Hugues Berthet - Baltic Ports Organization
Transcription
Hugues Berthet - Baltic Ports Organization
Shore connection solutions Plug in to green power Baltic Port Organization Ystad, April 2015 Hugues Berthet Shore Connection www.schneider-electric.com/shore-connection Business Development1 Director Such as airports, there are several years, Ports are currently their revolution to limit pollution and the impact on the environment 2 Shore connection general overview Up to 66% Savings Electrical network Existing or New substation Frequency adaptation And safety operation 0 Cable dispenser to ship connection Emission Noise Vibration Ship to supply ShoreBoxTM Container ship Hinterland Energy provider Shore Port Terminal To Quay Shore / Ship Interface Ship Ship 3 Shore connection general overview Up to 66% Savings Electrical network Existing or New substation Frequency adaptation And safety operation 0 Cable dispenser to ship connection Emission Noise Vibration Ship to supply ShoreBoxTM Ferry, RoRo Cargo G Cruise Hinterland Energy provider Shore Port Terminal To Quay Shore / Ship Interface Ship Ship 4 Main Interface Requirements HVSC Main Standard : IEC / ISO / IEEE 80005-1, HVSC IEC / ISO / IEEE 80005-2, Com. Protocol IEC / ISO / IEEE 80005-3, LVSC Container ship Plugs & Sockets outlets IEC 62 613, Plugs & Sockets Outlets Interface Voltage MV : 6,6 / 11kV, (+ 6% / - 3,5%) LV : 400 / 440V / 690V, (+ 6% / - 5%) Basket of Ships Power Demand MV : 1MVA up to 20MVA LV : <1MVA, 350A maxi per plug Ferry, RoRo Cargo Cruise Frequency on Board: 50Hz / 60 Hz Compensation Tide System : 9m Distance between ShoreBoX to connection point : LV / 300 m maxi & MV No limit 5 Our Solution Offer Plug in to Green Power Shore Connection Solution 6 3 Years of tests to learn the behaviour of a global Solution in 3 test platforms 1 Montbonnot Platform GFC • 10 GFC //, 5 MVA • Genset 1 MVA • Network Synchronization • General behaviour 2 Eybens Simulation Platform • HVAC • Fans • LV Automation Control Command 3 Volta Lab Final test in Lab • Test at In, 3 MVA • TVD • Type tested • Safety loop • Interface Shore / Ship • Adaptation to Ship 7 A complete platform to test & simulate 5 MVA 10 GFC in // Ship Loads 1 MVA Ship generator Test platform Energy management 8 An Integrated System is prefabricated & industrialized This is not a car But spare parts This is a car performed entirely by a manufacturer with a guarantee of performance over the duration of its life cycle 9 10 An Integrated System is MV – 50 Hz a prefabricated electrical substation Knowledge, Return on Experience, Port Context Usage values 2,3 MVA 400V – 50 Hz Upstream LV busbar RM6 SM6 Premset GFC 7000 Downstream Busbar 2 MVA Transformer 400V – 60 Hz 6,6 kV MV plug To ship GFC Galaxy 7000 Standard Product Standards compliant 6,6 kV – 60 Hz 11 Schneider Electric worldwide references Bergen Riga Marseille Los Angeles Tanger Casablanca Kalibaru 12 13 Helsinki Viking Line ShoreBoX overview Electrical network LV Cable dispenser Cable to ship connection Ship to supply ShoreBoxTM Safety operation & Energy Management G Hinterland Utility Viking Line Terminal Interface Shore to Ship Ship Gabriella Mariella 14 OSV connection at Port of Bergen ● All in one ShoreBoX, 1 MVA ● Operational middle of 2015 ● Supply electricity to OSV Offshore Supply Vessels at berth ShoreBoX 15 9th March 2015 Containership terminal at Port of Riga ● Port: Riga, Latvia ● Ship type: Containership ● Offer: 2x2MVA ShoreBoX with frequency conversion Berth under construction ShoreBoX shipped from France 16 Future Kalibaru Container Terminal • Existing port does not have the capacity to host the increasing sea freight volumes • Development of the new KCT (Kalibaru Container Terminal) started in March 2013 • Future capacity 13 M 20-foot containers / year • First phase is scheduled for completion in late 2017 • When fully operational, it will be the country’s largest industrial port and the 3rd in South East Asia ● New green, modern port in South Asia ● First phase includes 9 berths equipped with Schneider Electric 5-MVA shore connection systems ● 2nd and 3rd phases will equip berths with shore connection as well Future Kalibaru Container Terminal 17 Navy ship connection at Port of Toulon • Facility to provide 60hz to the base network • First installation to be operational in 2015. • 2x ShoreBoX MV-> MV 4MVA with frequency conversion • 2 types of ships connected , BPC 2,2MVA & FREMM 1,2MVA ShoreBoXTM 18 Moroccan Navy Port The ShoreBoX leaving the factory beginning of January 2014 During the commissioning, end of January 2014 The ShoreBoX installed and fully operational The customer has passed another order for an equivalent system for another Moroccan Navy Port FREMM French Frigate 19 CMN Marseille south of France ● Customers need: Supply 3 Ferries ● 3 Berths : Poste 68, 70 & 74 ● Voltage on Port : 20kV in substation ● Power per ship : 1,8MVA, 11kV ● 50hz (no frequency conversion) 20 CMN Ship modification in Marseille France January 2015 5 2 1 4 1 2 5 3 1 Incomer 2 MV Premset Cubicle 3 Transformer if reauired 4 Main Switchboard 5 Bridge 1 1 3 1 3 3 3 2 21 Plug in to Green Power Thank you for your attention Shore Connection Solution At your disposal [email protected] Mobile : +33 6 08 56 54 41 22