Type Priority Building Building HVAC & Mech Grounds Building Building Building Building Electrical HVAC & Mech HVAC & Mech HVAC & Mech 1 1 1 1 1 1 1 1 1 1 1 1 Plumbing Plumbing Grounds Grounds 1 1 1 1 Grounds 1 Building Building 1 1 Electrical Electrical Deferred Maintenance Capital Improvement Capital Renewal 17,000 100,000 100,000 2,500 16,000 25,000 40,000 72,000 22,000 10,000 40,000 40,000 1,952 31,600 12,000 250,000 Potential Funding Source School Capital Reserve Capital Reserve Capital Reserve Capital Reserve Capital Reserve Capital Reserve Capital Reserve Capital Reserve Capital Reserve Capital Reserve Capital Reserve Capital Reserve AAHS AAHS AAHS AT CMS CMS CMS CMS CMS CMS CMS CMS Capital Reserve Capital Reserve Capital Reserve Capital Reserve CMS D20 Soccer Stadium DV DW 150,000 Capital Reserve DW 200,000 Capital Reserve 275,250 Capital Reserve EMS EX 1 1 10,000 Capital Reserve 25,000 Capital Reserve EX EX Building 1 41,000 Capital Reserve FH Building 1 250,000 Capital Reserve FH Building Building Building Flooring 1 1 1 1 25,384 42,500 72,896 Capital Reserve Capital Reserve Capital Reserve 54,196 Capital Reserve FM FM FM FM HVAC & Mech 1 85,000 Capital Reserve FM Lighting 1 12,000 Capital Reserve FM Building 1 111,000 Capital Reserve HP Plumbing Building Building 1 1 1 48,360 50,000 General Fund Capital Reserve Capital Reserve HP LHS LHS Building Building Building 1 1 1 95,000 Capital Reserve 10,000 Capital Reserve 137,000 Capital Reserve LHS LHS LHS Electrical 1 3,040 Capital Reserve LHS Electrical Grounds HVAC & Mech Building 1 1 1 1 138,750 Capital Reserve 650,000 Capital Reserve 29,000 Capital Reserve Capital Reserve LHS LHS LHS MRMS Electrical HVAC & Mech Building Flooring 1 1 1 1 11,328 Capital Reserve 30,000 Capital Reserve 13,000 Capital Reserve Capital Reserve MRMS PCHS PH PH Building Building Electrical Flooring Grounds 1 1 1 1 1 38,000 HVAC & Mech HVAC & Mech 1 1 HVAC & Mech 750 25,760 45,000 250,000 Capital Reserve 5,000 Capital Reserve 8,500 Capital Reserve 6,500 Capital Reserve Capital Reserve PI RHS RHS RHS RHS 8,000 15,000 Capital Reserve Capital Reserve RHS RHS 1 32,000 Capital Reserve RHS HVAC & Mech 1 300,000 Capital Reserve RHS Lighting Plumbing 1 1 Capital Reserve Capital Reserve RHS RHS ASD20 - Facility and Site Manual 40,000 50,000 83 June 2011 District Wide Facility Repairs and Enhancements Description Utilization equipment - building has inadequate quantities of receptacles and branch circuits throughout. Provide additional outlets and circuits. Provide chilled water, air cooled condenser systems, fan coil units Air conditioners serving the computer lab and corridor are approaching the end of service life Replace service panel, 3 phase, 4 wire, 120/208V, 100 Amp Upgrade bathroom, 4 fixtures, 2 wall plumbing Upgrade bathroom fixtures throughout Replace toilet partition Replace steel overhead door, manually operated Painting, exterior on masonry, primer and one-coat Clean and paint, interior on masonry, primer and 2 coats in Garage Replace galvanized metal roof, standing seam Upgrade building electrical distribution (switches and outlets) Replace compressed air dryer Replace motor, 3 phase, 230V, 7 1/2 HP, for Hydraulic Lifts Replace air compressor, 10HP Type Priority Deferred Maintenance Capital Improvement Capital Renewal Potential Funding Source School Electrical 1 60,000 Capital Reserve RR HVAC & Mech 1 602,995 Capital Reserve RR HVAC & Mech 1 12,000 Capital Reserve RR Electrical Plumbing Plumbing Plumbing Building Building 1 1 1 1 1 1 6,326 Capital Reserve Capital Reserve Capital Reserve 3,047 Capital Reserve 2,947 Capital Reserve 14,152 Capital Reserve SC SC SC SC Transportation Transportation Building Building 1 1 22,400 Capital Reserve 220,472 Capital Reserve Transportation Transportation Electrical Electrical 1 1 Capital Reserve 1,500 Capital Reserve Transportation Transportation Electrical Electrical 1 1 1,852 Capital Reserve 12,000 Capital Reserve Transportation Transportation Replace motor, 3 phase, 230V, 1/2 HP, roll-up doors Replace fluorescent fixture, 2'X4' Replace carpet, roll goods in Office Area, replace flooring in waiting rooms and corridors Replace wall heater, electric, 4KW, Mechanics Dressing Room Replace furnace, gas-fired, 110 MBH Replace furnace, gas-fired, 100 MBH Replace window A/C unit, Training Office Replace split system A/C unit, air cooled 5 ton Upgrade building electrical distribution (switches and outlets) Electrical Electrical 1 1 14,816 Capital Reserve 29,312 Capital Reserve Transportation Transportation Flooring 1 43,104 Capital Reserve Transportation HVAC & Mech HVAC & Mech HVAC & Mech HVAC & Mech HVAC & Mech 1 1 1 1 1 450 4,251 4,502 9,727 25,200 General Fund Capital Reserve Capital Reserve Capital Reserve Capital Reserve Transportation Transportation Transportation Transportation Transportation Electrical 1 27,400 Capital Reserve Warehouse Replace motor, 3 phase, 230V, 1/2 HP, roll-up doors Add second cooling system for the data center Upgrade bathroom, 6 fixtures, 2 wall plumbing Electrical HVAC & Mech Plumbing 1 1 1 75,000 12,198 9,260 Capital Reserve Capital Reserve Capital Reserve Warehouse Warehouse Warehouse Add smoke detectors for coat rack areas in hallways Intercom system replace head end and speakers Replace boiler, cast iron, gas-fired, hot water, 135 MBH, domestic hw - cyclical Catch basin backing up in courtyard near Building C Building Building 1 1 HVAC & Mech Building 1 2 Building D drafting, tech shop classrooms - install new drop ceilings, to include mechanical diffusers, etc. Building Building D Computer Room - replace heat pump with Computer Room air conditioning unit Building 5,889 26,099 29,600 9,000 12,000 Capital Reserve 32,000 Capital Reserve WR WR 7,719 Capital Reserve Capital Reserve WR AAHS 2 25,000 Capital Reserve AAHS 2 40,000 Capital Reserve AAHS Building 2 44,000 Capital Reserve AAHS Building Building Building Building 2 2 2 2 63,767 85,000 Capital Reserve Capital Reserve 24,000 Capital Reserve 27,000 Capital Reserve AAHS AAHS AAHS AAHS Building 2 50,000 Capital Reserve AAHS Building Building Building 2 2 2 55,000 Capital Reserve 57,000 Capital Reserve 1,250,000 Capital Reserve AAHS AAHS AAHS Replace floor (install maple) in small Gym, building C Flooring Rubber stair treads deteriorating Flooring 2 2 60,000 Capital Reserve 14,500 Capital Reserve AAHS AAHS Grounds Grounds 2 2 3,500 15,000 Capital Reserve Capital Reserve AAHS AAHS Grounds 2 34,000 Capital Reserve AAHS Grounds Lighting 2 2 17,500 55,000 Capital Reserve Capital Reserve AAHS AAHS Lighting 2 50,000 Capital Reserve AAHS Bldg A, replace main entry doors and storefrnt system Building B, replace VAT with VCT at Classrooms cyclical Upgrade interior doors and frames throughout Replace exterior doors in B Bldg Bldg C, replace acoustical ceiling tile Replace exterior doors and frames rusting in Buildings A&B Replace partitions in Buildings A, B, C, Library, and Bldg D Replace aluminum windows Buildings A & B Roof covering - Replace the entire roof system(s) Erosion and water pooling under bridge across drainage swale located on east side of interior court Storm sewer - improve courtyard drainage Scoreboards - replace softball and baseball scoreboards, add football for practice field Fences - repair and straighten all chain link fences on site including athletic field fences Provide emergency egress lighting at stadium Stage lighting - install new dimmer cabinet. A new dimming system and stage console. ASD20 - Facility and Site Manual 84 June 2011 District Wide Facility Repairs and Enhancements Description Install bathroom toilet partitions at boys restrooms in the team room Wrestling Gym bathroom showers, 6 fixtures, 2 wall plumbing Renovate bathrooms throughout Paint portables, buildings and decks Replace roof top split system unit - 2-ton Replace carpet in corridors with VCT, replace carpet in classrooms and office. Replace gym and cafeteria floors Replace portable AC units Replace roof Outdoor surface allowance; install a synthetic surface at ballfield, install soft fall playground material Asphalt and curb patch in kiss n go and faculty lot; improve landscaping Upgrade controls system including valves, wiring, network integration. Upgrade misc. gate valves to ball valves. Upgrade pumps, evaluate expansion tank and evaluate boiler condition. Balance system and clean ductwork. Replace water heater. Replace all door harware throughout the building Provide emergency exit sign at main office Serving counter is missing glass sneeze guard / violates Health Dept hot food storage code. Some corridor doors missing closers/smoke seals Paint building exterior Replace all exterior doors Upgrade electrical outlets in Kitchen to GFI Type Deferred Maintenance Capital Improvement Capital Renewal Potential Funding Source School Plumbing 2 3,700 Capital Reserve AAHS Plumbing Plumbing Building Building 2 2 2 2 6,099 118,570 Capital Reserve Capital Reserve Capital Reserve 12,000 Capital Reserve AAHS AAHS AE AE Flooring HVAC & Mech Building 2 2 2 Grounds 2 Grounds 2 HVAC & Mech Building Building 2 2 2 Building Building Building Building Electrical 2 2 2 2 2 Gym floor has reached max number of sandings; repaing floor and provide for longer lasting floor finish Flooring North - significant cow trails - travel walkway should be considered Grounds Replace all track field event areas at football field Grounds Provide new parking lot and building exterior lighting Grounds Provide new tennis courts, post tension concrete system with new perimeter fencing. Maintain area for basketball goals Grounds Replace paint spray booth exhaust fan system HVAC & Mech Replace the airhandler serving the boys locker room Plumbing fixtures and flush valves outdated. ADA fixtures not present. Showers damaged. Emergency showers not installed. Dual handle metering faucets no longer allowed. Sinks in the shop area damaged, not in use. Replace all toilet partitions Repair skylight in staff lounge, rm 211 New roof, repair flashing, caulk, reboot roof protrusions Upgrade building electrical distribution, upgrade out of date panels and add circuits to classrooms Asphalt play area surfacing is very old, replace Provide solids interceptor at the art room sink District wide storefront door, mullion, hardware, weather seal repairs District wide carpet replacement/polishing Polyurethane all D20 HS tracks Install Power Factor capacitors to main distribution panel Ponding water on the west side of the building. Drainage from athletic field sitting at foundation of building. Regrade. Cracking in masonry bearing wall in Wood Shop. Door and frames rusting near Wood Shop Demo, regrade, and replace concrete entries at new wing and old bldg Carpet squares/vinyl tile old and fraying in corridor entrances, replce with VCT or polished concrete Downspouts drain over sidewalks, repair drainage at door 327 and pd entrances Turf at softball field, repair grade issues Install new theater dimming and lighting Window leaks at east wall - CR 125 & 128 Roof flashings - reinforce all base flashings Priority 4,500 500,000 151,000 102,000 362 2,300 4,000 2,118 2 140,000 Capital Reserve 3,000 Capital Reserve 257,000 Capital Reserve AE AE AI Capital Reserve AT 85,000 Capital Reserve AT Capital Reserve Capital Reserve General Fund AT CMS CMS Capital Reserve Capital Reserve 42,000 Capital Reserve 114,500 Capital Reserve Capital Reserve CMS CMS CMS CMS CMS 9,700 Capital Reserve CMS 2 2 24,500 26,500 Capital Reserve Capital Reserve CMS CMS 2 85,000 Capital Reserve CMS 2 2 24,875 125,000 Capital Reserve Capital Reserve CMS CMS 4,900 Capital Reserve CMS Capital Reserve Capital Reserve Capital Reserve CMS CMS DV HVAC & Mech 2 Plumbing Plumbing Building 2 2 2 Building 2 Electrical Grounds Plumbing 2 2 2 Building Flooring Grounds 2 2 2 Electrical 2 Building Building Building 2 2 2 Building 48,000 49,000 1,700 55,000 1,400 100,000 250,000 Capital Reserve DV Capital Reserve 23,500 Capital Reserve Capital Reserve DV DV DV 20,000 Capital Reserve 500,000 Capital Reserve Capital Reserve DW DW DW 22,000 Capital Reserve EAC 150,000 Capital Reserve Capital Reserve 9,500 Capital Reserve EMS EMS EMS 2 75,000 Capital Reserve EMS Flooring 2 30,000 Capital Reserve EMS Grounds Grounds Lighting Building Building 2 2 2 2 2 Capital Reserve Capital Reserve Capital Reserve 1,750 Capital Reserve 5,125 Capital Reserve EMS EMS EMS EX EX ASD20 - Facility and Site Manual 15,000 4,300 55,000 25,000 85 June 2011 District Wide Facility Repairs and Enhancements Description Add outlets and data ports to meet new computer and network needs Upgrade Building electrical, add circuits, upgrade panels Disposer not used because of drainage backups Swale at NW not draining / Add concrete pan and walk cover Type Priority Electrical 2 Electrical Grounds 2 2 Grounds Deferred Maintenance Capital Improvement Capital Renewal Potential Funding Source School 25,000 Capital Reserve EX 89,000 Capital Reserve Capital Reserve EX EX 2 7,675 Capital Reserve EX Grounds HVAC & Mech HVAC & Mech HVAC & Mech 2 2 2 2 5,000 37,100 33,500 Capital Reserve Capital Reserve Capital Reserve 13,000 Capital Reserve EX EX EX EX Electrical 2 24,000 Capital Reserve FH Electrical 2 77,500 Capital Reserve FH Building Building Building Grounds HVAC & Mech HVAC & Mech Building Building 2 2 2 2 2 2 2 2 1,448 36,500 Capital Reserve Capital Reserve 250,000 Capital Reserve Capital Reserve 9,400 Capital Reserve 23,000 Capital Reserve Capital Reserve Capital Reserve FM FR FR FR FR FR HP HP Electrical Electrical 2 2 Capital Reserve 30,000 Capital Reserve HP HP Flooring 2 98,600 Capital Reserve HP Plumbing 2 Capital Reserve HP Building 2 11,500 Capital Reserve LHS Building Building Building Building 2 2 2 2 16,000 Capital Reserve Capital Reserve Capital Reserve 7,500 Capital Reserve LHS LHS LHS LHS Building 2 13,000 Capital Reserve LHS Building Building Building Building 2 2 2 2 23,782 24,000 28,000 34,000 Capital Reserve Capital Reserve Capital Reserve Capital Reserve LHS LHS LHS LHS Building Building 2 2 51,500 Capital Reserve 63,000 Capital Reserve LHS LHS Electrical 2 2,128 Capital Reserve LHS Flooring 2 63,500 Capital Reserve LHS Flooring 2 283,500 Capital Reserve LHS Grounds 2 400,000 Capital Reserve LHS Plumbing Plumbing Building Building 2 2 2 2 Flooring Lighting Building 2 2 2 Building Building Repair and replace restroom floor cracks and partitions Flooring Asphalt play area aging - patch cracks, overlay and seal Add ventilation system to copy room Replace exhaust fans and motors Replace portable AC units Add circuits to classrooms and offices, provide circuits for AV expansions and computer room needs (include data drop adds) Upgrade building electrical distribution including panels, circuits, branch circuits and needed data outlets Provide additional emergency exit sign at Shops Building exit doors Replace blinds throughout the building Replace single-ply roof Apply crackfill to parking lot Replace HVAC control dampers Replace portable ac units Install guardrail at storage loft over stairs to gym Provide wet fire suppression system Upgrade building electrical distribution including panels, switches, outlets, added branch outlets, added circuits, and data outlets Replace recessed fan coil units Replace VCT in cafeteria and corridors, install new carpet in the classrooms, support spaces, and offices Renovate bathrooms including fixtures, partitions, fans, amenities Water seepage at CMU wall at east stair, peeling paint by coaches office Water from the roof of main building drains under trailers located along the south façade Renovate stairs at stage platform Replace 3-floor elevator Provide new curtain in the gymnasium Push panic bars need replacement at Library and stage Recaulk all exterior brick expansion joints, windows and doors Repaint all showers Replace all blinds Replace ceiling grid and tiles in commons All HM window/door frames rusting at Pool area; replace Replace lobby clerestory windows Upgrade receptacle system in Boys and Girls Locker Room to GFI Replace all wall pads and flooring at Wrestling Room Replace carpet/tile in all classrooms, offices, and library; replace corridor flooring with VCT or polished concrete, replace locker room and weight room flooring Replace parking lots with new full depth asphalt section Replace all bathroom fixtures and upgrade floors, walls and partitions Replace valves in Pool Pump Room Replace gymnasium separation curtains Replace window A/C unit, portable buildings Replace carpet in classrooms, offices, library and support spaces; install VCT or polished concrete in corridors, install new gym floor Provide emergency egress lighting at stadium Repair gym wall perimeter exterior drainage Repair gym wall subsurface water issue; install perimeter drain Provide wet fire suppression system ASD20 - Facility and Site Manual 1,500 3,000 1,700 250,000 75,000 55,000 14,000 160,000 143,200 Capital Reserve 9,800 Capital Reserve 12,500 Capital Reserve 12,909 Capital Reserve LHS LHS MRMS MRMS 17,500 5,400 425,580 Capital Reserve Capital Reserve Capital Reserve PCHS PCHS PH 2 2 55,000 192,000 Capital Reserve Capital Reserve PH PH 2 14,000 Capital Reserve PH 86 June 2011 District Wide Facility Repairs and Enhancements Description Gymnasium sound system / replace damaged pendant mounted speakers Replace sidecourt basketball goals, 4 total Replace storefront door, metal and glass, frame and hardware at Main Office Steep stair to Stage platform; reconfigure Replace gym scoreboards and add 2 for small gym Torn wall pads at Wrestling Room, replace all wall pads Replace roll down door in commons Replace blinds throughout Paint on steel trusses at entry and commons peeling Replace door closers and hardware throughout Replace all lockers, steel, medium Upgrade building electrical distribution (switches and outlets) Replace sauna steam generator Asphalt paving at bus lanes aging - overlay; replace Provide Control Room ventilation Revise ventilation/make-up air and heating in Darkroom Upgrade all bathroom fixtures Replace circulating pump, 15 HP, filtration pump Replace circulating pump, 5HP, HHW, Pool Mechanical Room Replace all drinking fountains in original bldg Faucets on lavs in pool locker rooms are outdated and should be replaced Replace Pool drain system valves, filter pit Replace all toilet partitions Clock program system is performing below acceptable standards; replace Doors - none in original building corridors - can't secure; replace all Panel boards in 1972/1974 areas are obsolete and should be replaced Provide fire alarm system including horn, strobe, annunciator panel, etc. Replace steel single door, frame and hardware at main entry Install new toilet partitions in the boys restrooms Damaged panic hardware north corridor exit, replace Replace seals and trim damaged at stage folding partition Add perimeter drain around gymnasiums Clock program - replace master clock and replace inoperative classroom clocks where battery powered clocks are now installed. Hollow metal frames rusting in west courtyard and entry doors; replace Replace roof with single ply system Repair flooring in room 133 (locker room) Replace classroom, offices, library, and support spaces carpet; replace corridors with VCT or polished concrete Chain link fencing failing at backstops Install 8' concrete walk for four feet along social trail on east side Provide fire alarm system including horn, strobe, annunciator panel, etc. Replace glass partition, tempered glass, steel frame, safety glass Replace wood door, solid core, single door, frame and hardware to replace louvered door in corridor Painting, interior on masonry, primer and one-coat in washbays Replace bathroom exhaust fan, Flammable Storage Room Replace bathroom exhaust fan Replace VCT flooring with ceramic tile floor Replace vinyl composition tile Renovate bathroom interiors Upgrade bathroom, 8 fixtures, 2 wall plumbing Replace toilet partition Provide panic hardware at Technology Room Replace bumber pads, Doors 1 and 2 Replace furnace, gas-fired, 137 MPH, Mezzanine Type Priority Deferred Maintenance Capital Improvement Capital Renewal Potential Funding Source School Building Building 2 2 18,000 15,000 Capital Reserve Capital Reserve PI RHS Building Building Building 2 2 2 15,037 15,500 30,000 Capital Reserve Capital Reserve Capital Reserve RHS RHS RHS Building Building Building 2 2 2 9,400 Capital Reserve 10,000 Capital Reserve 19,000 Capital Reserve RHS RHS RHS Building Building Building 2 2 2 29,000 Capital Reserve 32,500 Capital Reserve 215,638 Capital Reserve RHS RHS RHS Electrical Electrical Grounds HVAC & Mech 2 2 2 2 311,355 Capital Reserve 94,000 Capital Reserve 65,000 Capital Reserve Capital Reserve RHS RHS RHS RHS HVAC & Mech Plumbing Plumbing 2 2 2 10,000 94,800 Capital Reserve Capital Reserve 4,023 Capital Reserve RHS RHS RHS Plumbing Plumbing 2 2 8,563 Capital Reserve 12,726 Capital Reserve RHS RHS Plumbing Plumbing Plumbing 2 2 2 24,000 Capital Reserve 31,500 Capital Reserve 43,613 Capital Reserve RHS RHS RHS Building 2 Building 10,000 30,000 Capital Reserve RR 2 123,400 Capital Reserve RR Electrical 2 88,000 Capital Reserve RR Building 2 10,254 Capital Reserve SC Building Plumbing 2 2 15,000 4,401 Capital Reserve Capital Reserve SC SS Building 2 2,200 Building Building 2 2 3,400 Building Capital Reserve TMS Capital Reserve Capital Reserve TMS TMS 2 35,000 Capital Reserve TMS Building Building Flooring 2 2 2 56,400 Capital Reserve 524,000 Capital Reserve 2,500 Capital Reserve TMS TMS TMS Flooring Grounds 2 2 282,200 Capital Reserve Capital Reserve TMS TMS Grounds 2 4,500 Capital Reserve TMS Building 2 81,283 Capital Reserve Transportation Building 2 1,329 Capital Reserve Transportation Building 2 1,603 Capital Reserve Transportation Building 2 5,700 Capital Reserve Transportation Electrical Electrical Flooring Flooring Plumbing Plumbing Plumbing Building Building HVAC & Mech 2 2 2 2 2 2 2 2 2 2 243 973 8,362 9,120 Transportation Transportation Transportation Transportation Transportation Transportation Transportation Warehouse Warehouse Warehouse ASD20 - Facility and Site Manual 114,000 13,000 32,000 33,540 1,717 87 Capital Reserve Capital Reserve Capital Reserve Capital Reserve Capital Reserve Capital Reserve 5,141 Capital Reserve Capital Reserve 9,500 Capital Reserve 4,251 Capital Reserve June 2011 District Wide Facility Repairs and Enhancements Description Replace furnace, oil, or gas-fired, 82 MBH, Mezzanine Replace split system A/C unit, air cooled, 5 ton Replace space heater, gas-fired, ceiling mounted, 45 MBH Replace window A/C unit with DX split system Renovate bathroom interior Repair threshold/concrete grade at gymnasium double doors Replace clock system with wireless/satellite system and integrate with intercom alarm schedule Replace folding wall panels in classrooms Replace roof with single ply system Expansion joints need sealant at Buildings A and B Repair rust occurring at Buildings A & B columns/fascia Make weight room accessible for wheel chairs, etc. Clean concrete drainage swale and reset drain inlet located behind stadium press box Weed and remulch shrub beds Paint portables, decks, trim, etc East drainage swale (adjacent to play area) filling with gravel Replace asphalt bus area and teacher parking lot / patch cracks and seal Replace dishwasher with HE unit Provide attic access stairs in lieu of classroom ladder Replace heating hot water control valves Replace inefficirnt lighting with HE fluorescent; Lobby, multi-purpose Some stucco repair needed west of entry Recaulk exterior windows and wall expansion joints Replace all corridor doors/frames/hardware Conduct asbestos survey and abatement Provide new lockers throughout Replace bathroom exhaust fan Provide dugouts at softball field Upgrade and replace as necessary kiss n go and faculty access drives. Improve grade, landscaping, and safety features for bus lot/play area Single solids interceptor inadequate for double sinks at Art Room. Waste piping not per code. Provide concrete walk at perimeter of stadium interior and make fence changes to accommodate track and field needs Type Priority Deferred Maintenance Capital Improvement Capital Renewal Potential Funding Source School HVAC & Mech HVAC & Mech 2 2 5,500 Capital Reserve 8,400 Capital Reserve Warehouse Warehouse HVAC & Mech HVAC & Mech Plumbing 2 2 2 9,000 Capital Reserve 11,454 Capital Reserve Capital Reserve Warehouse Warehouse Warehouse Building 2 Building Building Building Building 2 2 2 3 Building Building 3 3 14,000 Grounds Grounds Building 3 3 3 5,000 Grounds 3 Grounds Plumbing 3 3 Building HVAC & Mech 3 3 Lighting Building 3 3 Building Building Building Building Electrical Grounds 3 3 3 3 3 3 Grounds 4,000 3,100 Capital Reserve 30,000 62,000 WR Capital Reserve Capital Reserve 282,750 Capital Reserve Capital Reserve WR WR WR AAHS Capital Reserve Capital Reserve AAHS AAHS 12,600 Capital Reserve 3,000 Capital Reserve Capital Reserve AAHS AAHS AT 12,500 Capital Reserve AT 43,000 Capital Reserve 3,000 Capital Reserve AT AT 23,000 Capital Reserve 65,000 Capital Reserve AVHS AVHS 8,300 Capital Reserve Capital Reserve AVHS CMS 5,600 110,000 4,000 16,000 Capital Reserve Capital Reserve Capital Reserve 150,000 Capital Reserve 973 General Fund Capital Reserve CMS CMS CMS CMS CMS CMS 3 254,500 Capital Reserve CMS Plumbing 3 1,800 Capital Reserve CMS Grounds 3 43,000 Capital Reserve D20 Football Stadium Roof drain grate missing on roof over 1968 addition Exterior painting allowance Building Building 3 3 250 General Fund 25,500 Capital Reserve DV DV Electrocoat all HS lockers (not PCHS, DCC, AVHS) Install anchors, improve drainage and grading, alter backfill conditions at Gym exterior wall per detail plan. Replace steamer Replace all exterior doors, frames, and hardware 6-burner range is approaching end of service life East parking lot asphalt-patch cracks and seal coat Kiln exhaust is inadequate, install new Upgrade all bathroom fixtures Replace inefficient lights with HE fluorescent fixtures; gym and exterior Replace inefficient lighting with HE fluorescent; LMC, Gym, Halls, Music Water damage to paint at east gym wall Extend FA into portables, intercom, and ADT Windows - replace clerestory windows Replace all door hardware with ADA compliant hardware Replace evaporative media that is deteriorating Remove cracking tile in lobby and polish the concrete below Replace all classroom, office and corridor floor coverings Asphalt play areas aged - patch cracks and seal Improve drainage at service area (storm drains fill with debris) East parking lot asphalt - reseal and crack fill Building 3 20,000 Capital Reserve DW Building Building Building Electrical Grounds HVAC & Mech Plumbing 3 3 3 3 3 3 3 650,000 91,925 Capital Reserve 2,800 Capital Reserve 161,609 Capital Reserve 9,100 Food Service Capital Reserve Capital Reserve Capital Reserve Electrical 3 8,100 Capital Reserve EW Lighting Building Building Building 3 3 3 3 21,500 15,000 28,000 34,000 Capital Reserve Capital Reserve Capital Reserve Capital Reserve EX FR FR FR Building Building 3 3 52,000 Capital Reserve 6,700 Capital Reserve FR FR Flooring 3 10,000 Capital Reserve FR Flooring Grounds 3 3 97,500 Capital Reserve Capital Reserve FR FR Grounds Grounds 3 3 Capital Reserve 9,500 Capital Reserve FR FR ASD20 - Facility and Site Manual 6,515 140,000 150,000 4,500 7,500 8,500 13,400 88 EMS EMS EMS EMS EMS EMS EMS June 2011 District Wide Facility Repairs and Enhancements Description Type Replace asphalt at service drive and parking lot, repair concrete curb Grounds Insulate domestic hot water piping in boiler room Plumbing Replace concrete under stadium bleachers Building Provide one (1) 25' X 60' portable classroom buildings, include elec, interom, FA, and data services Fire suppression system, wet pipe Replace FA system for the entire school Painting, interior on masonry, primer and one-coat Replace carpet, roll goods in portables Replace carpet in all classrooms, offices, library, and support spaces, remove corridor floor covering and install VCT or polish concrete Replace inefficient lighting with HE fluorescent; gym Replace toilet partition throughout with resin type Drainage off of building on the northwest side drains onto sidewalks Cracked asphalt at all lots - patch cracks; seal parking lot Add ventilation system to copy room Storm sewer - repair outlet pipe of inlet at southeast corner - add concrete collar and regrade Berms around building settling. Extreme erosion adjacent to concrete stair at southwest; remove berms and stucco Upgrade fire alarm system including horn, strobe, annunciator panel, etc., portable P5/P6 Replace fiberglass shingle roof, portable P3/P4 Replace fire alarm system including horn, strobe, annunciator panel, etc., portable P3/P4 Upgrade building electrical distribution (switches and outlets) Replace carpet in all classrooms, library, support spaces, and office; replace corridor floor covering with VCT or polished concrete East parking lot asphalt - seal cracks and seal Replace asphalt between buildings and portables No ventilation in faculty lounge Replace exhaust hood and ansul system Lenses and louvers - corridor lenses need to be cleaned and new ones added where broken Dumpster on south side of building not enclosed, enclose Replace all windows and frames throughout facility including pool Repaint metal cap flashings and CMU walls at roof Recoat all base flashings at Pool roof Replace steel double door, frame and hardware at Mechanical Rooms All HM window/door frames at Pool area; replace Replace all PE/Athletic/Pool lockers Replace all exterior doors Replace motor, 3 phase, 230V, 2HP, Racquetball Courts Replace HVAC diffusers in Gym Ductwork Improve drainage at north side of building by regrading and resurfacing. Combine with asphalt maintenance. Gravel drive on east side badly deteriorated, replace with asphalt Asphalt visitor parking area; replace with full depth section Asphalt playground deteriorating, replace with concrete pad Domestic water piping has not been insulated; insulate Replace baseboard heating unit with heat pump Upgrade building electrical distribution (switches and outlets) Replace service panel, 3 phase, 4 wire, 120/208V, 100 Amp Repaint metal parapet cap at roof perimeter Replace steel exterior door, frame and hardware at Trailer 301 Replace steel single door, frame and hardware at Trailer 304 Roof flashings - reinforce base flashings Priority 3 3 3 Deferred Maintenance Capital Improvement 2,000 92,500 Capital Renewal Potential Funding Source School 74,200 Capital Reserve Capital Reserve Capital Reserve HP HP LHS Capital Reserve Capital Reserve Capital Reserve 60,000 Capital Reserve 16,162 Capital Reserve LHS LHS MRMS MRMS MRMS 310,276 Capital Reserve MRMS MRMS MRMS Building Building Building Building Flooring 3 3 3 3 3 Flooring 3 Lighting Plumbing 3 3 16,400 Capital Reserve 24,136 Capital Reserve Building 3 7,500 Capital Reserve PH Grounds HVAC & Mech 3 3 6,800 Capital Reserve Capital Reserve PH PH Plumbing 3 12,000 Capital Reserve PH Building 3 5,000 Capital Reserve PI Building Building 3 3 23,254 Capital Reserve 12,835 Capital Reserve PI PI Building 3 23,254 Capital Reserve PI Electrical 3 Capital Reserve PI Flooring Grounds Grounds HVAC & Mech HVAC & Mech 3 3 3 3 3 110,000 Capital Reserve Capital Reserve 42,000 Capital Reserve Capital Reserve 28,800 Capital Reserve PI PI PI PI PI Building 3 Building 3 Building Building Building 3 3 3 Building Building Building Building 3 3 3 3 Electrical HVAC & Mech 125,000 454,720 100,000 9,700 32,664 8,000 9,000 4,000 Capital Reserve RHS 9,500 Capital Reserve RHS 260,000 Capital Reserve 6,500 Capital Reserve 7,500 Capital Reserve RHS RHS RHS Capital Reserve Capital Reserve Capital Reserve Capital Reserve RHS RHS RHS RHS 3 3 5,556 Capital Reserve 4,000 Capital Reserve RHS RHS Building 3 10,000 Capital Reserve RR Grounds 3 14,000 Capital Reserve RR Grounds 3 115,000 Capital Reserve RR Grounds 3 44,000 Capital Reserve RR Plumbing HVAC & Mech 3 3 4,000 Capital Reserve 15,811 Capital Reserve RR SC Electrical 3 5,328 Capital Reserve SITW Electrical Building 3 3 2,653 Capital Reserve 4,241 Capital Reserve SITW TMS Building 3 4,401 Capital Reserve TMS Building Building 3 3 4,401 Capital Reserve 4,500 Capital Reserve TMS TMS ASD20 - Facility and Site Manual 10,005 28,000 140,000 151,200 89 June 2011 District Wide Facility Repairs and Enhancements Description Repaint exterior portable classroom building, #304, primer and one-coat Main entrance storefront door, metal and glass, frame and hardware; replace Replace acoustical ceiling tile, 2'X4' in upper floor corridor Replace steel door, frame and hardware at east and west entrance Replace carpeting at Trailer 301 Replace Tennis Courts with concrete post-tension system Minor curb damage at storm sewer along eastern side. Create dunpster enclosure. Replace inefficient lighting with HE fluorescent; Gyms Provide containment at oil dump areas Painting, exterior on metal, primer and one-coat Replace fire alarm system including horn, strobe, annunciator panel, etc. Replace space heater, gas-fired, ceiling mounted, 30 MBH, Science Center Exterior door seals deteriorated Painting, exterior on metal, primer and one-coat Replace all parking surfaces and damaged curb Upgrade athletic locker rooms, fixtures, partitions, and amenities Building B, vinyl composition tile at corridors cyclical Building B, replace exterior single glazed storefront Renovate restroom 426, Bldg D outside of auditorium; renovation shall inslude fixtures, partitions, paint, flooring, lights, and mirrors Replace softball and baseball dugouts and tennis court bleachers Replace tennis courts Repair and refinish tennis courts Emergency shower and eyewash units provided, minimal bottle units and showers provided Replace potable water pressure regulator Verify MUA in kitchen/cafeteria. Add ventilation to copy room -tie into controls system. Provide mag holds for corridor classrooms Building envelope allowance for leaking windows, caulk, flashing, control joints, etc. Verify roof ladders are safe and meet code. Provide new exterior paint for building and portables. Repair/Replace roof and all roof flashings Flooring allowance for cafeteria, kitchen, misc spaces. Allowance to improve drainage at playfield (if no on synthetic..113-11) Upgrade classroom/exterior lighting, power, and data (throughout school). Verify appropriate GFI usage, interior and exterior. Replace toilet partitions Install new MUA unit in kitchen Renovate announcers booth, provide start/stop facility for track events, and replace home and visitor concrete below stands. Rework fence configuration for track meets, add 4' fence for walking path with concrete Provide ADA compliant door handles throughout school Replace grease trap Type Priority Deferred Maintenance Capital Improvement Capital Renewal Potential Funding Source School Building 3 6,048 Capital Reserve TMS Building 3 23,845 Capital Reserve TMS Building 3 43,139 Capital Reserve TMS Building Flooring 3 3 73,202 Capital Reserve 7,862 Capital Reserve TMS TMS Grounds 3 Capital Reserve TMS Grounds 3 9,000 Capital Reserve TMS Lighting Building Building 3 3 3 Capital Reserve Capital Reserve 7,800 Capital Reserve TMS Transportation Warehouse Building 3 HVAC & Mech Building Building Grounds 3 3 3 3 Building 4 Building 140,000 18,200 1,000 3,500 70,000 43,731 Capital Reserve Warehouse 3,000 Capital Reserve Capital Reserve 10,000 Capital Reserve 241,000 Capital Reserve Warehouse WR WR WR Capital Reserve AAHS 4 31,318 Capital Reserve AAHS Building 4 45,000 Capital Reserve AAHS Flooring 4 32,000 Capital Reserve AAHS Grounds Grounds Grounds 4 4 4 90,000 100,000 Capital Reserve Capital Reserve 50,000 Capital Reserve AAHS AAHS AAHS Plumbing Plumbing 4 4 4,000 Capital Reserve 1,500 Capital Reserve AAHS AAHS Building Building 4 4 10,000 30,000 Food Service Capital Reserve AT AT Building Building 4 4 25,000 Capital Reserve 250,000 Capital Reserve AT AT Flooring 4 35,000 Capital Reserve AT Grounds 4 15,000 Capital Reserve AT Lighting Plumbing HVAC & Mech 4 4 4 60,000 Capital Reserve 28,000 Capital Reserve 32,000 Food Service AT AT CMS Building 4 55,000 Capital Reserve D20 Football Stadium Grounds 4 34,000 Capital Reserve D20 Football Stadium Building Building 4 4 25,000 Capital Reserve 20,000 Food Service DV DV Replace storefront and all exterior doors and hardware Replace all exterior window units Upgrade flooring in cafeteria, restrooms, and support areas Allowance for interior flooring upgrades Replace parking lot (Faculty/Visitors) Building Building 4 4 38,500 Capital Reserve 225,000 Capital Reserve DV DV Flooring Flooring Grounds 4 4 4 44,000 Capital Reserve 230,000 Capital Reserve 75,000 Capital Reserve DV DV DV Replace FA systems at FM, TRANS, and Warehouse District wide exterior paint District wide interior paint Building Building Building 4 4 4 Capital Reserve 150,000 Capital Reserve 175,000 Capital Reserve DW DW DW ASD20 - Facility and Site Manual 100,000 90 June 2011 District Wide Facility Repairs and Enhancements Description Replace sod with synthetic surface at ATES, HP, FR, EW, PH, TMS, EMS, CMS, RHS, LHS, AAHS, EX, DCCMS/HS, CTE, PI, MV, FR, FH, RC, RR, TDVA, WR, CMS Add VFDs to ea AHU Improve perimeter drainage at new addition entry locations and other problem drainage areas Renovate all bathroom interiors Type Priority Deferred Maintenance Capital Improvement Capital Renewal Potential Funding Source School Grounds HVAC & Mech 4 4 9,600,000 24,000 Bond Issuance Capital Reserve DW EAC Building Plumbing 4 4 5,000 55,000 Capital Reserve Capital Reserve EMS EMS Building 4 12,000 Capital Reserve EX Electrical Flooring Grounds Grounds Grounds Building 4 4 4 4 4 4 35,000 Capital Reserve 8,500 Capital Reserve Capital Reserve 25,000 Capital Reserve 25,000 Capital Reserve Capital Reserve EX EX EX EX EX FH Building 4 3,500 Capital Reserve FH Building Building 4 4 15,000 Capital Reserve 45,000 Capital Reserve FH FH Building Electrical 4 4 250,000 Capital Reserve 44,000 Capital Reserve FH FH Flooring 4 90,000 Capital Reserve FH Grounds HVAC & Mech Building Electrical Flooring 4 4 4 4 4 70,000 13,000 25,000 6,000 10,000 Capital Reserve Capital Reserve Food Service Food Service Capital Reserve FH FH FR FR FR Grounds HVAC & Mech Plumbing 4 4 4 60,000 Capital Reserve Capital Reserve 6,000 Capital Reserve FR FR FR Building Building Building 4 4 4 25,000 Capital Reserve 37,500 Capital Reserve 49,500 Capital Reserve HP HP HP Grounds 4 3,000 Capital Reserve HP Grounds HVAC & Mech HVAC & Mech Building Building 4 4 4 4 4 30,000 Capital Reserve 20,000 Capital Reserve 360,000 Bond Issuance Capital Reserve Capital Reserve HP HP HP LHS LHS Building 4 5,176 Capital Reserve LHS Building 4 18,585 Capital Reserve LHS Building 4 19,500 Capital Reserve LHS Electrical 4 14,000 Food Service LHS Flooring 4 41,780 Capital Reserve LHS Grounds 4 9,601 Capital Reserve LHS Grounds 4 51,900 Capital Reserve LHS Lighting 4 50,000 Capital Reserve LHS Water infiltration at Facilities shower/Gym north wall Plumbing Replace all existing DX Units and balance system HVAC & Mech 4 4 47,500 Capital Reserve 928,308 Bond Issuance Install keyed electric switch for light rigging at stage 4 78,000 Capital Reserve PCHS 4 45,000 Capital Reserve PH Building envelope; new caulk, replace window and door seals, repair broken windows, seal brick cracks Upgrade ballasts and lamps in corridors and classrooms Replace flooring in portables Install wheel chair access to playfield Allowance for concrete and asphalt repairs Add permanent walking track Expand Health Room Provide insulation on all HW under sink piping and traps Building envelope allowance for caulk, windows and window seals, flashing, control joints, storefront glazing, paint, fascia Replace folding panel partitions at gym Replace roof EPDM membrane, repair roof penetrations, repair flashing/caulk at parapet locations…ballast where necessary Replace fan coil units Flooring allowance for corridors, classrooms, cafeteria, gym, and office areas Allowance for asphalt, curb and gutter and sidewalks Replace portable A/C units Replace grease interceptor Replace milk cooler Replace portable carpet and paint (exterior) Grounds allowance for parking lot crack seal and seal coat, repair sidewalks, improve drainage, repair curb and gutter Add ventilation and cooling to the lounge Replace dishwasher Building envelope allowance: foundations, paint, wall repairs, caulk, insulation, fascia, soffits, flashing, window seals, windows, storefront frames and glazing Repaint interior surfaces currently painted Replace skylight and leaking windows throughout Install metal gate at north side access drive to control visitor traffic Install concrete retaining wall on west side of playground Replace gym HVAC Replace unit ventilators and controls Add FA to Portable 4 Flush valves in pool lockers need access panels Replace wood door, solid core, double door and hardware at Gym storage Replace exterior steel doors at Cafeteria/Commons Painting, interior on masonry, primer and 1 coat at Pool 2-burner range is approaching end of service life, replace Replace epoxy resin floor at Cafeteria serving line and Kitchen Replace single steel door, frame and hardware at gym to tennis courts replace/install sidewalks and access paths to upper playfields Install fly connector strips and reorient receptacles at Stage lighting Electrical ADA Allowance: Provide ADA compliant door levers, automatic access control to storefront doors Building ASD20 - Facility and Site Manual 25,000 24,000 13,000 6,000 15,000 91 LHS MRMS June 2011 District Wide Facility Repairs and Enhancements Description Building envelope allowance: Exterior door sweeps, paint, flashing repairs, caulk, control joint repair, window seals, windows, glazing, storefront, mortar repair, graffiti seal Type Priority Deferred Maintenance Capital Improvement Capital Renewal Potential Funding Source School Building 4 25,000 Capital Reserve PH Building 4 60,000 Capital Reserve PH Flooring 4 105,000 Capital Reserve PH Grounds HVAC & Mech Building Building Building 4 4 4 4 4 35,000 Capital Reserve 16,000 Capital Reserve Capital Reserve 9,400 Capital Reserve 200,000 Capital Reserve PH PH RHS RHS RHS Electrical Electrical 4 4 14,816 Capital Reserve 15,160 Capital Reserve RHS RHS Grounds HVAC & Mech HVAC & Mech 4 4 4 100,000 Capital Reserve Capital Reserve 14,000 Capital Reserve RHS RHS RHS Plumbing Building 4 4 175,000 75,000 Capital Reserve Capital Reserve RHS RR Building 4 30,000 Capital Reserve TMS Building Flooring 4 4 42,000 Capital Reserve 16,000 Capital Reserve TMS TMS Grounds HVAC & Mech 4 4 25,000 Capital Reserve 7,727 Capital Reserve TMS TMS Plumbing Lighting Building Building Flooring 4 4 4 4 4 Grounds 4 HVAC & Mech Building Building 4 6 6 Building 6 Flooring Building 6 6 Replace toilet partitions in student and adult restrooms Replace carpet in the portables Replace roof top exhaust fans Out building needs gutters to eliminate wash-out around base of building Roof overflow directly above doors at exit stair Plumbing Flooring HVAC & Mech 6 6 6 Building Building 6 6 2,500 4,000 Capital Reserve Capital Reserve CMS CMS Single compartment grease interceptor not per code Replace switchboard in NE boiler room 120/208V, 200 Amp New carpet for classrooms, office, and lounge. New flooring for cafeteria and vct corridors Upgrade heating system to 4 pipe heating and cooling system Vacuum breakers are required at all hose bibbs and wall hydrants Provide mag holds for all corridor classrooms Outdoor storage expansion Library and computer lab addition Replace skylight in staff lounge Building 6 4,500 Capital Reserve CMS Electrical 6 34,678 Capital Reserve CMS Flooring 6 HVAC & Mech 6 1,000,000 Plumbing Building Building Building Building 6 6 6 6 6 1,200 35,000 36,400 266,500 Interior architectural allowance: interior blinds, new cafeteria tables are needed, replace folding panel partition at gym/stage, interior door hardware. Replace carpet in all classrooms, offices, library, and support spaces; install VCT or polished concrete in corridors Grounds allowance: drainage, erosion control, parking lots, curb and gutter, playgrounds, irrigation, sod; repair Replace portable AC units Replace athletic storage facility Exterior shop yard doors rusting; replace Replace corridor lockers Replace motor, 3-phase, 230V, 1/2 HP, basketball backboard Replace air compressor, 7 1/2 HP, Boiler Room Rubber running track pitted and gouged; replace top coat Add auxiliary room heater for pool boiler room Replace heat exchanger and pumps in pool Most plumbing fixtures are outdated and should be replaced with water conserving fixtures Replace all single pane glazing and frames Improve drainage/water deterrance at the gym wall perimeter and new wing perimeter foundation wall cold joints Groundwater drainage into industrial arts other school entrances; add subsurface drainage to divert subsurface drainage facility wide; replace needed storefornt systems to address rust/deterioration Repair flooring in all showers Replace cracked and spalled site concrete, add concrete path from main entry to portables and repair concrete at dumpster area Window A/C unit, repair/replace Replace all pushbutton faucets with new lever handle throughout Upgrade fluorescent lighting Replace door closers in poor condition Replace door hardware throughout Repair floor at freezer Repair spalled and chipped concrete at the lower parking lot surrounding the crosswalk area; new curb and gutter too, new striping is needed Provide chilled water, air cooled condenser systems, fan-coil units Bldg C replace storefront glass Piping and Insulation - Building A/BC/D Replace existing gas, water, and sanitary from building to service feed location Renovate restrooms, fixtures, exhaust fans, flooring, amenities Replace rooftop split system 2 -ton unit ASD20 - Facility and Site Manual 55,000 1,750 46,251 650 35,600 Capital Reserve Capital Reserve 11,000 Capital Reserve 30,000 Capital Reserve General Fund 5,000 Capital Reserve 546,483 16,000 25,000 92 TMS Warehouse WR WR WR WR Bond Issuance Capital Reserve 25,000 Capital Reserve WR AAHS AAHS 75,000 Capital Reserve AAHS Capital Reserve 11,000 Capital Reserve AE AI 20,000 Capital Reserve 8,000 Capital Reserve 20,500 Capital Reserve AI AT AT 273,000 Bond Issuance CMS Bond Issuance CMS Capital Reserve Capital Reserve Capital Reserve Bond Issuance 14,000 Capital Reserve CMS DV DV DV DV June 2011 District Wide Facility Repairs and Enhancements Description Allowance for new ceiling grid and tiles Replace existing gas, water, and sanitary from building to service feed location Provide concrete/fence enclosure for dumpsters Vacuum breakers are required at all hose bibbs and wall hydrants Replace bathroom plumbing fixtures (lavs, urinals, toilets) Replace toilet partitions, all restrooms Provide DCCMS, CMS, and MRMS coaches box at football field Replace aluminum frame and glazing at lower courtyard, cyclical Replce all wood double hung exterior windows Turf burned out at main entry. Needs to be re-sodded and have irrigation checked. Tennis Court Resurface Paint portables and decks Paint miscellaneous exterior wood Install ADA compliant lever handles on all interior doors 7 classroom additions Repaint exterior metal including roof Upgrade flooring in corridors, cafeteria, kitchen, classrooms, and gym Repair/upgrade playfield Install guardrail at storage loft over stairs to gym Remove all hold open devices from corridor doors and add mag holds and fire detection devices Provide ADA compliant door handles for all interior classroom doors Replace skylight window above entry Add smoke detectors and magnetic holds for corridor doors Paint interior Upgrade bathroom fixtures, flooring, and amenities Replace conc walk at landscape planter near Kindergarten Add softfall surface to existing playgrounds and new equipment for 2-5 playground Replace all flush valves and faucets to electronic/battery operated units Relocate vent through roof, away from air intake Improve drainage at building entrance - regrade and resurface, add inlets Provide wet fire suppression system Upgrade/improve student drop off area and dumpster areas, including damaged concrete Exhaust hood does not have make-up air. Verify kitchen has adequate supply of make-up air. Dishwasher is approaching end of service life Extend concrete walk to "trail" on south side of building Install mag holds on all corridor doors ADA allowance for handrails and installing dual locking classroom door hardware Type Building Priority 6 Deferred Maintenance Capital Improvement Capital Renewal Potential Funding Source School 14,000 Capital Reserve DV 75,000 Capital Reserve Capital Reserve DV DV Building Grounds 6 6 9,000 Plumbing 6 750 Plumbing Plumbing 6 6 40,000 Capital Reserve 18,500 Capital Reserve DV DV Building 6 90,000 Capital Reserve DW Building Building 6 6 231,831 Capital Reserve Capital Reserve EMS EMS Grounds Grounds Building Building 6 6 6 6 5,000 Capital Reserve 75,000 Capital Reserve Capital Reserve Capital Reserve EMS EMS EX EX Building Building Building 6 6 6 Capital Reserve Bond Issuance 19,750 Capital Reserve EX EX EX Flooring Grounds Building 6 6 6 405,500 2,000 175,000 Capital Reserve Bond Issuance Capital Reserve EX EX FH Building 6 25,000 Capital Reserve FH Building Building 6 6 50,000 Capital Reserve 10,000 Capital Reserve FH FH Building Building Flooring 6 6 6 54,000 35,000 Capital Reserve 42,000 Capital Reserve Capital Reserve FH FH FH Grounds 6 10,000 Capital Reserve FH Grounds 6 52,500 Capital Reserve FH Plumbing Building 6 6 40,000 5,660 Capital Reserve Capital Reserve FH FR Building Building 6 6 15,000 190,000 Capital Reserve Capital Reserve FR FR Grounds 6 60,000 Capital Reserve FR HVAC & Mech Plumbing 6 6 12,000 Food Service 4,500 Capital Reserve FR FR Building Building 6 6 5,500 25,000 Capital Reserve Capital Reserve HP HP Building 6 60,000 Capital Reserve HP Grounds Building 6 6 40,000 50,000 Capital Reserve Capital Reserve HP LHS 5,176 Capital Reserve 6,700 Capital Reserve LHS LHS Grounds allowance for softfall surface at playground Renovate girls and boys pool locker rooms Replace wood door, solid core, double door and hardware at 114 & 115 Steamer is approaching end of service life, replace Replace metal door, frame and hardware at Pool Pump Room and Office Replace all pool windows Repaint all exterior metal surfaces Replace panic hardware throughout building Water ponding at Kitchen dock and Auditorium entrance. Add storm drain - tie into adjacent system. Repair asphalt. Single sewer manhole configuration does not meet code. Grease interceptor undersized and requires frequent service. Building Building 6 6 Building Building Building Building 6 6 6 6 Grounds 6 Plumbing Replace locker room shower fixtures, wall-mounted Extend roof access hatch ladder Replace reinforced wire glass panel Plumbing Building Building Provide new safety compliant floor for all locker rooms Flooring ASD20 - Facility and Site Manual General Fund 21,698 4,500 12,500 30,000 1,964,900 9,176 35,000 40,000 96,361 DV Capital Reserve Capital Reserve Capital Reserve Capital Reserve LHS LHS LHS LHS 80,000 Capital Reserve LHS 6 22,000 Capital Reserve LHS 6 6 6 2,400 6,420 Capital Reserve Capital Reserve 8,000 Capital Reserve 6 27,000 Capital Reserve 93 LHS MRMS MRMS PCHS June 2011 District Wide Facility Repairs and Enhancements Description Replace tennis courts Folding panel partition at gym and stage is not a good sound barrier; replace Repair exterior window seals separating from brick jambs Replace sliding wood doors in classrooms Paint all interior HM doors and frames Replace windows throughout building Replace existing boilers with HE boilers Exterior lighting is inadequate. Add new parking lot lighting. Cracked and loose plaster / CMU in various walls Install auto door opener at south side of building Painting, interior on masonry, primer and one-coat Painting, exterior on metal, primer and one-coat Replace bathroom exhaust fan, portable P3/P4 Replace bathroom exhaust fan, portable P1/P2 Replace window A/C unit, portable P5/P6 Replace window A/C unit, portable P1/P2 Replace window A/C unit, portable P3/P4 Replace baseboard heating units with gas fired unit Replace storefront, metal and glass at stairwells Renovate girls and boys pool locker rooms Replace storefront, metal and glass in pool area Ponding water at west playfield by commons Renovate stagnant air situation in main restrooms Install MUA unit in kitchen/cafeteria Wood siding at walls above roof level need to be restained/painted. Secure loose trim. Painting, exterior on masonry and wood, primer and one-coat Painting, interior on plaster and drywall, primer and one-coat Upgrade primary electrical feed Type Grounds Priority 6 Building 6 Building Building Building Building HVAC & Mech 6 6 6 6 6 Lighting Building Building Building Building Electrical Electrical HVAC & Mech HVAC & Mech HVAC & Mech HVAC & Mech Building Building Building Grounds HVAC & Mech HVAC & Mech 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 Building 6 Building 6 Building Electrical 6 6 Electrical Deferred Maintenance Capital Improvement Capital Renewal Potential Funding Source 250,000 Capital Reserve Capital Reserve PH Capital Reserve Capital Reserve Capital Reserve Capital Reserve Capital Reserve PH PH PH PH PH Capital Reserve Capital Reserve Capital Reserve Capital Reserve Capital Reserve General Fund General Fund Capital Reserve Capital Reserve Capital Reserve Capital Reserve Capital Reserve Capital Reserve Capital Reserve Capital Reserve Capital Reserve Food Service PH PI PI PI PI PI PI PI PI PI PI RHS RHS RHS RHS RHS RHS Capital Reserve RR 21,960 Capital Reserve RR 81,000 31,100 Capital Reserve Capital Reserve RR RR 6 1,852 Capital Reserve RR Building 6 1,116 Capital Reserve SITW Building Building HVAC & Mech Building Building 6 6 6 6 6 1,320 Capital Reserve 4,401 Capital Reserve Capital Reserve Capital Reserve 3,072 Capital Reserve SITW SITW SITW TMS TMS Building 6 3,500 Capital Reserve TMS Building 6 9,293 Capital Reserve TMS Building Building 6 6 9,401 Capital Reserve 13,648 Capital Reserve TMS TMS Building Building Flooring Flooring 6 6 6 6 35,000 Capital Reserve 217,863 Capital Reserve Capital Reserve 7,862 Capital Reserve TMS TMS TMS TMS Grounds Building Building 6 6 6 Electrical Building 6 6 Building Building Building 9 9 9 Only one accessible access to gymnasium…add door Walk-ins are missing interior coved base Replace skylights Replace wood doors and hardware Building Grounds Building Building 9 9 9 9 Drainage east of playground/field and north of building Remove asphalt in front of classrooms; replace with concrete, compacted base course/boulders Provide synthetic turf field Emergency generator needs a new transfer switch Grounds 9 Grounds Grounds Electrical 9 9 9 Replace motor, 3 phase, 230V, 1HP, custodial office Replace wood door, hollow core, frame and hardware at bathroom Painting, interior on plaster and drywall, primer and one-coat Replace steel single door, frame and hardware Replace baseboard heating unit with heat pump Refinish interior doors and frames Repaint trailer 301 exterior Rebuild ramp to Trailer 301 per ADA codes (30' 0" run) Replace steel double door, frame and hardware at west side of cafeteria Replace steel single door, frame and hardware at IT entrance Replace wood deck and ramp at Trailer 304 Gymnasium sound system - does not operate satisfactorily, replace. Replace wood double hung windows throughout Repair flooring at the base of all benches Replace carpet at Trailer 304 Storm sewer - clean pipe outlets on perimeter drain and 12" storm sewer Extend corridor walls to Roof Deck Provide panic hardware at all exterior exit doors Provide ground fault interrupt receptacle, exterior and bathroom Replace wire reinforced glass in corridors Buildings A/B/C/D Glycol added with no correction to system capacities Provide ADA door handles to all classroom doors Missing brick veneer at lower level courtyard ASD20 - Facility and Site Manual 37,000 School PCHS 3,000 5,900 28,000 165,000 112,000 65,000 1,200 5,200 52,500 55,000 986 986 11,454 11,909 11,909 31,840 29,363 50,000 16,965 2,000 13,000 30,000 2,500 33,450 32,875 3,000 5,000 8,640 12,444 Capital Reserve Capital Reserve Capital Reserve TMS Transportation Transportation 1,600 64,000 Capital Reserve Capital Reserve Transportation WR 28,000 Capital Reserve Capital Reserve Capital Reserve AAHS AT CMS 12,000 3,400 44,500 1,000 52,200 15,000 Capital Reserve 37,000 550,717 94 Capital Reserve Capital Reserve Capital Reserve 46,000 Capital Reserve Capital Reserve Bond Issuance 10,000 Capital Reserve CMS CMS DV DV DV DV DV EMS June 2011 District Wide Facility Repairs and Enhancements Description Repair grading and add storm sewer along rear southeast corner in fire access Corridor doors require mag holds if school intends to continue to prop open doors Provide handicap access to stage Flagpole vent stacks away from RTU intake louvers Need improved student drop-off/pick-up area Replace push button metering faucets with lever handled faucets at the main toilet groupings Storefront door, metal and glass, frame and hardware at main entrance Replace roof Install a deluge valve to water curtain separating the Stage from the audience Replace split system A/C unit, air cooled 2.5 ton Provide new electric winch system for light rigging at stage Provide chilled water, air cooled condenser systems, fan coil units, delete rooftop unit replacement Gymnasium air handling unit noise Tile to carpet transitions exceed 1/2" height Provide chilled water, air cooled condenser systems, fan coil units Renovate all bathroom interiors Upgrade bathroom fixtures; all bathrooms Provide fire suppression system, wet pipe Undersized stalls in men's toilets at gymnasium; reconfigure restrooms at gymnasium Replace steamer Emergency shower and eyewash units need to be upgraded Provide fire suppression system Provide additional steel emergency egress stairway from Mezzanine Provide fire suppression system, dry pipe at canopy overhang Provide fire suppression system, wet pipe at Rack Storage Replace windows, all Type Priority Deferred Maintenance Capital Improvement Capital Renewal Potential Funding Source School Grounds 9 50,000 Capital Reserve Building Building Electrical Grounds 9 9 9 9 25,000 17,000 160,000 Capital Reserve Capital Reserve 9,000 Capital Reserve Capital Reserve EX FR FR FR Plumbing 9 27,000 Capital Reserve FR Building Building 9 9 63,069 Capital Reserve 1,250,000 Bond Issuance Plumbing HVAC & Mech 9 9 8,000 Capital Reserve 15,475 Capital Reserve Electrical 9 2,250 Capital Reserve PCHS HVAC & Mech HVAC & Mech Flooring 9 9 9 2,142,859 Bond Issuance 4,000 Capital Reserve Capital Reserve PCHS PH PI HVAC & Mech Plumbing Plumbing Building 9 9 9 9 533,127 35,000 40,494 333,600 Bond Issuance Capital Reserve Capital Reserve Bond Issuance PI PI PI RHS Plumbing Building 9 9 13,000 Capital Reserve 6,400 Capital Reserve RR TMS Plumbing Building 9 9 13,000 181,777 Capital Reserve Capital Reserve TMS Transportation Building 9 3,000 Capital Reserve Warehouse Building 9 3,260 Capital Reserve Warehouse Building Building 9 9 97,600 203,500 Capital Reserve Capital Reserve Warehouse WR Total 2,000 878,588 ASD20 - Facility and Site Manual 95 31,314,427 EMS LHS LHS LHS MRMS 20,236,471 June 2011 Where dreams take flight… One student at a time. ASD20 - Facility and Site Manual 96 June 2011 Issued by: Business Services Academy School District Twenty 1110 Chapel Hills Drive Colorado Springs, Colorado 80920 719.234.1200 www.asd20.org