RECAPP Facility Evaluation Report
Transcription
RECAPP Facility Evaluation Report
RECAPP Facility Evaluation Report The Board of Trustees of Red Deer Catholic Regional Division No. 39 St. Patrick's Community School B1494A Red Deer Report run on: April 7, 2011 4:26 PM Red Deer - St. Patrick's Community School (B1494A) Facility Details Building Name: St. Patrick's Community Scho Address: 56 Holt Street Location: Red Deer Building Id: Gross Area (sq. m): Replacement Cost: Construction Year: B1494A 5,926.71 $16,537,886 1980 Evaluation Details Evaluation Company: Berry Architecture & Associates Evaluation Date: November 16 2010 Evaluator Name: Michelle Ovelson Total Maintenance Events Next 5 years: 5 year Facility Condition Index (FCI): $2,476,822 14.98% General Summary: The original single storey school was built in 1980 as an addition to existing G.H. Dawe Community Centre. The 1980 construction had an original gross area of 5142.5 square metres. In 1982 two additions were completed, including a 6 classroom addition, and a two classroom portable addition totalling 485 square metres. In 2001 a renovation took place to upgrade the administration space, home economics, and industrial education. The mechanical room is located in a rooftop penthouse. There are too many students in the building for it's size and design, there are currently 634 students. Overall, the building is in acceptable condition. Structural Summary: The original 1980 building was constructed with concrete foundation walls on concrete strip footing with a concrete slab on grade. The roof framing consists of sloped metal deck on OWSJ, and is supported by steel columns and loadbearing block walls. The 1982 addition was constructed with concrete foundation walls on concrete strip footing with a concrete slab on grade. The exterior walls are load bearing pre-cast wall panels, with pre-cast panel roof. Included in the construction of the original school is a mechanical penthouse located above the Industrial Arts Room. Overall the structure is in acceptable condition. Envelope Summary: The exterior finishes were replaced in 2009 with stucco, metal siding and split face block and are in excellent condition. Most of the roofing has been replaced except over the gym and mechanical spaces. The roofing types include built-up rooofing, and modified bitumous membrane roofing. Overall, building envelope is in good condition. Interior Summary: Interior walls consist mainly of painted drywall, and concrete block partitions. The interior of the school was repainted in 2001 and is in good condition. The administration, staff rooms and library are carpeted. The remainder of the school is mainly VCT. Overall the interior of the school is in acceptable condition. Mechanical Summary: A boiler system provides hot water to fin tube radiation around the perimeter of the building, and to fan coils, unit heaters and duct reheat coils. The exception is the 1982 addition which is an all air system. 2001- A water to glycol heat exchanger and pumping system was installed to serve the 1982 addition rooftop unit and the CTS air handling unit. Five indoor ventilation systems with overhead ductwork serve the various areas of the original 1980 school. A packaged rooftop heating/cooling/ventilation unit serves the 1982 south addition. 2001- A rooftop heating/ventilation unit with a glycol coil serves the 1982 north addition. A number of roof mounted exhaust fans are provided. The CTS shop is provided with independent exhaust systems and a dust collector. Plumbing fixtures are in a good state of repair. Sanitary sewer, storm sewer, water and natural gas connect to the City and Utility Co. services in the street. No humidification systems are provided. Controls are a combination of pneumatic and electric controls that have been upgraded to a BMCS. The system is in good condition and has been well maintained. Overall rating: 5-Good Report run on: April 7, 2011 4:26 PM Page 2 of 45 Red Deer - St. Patrick's Community School (B1494A) Electrical Summary: The facility was originally built in 1980 and there has been no major upgrading since then. The main service is 800A 347/600V 3-phase; The service is underground fed from pad mounted transformer. The fluorescent fixtures are T-8 lamp fluorescent with electronics ballasts. The Metal Halide fixtures are used in gym. All fire alarm, intrusion, telephone and Public address and Music systems meet current facility requirements. The overall rating for the facility shall be "Good" Condition Rating 1 - Critical 2 - Poor 3 - Marginal 4 - Acceptable 5 - Good 6 - Excellent Rating Guide Performance Unsafe, high risk of injury or critical system failure. Does not meet requirements, has significant deficiencies. May have high operating/maintenance costs. Meets minimum requirements, has significant deficiencies. May have above average operating maintenance costs. Meets present requirements, minor deficiencies. Average operating/maintenance costs. Meets all present requirements. No deficiencies. As new/state of the art, meets present and foreseeable requirements. Report run on: April 7, 2011 4:26 PM Page 3 of 45 Red Deer - St. Patrick's Community School (B1494A) S1 STRUCTURAL A1010 Standard Foundations* Concrete foundation wall on concrete strip footing. Rating 4 - Acceptable Installed Design Life Updated 1982 0 APR-11 A1030 Slab on Grade* Concrete slab on grade, 1.5" different in floor height in corridor 803 from slab settlement. Rating 4 - Acceptable Installed Design Life Updated 1980 0 APR-11 B1010.01 Floor Structural Frame (Building Frame)* Concrete slab on steel deck on OWSJ Rating 4 - Acceptable Installed Design Life Updated 1980 0 APR-11 B1010.02 Structural Interior Walls Supporting Floors (or Roof)* Loadbearing concrete block walls supporting mechanical penthouse. Pre-cast concrete walls around the portables. Rating 4 - Acceptable Installed Design Life Updated 1980 0 APR-11 B1010.05 Mezzanine Construction* concrete mezzanine in industrial arts room with ladder access. Rating 4 - Acceptable Installed Design Life Updated 1980 0 APR-11 B1010.07 Exterior Stairs* Cast in place concrete stairs. Rating 4 - Acceptable Installed Design Life Updated 1980 0 APR-11 B1010.09 Floor Construction Fireproofing* Spray fireproofing to underside of floor of mechanical house above Industrial Arts room. Rating 4 - Acceptable Installed Design Life Updated 1980 Report run on: April 7, 2011 4:26 PM 0 APR-11 Page 4 of 45 Red Deer - St. Patrick's Community School (B1494A) B1010.10 Floor Construction Firestopping* Fire caulking to floor penetrations Rating 4 - Acceptable Installed Design Life Updated 1980 0 APR-11 B1020.01 Roof Structural Frame* Metal Deck on steel roof joists supported by steel columns and steel beams. (1982) Precast concrete roof deck supported by concrete precast walls. Rating 4 - Acceptable Installed Design Life Updated 1980 0 APR-11 B1020.04 Canopies* Steel frame canopies at entrance Rating 4 - Acceptable Installed Design Life Updated 2009 Report run on: April 7, 2011 4:26 PM 0 APR-11 Page 5 of 45 Red Deer - St. Patrick's Community School (B1494A) S2 ENVELOPE B2010.01.02.02 Concrete Block: Ext. Wall Skin* Split face concrete block. Rating Installed Design Life Updated 6 - Excellent 1980 0 APR-11 B2010.01.06.03 Metal Siding** Corrugated prefinished metal siding. Rating Installed Design Life Updated 6 - Excellent Event: 2009 40 APR-11 Replace exterior metal siding (1020sq.m) Type Year Cost Priority Lifecycle Replacement 2049 Unassigned $125,460 Updated: APR-11 B2010.01.08 Cement Plaster (Stucco): Ext. Wall* Stucco walls. Rating Installed Design Life Updated 6 - Excellent Event: 2009 0 APR-11 Reclad existing stucco walls. Type Year Cost Priority Failure Replacement 2010 Unassigned $50,000 Updated: APR-11 Event: Reclad existing stucco walls.(cont.) Concern: Existing stucco walls have major holes and cracks in them allowing serious damage from the elements. There is serious building envelope failure. Recommendation: Remove existing rough textured stucco, install new air barrier membrane and masonry base with metal cladding on upper portion of walls. Consequences of Deferral: Continued damage and high maintenance costs, as well as moisture infiltration. Type Year Cost Priority Failure Replacement 2009 High $384,042 Large portion of damaged stucco at gym. Updated: OCT-10 Report run on: April 7, 2011 4:26 PM Page 6 of 45 Red Deer - St. Patrick's Community School (B1494A) B2010.01.09 Expansion Control: Exterior Wall Skin* Stucco control joints in stucco Rating Installed Design Life Updated 6 - Excellent 2009 0 APR-11 B2010.01.11 Joint Sealers (caulking): Ext. Wall** Exterior caulking Rating Installed Design Life Updated 6 - Excellent Event: 2009 20 APR-11 Replace exterior caulking (3200m) Type Year Cost Priority Lifecycle Replacement 2029 Unassigned $91,136 Updated: APR-11 B2010.02.02 Precast Concrete: Ext. Wall Const.* Pre-cast walls for portables. Rating 4 - Acceptable Installed Design Life Updated 1980 0 APR-11 B2010.02.03 Masonry Units: Ext. Wall Const.* Concrete block masonry. Rating 5 - Good Installed Design Life Updated 1980 0 APR-11 B2010.02.04 Load-Bearing-Metal Studs: Ext. Wall* Metal stud framed walls in original building. Rating 4 - Acceptable Installed Design Life Updated 1980 0 FEB-06 B2010.03 Exterior Wall Vapor Retarders, Air Barriers, and Insulation* Rigid insulation in pre-cast concrete wall panels. Batt insulation in metal stud framed walls. Rating 4 - Acceptable Installed Design Life Updated 1980 Report run on: April 7, 2011 4:26 PM 0 APR-11 Page 7 of 45 Red Deer - St. Patrick's Community School (B1494A) B2010.05 Parapets* Wood frame parapets Rating Installed Design Life Updated 4 - Acceptable 1980 0 APR-11 B2010.06 Exterior Louvers, Grilles, and Screens* Miscellaneous prefinished metal vents at mechanical penthouse. Rating Installed Design Life Updated 4 - Acceptable 2004 0 APR-11 B2010.09 Exterior Soffits* Prefinished metal soffit. Rating Installed Design Life Updated 6 - Excellent 2009 0 APR-11 B2020.01.01.02 Aluminum Windows (Glass & Frame)** - 1980 Section Anodized aluminum windows Rating Installed Design Life Updated 4 - Acceptable Event: 1980 40 APR-11 Replace aluminum windows (352sq.m) Type Year Cost Priority Lifecycle Replacement 2020 Unassigned $386,739 Updated: APR-11 B2020.01.01.06 Vinyl, Fibreglass &Plastic Windows** Vinyl window in administration area Rating Installed Design Life Updated 5 - Good Event: 2001 40 APR-11 Replace vinyl windows (48sq.m) Type Year Cost Priority Lifecycle Replacement 2041 Unassigned $46,780 Updated: APR-11 Report run on: April 7, 2011 4:26 PM Page 8 of 45 Red Deer - St. Patrick's Community School (B1494A) B2030.01.01 Aluminum-Framed Storefronts: Doors** Aluminum door in kindergarten room Rating Installed Design Life Updated 4 - Acceptable Event: 1999 30 APR-11 Replace exterior aluminum door (1 door) Type Year Cost Priority Lifecycle Replacement 2029 Unassigned $3,164 Updated: APR-11 B2030.01.02 Steel-Framed Storefronts: Doors** Hollow metal entrance frames with sidelights. Rating Installed Design Life Updated 4 - Acceptable Event: 1999 30 APR-11 Replace exterior steel frame and doors at 700 wing Concern: Frame doesn't fit properly in opening, screws are coming loose. Recommendation: Replace steel doors Type Year Cost Priority Failure Replacement 2013 Medium $4,350 Updated: APR-11 100_1664.JPG Event: Replace steel storefront doors (5 units) Type Year Cost Priority Lifecycle Replacement 2029 Unassigned $11,599 Updated: APR-11 Report run on: April 7, 2011 4:26 PM Page 9 of 45 Red Deer - St. Patrick's Community School (B1494A) B2030.02 Exterior Utility Doors** Hollow metal door frame Rating Installed Design Life Updated 4 - Acceptable Event: 1999 40 APR-11 Replace metal exterior doors (4 doors) Type Year Cost Priority Lifecycle Replacement 2039 Unassigned $9,280 Updated: APR-11 B3010.01 Deck Vapor Retarder and Insulation* Rigid insulation on precast concrete roof deck (2001) - 75mm EPS insulation added to existing 1982 wing (2004) - 75mm EPS insulation added to existing 1982 wing Rating 4 - Acceptable Installed Design Life Updated 1980 Report run on: April 7, 2011 4:26 PM 0 APR-11 Page 10 of 45 Red Deer - St. Patrick's Community School (B1494A) B3010.04.01 Built-up Bituminous Roofing (Asphalt & Gravel)** Built up roof over Gym and Library Rating Installed Design Life Updated 3 - Marginal Event: 1980 25 APR-11 Replace roof over Library/ forum area (Cont) Type Year Cost Priority Failure Replacement 2009 Unassigned $18,404 Updated: OCT-10 Event: Replace roof over Gym with new SBS roof system. (918sq.m) Concern: Original built-up roof is showing wear, requires replacement. Bubbling has been identified in a number of locations, and the roof has been patched numerous times. Roof has large backslope with exposed roof membrane with also has numerous patches and repairs. Recommendation: Replace roof over Gym and Library with new SBS roof system. Consequences of Deferral: Possible roof failure leading to interior water damage. Type Year Cost Priority Failure Replacement 2013 Medium $160,448 Large portion of exposed membrane at backslope from parapet on gym roof. Updated: APR-11 B3010.04.04 Modified Bituminous Membrane Roofing (SBS)** SBS roofing on all roofs except the gym and mechanical room Rating Installed Design Life Updated 5 - Good Event: 2009 25 APR-11 Replace SBS Roofing (3850sq.m) Type Year Cost Priority Lifecycle Replacement 2034 Unassigned $672,903 Updated: APR-11 Report run on: April 7, 2011 4:26 PM Page 11 of 45 Red Deer - St. Patrick's Community School (B1494A) B3010.08.02 Metal Gutters and Downspouts** Pre-finished metal downspouts Rating Installed Design Life Updated 6 - Excellent Event: 2009 30 APR-11 Replace metal downspouts (20m) Type Year Cost Priority Lifecycle Replacement 2039 Unassigned $377 Updated: APR-11 B3020.01 Skylights** Aluminum Skylight. Rating Installed Design Life Updated 4 - Acceptable Event: 1980 25 APR-11 Replace aluminum skylight (9sq.m) Type Year Cost Priority Lifecycle Replacement 2014 Unassigned $20,951 Updated: APR-11 Report run on: April 7, 2011 4:26 PM Page 12 of 45 Red Deer - St. Patrick's Community School (B1494A) S3 INTERIOR C1010.01 Interior Fixed Partitions* Concrete block walls - painted. Gypsum wallboard on steel studs. Rating Installed Design Life Updated 4 - Acceptable 1980 0 APR-11 C1010.03 Interior Operable Folding Panel Partitions** Operable wall at gym, custom made. Since the door is custom made it is very difficult for maintenance to repair the partition. Rating Installed Design Life Updated 4 - Acceptable Event: 1980 30 APR-11 Replace folding panel partition (120sq.m) Type Year Cost Priority Lifecycle Replacement 2014 Unassigned $21,923 Updated: APR-11 C1010.05 Interior Windows* Hollow metal interior glazing frames complete with wired glass between staffroom and main corridor Rating 4 - Acceptable Installed Design Life Updated 1980 0 FEB-06 C1010.06 Interior Glazed Partitions and Storefronts* Steel framed storefronts at vestibules Rating 4 - Acceptable Installed Design Life Updated 1980 0 APR-11 C1010.07 Interior Partition Firestopping* Fire sealant in rated rooms Rating 4 - Acceptable Installed Design Life Updated 1980 0 APR-11 C1020.01 Interior Swinging Doors (& Hardware)* - Metal Hollow metal doors and frames numerous locations throughout school. Replace gym metal frame with metal frame that has removable mullions. (less than $1000) Rating 5 - Good Installed Design Life Updated 2001 Report run on: April 7, 2011 4:26 PM 0 APR-11 Page 13 of 45 Red Deer - St. Patrick's Community School (B1494A) C1020.01 Interior Swinging Doors (& Hardware)* - Wood Painted wood doors. Rating Installed Design Life Updated 4 - Acceptable 2008 0 APR-11 C1020.03 Interior Fire Doors* Mechanical Room door and frame - needs to be repainted. (2001) Hollow metal doors with g.w. glass in hollow metal frame - 45min F.R.R. (2001) Rated shutter at administration office - 45min F.R.R. Some door ratings have been painted over. Rating Installed Design Life Updated 4 - Acceptable Event: 1980 0 APR-11 Replace door with rated door (3 doors) Concern: Storage room in industrial arts classroom is missing a rated door, change rooms used as storage rooms required rated doors. Recommendation: Replace existing door with a rated door Type Year Cost Priority Code Repair 2014 Medium $4,215 Updated: APR-11 C1030.01 Visual Display Boards** Tackboards (1995) Whiteboards Rating Installed Design Life Updated 4 - Acceptable Event: 1980 20 APR-11 Replace 24 whiteboards and 74 tackboards Type Year Cost Priority Lifecycle Replacement 2014 Unassigned $69,600 Updated: APR-11 Report run on: April 7, 2011 4:26 PM Page 14 of 45 Red Deer - St. Patrick's Community School (B1494A) C1030.02 Fabricated Compartments (Toilets/Showers)** Metal toilet partitions (1990) Melamine shower partitions Rating Installed Design Life Updated 4 - Acceptable Event: 1980 30 APR-11 Replace metal toilet partitions (17 stalls) Type Year Cost Priority Lifecycle Replacement 2014 Unassigned $21,516 Updated: APR-11 C1030.05 Wall and Corner Guards* Metal corner guards throughout school Rating Installed Design Life Updated 4 - Acceptable 1980 0 APR-11 C1030.08 Interior Identifying Devices* Room number on door frame, acrylic signage on doors Rating Installed Design Life Updated 4 - Acceptable 1980 0 APR-11 C1030.10 Lockers** - 1980 Original lockers in numerous corridors and boys/girls change rooms. Rating Installed Design Life Updated 3 - Marginal Event: 1980 30 APR-11 Replace metal lockers (350 lockers) Concern: Lockers are dented, damaged, in marginal condition. Recommendation: Replace original 1980 lockers Consequences of Deferral: Maintenance issue, poor appearance. Type Year Cost Priority Failure Replacement 2014 Low $101,844 Updated: APR-11 Report run on: April 7, 2011 4:26 PM Page 15 of 45 Red Deer - St. Patrick's Community School (B1494A) C1030.10 Lockers** - 2000 Full height lockers in various locations throughout school. Rating Installed Design Life Updated 4 - Acceptable Event: 2000 30 APR-11 Replace metal lockers (318 lockers) Type Year Cost Priority Lifecycle Replacement 2030 Unassigned $184,990 Updated: APR-11 C1030.12 Storage Shelving* Various wood shelving in classrooms Rating Installed Design Life Updated 4 - Acceptable 1980 0 APR-11 C2010 Stair Construction* Steel pans and stringers with concrete cast treads to mechanical room Rating Installed Design Life Updated 4 - Acceptable 1980 0 APR-11 C2020.08 Stair Railings and Balustrades* Painted steel handrail up to mechanical room. Rating Installed Design Life Updated 4 - Acceptable 1980 0 FEB-06 C3010.02 Wall Paneling** Wood wall paneling in music room and administration office Rating Installed Design Life Updated 4 - Acceptable Event: 1990 30 APR-11 Replace wood wall panelling (75sq.m) Type Year Cost Priority Lifecycle Replacement 2020 Unassigned $6,525 Updated: APR-11 Report run on: April 7, 2011 4:26 PM Page 16 of 45 Red Deer - St. Patrick's Community School (B1494A) C3010.04 Gypsum Board Wall Finishes (Unpainted)* Exposed gypsum board in mechanical room Rating Installed Design Life Updated 4 - Acceptable 1980 0 APR-11 C3010.06 Tile Wall Finishes** 25mm x 25mm ceramic tile around urinals 75mm x 75mm ceramic tile in washroom Rating Installed Design Life Updated 4 - Acceptable Event: 1980 40 APR-11 Replace ceramic tile (35sq.m) Type Year Cost Priority Lifecycle Replacement 2020 Unassigned $91,139 Updated: APR-11 C3010.09 Acoustical Wall Treatment** 4'x4' Tectum wall panels in room 703 Rating Installed Design Life Updated 4 - Acceptable Event: 1990 20 APR-11 Replace acoustic panels (8sq.m) Type Year Cost Priority Lifecycle Replacement 2014 Unassigned $1,689 Updated: APR-11 C3010.11 Interior Wall Painting* Interior walls repainted throughout school. Rating 4 - Acceptable Installed Design Life Updated 2001 Report run on: April 7, 2011 4:26 PM 0 APR-11 Page 17 of 45 Red Deer - St. Patrick's Community School (B1494A) C3010.14 Other Wall Finishes* Original stucco wall at corridor to portables. Rating Installed Design Life Updated 3 - Marginal Event: 1980 0 APR-11 Building movement causing cracking in wall. Concern: Building movement causing cracking in at joint between 1980 original building, and 1982 addition. Recommendation: Provide proper control joint. Consequences of Deferral: Maintenance, and possible envelope failure at this vestibule. Type Year Cost Priority Preventative Maintenance 2014 Medium $7,840 Updated: APR-11 C3020.01.02 Paint Concrete Floor Finishes* Painted concrete cast in place slab in mechanical room. Painted concrete floor in 719. Rating Installed Design Life Updated 4 - Acceptable 2001 0 APR-11 C3020.02 Tile Floor Finishes** Original ceramic tile in washroom 609, 610, 707, vestibule 807, 805 Original 2"x2" Floor tile in washrooms 714G, 714H, 707A and 707B Rating Installed Design Life Updated 4 - Acceptable Event: 1980 50 APR-11 Replace ceramic tile (235sq.m) Type Year Cost Priority Lifecycle Replacement 2030 Unassigned $39,332 Updated: APR-11 Report run on: April 7, 2011 4:26 PM Page 18 of 45 Red Deer - St. Patrick's Community School (B1494A) C3020.04 Wood Flooring** Hardwood flooring in Gym. Rating Installed Design Life Updated 4 - Acceptable Event: 1980 30 APR-11 Replace wood flooring (518sq.m) Type Year Cost Priority Lifecycle Replacement 2014 Unassigned $128,055 Updated: APR-11 C3020.07 Resilient Flooring** VCT throughout Rating Installed Design Life Updated 4 - Acceptable Event: 1980 20 APR-11 Replace vinyl composite tile (4041sq.m) Type Year Cost Priority Lifecycle Replacement 2014 Unassigned $204,515 Updated: APR-11 C3020.08 Carpet Flooring** Carpet in rooms 502, 503, 505b, 510 and Student Gathering Rating Installed Design Life Updated 4 - Acceptable Event: 2001 15 APR-11 Replace carpet flooring (240sq.m) Type Year Cost Priority Lifecycle Replacement 2016 Unassigned $15,586 Updated: APR-11 Report run on: April 7, 2011 4:26 PM Page 19 of 45 Red Deer - St. Patrick's Community School (B1494A) C3020.08.02 Sheet Carpet Element to be deleted. Replaced with resilient flooring. Rating Installed Design Life Updated 4 - Acceptable Event: 0 0 APR-11 Replace carpet in Forum and staffroom area with VCT Type Year Cost Priority Failure Replacement 2009 Unassigned $8,344 Updated: OCT-10 C3020.14 Other Floor Finishes* Stained concrete floor Room 700. Rating 4 - Acceptable Installed Design Life Updated 1980 0 APR-11 C3030.01 Concrete Ceiling Finishes (Unpainted)* Concrete ceiling under mezzanine in industrial arts room Rating 4 - Acceptable Installed Design Life Updated 1980 0 APR-11 C3030.02 Ceiling Paneling (Wood)* Wood panelling in staff room 510 Rating 4 - Acceptable Installed Design Life Updated 1995 Report run on: April 7, 2011 4:26 PM 0 APR-11 Page 20 of 45 Red Deer - St. Patrick's Community School (B1494A) C3030.05 Veneer Plaster Finishes (Stipple)* Textured ceiling finish to corridors and some classrooms Rating Installed Design Life Updated 4 - Acceptable Event: 1980 0 APR-11 Replace textured ceiling with acoustic ceiling tile (600sq.m) Concern: Difficult to service duct work above ceiling. Recommendation: Replace ceiling with acoustic ceiling tile Type Year Cost Program Functional Upgrade 2014 $26,424 Priority Low Updated: APR-11 C3030.06 Acoustic Ceiling Treatment (Susp. T-Bar)** - 1990 Suspended t-bar in corridors and classrooms Rating Installed Design Life Updated 4 - Acceptable Event: 1990 25 APR-11 Replace acoustic ceiling tile (1500sq.m) Type Year Cost Priority Lifecycle Replacement 2015 Unassigned $66,060 Updated: APR-11 C3030.06 Acoustic Ceiling Treatment (Susp. T-Bar)** - 2001 Suspended ceiling tile in corridors and classrooms Rating Installed Design Life Updated 4 - Acceptable Event: 2001 25 APR-11 Replace acoustic ceiling tile (1500sq.m) Type Year Cost Priority Lifecycle Replacement 2026 Unassigned $66,060 Updated: APR-11 Report run on: April 7, 2011 4:26 PM Page 21 of 45 Red Deer - St. Patrick's Community School (B1494A) C3030.07 Interior Ceiling Painting* Painted exposed structure in mechanical room and industrial arts room Painted gypsum ceiling in washrooms and janitor rooms Rating Installed Design Life Updated 5 - Good 1980 0 APR-11 C3030.09 Other Ceiling Finishes* Spray on acoustical treatment to steel deck in Gym. Rating Installed Design Life Updated 3 - Marginal Event: 1980 0 APR-11 Remove damaged gym acoustic treatment and install new tectum boards (518sq.m) Concern: Existing spray on acoustic ceiling treatment is peeling / falling daily, especially with impact from balls, etc. Recommendation: Remove damaged acoustic treatment and install new tectum boards. Consequences of Deferral: Continued maintenance costs, cleaning, possible health risk due to dust of fallen debris. Type Year Cost Priority Failure Replacement 2014 High $62,160 Updated: APR-11 Portion of damaged ceiling area. Report run on: April 7, 2011 4:26 PM Page 22 of 45 Red Deer - St. Patrick's Community School (B1494A) S4 MECHANICAL D2010.04 Sinks** Floor mounted janitor sinks. Half Bradley sink serving Industrial Arts. Stainless steel sinks single compartment sinks in science classrooms. Double compartment sinks in administration area. Rating Installed Design Life Updated 4 - Acceptable Event: 1980 30 APR-11 Replace Approx. 22 Sinks Type Year Cost Priority Lifecycle Replacement 2014 Unassigned $43,000 Updated: APR-11 D2010.08 Drinking Fountains/Coolers** Wall hung refigerated. Rating Installed Design Life Updated 4 - Acceptable Event: 2000 35 APR-11 Replace 8 Drinking Fountains / Coolers Type Year Cost Priority Lifecycle Replacement 2035 Unassigned $24,000 Updated: APR-11 D2010.10 Washroom Fixtures (WC, Lav, Urnl)** LV - Countertop undermount vitreous china and wall hung china type with infrared and two handle faucets. UR- vitreous china, wall mounted with infrared faucets. WC - vitreous china, floor mounted, flush valve. Rating Installed Design Life Updated 4 - Acceptable Event: 2000 35 APR-11 Replace 24 Washroom Fixtures Type Year Cost Priority Lifecycle Replacement 2035 Unassigned $30,000 Updated: APR-11 D2020.01.01 Pipes and Tubes: Domestic Water* Copper piping distribution throughout. Rating 4 - Acceptable Installed Design Life Updated 1980 Report run on: April 7, 2011 4:26 PM 0 APR-11 Page 23 of 45 Red Deer - St. Patrick's Community School (B1494A) D2020.01.02 Valves: Domestic Water** Isolation valves for plumbing fixtures. Rating Installed Design Life Updated 4 - Acceptable Event: 1980 40 APR-11 Replace 110 Valves: Domestic Water Type Year Cost Priority Lifecycle Replacement 2020 Unassigned $29,000 Updated: APR-11 D2020.01.03 Piping Specialties (Backflow Preventors)** Provided on boiler water make-up. Rating Installed Design Life Updated 4 - Acceptable Event: 1980 20 APR-11 Replace Backflow Preventor Serving Boiler System Type Year Cost Priority Lifecycle Replacement 2014 Unassigned $5,000 Updated: APR-11 D2020.02.02 Plumbing Pumps: Domestic Water** In-line B&G hot water recirculation pump. Rating Installed Design Life Updated 4 - Acceptable Event: 1980 20 APR-11 Replace Plumbing Pump: Domestic Water Type Year Cost Priority Lifecycle Replacement 2014 Unassigned $2,000 Updated: APR-11 Report run on: April 7, 2011 4:26 PM Page 24 of 45 Red Deer - St. Patrick's Community School (B1494A) D2020.02.06 Domestic Water Heaters** Two natural gas fired heaters Giant model UG65-365NH, ser # A3173155, and A3483970, 65 gal, 95kW heating capacity, 250 l storage. Rating Installed Design Life Updated 4 - Acceptable Event: 2000 20 APR-11 Replace 2 Domestic Water Heaters Type Year Cost Priority Lifecycle Replacement 2020 Unassigned $20,000 Updated: APR-11 D2020.03 Water Supply Insulation: Domestic* Piping insulated and canvas covered. Rating 4 - Acceptable Installed Design Life Updated 1980 0 APR-11 D2030.01 Waste and Vent Piping* Cast iron and copper. Rating 4 - Acceptable Installed Design Life Updated 1980 0 APR-11 D2030.02.04 Floor Drains* General purpose floor drains located as per code. Rating 4 - Acceptable Installed Design Life Updated 1980 0 APR-11 D2040.01 Rain Water Drainage Piping Systems* Flat roofs have internal drains with rainwater leaders that connect to the storm system. Rating 4 - Acceptable Installed Design Life Updated 1980 0 APR-11 D2040.02.04 Roof Drains* Cast iron drains with dome strainers. Original drains were flow control type that were replaced with open flow drains when the roofing was replaced. Rating 4 - Acceptable Installed Design Life Updated 1980 Report run on: April 7, 2011 4:26 PM 0 APR-11 Page 25 of 45 Red Deer - St. Patrick's Community School (B1494A) D3010.02 Gas Supply Systems* Steel schedule 40 piping distribution. Indoor gas meter located in meter room. Rating Installed Design Life Updated 4 - Acceptable 1980 0 APR-11 D3020.02.01 Heating Boilers and Accessories: H.W.** Two natural gas fired copper tube boilers Laars model HL2933-CN11, ser # 1800766(65), 860kW heating capacity 2 stage, c/w all related accessories, low water cut off, flow switch and an expansion tank. Two base mounted circulating pumps Armstrong model 2.5E 4030, ser # 63426(27) 200gpm, 50ft., provide hot water to the terminal heating units and glycol heat exchanger. Rating Installed Design Life Updated 3 - Marginal Event: 1980 35 APR-11 Replace Heating Boilers and Accessories: H.W. Concern: Older boilers are inefficient and provide poor temperature control. Recommendation: Replace 2 Boilers and accessories. Type Year Cost Priority Failure Replacement 2013 Medium $185,000 Updated: APR-11 D3020.02.02 Chimneys (& Comb. Air): H.W. Boiler** Type 'B' chimney through the roof. Chimney cap is damaged and should be repaired or replaced. Combustion air from a roof hood. Rating Installed Design Life Updated 4 - Acceptable Event: 1980 35 APR-11 Replace Chimneys &Comb. Air: H.W. Boiler Type Year Cost Priority Lifecycle Replacement 2014 Unassigned $15,000 Updated: APR-11 D3020.02.03 Water Treatment: H. W. Boiler* Pot feeder and side stream bypass filter. Rating 4 - Acceptable Installed Design Life Updated 1980 Report run on: April 7, 2011 4:26 PM 0 APR-11 Page 26 of 45 Red Deer - St. Patrick's Community School (B1494A) D3040.01.01 Air Handling Units: Air Distribution** 1980 original building- Five Trane indoor air handling units c/w supply fan, heating coil and filters. Return air fans are axial fans with outdoor/return air mixing dampers located in the ductwork. Heating coils are supplied with hot water except for the CTS unit that is supplied with glycol. Mechanical room is utilized as a relief air plenum. The mixing dampers were replaced in 2003 and upgraded with electronic operators. AHU-1: Trane model 25MP-HF-TH, Ser # 699853, 3hp. AHU-2: Trane model 35MP-HF-TH, Ser # 699860, 7.5hp. AHU-3: Trane model 31MP-HF-TH, Ser # 699859, 7.5hp. AHU-4: Trane model 17MP-HF-TH, Ser # 699861, 7.5hp. AHU-5: Trane model 21MP-HF-TH, Ser # 699862, 7.5hp. 1982 North addition- A roof mounted ventilation unit Engineered Air Model LM-6-CO, ser # S31975-AHU-1, 5500 cfm, c/w 5hp supply fan, 3hp return fan, filters, glycol heating coil and mixing dampers. Rating Installed Design Life Updated 4 - Acceptable Event: 1980 30 APR-11 Replace 5 Air Handling Units: Air Distribution Type Year Cost Priority Lifecycle Replacement 2014 Unassigned $700,000 Updated: APR-11 D3040.01.03 Air Cleaning Devices: Air Distribution* Filters provided in air handling units. Rating 4 - Acceptable Installed Design Life Updated 1980 Report run on: April 7, 2011 4:26 PM 0 APR-11 Page 27 of 45 Red Deer - St. Patrick's Community School (B1494A) D3040.01.04 Ducts: Air Distribution* Overhead galvanized steel ductwork distribution. Rating Installed Design Life Updated 4 - Acceptable Event: 1980 0 APR-11 Upgrade ductwork distribution system. BOE: 800 sq.m. Concern: There are number areas that additional partition walls have been added. Some corridor areas have been converted to classrooms without provision for ventilation system. Poor air distribution in gymnasium area. Recommendation: Adjust existing ductwork distribution to serve new and modified areas. Installed additional re-heat coils were required. Upgrade gymnasium ductwork distribution with new overhead supply air ducts. Complete air balancing for entire air distribution system. Refer to related Upgrade under D3050.02 Air Coils** Type Year Cost Program Functional Upgrade 2013 $85,000 Priority Medium Updated: APR-11 D3040.01.07 Air Outlets & Inlets: Air Distribution* Ceiling diffusers and sidewall grilles. Rating Installed Design Life Updated 4 - Acceptable 1980 0 APR-11 D3040.03.01 Hot Water Distribution Systems** Steel piping with weleded and screwed fittings and overhead distribution to fin tube wall radiation, reheat coils, air handling unit coils, heat exchanger, fan coils and unit heaters. Rating Installed Design Life Updated 4 - Acceptable Event: 1980 40 APR-11 Replace Hot Water Distribution System. BOE: 5926 sq.m. Type Year Cost Priority Lifecycle Replacement 2020 Unassigned $625,000 Updated: APR-11 Report run on: April 7, 2011 4:26 PM Page 28 of 45 Red Deer - St. Patrick's Community School (B1494A) D3040.04.01 Fans: Exhaust** Variety of roof mounted exhaust fans serve the washrooms, change rooms, etc. Roof mounted exhaust fans serve the CTS area. Rating Installed Design Life Updated 4 - Acceptable Event: 1980 30 APR-11 Replace Approx. 14 Exhaust Fans Type Year Cost Priority Lifecycle Replacement 2014 Unassigned $28,000 Updated: APR-11 D3040.04.02 Air Cleaning Devices: Exhaust* CTS wood working shop provided with an outdoor dust collector and overhead ductwork connecting to the shop equipment Paint area hood c/w a separate roof exhaust fan. Rating Installed Design Life Updated 4 - Acceptable 1980 0 APR-11 D3040.04.03 Ducts: Exhaust* Overhead, galvanized steel medium and low velocity exhaust air ducts. Rating 4 - Acceptable Installed Design Life Updated 1980 0 APR-11 D3040.04.05 Air Outlets and Inlets: Exhaust* Ceiling and wall mounted egg crate and louver face grilles. Rating 4 - Acceptable Installed Design Life Updated 1980 Report run on: April 7, 2011 4:26 PM 0 APR-11 Page 29 of 45 Red Deer - St. Patrick's Community School (B1494A) D3040.05 Heat Exchangers** A water to glycol plate heat exchanger c/w a singlel pump system, glycol feeder and expansion tank. System provides glycol to the CTS air handling unit and the 1982 north addition rooftop unit. Plate heat exchanger, water to glycol, Bell & Gossett ser # 781254-01, Extrol model AX200V expansion tank, and a Grundos UPS40-80/F pump circulates glycol to AHU-5 and rooftop unit RTU-2. Rating Installed Design Life Updated 4 - Acceptable Event: 2001 30 APR-11 Replace Heat Exchanger Type Year Cost Priority Lifecycle Replacement 2031 Unassigned $15,000 Updated: APR-11 D3050.01.01 Computer Room Air Conditioning Units** Liebert unit provide AC to hub room. Rating Installed Design Life Updated 2 - Poor 2000 30 APR-11 Event: Replace Computer Room Air Conditioning Unit Concern: Existing unit is not operational. Recommendation: Replace AC unit with new. Type Year Cost Priority Failure Replacement 2013 Medium $20,000 Updated: APR-11 Report run on: April 7, 2011 4:26 PM Page 30 of 45 Red Deer - St. Patrick's Community School (B1494A) D3050.02 Air Coils** Hot water reheat coils provided in the duct systems serving classrooms and common areas. Rating Installed Design Life Updated 3 - Marginal Event: 1980 30 APR-11 Provide approx. 10 new re-heat coils and install new access panels. Concern: Majority of the existing heating coils have very limited access. Existing access panels are not sufficient to service coils. Refer to related upgrade under D3040.01.04 Ducts: Air Distribution* Recommendation: Provide additional heating coils serving upgraded ventilation system. Provide additional access panels serving existing and new reheat coils. Type Year Cost Program Functional Upgrade 2013 $60,000 Priority Medium Updated: APR-11 Event: Replace Approx. 40 Re-heat coils. Concern: Number of coils are weak and in poor condition. Poor zoning control. Recommendation: Replace existing coils. Type Year Cost Priority Failure Replacement 2013 Medium $120,000 Updated: APR-11 D3050.05.02 Fan Coil Units** Provided in vestibules and entrances and supplied with heating water. Rating Installed Design Life Updated 4 - Acceptable Event: 1980 30 APR-11 Replace 7 Fan Coil Units Type Year Cost Priority Lifecycle Replacement 2014 Unassigned $28,000 Updated: APR-11 Report run on: April 7, 2011 4:26 PM Page 31 of 45 Red Deer - St. Patrick's Community School (B1494A) D3050.05.03 Finned Tube Radiation** Perimeter radiation provided in some areas. Various type of enclosures. Rating Installed Design Life Updated 4 - Acceptable Event: 1980 40 APR-11 Replace Finned Tube Radiation. Approx. 150m linear length. Type Year Cost Priority Lifecycle Replacement 2020 Unassigned $55,000 Updated: APR-11 D3050.05.06 Unit Heaters** Hot water unit heaters provided in the mechanical rooms and CTS shop. Rating Installed Design Life Updated 4 - Acceptable Event: 1980 30 APR-11 Replace 4 Unit Heaters Type Year Cost Priority Lifecycle Replacement 2014 Unassigned $16,000 Updated: APR-11 D3060.02.02 Pneumatic Controls** Pneumatic control provided for room radiation and reheat coils. Electric control for the unit heaters and fan coils. Duplex air compressor and air dryer located in the mechanical room. Rating Installed Design Life Updated 4 - Acceptable Event: 1980 40 APR-11 Replace Pneumatic Controls. BOE: 5926 sq.m. GFA. Type Year Cost Priority Lifecycle Replacement 2020 Unassigned $48,000 Updated: APR-11 Report run on: April 7, 2011 4:26 PM Page 32 of 45 Red Deer - St. Patrick's Community School (B1494A) D3060.02.05 Building Systems Controls (BMCS, EMCS)** A Dimax BMCS is integrated with the pneumatic system for software control of central systems. Rating Installed Design Life Updated 4 - Acceptable Event: 1990 20 APR-11 Replace Building Systems Controls. BPOE: 5926 sq.m. Type Year Cost Priority Lifecycle Replacement 2014 Unassigned $120,000 Updated: APR-11 D4020 Standpipes* Hose cabinets provided in the corridors. Rating 4 - Acceptable Installed Design Life Updated 1980 0 APR-11 D4030.01 Fire Extinguisher, Cabinets and Accessories* Hand held fire extinguishers provided throughout. Tags indicate recent inspection. Rating 4 - Acceptable Installed Design Life Updated 1980 Report run on: April 7, 2011 4:26 PM 0 APR-11 Page 33 of 45 Red Deer - St. Patrick's Community School (B1494A) S5 ELECTRICAL D5010.02 Secondary Electrical Transformers (Interior)** The step down transformers are used in this facility for 600-120/208 V system. Rating Installed Design Life Updated 4 - Acceptable Event: 1980 40 APR-11 Replace 2 Secondary Electrical Transformers (Interior) Type Year Cost Priority Lifecycle Replacement 2015 Unassigned $60,000 Updated: APR-11 D5010.03 Main Electrical Switchboards (Main Distribution)** The main service is fed from an on site pad mounted transformer. The main distribution is rated at 800A 347/600V. The distribution section is complete with feeder breakers that are adequately identified. Rating Installed Design Life Updated 5 - Good Event: 1980 40 APR-11 Replace Main Electrical Switchboards (Main Distribution) Type Year Cost Priority Lifecycle Replacement 2020 Unassigned $45,000 Updated: APR-11 D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution)** - 1980 Branch circuit distribution panels located throughout building and all the panels only have few space for the future uses. Rating Installed Design Life Updated 4 - Acceptable Event: 1980 30 APR-11 Replace 7 Electrical Branch Circuit Panelboards (Secondary Distribution)1980**] Type Year Cost Priority Lifecycle Replacement 2014 Unassigned $35,000 Updated: APR-11 Report run on: April 7, 2011 4:26 PM Page 34 of 45 Red Deer - St. Patrick's Community School (B1494A) D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution)** - 1982 The panel is located in 1982 addition portion of the building. Rating Installed Design Life Updated 4 - Acceptable Event: 1982 30 APR-11 Replace 1 Electrical Branch Circuit Panelboards (Secondary Distribution) Type Year Cost Priority Lifecycle Replacement 2014 Unassigned $5,000 Updated: APR-11 D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution)** - 2001 The panels are located in Home economics and industrial education. Rating Installed Design Life Updated 6 - Excellent Event: 2001 30 APR-11 Replace 2 Electrical Branch Circuit Panelboards (Secondary Distribution) Type Year Cost Priority Lifecycle Replacement 2031 Unassigned $10,000 Updated: APR-11 D5010.07.01 Switchboards, Panelboards, and (Motor) Control Centers** There is a 6-section MCC; and a partial BMS was installed to operate MUA air handling units. Rating Installed Design Life Updated 4 - Acceptable Event: 1980 30 APR-11 Replace motor control center Type Year Cost Priority Lifecycle Replacement 2014 Unassigned $45,000 Updated: APR-11 Report run on: April 7, 2011 4:26 PM Page 35 of 45 Red Deer - St. Patrick's Community School (B1494A) D5010.07.02 Motor Starters and Accessories** Individual motor starters and load switches are used major mechanical ventilation units and some small water pumps. They are located through out the school. Rating Installed Design Life Updated 4 - Acceptable Event: 1980 30 APR-11 Replace 10 Motor Starters and Accessories Type Year Cost Priority Lifecycle Replacement 2014 Unassigned $6,000 Updated: APR-11 D5020.01 Electrical Branch Wiring* Most branch wirings are originally installed with building; the wires are either installed in conduits or the BX wires are used. Some wirings are installed during 2001 renovation. Rating Installed Design Life Updated 5 - Good 1980 0 APR-11 D5020.02.01 Lighting Accessories: Interior (Lighting Controls)* Lighting is locally controlled by line voltage switches. Rating Installed Design Life Updated 4 - Acceptable 1980 0 APR-11 D5020.02.02.02 Interior Fluorescent Fixtures** All the fixtures are either retrofit T-8 Lamps completed with electronic ballast. Some of the light fixtures has been designated as emergency light and fed from Emergency generator power. Rating Installed Design Life Updated 5 - Good Event: 2000 30 APR-11 Replace 1050 Interior Fluorescent Fixtures Type Year Cost Priority Lifecycle Replacement 2030 Unassigned $210,000 Updated: APR-11 Report run on: April 7, 2011 4:26 PM Page 36 of 45 Red Deer - St. Patrick's Community School (B1494A) D5020.02.02.03 Interior Metal Halide Fixtures* High bay Fixtures are located in the gym with a good coverage. Rating Installed Design Life Updated 5 - Good 2000 0 APR-11 D5020.02.03.02 Emergency Lighting Battery Packs** The few fixtures are originally installed with the building. The units are regularly tested and some unit batteries are replaced. Rating Installed Design Life Updated 4 - Acceptable Event: 1980 20 APR-11 Replace 50 Emergency Lighting Battery Packs Type Year Cost Priority Lifecycle Replacement 2014 Unassigned $20,000 Updated: APR-11 D5020.02.03.03 Exit Signs* Exit signs located at required exits. Fixtures are incandescent lamps. Rating 4 - Acceptable Installed Design Life Updated 1980 0 APR-11 D5020.03.01.04 Exterior H.P. Sodium Fixtures* The wall packs are installed along the building perimeter with good coverage Rating 6 - Excellent Installed Design Life Updated 2009 0 APR-11 D5020.03.02 Lighting Accessories: Exterior (Lighting Controls)* Exterior lighting is controlled both timer and photocell. Rating 4 - Acceptable Installed Design Life Updated 1980 Report run on: April 7, 2011 4:26 PM 0 APR-11 Page 37 of 45 Red Deer - St. Patrick's Community School (B1494A) D5030.01 Detection and Fire Alarm** General Electric EST Quickstart panel is used for facility fire alarm system completed with horns, pull stations, detectors at required locations. Rating Installed Design Life Updated 6 - Excellent Event: 2010 25 APR-11 Replace Detection and Fire Alarm Type Year Cost Priority Lifecycle Replacement 2035 Unassigned $100,000 Updated: APR-11 D5030.02.02 Intrusion Detection** The Maxsys DSC PC-4000 panel is used for facility security system and has motion sensor installed in the hallways and door contactors installed at exterior doors. Rating Installed Design Life Updated 5 - Good Event: 2000 25 APR-11 Replace Intrusion Detection Type Year Cost Priority Lifecycle Replacement 2025 Unassigned $50,000 Updated: APR-11 D5030.03 Clock and Program Systems* Omron H5S timer is used for clock system, and it is integrated with PA system. Rating 5 - Good Installed Design Life Updated 2001 0 APR-11 D5030.04.01 Telephone Systems* Cisco IP 7491 is used for telephone system with handsets installed in all the classrooms and offices Rating 5 - Good Installed Design Life Updated 1980 0 APR-11 D5030.04.02 Paging Systems* Bogen ZMP 3 is used for facility paging and it is integrated with PA system. Rating 5 - Good Installed Design Life Updated 2008 Report run on: April 7, 2011 4:26 PM 0 APR-11 Page 38 of 45 Red Deer - St. Patrick's Community School (B1494A) D5030.04.04 Data Systems* One server and one patch panel location are installed in the facility and through supernet connected to regional school board. Rating Installed Design Life Updated 5 - Good 2005 0 APR-11 D5030.04.05 Local Area Network Systems* Data outlets are installed through school classrooms and offices; and Cat 5 cables are installed either conduit or free air. The wireless can be accessed through entire facility. Rating Installed Design Life Updated 5 - Good 2001 0 APR-11 D5030.05 Public Address and Music Systems** Interm PA-4000 is used for entire school PA system. Rating Installed Design Life Updated 4 - Acceptable Event: 1980 20 APR-11 Replace Public Address and Music Systems Type Year Cost Priority Lifecycle Replacement 2014 Unassigned $20,000 Updated: APR-11 Event: Install the sound amplification systems in classrooms Type Year Cost Program Functional Upgrade 2009 $440 Priority Unassigned Updated: OCT-10 D5030.06 Television Systems* The TV outlets are available in classrooms and library. Portable TV sets are used for some classroom presentations. Rating 4 - Acceptable Installed Design Life Updated 1980 Report run on: April 7, 2011 4:26 PM 0 APR-11 Page 39 of 45 Red Deer - St. Patrick's Community School (B1494A) D5090.01 Uninterruptible Power Supply Systems** The UPS unit is used for service power supplier. Rating Installed Design Life Updated 5 - Good Event: 2001 30 APR-11 Replace 1 Uninterruptible Power Supply Systems Type Year Cost Priority Lifecycle Replacement 2031 Unassigned $4,000 Updated: APR-11 D5090.02 Packaged Engine Generator Systems (Emergency Power System)** The indoor Kohler 30 KW generator services both mechanical heating and school emergency lighting loads. It is a gas fired generator. Rating Installed Design Life Updated 4 - Acceptable Event: 1980 35 APR-11 Replace Packaged Engine Generator Systems (Emergency Power System) Type Year Cost Priority Lifecycle Replacement 2015 Unassigned $85,000 Updated: APR-11 Report run on: April 7, 2011 4:26 PM Page 40 of 45 Red Deer - St. Patrick's Community School (B1494A) S6 EQUIPMENT, FURNISHINGS AND SPECIAL CONSTRUCTION E1020.02 Library Equipment* Wire rack book carts. Modernfold bifold door. Rating Installed Design Life Updated 4 - Acceptable 1980 0 APR-11 E1090.04 Residential Equipment* Fridge, stove, microwave in staff room Rating Installed Design Life Updated 4 - Acceptable 2001 0 APR-11 E1090.07 Athletic, Recreational, and Therapeutic Equipment* Sidecourt swingout basketball backstops mounted to concrete block wall. Sidecourt motorized swingdown basketball backstops mounted to concrete block wall. Main court swingout basketball backstops. Main scoreboard mounted to block wall. Rating Installed Design Life Updated 4 - Acceptable 1980 0 APR-11 E2010.02 Fixed Casework** - 1980 Original millwork is failing, doors don't open properly, handles are missing or falling off. Rating Installed Design Life Updated 3 - Marginal Event: 1980 35 APR-11 Replace 1980 millwork (260m) Concern: Millwork is failing, doors don't open properly, handles are missing or falling off. Counters are cracking. Recommendation: Replace all 1980 millwork Type Year Cost Priority Failure Replacement 2014 Low $196,690 Updated: APR-11 Report run on: April 7, 2011 4:26 PM Page 41 of 45 Red Deer - St. Patrick's Community School (B1494A) E2010.02 Fixed Casework** - 2001 Millwork in staff room and home economics room Rating Installed Design Life Updated 4 - Acceptable Event: 2001 35 APR-11 Replace millwork (80sq.m) Type Year Cost Priority Lifecycle Replacement 2036 Unassigned $60,480 Updated: APR-11 E2010.03.01 Blinds** Vertical blinds. Horizontal blinds. Rating Installed Design Life Updated 4 - Acceptable Event: 1980 30 APR-11 Replace blinds (340sq.m) Type Year Cost Priority Lifecycle Replacement 2014 Unassigned $34,626 Updated: APR-11 F1020.02.13 Paint Booths* Paint booths in Industrial Education Rating 4 - Acceptable Installed Design Life Updated 1990 Report run on: April 7, 2011 4:26 PM 0 APR-11 Page 42 of 45 Red Deer - St. Patrick's Community School (B1494A) S8 FUNCTIONAL ASSESSMENT K2030.02 Program Spaces* There are too many students for the space. They require a smaller student occupancy or a redesign of the space. Rating Installed Design Life Updated 2 - Poor Event: 1980 0 APR-11 Add vestibule entrance to portables Concern: No vestibule at entrance of portables, hallway gets quite cold. Recommendation: Add exterior vestibule to entrance Type Year Cost Priority Code Repair 2014 Low $23,400 Updated: APR-11 Event: Conduct a study to determine if the occupancy can be reduced or the space can be redesigned Concern: There are too many students for the space. They require more lockers and millwork but have no available wall space to put them. The lockers are the wrong size, they have 2 tier lockers for elementary students when most students of that age are not tall enough to reach the top tier of lockers. There are not enough washrooms for the occupancy. They're using science millwork as lockers for students. They've had to create classrooms inside of classrooms. There is a classroom in a corridor with double doors leading to the dawe centre. The janitor rooms are too small. Recommendation: Conduct a study to determine if the number of students attending can be reduced or if they space could be redesigned and used more efficiently. Consequences of Deferral: Poor student learning environment. Type Year Cost Priority Study 2014 Medium $2,500 Updated: APR-11 K4010.01 Barrier Free Route: Parking to Entrance* Level entry from sidewalk to door. Barrier free access from parking lot with pararamp. Rating 4 - Acceptable Installed Design Life Updated 1980 Report run on: April 7, 2011 4:26 PM 0 FEB-06 Page 43 of 45 Red Deer - St. Patrick's Community School (B1494A) K4010.02 Barrier Free Entrances* No barrier free openers to doors Rating Installed Design Life Updated 3 - Marginal Event: 1980 0 APR-11 Add barrier free operators to main doors Concern: No barrier free entrance is available. Recommendation: Add barrier free operators to main doors. Consequences of Deferral: Barrier free access into school is not available. Type Year Cost Barrier Free Access Upgrade 2014 Priority $7,584 High Updated: APR-11 K4010.03 Barrier Free Interior Circulation* Interior of school is fully accessible. Rating 4 - Acceptable Installed Design Life Updated 1980 0 FEB-06 K4010.04 Barrier Free Washrooms* Barrier free access is provided in washrooms 609 and 610. Rating 4 - Acceptable Installed Design Life Updated 1980 0 FEB-06 K4020.02 Fire Code* Storage in mechanical room and beside exit needs to be relocated. Rating 4 - Acceptable Installed Design Life Updated 1980 0 APR-11 P4060014.JPG Report run on: April 7, 2011 4:26 PM Page 44 of 45 Red Deer - St. Patrick's Community School (B1494A) K4030.01 Asbestos* Report completed for school. Asbestos fittings in piping. Rating Installed Design Life Updated 4 - Acceptable 1980 0 FEB-06 K4030.04 Mould* No mould found or reported Rating Installed Design Life Updated 5 - Good 1980 0 APR-11 K4030.07 Ozone Depleting Substances (CFC's, HCFC's, Halon)* R22 refrigerate in AC units Rating Installed Design Life Updated 4 - Acceptable 1980 0 APR-11 K4030.09 Other Hazardous Materials* All hazardous materials are stored in rated rooms. Rating Installed Design Life Updated 5 - Good 1980 0 APR-11 K5010 Reports and Studies* Rating 5 - Good Installed Design Life Updated 2010 Report run on: April 7, 2011 4:26 PM 0 APR-11 Page 45 of 45