Pilbara Iron Ore Project - Sydney Investor
Transcription
Pilbara Iron Ore Project - Sydney Investor
Pilbara Iron Ore Project Prefeasibility on track Kevin Wills Managing Director Right commodity Right address Right project Right timing * Please refer to Slide 21. FLINDERS MINES Iron ore Pilbara Potential for 113Mt DSO ore and low-cost mining* Option for fast track start 2012 PILBARA IRON ORE PROJECT - SYDNEY INVESTOR PRESENTATION 26 MARCH 2010 1 Location of projects 0 BROOME PORT HEDLAND DAMPIER PILBARA IRON ORE REGION MINES Pilbara 400 km 200 FLINDERS PILBARA HEMATITE PROJECT •175km south of Dampier •550Mt Indicated and Inferred Resource* •CID and BID hematite •Prefeasibility in progress Pilbara Drilling TOM PRICE WESTERN AUSTRALIA MIDWEST IRON ORE REGION MOUNT MAGNET GERALDTON CANEGRASS MAGNETITE PROJECT KALGOORLIE-BOULDER PERTH ESPERANCE Canegrass •370km E of Geraldton •Exploration Target* of 1.7 to 3.0Bt of 20-40% magnetite •Soft gabbro host rock – low energy costs Canegrass Drilling ALBANY * Please refer to Slide 21. PILBARA IRON ORE PROJECT - SYDNEY INVESTOR PRESENTATION 26 MARCH 2010 2 Development highlights FLINDERS MINES • Two significant iron ore projects – Pilbara (Blacksmith hematite) and – Mid West (Canegrass magnetite) Company making potential • Non iron assets moving to Flinders Exploration Limited (FEX) IPO • $59.0M cash in bank at 22 March 2010 • WorleyParsons undertaking Prefeasibility Study (PFS) – on track • Bankable Feasibility (BFS) planned to start Q4 2010 PILBARA IRON ORE PROJECT - SYDNEY INVESTOR PRESENTATION 26 MARCH 2010 3 Project highlights FLINDERS MINES • Pilbara 550Mt iron ore Indicated and Inferred Resource* at 55.6% iron • Delta 113Mt Indicated and Inferred Resource* of lower CID and BID at 58.5% iron – potential direct shipping ore • Metallurgical and beneficiation testwork underway • Mining studies underway suggesting low cost mining • Several short and long-term infrastructure options due to location and Pilbara developments eg WA Government recently backed new multiuser port at Anketell * Please refer to Slide 21. PILBARA IRON ORE PROJECT - SYDNEY INVESTOR PRESENTATION 26 MARCH 2010 4 Corporate FLINDERS MINES Shares on issue Shareholders 1,819 million 13,503 Now included in S & P/ASX 300 Metals and Mining Index ASX Emerging Companies Index Recent trading 22.3.2010 Shares 13.0 cents Share price and volume – past 6 months Market capitalisation $237 million Cash in hand $59 million Top 20 shareholders 481M shares 26.5% PILBARA IRON ORE PROJECT - SYDNEY INVESTOR PRESENTATION 26 MARCH 2010 5 Executive team FLINDERS MINES Kevin Wills Gary Sutherland Nick Corlis David Godfrey Mick Anstey Managing Director General ManagerProjects Exploration Manager Chief Financial Officer Manager HSE & Risk Appointed Appointment in progress Manager Project Services Mining Manager PILBARA IRON ORE PROJECT - SYDNEY INVESTOR PRESENTATION 26 MARCH 2010 6 Pilbara Iron Ore Project (PIOP) To Dampier 185 km Inferred Resource ou o r do bu ara -P i er ay ilw mp Ra Da ab Blacksmith Delta Champion Anvil • E47/882 – 108 sq km • Five deposits 550Mt* –– Ajax, Blackjack, Champion, Delta, Eagle • Scoping Study suggests focus on Delta – highest grade/lowest stripping ratios • 19km from Dampier – Paraburdoo railway • Additional resource expected Ajax Blackjack MINES Blacksmith Indicated Resource m 9k t1 FLINDERS Eagle Anvil 0 5 km To Tom Price 40 km * Please refer to Slide 21. To Paraburdoo 130 km • E47/1560 – 44 sq km • Resources in new Global resource – expected April 2010 PILBARA IRON ORE PROJECT - SYDNEY INVESTOR PRESENTATION 26 MARCH 2010 7 Delta Valley perspective view to southwest FLINDERS MINES Delta Valley resource area N PILBARA IRON ORE PROJECT - SYDNEY INVESTOR PRESENTATION 26 MARCH 2010 8 Key rock types FLINDERS MINES Overburden Basement - BIF CID BID 50m 50m Note: Section is diagrammatic Overburden (OBD) Waste Channel iron deposit (CID) Ore Bedded iron deposit (BID) Ore Banded Iron Formation (BIF) – Basement Waste PILBARA IRON ORE PROJECT - SYDNEY INVESTOR PRESENTATION 26 MARCH 2010 9 Outcropping Bedded Iron Deposits FLINDERS MINES Delta Deposit Outcropping BIF – basement Area of outcropping BID Cover overlying CID PILBARA IRON ORE PROJECT - SYDNEY INVESTOR PRESENTATION 26 MARCH 2010 10 Global Resource MINES Tonnage Mt Fe % SiO2 % Al2O3 % P % LOI % +50% 550.1 55.6 9.6 4.6 0.07 5.7 117º25' Indicated and Inferred* Open Open • 1022 holes / 50,519m Open Open Open 520 Open Champion Open 439 Open E47/882 518 Open Blackjack Open 441 Total drilling to date Ajax Open Open Delta Blacksmith Camp Open (BID intersection outside Inferred Resource) RC Drillhole Exploration Tenement 0 1 km Open Eagle 116 115 RC Drillhole Open Open mineralisation * Please refer to Slide 21. Indicated Resource (+50% Fe cutoff) Inferred Resource (+50% Fe cutoff) Resource estimates by Golder Associates Pty Ltd • 721 RC holes / 35,480m • 32 metallurgical drill holes 2009 Drilling 117º30' Iron Grade Cut-off JORC Classification FLINDERS PILBARA IRON ORE PROJECT - SYDNEY INVESTOR PRESENTATION 26 MARCH 2010 11 -22º10' Delta activities FLINDERS MINES RC drilling Diamond drilling Geophysical logging RC chip logging Core logging Blacksmith camp PILBARA IRON ORE PROJECT - SYDNEY INVESTOR PRESENTATION 26 MARCH 2010 12 Delta Indicated and Inferred Resource Si % Al % P % LOI % 50% cutoff – Indicated and Inferred* 0 Lower CID 54.7 59.7 6.2 4.4 0.06 2.9 BID 58.3 57.4 4.7 2.9 0.13 9.4 Total 113.0 58.5 5.4 117°30' Fe % 3.6 0.10 6.3 MINES 117°28' Mt FLINDERS -22°08' 500 m rm A rth o N E47/882 57% cutoff – Indicated and Inferred* 50.5 59.9 6.1 4.3 0.06 2.9 BID 33.1 58.5 3.9 2.7 0.13 8.9 Total 83.6 59.3 5.2 3.7 0.09 5.3 Delta Open Lower CID ut o S rm A h Open * Please refer to Slide 21. •Inferred resource hole spacing 500 x 100m •Indicated resource hole spacing 125 x 100m •381 RC drillholes for 21,577m Completed RC drillhole Open mineralisation Indicated Resource (+50% Fe cutoff) Inferred Resource (+50% Fe cutoff) Original Exploration Target Exploration licence PILBARA IRON ORE PROJECT - SYDNEY INVESTOR PRESENTATION 26 MARCH 2010 13 Delta Orebody FLINDERS MINES Cross sections Plan view of block model Distribution – Lower CID Distribution – BID Resource estimation Block model has 44,576 mineralised blocks of 25 x 25m N & E, 2, 4 or 6m RL slices. PILBARA IRON ORE PROJECT - SYDNEY INVESTOR PRESENTATION 26 MARCH 2010 14 Metallurgical testwork Unconfined compressive strength (UCS) Screen to lump and fines Crushing work index (CWI) Size by size analysis Head assay BOND abrasion index (BAI) Bulk density Lump to fines ratio Heavy liquid separation • Logging completed –– Photographic Ore composition testwork Individual ore type testwork (PQ3 83mm) Crush to -33mm MINES Current Status • Drilling completed, 32 holes Diamond drill core In situ specific gravity FLINDERS –– Geophysical –– Geotechnical • Phase 1: results available • Phase 2: assessment being prepared 1. UCS = a measurement of the true rock strength. 2. CWI = measures the relative resistance of the rock to the impact of a crusher. 3. BAI = determines the abrasiveness of the ore PILBARA IRON ORE PROJECT - SYDNEY INVESTOR PRESENTATION 26 MARCH 2010 15 Delta – Mining benefits FLINDERS MINES • Open cut low cost mining possible • Majority of mining above water table ie dry • Potential for low waste/ore ratios • Early testwork indicates most of orebody is free dig • Proximity to existing infrastructure • Multiple infrastructure options available • Additional high-grade DSO/BID expected • Fast track option under consideration for production in 2012 PILBARA IRON ORE PROJECT - SYDNEY INVESTOR PRESENTATION 26 MARCH 2010 16 Conceptual development timetable options 2009 Scoping study complete 2010 2011 2012 FLINDERS MINES 2013 t Prefeasibility study (PFS) t Potential fast track decision Bankable feasibility study (BFS) Design and construct Operation DSO (Direct shipping ore) path Commence production late 2012 Beneficiation and infrastructure path Commence production late 2013 PILBARA IRON ORE PROJECT - SYDNEY INVESTOR PRESENTATION 26 MARCH 2010 17 0 INDIAN 20 km Dampier Cape Lambert Karratha Karratha Balla Balla Balla Balla Roebourne Roebourne Whim Whim Creek Creek API IRON ORE TENURE FMS Tenements FMG Tenements RIO Group Tenements Aquila Tenements Railway Sino Sino p Ca b am eL ert ica on aw n n Pa Pannawonica Pannawonica Da Mesa JJ Mesa Robe Robe Mesas Mesas API BLACKSMITH Kens Kens Bore Bore Cardo Cardo Bore Bore North North Cardo Cardo Bore Bore East East Catho Catho Well Well ANVIL Upper Upper Cane Cane Trinity Trinity Bore Bore bu r do o Caliwingina Caliwingina Bungarroo Bungarroo Ck Ck Existing FMG (Proposed) Aquila/API (Proposed) Railway Cochrane/Jewel Cochrane/Jewel FMG Homestead Homestead Silvergrass Silvergrass Major Iron Ore Deposits Ports (Existing) Ports (Proposed) Localities Roads RAILWAYS FMG mp ier Pa ra -22° MINES Anketell OCEAN Cape Preston FLINDERS 118° 116° Infrastructure options Serenity Serenity Solomon Solomon Firetail Firetail East East • Well located with respect to existing infrastructure • PFS considering seven potential infrastructure options • Ideally located for numerous long term proposed infrastructure development solutions, both rail and port Nammuldi Nammuldi Brockman Brockman 22 PILBARA IRON ORE PROJECT - SYDNEY INVESTOR PRESENTATION 26 MARCH 2010 18 Project milestones Milestone FLINDERS MINES Targeted Commence exploration November 2007 Orebody discovery August 2008 First Inferred Resource April 2009 Scoping study August 2009 First Indicated Resource February 2010 First mining plan April 2010 Complete PFS Q4 2010 Fast Track Option (FT) Complete FT BFS June 2011 FT Ministerial approval June 2012 Complete FT design and construction October 2012 FT operation December 2012 Beneficiation and Infrastructure Option (B&I) Complete B&I BFS September 2011 B&I Ministerial Approval September 2011 Complete B&I design and construction September 2013 B&I operation December 2013 Achieved PILBARA IRON ORE PROJECT - SYDNEY INVESTOR PRESENTATION 26 MARCH 2010 19 Project standouts FLINDERS MINES • Part of Pilbara Iron ore province • WorleyParsons undertaking PFS – on track – BFS to commence Q4 2010 • Large Global resource of 550Mt* part requires beneficiation • 113Mt* of Potential DSO Resource at Delta • Dry mining, free diggable ore and low waste leads to low mining costs • Infrastructure options available – WA Government recently backed new multiuser port at Anketell • Fast track option – potential production in 2012 * Please refer to Slide 21. PILBARA IRON ORE PROJECT - SYDNEY INVESTOR PRESENTATION 26 MARCH 2010 20 Compliance statements Disclaimer FLINDERS MINES Exploration Targets This presentation is designed as a general overview of Flinders Mines Limited’s (FMS) activities. You should not make an investment decision with respect to FMS based solely on this presentation. The presentation contains forward looking statements that are subject to risk factors associated with the exploration and mining industry. It is believed that the expectations reflected in these statements are reasonable, but they may be affected by a variety of variables which could cause actual results or trends to differ materially. JORC Compliance Exploration Targets are reported according to Clause 18 of the JORC Code. This means that the potential quantity and grade is conceptual in nature and that considerable further exploration, particularly drilling, is necessary before any Identified Mineral Resource can be reported. It is uncertain if further exploration will lead to a larger, smaller or any Mineral Resource. Resources 550Mt Global Resource comprises 157Mt Indicated @ 56.5% Fe and 393Mt Inferred @ 55.1% Fe. Delta Indicated and Inferred Resource Mt Fe Si % % Al % P % LOI % 50% cutoff – Indicated and Inferred Competent Person The information in this report that relates to Exploration Results, Mineral Resources and Ore Reserves is based on information compiled by Dr K J A Wills (who is a Fellow of the Australasian Institute of Mining and Metallurgy) and Mr N Corlis (who is a member of the Australian Institute of Geoscientists). Dr Wills and Mr Corlis are employees of Flinders Mines Limited. Both have sufficient experience that is relevant to the style of mineralisation and types of deposit under consideration and consent to inclusion of the information in this report in the form and context in which it appears. Dr Wills and Mr Corlis qualify as Competent Persons as defined in the 2004 Edition of the “Australasian Code for reporting of Exploration Results, Mineral Resources and Ore Reserves”. Lower CID BID Indicated 43.3 59.8 6.1 4.4 0.07 3.0 Inferred 11.4 59.2 6.7 4.5 0.05 2.8 Indicated 49.9 57.7 4.4 2.9 0.13 9.3 8.4 113.0 55.5 58.5 6.6 5.4 2.8 3.6 0.12 0.10 10.5 6.3 Inferred Total 57% cutoff – Indicated and Inferred Lower CID BID Total Indicated 40.6 60.0 6.0 4.2 0.07 2.9 9.9 59.6 6.4 4.3 0.05 2.7 Indicated 32.8 58.5 3.9 2.7 0.13 8.9 Inferred 0.3 83.6 57.8 59.3 5.5 5.2 2.4 3.7 0.12 0.09 8.7 5.3 Inferred PILBARA IRON ORE PROJECT - SYDNEY INVESTOR PRESENTATION 26 MARCH 2010 21 Finale FLINDERS MINES Right commodity Iron ore Right address Pilbara Right project Potential for 113Mt DSO ore and low-cost mining Right timing Option for fast track start 2012 For further information please visit our website at www.flindersmines.com or contact: Kevin Wills on 08 8132 7950 or 0419 850 997 Email: [email protected] 62 Beulah Road Norwood South Australia 5067 Telephone 08 8132 7950 Duncan Gordon - Investor relations on 08 8232 8800 or 0404 006 444 Email: [email protected] PILBARA IRON ORE PROJECT - SYDNEY INVESTOR PRESENTATION 26 MARCH 2010 22