table of contents - ronny carroll homes
Transcription
table of contents - ronny carroll homes
BRidgeland New Construction Development Standards For Lakeland Village (The Shores, First Bend, The Cove, Water Haven, Hidden Creek) TABLE OF CONTENTS I. GENERAL A. Introduction to Bridgeland B. Mission Statement C. Bridgeland Organization D. Document Philosophy and Terms E. Residential Communities F. Community Logo G. The Shores H. First Bend I. The Cove J. Water Haven K. Hidden Creek 4 5 5 5 7 7 8 9 10 11 12 II. SITE DESIGN A. Site Design Philosophy B. Community and Neighborhood Standards C. Lot Sizes/ Street Frontages/ Neighborhoods D. Street Relationship E. House Location on Lot F. Setbacks G. Entry Wall H. Entry Wall Typical Layouts I. Sidewalks J. Driveways K. Utilities L. Carports M. Pools and Spas N. Grading/ Drainage O. Entry Wall Grading Requirements 13 13 13 13 13 14 14 19 23 25 25 25 25 26 27 III. ARCHITECTURAL DESIGN A. Philosophy B. Overall Massing C. Individual Elements D. Architecture E. Antennas F. Energy Conservation 29 29 29 32 36 36 IV. A. B. C. D. E. F. G. H. I. FENCING General Fence Responsibility Fence Types & Requirements Fence Location Grade Transition Fencing Angled Fence Fences as Screening Other Fence Types Submission and Approval 37 37 37 41 47 48 49 49 49 BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 2 of 76 V. A. B. C. D. E. F. G. H. I. J. K. L. M. N. O. P. LANDSCAPE General Landscape Approach Street Trees in the Right-of-Way Boulders/Rocks in the Right-of-Way Landscaping Components Yard Definitions Front Yard Landscape Side Yard Landscape – Corner Lot Rear Yard Landscape Planting Quantity Requirements Sod Irrigation Plant Bed Edging Plant Material Energy Conservation Tree Protection and Preservation 49 49 50 52 52 53 54 58 60 63 64 64 64 64 66 66 A. B. C. D. E. F. G. H. I. J. K. L. M. N. O. P. Q. R. PROCEDURES AND SUBMISSIONS General Scope of This Document Procedure Required Submission Information Quality of Submission Content Submission Timing Submission Fees ARC Action on Submittals Variances Appeals Final Inspection Procedures, Penalties, and Variances Certificate of Compliance Certificate of Non-Compliance Remedies Changes in Review Procedures Governmental Regulations Job Site Procedures Lot Mowing 67 67 67 68 68 68 68 69 69 69 69 70 70 71 71 71 71 72 VI. VII. APPENDIX-I A. Custom Lot Requirements B. Over-sized Custom Lots (Lots over 130’ wide) 73 73 VIII. APPENDIX-II (Cove Section 7, Water Haven Section 8 and Hidden Creek) A. Sidewalks 74 IX. A. B. C. D. E. F. G. H. I. APPENDIX-III The Shores Neighborhood Fencing Diagrams & Street Tree Layout First Bend Neighborhood Fencing Diagrams & Street Tree Layout The Cove Neighborhood Fencing Diagrams & Street Tree Layout Water Haven Neighborhood Fencing Diagrams & Street Tree Layout Hidden Creek Neighborhood Fencing Diagrams & Street Tree Layout Certificate of Compliance Checklist (Final Inspection) New Construction Submittal Form New Plan Submittal Form Bridgeland / AT&T Structured Wiring Requirements 76 BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 3 of 76 I. GENERAL A. Introduction to Bridgeland Bridgeland is a new town development of over 10,000 acres, strategically located in the northwest portion of Harris County, between I-10 and US 290, along the (future) Grand Parkway. The initial access will be from Fry Road which connects to both US 290 and I-10 The Developer of Bridgeland, The Howard Hughes Corporation, has a significant and successful heritage in creating community environments of special character. The plan for Bridgeland reflects the best aspects of current community planning in Houston and around the country with additional planning concepts which make it distinctive. BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 4 of 76 Bridgeland is much more than a residential master planned community. By virtue of its significant size, Bridgeland is being developed in a creative and comprehensive way with a variety of land uses organized to create a real “new town”, one which is much more than the sum of the various parts. B. Mission Statement The Bridgeland Mission Statement is as follows: In the vibrant town that is Bridgeland, excellence and opportunity prevail. Every facet of the town’s extraordinary beauty will be reflected in its homes, open areas and public centers. Programs that foster human growth and potential, combined with a universal spirit of citizenship and desire to excel, will inspire a more meaningful life for all, while supporting the continued enrichment and growth of Houston. C. Bridgeland Organization The physical plan is composed of a Town Center centrally located within Bridgeland and along the Grand Parkway and a series of residential communities organized by a series of lakes, trails, or roads. D. Document Philosophy and Terms Achieving this mission will require the joint efforts of the Developer and individual builders. These Standards establish criteria and procedures to guide builders, and their architects, engineers, and other designers in working with the Developer to achieve a physical environment that establishes the new town of Bridgeland as one of the most desirable locations in the Houston area. The Bridgeland Architectural Review Committee (ARC) will administer these criteria. The following glossary is provided to insure a common understanding of important terms used in this document. Village: Bridgeland will be composed of four residential Villages. Each Village is composed of a series of Communities of 150 to 250 acres. Community: A community is a collection of Neighborhoods (sections). Neighborhood: A specific area (section) within a community that has characteristics that distinguish it from other neighborhoods. Corner Lot: A lot bounded by street right of way or landscape reserve on at least two sides. BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 5 of 76 Easement: The right of another party (e.g., a utility company, governmental authority, etc.) to use a portion of an individual property for a limited purpose, as set out in a plat, the Covenants, or an Easement agreement recorded in the Harris County Real Property Records. The Easements established by the Covenants (the “Covenant Easements”) affect all lots and provide a buffer zone between properties to minimize the impact of one lot upon the other. They are set aside to provide utility service and drainage to the surrounding area, and natural vegetative screening and privacy separations between lots. Many lots in Bridgeland are also affected by Drainage Easements (D.E.), Storm Sewer Easements (S.S.E.), Sanitary Sewer Easements (S.E.), Utility Easements (U.E.), Access and Utility Easements (A.U.E.), and Pathway Easement (P.E.). Front Façade: The most predominant front plane of the dwelling/attached garage, generally, parallel to the street right-of-way and usually defined by the front corners of the dwelling/attached garage structure which extend nearest to the side lot lines. The front façade of a dwelling may be a different depth from the front property line on each side of the house, depending on the house design. Front Yard: The portion of a lot between the front street right-of-way and the front façade of the dwelling. Interior Lot: A lot which faces a public right of way only on the front and which has other residential lots adjacent on both sides. Improvement: Is the placement, construction, alteration or repair of any structure, including, but not limited to, adding or removing square footage to or from a structure, painting or repainting a structure, or in any way altering the construction, size, shape or physical appearance of the interior or exterior of a structure. Improvements may be either permanent that is, affixed to the ground, or temporary. Landscaping: The combination of natural elements such as trees, shrubs, ground covers, vines, and other living organic and inorganic material. Developer: The Howard Hughes Corporation, and its successor or assigns. Applicant: Any Builder or other entity who or which has made or intends to make a submittal to the ARC. Bridgeland Architectural Review Committee (ARC): A special committee established by the Developer to review and approve all proposals made for improvements within Bridgeland. Bridgeland Development Standards: BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 6 of 76 A document containing basic planning principals, general development program, the development review process and standards required for development within Bridgeland. Owner: The owner of record title to the fee interest in any tract of land, whether or not they reside on the tract. Plat: A map of land divisions within Bridgeland that shows individual lots, property lines, building setback lines, streets, certain easements and other matters. Plats are legal documents recorded in the Real Property Records in the Harris County Clerk’s Office. Property Survey: A scale drawing of an individual lot showing all Easements, platted Building Lines, and the exact location of all structures and improvements within the lot, prepared and certified by a surveyor or engineer. Rear Yard: The portion of a lot between the rear face of the house and the rear property line. Side Yard: The portion of a lot between the Front Yard and the Rear Yard and extending to the street on the street side of a Corner Lot. Sign: Any device, structure, fixture or placard using graphics, symbols and/or written copy of the primary purpose of identification or advertising any establishment, product, goods or services. Single Family Dwelling: A structure designed for the residential use of a single family. Single Family Lot: A lot or tract of land upon which one or more Single Family Dwellings has or will be built. UE: Utility Easement. E. Residential Communities Each of the residential communities will have its own name/identity within Bridgeland F. Community Logo The officially adopted logo and logotype of Bridgeland shall only be used in reference to the Bridgeland community. All other uses shall be approved in writing by the developer. The use of the logo and logotype for advertising and marketing material is encouraged, but is an official trademark and requires permission for use. No modifications to the logo or logotype will be allowed. BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 7 of 76 G. The Shores: The first residential community being developed within the first Village of Bridgeland is The Shores, refer to the plan below. Home buyers will arrive at The Shores via North Bridgeland Lakes Parkway. i. Neighborhoods The Shores is composed of 10 residential neighborhoods. Some development standards are common for all of The Shores and other pertain to specific neighborhoods only. Allen Shore Austin Shore Colony Shore Elizabeth Shore Founders Shore Gail Shore Laura Shore Ravens Shore Settlers Shore Thomas Shore 80’ 65’ 70’ 50’ 65’ 70’ 55’ & 60’ 50’-55’ 60’-65’ 80’ BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 8 of 76 H. First Bend: The second residential community being developed within the first Village of Bridgeland is First Bend, refer to the plan below. Home buyers will arrive at First Bend via North Bridgeland Lakes Parkway. ii. Neighborhoods First Bend is composed of 6 residential neighborhoods. Some development standards are common for all of First Bend and other pertain to specific neighborhoods only. 50’-55’ Lots 60’-65’ Lots 70’ Lots 90’ Lots Sections 5, 6, 8 & 9 Sections 4, 7, 10 & 12 Section 1 & 2 Section 3 BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 9 of 76 I. The Cove: The third residential community being developed within the first Village of Bridgeland is The Cove, refer to the plan below. Home buyers will arrive at The Cove via North Bridgeland Lake Parkway. iii. Neighborhoods The Cove is composed of 7 residential neighborhoods. Some development standards are common for all of The Cove while others pertain to specific neighborhoods only. Whisper Cove Angler Cove Sunset Cove Waterside Estates Emerald Cove Pioneer Cove Briar Cove 60’ 65’ 55’ 90’ 80’ 70’ 50’ BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 10 of 76 J. Water Haven: The fourth residential community being developed within the first Village of Bridgeland is Water Haven, refer to the plan below. Home buyers will arrive at Water Haven via North Bridgeland Lake Parkway. iv. Neighborhoods Water Haven is composed of 9 residential neighborhoods. Some development standards are common for all of Water Haven while others pertain to specific neighborhoods only. Mill Haven Meadow Haven Arbor Haven Moonlit Haven Shady Haven Pine Haven Lake Haven Brook Haven 50’ – 55’ 55’ – 60’ 60’ 60’ – 65’ 70’ 70’ - 80’ 60’ 80’ BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 11 of 76 K. Hidden Creek: The fifth residential community being developed within the first Village of Bridgeland is Hidden Creek, refer to the plan below. Homebuyers will initially arrive at Hidden Creek via North Bridgeland Lake Parkway and through The Shores. Future access will be via Josey Ranch Road from North Bridgeland Lake Parkway. v. Neighborhoods Hidden Creek is composed of 18 residential neighborhoods. Some development standards are common for all of Hidden Creek, while others pertain to specific neighborhoods only. Chacon Creek 70’ BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 12 of 76 II.SITE DESIGN A. Site Design Philosophy-the “Big-Ideas” The land planning for Bridgeland is focused on creating a distinctive water-side new town. The nature of the overall street system (thoroughfares/collectors/residential streets), the overall residential hierarchy (town/community/neighborhood), and the relationship to amenities (water/parks/trails/activity centers) reflect a consistent approach. The Land Plan emphasizes desirable views of water, open space and other amenities, while minimizing the less desirable views, such as that of rear fences, etc. to enhance the life of the Bridgeland residents B. Community and Neighborhood Standards Within individual residential neighborhoods, some particular design considerations may vary, reflecting the character of that particular area. Therefore, some portions of these development standards will apply universally throughout Bridgeland, while some standards and criteria may be particular to an individual community, to individual neighborhoods or even to lots within a neighborhood. C. Lot Sizes/Street Frontages/Neighborhoods Within the various neighborhoods, lot sizes/street frontages range from 50 feet in width up to and including some lots over 100 feet in width. These lot sizes are grouped primarily by size within individual neighborhoods. Unless otherwise specified, the standards for lots within a neighborhood shall apply to the whole neighborhood, regardless of specific lot size/street frontage. D. Street Relationship The overall appearance of the streetscape will be a major part of the impression of Bridgeland. There are various elements that contribute to the streetscape impression including: the houses, the house location on the lot, the garage location and the position of the drive, the landscaping in the right of way and the landscaping on the lots. E. House Location on Lot In determining the location of the house, the following factors should be considered: visibility from street, shape of lot, floor plan, setbacks, relationship to adjacent houses, relationship to lakes and amenities. vi. Detached Garages Detached Garages in rear yards are encouraged. On corner lots, the garage may be detached with the door facing the side street or opposite on the street side with driveways extending to the front street. Detached garages backing towards a lake are prohibited. Detached garages shall be setback a minimum of three (3) feet from an interior side lot line. In order to provide space for parked vehicles, a detached or side loading garage on the side street side of a corner lot shall be set back a minimum of twenty (20) feet from the curb. BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 13 of 76 vii. Decks and Patios Decks shall be setback at least five feet from any property line and in general, shall be behind the rear line of the house. Where the rear has several planes, the ARC will make an individual judgment. Decks and patios may be placed with in the utility easement; however, the utility company has a right to remove them at the Builder’s/ Homeowner’s expense. F. Setbacks Front setbacks for houses are shown on the plat and are restated in the neighborhood diagrams that are part of this document. Side and rear yard minimum setbacks are also shown on the plats, and in the chart below. Interior Lots Corner Lots Interior side setback 20 ft from front lot line 5 ft from side lot line Street side house setback N/A Rear house setback 20 ft from rear lot line 7.5 ft or UE whichever is greater 3’ from interior lot line 4 ft from side lot line 5 ft from rear or side lot line 5 ft from rear lot line 5 ft from side lot line 20 ft from front lot line 5 ft from side lot line 10 ft or min 15’ w/ fence 20 ft from rear lot line 7.5 ft or UE whichever is greater 20 ft from street side lot line N/A 5 ft from rear or side lot line 5 ft from rear lot line 15 ft from side lot line Front house setback Rear detached garage setback Detached/Side loading garage side yard setback Driveway interior side setback Porches/ Decks/ Patios rear and side setback Pool deck rear setback Pool deck side setback G. Entry Walls In keeping with the theme of Bridgeland to create a traditional neighborhood character the lots are raised with a front yard wall. This wall will be consistent in height for each lot type. The layout and grading of the wall is described in the following sections. i. Entry Wall Layout Requirements All lots shall have a set of masonry or brick steps along the front property line to negotiate the grade change. Plant material shall be used to enrich the effect. All masonry/ brick materials used for steps, side walls, and wing walls shall be the same materials used for the house. Builder is required to submit step and wall plans and materials for ARC approval prior to construction. BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 14 of 76 Entry Wall Requirements Walk & Wall Layout BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 15 of 76 Entry Wall Requirements Walk & Wall Layout Entry Wall Requirements Stair & Cheek Wall Detail BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 16 of 76 Entry Wall Requirements Concrete Form Plan BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 17 of 76 Entry Wall Requirements Concrete Form Plan BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 18 of 76 H. Entry Wall Typical Layouts Each lot type has separate requirements for the entry walk wall layout. i. 50’- 55’ & 60 - 65’ Lots 50’-55’ and 60’-65’ lots shall have a 5’ long wing wall on both sides of standard columns. Entry Wall Requirements 50’-55’ & 60’-65’ Lot – Typical BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 19 of 76 ii. 70’ Lots 70’ lots shall have a 10’ long wing wall on both sides of the standard columns. Entry Wall Requirements 70’ Lot - Typical BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 20 of 76 iii. 80’ Lots and Larger 80’ lots shall have a 15’ long wing wall on both sides of the standard columns Entry Wall Requirements 80’ Lot – Typical BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 21 of 76 iv. Radius Walls Lots on a curved street or walk shall have an entry wall that follows the curve of the walk. Entry Wall Requirements Radius Entry – Typical BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 22 of 76 I. Sidewalks (See Section VIII-Appendix II for Hidden Creek Requirements) A four (4) foot sidewalk is required to extend from the front door to the terrace steps and extend to the curb. Sidewalks that are not straight are preferred. A four (4) foot sidewalk is also required offset five (5) feet from the back of curb across front of the lot, and at the side street on corner lots. Refer to the illustration below for detailed dimensions. According to TDLR standards, sidewalks shall have a maximum side slope of 2% and a maximum running slope of 5%, this includes where sidewalks cross driveways. Sidewalk Requirements Builder Walk – Typical Sidewalk Requirements Builder Walk at Neighborhood Entry Circles – Typical BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 23 of 76 Sidewalk Requirements Builder Walk at Cul-de-Sacs – Typical J. Driveways Driveway locations are as depicted on neighborhood fencing diagrams. The ARC may grant variances to site specific situations as it deems appropriate. All driveway designs are subject to review by the ARC. Driveways shall typically cross the building setback area in a straight line at a ninety (90) degree angle to the street right-of-way. Where this may not be feasible due to the particular conditions of a lot, the alignment of the driveway shall be direct and logical. Turnaround or circular drives may be allowed on certain sized lots and with certain architectural styles. Under no circumstance may an entire front yard be paved as a driveway. i. Driveway Responsibility/Construction Builders are required to build the driveway out to the street. Most lots have a mountable curb at the street. Driveways are to be a minimum of three and one half inches (3.5”) thick over a sand base. Six by six (6x6) woven wire mesh shall be installed within the apron of the driveway as a minimum. Expansion joints between the curb and driveway are required as illustrated. Where barrier curbs exist, saw cut into existing street and dowel into existing concrete paving. Where the driveways intersect the sidewalk and front walks, the driveway finish may not continue through the sidewalk. The radius at the curb shall be five feet (as necessary to meet sidewalk edge). Sidewalks shall not have a side slope greater than 2% and a running slope greater than 5%. BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 24 of 76 ii. Driveway Widths Driveways serving two car garages facing the street shall be no more than twentytwo feet (22’) and three car garages shall be a maximum of thirty-two feet (32’) at the garage. The maximum width to service a swing in garage is twenty-eight feet (28’). All driveways must be a maximum width of fourteen feet (14’) at the sidewalk when serving a two (2) car garage and a maximum of sixteen feet (16’) at the sidewalk when serving a three (3) car garage that has three (3) bays facing the street. Additional driveway widths will not be allowed. See graphic below for typical driveway: K. Utilities If it can be avoided, driveways shall not be constructed over inlets or manholes. In instances where this may be unavoidable, compliance with County regulations that may require inlet adjustments and/ or upgrade may be necessary. L. Carports Carports are not permitted on any lot. M. Pools and Spas Portable or permanent above ground swimming pools are prohibited. Smaller, prefabricated above ground hot tubs are acceptable if part of an integrated deck system. If visible from public view or from other lots they shall be skirted, decked, screened, or landscaped to hide all plumbing, heaters, pumps, filters, etc. BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 25 of 76 Swimming pool appurtenances as rock waterfalls and sliding boards shall not be over six feet (6’) in height. Skimmer nets, long handle brushes, pool chemicals, filters, pumps, heaters, plumbing, etc. shall not be visible from public view. Pool Walls shall not encroach on utility easements. If pool plumbing is required in utility easements, contact the local utility company before digging. Wood or concrete pool decks may be placed on utility easements, but are subject to removal by utility companies and replacement will be at lot owner’s cost. Pool decks shall be set back a minimum of five feet (5’) from the side building setback and a minimum of five feet (5’) from the rear property line. All pools and spas, with a site and landscaping plan, shall be approved in writing by the ARC prior to construction. Other requirements: • Drains. Pool and backwash drains shall discharge into the sanitary sewer system at connections approved by the MUD. • Dwelling Foundation. The Owner should obtain competent engineering advice to determine that the swimming pool is located far enough from the dwelling foundation to maintain support for the foundation. • Elevation. The pool should be elevated above the surrounding grade a sufficient height to not permit an inflow of storm water. • Excavation. Excess soil from a swimming pool excavation shall be removed from the site by the lot owner. • Lights in or around swimming pools shall be included on the plan for review and approval. • There shall be no construction access from any lake or Common Area unless permission is granted by the HOA and/ or ARC. • A damage deposit must be posted by the Owner or Builder prior to any construction to cover any damage caused to common property. N. Grading/ Drainage The Owner shall ensure that the placement of any improvement or landscaping does not halt or materially impede drainage flowing off of a neighboring tract, and does not redirect the flow or significantly increase the amount of water flowing onto a neighboring tract. Enforcement of this requirement is by the affected property owner(s). Graded slopes shall not exceed 3:1. All slopes shall be properly stabilized to prevent erosion. Lawn areas should have slopes of at least 2% to prevent standing water. Generally, driveway slopes should not exceed 7%. i. Grading at Lot Perimeters General. Grading beyond lot boundaries is not allowed unless approved by the master developer. Any damage to areas outside the lot caused by construction activity shall be repaired at the home builder’s cost. ii. Drainage onto Adjoining Lots. Adjoining properties shall be protected from flooding or surface drainage. BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 26 of 76 iii. Parcel Drainage. Drainage discharge points for each neighborhood and community have been predetermined. Grading at lot edges should provide for positive drainage away from perimeter property lines and back towards internal street or drainage facilities. iv. On waterfront lots, special attention should be paid to controlling runoff into the adjacent body of water especially during construction. Waterfront lots include lots that are adjacent to lakes, bayous, ponds, or any other water body or wetland. v. Wherever possible, drainage shall be directed away from this body of water to avoid soil, fertilizer, pesticides, petroleum products, and other chemical runoff. These concerns apply both during and after construction. The dumping of any foreign material into the water body is strictly prohibited. vi. The eighteen (18) inch terrace grading with a 2% slope at the curb for the sidewalk, shall be maintained or replaced after construction of the house. O. Entry Wall Grading Requirements The following illustrations are grading guidelines to meeting the requirements of front wall & walk configurations. Note: Finished grade of backfill on all walls shall 4” below top-of-wall. Entry Wall Requirements Walk & Wall Grading BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 27 of 76 Note: All elevations are relative to exact top-of-curb elevations Grading Requirements Front Yard – Typical Note: All elevations are relative to exact top-of-curb elevations Grading Requirements Side Yard– Typical III. ARCHITECTURAL DESIGN BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 28 of 76 A. Philosophy-the “Big Ideas” The standards in this section provide a basis for developing the design concepts, forms, and materials used for homes within Bridgeland. This section identifies those architectural elements that influence the overall neighborhood appearance and perception of the street scene character. These include the appropriateness of a house design to a particular site, overall building massing, the location and visual impact of key elements like entries, garages, etc., the style of the architecture and how it relates to those around it, and the quality and quantity of the exterior materials used on the home. B. Overall Massing The house shall be sited on the lot so the house and entry are predominant and the garage minimized. i. Height Varied elevations and arrangements on the site are encountered to create a more interesting street scene. More pleasing arrangements are achieved with a variety of articulated plans, which break the rectangular box into interesting threedimensional shapes with courtyard-like spaces in and around each house. In addition to the improved footprints, the street scene is made more attractive with the combination of right and left hand units if garages are not detached. C. Individual Elements i. Entries The main entry shall provide an important point of interest to each home and shall be protected with overhangs, recesses, porches, or trellises. Sidelights and transoms are encouraged. When used with wall extensions, the whole entry can even result in a courtyard effect. ii. Garages Each house shall have a garage capable of accommodating a minimum of two (2) full size automobiles and a maximum of four (4). Where a garage provides parking for two cars, two single garage doors are preferred over a single double door. Three garage spaces may front the street on sixty-five foot (65’) or larger product type provided that the third bay is set back a minimum of twelve inches (12) from the other two bays. A separate roofline over the third bay is preferred to break up the view from the street. Detached three car garages located in the rear yard or side yard on a corner lot will be allowed. An extension in the depth of a garage which permits additional storage space is permitted. The front façade of front loaded detached garages shall be the same masonry used on the main house, except at garage door headers, where siding can be used. Garage doors shall not exceed the standard height of typical home garages. BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 29 of 76 On a corner lot with a detached side loading garage the exposed wall in front of the breezeway fence must be screened by a solid hedge. Plant material is required to be a min. 5 gal. shrub @ 24”-30” on center. The hedges shall be of Wax Myrtle, Oleander, Elaeagnus, Ligustrum (shrub form) or Burford Holly. The garage doors shall not dominate the facade. Treatment of detail on garage doors shall be consistent with the overall character of the house. This may be accomplished with well placed windows along the top of the garage door and by breaking up the mass with paneled construction. Where a two-car garage is built, two single doors divided by a column are encouraged. All garage doors shall be a panel metal or wood design and of a color which matches the color of the adjacent wall or trim; darker colors are preferred. No particle board or fiberglass doors are permitted. Glass fenestration is permitted. No reflective film or foil is permitted on windows. Refer to Section II.F for Garage Setback requirements. a. Side-entry Garages Where a side entry garage at the front plane of the house is allowed, the wall facing the street may not be solid. Windows with shutters or blinds, and/or architectural embellishment will be required to soften the effect of the garage and will be established on a case-by-case basis based on visibility. b. Carports Carports are prohibited. c. Garage Living Areas Living areas above detached garages are prohibited. iii. Roofs a. Rooftop Elements. The roofs shall be kept as visually unobstructed as possible. All stack vents and attic ventilators shall be located on the rear slopes of roofs and mounted perpendicular to the level ground plate. No solar collectors shall be allowed on any roof slope visible from a public street, lakefront, or other Common Area. Rooftop or window HVAC equipment is not permitted under any circumstances. b. Roof & Porch Overhangs. Overhangs shall be used consistently on eave conditions and rake conditions. Overhangs shall be an integral part of the building form and not thin planes extended past the mass of the house. Exposing the ends of rafters is prohibited. Porches and overhangs shall have a minimum slope of 3 / 12 pitch. c. Roof Material The roof material shall be dimensional asphalt shingles with a 30-year warranty. Colors shall be approved by the ARC along with the entire color palette for the house. BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 30 of 76 d. Exposed Roof Penetrations All exposed stack vents, skylight curbs, attic ventilators, and other metal roof accessories shall match or closely resemble the roofing color. Roof and valley flashing shall be of a pre-finished color that matches the roof color. Lacing valleys with shingles is also permitted where adequate sub-surface water protection and support is provided. Roof-mounted ventilators shall be no higher than 10 inches above the roof surface. Under no circumstances shall any of the above mentioned items extend above the ridge line or parapet on an approved flat roof. The number and size of stack vents shall be minimized. iv. Chimneys a. Chimneys can be used to establish an ornamental or thematic character. The minimum plan dimensions for an exposed mass is 24” x 24” and a larger form is preferred. b. In the event of gas fireplaces, direct vents in place of chimneys are allowed, provided the vents are located along the rear slope or rear half of the roof and painted to match the shingles. c. The height of the chimney shall be in proportion to the roof line and adhere to fire codes. Broad, massive chimneys are encouraged and small, spindly shaped chimneys will not be approved. Chimneys which barely peak above or squat on the roof are unacceptable. d. Exposed metal flues are not allowed. They may be used only when faced with the brick/ masonry used on the house. e. Fireplaces shall be made of the same material as the house. Exterior chimneys on all lots shall have all sides constructed with brick/ masonry materials, matching the house. f. If a chimney occurs in an interior portion of the roof (not an external house edge) or at the rear or non-corner side of a home, it shall be constructed of materials that match the architectural style and color of the home. Metal flues, stucco, or wood sided chimneys are permitted in these locations. Cladding metal flues with masonry, brick, or wood is preferred if metal flues are to be used. g. Spark arrestors and caps are required on all chimneys. The spark arrestor and cap shall be unadorned and designed to match or be compatible with the color and material of the exterior elevations of the home. Caps shall be of metal or masonry construction. h. Heights of chimneys shall meet all fire code requirements and be proportional to the roofline of the respective home. v. Decks/Patios/Porches a. Porches Porches are encouraged; they provide relief to elevations and architecture transition between outdoor and indoors. When of substantial size, a porch may be considered as the primary front plane of a house for calculating the garage setback. BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 31 of 76 b. Deck/Patio Design Any exterior deck shall read as an integral element of the house design. Front yard decks and patios will generally not be approved unless necessary to accommodate a unique feature on the lot, and when integrated into the overall entry sequence of the dwelling. Where a patio is concrete and has an exposed foundation more than one foot in height, the edge shall be covered with masonry matching that on the house. Where a wood deck is two feet or less above grade, the vertical plane at the edge shall be screened with a continuous shrub planting. Where the deck is more than two feet but less than four feet above the adjacent grade, the vertical plane at the edge of the deck shall be screened with framed lattice panels or masonry. Where a deck is more than four feet above the adjacent grade, it shall be detailed as a porch, with substantial supports such as masonry piers, in addition to the skirting. Such a deck will only be considered if it has no impact on adjacent properties and is not visible from a street or public space. Trim board shall be used in all cases to conceal exposed joist ends. Decks shall be built with support posts of sufficient size or detail so that knee braces are not required. If a railing is required, a simple vertical picket or horizontal board railing built in a vertical plane is preferred. If stairs are part of the deck design, the stair railing shall match the deck rail and shall be included within the mass of either the deck or the house. D. Architecture i. Style The exterior architectural style shall be in conformance with the project character of each neighborhood. A range of styles is permissible provided that a particular style is deemed appropriate by the ARC for a particular location or neighborhood. All elements of a home shall be architecturally compatible. ii. Plan Repetition To meet the streetscape design objectives for the community the following rules apply: a. Production model mix in must avoid monotony, but maintain continuity of scale and character. b. If a plan is to be repeated with the same front elevation design on either the same side or opposite side of the street, it shall not occur more frequently than every fourth (4th) consecutive lot. Thus, where this situation exists, at least three (3) other homes shall occur between the next repeated front elevations. Brick and trim color in this situation shall be different. c. If a plan is to be repeated with a different front elevation design on the same side or opposite side of the street, it shall not occur more frequently than every third (3rd) lot. Thus, at least two (2) other homes shall occur between the next repeated floor plan with a different front elevation design. Brick color shall also be different with patio homes being an exception. BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 32 of 76 The ARC reserves the right to reject an elevation that closely resembles that of a nearby house or in any way detracts from the overall street scene. Identical uses in brick type and color, and siding color are generally prohibited on homes which are adjacent to one another. The design of the house and particularly the placement of windows shall maintain privacy within that house, take advantage of any garden or open space views, but also shall avoid overlooking adjacent houses to a manner that infringes on the privacy of their living room or patio areas. iii. Elevation Openings All openings in a building such as windows and doors shall relate to each other on each elevation vertically and horizontally in a clearly defined order. Front facing gables at entries are encouraged to break down the scale of the main roof mass. iv. Detailed Elements a. Gutters & Downspouts: Gutters and downspouts shall be designed and installed so that water runoff does not adversely affect drainage on adjacent property. If gutters are not used, positive drainage away from the building shall be provided. Downspouts are to be located to provide a clean, unobtrusive appearance, terminated by either splash blocks or connection to the storm sewer. Gutters and downspouts shall be integrated with architectural design in color, shape, and location. Drain pipes tied into rain gutter downspouts shall be completely hidden from view, by shrubs or ground cover large enough and dense enough to screen. b. Rain Gutter Drains: Although gutters are not required, roof design or the use of diverters are encouraged to keep dripping water off of patios, balconies, stairs, doorways, etc. Positive drainage away from the house should be provided for rainfall, irrigation, air conditioner condensate and all other types of water runoff. Roof drainage that will ultimately create erosion or run across pedestrian walks and paths is not acceptable. Drainpipes tied into rain gutter down spouts shall be completely hidden from view. Plant shrubs and ground cover large enough and dense enough to screen visual obstructions. Use splash blocks where practical. c. Screens: Solar screens are prohibited. d. House Numbers: House numbers shall be a minimum of four (4) inches tall sandblasted into a precast panel. The panel shall be located on the front façade of the house. Particular fonts are not required; however, the text shall be easily read from the street. BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 33 of 76 e. Security Devices/Bars: Security devices such as cameras, sirens and speaker boxes shall be the minimum size needed to be effective and shall be located unobtrusively. As previously mentioned under the section for “Entrances and Windows”, security and/ or burglar bars on the exterior of homes are not permitted. If security devices are being considered for a home, the builder shall utilize a device which is not visible to public view and preferably mostly contained within the home. Cameras are to be located under the eaves of the home and the camera(s) or their field(s) of vision shall not be placed to be focused on any neighboring property. f. Exterior Materials/Colors: The ARC will consider optional materials not included or listed below that are, in the opinion of the ARC equal or greater in quality level. Materials shall be used with restraint in regards to both color and diversity of material types. The intent is to create a continuity of materials and color throughout the neighborhood. The number of primary materials on the exterior will be limited to three (3) not including roof shingles. g. Base Wall Material Requirements: The first level of all homes in shall be 100% masonry (brick or stone) on all elevations. Siding on the front elevation will only be allowed on a case by case basis and is generally discouraged. h. Wall Material Transitions: All transitions between materials shall occur at logical points in the elevation. Where there is a transition on the upper levels of a home from masonry to another approved material on a side elevation, the masonry shall extend back at least 2 feet. Exceptions will be considered on a case by case basis. No material change may ever occur on an outside corner. i. Brick: Brick shall be hard fired and have an overall appearance of relative evenness in color and texture. Only earth tone colors are acceptable. Painted brick is not permitted. Brick shall meet standard specifications established by The Brick Institute of America. j. Stone: Stone on the exterior of a residence shall be approved by the ARC to ensure architectural compatibility within the neighborhood. If stone is to be incorporated, it shall be earth tones. k. Masonry Mortar Joints: All mortar joints shall be tooled; “slump” joints will not be allowed. Mortar colors if used, shall be selected to compliment the brick or stone color. BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 34 of 76 l. Siding: Siding may only be used as a secondary material. Where it is used, the siding material shall be a cementious material and shall be of horizontal, lap type. Siding shall be painted with medium range colors. The use of wood, particle board, or any sheet siding is prohibited. Vinyl or aluminum siding is also prohibited. m. Stucco: The use of authentic stucco is permitted. The stucco shall conform in color with all other exterior housing materials. n. Trim: All trim shall be smooth/ semi-smooth, high quality finish grade stock wood or fiber cement board. Trim shall be stained or painted as approved by the ARC. o. Windows: Window type/color/finish shall be complimentary to the overall character of the home’s design. Mill finish aluminum is not permitted. Reflective, “mirrored” or tinted glass is not permitted. p. Awnings: Awnings are prohibited. q. Materials Submission: Samples of all finished materials will be submitted by all builders to the ARC for approval. Each builder is required to submit a color palette to the ARC for approval. r. Exterior Colors: Exterior paints and stains for each residence shall be selected to complement or harmonize with the colors of the other materials with which they are used. The general intent is to encourage greater variety among homes along the street. Wood siding and trim shall generally stay within the earth tone color family. The use of white is also permitted. Extremely bold or primary colors, however, are prohibited. Yellow, blue, or green pastels are discouraged. However, soft and muted earth tone pastel colors like grey, beige, brown, salmon, etc., are acceptable. The variety and number of exterior colors on each house shall be held to a maximum of three not inclusive of brick color or front door color. Brick colors shall generally be of an earth tone family or range. No one brick color family shall dominate a particular street scene. Dark colored brick is preferred. Brick for houses on consecutive and facing lots shall vary in order to avoid monotony. Variety in brick use is highly encouraged. Likewise, trim color and/or field color shall also vary. BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 35 of 76 s. Exterior Building Lighting: Any lighting on individual lots shall be directed away from adjoining property. Light sources shall not conflict with the sight lines of pedestrians or motorists in a manner which endangers their safety and welfare. Exterior lights located on the 2nd (second) story of the home are prohibited (i.e. Flood lights). Flood lights are permitted on the rear of the home and one fixture may be installed on the garage. Exterior illumination of architectural features such as columns, entries, chimneys and landscape features is encouraged. A sconce light is preferred. Ground lighting or decorative fixtures shall be of high quality materials and workmanship and be in scale and style with the residence. Sodium vapor lights, except for subdivision street lights, are prohibited. Mercury vapor lights, when used for special landscape lighting affect, (hung in trees as up and down lights) are permissible with ARC approval. Incandescent, low voltage incandescent, metal halide, quartz and natural gas lights are acceptable. Colored lighting of any sort is prohibited as is the use of fluorescent and neon lighting and colored lenses. Only during the holiday season will such lighting be permitted. Conduits and wiring shall remain concealed from view of the neighboring lots. All wiring for exterior lighting shall be underground. Pathway lighting and landscape lighting is encouraged. Such lighting shall be inconspicuous. Lights (except those operating on 12 volts or less) may not be located within 5’ of a side property line or 10’ of a rear property line. Lights shall be set back a minimum of 20’ from the pavement edge. Decorative lighting fixtures shall be an integral and compatible part of the architecture of the dwelling. Light fixtures and their supports shall be of materials and colors of muted earth tones in the brown, gray, and green ranges are preferred. White fixtures and supports are acceptable only if they are compatible with the architectural style of the dwelling. Proposed walkway lighting shall be inconspicuous and of a bollard or dome light design. The lamp may be incandescent (100w maximum), quartz (75w maximum), and metal halide (75w maximum), or fluorescent (25w maximum). Low level directional lighting along walkways or at sidewalk and walkway edges is encouraged. All light fixtures and their locations shall be submitted to the ARC or noted on the plans prior to installation. BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 36 of 76 E. Antennas Television antennas on roofs shall be avoided. It is preferable that antennas be placed within the attic space of a home or that the resident makes use of cable services. If placed outside, the antenna shall not encroach on neighboring private or public property. Antennas, satellite dishes, and radio towers shall not be readily visible to neighbors or from a public right of way. If the antenna is placed on the site, it is suggested that the smallest antenna possible be used to avoid attention. Radio towers are prohibited. F. Energy Conservation Minimize large grass areas on south and west sides of the home. Where windows are necessary, provide roof overhangs, porches, trellises, louvered windows, etc. to minimize direct heat gain. IV. FENCING A. General This chapter outlines required fencing locations and types. B. Fence Responsibility Neighborhood fencing as outlined and illustrated in these guidelines will be the responsibility of each builder as they develop lots. C. Fence Types & Requirements Both metal and wood fencing will be used. These fence types are detailed below. All wood fence hardware connections are to be screw or ring shank nails, on a straight-line guide. No used material is allowed. Fences are to be kept in good repair. Painting, sealing or staining of fences is prohibited. The finished side shall face public view. The use of RightWood fence products is not allowed. All metal fencing will be of a manufactured product that uses pre-galvanized steel with a zinc phosphate primer coating and a topcoat paint finish. All mounting hardware will be of a bracket design. All metal fencing will be of a design that allows it to easily accommodate changes in elevation by use of a rackable system. All metal fencing will have a flush mount bottom rail. All metal fencing will have a minimum 15 year manufacturer warranty. Both the Montage Plus by Ameristar fence products and TangoRail by MerchantsMetals currently meet our specification requirements. The following specs apply to the metal fencing: Post Size: 3” square Picket Size: 3/4” Rail Size: 1 ½” Reference the following diagrams for both the wood and metal fencing design requirements. BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 37 of 76 i. Good Neighbor Wood Fence BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 38 of 76 ii. 6’ Wood Fence (finished side out) BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 39 of 76 iii. Metal Fence BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 40 of 76 iv. Upgraded Metal Fence (For use in sections as specified) D. Fence Locations Front fences shall be set back a minimum of ten feet (10’) and maximum of fifteen feet (15’) from front face of the house unless there are conflicts with windows or other architectural elements of the house. Fencing along interior property lines will be on the property line. At the street side of corner lots, a minimum side fence setback of ten feet (10’), equal to the side building setback is required. In addition corner lot fencing must be located a minimum of ten feet (10’) and maximum of fifteen feet (15’) from the back corner face of the home. Side interior fences more than ten feet (10’) long require a planting buffer. (Refer to Section 5 for more detailed information on landscape requirements). On all lots with detached garages, a breezeway fence is required between the detached garage and the home. This fence shall be a minimum of four (4) feet in height and a maximum of six (6) feet and shall be constructed of wood, wrought iron or brick depending on location. Detached garages on Corner Lots (when the breezeway / driveway is facing the street) shall have a four (4) foot masonry fence to match the masonry of the house with optional wrought iron up to two (2) feet attached to the masonry, for a maximum total height of six (6) feet. BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 41 of 76 For detached garages on Interior Lots, the breezeway fence can also be constructed of wood, the good side of the fence shall face to the outside, and the gate shall be of the same material. If constructed of brick, the brick color shall be the same as the home and the gate shall be made of wrought iron. The maximum height for a fence in this location is six (6) feet. These fences shall extend from the rear of the house parallel to the side property line extending to the rear property line. The following graphics provide fencing type locations for typical lot scenarios. Note: Confirm specific fencing type with the Neighborhood Fencing Diagrams Fence Requirements Interior Lot – Typical BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 42 of 76 Note: Confirm specific fencing type with the Neighborhood Fencing Diagrams Fence Requirements Corner Lot – Typical BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 43 of 76 Note: Confirm specific fencing type with the Neighborhood Fencing Diagrams Fence Requirements Landscape Reserve – Typical BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 44 of 76 Note: Confirm specific fencing type with the Neighborhood Fencing Diagrams Fence Requirements Lake – Typical BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 45 of 76 Note: Confirm specific fencing type with the Neighborhood Fencing Diagrams Fence Requirements Side Yard at Lake – Typical BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 46 of 76 E. Grade Transition Fencing All grade transitions for wood fences shall be by “stair-stepping” that is keeping the tops and bottoms of the fence level. No more than 6” can be transitioned at a single point. If necessary, the fence panels shall be decreased in length to meet these standards. i. Grade Transition for Wood Fence BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 47 of 76 F. Angled Fence Side or rear fences on corner lots that obstruct the view of the front of an adjacent house shall be angled as shown below. BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 48 of 76 G. Fences as Screening Utility meters, A/C units or other equipment shall be fully screened from public view with fencing and/ or landscape. If landscaping is used, it shall create a solid screen immediately when planted. H. Other Fence Types. The ARC will consider other fence types only where there are special conditions exist. Diagonal and horizontal fencing as well as chain link will never be permitted. I. Submission and Approval The ARC shall approve all fences prior to installation. The Builder shall clearly identify on each site submission, the fence type being proposed on all sides of the lot, as a confirmation of correct interpretation of the information on the Neighborhood Diagrams in the Appendix. V. LANDSCAPE A. General This section outlines the standards for creating an attractive and functional landscape environment that enhances the architecture of the houses, provides a canopy along streets, buffers unwanted views and provides color, texture and visual interest. B. Landscaping Approach All yards shall be landscaped with a minimum combination of trees, shrubs, ground covers and grass as shown in the planting charts. Front yard trees and corner side yard trees are to be container grown or machine dug. Planting beds are to be curvilinear with the shrubs massed in tiers. Smaller shrubs and ground cover are to be placed in the front of the bed. Larger shrubs shall be placed in the rear of the bed. Groupings of shrubs of the same species provide a substantial look. Care shall be taken when planting large trees and shrubs near the foundation. Large trees and shrubs shall be planted no closer to the foundation than two (2) times the diameter of the root ball of a mature plant. Radius beds shall be placed 8 feet minimum from the house. Widths of the beds shall vary. Planting beds, in addition to foundation plants, shall extend toward the front property line to offer a more lush appearance to the community. Mulch all planting beds with at least 2" deep shredded pine or hardwood mulch. Other materials to be used in place of mulch will be submitted to the ARC for approval. Gravel and rock may be used at drip line of house, but is not permitted for use or substitution for shrubs, ground cover, and mulch or grass lawns. Specimen boulders may be permitted upon review and approval of the plan by the ARC. BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 49 of 76 C. Street Trees in Right-of-Way Street trees are required in the street right-of-way in the area that extends from the curb to the sidewalk. Each neighborhood will have a single species of street tree to reinforce neighborhood identity (see fencing exhibit for species). The Builder is responsible for the cost and installation of all street trees along their lot(s). Refer to the Street Tree Master Plan in the Appendix of these Guidelines for detailed information on street tree type required. The spacing of the trees will be at forty feet (40’) on center along all streets within. This applies on all street frontages whether at the front of houses on an individual lot, or at the side of a corner lot. The trees will be three and a half inch (3 1/2”) caliper. The trees shall be centered between the back of the curb and the edge of the sidewalk. Refer to the figures below for the street tree locations. Harris County requires that street trees be located forty feet (40’) back from all county street signs (along the site line) to avoid the street tree obstructing the view of the sign. The Builder is responsible for maintenance of street trees within the right-of-way adjacent to their lot. In the event that any street tree in the right-of-way is lost due to damage or disease, the Builder shall immediately replace it with a tree of similar height and type to the one lost. Trees along the streets shall not be changed, relocated, or removed without prior consent from the ARC. BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 50 of 76 BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 51 of 76 Sidewalk Requirements Builder Walk at Neighborhood Entry Circles – Typical Sidewalk Requirements Builder Walk at Cul-de-Sacs – Typical D. Boulders/Rocks in the Right-of-Way Boulders/Rocks located in the right-of-way are a violation of Harris County policy and are not allowed. E. Landscaping Components These guidelines address the following areas: street, front yard, side yard for corner lots and in some cases, rear yard landscaping. BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 52 of 76 F. Yard Definitions The front yard shall be defined as the area between side lot lines from the front of the house and fence to the front property line. The side yard of a corner lot shall be defined as the area on the side of the house and/or the side fence, from the front plane of the house to the rear property line. The rear yard shall be defined as the fenced area from the back of a house to the rear property line. Front Yard Side Yard Side Yard – Corner Lot Detached Rear Yard Side Yard – Corner Lot Front Loaded Yard Definitions Front Yard, Side Yard, and Rear Yard – Typical BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 53 of 76 G. Front Yard Landscape The standards for front yard landscaping are related to lot frontage. Refer to the planting chart in this section for more detailed requirements. Front yard landscaping shall be done in such a manner to provide a colorful and complimentary foreground to the residence. Avoid placing large trees and plants in front of significant architectural features. Avoid shade trees planted exactly in the center of the yard. Front yard landscaping shall be used to screen driveways and large blank facades of the residence. Of the shrub quantities shown, a minimum of 10% shall be placed in the front ten feet (10’) of the lot to compliment the right of way plantings and as terrace wall enhancements. Refer to the following figures for front yard landscaping requirements for each lot type. Landscape Requirements 50’-55’ Lot – Typical BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 54 of 76 Landscape Requirements 60’-65’ Lot – Typical BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 55 of 76 Landscape Requirements 70’ Lot – Typical BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 56 of 76 Landscape Requirements 80’ Lot – Typical BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 57 of 76 H. Side Yard Landscape - Corner Lot The street side yard of corner lots shall have plant material to soften long walls or fences. Fences shall be setback from the side property (right-of-way) line to allow for a landscape buffer. Refer to the planting chart in this section for more detailed requirements for this area. A thirty-five (35’) by thirty-five foot (35’) sight distance triangle shall be maintained at corners. Positioning of the trees and shrubs shall also not impede pedestrian access on the public sidewalk. Landscape Requirements Side Yard, Corner Lot – Side Loaded BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 58 of 76 Landscape Requirements Side Yard, Corner Lot – Front Loaded BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 59 of 76 I. Rear Yard Landscape Metal fencing is required on lots with public views, and those adjacent to a lake, greenbelt, walking trail, park, or common area (see attached neighborhood specific fencing diagram). The Builder will be required to provide landscape planting in the rear yard on these lots. (See pages 57-59 regarding plant quantities and type requirements). Landscape Requirements Rear Yard at Greenbelt, Walking Trail, Park or Common Space – Typical BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 60 of 76 Landscape Requirements Rear Yard at Lake – Typical BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 61 of 76 Landscape Requirements Side Rear Yard at Lake – Typical BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 62 of 76 J. Plant Quantity Requirements Front Yard Plant Quantity Requirements Front Lot Widths Trees Shrubs *Street Trees 3-1/2" Caliper Shade 2" Caliper 5 Gal 1 Gal (18"3-1/2" Caliper 15 Gal Trees Ornamental Trees (48"o.c.) (36"o.c.) 24"o.c.) Shade Trees From To 50' 59' 1 2 2 10 25 1 60' 69' 2 2 3 15 30 1 70' 79' 2 3 4 20 40 1 80' 90' 2 3 4 20 40 2 *See illustrations on pages 47-51. * Species must follow neighborhood tree master plan Street Tree Note: Quantities are minimal requirement. Add additional street trees as needed to achieve overall 40'-0" O.C. spacing. Side Yard (Corner Lot) Plant Quantity Requirements Front Lot Widths Trees 3-1/2" Caliper Shade 2" Caliper Trees Ornamental Trees From To 50' 59' 2 2 60' 69' 2 2 70' 79' 2 2 80' 90' 2 3 *See illustrations on pages 52-53. * Species must follow neighborhood tree master plan. Street Tree Note: Quantities are minimal requirement. Add additional street trees as needed to achieve overall 40'-0" O.C. spacing ** Front Lot Widths Shrubs *Street Trees 15 Gal 5 Gal 1 Gal (18"3-1/2" Caliper (48"o.c.) (36"o.c.) 24"o.c.) Shade Trees 2 5 5 2 2 10 12 2 3 10 15 2 3 10 15 2 Evergreen foundation hedge to run the length of the iron fence; plant material required to be min. 5 gal. @ 24"-30". Approved plants: Wax Myrtle, Oleander, Elaeagnus, Ligustrum (shrub form) or Burford Holly. Additional shrubs to be used along the fondation of the home. Rear Yard w/ Public View Plant Quantity Requirements Trees Shrubs 3-1/2" Caliper Shade 2" Caliper Evergreen foundation hedge to run the length of the home Trees Ornamental Trees on lake lots and evergreen hedge to run the length of the From To 50' 59' 2 2 fence on trail and/or greenbelt lots.; plant material required 60' 69' 2 2 to be min. 5 gal. @ 24"-30". Approved plants: Wax Myrtle, 70' 79' 2 2 Oleander, Elaeagnus, Ligustrum (shrub form) or Burford 80' 90' 2 3 Holly. *See illustrations on pages 54-56. * Species must follow neighborhood tree master plan Note: Requirements in this table are not required on corner lots Note: Same quanities are required for Side Rear Yard at Lake Interior Side Fence Plant Quantity Requirements Interior Fence Widths From 10' 20' 50' To 20' 40' 60' Trees 3-1/2" Caliper Shade 2" Caliper Trees Ornamental Trees 0 1 1 1 1 2 15 Gal (48"o.c.) 1 1 2 Shrubs 5 Gal (36"o.c.) 3 4 5 1 Gal (18"24"o.c.) 3 6 8 *Species must follow neighborhood tree master plan Note: These requirements pertain to interior fences. BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 63 of 76 K. Sod Solid sodding with St. Augustine is required on all portions of the lot and within the right-of-way. This includes front, side, rear yards, and parkway area between the curb and the right-of-way where the street trees are located. Lawns may be “over seeded” with rye grass (maintained to 2 1/2” height). Neither gravel nor rock is permitted for ground cover. L. Irrigation Irrigation is preferred, but not required on lots. Sprinkler heads shall be located to effectively and evenly water intended area with 100% coverage while minimizing overthrow onto pavement, walks, etc. Builders shall instruct the homeowners in the operation of the system. Care shall be taken to avoid irrigation spray and runoff on adjacent property. All irrigation systems shall be designed and installed by a licensed irrigator in the state of Texas and be equipped with a backflow prevention device as mandated by appropriate local code. M. Plant Bed Edging Plant bed edging is not required. If edging is installed, it must be in keeping with the architecture and materials of the residence. Scalloped concrete borders, plastic edging, and landscape timbers etc., are not permitted. Plant bed edging requirements are not limited to those listed in these Guidelines. Plant bed edging materials and construction design shall be submitted with the landscape plans prior to installation. N. Plant Material On the following page is a list of plant material considered to be appropriate for use in the landscape planting. Other plant material may be used if approved by the ARC, but priority shall be given to plants from this palette. The Builder is encouraged to use a blend of the suggested plant material throughout the community. Planting plans shall be reviewed and approved by the ARC prior to installation. BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 64 of 76 SHADE TREES Bald Cypress - Taxodium distichum Burr Oak - Quercus macrocarpa Mexican Sycamore Cedar Elm - Ulmus crassifolia Drake Elm - Ulmus parvifolia sempervirens Live Oak - Quercus virginiana Loblolly Pine - Pinus taeda Shummard Oak - Quercus shumardii Magnolia - Magnolia sp. Monterrey Oak – Quercus polymorpha Pecan – Carya illinoensis Sweetgum - Liquidambar styraciflua Water Oak - Quercus nigra ORNAMENTAL TREES American Holly – Ilex opaca Mexican Plum - Evergreen Crape Myrtle – Lagerstroemia indica Redbud – Cercis canadensis Yaupon Holly – Ilex vomitoria Golden Rain Tree – Paniculata Mexican Fan Palm (Rear Yard Only) – Washintonia robusta Date Palm (Rear Yard Only) – Phoenix dactilyfera Sabel Palm (Rear Yard Only) – Sabal palmetto Sago Pam – Cycas revolute Dwarf Palmetto – Sabal minor SHRUBS Abelia Banks Rose Cleyera Dwarf Crape Myrtle Dwarf Wax Myrtle Dwarf Pittosporum Floribunda Rose Specimen Fountain Grass Indian Hawthorn -CSnow White, Jack Evans Italian Jasmine Gulf Muhly Nandina Domestica Oleander Pittosporum Possum Haw Variegated Pittosporum GROUND COVER & VINES Ajuga Algerian Ivy Boston Fern Carolina Jasmine Chinese Star Jessamine Chinese Wisteria Specimen Climbing Fig English Ivy Holly Fern Honeysuckle Japanese Star Jasmine Lamb’s Ear Liriope Monkey Grass Trumpet Creeper Specimen Wood Fern Burford Holly Dwarf Burford Holly Spirea Bridal Wreath Mexican Bush Sage ANNUALS & BULBS Spring and Summer Amaryllis Begonias Bluebonnet Daylily Dusty Miller Impatiens Lily of the Nile Marigolds Periwinkle (Vinca) Petunias Portulaca Purslane Salvia Verbena Fall & Winter Alyssum Bulbs Chrysanthemum Cyclamen Dianthus Pansies Tulip St. Augustine - Solid Sod BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 65 of 76 . O. Energy Conservation The use of shade trees and landscaping in lieu of concrete patios or drives near windows shall be used to reduce radiant heat gain. Landscaping shall be used extensively near windows and doors with deciduous shade trees and shrubs to provide a shield (shade) from the sun in the summer, but still allow the warmth of the sun to permeate in the winter. P. Tree Protection and Preservation Lots with rear yards south of the former House Hahl Road and Common Areas throughout Water Haven will have existing vegetation that is to be preserved. The following procedures shall be implemented to ensure the survival and good health of this plant material. Protection of trees on construction site: i. Fences or barricades shall be placed around dripline (outward extent of tree canopy) of trees to prevent storing of machinery or equipment which can cause soil compaction and mechanical damage. No materials or equipment of any sort may enter or be stored within the fenced protection area or dripline of the tree; potentially toxic materials such as solvents, paints, gasoline or oil, etc., shall not be poured on the ground near the dripline of the trees. ii. There shall be no parking of vehicles or equipment under existing tree canopies. iii. Excessive pedestrian traffic shall not occur within dripline of trees. Care shall be taken when working in the vicinity of trees in order to prevent damage to trunks, branches, and foliage. iv. Soil shall not be excavated, spread, spoiled, or otherwise disposed of within the dripline of trees. v. Trash fires are prohibited. vi. Trenching or boring near protected trees shall be avoided when possible. When necessary, care shall be taken to avoid damaging the tree’s root system by hand trenching. vii. Placement of utilities within the dripline is detrimental to chances of survival on a developed Lot. Where keeping utility lines from within tree canopies is not possible, care shall be taken to protect root system as much as possible. viii. In close areas, where fencing to dripline is not possible, protect trunk by strapping (not nailing) a continuous shield of wood 2”x 4”x 5’ around the trunk and laying plywood on the ground in dripline of tree to prevent compaction of soil by trucks or machinery. No nails, bolts, ropes, or guy wires shall be attached to any trees. ix. Prune trees horizontally using accepted methods to compensate for any loss of root system. x. Fencing. Every effort shall be made to preserve existing trees by adjusting fence lines to weave among, jog around, or abut to trees or stands of trees. No part of a fence may attach to a tree. No tree having a diameter greater than 6" measured 2' above natural grade may be removed for installation of fencing. BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 66 of 76 VI. PROCEDURES & SUBMISSIONS A. General: The process of submitting plan, specifications and samples to the Bridgeland Architectural Review Committee (“ARC.”) is explained in this section. This process is a mechanism for insuring uniform conformance by Builders to the guidelines established to create a new town consistent with the Bridgeland Mission Statement. A clear, direct statement as to acceptability of construction plans will be made to builders who make submissions according to the standards and within the stated review time period. B. Scope of This Document: All new construction, subsequent construction, remodeling with exterior exposure, expansion, and demolition of structures within Bridgeland in general and The Cove and Water Haven in particular, shall be reviewed and approved by the ARC, prior to commencement of any on-site building or construction activity. The ARC may consider any and all exterior elements of design including, but not limited to, size, massing, architectural style, colors, materials, harmony of design and other factors that, in the opinion of the ARC, affect the appearance of the improvement(s) and/or their compatibility with surrounding development. This document specifically applies to the activities of Builders constructing new homes on lots within The Shores, First Bend, The Cove and Water Haven and on which there are no existing structures. A separate yet similar document will govern subsequent activities by homeowners or builders on lots once the initial construction activities have been completed. C. Procedure: The review process begins when a Builder submits an application form with two sets of plans, drawings, specifications and other required information to the ARC for processing. Submissions shall be made to the address listed below. Application forms and information can also be obtained from that address. Bridgeland ATTN: Architectural Review Committee 23720 House Hahl Road Cypress, TX 77433 281-213-9600 Fax: 281-256-7341 The address listed for the ARC may change from time to time in the course of the development of the Bridgeland. BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 67 of 76 D. Required Submission Information: The builder is required to submit the following information to be reviewed by the ARC. i. Architectural a. Floor plans and (all) exterior elevations at a minimum of 1/8”=1’-0” b. Outline specifications with materials/colors list clearly referenced to location c. Statement of House Square Footage ii. Site Plot plan drawing at a minimum scale of 1”=30’ including the following information a. Neighborhood Name, Section Number, Block Number, Lot Number b. Right of way, minimum setbacks & easements c. Actual footprint of house and garage, with dimensions of main elements from property line d. Driveway, patios, walls and any other flatwork, fully dimensioned e. Utility service locations f. Total area of all footprint areas of impervious cover including house and garage footprint g. Location, height and material of each exterior fence or wall h. Any proposed freestanding exterior lighting, including fixture cuts including locations, mounting heights and manufacturer’s catalog photographs of proposed fixtures. i. Any temporary construction facilities such as trailers, storage locations, fences, temporary signs, lights, etc. j. Actual material samples of all exterior wall material and roofing. Complete color combinations of all exterior colors including siding, trim, gutters, downspouts, doors, windows, roof material, etc. E. Quality of Submission Content: It is in the interest of both the Builders and the Developer that this process be a smooth and timely one. Towards that end, the approvals can be facilitated if complete and high quality documentation is provided to the ARC. When an Application is received, it is reviewed for completeness. An Application that is not complete will be returned with an explanation of the reasons for this action. A complete Application will be processed and reviewed by the ARB. F. Submission Timing: Submissions to the ARC for approval may be made at any time. Responses will generally be made within 7 days from receipt, however there is no time restriction and lack of response shall be deemed a rejection. G. Submission Fees: Nominal fees may be established by the Developer in the future to help defray the expenses associated with the review of improvements. The fees are adjusted from time to time and are based on the complexity of the project proposed. A list of current fees can be obtained from the Developer’s office. BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 68 of 76 H. ARC Action on Submittals: The approval process is intended to minimize hardship or undue delays, while facilitating the common goals of the Builders and the Developer. Every effort will be made to review and act upon applications as soon as possible after they are received. Notice of Approval, Conditional Approval or Disapproval of each submission will be returned to the Applicant via email or fax. Construction may proceed immediately following receipt of written Final Approval. I. Variances: Variances to these Standards may be granted by the ARC. Any variance granted will only be applicable to the specified site and conditions for which the variance was granted, only if it has been identified in the submitted plan and specifically approved by the ARC. Granting of such a variance will not modify or change any standards as they apply to other lots or conditions. All variances shall be exercised within one year from the date of approval, or the variance shall be null and void. Upon an application being filed 30 days prior to expiration and for good cause, the ARC may grant an extension of time not to exceed one year J. Appeals: Every aspect of a proposal is carefully weighed and most projects are approved. If a proposed submission is not approved by the ARC, the applicant may appeal the decision to the ARC in writing within 10 days of receipt of the ARC decision. Appeal can be made by addressing a letter to the ARC stating the decision being appealed and the specific objection to the decision. The ARC then hears and rules on appeal as promptly as possible. All decisions of the ARC are final. K. Final Inspection Procedures, Penalties, and Variances: A representative of the ARC must inspect the improvements to verify that they have been constructed in conformance with the Covenants, the approved plans and these Development Standards. The Final Inspection represents a selected portion of the Development Standards; it should not be considered as a total approval of the Development Standards. Each builder is ultimately responsible to make sure every home is built to be in full compliance with these standards. i. Inspection Procedures and Penalties Each Builder is responsible for requesting a Final Inspection on a home once it is completed and before it closes. Anyone who fails to request a Final Inspection before a home closes will be subject to a $500.00 fine. The builder will have ten (10) working days to correct all items listed on the Final Inspection report. It is the builder’s responsibility to request a re-inspection once the necessary corrections have been made. If the issues have not been resolved within ten (10) working days, then all New Construction Submittals (starts) will be put on hold until all inspection items are completed. BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 69 of 76 If a Final Inspection is done before a home closes and there are any un-resolved issues still remaining after the closing and the ten (10) day grace period, those items will be submitted to the Homeowner through the HOA as a request to comply with the New Construction Development Guidelines. All notices sent to Homeowners will include a suggestion that they contact the Builder to make the necessary corrections in order to be in compliance with the New Construction Development Guidelines. The Homeowners will also be informed that it was the Builders responsibility to make sure that all construction requirements were met before the home closed. ii. Variances: When applying for a variance on an issue of non-compliance, the following steps must be followed: a. Submit a written request per address b. List all issues separately per request (i.e. when dealing with the Entry Walls, list Columns, Wing Walls, and Cheek Walls individually) c. Give detailed information per issue as it relates to the Construction Development Standards (i.e. Actual dimensions of a Column as compared to what is required) d. Submit all written requests to: John Stoneham Builder Coordinator P: 281-389-6444 F: 281-256-7341 [email protected] All variance requests will be considered on a case by case basis and issues will be considered individually L. Certificate of Compliance: following the inspection, where the improvements are found to be in conformance with the Covenants, the approved plans and these Development Standards, the ARC will issue a Certificate of Compliance stating that the improvement complies with the Covenants, the approved plans and these Development Standards. Refer to Appendix VII, F M. Certificate of Non-Compliance: Where the improvements are found to not conform, a Notice of Non-Compliance may be recorded in the Harris County Real Property Records, which may require compliance with the Covenants and these Development Standards before the property can be sold. BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 70 of 76 N. Remedies: Additional remedies and enforcement rights exist under the Covenants. The ARC may file suit to obtain an injunction mandating compliance with the Covenants and the Standards. The ARC has the further right, after proper notice to the Owner, to go onto the property where a violation exists, fix or remove the violation, and collect any costs incurred from the Owner. O. Changes In Review Process: The ARC reserves the right to alter the review process in order to ensure an adequate review of all submissions while accommodating the needs of Builders. P. Governmental Regulations: The Covenants and these Development Standards are not intended to permit any action prohibited by applicable laws, rules, or regulations of any governmental authority. Where these Standards contain requirements in addition to or more restrictive than applicable governmental laws or regulations, the provisions of these Standards are binding and enforceable, and prevail over the requirements of such laws or regulations unless these Standards are expressly made unenforceable by law or judicial decisions. Q. Job Site Procedures: i. Trash Containment All lots under construction are required to have two forms of trash receptacles (types A &B). They must be kept on site and maintained during the construction process. Type A – refers to a trash bin that will be used to contain trash material that will most likely be wind-blown from the construction of the home. This material includes but is not limited to shingles, insulation, a/c ducts, and mortar bags. Material such as interior trim and tile will also be placed in this trash bin. The trash bin will have three sides that will be made of heavy gauge wire panel or solid wood material. Orange safety fence will not be accepted unless it is used in conjunction with another material, such as the heavy gauge wire, that will contain the trash in the bin. The dimensions for the trash bin will be 8’ to 10’ long for each panel and a height of 4’ to 6’ for each panel. Heavy material such as lumber and brick should be placed in a single pile on the lot under construction. Any additional small debris left over after trash pick-up should be placed in a trash bin. No random material should be left out around the house. Type B – refers to a trash bin that will be used to contain trash from labor and trade personnel working on the job site (plates, cans, food trash, ect….). This trash bin will be a fifty-gallon plastic drum or similar product that functions in the same capacity. Daily clean up food trash is required in order to reduce the amount of trash that is blown into the streets and neighborhood. Each builder is responsible for enforcing the daily clean up of food trash and making sure that all construction trash around the house is contained. BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 71 of 76 ii. Silt/Mud in Street Each builder is responsible for insuring that every lot under construction has a silt fence installed and maintained along with keeping the street clean by removing any silt or mud that develops. Each builder is also responsible for repairing any silt fence that is damaged on an adjacent lot during construction. This also included the removal of any dirt or mud that accumulates in the street from access to a home under construction via an adjacent lot. iii. Damage to common areas and or cul-de-sac island The builder is responsible for any damages incurred on the common areas and or culde-sacs sustained by their subcontractors or delivery trucks. This includes but is not limited to ruts, planting damage, and or irrigation damage. The builder will either be asked to replace or repair the damaged material or be billed for any damages. R. Lot Mowing Each builder is responsible for ensuring that the lots they own are mowed on a monthly basis. BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 72 of 76 VII. Appendix-I A. Custom Lot Requirements Review i. Chimney Caps are required a. Caps must be masonry ii. Pattern stone, brick or concrete unit pavers on Driveways and Private walks are required a. At a minimum, driveways must be outlined with pattern concrete, stone, flagstone, brick or concrete unit pavers. b. Driveways and Private walks may be constructed entirely of pattern concrete, stone, flagstone, brick or concrete unit pavers. Color sample must be submitted for approval prior to installation. c. Walk edges will follow standard per I. Site Design, G – Walk & Wall Requirements. iii. A 5’ minimum garage eave overhang is required iv. Landscape Plan Submittal is required (refer to landscaping quantities on page 57) v. Dedicated Fence layout plan in required B. Over-sized Custom Lots (Lots over 130’ wide) i. 15’ setback on each side of the lot a. Driveways can encroach in the 15’ setback ii. Garages can not face the street BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 73 of 76 VIII. Appendix-II A. Sidewalks – Required in Cove Section 7, Water Haven Section 8, and the community of Hidden Creek. The following detailed sidewalk is to be built as a four (4) foot sidewalk offset five (5) feet from the back of the curb across the front of the lot, and at the side street on corner lots. When located at Entry Circles or Cul-deSacs, the sidewalk will be three feet-six inches (3’-6”) from back of curb. Refer to the following diagram details for the construction requirements of the sidewalk layout. i. BRIDGELAND DEVELOPMENT STANDARDS 8/8/2012 Page 70 of 70 BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 74 of 76 ii. Expansion joints at 12'-0" o.c.; Control joints at 4'-0" o.c. Expansion joints are 1x4 redwood with a caulk sealant: Sikaflex 2c SL, Color: Limestone, Builders Products (713) 686-8203 4' 4' EJ Reference Bridgeland Concrete Sidewalk Detail 4' CJ CJ EJ EJ CJ CJ EJ ***Sidewalk is Medium Broom Finish, No picture frame.*** 12' EJ EJ CJ CJ EJ EJ CJ CJ distance will vary ***Sidewalk is Medium Broom Finish, No picture frame.*** BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 75 of 76 APPENDIX-III BRIDGELAND NEW CONSTRUCTION DEVELOPMENT STANDARDS 1/16/2014 Page 76 of 76 VE RI D Fi r s tBe nd TheRe s e r v e C BE HA N NN D D EL RI VE D N BE T RS FI 5 ’ Me t a lFe nc e( upgr a de d) Bl oc kNumbe r Spe c i f i e dDr i v e wa yLoc a t i on Legend Fi r s tBe nd: Loc a t i onKe y 3. BUILDERS MUST PLANT A CONTINUOUS SHRUB HEDGE ALONG FENCE LINES ADJACENT TO COMMON AREA RESERVES. 2. ANY LOT WHOSE LAKE FRONTAGE IS GREATER THAN 120 FT. SHALL RECEIVE 4-65 GAL. HARDWOOD TREES. NOTES: 1. ANY LOT WHOSE LAKE FRONTAGE IS LESS THAN 120 FT. SHALL BE PLANTED WITH 2-65 GAL. HARDWOOD TREES. COVE LA NE DRIVE ENGLE COVE CIRCLE ED GEW OO D V CO E IV VE E CO DR N VE HA E N LA SIDE RESTRICTED RESERVE A 40 83 LA E G DR IV ND IN CIRCLE ROYAL COVE CIRCLE 81 79 80 44 31 32 33 34 35 36 37 38 39 30 29 28 47 48 74 49 73 72 71 56 70 54 69 15 16 17 18 19 20 21 22 RESTRICTED RESERVE D 9 14 13 12 11 10 8 3 4 7 5 6 RESERVE C COVE HARBOR LANE 57 55 58 1 2 59 63 64 65 66 67 68 60 MOON LIGHT COVE CIRCLE D R 21 20 BRIARWOOD COVE CIRCLE RESTRICTED RESERVE A D R IL L S IT E 61 62 E IV DR COVE SPRINGS COURT K WATERSIDE ESTATES (SEC. 7) RESTRICTED RESERVE E 27 26 25 24 23 46 COVE FOREST DRIVE 45 COBBLE COVE CIRCLE RESERVE B CREST COVE DRIVE SUSNSET COVE (SEC. 6) 82 E CO V IV CO VE SP RI N GS VE P AR VE LAKESIDE HAVEN DRI COLDWATER COVE LANE L I VE O A K GLEN KE LA COVE DRIVE COVE RIDGE LANE 17 1 R O O K VE CO E RIV D VALLEY COVE DRIVE 16 3 15 14 RESTRICTED RESERVE A CHESTNUT COVE CIRCLE 42 41 23 22 RESTRICTED RESERVE B BLUE COVE LANE 2 14 15 4 5 6 13 12 11 COVE POINTE DRIVE 3 VILLAGE COVE COURT 7 10 8 9 9 8 10 VILLAGE COVE 7 11 6 12 LANE 4 13 5 12 11 6 10 7 8 9 RESTRICTED RESERVE B 10 12 37 5 38 4 14 11 RESTRICTED RESERVE D 13 40 25 24 39 COVE 38 28 37 LA NE BE ND 27 29 36 35 0 100 34 33 RESTRICTED RESERVE E 40 2 200 32 39 3 15 1 PIONEER COVE (SEC. 2) BR ID PIONEER COVE CIRCLE BRIAR COVE (SEC. 4) COVE BLUFF COURT 19 CYPRESS COVE PARK CIRCLE B LIFT STATION EMERALD COVE (SEC. 5) 1 18 E IV DR VE K CO BLACDRIVE FOR ILLUSTRATIVE PURPOSES ONLY. COVE 400 23 SO 22 6 UTH 7 6 5 21 5 NY 8 LO CO 4 3 2 SH 1 7 8 6 E OR DR 4 20 9 IVE 4 19 3 7 12 13 5 10 9 7 OM SH 4 OR 2 5 RIV 5 18 13 2 7 8 1 24 9 16 8 18 9 14 4 4 17 22 14 12 16 3 13 23 8 3 17 16 EL OR AN 11 15 SH 6 17 18 19 20 21 2 7 19 2 1 3 4 1 4 18 2 10 1 3 2 1 8 22 6 19 17 7 16 8 1 15 9 2 14 18 87 20 79 78 77 5 74 24 75 76 8 19 23 20 4 NUT T A L L O A K July 6, 2011 Bridgeland Development, L.P. a project developed for “The Cove” Street Tree Plan K a t y, Te x a s 77494 281.646.1641 Fax Suite A-250, WA T E R OA K 23501 Cinco Ranch Boulevard, Phone 281.646.1602 BRIDGELAND 20 9 21 3 U JU CO NCT URT ION 5 9 7 6 5 4 3 2 BA YO D OA 10 1 R DS 5 1 WEST SETTLERS SHORE CIRCLE 12 14 22 18 21 2 20 GAIL SHORE DRIVE 2 15 11 DR. 1 NORTH THOMAS SHORE 13 21 3 1 11 17 16 15 10 COLONY SHORE CIRCLE 11 25 10 15 E 20 ED 19 AS N. COLONY SHORE DR. 6 11 12 10 3 6 TH RTH JUNIORS MAP COURT 6 14 26 7 5 12 E RIV FINAL DESIGN SOLUTIONS ARE SUBJECT TO CHANGE SIDE ED THIS DRAWING DEPICTS CONCEPTUAL LANDSCAPE IMPROVEMENTS PARK D R ILL S IT E EGR ET COVE AUDUBON COVE CIRCLE DR CO WHISPER COVE (SEC. 3) TERRACE COVE LANE OR SH L A UR EL O A K S H U MA R D O A K VE CO E SS COMMERCIAL COMMERCIAL TH BRI R DGELAND PA ANGLER COVE (SEC. 3) ER GL AN BREE ZEWA Y CO VE DR IVE NOR IV E DR CO VE BR O OK Y KWA 11 NO LA UR E L OA K W A TER O A K LL RD . NU TT A LL OA K EN MI SH UM A R D O A K VE BORD LI V E O AK CO K OO G VE DRIVE CO DRIVE E G BR DRIVE VE DIN LAN GS E E RE DRI SPRIN PR IV D OA Y SHO BORD EN SH ORE CIR. STREET TREE PLANTING LEGEND LR AH EDGEWOOD COVE DRIVE US EH COLON HO WEST IVE VE DR ER CO BUNK Y SHORE DRIVE CY ICE DRI VE COVE CT. NER S VO COVE ORE SH SHOR ELAN DS RD . AS EAST COLON OM H TH PART RT NO NY LO CO FULL ERS GRA NT CO URT SHORELANDS ROAD K DRIVE COVE CREE DRIVE D R U MM O N D R ED M AP LE L A UR EL OA K FINAL DESIGN SOLUTIONS ARE SUBJECT TO CHANGE FOR ILLUSTRATIVE PURPOSES ONLY. THIS DRAWING DEPICTS CONCEPTUAL LANDSCAPE IMPROVEMENTS D R UM M O N D RE D M A PLE L A CE B A RK EL M S HU M A R D O A K LA C EBA R K E LM N U TT AL L OA K W A T ER OA K SH UM A R D O A K L I V E O AK STREET TREE PLANTING LEGEND MOONLIT HAVEN (SEC. 7) ND L AY ARKW A KE P E HAVEN DRIVE ARBOR HAVEN (SEC. 8) LAKESID MEADOW HAVEN (SEC. 5) MILL HAVEN (SEC. 4) ELA RIDG TH B NOR DR IVE EN HAV IVE DR LAKE HAVEN (SEC. 9) EN AV EH SID BROOK HAVEN (SEC. 6) D RI L L SITE KE LA PINE HAVEN (SEC. 10) SHADY HAVEN (SEC. 2) HOUSE HAHL ROAD PARKS ID E MASON OAD MASON R PARKSIDE HAVEN DRIVE ROAD 0 100 200 400 WA T ER OA K NUT T A LL OA K K a t y, Te x a s 77494 281.646.1641 Fax Suite A-250, July 6, 2011 Bridgeland Development, L.P. a project developed for “Water Haven” Street Tree Plan Bridgeland L IVE O A K L A UREL O A K 23501 Cinco Ranch Boulevard, Phone 281.646.1602 8 16 7 12 6 7 14 13 11 15 10 8 9 9 14 13 12 11 10 6 16 1 5 15 5 4 2 2 3 1 Fence layout chacon creek section 5 3 4 K a t y, Te x a s 77494 281.646.1641 Fax M ONT ERR EY OAK L AUR EL OA K January 12, 2012 Bridgeland, L.P. a project developed for “HIDDEN CREEK” Street Tree Plan Bridgeland SH UM ARD OAK LIV E OAK N UTTAL O AK MONTERREY OAK NUTALL OAK SHUMARD OAK LAUREL OAK L IV E O A K STREET TREE PLANTING LEGEND FINAL DESIGN SOLUTIONS ARE SUBJECT TO CHANGE FOR ILLUSTRATIVE PURPOSES ONLY. THIS DRAWING DEPICTS CONCEPTUAL LANDSCAPE IMPROVEMENTS Suite A-250, .#0&5%#2'#4%*+6'%674' -)#&'(14'56&'5+)0..% 23501 Cinco Ranch Boulevard, Phone 281.646.1602 125’ 250’ 500’ SCALE: 1”= 500’ 0’ Section 5 Rejected Notes Results sent to Builder on: __________________ Legal: ________ Contact Number: ___________ Items must be corrected by the Builder within 10 days of notice. Please submit checklist for re-inspection once items have been corrected. This Final Inspection represents a selected portion of the Development Standards, as listed above; it should not be considered as a total approval of the Development Standards. Each Builder is ultimately responsible to make sure every home is in full compliance with the Development Standards. Inspection Date: _______________________ Exterior lighting is in compliance. Exterior elements are in compliance. Public sidewalk is installed correctly/completely. Driveway entry width correct. Brick outlining private walk. Pad(s) width correct. Entry wall layout is correct. Private walk width correct. Correct amount of shrubs installed. (If needed correct side yard landscaping is planted.) (If needed correct rear yard landscaping is planted.) Correct street tree/size is installed (Street Sign). Shade tree quantity, and type, and size are correct. Correct amount of ornamentals/size installed. Fencing is constructed/located correctly (corner clip). Approved Address: ____________________ Builder: ______________ Item Roof pipes, vents, louvers, flashing and utility equipment have been painted to match the surface from which they project. Mechanical/utility equipment and any service areas are screened from public view. Chimney cover used. Contact Name: _____________ Date: __________ Email [email protected] for all final inspection requests. Bridgeland – Lakeland Village - Final Inspection Checklist ARCHITECTURAL CONTROL COMMITTEE 23720 House Haul Rd Cypress, TX 77433 (281)-213-1102 (281)-256-7341 NEW CONSTRUCTION SUBMITTAL FORM This form must be completed in its entirety. Date Submitted: SUBMITTED BY: Builder: Contact: E-mail: Phone: Fax: PLOT PLAN INFORMATION: Address: Lot Plan Number: ________ Elevation: _________ Block Section Base Total Living Square Footage: ____________ Total Living Square Footage with Plan Options: _____________________________ Stories: _______ Half Story: ______ Bedrooms: ________ Baths: ________ Half Baths: _____ Garage: Attached ___ Detached ___ # of cars ___ Brick: Manufacture _________ Color _______ Stone: Manufacture _________ Color _______ Paint: Manufacture __________ Color _______ Roof: Manufacture __________ Color _______ START INFORMATION: Start Type: Buyer ___ Spec ___ Estimated Start Date: _________ Estimated Completion Date: _________ Please be advised that this letter reflects only the opinion of the ARC with regard to review of the plan for compliance with the Declaration of Covenants, Conditions and Restrictions and the Development Standards for Lakeland Village, Bridgeland. The opinion does not imply that the plans are functionally or mechanically sound. All builders remain responsible for construction of any residence to be in full compliance with the Declaration of Covenants, Conditions and Restrictions and the Development Standards for Lakeland Village, Bridgeland and any local, state or national building codes or requirements that may be applicable. The builder is also responsible for insuring that adjacent homes do not have identical brick or exterior colors. Approved ___ Disapproved ___ Developer’s Comments: _____________________________________________________________________________ _____________________________________________________________________________ _____________________ Approval Signature __________ Date ARCHITECTURAL CONTROL COMMITTEE 23720 House Hahl Road Cypress, Texas 77433 (281)-213-1102 FAX (281)-256-7341 NEW PLAN SUBMITTAL FORM Date Submitted: SUBMITTED BY: Builder: _______________________ Contact: ____________________ Phone: ____________________ E-mail: ____________________ Fax: ______________________ PLAN INFORMATION: Plan Number: ________ Base Living Square Footage: _____________ Elevation(s) Stories: _______ Total Living Square Footage (including any options) Half Story: ______ Bedrooms: ________ Garage: Attached ___ Detached ___ Baths: ________ Half Baths: _____ # of cars ___ COMMUNITY / SECTION(S) IN WHICH PLAN WILL BE BUILT: *Bridgeland will be composed of four residential Villages. Each Village is composed of a series of Communities. Each Community is composed of a series of Neighborhoods (sections). Community______________ Section __________________ Lot Width ______ Please be advised that this letter reflects only the opinion of the ARC with regard to review of the plan for compliance with the Declaration of Covenants, Conditions and Restrictions, and the Development Standards for Bridgeland. The opinion does not imply that the plans are functionally or mechanically sound. All builders remain responsible for construction of any residence in full compliance with the Declaration of Covenants, Conditions and Restrictions and Development Standards for Bridgeland and any local, state or national building codes or requirements that may be applicable. Approved ___ Disapproved ___ Developer’s Comments: _____________________________________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________ _____________________ Approval Signature __________ Date SFU STRUCTURED WIRING REQUIREMENTS FOR U-VERSE The Builder agrees to provide Structured Wiring (“SW”) within each Home of a U-verse Subdivision based on the following definitions and in accordance with the following specifications: I. HOME MAIN DISTRIBUTION FACILITIES (“HMD Facilities”): HMD Facilities include Underwriters Laboratories (UL) Listed CAT-5e Universal Twisted Pair (UTP) 4-pair cables and Tri or Quad-Shield RG-6 coax cables, and are used to provide Voice, Internet Access and Video services into the Home. HMD Facilities are placed between the AT&T demarcation point, usually located on the exterior of the Home, and the Central Wiring Panel (CWP) usually located inside the Home. Depending on the type of facilities AT&T uses to serve the Home, the AT&T demarcation point will be referred to as either the fiber-fed Optical Network Terminal (ONT), or the copper-fed Network Interface Device (NID). All SW served Homes must be equipped with the following HMD Facilities: A. Two UL Listed CAT-5e UTP 4-pair homerun cables between the NID or ONT usually located on the exterior of the home, and the CWP usually located inside the home. B. One Tri or Quad-Shield RG-6 homerun cable between the NID or ONT usually located on the exterior of the home, and the CWP usually located inside the home. In addition, fiber-fed Homes will be equipped with a fiber-fed ONT and will require an AC Power Feed. See Section II, paragraph C – AC Power Feed for information about the AC power feed required to power the ONT. II. HOME INSIDE WIRE (“HI Wire”): The HI Wire is placed between the CWP and the Voice, Internet Access, and Video outlets within the Home. All SW served Homes must be equipped with the following HI Wire facilities: A. Voice/Internet access Outlets within the Home: Minimum of Two Voice/Internet access outlets All Voice/Internet access outlets must be wired and equipped per bullets 1 – 3 below: 1) A minimum of One, and recommendation of Two UL Listed CAT-5e UTP 4-pair homerun cables between the CWP and each Voice/Internet access outlet. 2) Outlets should include ports for RJ11 & RJ45 3) Outlets should be within 3’ of a Standard, Duplex 110V AC Nonswitched, Grounded outlet B. Video Outlets within the Home: Minimum of Two (2) Video Outlets per Home All Video Outlets must be wired and equipped per bullets 1 – 4 below: 1) One UL Listed CAT-5e UTP 4-pair homerun cable between the CWP and each Video Outlet 2) One Tri or Quad-Shield RG-6 homerun cable between the CWP and each Video Outlet 3) Outlets should include ports for RJ45 & F-Connector 4) Outlets should be within 3’ of a Standard, Duplex 110 AC Nonswitched, Grounded outlet C. AC Power Feed: Fiber-fed Homes will be equipped with a fiber-fed ONT and will require an AC Power Feed used to poser the ONT from an Uninterruptable Power Supply (UPS) that AT&T will mount in a controlled environment (320 – 1130 F) inside the Home, and within a maximum distance of 100’ from the ONT. The Builder agrees to provide the following in each fiber-fed Home: 1) One UL Listed 16 gauge stranded copper 1-pair cable should be installed during construction, between the ONT and a builder selected Standard, Duplex 110V AC Non-switched, Grounded outlet in a controlled environment and within a maximum distance of 100’ from the ONT. MDU STRUCTURED WIRING REQUIREMENTS FOR U-VERSE 1. New Construction: The wiring installed by the Builder within each residential Unit shall be installed in a star configuration from the central wiring panel to each communications outlet. The following are the Builder Wiring Requirements within each Unit: i. ii. One (1) 4-pair CAT 5e cable should be placed between each Voice/data jack and the central wiring panel; and One (1) tri-shield RG6 cable or one 4-pair CAT 5e cable should be placed between each video jack and the central wiring panel.