idp - city of Johannesburg
Transcription
idp - city of Johannesburg
CITY OF JOHANNESBURG DRAFT 2009/10 INTEGRATED DEVELOPMENT PLAN (IDP) REVISION 1 Table of Content Table of Content ...................................................................................................1 CHAPTER 1: INTRODUCTION ............................................................................3 CHAPTER 2: STRATEGIC OVERVIEW ..............................................................8 CHAPTER 3: INTERGOVERNMENTAL ALIGNMENT ......................................23 CHAPTER 4: COMMUNITY OUTREACH ..........................................................36 CHAPTER 5: SPATIAL DEVELOPMENT FRAMEWORK (SDF) AND CAPITAL INVESTMENT FRAMEWORK (CIF)...................................................................40 CHAPTER 6: GOVERNANCE AND ADMINISTRATIVE ARRANGEMENTS ....63 CHAPTER 7: PERFORMANCE MANAGEMENT SYSTEM..............................74 CHAPTER 8: SECTOR PLANS .........................................................................79 Community Development Sector Plan.............................................................92 Corporate And Shared Services Sector Plan ................................................113 Economic Development Sector Plan .............................................................123 Environmental Management Sector Plan ......................................................150 Financial Sustainability Sector Plan ..............................................................162 Governance Sector Plan ...............................................................................173 Health Sector Plan ........................................................................................200 Housing Sector Plan......................................................................................210 Infrastructure And Services Sector Plan........................................................218 Legislature Sector Plan .................................................................................227 Public Safety Sector Plan ..............................................................................237 Spatial Form And Urban Management Sector Plan.......................................247 Transportation Sector Plan............................................................................263 CHAPTER 9: KEY IDP STRATEGIC INTERVENTIONS .................................275 CHAPTER 10: 2010 FIFA WORLD CUP .........................................................283 CHAPTER 11: AREA BASED INITIATIVES AND PROJECTS .......................307 2 CHAPTER 1: INTRODUCTION The developmental nature of societies is not static and performance changes over time, it is thus required in terms of Municipal Systems Act that municipalities must review their IDP on an annual basis in order to assess their performance and reflect on changes in the communities. The Integrated Development Plan (IDP) is a comprehensive, integrated and multi-faceted document that seeks to accomplish sets of objectives and imperatives. And one of the primary objectives of 2009/10 IDP review is “To host the best World Cup ever in 2010” and accordingly the 2009/10 IDP review is informed by such imperatives. Therefore the 2009/10 IDP review happened during interesting period in the history of the City of Johannesburg in the sense that it was written as the process of 2010 FIFA World Cup preparations unfolds. The CoJ as a major host city for 2010 FIFA World Cup plays a pivotal role in ensuring that the country delivers on a mandate of a memorable and best World Cup ever in true African style. Therefore this document is unique because it dedicates a chapter solely on 2010 which showcases and reflects on the state of readiness for 2009 FIFA Confederation Cup and 2010 FIFA World Cup. In addition to a dedicated chapter on 2010 FIFA World Cup, various sector plans in 2009/10 IDP review document shed more light on 2010 FIFA World Cup programmes and projects deliverable for 2009/10. The impact of the 2010 FIFA World Cup permeates the entire organization hence there is deep shared commitment from all the CoJ internal and external stakeholders. 2010 FIFA World Cup has permanently transformed the landscape of the CoJ in terms of stadiums, transport and supporting infrastructure since the history of the discovery of Gold in Johannesburg. It is for this reasons that the 2009/10 IDP review is a unique document that seeks to position the CoJ as a World Class African Host City for FIFA World Cup. The driving force behind the development of an IDP is summarised by the following five main reasons: Firstly, the IDP is part of a suite of strategic planning instruments that guide development and service delivery in the City. The Growth and Development Strategy (GDS) provides the vision and long-term strategic perspective for the City, while the IDP sets out the strategic plan for the medium term that coincides with the electoral term of 2006 to 2011. Each department and Municipal Entity (ME) within the City is required to complete a detailed annual business plan that gives operational expression to the IDP; Secondly, the Municipal Systems Act prescribes the formulation and approval of the IDP by the full Municipal Council, meaning that the IDP may not be delegated. This is important because the legislation lends the weight of the law on to the IDP and the approved IDP itself has the force of law; Thirdly, the IDP is the key mechanism for vertical and horizontal alignment. It strives to achieve vertical integration between the municipality and other spheres of government; and works towards horizontal integration between adjacent municipalities; Fourthly, the IDP weaves together the discrete activities within the municipality by providing a strategic overview, detailing the processes of intergovernmental alignment, showing the outreach and consultation process, setting out a summary of the Spatial Development Framework and Capital Investment Framework and framing the Performance Management System. The essence of the IDP is the Sector Plans, which defines the delivery agenda. The Financial Plan component of the IDP shows the linkages between the IDP and the budget as a whole; and Lastly, once the IDP is approved by the Council it becomes a public document governed by Promotion of Access to Information Act 2 of 2000 which gives effect to the constitutional right of 3 access to any information held by the state and any information that held by another person and that is required for the exercise or protection of any right; and to provide for matter connected therewith. It is for this reason that the IDP must be made available to all City of Johannesburg stakeholders. PROCESS FOR THE 2009/10 REVIEW Two critical events necessitate the early commencement of the 2009/10 IDP review process: The national and provincial election held on 22 April 2009; and FIFA Confederation Cup, a prestigious warm-up event that serves as a dry run to the 2010 FIFA World Cup. IDP Assessment workshop IDP Assessment discussion Workshop, held at Shumba Valley in August 2008, set the tone for the 2009/10 IDP review. The primary aim of the Workshop was to highlight challenges for the next financial year in view of the two critical issues raised above. The idea of roundtable discussion on sector plan, business plan and budget was recommended in order to expedite the process of 2009/10 IDP review. The Roundtable discussion served as a dry run for departments to prepare for the Budget Panel which was held from 26 November to 1 December 2008. Budget Lekgotla I The first Budget Lekgotla was held in September 2008 and it sought to achieve amongst others the following objectives: To perform a strategic assessment of the mid-term and key IDP Intervention (first half of electoral term) including achievements, opportunities and challenges; To define the medium term budget for the City of Johannesburg; To conceptualise and implement community-based planning; and To conclude discussions on the content of the Mid-Term Report. Emerging from the Budget Lekgotla was a comprehensive progress report on the following key IDP interventions: Rea Vaya Bus Rapid Transit project and Gautrain; Formalisation of informal settlements; Implementation of Growth Management Strategy; Developmental approach to Property Rates and Tariffs; City Power Risk Assessment; Housing delivery and secondary property market (facilitation of housing delivery by private sector and provincial government on a leveraging basis); Increased spending on maintenance of infrastructure, roads and public facilities; City wide 200 000 Tree Programme; Community Bank and SMME Fund; Upscaling of Soweto Empowerment Zone; Implementation of Inner City Regeneration Charter; 2010 Soccer World Cup; Environmental Demand Side Management (Energy, Water and Refuse); Upscaling of targeted crime prevention initiatives; Implementation of Social Package; and Upscaling of basic infrastructure to meet national targets. The aforementioned key IDP interventions are discussed in detail later in Chapter 4. 4 Sector/Business Planning Round Table and Budget Panel Hearings Following the Budget Lekgotla, core departments and Municipal Entities engaged in earnest in an initial round of business planning and budgeting in preparation of the Budget Panel hearing. The budget panel hearing was held from 26 November to 1 December 2008 and provided comments on initial core departmental and Municipal Entities (MEs) budget submissions based on the IDP programmes and projects. Municipal Entities and core departments were required to update the sector plan and business plan based on the comments emanated from the Budget panel. A th special Budget Panel Assessment Workshop was held on the 16 of January 2009 as follow up to the Budget Panel hearing. Three core departments and two MEs presented further motivation for their budget proposals. The second Budget Panel Assessment Workshop in preparation for Budget Lekgotla II was held th on the 26 of January 2009. The primary aim of workshop was to deliberate on the following key issues: Budget proposal assessment; Capital project prioritisation; Financial plan framework; and Community based planning. Following the Budget panel hearing all departmental sector plans were submitted to section 79 committees for comments. Departments updated sector plan and business plan simultaneously from the comments emanating from the committees. Intergovernmental Engagement In reviewing the CoJ IDP 2009/10, provincial engagements took place and Provincial Government committed to provide Capex budgets that are reflected in chapter 11: Area-based initiatives. IDP and Public Participation A stakeholder summit is scheduled for 28 March 2009 and it will provide for opportunities for stakeholders to represent the interest of their ward as to ensure sustainable communication between all stakeholders and City of Johannesburg when it comes to service delivery. IDP and Public participation allow the City and communities to plan together in order to achieve joint and coordinated outputs that compliment each other. Furthermore, it will also aid in fostering a social contract between the City and communities as well as empowers ward councillors and ward committees to take ownership for development in their areas. The CoJ introduced community based planning at ward level. Through community based planning wards’ concerns and challenges were responded to in the IDP, departmental and Municipal Entities business plans and finally in the budget. The first phase of community based planning entailed ward preparation, SWOT analysis and ward vision and draft ward plans. The second phase of community based planning consisted of the finalisation of the draft ward plans, including the three (3) ward issues and the integration of those ward issues in the IDP. Midterm Report The midterm report reviewed the CoJ performance according to the sectors as defined in the GDS and IDP, namely governance, financial sustainability, economic development, spatial from and urban management, environment, transportation, infrastructure, housing, community development, health, public safety and corporate and shared services. The mid-term review provided a report against the commitment made in the 2006-2011 Integrated Development Plan and 2006 Growth and Development Strategy. Therefore the 2009/10 IDP review is informed by the midterm progress in order to address the challenges were gaps were identified. 5 STRUCTURE OF THE 2009/10 IDP DOCUMENT The document consists of the following chapters: Chapter 1 Chapter 2 Chapter 3 Chapter 4 Chapter 5 Chapter 6 Chapter 7 Chapter 8 Chapter 9 Chapter 10 Chapter 11 : : : : : : : : : : : Introduction Strategic overview Intergovernmental alignment Community outreach Spatial development framework Governance and administrative arrangements Performance management system Sector plans Key IDP strategic interventions 2010 FIFA World Cup Area-based initiatives and projects The section below describes the proposed content to be covered in each chapter. Chapter 1: Introduction Chapter 1 defines the IDP and its importance in relation to good governance, coordination and integration across the three spheres of government and also as a mechanism to enhance community participation and accountability. Furthermore, it outlines the key components of the entire IDP document as a well the process followed in compiling the 2009/10 IDP review. It also reflects on the challenges encountered and lessons informing this review process, and how this experience will inform future planning in terms of long, medium and short-term planning. It conceptualises the significance of the 2009/10 IDP review in relation to the current context. This chapter will also highlight the key drivers of the 2009/10 IDP review process; namely: •The Millennium Development Goals (MDGs); Six principles of the Growth and Development Strategy; Mid- term reporting on the progress made against the 2006 ANC Local Government Manifesto; Key IDP Strategic Interventions; City’s readiness to host 2010 World Cup; and Community Based Planning. Chapter 2: Strategic Overview This chapter of the Integrated Development Plan sets out: How the City’s Growth and Development Strategy continues to provide the strategic frame for the IDP; and Key aspects of the strategic context within which the City is operating, which have shaped strategic choices about where to place programmatic and budgetary emphasis in 2009/10. Chapter 3: Intergovernmental Alignment This chapter highlight the City’s efforts towards strengthening intergovernmental alignment and rigorous sectoral engagement with provincial counterparts through the Exco approved July-toJuly Road Map. It also reflects on the lessons from the MEC’s on the City’s 2008/09 IDP. It also highlights key areas of alignments between the City and Provincial/National counterparts and identifies joint initiatives as well as Gauteng Provincial Government projects within the CoJ area. This chapter will also reflect on some of the City’s initiative in addressing issues of inter municipal alignment with a view of to improving horizontal and vertical alignment. 6 Chapter 4: Community Outreach This chapter deals with the City’s outreach process and rolling out of the Community Based Planning Phase 2 (drafting of ward plans). It also integrates community inputs into the Sector Plans, Business Plans and Budgeting processes. Chapter 5: Spatial Development Framework This chapter outlines high-level interventions of the spatial development framework, Growth Management and Capital investment programmes into the City’s settlement restructuring agenda. This discusses the outcomes and the impact of the Growth Management analysis in relation to the revised SDF and Capital Investment Framework for the City. Chapter 6: Governance and Administrative Arrangements This chapter outlines and demonstrates how the City’s governance and institutional arrangements has been implemented for achievement of the vision of “A World Class African City”. Furthermore, it reflects on key programmes and activities for the Offices of the Speaker and Chief Whip in relation to the City Governance model. It also reflects on the functioning of Section 79 Committees, Service Level Agreements and the appointments of Boards for the Municipal Entities. With regard to human resources, it outlines the City’s HR Shared Services Centre Model. Chapter 7: Performance Management System This chapter outlines the processes and systems that are in place for monitoring and reporting on the issues of organisational performance in relation to the 5-Year Mayoral priorities as well as for the individual scorecards and also to report on the achievements as well challenges that require further attention. Chapter 8: Sector plans The departmental sector plans are the building block of the City’s 5 year IDP. The annual review of sector plan provides the City with an opportunity to reflect on progress made in each sector and to identify delivery agendas for the year ahead (2009/10) and to reporting on the progress made on the 5 Year IDP Sectors Indicators as well as City’s Growth and Development Strategy. It also forms the basis for the development of business plans and departmental performance management targets. Furthermore, it also addresses internal and external environment that impacting on each sector and reports on the progress towards meeting IDP 5 year objectives and targets. Chapter 9: Key IDP Strategic Interventions This chapter provides a progress report on each key IDP strategic Intervention and outlines key plans for the remainder of the current mayoral term. Chapter 10: 2010 FIFA World Cup Projects This chapter outline the progress in terms of the implementation of 2010 projects and it also highlight challenges facing the City in implementing its plans in relation to these projects. Furthermore, it also highlights the CoJ state of readiness to host the Confederations in 2009 as well as the 2010 World Cup. Chapter 11: Area-based Initiatives and projects This chapter provides an overview of the City’s key projects and initiatives at an area-based level. These projects and initiatives support of the 5-year Mayoral Priorities, City’s Growth and Development Strategy (GDS) and the delivery agendas for 2008/09. The chapter also includes the key urban management issues and interventions for each of the city’s regions. Furthermore, it also includes the Gauteng Provincial Government Capex projects for 2008/09 to be implemented in the City of Johannesburg municipal area. 7 CHAPTER 2: STRATEGIC OVERVIEW INTRODUCTION This chapter of the Integrated Development Plan sets out: How the City’s Growth and Development Strategy continues to provide the strategic frame for the IDP; and Key aspects of the strategic context within which the City is operating, which have shaped strategic choices about where to place programmatic and budgetary emphasis in 2009/10. THE GROWTH AND DEVELOPMENT STRATEGY AS THE STRATEGIC FRAME FOR THE IDP The Municipal Systems Act (MSA) (Act 32 of 2000) requires that municipal IDPs must include the following components: A vision of the long-term development of the municipality; An assessment of the existing level of development in the municipality which must include an identification of the need for basic municipal services; The municipality’s development priorities and objectives for its elected term; The municipality’s development strategies, which must be aligned with any national or provincial sectoral plans and planning requirements; A spatial development framework which must include the provision of basic guidelines for a land use management system; The municipality’s operational strategies; A disaster management plan; A financial plan, which must include a budget projection for at least the next three years; and Key performance indicators and performance targets. In the City of Johannesburg, a deliberate choice was made at the start of the current Council term of office to develop the first four of these components through the formulation of a Growth and Development Strategy (GDS). The GDS and a 5-Year 2006/11 IDP are not disconnected or competing documents. They were developed simultaneously, through the same process, and are regarded as related parts of a regular and predictable medium-term cycle of strategic resource allocation. This cycle ensures that every five years the City will: 8 Review progress made over the previous term of office; Assess future growth & development opportunities and challenges and re-orientate longerterm strategy, and On the basis of these two steps, chart the course forward for the next term. Diagrammatically this regular, predictable cycle of integrated long term and medium term planning can be represented as follows. 5 year term review 5 year term review Revised GDS GDS June 05 2006/11 5-year IDP 2006/11 IDP rev1 2006/11 IDP rev2 2006/11 IDP rev3 2006/11 IDP rev4 20011/16 5-year IDP June 06 June 07 June 08 June 09 June 10 June 11 In this system of planning the GDS charts the long term strategic course, and makes some of the bigger, overarching decisions about what should be prioritized to accelerate growth, reduce poverty, build sustainable settlements and empower communities. The IDP defines the medium term path. It spells out where we want to be after five years, and how we intend to get there. In a sense, the GDS and 5-Year IDP are two sides of the same coin, with the GDS articulating for the IDP an assessment of the state of development in the municipality, a vision for long term development, and a statement of development priorities and strategies which frame IDP objectives and programmes for the 5-year. The Growth and Development Strategy is made up of four sections: A Long Term Strategic Perspective. This provides a perspective of what the future may hold, on the basis of a strategic analysis of current and future trends and dynamics. It defines strategic challenges and opportunities, and the implications thereof; A Development Paradigm. This is a set of core propositions for what must be emphasized if the City is to follow the best and fastest route to development. This boils down to 6 principles that light the way on the development path ahead; A Vision Statement. This is a statement of what an ideal city ought to look like 25 to 30 years from now; A clear set of strategic choices for exactly what we should aim to accomplish over the longer term and what we need to do concretely to achieve this. These choices consist of: Long Term Goals; and Long Term Strategic Interventions for achieving our Goals. These Long Term Goals and Long Term Strategic Interventions constitute one half of a set of Sector Plans. The Sector Plans bridge the GDS and IDP. Whereas the Long Term Goals and Strategic Interventions emerge from the GDS, they are carried over into the 2006-11 IDP to frame: 5-Year Objectives, specifying the outcomes we will aim to achieve over the next term of office; and IDP Programmes (made up of initiatives, projects, new policies, etc), which state exactly what must be done in the next five years if we are to achieve our 5-Year Objectives. The 2006/11 5-Year IDP has twelve Sector Plans. These roughly correspond with the portfolios of the Mayoral Committee (with two sector plans – Financial sustainability and Economic Development belonging to one Member of the Mayoral Committee, and Governance being shared between the Executive Mayor and Speaker), and also with the departmental structure of the municipality. The thirteen sector plans are: 9 Community Development Corporate & Shared Services Economic Development Environment Financial Sustainability Governance Health Housing Infrastructure & Services Legislature Public Safety Spatial form & Urban Management Transportation This integrated package is expressed diagrammatically as: Corp service Governance Finance Safety Health Transport Spatial Dev Environment Infrastructre Housing Human Dev Econ Dev Analysis Vision Proactive absorption of the poor Balanced & shared growth Facilitated social mobility Settlement restructuring Sustainability & environmental justice 1. Long-Term Goals 2. Long Term Strategic Interventions bridging into … 3. Five-Year IDP Objectives 4 Five-Year IDP Programmes Innovative governance solutions The heart of the Growth and Development Strategy is the Development Paradigm. In 2006, through an extended process of internal consultation and debate informed by clear political choices emerging locally and nationally, as well as national and provincial policy directions, the City of Johannesburg extracted a set of six core development principles. These six principles are value propositions that cut across and underpin the strategic choices made in the GDS and IDP. The six principles are: 1. Proactive absorption of the poor: Johannesburg is South Africa’s premier business city. This means it will remain a magnet for opportunity seekers. The City will not hope that the poor will go elsewhere. And it will not fail to address their needs. The City will work to facilitate the transition of ‘the poor’ (new households, new internal and circular migrants; those in hostels, informal settlements and historical ghettoes; youth; and refugees) into the city. This means helping the poor to access basic livelihoods, start to build a core of assets, master demands of urban life, gear up for participation in the urban economy and negotiate urban costs of living. 10 2. Balanced and shared growth: Historically, Johannesburg’s relatively fast economic growth has been premised on commodity exports, in turn reliant on low input costs – especially low wage costs – for large business. The City must continue to keep the cost of doing business in the city as low as possible, but the structural dynamic in the economy must change if all residents are to enjoy the fruits of this growth. In a future local economy, ‘accelerating economic growth’ and ‘ensuring that the benefits of growth are shared more broadly’ will not be separate priorities. The City must instead work to ensure that the rate of economic growth is itself being driven up via a process of spreading the benefits of economic growth. 3. Facilitated social mobility and reduced inequality: As a post apartheid city Johannesburg has a non-negotiable obligation to ‘absorb’ the poor. But this does not mean taking in more poor people so that we carry a bigger welfare burden. We don’t just want to help people in poverty. Through shared growth, and other measures, we want to help people out of poverty. This is critical for the future development of Johannesburg. A bigger middle-strata of society is critical to expand the domestic economic market, and thereby encourage investment, bring greater social stability, and create the pool of savers, risk-takers and investors in human capital from which derives future productive capacity. This means we must work to enable people to aspire, and to unblock obstacles to rapid social mobility. 4. Settlement restructuring: We have transformed our City in institutional terms. We must now accelerate the restructuring of our city in spatial terms. This involves a number of things. But at the very least, as a matter of principle, we need to change city form to bring jobs closer to people and people closer to jobs. This requires boldness and creativity, and perhaps a fundamental change in planning approach away from simply facilitating spatial development towards actively directing it. We acknowledge that cities are built by many players but we must regain control over future spatial structure. 5. Sustainability and environmental justice: Recent events in New Orleans illustrate that cities ignore the risk of global environmental trends at their peril, and that the worst affected whenever cities fail to manage these risks are always the poor. Johannesburg must become a more ‘sustainable city’ by anticipating and managing the effects of environmental change. This means trying to limit the impact of urban processes of production and consumption on the environment, inter alia by adopting more environmentally sustainable practices. It also means promoting ‘environmental justice’ by ensuring that poorer communities do not routinely suffer most the effects of urban-environmental risks and disasters, as well as ensuring that quality of life is enhanced by extending green infrastructure to areas that have historically functioned as grey, featureless dormitory townships. 6. Innovative governance solutions: The worldwide long-term trend is for citizens and stakeholders to demand more and more of their governments while at the same time wanting to contribute less and less to the public purse. Efficiency improvements are critical, but will only be part of the long-term solution. It is recognized that the development challenges facing the City cannot be met alone. The City of Johannesburg is committed to finding joint solutions to these challenges by working closely with citizens, communities, business, other spheres of government and other interested stakeholders. The Vision for the City of Johannesburg contained in the GDS gives expression to these 6 principles. It states: In the future, Johannesburg will continue to lead as South Africa’s primary business city, a dynamic centre of production, innovation, trade, finance and services. This will be a city of opportunity, where the benefits of balanced economic growth will be shared in a way that enables all residents to gain access to the ladder of prosperity, and where the poor, vulnerable and excluded will be supported out of poverty to realise upward social mobility. The result will be a more equitable and spatially integrated city, very different from the divided city of the past. In this world class African city for all, everyone will be able to enjoy decent accommodation, excellent 11 services, the highest standards of health and safety, and quality community life in sustainable neighbourhoods and vibrant urban spaces. The Growth and Development Strategy, as summarised here, continues to provide the strategic frame for the 2009/10 revision of the 5-year 2006/11 IDP. There has been no cause to reconsider its core principles or key long term goals and strategic interventions that frame the medium-term objectives contained in the IDP. STRATEGIC ASSESSMENT While the strategic frame for the IDP, as provided by the GDS, has not changed, it is appropriate that each revision of the IDP refreshes the City’s understanding of the strategic context within which it operates. Through an annually updated strategic assessment the City may arrive at key points of emphasis and make key decisions on where to allocate resources for the next financial year. This strategic assessment, organised by each of the GDS principles, draws on: The City’s mid-term report on progress over the first two and a half years of the current term of office, released in November 2008. This included an assessment of what the City hopes to achieve in the remainder of the term of office; The results of a set of GDS indicators that have been developed to assess overall progress on key strategic outcomes; Strategic assessment discussions at the two Budget Lekgotlas held as part of the normal annual planning cycle; Identification of critical strategic challenges and opportunities arising in the next year. GDS indicators In 2007/08 the City identified and approved 26 key GDS Indicators to track progress on the implementation of the Growth and Development Strategy. These are as follows: Note: The figures included are illustrative only for this draft IDP. All available data will be checked and included in the final IDP Gross Value Added Principle 1999/2000 2001/02 2002/03 2003/04 2004/05 2005/06 2006/07 2007/08 2 4.0% 3.2% 5.0% 4.1% 5.7% 5.6% 6.1% 6.4% (GVA) growth per annum Unemployment rate 2 33.5% 34.3% 30.1% Number of EPWP jobs 2 16 036 27 000 54 349 created by the City Human Development Index (HDI) 3 Household Gini coefficient 3 Total number of 1 housing opportunities created by the City 12 103 641 Principle The number of units in informal settlements in the city 1 Unaccounted for water 5 Electricity outages: number and duration per yr 2 bulk 2 medium 2 low 2 Households with 1 access to basic water services number 1 percentage 1 Households with access to basic 1 sanitation services number 1 percentage 1 Households with 1 access to basic electricity services (LOS2) number 1 percentage 1 Total city ecological 5 footprint in sq km Days per yr that air pollution is within air quality guidelines 5 Net tonnage of waste disposed of in landfill sites 5 Transport to work 4 13 1999/2000 2001/02 2002/03 2003/04 2004/05 2005/06 2006/07 2007/08 38.1% 42.5% 37.9% 35.6% 33.1% 33.5% 34.9% Principle average time 4 average cost 4 Percentage of people travelling by public 4 1999/2000 2001/02 2002/03 2003/04 2004/05 2005/06 2006/07 2007/08 transport Total fatalities per million vehicle kms 4 travelled HIV/Aids prevalence rate 1 Infant mortality under 1 year old 1 Maternal mortality per annum 1 Crime rates 6 30.6% Municipal Credit Rating 6 (MCR) Household Satisfaction Index (HSI) 6 Business Satisfaction 6 64 A- A+ AA- 62 68 61 60 63 69 68 58 64 64 Index (BSI) Number of cases of corruption 6 reported 6 resolved 6 Proactive absorption of the poor Census 2001 estimated the City’s population at 3 225 812, growing at an average of 4, 1% per year. The 2007 Community Survey results, released at municipal level in March 2008, estimate the Johannesburg population at 3 888 180. This is consistent with estimates derived by the Bureau for Market Research in 2006, that Johannesburg’s population was then 3 790 000. These estimates represent a 20, 5% growth over the 6 years since the last census, at an average growth rate of about 3, 16% per year. At this rate of growth the§ City has estimated that it needs to plan for a population of approximately 4,2 million by 2010, and an additional one million people, over and above the Community Survey results, by 2014/15. Continued high population growth rates are driven primarily by rural to urban as well as crossborder migration. There is some evidence that new dynamics may be emerging in rural to urban migration patterns. 14 While rapid urbanisation is often accepted as the norm, there is evidence that many urban areas in South Africa are still in a transitional phase, with much migration being of a temporary nature. The City’s GDS summed up this trend as ‘fast but tenuous urbanisation’. On this pattern the City will continue to see many single person households establish themselves in informal settlements, backyard shacks and apartments in inner city bad buildings. In these tenure arrangements they try to maximise incomes and minimise urban costs of living in an effort to send as much money home to families remaining in rural areas. Commitment to sustained urban livelihoods is limited, and if households suffer poverty-shocks, for example through the loss of a job or a sudden decline in health, they will leave the city to ‘return home’ to rural areas or small towns. But the 2007 Community Survey suggested that this pattern may be changing. It indicated that the rate of growth of households may have slowed considerably since the last census. In 2001 there were 1 006 742 households in the City, growing at 6, 7% per year. In 2007 the Community Survey estimated 1 165 014 households. This represents a household growth rate of 2.46% over the last 6 years, with an estimated increase in household size from 3, 2 persons to 3, 3. There are many factors that may explain this, including weaker public housing delivery. However, one important possible explanation is that in the 1996-2001 period many new-migrants set up single person households, for example in dwellings in informal settlements, and as a consequence population growth rates were high over the period, but the pace of increase in numbers of households was even higher; by contrast, in the post 2001 period new-migrants began to consolidate their households by bringing their families from rural areas to live with them in the City, resulting in higher population growth relative to household growth, and an increase in average household size. These trends demand more investigation. They may mean that the service delivery burden on the City could become more manageable over time. Cross-border migration remains a key issue for the City. The xenophobic violence that swept across Johannesburg and other cities in South Africa in May 2008 speaks to the vulnerability of both foreign migrants and local communities that do not yet feel integrated into the mainstream of city-life. Foreign migration into Johannesburg can be expected to continue. Various factors, such as the recent cholera epidemic in Zimbabwe, may even accelerate this trend. Migration certainly represents a challenge, but the City remains committed to the fundamental premise contained in the GDS that the future development of the country as a whole can only be enhanced if a greater percentage of the population find sustainable livelihoods in urban centres. The GDS recommends planning based on higher levels of population and household growth, based on the thinking that over the medium to long term demographic trends do not follow an immutable logic, but are strongly influenced by the policy choices that the City itself makes to exclude or absorb new migrants. Because the City has a responsibility to help unwind national apartheid settlement patterns which condemned millions to lives of poverty and low opportunity in rural hinterlands, and because Johannesburg’s own development prospects may be eroded by the unwillingness of a large portion of the population to invest their aspirations and resources in the City permanently, the GDS advocates a policy of trying to accommodate and assimilate new migrants as quickly as possible. This has implications for the costs that must be borne by established and wealthier residents of the City, who will in effect have to subsidise the process by which newer households get onto the ladder of urban prosperity. While this may seem onerous, as a policy choice it is preferable to one which aims to exclude the poor in the hope that they will ‘go somewhere else’ – a policy path that will inexorably lead to greater inequality, more informal settlements, relatively more crime and violence, greater economic uncertainty and instability, and ultimately lower growth and development prospects for the city as a whole. The challenge of migration is therefore not how to prevent more people coming to Johannesburg, but how to realise the potential opportunities of successfully absorbing newcomers into the city so that they do not end up marginalized socially, spatially, economically and politically. This requires accelerated pace of housing delivery and service network extension, as well as creative measures to smooth the costs borne by poorer households as they enter formal housing supplied 15 with metered services. It also requires innovative approaches to building a fast-growing and sustainable economy in which the benefits of wealth creation are equitably shared in a way that adds further to the dynamic of growth. The available evidence suggests that the City continues to make progress in meeting its population’s requirements for access to housing, piped water, decent sanitation, regular waste removal and electricity. For example: Against a target of 100 000 new housing opportunities over the five year term of office the City achieved 14 307 in 2006/07 and 19 892 in 2007/08. The City rolled out Level of Service 1 water connections to 17 332 households in 2006/07 and a further 4 216 households in 2007/08. The Community Survey estimates that 91,6% of households in the City had piped water either inside their dwellings or to their yards. The City rolled out 20 837 new electricity connections in 2006/07 and a further 16 500 in 2007/08. The Community Survey estimates that 89,4% of households now use electricity for lighting purposes (compared to 84,9% in 2001) Access refers both to physical proximity and availability of network infrastructure, and to affordability of the service. In this respect the City’s social package continues to evolve: In 2007/08 the City increased the allocation of free basic water to 10kl for some 110 000 households registered on its indigency database; Over the last year it has also introduced further allocations of 4kl free emergency water for those households on pre-payment meters, and provision for households to represent themselves to the City for more free water beyond this if they meet certain criteria. In 2008/09 the City was required by the National Property Rates Act to change the basis for its valuation roll from valuing site only to valuing both a property’s site and improvements. This change shifted the burden of taxation across the city, with newer areas, and areas where there are relatively larger houses on relatively smaller stands, picking up more of the burden. To alleviate the impact the City has phased in the new system, most notably in the way it impacts sectional title properties. It also provided that the first R150 000 of value is excluded from the calculation of property tax. This means that many poorer areas may little or no rates. At the same time as the new property rates were introduced the City shifted to a new basis for charging for refuse removal. Pikitup tariffs are now also scaled by property value. A household living in a property valued at less than R150 000 pays no refuse charges, except for a minor city cleaning levy. In 2008/09 the City also extended free basic electricity from 50kWh to 100kWh for those households on the lifeline tariff. Households consuming less than 300kW are assumed to be on the lifeline tariff. The City’s social package will evolve further in 2009/10 with the introduction of per person allocations of free basic services, up to a maximum per household. This will deepen the benefit of free and subsidised services still further. These measures are critical to protect poor households, since all the evidence suggests that South Africa is moving steadily from a lowinfrastructure cost environment to one in which the full costs of building and maintaining infrastructure are factored into the price of services. For example the load-shedding crisis in early 2008 led to a double increase in Eskom’s, and thereafter City Power’s tariffs. City Power absorbed some of the costs implied by the second hike, but even then the price of electricity to some properties in the city increased by 50-60%. This trend will continue. Municipalities have been instructed by National Treasury circular 48, issued on 2 March 2009, to budget on the assumption of a minimum 25% increase in bulk-electricity costs. Balanced and Shared Growth The ability of Johannesburg to proactively absorb the poor depends to a very large extent on whether the local economy grows in a sustainable manner, and in a way that spreads the benefits of growth. 16 According to the Global Insight database, Gross Value Added (GVA) growth in the City was in the region of 6% in 2006 and 2007. The City’s economy is dominated by four sectors, three of which are service sectors. The four key sectors are: Financial and business services Retail and wholesale trade Community and social services Manufacturing While not a major sector in terms of economic weight, the table below makes clear that construction has also seen dramatic growth in the last few years. Annual Growth in Real Value Added 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 1 Agriculture -5.4% -1.1% 12.7% 2.8% -6.9% 9.2% -5.9% 0.5% 2.4% -7.7% 0.3% 2 Mining 53.4% -3.8% -0.8% 5.0% -22% -1.2% 9.1% -2.1% 10.5% 0.6% -1.4% 3 Manufacturing 7.5% 5.6% 3.9% 3.5% 2.9% 2.8% -1.0% 4.9% 5.1% 5.4% 4.3% 4 Electricity 8.0% -7.3% 2.3% -2.4% -5.5% 3.9% 3.1% 3.2% 2.1% 3.0% 3.1% 5 Construction 4.6% -5.7% 3.9% 10.2% 0.8% 11.8% 12.8% 12.5% 13.4% 18.3% 19.1% 6 Trade 3.5% 3.3% 11.3% 4.9% 2.1% 3.1% 7.3% 6.0% 7.9% 6.8% 5.0% 7 Transport 13.0% 8.8% 10.4% 7.9% 7.1% 8.8% 6.0% 6.4% 5.2% 4.5% 5.7% 8 Finance 9.8% 8.7% 9.6% 7.0% 8.8% 10.3% 3.8% 7.9% 5.3% 7.3% 9.3% 9 Community services -0.2% 0.8% -0.7% -1.0% 0.4% -0.3% 4.3% 2.5% 3.2% 3.5% 3.6% Total Industries GVA 6.3% 3.9% 5.7% 4.0% 3.2% 5.0% 4.1% 5.7% 5.6% 6.1% 6.4% Taxes less Subsidies on products 10.1% 2.2% 3.9% 0.7% 0.8% 5.6% 2.6% 6.3% 5.3% 5.2% 5.0% Total GDP 6.6% 3.8% 5.6% 3.7% 3.0% 5.0% 3.9% 5.7% 5.6% 6.0% 6.2% Source: Global Insight Database, 2008 GDP growth has been robust in recent years, and emergent economic sectors have been rising to contribute further to that growth. But it is now clear that the last year of tumultuous economic crisis will impact significantly on the national and local economy. In the first half of the 2008 calendar year, the world saw a rapid rise in commodity prices, most notably a spike in the price of oil to almost $150 per barrel. This translated into spiralling inflation and rapidly rising interest rates. Although the evidence indicates that they have peaked, neither inflation nor interest rates come down significantly. In the second half of 2008 the world witnessed a global financial and then economic collapse on a scale not seen since the Great Depression of the early 1930s. The financial crisis has frozen credit in almost all countries. Though South African banks were largely insulated, the crisis has nevertheless seen a significant increase in risk aversion locally. An inability to borrow has translated into weaker domestic spending. Coupled with a rapid decline in demand for exports, this has dampened investment plans of firms, and in some sectors already led to retrenchments. This will in turn lead to lower demand. As a consequence the South African economy shrank by 1, 8% in the last quarter of 2008, although it still grew by 3, 1% over the year. 17 These trends will impact negatively on Johannesburg’s economy. This is a concern when the city is already grappling with sustained high unemployment, and continued inequities in the geographic and racial distribution of work and wealth creating opportunities. The employment profile in the City is presented below using figures from the 2001 Census and 2007 Community Survey, as well as the Labour Force Survey. The unemployment figures from both the March 2007 LFS and the March 2007 Community Survey are aligned at approximately 30% on the expanded definition of unemployment. 2001 2007 Employed 1 085 546 62.7% 1 417 463 70.4% Unemployed 647 039 37.3% 596 417 29.6% Total workforce 1 732 585 Not economically active and as % of working age population 640 059 27.0% 626 769 Working age population (15-65) 2 372 644 2 013 880 23.7% 2 640 651 Source: Census 2001, and Community Survey 2007 March 2007 March 2006 March 2005 March 2007 March 2006 March 2005 Employed 1,355,673 1,278,591 1,256,494 69.9% 65.7% 66.5% Unemployed 582,926 668,793 633,041 30.1% 34.3% 33.5% Total workforce 1,938,599 1,947,383 1,889,535 Not economically active and as % of working age population 583,720 622,738 566,522 23.1% 24.2% 23.1% Working age population (15-65) 2,522,319 2,570,121 2,456,057 Labour Force Survey (LFS), March 2005, 2006, 2007. (Expanded Definition of Employment) While there are reasons to be concerned about the short to medium term future of the City’s economy, there are also reasons for optimism. On the one hand, two major soccer tournaments – the Confederations Cup and the World Cup – as well as other events such as the World Culture Summit will bring significant numbers of tourists into Johannesburg. Visitors spend during these events will lift the local economy. On the other hand, the slowdown in the economy gives the City a little breathing space to catch up with infrastructure demand. For example lower demand for power and smaller increases in vehicle purchases provides space for the City to get ahead of the curve on electricity supply and road maintenance for when demand picks up again. This will enable Johannesburg to have a more solid platform for sustainable growth over the longer term. For these reasons the City remains committed to supporting economic growth of up to 9% by 2014, despite the current downturn. Social Mobility and Reduced Inequality A lack of adequate data means it is difficult to get a clear understanding of the changing class composition of Johannesburg’s society, and in turn those factors that are blocking social mobility and increased equality. This lack of clear data notwithstanding, the available evidence suggests both that some progress is being made, but that there remain concerns with: Levels of income and wealth inequality; 18 The inability of households to realize wealth from assets, most notably by using property in townships to secure capital for education, business investments, etc. A still poorly functioning property market in many areas of the city constrains movement of people out of poverty; Unequal access to the skills needed to participate in an economy that is rapidly transiting to one in which finance & business services and trade are the key drivers of growth and jobs; The effect that the price of the City’s own services has on the ability of households to stabilize themselves in formal shelter, and move up the housing ladder. Information modelled by the Bureau for Market Research in 2006 gives the following picture of annual household income in the City, when compared to Census 2001. It shows that a smaller proportion of Johannesburg households are very poor in 2006 than in 2006, and a greater proportion may be considered middle class. However, it still tells a story of very serious income disparities. Annual household income (R) 2001 2006 No income 196,695 18.7% 130,278 10.7% R1 - R4 800 43,469 4.1% 28,714 2.4% R4 801 - R9 600 115,015 11.0% 125,514 10.3% R9 601 - R19 200 185,440 17.7% 243,112 19.9% R19 201 - R38 400 167,639 16.0% 255,818 20.9% R38 401 - R76 800 120,671 11.5% 142,379 11.7% R76 801 - R153 600 90,228 8.6% 124,859 10.2% R153 601 - R307 200 70,701 6.7% 87,386 7.2% R307 201 - R614 400 39,482 3.8% 54,852 4.5% R614 401 - R1 228 800 12,114 1.2% 16,790 1.4% R1 228 801 - R2 457 600 4,834 0.5% 6,955 0.6% R2 457 601+ 3,406 0.3% 4,795 0.4% TOTAL 1,049,694 1,221,452 Source: Census 2001; Bureau for Market Research (BMR), 2006 Settlement Restructuring Recent mapping and satellite imagery suggests that strategic spatial planning capability, land use management capacity, and infrastructure capacity in the city was not adequately matched to the sudden take-off in the property market over the last seven years. The result has been a sprawl of poorly planned estates, especially in the north-western part of the city. Service, transport and social infrastructure has struggled to keep pace with this pattern of development. The consequence has been spiraling costs of services, further spatial fragmentation of an already divided city, and excessive road congestion. This pattern of growth is unsustainable. The City has responded by reinforcing capacity in a range of different areas, and beginning to roll-out key initiatives that will both better anticipate and rebalance these unsustainable patterns of development. Key initiatives include the formulation of a growth management strategy, housing developments in preferred locations and the regeneration of the Inner City – a key business, residential and transport node that has spare infrastructure capacity. Particularly important is the roll-out of the Rea Vaya Bus Rapid Transit (BRT) network. BRT supporting road surfaces have been rolled out in the median lanes of roads and streets across a large part of the City, and BRT stations are under construction. The first phases of this infrastructure will be in place by 2010. Together with the Gautrain, which has already been tested on a stretch of rail in Midrand in January 2009, this new public transport infrastructure will produce significant changes in the spatial form and functioning of Johannesburg. 19 Sustainability and Environmental Justice The load-shedding required by Eskom in January 2008 represented a serious challenge to the City, especially from an economic growth and revenue security perspective. However, ironically, the power crisis also sharply brought into focus issues key to the building of a sustainable city. A positive result of the crisis has been quantum leaps forward in clarifying demand and supply trends in a range of resource input areas, and ways to bring demand into line with available supply. Over the last year the City has focused on: In addition to the immediate concerns over energy security, potential future environmental shocks and risks in areas of water supply and fuel costs. The evidence suggests that with climate change trends and exponential economic and population growth, water supply to the Gauteng area may be constrained within the next five years. Both the quantity of water, and the quality of water as available sources become more polluted, has been highlighted as concerns in recent months. Oil rose to over nearly $150 per barrel in the first half of 2008. It has since fallen back to less than $50 per barrel as the global economic crisis has spread. While the reduction is welcome, the 2008 peak is nevertheless a warning bell of future trends. For a city far from port areas, and therefore with high costs of freight and logistics, and with a historically poor public transport system, the future fuel price may still set hard limits on economic growth. Ways to precisely calculate the benefits versus risks of different investments that could be made in response to natural resource crises. Over the last year the City has invested in gas turbines and now estimates that it has the ability to load-shed 10% of power drawn from the national grid without affecting power supply to businesses and households within the City Power supply area. Ways to not simply advocate for reduced consumption and more sustainable resource use, but to strongly regulate demand. The City is introducing a range of regulatory measures, including a new rising block tariff structure for electricity consumption introduced in 2008/09, a new demand management by-law, and smart meters that enable ripple control of major household appliances. The possibility of ‘carbon trading’ as a future revenue stream to justify expenses in green infrastructure. Johannesburg residents still have unequal access to green infrastructure such as trees and parks, and unequally bear the burden of degraded and polluted environments. There is evidence of progress in addressing this situation as over half of a targeted 200 000 trees have been planted in the south of the city over the last two years. However, there remains cause for concern. The lack of adequate stormwater drainage has been raised repeatedly in ward planning processes in recent years. At the end of February 2009, devastating floods in parts of Soweto caused some R350 million in damage, demonstrating again that in general our settlements are poorly designed in the face of more unpredictable and violent weather resulting from climate change, and that the poor confront the greatest risks and burdens. Innovative Governance Solutions The City of Johannesburg continues to innovate various mechanisms to provide for participatory governance, as required by the Municipal Systems Act. It is also leading with the development of a system of Council oversight over the executive that is new to local government. These innovations strengthen the voice of councilors, communities and stakeholders in the affairs of local government. These positive trends notwithstanding, the City’s annual satisfaction survey still shows that residents and ratepayers have high expectations of service delivery performance that are not being met. In some cases poor satisfaction ratings are due to unreasonable expectations of what can be delivered by the City and other spheres within current resource envelopes. In other cases poor satisfaction reflects the reality of unequal access to services across the City. For example, a 20 correlation of satisfaction levels with levels of access to water services from the 2008 Satisfaction Survey results clearly shows that the lower the level of access to water services, the lower the satisfaction rating across all services. Minimal level of water service provision Basic level of water service provision Full level of water service provision Group totals for water provision Mean Number of responses Electricity 2.30 N=143 Refuse collection 2.46 N=149 Roads (neighbourhood streets) 1.97 N=174 Sanitation and waste water 2.16 N=172 Stormwater 1.81 N=147 Street lights 2.39 N=148 Water provision 2.67 N=169 Electricity 3.87 N=187 Refuse collection 6.25 N=287 Roads (neighbourhood streets) 4.10 N=286 Sanitation and waste water 3.66 N=281 Stormwater 4.70 N=184 Street lights 5.83 N=267 Water provision 6.51 N=285 Electricity 5.91 N=2492 Refuse collection 7.35 N=2504 Roads (neighbourhood streets) 5.81 N=2506 Sanitation and waste water 7.20 N=2498 Stormwater 6.14 N=2352 Street lights 5.84 N=2440 Water provision 7.69 N=2494 Electricity 5.59 N=2822 Refuse collection 6.99 N=2940 Roads (neighbourhood streets) 5.42 N=2966 Sanitation and waste water 6.57 N=2951 Stormwater 5.81 N=2683 Street lights 5.66 N=2855 Water provision 7.29 N=2948 Source: City of Johannesburg, Citizen Satisfaction Survey 2008 While public participation continues to be enhanced, the bar also continues to be raised. Various court cases, in the Constitutional Court and lower courts, and concerning the City directly or tangentially, have recently highlighted the consideration that unless the City meaningfully engages with people affected by its administrative action that action may be deemed unlawful. The City continues to build the capacity to undertake consultation at the levels required and expected. The key challenge confronting governance in the City is the impact that various factors will have on financial stability. The global financial and economic crisis will impact on the local economy and in turn the spending power of households and firms. This has already begun to impact on City revenue security. In addition, key changes have been made to the intergovernmental fiscal system, notably the partial replacement of the RSC levy replacement grant with a share of the national fuel levy, which will reduce the amount of national transfers received by the City. When coupled with continued high inflation, a reduced capacity to borrow in the current financial climate, and some unavoidable spending pressures, the City’s finances will inevitably be less secure than in previous years unless the City takes bold and innovative steps. The City continues to regard financial stability as key to meeting the medium and long term needs of and 21 expectations for a better quality of life of Johannesburg’s residents, and will make every effort to preserve this stability. 22 CHAPTER 3: INTERGOVERNMENTAL ALIGNMENT INTRODUCTION Each sphere of government has a service delivery mandate, which ranges from social grants, free basic services to services such as social welfare, identity documents and policing, education and health care. It is therefore that Intergovernmental relations (IGR) are a critical component to the roll-out of service delivery. LEGISLATIVE FRAMEWORK The Intergovernmental Relations Framework Act of 2005 (IRGFA) requires all spheres of government to effectively co-ordinate, communicate, align and integrate service delivery in order to ensure access to services supplied by all spheres of government. The IRGFA gives legislative expression to intergovernmental alignment by: Taking into account the circumstances, material interests and budgets of other governments and organs of state, when exercising statutory powers or performing statutory functions; Consulting other affected organs of state in accordance with formal procedures as determined by any applicable legislation, or accepted convention, or as agreed with them or, in the absence of formal procedures, consulting them in a manner best suited to the circumstances, including by (i) direct contact; or (ii) any relevant intergovernmental structures; Co-ordinating actions when implementing policy or legislation affecting the material interests of other governments; Avoiding unnecessary and wasteful duplication or jurisdictional contests; Taking all reasonable steps to ensure that sufficient institutional capacity and effective procedures prevails, i.e. to consult, to co-operate and to share information with other organs of state; and to respond promptly to requests by other organs of state for consultation, cooperation and information sharing; and Participating in intergovernmental structures and efforts to settle intergovernmental disputes. In terms of Intergovernmental Relations, the City has been involved in the following key engagements: Alignment to National and Provincial policies and strategies and Gauteng City Region; MECs comments in terms of the 2008/09 Integrated Development Plan Revision; and Provincial Engagement, Intergovernmental Projects and transfers ALIGNMENT TO NATIONAL AND PROVINCIAL POLICIES AND STRATEGIES The City of Johannesburg (CoJ) has aligned its plans to key IGR strategies and policies such as the National Spatial Development Perspective (NSDP), the Provincial Growth and Development Strategy (PGDS) and the Global City Region (GCR). Whereas, NSDP highlights the spatial priorities nationally in terms of provision of basic services to all, to alleviate poverty and to address inequality, the CoJ’s Growth and Development Strategy (GDS) describes the CoJ’s long-term strategic perspective, that looks at the current development challenges facing the city and development paradigm that focuses on the six principles, namely: Pro-active absorption of the poor; Balanced and shared growth; Facilitated social mobility and equality; Settlement restructuring; 23 Sustainability and environmental justice; and Innovative governance solutions. The PGDS addresses the key developmental and economic challenges in the Province. The CoJ GDS ensures collaboration and integration of these challenges to be addressed through provincial sector engagements between the Community Development and Economic Development departments. Provincial government has identified a couple of strategic avenues to address GCR in the region. In summary it includes managing a GCR knowledge based economy and to position Gauteng as an economically active and sustainable region through integrated planning, implementation and coordination of economic growth and competitiveness strategies. The City however identified the following key issues to further develop the GCR: The City need to play a proactive role in shaping the nature and meaning of the global city region; National states remain important as a counterbalance to a “city state”, especially with respect to fiscal redistribution; Two tier arrangement of both political and administrative decentralisation attempts to address the tension between locally responsive service delivery within a broader regional entity; Creating forums, partnerships and other arrangements, on the basis of a common agenda, to bring different actors together are critical institutionalising cooperation within the GCR; Morphology of Gauteng clearly demonstrates the need for coordination; Metros/GCR should be enabled to play a policy leadership role given capacity compared to other municipalities Balance to be struck between poverty reduction/service delivery and economic growth; Economic development strategy is critical to success; Destination marketing of Gauteng undermines the Johannesburg brand; Idea of merging of economic agencies has not had consultation; Spatial planning is critical to the long term, optimal structure of the city region Take into account existing social services programmes; City must respond in an ongoing way to the arrival of foreign nationals; GCR concept holds promise for housing delivery e.g. Diepsloot is well located in the context of the GCR; Court judgments do not distinguish between local and provincial government; Problem with the process of engagement between City and province on GCR e.g. Transport Authority and DFA Tribunal; Problem of subordinating municipal plans to provincial plans; and Problem of provincialisation of municipal functions such as health and ambulance services and removal of housing accreditation. In order to take the process forward, the CoJ proposes that: 24 Principle of fiscal redistribution is accepted but must be balanced with the City’s need for fiscal sustainability; Community/stakeholder participation be strengthened; Views of other provinces are heard; Need to identify the priorities to make the GCR a success e.g. marketing the GCR; GCR must demonstrate how it will improve quality of life of the people (“people centred”); and GCR processes must be consultative. MEC ’S COMMENTS ON THE 2008/09 IDP MEC’s for Local Government are required to officially comment on municipal IDPs with a view to enhancing service delivery and intergovernmental relations. The Gauteng MEC for Local Government, MEC: Qedani Mhlanga made the following comments on the CoJ 2008/09 IDP in view of the five national Key Performance Areas and the City responded accordingly: Local Economic Development and Growth MEC’s Comment City’s Response The CoJ contributes 44% to Gauteng’s Gross Value The CoJ adopted a Skills Development Strategy, which Added (GVA) and 16% to the national GDP. The includes: Accelerated and Shared Growth Initiative of South Africa Development of a Skills Hub in order to understand the (ASGISA) highlights the lack of skills in the economy as level of skills that exists among different categories of the one of the main hindrances to economic growth. One of City’s labour market, and in particular among the the strategic choices of the city is to address social unemployed; mobility and inequality through amongst others, a skills Buy-in from the private sector, including the FETs and HEI development programme. The city also acknowledges that stakeholders into the Skills Hub; and in order to address this issue, it needs to develop Setting up of the panel of ‘artisans’ who are ready to be partnerships with formal businesses, the Further contracted for the recognised for prior learning (RPL) Education and Training (FET) Colleges and Higher project. Education Institutions (HEIs), the Department of Economic Development (DED) and the Department of Labour (DoL). In order to meet the city’s growth target of 9%, it is anticipated that the city will expedite the implementation of its Skills Development Programme. The development of a support programme for Industrial The implementation of the Marlboro/Wynberg Economic Parks in the City of Johannesburg is currently underway. Plan as part of the Industry Restructuring Support This programme is focused on cluster development and Programme is a proactive initiative. It is recommended enhancement of physical and social infrastructure; human that the CoJ extends this programme to other industrial capital improvement and knowledge-based development; areas such as Jeppestown, Cleveland and Doornfontein. establishment of partnerships with relevant stakeholders It is also critical to ensure that city-wide programmes, like and adoption of a multi-sectoral approach to industrial the Industry Restructuring Support Programme, are development. aligned to area-based initiatives within the city. The mentioned areas will therefore benefit from the programme. The city’s plan to implement a Home Industry The Department is planning to rollout of the SMME fund Development and Support Programme encourages the will which will facilitate the participation of ex-combatants local production of goods and services. This initiative is in and vulnerable groups in businesses in line with the line with the Proudly South African campaign which arose proudly South Africa concept. from the concern about the increasing rate of unemployment as discussed at the 1998 Job Summit. The In addition, the Johannesburg Fresh Produce Market campaign's primary objective is to stimulate the demand (JFPM) is currently putting various mechanisms (Premium for South African goods and services. Hall) to support local emerging farmers to improve the quality of their products so as to supply for the global market. Part of the delivery agenda for 2008/09 is the The CoJ through the Department of Economic implementation of a support programme for Small Medium Development is in the process of finalizing a citywide and Micro Enterprises (SMMEs). Attached to the various SMME policy framework, strategy and implementation SMME support programmes that the city is currently plan that seeks to increase the overall participation of undertaking, there is a need to develop a clear SMME exit SMMEs in the economy of the City. The CoJ will ensure strategy. This strategy must be aimed at eliminating that an exit strategy is incorporated into the revised policy. continued SMME exclusive dependency on government funding for sustenance, and enhancing their financial viability. Nodal development in marginalised areas received very The research undertaken by the CoJ on the secondary property market creates a solid basis from which to design high priority for the allocation of resources, both capital and operational. A number of detailed development and implement interventions that would enhance the frameworks and precinct plans for nodes in marginalised growth and sustainability of this market. However, in line areas have been completed. Development interventions with the High Priority Areas as identified in the Growth have been identified and included in the capital Management Strategy (GMS), it is essential to prioritise programmes for these areas. Further work is also being the nurturing of economic activity (including a vibrant done on station areas to act as nodes and economic property market) in marginalised areas so as to deepen activity areas. their nodal status. This would enhance the economic functionality of these areas parallel to the process of structuring a desired city form. 25 Service Delivery and Infrastructure Development The CoJ’s efforts to explore energy saving measures in The City has significantly invested in electricity distribution response to the energy crisis facing South Africa are infrastructure and network upgrades. City Power has commendable. The Department of Local Government worked with Eskom to implement a load-shedding (DLG) is committed to address the electricity crisis management plan and develop demand-side gripping the province by ensuring that the Gauteng management policies to respond to the electricity Energy Strategy is properly implemented, in partnership shortages experienced in 2008. with all stakeholders, to ensure a 10% reduction in electricity consumption. The City is involved in programmes encouraging and allowing consumers to regulate their own demand for municipal services, with positive effects on the environment. These involve geyser control, prepaid meters, energy efficiency plans regarding heating, ventilation and lighting. Furthermore, the city has made use of solar lighting for traffic lights, landfill gas, and biogas from waste water treatment works. The CoJ must continue to work closely with the Gauteng CoJ Housing is engaging regularly with City Power and Department of Housing (GDoH) and align its Housing Eskom regarding planning for new housing developments Programme with the Electrification Plan so as to so as to ensure alignment of programmes. In addition the effectively reduce the electricity backlog in line with the City is promoting energy efficiency through orientation of 2012 Millennium Development Goals (MDG) electricity housing on site, implementing solar panels on the Cosmo target. City Project and utilizing energy efficient bulbs in some of the social housing projects. Also, the CoJ will engage GDOH as proposed. Working towards the conclusion of the Premier’s Priority The City received funding under the Neighbourhood Townships Programme (20 PTP) should be a major focus Development Partnership Grant (NDPG) which is directed for the 2008/09 financial year. A lot of work has already to townships and includes Zola and Orlando which form been done by both the City and the Gauteng Provincial part of the 20 PTP. Projects have been identified in both Government (GPG) in Zola and Orlando to meet the townships and are expected to roll-out in the current Premier’s directives. Furthermore, it is noted that the City financial year (2008/2009). has prioritised the tarring of roads in Ivory Park, Diepsloot Currently GDoH is piloting the backyard rental and Orange Farm. It is critical that these projects are accommodation which will provide valuable lessons for completed as envisaged. Completion of the 20PTP by the City. 2009 as per the provincial target is a critical step in taking forward the Breaking New Ground programme of building sustainable human settlements, gradually eradicating the mono-functional dormitory townships produced by apartheid spatial planning. The revision of the CoJ Growth and Development To address the service delivery backlogs in informal Strategy (GDS) target of complete eradication of the settlements, the City has developed and prioritized the sanitation backlog from 2011 to 2010 in line with the implementation of the Basic Services Programme. This national target assists in expediting the scale at which the programme is aligned to the Formalisation of informal provision of basic sanitation occurs in the city. Despite settlement programme which will resolve the critical issue challenges, largely in informal settlements, posed by of settlements established on privately owned land. settlements established on privately owned land, it is critical that the backlog eradication programmes on sanitation be fast-tracked. The CoJ 2008/09 IDP indicates that the city is currently The City has concluded the feasibility studies for the busy with feasibility studies with regards to informal informal settlements, and is working together with the settlements formalization. The city is encouraged to GDoH to expedite the process. The GDoH participates on continue to work closely with the GDoH to expedite this the multi-disciplinary Steering Committee that has been process. This expedition includes the speedy identification established at the City, and the GDoH and the City have and acquisition of parcels of well-located land for housing shared and corroborated their individual lists of informal development. A foundation for this land acquisition settlements. Current discussions are confirming how process has been laid in the finalisation of the land audit these settlements may be categorised for formalisation, processes both in the city and within the DLG. The i.e. whether the settlement can be formalised, and if so, conclusion of the formalisation process will assist in by way of in-situ upgrade or relocation, or whether it is ensuring that Gauteng meets the MDG target of already part of a township establishment process. The eradicating all informal settlements by 2014, and the provincial goal of informal settlements formalisation by provincial goal of informal settlements formalization by 2009 is clearly understood by the Steering Committee. 2009. In respect of the identification and acquisition of land, it is anticipated that the City's Land Strategy will address this. The Land Strategy looks at the acquisition and utilisation of vacant, underutilised and brownfields land parcels, which are both City and state owned, for the attainment of the City's strategic objectives and goals, specifically the provision of housing. The CoJ is one of the main destinations for migrants from The CoJ accepts that a major metropolitan centre will 26 other provinces within South Africa as well as other countries. The perpetual migration into the CoJ continues to pose challenges where service delivery, infrastructure development and maintenance are concerned. Migration into the city, if not properly managed, has the potential to undermine the city’s efforts to meet the essential service delivery targets. On this note, the city is urged, in partnership with other role players, to continue to intensify its efforts to deal with the influx through the Migrant Help Desk so that infrastructure backlogs caused by influx into the city are effectively managed. The discussion between the CoJ and the City of Tshwane (CoT) to integrate the Bus Rapid Transit Systems (BRT) is an innovation that will contribute to building Gauteng as a Globally Competitive City Region (GCCR). It is advisable that these discussions also include other adjacent municipalities in order to truly integrate the various public transport systems within the province. inevitably urbanise and attract migrants with the country and beyond. The key issue is the effective planning and management of the urbanisation process so as to ensure balanced sustainable development. Furthermore, the CoJ’s immediate plan is to expand the migrant desk services to the seven regions through the establishment of satellite offices with special focus on outreach work within communities. Formal meetings and discussions have taken place between the Tshwane and Johannesburg MMCs for Transportation and BRT technical teams, with the initial objective of mutual learning on the BRT process. The extension of the BRT network outside of Johannesburg will receive consideration in the Update of the City’s Integrated Transport Plan (ITP), which will commence shortly. Currently the Transportation Department (CoJ) is working closely with the Gauteng Department of Public Transport, Roads and Works on the design of Integrated Rapid Public Transport Networks to ensure that integration takes place. The CoJ has a comprehensive strategy to address demand side for water and to reduce unaccounted for water losses and this effort will ensure that the outcomes of these approaches are achieved. It is noted that although the national target on water is that of ensuring complete household access to water by 2008, this can only be achieved by 2010 in the CoJ. With a backlog growth of 7% in the informal settlements, the implementation of the Demand Side Management Programme, which includes education and awareness campaigns, the reduction of water losses through infrastructure refurbishment and the installation of prepaid meters, is critical. This will aid in mitigating the possibilities of Gauteng becoming a water-stressed province by 2015. The implementation of a GMS will help address issues of The comment is noted and supported as a critical aspect sustainable development and provide guiding framework of the strategy. A number of mechanisms have been on how the CoJ deals with the spatial disjuncture between developed and some are in the process of development. infrastructure provision and development growth patterns. The focus is more on enabling incentives but also include However, in this effort to restructure the form and function some disincentives. of the city, the GMS might require further depth in terms of clearly delineating disincentives to be employed in discouraging development in low priority areas. This set of tools might include the strengthening of enforcement mechanisms around land use development applications. As part of the lessons learnt from the GMS research, Noted. It is inevitable that resources would ultimately have substantial social amenities backlogs in growth areas to be prioritised and implementation staggered over time. have been identified. Within the context of limited GMS provide a clear framework for prioritization although resources, it will be significant to balance interventions to it is recognized that a finer grain assessment would be address this set of backlogs in growth areas against required. service backlogs in other areas, as envisaged in the MDG targets. Financial Management and Viability In 2004 the state of most municipalities’ finances was not The CoJ was previously receiving disclaimers due a satisfactory, prompting the DLG to pronounce the need to number of areas of weakness which included amongst achieve unqualified audit opinions by 2009. The CoJ’s others the completeness of revenue and fixed assets, achievement of an unqualified audit report from the consolidation of accounts and the complexity and scale of Auditor-General (AG) for the first time in 15 years for the CoJ structure and operations. External requirements like 2006/07 financial year, and at least two financial years international accounting standards, many pieces of before the target financial year is commendable. On this legislation and large volume of guidance, recovery of note, DLG congratulates the city and hope that this record debt, geographical size of CoJ, provision of free consumer will be maintained. services and governance also played a major role. The turnaround interventions that have facilitated the achievement of an unqualified audit report have been focused mainly on ensuring accountability among all departments and entities. These interventions are geared to ensure that the City maintains the clean audit trend going forward. According to the Provincial Treasury Report, the CoJ had The comment is noted although the Capex figure as at the 27 only spent 48.6% of its Capital Budget as at 31 May 2008. This level of expenditure is disconcerting and it is instructive that the city put mechanisms and processes in place to ensure maximum capital expenditure (CAPEX) in implementing the 2008/09 IDP. During the 2007/08 MEC engagements, one of the issues that were raised was the inability of the city to effectively deal with debt collection. It is expected that through the recently adopted Debtors Strategy the city will improve its debt collection rate to advance the city towards increased financial viability. end of June 2008 was 92%, which was an improvement from the 3rd quarter figure of below 50%. The CoJ is applying a number of mechanisms within the legislative framework to improve its overall effectiveness of debt collection, including: Engagement with a panel of attorneys to facilitate debt collection. Revised personnel structure to include staff dedicated to outbound telephone collections and written notices. Expansion of the CoJ revenue base through collecting in areas where there was previously no credit control-taking place. Restructuring of the debtors book. A full analysis of the debtors has been undertaken that provides a breakdown of the book thus assisting with the determination of the best approach to collect from the book. To complement the work currently being done with the debtor’s book, the City continues to annually collect an average of R1, 3 billion of the recoverable portions of the debtor’s book. The National Credit Act pronounces on steps to be undertaken in the process of debt recovery. In compliance with the Act, the City is proactively preventing prescription of debts through monitoring of accounts through systems that flag concerning accounts. Institutional Development and Transformation The CoJ’s dedication to service delivery is evident in the The CoJ will continue its efforts to further cascade the manner performance is managed in the city. The new PMS. Performance Management System (PMS), currently in the process of being cascaded to other levels of employment, is acknowledged. The city must continue steadfastly in its endeavour to implement the new PMS to promote and maintain a culture of performance. It is noted that the city has developed a system for The CoJ is in the process of finalizing its organizational tracking employees leaving the organisation and probing Retention policy, and the comments made by the MEC their reasons for doing so. It is recommended that the are very much part of this process, and will continue to findings derived from this system, particularly the exit inform our retention implementation. interviews, inform the CoJ’s Skills Retention and Succession Planning Strategies. The city has done well in terms of legislative compliance The comment is noted. in addressing racial imbalances with respect to Employment Equity (EE). The approval of the new EE plan that focuses on women and people with disabilities is a critical step in advancing the interests of designated groups. The DLG is looking forward to the successful implementation of this plan. Democracy and Good Governance The CoJ’s active participation in the various structures The City will continue to actively participate in the Core driving the GGCR agenda is markedly commendable. As Group and GCR Technical Committee, both convened by the city is well aware, the initiative necessitates the Premier’s Office to co-ordinate the Roadmap, going cooperation internally between municipalities as well as forward. The City will formalize support initiatives into a across the province (drawing on the various comparative GCR Framework in the 2008/09 financial year. advantages of each municipality) so as to enhance its regional competitiveness in the global circuit of urbanized regions. Consequently, it is critical for the CoJ to localize the GGCR Roadmap, through the expedient development of a CoJ GCR Framework which will spatially locate time bound, measurable interventions that will concretely enhance the GGCR agenda. The upscaling of the implementation of the Women Quarterly reports on implementation are presented to the Development Strategy (WDS) is crucial to the programme Mayoral Human Development Subcommittee. A review of of women empowerment, to inter alia enable them to the Strategy is to take place this financial year. The ward actively participate in the formal economy. The various women development forums set up as part of the strategy 28 programmes emanating from the WDS, if expediently and effectively implemented, could contribute to entrepreneurship and skills development among women, who constitute a very critical group in the country’s transformation agenda. The CoJ’s Councillor Training Programme, if properly linked to the Women Councillor mentorship programme and the Community Development Workers (CDW) training programme, would enhance the capacity of the city to improve Community Based Planning (CBP). This builds on existing working relationships between the ward committee system and the CDW programme, and provides a resource that could be tapped in enriching the process of priority needs and interventions identification processes. Moreover, regional summits should be integrated into the broader communication strategy to convey progress on programmes and projects to the citizenry, thus minimising service delivery-related protests sprouting throughout the city. The CoJ is the only municipality in Gauteng to have developed an Anti-Xenophobia and Common Citizenship Programme. It is noted that the city has budgeted to implement this programme in the current 2008/09 financial year. In this regard the city is encouraged to continue to work closely with the CDWs and other spheres of government, civil society, organized business and law enforcement agencies to curb violent attacks on foreign nationals. will play a critical role in the monitoring and evaluation of the impact at ward level. They will also be involved in mobilizing women to take up the opportunities offered by the city through this strategy. The City has begun to align the Councillor training programmes with Ward Committee training to ensure that Councillors and Ward Committee Members are on the same level of understanding of the issues facing their communities and how best to address them. The first phase implementation of Community Based Planning (CBP) provided an opportunity to foster collaboration between Councillors, ward committee members and CDWs. The training provided as part of this phase to all these role players enabled for a good working relationship among the Ward Councillor. Ward committee members and CDWs in the identification of ward priorities, the convening CBP Regional Summits, Public meetings and Ward Committee meetings. The Councillor Community Facilitation Programme targeting women councillors equips councillors with effective meeting skills, facilitation of community development processes and development management. The training programme also focuses on skills development on networking and building of partnerships with CBOs and NGOs The City has set itself two deliverables to Intensify its efforts on fostering tolerance and integration of migrants into communities. Facilitating community dialogues and seminars in all the seven regions. The CoJ intends to establish a Migrant Advisory Board a structure similar to the one of the City of London. The Board will draw representation from the various spheres of government like the Departments of Home Affairs and Foreign Affairs, the South African Police Services, migrant community and civil society. The main task will be advice the city on the development of regulations aimed at addressing some of the challenges faced by the migrant communities in Johannesburg. A report detailing the comments of the MEC with responses was submitted to the Mayoral Committee in 2008, for consideration. PROVINCIAL ENGAGEMENT, INTERGOVERNMENTAL PROJECTS AND TRANSFERS The idea of convening a Roundtable discussion for business plans and budgets was first mooted at the IDP Assessment discussion Workshop, which was held at Shumba Valley in August 2008. The Roundtable discussion served as a dry run for departments to prepare for the Budget Panel held from 26 November to 1 December 2008. The Roundtable discussions took place from 22-23 October 2008, in the Exco Boardroom, Metropolitan Centre and provided an excellent opportunity for cross-pollination of ideas amongst the core departments and constructive s well as the platform to engage constructively on the content of the business plans and the sector plans. It is also intended to address issues of dependencies between departments and to promote the culture mutual learning and sharing of information. The objectives of the round table session were: To provide feedback to departments on draft sector plans, draft business plans, budgets, both operational and Capex, as well as to departmental responses in terms of the community issues raised at the regional summits and departmental risk assessments; To identify areas of dependency and integration amongst the core departments and to consolidate areas of synergies; 29 To identify departmental and sectoral priorities both strategic and operational, to be addresses in sector and business; and To identify areas of intergovernmental alignment. The panel for the Roundtable discussion consisted of members of the following departments and spheres of government: lead departments (CSU, SHU, DPUM, JRAS, Budget Office, and Office of the Speaker); and Department of Local Government (DLG) Technical Steering Committee (TSC). PROVINCIAL ENGAGEMENT The section below highlights the high level issues between CoJ and Provincial sectors, per sector. Environmental Management Sector The Department has established good working relationship with its provincial counter parts Gauteng Department of Agriculture, Conservation and Environment (GDACE) in the area of Environmental Impact Management. The Department has afforded many Municipality Departments and Municipal Entities an opportunity to present their projects and resolve environmental authorisation related queries through monthly meetings held with the GDACE. Joint planning between the City and the Province is now taking place on key priority areas of development. Further, the Department has in the past year actively participated in the GDACE Technical Working Group Forum (GDACE TWG Forum – Sustainable use of Environment) chaired by GDACE and includes all Municipalities and Metros within Gauteng Province. It serves as a platform for discussion for collective planning/management, sharing ideas and collaboration on environmental issues such as response to climate change, integrated waste management and water resource management. The Department will continue to strengthen the relationship with its provincial counterpart and plans to establish a one on one intergovernmental relations forum with the Province. The Department also continues to engage with both the provincial and national Departments of Environment on matters pertaining to Air Quality Management through working groups that have been established. Through this relationship the Department has been successfully granted delegation powers in authorizing air quality permits until September 2009, which will go a long way in reducing air pollution emissions with the City of Johannesburg. Natural resource management remains a challenge as witnessed through the current state of water resources. The Department is engaging with Department of Water Affairs and Forestry and other key stakeholders through catchment management forums in proactively addressing these challenges. The Department also works in collaboration with DWAF (Working for Water) in alien plant removal and GDACE in upper Jukskei River clean up programmes. A number of notable partnerships have also been established on matters pertaining to biodiversity, catchment management and water quality management issues, these include: Partnership with other international cities around Biodiversity management through the Local Action for Biodiversity (LAB) Programme. Engagement with Department of Minerals and Energy in minimising mining activities impact on land and water resources. The city cooperate with the South African National Biodiversity Institute on the number of projects including “Alien Plant Control’s Working for Water Programme’, Grasslands Management Programme and Wetlands Management Programme. There is also cooperation with other council departments and MEs around the implementation of rehabilitation programmes, including the Klipriver/ Klipspruit Programme 30 Much progress has been made in collaborative efforts with neighbouring municipalities to address similar areas of interest. Collaborations include implementation of emission reduction strategies with Ekurhuleni and City of Tshwane as the emissions are trans-boundary, implementation of Modderfontein/ Kyalami EMF with City of Tshwane. The Department will, further establish a working group with neighbouring these municipalities for information sharing sessions. Transportation Sector The Transportation Department also engages with the national and provincial Departments and their agencies on the planning and implementation of its projects such as the BRT, 2010 FIFA World Cup and their projects such as Gautrain and the Gauteng Freeway Improvement Scheme, as well as on the : Establishment of the City’s Transport Authority N 17, and Increasing access to public transport services outside of the major arterial spines is a major challenge. Health Sector The Health Department has been having continuous Sectoral engagement with provincial counterparts firstly through the monthly Interim District Advisory Committee meetings at which joint service delivery projects are discussed; as well as through the Provincial IDP workshops on issues such as: Provincialisation of health care facilities has the potential to hamper services delivery Strengthening primary health care (through increasing service hours in selected regions) Jozi Ihlomile, there is a need to intensifying implementation and co-ordination with other spheres of government and non-governmental organisations (including business and community-based organisations) The need for the department to pay attention on issues of environmental health (Municipal Health Services) through promotional, educational and enforcement programmes The Health Department has in addition been engaging with other municipalities through the monthly SALGA Gauteng Social services working group meetings. Spatial Planning and Urban Management Sector The Department coordinates the citywide administration of the conditional grant funds received from National Treasury through the Neighbourhood Development Partnership Grant (NDPG). The grant aims to stimulate and accelerate investment in poor, underserved residential neighbourhoods such as townships, by providing technical assistance and grant financing for municipal projects that have a distinct private sector element. The NDPG priority areas are townships, RDP and low-income housing estates, homeland areas, town centres and informal settlements. The City will prepare a Township Renewal Agenda and related Programme to better coordinate the projects that are being undertaken by the various Core Departments and Municipal Entities. All NDPG-funded projects within the City will fall within the ambit of this Agenda and Programme, such that integrated development planning, public investment and leveraging of private sector investment is realised and optimised through the coordinated expenditure of the grant funds. Specific issues, include: 31 Number of Informal Settlements between Province and CoJ Expediting formalisation of informal (especially informal settlements located on private land) Streamlining CoJ and Provincial Informal Settlement Plan Roll-out of 20 PTP to other townships Clarity regarding provincial processes of proposed projects in CoJ area and clear descriptions thereof, including projects done by Blue IQ, GEDA and GEP Clarity on the Urban Edge Review process is still hindering Housing Sector The Provincial Department of Housing plays an active role in planning and implementing housing projects within the jurisdiction of the City of Johannesburg. In addition the Provincial Department provides the subsidy funding for the City to implement its housing projects and achieve it targets. Thus ensuring greater alignment of projects and programmes between the two spheres is critical to coordinated and effective housing delivery in Johannesburg. Although there are regular engagements between the Province and the City, greater and effective coordination is required in the following areas and programmes: Formalisation of informal settlements; Conversion and redevelopment of hostels; Implementing emergency housing; and Roll out of Accreditation of Municipalities. If these issues are not adequately addressed, this may have a negative impact on the City’s objectives and targets. Legislature Sector The Office of the Speaker in the City of Johannesburg Council works closely with the equivalent Offices at a Provincial and National Level. This cooperation will develop over the remainder of this term of office and includes: Development of the institutional “Johannesburg” model and the identification of the necessary legislative changes; Alignment of Oversight and Scrutiny including joint sittings of matters that require a multidisciplined approach; Cooperation on community participation with Committees and Members of the Executive Committee of Province in association with the relevant City Committees and Members of the Mayoral Committee; Ceremonial and protocol matters; and The Speakers Council of Gauteng. In terms of the provision of section 40 chapter 3 of the Constitution all spheres of government must observe and adhere to the principles and conduct their activities within the parameter of the chapter. In a formalised manner the Speaker of council participates in the Speakers forum to enhance good governance. Administratively officials of the local legislature contribute meaningfully by participating in various forums such the provincial establishment of economic black empowerment, human capital development, SALGA, Commission for Remuneration of Public Office Bearers and Local Government at provincial level in furtherance of the Johannesburg governance model by empowering municipalities which wishes to implement the governance model. Corporate and Shared Services Sector In view of the Sector’s primary internal focus, in contrast to the provision of external services to communities at large, alignment with Provincial as well as National initiatives is predominantly ensured by accommodating National legislative and generic strategic priorities. However, in the case of Public Conveniences, interaction with Provincial programmes is facilitated via interaction with the Spatial Form and Urban Management Sector while continuous liaison with the City’s 2010 programme is furthermore ensured. The impact and implication of key programmes such as 32 the evolution of the Gauteng Global City Region and the establishment of a single Public Service are accommodated, via interaction with internal units such as the Central Strategy Unit and continuous engagement with key stakeholders such as SALGA and the Department of Provincial and Local Government (dplg). Economic Development Sector The Department continues to actively engage with both provincial and national stakeholders in critical areas to ensure that implementation is carried out in a complementary manner that maximises use of scarce human and financial resources. In particular extensive consultations are being carried out through the City’s Policy and Program development, the road shows promoting the Inner City Property Scheme, the Regional Spatial Development Frameworks, and the other developmental efforts being embarked on. In addition to the public sector engagements, private sector participation is actively pursued via forum such as the monthly Johannesburg Business Forum to establish where areas of intervention should be, and where private sector should be encouraged to take the leading role, such as in the ICT project. Further, the Department has in the past year actively engaged with GEDA on issues of development of the SMMEs specifically around the Community Bank and undertook study tour jointly to India and Bangladesh. Further engagements continue with state owned financial institutions such as DBSA for the Jozi Equity Fund. The Department sits on the SANIEF Forum represented by major Municipalities and Metros within Gauteng Province which serves as a platform for discussion for collective planning/management, sharing ideas and collaboration on economic issues pertaining to informal traders. The Department will continue to strengthen the relationship with its provincial counterpart and plans to establish a one on one intergovernmental relations forum with the Province. A number of notable partnerships have also been established on matters pertaining to SMME skills development programme with the University of Johannesburg’s Centre for Small Business Development and the Business Place. Other partnerships involving the, Sector Support programme are notably with the private sector such as the Diamond school to help establish a core of skilled entrepreneurs in value-add mining services, the International Positioning programme that engages with External Relations Unit to identify, establish and build economic relationships on an international, national and local with several international bodies and selected sister cities. The Department is positioned to facilitate the implementation of the recently signed MOU between Gauteng Department of Local Government and the Belgian Chamber of Commerce. Direct discussions between the Chamber and the various municipalities including COJ are under way. Cooperation also continues with other council departments and MEs around the implementation of EPWP and BEE programmes. More specific issues include: 33 Implementation of projects remains an key challenge for the department The “trickle-down” impact of the 10 catalystic projects may take longer than the current term of office (Soweto Empowerment Zone, SMME fund and most recently Inner City Property Scheme) 9% economic growth summit resolution needs further unpacking The development of the Liner Market need to be revisited (impact vs. budgetary requirements) Special attention needs to be paid to issue of dependencies, i.e. DED and DPUM on spatial planning related, DED and Community Development around the skills development The department need to address supply-side support interventions such as economic concentration/agglomeration, industrial support and the creation of economic linkages vertically and horizontally at the local level Revisit targets for Expanded Public Works programme city wide. Financial Sustainability Sector The sector strives to create engagements with other spheres of government. The Department of Local Government has supported the sector through PSU initiatives, assisting the sector with data purification. In the spirit of learning from neighbouring municipalities the sector, through R&CRM, has bilateral ties with the City of Ekurhuleni in areas of pay points maximization. Together with other spheres of government the sector is participating in the Thusong Service Centre. Thusong Service Centre is the output of a study conducted in 2003 by SITA as well as DPSA in 2005, based on the Brazil model. The Service Centre is deemed ideal as part of the process of achieving the government’s vision of improving access to, and quality of services to all recipients, including citizens, business and public servants, based on the Batho Pele principles. Thusong Service Centre is an urban shopping mall that provides the following: Integrated approach to service delivery in urban areas; Wide range of technologies appropriate to the needs of citizens; Delivery of services to citizens using many innovative delivery channels; Sharing the initiatives of other stakeholders, e.g.: National Governments, Provincial Governments and Metros; and Integrated use of government resources. More specific issues include: Undertake financial impact on the CoJ citizens ability to pay for services due to global / national financial challenges Effectiveness and functioning of the call centre (turn around time of case reported) Explore possibilities of decentralization of points of contacts region wide Consider refining supply chain management process (i.e. requesting service providers to indicate the ward they are from) so as to ensure that the department meets its target of preferential procurement With regard to City’s Capex spending, there is a need for the department to develop mechanism to penalize under spending/ under reporting Challenges regarding MIG spending. Public Safety Sector As part of the intergovernmental relations programme, EMS and JMPD engaged with critical stakeholders like the Gauteng Provincial Government Health Department, the Department of Local Government, the South African Police Services and the Department of Community Safety. One of the important issues discussed with Provincial Health is the provincialisation of ambulances, capacitation of the ambulance service ahead of the FIFA Soccer World Cup. In relation to the Department of Community Safety, some of the discussions include the development of joint 2009/10 programmes, signage, consolidation of the school safety programme, social crime prevention programmes, bad buildings and joint simulation programmes. Further engagement will be held to improve the value of the programme on: JMPD deployment strategy for crime prevention and traffic management Support structures for CPF's need to be adequately communicated and effectively monitored so that detailed feedback on each CPF can be produced Urban management (by-law enforcement), the role played by DPUM and regional offices is not sufficiently explored in the responses Training and deployment of fire fighters Readiness of the Disaster Management Centre before 2010 is a major concern Issues of interdepartmental and intergovernmental dependencies require innovative solution as most of this sector’s outputs are fully depended on joint inputs from various role-players. 34 Community Development Sector There is a need for and integrated approach to deal with removal of street children (the infants with their mothers from the street intersection) and the Youth and women empowerment programmes need to be streamlined. Infrastructure and services Sector This sector needs to focus on the alignment of Capex investment projects in CoJ and an integrated plan to address infrastructure backlogs. INTERGOVERNMENTAL PROJECTS AND TRANSFERS During the IDP and Business Planning Round Table session held in October 2008, Provincial Departments had the opportunity to engage sectors in terms of the 2009/10 Delivery Agenda, including City projects identified for the 2009/10 financial year to ensure joint implementation of projects. In February 2009, Gauteng DLG forwarded a set of 2009/10 Capex projects, approved by the Gauteng MEC for Finance, to be implemented in the City. The detail of the Capex projects is covered in the Medium-Term Budget Book. The section below outlines the funding to be transferred by both provincial and national government to the City. Provincial Transfers for 2009/10 Department HIV/Aids Primary Health Care EMS Community Development: Sports, Arts, Culture and Recreation-Equitable Share Community Development: Sports, Arts, Culture and Recreation-Recapitalisation of community libraries Environment: Sustainable Resource Management Environment: Technology Development and support Total: 2009/10 Budget (000) 2 465 76 967 75 300 1 120 7 000 1 000 150 164 002 CONCLUSION The City is committed to refine the IDP process and will therefore ensure to continually deepen IGR engagements through sectoral engagements and joint planning as well as through provincial participation in the CoJ budget process as at the Round Table sessions held in October 2008, where provincial officials engaged the city in terms of its business and sector plans. 35 CHAPTER 4: COMMUNITY OUTREACH INTRODUCTION The City’s commitment to public participation and consultation is based on its Constitutional and legal obligations and its overall governance model. Furthermore, a Well-governed and managed city is one of the six Mayoral Priorities of the Executive Mayor for the current mayoral term. In line with the City’s long-term vision, the City engages in public participation to ensure that through its planning processes it empowers communities to generate ideas and contribute meaningfully in the creation of a more equitable and spatially integrated city. Also, the City has the responsibility to respond to both citywide challenges (e.g. public transport and employment creation) and local (community or ward) needs and issues (e.g. speed humps on a local street, street lighting or upgrading the local community hall). The MEC for Local Government has commended the City on the vigorous outreach process undertaken in the previous years, noting positive developments in the consultation process. In the 2007/08 IDP Review and she made the following comment: “In drafting its IDP, the City has followed a process that is largely compliant with the Municipal Systems Act (MSA). Furthermore, the City can be applauded for the manner in which consultation and stakeholder engagement processes are managed. Testimony to this is the way in which issues raised during Regional Stakeholder Summits, the Inner City Summit, Mayoral Road shows and other forums have been captured and presented in the IDP. In the City’s quest to pilot a Community Based Planning approach, it is recommended that the City consider utilizing the opportunity to capacitate and empower communities to own the planning and budget processes in their wards.” Hence, the City has engaged and consulted with its stakeholders on the 2009/10 Budget and Integrated Development Plan (IDP). This chapter describes the processes followed and issues raised during this consultation process. The outreach process, in preparation for the 2009/10 IDP, consist of three distinct phases: Phase one: Ward Public meetings and Regional Summits Between October 2008 and January 2009 ward councillors convened ward public meetings to report on projects, to discuss budgets that have been prioritised for their respective wards, to confirm 3 priorities contained in ward plans and to sign off ward plans together with communities so as to form part of the revised final budgets prior the Budget Lekgotla held in February 2008. These meetings were also used as an opportunity to report back on the implementation of 2008/09 projects. The majority of the 109 elected ward councillors held meetings. Furthermore, a series of regional meetings are being held with various stakeholders, namely Youth Council, NGOs, faith-based organisations, labour and people with disability to create public awareness of the City’s mid-term achievements, to inculcate the culture of participatory planning and also to mobilise communities in order to participate meaningfully in the city’s outreach and consultation processes (i.e. stakeholder summit). 36 The table below outlines the Regional Summits currently being held. Region Region C Region D(1) and D(2) Region F Number of Wards 12 wards 36 wards 15 wards Date 07 March 2009 07 March 2009 07 March 2009 Region A Region G Region E Region B 9 wards 12 wards 14 wards 11 wards 14 March 2009 14 March 2009 14 March 2009 14 March 2009 Venue Civic Center Council Chamber, Roodepoort Orlando communally hall, Eureka House, 92 Malborough and Rossettenviile Road, Springfield. Halfway House Primary School Poortjie Multi Purpose Centre Park Recreation Centre, Orange Grove Riverlea Empowerment Centre High-level Summary of ward issues across sectors A full set of ward issues and the departmental responses is contained in IDP Volume 2: Area Based Initiatives and Projects. The analysis of ward issues raised by ward stakeholders in the regional summits fell into five categories: Service Delivery issues including upgrading and maintenance of infrastructure and urban management; Public participation issues such as community involvement in decision-making, customer relationship management issues and communication processes; Service level issues such as levels of infrastructure quality and frequency of maintenance interventions; Developmental issues such as infrastructure, systems, processes and projects to assist improve the quality of lives of Joburg residents; and Issues relating to provincial functions and powers. In terms of service delivery issues it is difficult to scientifically assess the extent to which these are prevalent in wards because the regional summits were prefaced with the request that these not be included in the ward plans rather referred to the “green book”. The latter is the official record. However it is interesting to note that despite this request the service delivery issues still crept into the ward plans quite substantially. Mostly these issues focused on the clearing of stormwater drains, the maintenance of public parks and the maintenance of street lights, traffic signs and traffic lights. Although not many public participation issues were recorded in the ward plans the discussions around development of the issues, their prioritisation and the departmental responses reflected a sense of distance between the departments and communities, councillors and communities and it also reflected a sense of frustration at the impenetrability of the service delivery departments. Simple and available information on service delivery routines are not made available to the public and where there are deviations, these appear not be made available to residents. With regards to customer relationship management there is a distinct sense that beyond the call centre whose turnaround time does not meet the expectation of residents, matters cannot be escalated and information on resolution such as lead times is not known by the call centre staff. Also, it became apparent that there is not adequate information dissemination on departmental activities to communities. For instance in some cases, long project/process approval cycles are clearly not understood by communities which impact on prioritisation of issues. This suggests that departments are not adequately communicating macro development process progress such as the Urban Edge investigation and the status of conservancies in the City, to name a few. 37 Furthermore, the public participation meetings made it apparent that community stakeholders are still not familiar with Council processes in general. For example, there is an expectation that ward issues raised at the public meetings will receive attention however the planning and budgetary process in the City are very complex. In addition to this community members require more information on council policies especially zoning and its components, development priorities, densification, the limits on certain types of expansion and development and provincial competencies. Moreover, in articulating their developmental priorities communities tended to demand high levels of service in all areas all at once. There seems not be a sense that levels of service are related to rates and that improvements in service levels are sequenced according to budget availability. This relates in some part to the previous comment about the awareness of the provisions of council policies, in this case the approach the city takes to improving service levels according to affordability. The most obvious example of this is the surfacing of roads and the installation of stormwater. The latter reflects a high level of service and the achievement of this level correlate to budgetary sequencing in terms of Capex allocation, affordability and rates levels – yet community members cannot apply this standard to their expectations of developments in their neighbourhoods. Developmental issues are the kinds of issues were mostly expected to come from the CBP process. These issues related largely to five core issues: Access to services provided by all three spheres of government: These tended to be expressed as the need for a multi-purpose centre but when interrogated translated into access rather than physical infrastructure Sporting programmes for the youth: Again these tended to be expressed as infrastructure in the name of sporting facilities development but when interrogated communities just needed a solution to youth entertainment Skills Development and SMME opportunities: Similarly, this need is expressed as a need for a skills centre to address poverty and joblessness but upon closure reflection indicates the need for second economy stimulus and an expanded social net Surfacing of roads to a high level of service: This reflects an expectation by community members that where a road exists, it must be tarred and has stormwater installed in all instances. Traffic management received substantial attention particularly the effectiveness of traffic calming in residential areas, the management of congestion and the maintenance of traffic management infrastructure (traffic lights and signage) Issues relating to provincial functions and powers: A large component of these issues were around education and health issues. In terms of the former, there seemed to be a frustration that land zoned for provincial projects such as schools was not being effectively utilised. In terms of the latter there is a definite demand that certain hospital services be provided at primary health care clinics, most notably maternity services. All these issues were escalated to relevant provincial authorities. Phase two: Stakeholder Summit and Outreach process In preparing for the Stakeholder summits, departments tabled their draft delivery agendas at Section 79 Portfolio Committees for comment. The Delivery Agendas provided an outline of the actual deliverables for 2009/10. Furthermore, at the Stakeholder Summit sectors are expected to provide progress on the ward issues submitted during community based planning. The IDP will be tabled at Council for commenting purposes. Subsequent to the tabling of the IDP, the City will host the Stakeholder Summit wherein the Executive Mayor will present a high level overview of the City’s mid- term performance; overview of the 2009/10 IDP, Budget and tariffs and a summary of the all Capex projects planned for each ward and the City’s big ideas for the medium term. Also, at the Stakeholder Summit, sectors will present their mid-term achievements and their delivery agendas for 2009/10 financial year in order to allow communities and stakeholders to make inputs prior the Budget Day. 38 Phase three: Intergovernmental engagement and commenting process This phase includes participation in various sectoral engagement sessions led by the Gauteng Department of Local Government with provincial and national counterparts. Furthermore, the tabled IDP will also be forwarded to the MEC for Local Government in preparation for the Provincial IDP Analysis wherein provincial and national departments and parastatals provide comments in relation to the issues of alignment and harmonization prior final approval of both the IDP and Budget. Culminating from these processes, the City intends to provide feedback to stakeholders and communities on the final decisions of Council, including the approved 2009/10 IDP and Budget and the City’s Service Delivery and Budget Implementation Plan. These will be undertaken in July 2009. 39 CHAPTER 5: SPATIAL DEVELOPMENT FRAMEWORK (SDF) AND CAPITAL INVESTMENT FRAMEWORK (CIF) GROWTH MANAGEMENT STRATEGY (GMS) The City of Johannesburg faces a series of direct and in-direct challenges that will impact on its sustainable growth and development. These include but are not limited to: A desire to see the City facilitate accelerated economic growth (above the National Gross Domestic Product figures); A disjuncture between infrastructure provision and development growth patterns; National shortage of energy; The on-going challenge to restructure the spatial economy of apartheid settlement, and The need to detail where the City is prepared to invest in infrastructure, in terms of priority, medium and long-term. In response to these challenges, the City has developed a comprehensive Growth Management Strategy (GMS) to determine where, and under what conditions, growth can be accommodated. The concept of “Growth Management” is widely used internationally to ensure that population and economic growth is supported by the necessary services and infrastructure and at the same time meets spatial and socio-economic objectives. The GMS is complimentary to other strategic policy documents such as the City’s Spatial Development Framework (SDF) and is premised on the six development paradigms of the Growth and Development Strategy (GDS) adopted in 2006, namely: The pro-active absorption of the poor; Balanced and shared growth; Facilitated social mobility; Settlement restructuring; Sustainability and environmental justice; and Innovative governance solutions Explcit statements in the GDS that influence a GMS for the City include: “The (future) urban form…will be anchored on an efficient public transport system, and a worldclass network of transport infrastructure” “The city form must be changed to bring jobs closer to people and people closer to jobs” “Anchored on the Gautrain and a complete refurbishment of current infrastructure, rail will be a mode of choice for many people…” “City functioning must improve to accelerate the pace of delivery of appropriate housing in good locations and to reduce the high cost of having to deliver services on the urban edge.” “…ensure that movement systems in the city directly link with, and are supported by, strong highintensity, mixed-use nodes and higher residential densities.” There is a direct relationship with these statements and the development strategies of the SDF relating to strategic densification, nodal management and movement and the Urban Development Boundary. The GMS has built on these policy foundations to determine the growth parameters for the City. 40 Primary Informants of the GMS A series of inter-related projects and outputs are being used to inform the City’s GMS. The table below provides a summary of these projects. Input/Projects into GMS An Economic and Property Perspective that considers status quo and potential growth scenarios Curent Policy/strategic documentation e.g. GDS, SDF etc. A Regional Analysis reflecting the development profile of each of the City’s administrative regions Questions to be answered A Trend Analysis System that explains the development trends within the City Potential Growth Estimate Precincts in and around designated areas Verification of Infrastructure capacity in these Growth Estimate Precincts A Land Strategy that indicates the main opportunities for infill and growth How much growth can the City expect? In which sectors will this growth occur? Where is the market tending to direct this growth? Time-frame Completed How much growth does the City want to achieve? What kind of growth do they want? Where does the City want to direct this growth? Where are the City’s priority areas? Existing What is currently happening in the regions in terms of development? What are the major property trends in each of the regions? What are the major development constraints experienced in each of the regions? Completed Verification of the above inputs/projects Based on the City’s policies, the nature and number of development applications received, as well as the trends in the property market, what can the City anticipate in terms of City growth during the next 5 to 10 years? Based on this information, how can the City take advantage of the opportunities generated by this situation? Completed How much growth can currently be sustained in these designated areas? What needs to be done to accommodate the desired level of growth in these areas? Completed Can the current level of infrastructure in these areas accommodate any future growth? What needs to be done/how much invested financially in order to accommodate the desired level of future growth? Completed Besides the designated areas, where else can the City accommodate new growth? Where are the resources in terms of City owned land and infrastructure capacity that could assist in accommodating future growth? What needs to be done by the City in order to acquire property/land in designated areas or elsewhere? Completed A completed Informal Settlements database and a framework for formalisation re: guidelines and development scenarios What is the existing backlog for formal housing? Which settlements have a plan of action? If addressed in the existing informal settlements, what needs to be done/ invested by the City to accommodate the existing backlog together with the anticipated growth? Database complete / Framework In Progress Northern Detailed Development Frameworks How will future growth be accommodated in the Northern Region of the City? What kind of development will be allowed where? How will this solve the existing housing backlog in the area? What are the infrastructure requirements to accommodate this growth and development? Completed How has the City determined geographic priority areas? Completed Growth Management Areas 41 Input/Projects into GMS Questions to be answered Time-frame What development parameters apply to these areas? Specifications re: Inclusionary Housing and Infrastructure A Framework of land development incentives and disincentives that would facilitate the appropriate development of the Growth Management Areas How can the City encourage the market to direct future urban growth to where the City desires? How can the City ensure that the types of development are desirable /consistent with the City’s vision for a specific area? How can the City and the Private Sector form partnerships to address appropriate future growth? Framework complete, Implementation pending Outcomes of the GMS Research Current Land Use Growth patterns: Map 1 indicates densification trends in the City as assessed by the Department of Development Planning and Urban Management and also reflects the location of Township Establishment applications. Information relating to power and water capacities has been overlaid on these densification areas and a clear correlating pattern of the City’s hotspots and the densification areas emerges (Map 2 – relating to Power). The provision of social amenities has also been hugely constrained in these growth areas and has developed substantial backlogs in respect of public facilities such as schools and clinics (which remain the mandate of the respective Provincial Departments). One of the major constraints relating to information within the City is in respect of the City’s decentralised office space, specifically in the south of the City. With respect to decentralised office space that has been monitored, the performance of the major office nodes is reflected in Table 1 (reflects Category A and B). The decline of some nodes (e.g. Braamfontein, Randburg) may be attributed to changing land uses (from office to residential) and / or re-classification of office space from A/B category to “C” Class (i.e. downward re-classification). Sandton & Environs Midrand Randburg Braamfontein Bryanston/ Epsom Downs Sunninghill Rosebank Woodmead Bedfordview/Bruma Parktown Milpark Rivonia Illovo Constantia Kloof Basin Hyde Park/Dunkeld Fourways Houghton/Killarney Melrose/Waverley Total Rentable Stock 2001 1,020,042 356,728 459,922 427,788 242,810 302,952 281,292 230,093 274,446 290,331 177,825 269,636 90,301 72,444 101,124 57,376 73,091 22,018 4,750,219 Source: SAPOA Top 4 in terms of % change Table 1: Decentralised office space 42 2006 1,030,950 399,589 377,399 347,888 308,970 304,607 290,840 287,539 282,296 256,942 222,980 207,981 147,586 140,264 104,625 102,921 98,467 49,741 4,961,585 % of total market 20.78 8.05 7.61 7.01 6.23 6.14 5.86 5.8 5.69 5.18 4.49 4.19 2.97 2.83 2.11 2.07 1.98 1 % Change in m2 1.07 12.02 -17.94 -18.68 27.25 0.55 3.39 24.97 2.86 -11.5 25.39 -22.87 63.44 93.62 3.46 79.38 34.72 125.91 4.45 Bottom 4 in terms of % change In addition to the decentralised office information, Maps 3 and 4 indicate the spatial distribution of retail shopping centres, Map 3 indicates all shopping centres developed in the City prior to 2000 2 2 and over 30,000m . Map 4 relates to all shopping centres developed post 2000 over 10,000m in extent. A wider distribution of these centres emerges post 2000, with Soweto and the North-West of the City in particular, experiencing substantial retail-related land use growth. GMS Proposals The City is intent on defining Growth Management Areas that will: Differentiate between priority / short-medium term development areas (i.e. where the City intends investing City funding and will consider approving development rights) Indicate additional development conditions within the respective Management Areas (e.g. inclusionary housing, infrastructure provision, incentives etc.) The Management Areas are indicated below and spatially represented in Map 5: Public Transport Priority Areas Marginalised Areas Consolidation Areas Expansion Areas Peri Urban Areas High priority areas are those located around the priority public transport network: Gautrain, Bus Rapid Transit System (BRT) and SARCC rail network (i.e. Public Transport Priority Areas) and the Marginalised Areas. These areas will be the focus for service upgrading in short to medium term (current – 5 years). Medium priority areas represent the remainder part of the developed urban environment (i.e. the Consolidation Areas) as well as some priority Expansion areas. Services within the medium priority areas will be upgraded in the medium to longer term (5 – 10 years). Low priority areas represent Peri-Urban Areas outside the City’s Urban Development Boundary and, if at all, will be serviced in the longer term (10 years +). A summary of the proposed Management Areas is illustrated in Table 2 below. Management areas Where? Why? Requirements Public Transport Priority Areas CoJ CBD ± 20 Growth Estimate Areas along priority public transport network Transit Orientated Development Areas (± 1 km around rail stations) Industrial Areas within 1 km from priority public transport system To restructure city form and bring jobs closer to people and people closer to jobs. City fabric to ensure more livable neighbourhoods, and city functioning to improve urban efficiency and promote economic development. Minimum of 20% inclusionary housing Inclusionary housing portion to be provided on site or along BRT distribution network related to the area. Considered Incentives Special Rating District Density bonus Fast track applications SMME support Tax rebate for high density inclusionary housing Off site parking associated with BRT park and ride NB: application of these inventive dependent on locational aspects Marginalised Areas 43 Diepsloot / Ivory Park / Orange Farm To ensure that all people have equal access to Economic development to be Management areas Consolidation Areas Expansion Areas (Comprises areas identified to accommodate short to medium term urban expansion, and which are located around future public transport routes: BRT future phases). Peri-Urban Areas Where? Why? Requirements Development Programmes Alexandra Urban Renewal Area Soweto Area proper services and facilities, and that the benefits of growth are shared more broadly in the City. Includes all developed areas not covered by the previous categories, and distinguishes between two subcategories: areas: Areas located along/around future public transport routes (BRT phases 2 and 3) – Densification / rezonings allowed subject to services availability) Areas not located around any future public transport routes (Very limited further development allowed, irrespective of infrastructure availability) Two sub-categories: Socio-Economic Priority Expansion Areas (Central North (Diepsloot) and all Southern Expansion Areas Market Driven Expansion Areas (North Western Areas (Lanseria) and North Eastern Area (Kyalami)) To optimally utilise existing infrastructure to promote development along future public transport corridors, without compromising the sustainability of the city by over utilisation of such resources. promoted as part of selected precinct developments Focus is on the provision of socio economic facilities and upgrading of infrastructure Development to link with public transport Areas with limited infrastructure capacity: Allow medium to high density development with significant inclusionary housing component within walking distance from BRT distribution network subject to Infrastructure availability provisions Areas beyond the UDB To prevent low intensity development in areas that will place an unnecessary (and unsustainable) burden on physical, financial and human resources of the city. Areas experiencing significant service backlogs: No further development allowed short to medium term NB: Limitations on development type and extent of curtailment to be determined To facilitate and accommodate growth and expansion only in selected areas (around future public transport network) which will enhance the sustainability of the city in the medium to long term. Table 2: Proposed Growth Management Areas 44 Housing mix premised on: 30% Subsidy 20% Inclusionary 50% bonded Density: 60 –125 dwelling units per hectare linked to Public transport. Economic and social facilities inclusive within development Public transport orientation and design ( for future role out) Private sector infrastructure provision in Market Driven Expansion areas No development allowed short to medium / long term (within the provision of Land uses permitted beyond the UDB) Considered Incentives The Development Strategies of the SDF In association with the GMS, the City’s Spatial Development Framework (SDF) prescribes a series of development strategies and policy guidelines to address development challenges and to re-structure and re-engineer the distorted and existing urban form. The founding principles of the SDF are the creation of a sustainable urban environment, increasing of the efficiency of the City’s various components and facilitating access to urban opportunities. These are considered in Table 3 below. Principle Sustainability Efficiency Accessibility Outcomes Responsible use of the City’s natural resources A sustainable rates base and financial model Safe and secure urban environments through safety and design principles Protection and conservation of the City’s cultural heritage Sustainable economic growth and job creation An efficient and robust urban form and structure Managed growth facilitated within the constraints of infrastructure provision An open space system that is citywide in extent and interconnected Facilitating physical access to opportunities for all communities and citizens Diversity of opportunities – economic, social and institutionalafforded by the City All modes of transport supporting good access to opportunities Table 3: Principles and outcomes of the SDF To accelerate the delivery of developments that support the SDF’s principles of Sustainability, Accessibility and Efficiency, medium and long-term objectives and strategies have been supplemented by specific instruments that are used on a daily basis to address recurring development issues and assess the appropriateness of a development proposal or initiative. Further, these are supported by Capital Investment Programmes which are detailed later in the CIF component of this Chapter. These instruments inform potential investors, developers or communities of the expected approach to development to ensure that development supports and implements the identified strategies. The spatial manifestation of the plan is represented in Map 6. Development Strategies Supporting an efficient movement system 45 Past trends Developments designed for private vehicles. Inefficient public transport Hierarchical road network with numerous unconnected roads, loops and dead-ends Mobility of arterials compromised SDF desired urban form Multi-modal transportation and land use patterns that support public transport and pedestrian movement. Focusing development (esp. higher density residential uses) in existing public transport infrastructure. SDF instruments Objectives Road Hierarchy Bus Rapid Transit (BRT) Gautrain Stations Existing rail network Support public transport. Reduce travel and transport cost. Promote accessibility of communities to employment, recreation and social opportunities. Protect the mobility function of major arterials and roads. Ensure that movement system directly links with and is supported by strong high intensity nodes and higher density residential development. Development Strategies Ensuring Strong Viable Nodes Supporting Sustainable Environmental Management Initiating and Implementing Corridor Development Past trends “Creep” of nonresidential uses into residential areas Increasing vacancy rates and declining amenity in key nodal points Unchecked, market led, speculative nodal development that has placed demands on public investment in infrastructure Emphasis is on private space i.e. shopping malls, security estates and private open space. Lack of functional and connected network of open space New development has outstripped the provision of open spaces and social amenities Stormwater infrastructure being exceeded Ad-hoc and unmanaged approach to linear development No consistency in the use of the term corridor SDF desired urban form A Managed Hierarchy of nodes within the City Non-residential uses are limited to existing and emerging, managed nodal points Increased profile of the pedestrian and public transport aspects of the nodes SDF instruments Objectives Nodal Hierarchy Nodal Profiles and Boundaries Management guidelines Ensure clustering of various activities (work, live, play and pray) at appropriate locations. Support viable public transport. Maximise opportunities and diversity at accessible points. Emphasis on public space i.e. pedestrian environment, public parks and facilities. Johannesburg Metropolitan Open Space System. Design Guidelines. Create a network of open spaces Support sustainable stormwater catchment practices. Protect important environmental areas. Promote the prevention and reduction of pollution. Delineation of two development corridors Focused infrastructure deliver to support corridor development Series of goals and objectives established per corridor East West Development Corridor (EWDC) North South Development Corridor (NSDC) Determine appropriate interventions Maximise opportunities Facilitate linkages Manage new developments in a co-ordinated fashion. Combat urban sprawl. Create economies of urbanisation. Focus on in-fill and redevelopment. Support efficient infrastructure provision (capital investment). Provide a mechanism for effective growth management. Support a more efficient urban form that is public transport orientated. Protect environmentally sensitive areas, agricultural land and open space. Support a multimodal transportation system. Promote appropriate Managing Urban Growth and Delineating an Urban Development Boundary Urban sprawl on greenfield sites Erosion of rural character of the few rural assets of the City Proliferation of subsidised housing initiatives on peripheral locations away fro economic and social opportunities Escalating physical and social infrastructure demands and costs for both new infrastructure and maintenance costs Infill, “brown-fields” developments Abatement of urban sprawl on the periphery of the City Conservation of rural character of areas beyond the Urban Development Boundary Land use guidelines. Subdivision of Land Table. Amendment Procedures. Increased Low density and Higher densities and Strategic Densification 46 Development Strategies densification of strategic locations Facilitating sustainable housing environments in appropriate locations Past trends dispersed activities Market preference for one erf one unit Perceptions that increased density equates to low cost housing Wasted land opportunities e.g. car parking above ground Low coverage and height restrictions Subsidised housing located on the periphery of the City and its opportunities Lag in delivery of non-residential components of new housing schemes e.g. clinics / schools Focus on 250m erven on single erf SDF desired urban form clustered activities in identified strategic locations, Co-ordinated investment in infrastructure to support densification initiatives Increased focus on infill and regeneration programmes in closer proximity to existing opportunities and infrastructure Range of housing typologies to support the accommodation of various needs SDF instruments Objectives Priority Areas Base and minimum density guidelines proposals densities and densification. Promote the optimal use of existing and future infrastructure and resources. Spatial location and database of the City’s informal settlements Housing Programme Pilot Projects (e.g. Princess Plots) Develop appropriate housing typologies. Promote adequate provision of social and economic amenities. Table 4: SDF Development Strategies Four of the Development Strategies are considered in greater detail in this section, namely: Strong Viable Nodes; Increased Densification of Strategic Locations; Initiating and Implementing Corridor Development; and Managing Urban Growth and Delineating an Urban Development Boundary. Details of the other strategies can be found in the SDF and specific objectives and interventions relating to Movement, Environmental Management and Housing can be found in the sector plans in this document. Strong viable nodes The purpose of this strategy is to develop a well structured hierarchy of nodes that are linked and integrated with the public transport and movement system. The nodes represent the areas in the city where urban opportunities are maximized and have high levels of access. The City defines a node as a well-defined and legible urban environment where highly accessible, mixed and compatible land uses are concentrated and serviced. Nodes are characterised by: Clustering of activity on the basis of convenience and accessibility; High levels of accessibility via public and private transport facilities and transport routes; Activity mix and a diversity of public facilities; Density of development; and A recognisable centre or core, which supports a pedestrian environment and public spaces, but does not necessarily exclude vehicular traffic. In order to protect and enhance the existing amenity of the City’s nodes, associated infrastructure investments and to minimise the creep of non-residential uses into the residential suburbs, the City is intent on: 47 Regulating speculative growth of new nodal points; Eliminating linear creep along mobility spines and roads; Defining a clear network of nodes (as destination points) that contributes directly to an aligned public transportation network; Ensuring that re-investment occurs, rather than flight to “new” nodes serving the same or similar market; Ensuring adequate levels of infrastructure to support development; Densifying within and on the periphery of defined nodes; Supporting Inner City and traditional town centre regeneration initiatives; Embracing public/private partnerships such as Central Improvement Districts, (CIDs) to stimulate growth and provide additional services; Monitoring the “health” of each node; and Building a distinct and positive identity for each node. The SDF has identified a Nodal hierarchy and distinguishes between nodes of a mixed use and specialist use (including industrial uses). Each of these nodes has a distinct character, significance and development rationale. Some require specific interventions to make them work in a more efficient manner, whilst others are rapidly expanding and require management controls. Increased densification of strategic locations The promotion of residential densification in strategic locations will contribute towards a more compact and concentrated urban form. Strategic densification contributes towards the following outcomes: Increasing the viability of existing and proposed public transportation infrastructure and services; Optimising the use of land and provides accommodation in close proximity to urban opportunities; Phased, cost effective and efficient infrastructure provision; Improving citizens’ quality of life via access to opportunities and reduction in travel time; Reduction in pressure for development on open spaces and environmentally sensitive areas; and Reduction of air, water and land pollution. However, the City also acknowledges that there are concerns about densification: Residents have diverse requirements and need areas of both low and high densities; Significant public expenditure is needed for the development of an integrated movement system, including a reliable and efficient public transport system. There is a limited capital funding within the public sector in the short term to either carry the cost of actual developments, or to provide infrastructure across the City in support of densification. The market is largely demand driven and profit oriented. This means that the areas of densification and the rate of development in support of densification are dependent on market demand, capital availability and profit. The intention is to channel market supply into strategic areas; It is increasingly difficult to find well-located land for housing for subsidized housing initiatives; Higher densities may result in concentrations of air and noise pollution; and Infrastructure capacities will have to be assessed in terms of their ability to accommodate higher densities. The City has introduced a Gross Density of ten units per hectare to guide future residential developments. In an instance where an RSDF stipulates a density of less than the Gross Density, the lower RSDF density will prevail. Beyond the citywide base density, locational factors may indicate a greater desired Density figure. 48 These factors may include the proximity of a site or area to the following: Nodes: CBD, Metropolitan, Regional and District nodes; Transportation routes: Strategic Public Transportation Network, Mobility Spines and Roads, Activity Streets, Rail Stations; Subsidised housing initiatives. Densification in and around nodes The City’s nodes have the greatest potential for the creation of sustainable patterns of development. In order to maximise nodal growth and to benefit from nodal characteristics of mixed use and public transportation orientated there should, in-principle, be no upper limit on the number of dwellings that may be provided in any node. This in-principle support is subject to the following safeguards: Compliance with existing policies /development plans; Avoidance of undue adverse impact on the amenities of the surrounding area; Appropriate urban design parameters; and Capacity of services and infrastructure. Potential benefits of densification in the City’s nodes should include: Assisting urban regeneration initiatives; Increasing the optimal use of existing infrastructure; Supporting local services and employment; Encouraging affordable housing provision; and Sustaining alternative modes of travel, such as walking, cycling and public transport. Proposals within and around nodes must be supported by a motivation demonstrating a tangible and positive contribution to the respective node. Priority nodes within an “investment footprint” The following existing and planned public-sector initiatives provide unique opportunities to increase densities and complement the respective initiatives: Gautrain stations (investment of +/-R20 billion for whole project); Bus Rapid Transit (BRT) initiative; and 2010 World Cup infrastructure investment. These three initiatives will realise unparalleled levels of investment within the City over a relatively short-term and can loosely be described as an “Investment Footprint” The permanent legacy of investment in physical infrastructure provides a golden opportunity to realise additional benefits and opportunities to a greater number of citizens through densification initiatives. This can make a tangible contribution towards the founding SDF principle of facilitating access to urban opportunities within the City. The nodes that fall within this “Investment Footprint” include: 49 Lenasia; Kliptown; NASREC; Johannesburg CBD (including Greater Ellis Park); Parktown; Randburg; Rosebank; Illovo; Sandton; and Midrand. The City will actively support higher density residential development proposals within and around these nodes. The core MEs continue to assess density proposals and the impact these would have on existing and planned infrastructure provision. Where upgrading to support these proposals is required, the City is prepared to invest to realise the best possible urban redevelopment within these strategic nodes. Densification on mobility and public transportation routes/infrastructure The primary rationale for increasing residential densities along movement lines is to increase the accessibility of public transportation to a broader market and to increase this market’s contribution towards a cost effective and citywide public transport network. It is acknowledged that densities across the whole City do not presently support an effective and sustainable citywide public transport system. Densification along the primary public transport routes and specifically the pilot BRT routes will assist in these short-term pilot routes such as the Lenasia-Regina Mundi-Parktown-Sunninghill and the medium-long- term interventions of the broader 300+ km long network. Increasing residential densities within close proximity to existing social facilities will increase access to and the use of these facilities. Further, it can also encourage and re-introduce the notion of a “sense of community” and promoting community activities. As a result of the high premium of land, as well as an established need for a variety of housing typologies, increasing residential densities within subsidized housing initiatives can prove to be an efficient way of optimising existing land resources, bulk infrastructure and accommodating a range of housing options. Initiating and implementing corridor development The development of corridors has been identified as a potential instrument to restructure the City into robust, efficient and well-connected urban areas by unlocking inherent and under-utilised economic and social development potential. Corridors represent those areas in the urban system where the benefits of well developed public transport and movement systems, interlinked areas of opportunity, private and public services, infrastructure and densities are maximised. The development and transportation community has used the term corridor in many different ways – activity corridor, movement corridor, transport corridor to name but a few. For the purposes of the City’s definition, development corridors are characterised by: Connected nodes; Existing/potential for regional and inter-regional accessibility; Provision of a number of movement options – i.e. road and rail; Intense, high-density mixed land uses; and Availability of tracts of vacant /under-utilised land that provides opportunities for higher densities and integration opportunities. Two development corridors have been identified in the City, namely the East-West Development Corridor (EWDC) and North-South Development Corridor (NSDC). These two corridors are very different in nature although both contain a number of the abovementioned attributes for corridor development. The East-West Development Corridor (EWDC) runs midway through the City from the eastern boundary linking the industrial development in Ekurhuleni on the east to Mogale on the western boundary of the City a distance of over 30 kilometres. 50 The Corridor incorporates the traditional mining belt that has been perceived as a barrier to the integration of the northern and southern parts of the City. The mining legacy of the area has also presented a number of environmental challenges and constraints the most visible of these being the numerous mining dumps. With respect to transportation, there is an existing railway line with a number of associated stations and strong east-west road linkages. Conversely, there are very few strategically located road linkages to the north of the mining belt. Many of the existing industrial, commercial, retail and residential areas are not operating optimally given these constraints. Due to the central location of the EWDC it has the potential to become an integral restructuring and integrating mechanism within the City. The challenge for the City is to take advantage of the opportunities this area presents and transform it into a vibrant, mixed-use urban environment with a thriving economy. The EWDC presents the City with unique opportunities to: Fast-track development in impoverished southern areas; Create employment; Improve the quality of life for the urban poor; and Improve the north-south spatial integration. The North-South Development Corridor (NSDC) extends from Orange Farm north via Lenasia and Soweto to the central anchor point of the CBD. From the CBD it continues north through Sandton to Midrand. It provides inter-regional access beyond the municipal boundaries to Sedibeng to the south and Tshwane to the north. The NSDC presents the City with the opportunities to: Facilitate movement between the labour market located in the south of the City and the economic opportunities of the north; Utilise the existing infrastructure and public amenities; Reinvestment and infill development possibilities for higher density residential development; Further densification where services are available at strategic locations; and Further economic growth and development. Presently, the character and management of the corridor is split between the central-north and central-south sections. The central-north section is characterised by high degrees of investment and economic and employment opportunities. Private transport dominates in this section and congestion is the main constraining mobility factor. The alignment is based on the N1/M1 highway. Metropolitan and Regional nodes exist in the area including Midrand, Sandton, Sunninghill, and Rosebank. The Gautrain route and four of the Gautrain stations (Midrand, Sandton, Rosebank, Park StationCBD) fall within this section of the Corridor. Other movement lines include the Oxford/ Rivonia Roads arterial, Louis Botha and Jan Smuts Avenue and Old Johannesburg Road. These factors continue to attract development and reinforce the vibrant economic activity already present within the area. The northern part of the Corridor is the location of choice for many high tech industries and office nodes. The challenge for the City is to integrate and manage existing, well-established land uses and reduce congestion levels in a manner that has long-term benefits for all the residents of the City. 51 Conversely, the central-south section has fewer economic and employment opportunities and a greater pool of labour resources. Public transport dominates in this section and the condition and capacity of infrastructure is the main movement issue. A freight and passenger based, second leg of the central-south section is also envisaged along the N1 highway. A consolidated and integrated corridor would increase the opportunities afforded to the labour force and economic opportunities in the central-south by facilitating better access and coordinating public expenditure. The alignment of this central-south section is based on the existing rail infrastructure that links the Central Business District with Soweto – Lenasia – Ennerdale – Orange Farm and roads such as the R533, N17 and the N1 highway. The alignment of the central-south section of the NSDC incorporates the following major public investment initiatives and nodes presently being undertaken in the area including: BRT Flagship Project: Regina Mundi-Parktown-Lenasia; NASREC Regional Node and 2010 stadium precinct; Baralink Regional Node; Kliptown District Node; Lenasia District Node; Lenasia South/Unaville District Node; Ennerdale District Node; and Stretford District Node. The implementation of these projects will act as catalysts for further development and can overcome the perceptions that the area is stagnant and dormant. Managing urban growth and delineating an urban development boundary The fundamental outcomes of the City’s UDB are envisaged to be: Reducing the developmental footprint of the City in order to prevent the excessive consumption of land on the City’s periphery; Focusing on in-fill, redevelopment and densification in strategically demarcated areas; Supporting cost efficient infrastructure provision; Supporting an urban form that is conducive to the use of public transport; Protecting environmentally sensitive areas, agricultural land and open space; and Providing direction for capital investments for efficient infrastructure provision. Historically, urban expansion of the City has been encouraged by making more (often less expensive) land available for development on the periphery of the city. Peripheral growth has accommodated initiatives to house the urban poor and the boom of middle-to-high income security estates seeking suburban amenity. In the process big cities began to grow larger in terms of surface area and at relatively low densities. This trend has made it increasingly difficult for the historically disadvantaged and poor to cope in an urban environment that has become less and less conducive to public transport. Within the City’s present context and development climate the delineation of an Urban Development Boundary (UDB) provides a clear message that these historical trends need to be checked and that development trends need to adapt to support broader principles of efficiency, accessibility and sustainability. The current alignment of the Urban Development Boundary is reflected in Maps 7 and 8. 52 CAPITAL INVESTMENT FRAMEWORK (CIF) INTRODUCTION The Capital Investment Framework (CIF) provides the procedure that leads to the implementation of the IDP and its associated components (SDF, GMS and sector plans) as far as infrastructure and the provision of public amenities is concerned. It is the framework through which the City identifies and prioritises capital projects for implementation in the forthcoming financial year. The CIF has two components. The first is a series of engagements with the sector departments and associated Municipal entities to identify critical capital projects. The second is the production of a list of capital projects that meet the desired developmental and spatial outcomes of the City. Responsibility for the planning of the CIF sits with the Development Planning and Facilitation Directorate and the Department of Finance. The responsibility for executing the projects identified through CIF sits with sector departments. The purpose of the CIF is to eradicate the service delivery backlogs in poor marginalised areas, and ensure the improvement and the management of existing infrastructure. In order to achieve this purpose the CIF has a number of key objectives, namely to: Improve service delivery through infrastructure and services that are planned, delivered, upgraded or managed in an objective and structured manner; Prioritise projects and programmes through a strategic and spatially-linked information system (Capital Investment Management System, known as CIMS); Direct future public and private investment by strategically aligning capital budgets between Departments and Entities to priority areas of the City; and Identify types of infrastructure and services planning and implementation choices in a strategic manner. A full list of the planned capital projects 2009/10 can be found in chapter x of the IDP, or in the Service Delivery and Budget Implementation Plan 2009/10 (SDBIP). The remainder of this chapter provides: An overview of the City’s budget, and its allocation to the administrative regions; A breakdown of the sources of funding for capital projects for the City of Johannesburg; An assessment of the extent of coordination between the capital budget and the GDS; and An assessment of the extent of coordination between the capital budget and the Sector Plans, GMS and SDF. THE CITY’S CAPITAL BUDGET Demands placed on the City’s capital budget far exceed available resources. As such the City has to be strategic in its choice of projects, identifying only those critical projects that need to be undertaken. As shown in Table 1 the total capital budget for the City is obtained from a number of different sources. It is funded from the tariffs, the rates base, bulk service contributions and external funding (e.g. housing subsidy, Municipal Infrastructure Grant (MIG), Neighbourhood Development Partnership Grant (NDPG), national department grants and loans and provincial department grants and loans). 53 1 As can be seen from Graph 1, the majority of the capital budget is from the City’s own resources . The second largest contributor is national grants, other than MIG. MIG is the third largest source of funds, it is utilised for the provision of bulk and basic services and is focused on providing these services to the poor. The broad breakdown of the respective line departments and Municipal Entities for the 2009/2010 financial year is depicted in the table below, and followed by a chart: Table 1: Total City Capex Budget Breakdown for all Municipal Entities and Core Departments, 2009/2010 2009/10 DEPARTMENT VOTE INDICATIVE SOURCE OF FINANCE (R’000) BUDGET COJ 2009/10 Funding Public Contributions CRR National Provincial (R’000) (Cash) Grant Grant Economic Development 574 574 Environment 849 849 Infrastructure and Services 361 Transportation 804,825 Community Development: Core 1,908 Community Development: Libraries 8,738 8,000 738 Community Development: Social Services 9,382 9,000 382 Community Development: Sport and Recreation 64,656 7,000 1,656 MIG BSC DEPARTMENT 361 150,000 611 56,000 382 Health Services 7,034 Office of the Executive Mayor 2,297 Office of the Executive Mayor 2010 173,066 Speaker: Legislative Arm of Council 1,151 1,151 Finance 4,441 4,441 Revenue and Customer Relations 7,385 Corporate and Shared Services 7,321 5,000 2,321 Housing 407,277 144,625 2,095 Development Planning and Urban Management 289,979 79,000 2,390 Development Planning and Urban Management: Inner City 300,000 300,000 Emergency Management Services 7,308 6,710 1 654,214 1,908 Community Development: Arts, Culture 382 and Heritage 5,000 2,034 2,297 173,000 66 7,385 90,000 193,589 170,557 15,000 598 Please note that the chart depicts some Divisions (Departments/ Municipal Entities) as having ‘0’ budget allocation as these particular Divisions’ budgets are too small to show as a percentage in comparison to other Divisions that have been awarded much larger budgets 54 Other & 2009/10 DEPARTMENT VOTE Johannesburg Metropolitan Police Department TOTAL CORE ADMINISTRATION INDICATIVE SOURCE OF FINANCE (R’000) BUDGET COJ 2009/10 Funding Public Contributions CRR National Provincial (R’000) (Cash) Grant Grant 835 835 847,803 90,000 33,074 MIG Other & BSC 2,099,769 887,335 241,557 City Power 863,874 600,000 Johannesburg Water 695,500 519,000 110,000 66,500 Pikitup 47,793 45,000 2,793 Johannesburg Roads Agency 170,000 103,000 67,000 Johannesburg City Parks 44,000 15,000 10,500 Johannesburg Zoo 7,000 7,000 Johannesburg Development Agency 60,000 60,000 Johannesburg Property Company 45,000 45,000 Johannesburg Fresh Produce Market 20,000 20,000 Johannesburg Social and Housing Company 92,913 40,000 Johannesburg Civic Theatre 1,000 1,000 Roodepoort City Theatre MUNICIPAL ENTITIES 107,174 39,000 117,700 Metrobus 18,500 Metro Trading Company Johannesburg Tourism Company 200 200 TOTAL MEs 2,047,280 1,455,200 TOTAL CITY OF JOHANNESBURG 4,147,049 2,342,535 Graph 1 55 52,913 160,087 33,074 1,007,890 229,293 202,700 90,000 470,850 202,700 All Capex funding sources for 2009/2010 Other & BSC 5% CMIP/ MIG 11% Provincial Grant 2% National Grant 24% COJ Funding 57% CRR Loans 1% CAPEX ALLOCATION PER REGION – 2009/10 The administrative regions of the city are responsible for the urban management function within their jurisdiction. Unless there are quality infrastructure and public amenities in place the regions are unable to fulfil their functions meaningfully. Given the limitations on the capital budget, regions that serve largely marginalised and/or poor communities have received the largest allocations. This is represented in table 2. Region F, which includes the inner city, that has the largest CAPEX allocation due to the growth of slums in the region, the ageing infrastructure that requires replacement and the importance of the region as an economic growth generator. This is followed by Region D, Soweto, due to the historically disadvantaged background of the area and the persistence of poverty. Region G, Orange Farm, arguably the most geographically and socially marginalised area in the City receives the third highest allocation. Table 2 Overview of the City’s Regional Capex Share Region A B C D E F G COJ CAPEX Funding R 114,246,000.00 R 123,141,666.67 R 180,215,985.33 R 372,538,500.00 R 174,950,000.00 R 1,055,092,441.00 R 323,059,500.00 Total CAPEX Funding R 307,598,500.00 R 300,333,166.67 R 336,341,985.33 R 940,633,000.00 R 537,088,500.00 R 1,849,608,500.00 R 603,293,000.00 GROWTH AND DEVELOPMENT STRATEGY (GDS) SECTOR PROGRAMMES – CAPEX ALLOCATION FOR 2009/10 In the identification of 12 sector programmes in the GDS that mirror the Departmental configuration of the City; the provision of a policy timeline that is aligned to budget planning cycles; and through its development paradigm that promotes economic development, environmental sustainability and poverty eradication the GDS provides the foundation for capital expenditure allocation in the City. Table 4 provides an indication of the capital expenditure per sector programme of the GDS for 2009/10. It should be noted that capital allocations are concentrated in specific programmes: namely Infrastructure and basic services, housing, transportation, economic development and 56 spatial form and urban management. The nature of these allocations, and projects associated with the critical sector programmes will be described further. Table 4: Capex allocation per sector programme Sector Programmes Economic development Human and community development Housing Infrastructure and basic services Environment Capex R263940000 R24000000 R184625000 R1164000000 R22000000 Spatial form and urban management R439000000 Transportation Health R253000000 R5000000 Safety R6710 Financial sustainability Governance R2297000 Corporate and shared services R7321000 Economic Development Programme A critical aspect of the GDS and IDP is to bridge the divide between the City’s first and second economies; to ensure that balanced, equitable and shared growth is attained; and to prioritise the development of marginalised areas and disadvantaged communities. The programme seeks to provide critical infrastructure to marginalised areas by addressing the backlogs within the shortest possible time period. The key marginalised areas are Soweto, Diepsloot, Orange Farm and Greater Ivory Park, (including the areas of Kaalfontein and Rabie Ridge). From the four prioritised regions, Soweto gains the largest share, as it is a pivotal area for redevelopment, holding vast economic potential. Another critical aspect of economic growth in the City is the promotion of the first economy, and putting structures and systems that facilitate the shift of businesses from the second to the first economy. Critical projects in this regard include the construction of an information hub, the construction of linear markets, and the facilitation of cheap broadband for the City. Infrastructure and basic services Programme This programme includes the full spectrum of infrastructure and social amenities provision for strategic developmental interventions in the following areas: Infrastructure provision with relevant capacities; Provision of new social, health and recreation facilities; Procurement of land for open space provision as well as servitudes; Provision of bulk infrastructure to new housing opportunities; Public lighting; Resolving power outages; Addressing storm water drainage; Provision of waste removal services; and Increasing the overall infrastructure capacity levels of the City to meet rapid development Implementation of demand side management interventions The capital budget allocated to this programme is approximately R1.16bn, with Johannesburg Water receiving R519m, City Power receiving R600m, and Pikitup receiving R45m. 57 Environmental Programme This programme sees to the conservation of the natural and built environment, and to provide for public open space in the most sustainable manner possible, given constrained resources and urbanisation pressures. The total capital budget allocated to the Sustainable Environments Programme from the City is R22m, allocated towards key environmental priorities and towards Johannesburg City Parks. Housing Programme This programme focuses on addressing the housing backlog, the eradication of informal settlements and the removal of slums in the City. The programme includes a number of departments with different responsibilities. This financial year sees R169m budget for the Housing Department, R90m for JOSHCO and R48m for ARP. The total for all Housing related projects in the 2009/2010 financial year is R307m. The CIF prioritises housing projects in terms of the GMS. Transportation Programme The Transportation Programme includes the City’s transport related entities, i.e. Transportation Department, Metro Bus, and the Johannesburg Roads Agency (JRA). Their contribution from the City is R196m. Of this JRA receives R105 million, the Transportation Department – R91 million and Metrobus R0. The main focus of the Transportation Programme concerns the implementation of the Rea Vaya Bus Rapid Transit system (BRT), its link with the Gautrain station developments and transport infrastructure for the 2010 World Cup. The bulk of the BRT funding comes from the National Transport Department. Spatial Form and Urban Management Programme Integrating the fragmented nature of the City, upgrading existing public and residential environments and developing sustainable human settlements forms the thrust of this programme. Areas that are prioritised for funding under this programme are the marginalised areas (detailed above), the Inner City, Alexandra, Cosmo City. A key issue determining the allocation of capital in this Programme is the need to regenerate existing developed areas that have been and are in decline for a number of reasons, through: Upgrading and maintenance of infrastructure; Pavement management; Storm water management; Upgrading and maintenance of social, health and recreation facilities; Provision of new housing where possible; Provision of public transport facilities; Promoting a safe environment; and Protection of cultural amenities The City has committed more than R379m towards area regeneration projects in the Inner City (Region F) and Alexandra (Region E). These funds address the upgrading of infrastructure, housing provision and the provision of social, health and recreation facilities. The Johannesburg Development Agency and the Department of Development Planning and Urban Management have be allocated R241million and R65 million respectively in order to facilitate projects Inner City Regeneration Inner City regeneration is a key focus of the City Of Johannesburg for the current 5-year IDP period, having started in the 2007/2008-budget cycle. The City had spent a dedicated, ringfenced budget of R300m in 2007/2008. In the 2009/2010-budget cycle the amount will no longer be ring fenced, though significant funds will be dedicated to public environment upgrades and housing through the Johannesburg Development Agency and JOSHCO. Other departments will 58 receive funding for inner city projects, examples include the Bus Rapid Transit system, storm water reticulation; substation and electrical upgrades, improved refuse removal systems (underground bins), social housing provision and upgrades, and social and health facilities. Key outcomes defined in the Inner City Charter The following are anticipated outcomes of the Inner City Charter: Through a developmental, not simply regulatory approach, the City of Johannesburg will work with all necessary stakeholders to ensure that there is no more unmanaged trading on the streets of the Inner City; Develop a citywide broadband network in line with international trends in municipal broadband deployment. This will facilitate access to broadband connectivity for businesses in the Inner City; The City of Johannesburg wishes to see an economic resurgence in the Inner City, to result in a dynamic multifaceted local economy. Envisaged results include an Inner City hub of cross-border wholesale and retail trade and related increased entrepreneurship and job creation in the retail, wholesale, freight logistics, tourism and transportation industries. (Also) development and marketing of Johannesburg as a world-class Business Process Outsourcing / off-shoring / call centre destination; The City also wishes to see negotiated agreement on options for extension of the UDZ. Also broader take up with a view to achieve balanced and shared growth by increasing BEE participation; The City of Johannesburg will lead targeted support measures to solve problems that may be weighed in relocation decisions, so that key economic institutions maintain and extend their footprint in the Inner City; The City wishes to see a systematic improvement in the general business environment, with key constraints inherent in the built environment in the Inner City being systematically addressed; and The City will ensure improved data and information on economic conditions, trends, opportunities and constraints is made easily accessible to investors interested in the Inner City. Growth Management Strategy (GMS) and Spatial Development Framework (SDF) The GMS indicates that the City should prioritise the development of Public Transport Priority Areas and Marginalised Areas in the short term. The areas defined reinforce the other GDS programmes and their project priorities. In turn the CIF prioritises infrastructure and public amenity upgrades that are located in those areas defined in the GMS. Projects in these areas should: 59 Upgrade existing infrastructure in order to support more intensive land uses and higher density residential development; Facilitate the implementation of Phase 1a and 1b of the BRT system; Facilitate mobility along important arterials; Provide quality pedestrian and cycle facilities integrated with public transportation facilities; Offer economic opportunities to the poor and marginalised; Provide necessary public amenities; and Integrate transportation modes, especially the existing rail network with the BRT and Gautrain Stations. % Split Actual Allocation 2008/09 Expansion, 2% Peri-Urban, 5% Marginalised, 7% Consolidation, 29% Marginalised (PTMA), 18% Expansion Peri-Urban Consolidation Consolidation (PTMA) Marginalised (PTMA) Marginalised Consolidation (PTMA), 39% Of the 264 capital projects identified for the 2009/10 financial year 78% of projects were located in the Public Transport Priority Areas and Marginalised Areas (Marginalised, Marginalised(PTMA) and Consolidation PTMA categories as per legend) as defined by the GMS. This proves that there is a strong correlation between the allocation of capital expenditure and GMS, and that projects are following policy imperatives. A possible concern is that 39% of the projects are located within the Consolidation (PTMA), which includes the North-South Link of the BRT and the Gautrain Stations, while the marginalized areas (townships) only make up a combined 25 percent of projects. The mitigating factor though is that the Consolidation (PTMA) category also includes the Inner-city, which is a mayoral priority for the City. 60 Map x: Location of Capital Projects in relation to GMS development areas ´ !( a!( a aa a !( aa a a !( !( a a aa aa i !( d i a d aa !( a d!( (!!( d !( i# !( dd d !( !( i !( da!( d a!( ddd i d a!( !( !(d ! a a ai !( i ida a a!( d!( i !( !( # i ## d!( !( # (! !( d !( !( !( !( a a a !( !( !( d ad a a d aa d !( !( d a # #d ia a !( aa !( dd d d a a ad da aa d !( a !( !( !( d!( a !( !( d i d!( !( !(!( !( i!(d !( # !( !(!( !( !( d !(!( i !(d ia!( !(a #a d !( a!( !( a#i ad d d !( !(!(d dd (!!( !(!( !( !( a ! a a i d !( d d i d ad a a a !( !( !( !( !( !( ! d!( !( !( a i # a d 2010 Other Housing Transportation JHB Water City Power searchResults searchResults Public Tranport Areas Consolidation_Areas Expansion_Areas 0 1.5 3 61 6 9 12 Kilometers Marginalised_Areas Peri_Urban_Management_Areas !( Map x, above, provides a graphic representation of the alignment of 78% of capital projects with the GMS priority areas. The public transport priority areas are coloured in pink, while the marginalized areas are coloured in yellow. The individual projects, by Department or Municipality are shown by the icons. Finally, it should be noted that to a large extent the GMS Public Transport Priority Areas and Marginalised areas coincide with the corridor development strategy outlined in the SDF. Nodal Development The SDF notes the key contribution that strong, viable nodes play as structuring elements within the City. The CIF views nodes, as defined in the SDF and RSDFs, as one of the priority areas for capital expenditure given the importance of these concentrations of development in promoting economic growth within the City. This Programme supports the efficient management and growth of the City’s existing nodes through the following interventions: Upgrading and maintenance of infrastructure to support increased intensity of uses and residential densification; Pavement management; Storm water management; Upgrading and maintenance of social, health and recreation facilities; Providing of public transport facilities; and Supporting the Gautrain Station and BRT developments. The nodes involve the following key areas: Sandton, Randburg, Stretford, City Deep, Baralink, Lenasia, Kliptown, Roodepoort, Nasrec, Fourways, and Ennerdale. The total budget of the nodal programme is R974 million. This is certainly a significant capex portion and once again shows the City’s strategic intent of densifiying and compacting the city to enable the provision of infrastructure, services, and economic development that will enhance the quality of life for all the City’s citizens. 2010 The 2010 Programme is aimed at gearing the City for the 2010 World Cup in terms of its infrastructure requirements. Apart from the 2010 Office, The Municipal Entities and Core City Departments are directly involved in the upgrading of infrastructure for 2010. This includes City Power, the Johannesburg Development Agency, Johannesburg Water, Social Development (Sports and Recreation), and Transportation. A total of R179m will be allocated to 2010 in the forthcoming financial year. CONCLUSION Given the limited capital budget available to the City in the current economic downturn, and the Growth and Development Strategy that makes both social upliftment and economic growth development an imperative the city must prioritise its capital expenditure. Policy in terms of the Sector Plans, the GMS, the SDF, and local area plans provide guidance in determining capital expenditure. Discussions between and within departments, and with communities, refine the priority capital projects further. Further to these considerations the City strategically prioritises its capital expenditure to: Reduce infrastructure backlogs; Enhance the physical infrastructure base of the City; Improve the levels and standards of services to the residents, businesses and commercial users of the City’s infrastructure; Attain assets that will improve the quality of life of its residents; and to Ensure that the capital expenditure of the City is directed towards sustainable development. 62 CHAPTER 6: GOVERNANCE AND ADMINISTRATIVE ARRANGEMENTS INTRODUCTION In April 2006 the City of Johannesburg approved its new governance and institutional arrangements. The governance model comprises of the Legislature, made up of Speaker of Council, Council Chief Whip, and Section 79 Portfolio and Standing Committees; and the Executive, made up of the Executive Mayor and Members of the Mayoral Committee (MMCs) and the administration led by the City Manager. Underpinning the City’s governance model are the following key principles: Delineation of powers to separate legislative and oversight roles on the one hand, and executive roles and responsibilities on the other; Governance and institutional arrangements should deepen democracy, facilitate citizen empowerment and enhance stakeholder participation and involvement; Decision-making powers and accountability should be strengthened, clearly defined, allocated and decentralised, where appropriate; Expeditious and efficient decision-making should ensure the facilitation of effective government; Institutional structures of the City, such as Departments, regions and municipal entities (MEs), to be considered part of a single group, based on a politically-led strategic and policy perspective; and Clear oversight of MEs by the respective Core Department. This chapter outlines and demonstrates how the City’s governance and institutional arrangements has been implemented for achievement of the vision of “A World Class African City”. The following organogram reflects the governance and institutional arrangements. 63 EXECUTIVE LEGISLATURE Speaker Chairperson of Committees Whips Executive Mayor Members of the Mayoral Committee (MMCs) Departments Chief Whip Portfolio Committees Leader of Executive Business Standing Committees Finance and Economic Development Health Rules Petitions and Public Participation Community Development Environment Ethics/ Disciplinary Programming Infrastructure and Services Transport Development Planning & Urban Management Safety Housing Corporate Services and Administration KEY: Proposed changes: ANC DA AZAPO ID ACDP CDP CF IFP OKM PAC Independant UDM Public Accounts VF Plus Figure 1: CoJ Governance model LEGISLATURE The legislature is made up of the Council, Speaker of Council, Council Chief Whip and two sets of council committees namely Section 79 Portfolio Committees and Standing Committees. Council The Council comprises 217 elected Councillors, made up of 109 Ward Councillors and 108 Proportional Representation (PR) Councillors. The Council, meeting in plenary, provides an important platform for meaningful debate on issues that affect the City and require the attention of the Council. There are essentially three key interrelated roles that the Council plays: legislation, oversight, and ensuring community and stakeholder participation. Firstly, the Council’s legislative functions entails the approval of By-laws, policies, the Integrated Development Plan (IDP), tariffs for rates and service charges, and the Budget. The Council’s role here is to consider reports from the Executive Mayor on each of these functions, open up public discussion and comment, stimulate debate in multi-party Portfolio Committees, and provide the public platform for citywide debate. On the basis of the comments received, the Council is placed in the position to approve or amend the report, or to refer the report back to the Executive Mayor. Secondly, an important innovation introduced by the City in 2006 was to separate legislative and executive roles. In this respect, the Council delegated its executive functions to the Executive Mayor and defined its own role to that of oversight of the Executive. This function is performed by Council in plenary, the Municipal Public Accounts Committee, and the Section 79 Portfolio Committees that have been formed under the chairpersonship of non-executive Councillors. These committees monitor and scrutinise the delivery and outputs of the Executive, and may request the Members of the Mayoral Committee (MMCs) or Heads of Department (HODs) to account for service delivery and performance. Thirdly, Council seeks to ensure community and stakeholder participation. The Council, led by the Office of the Speaker, is charged with facilitating community and stakeholder consultation and 64 participation in the affairs of the Council. Individual Ward Councillors, in conjunction with elected Ward Committees, play a critical role in facilitating these participatory processes. Speaker of the Council In terms of Section 160(1)(b) of the Constitution and Section 36 of the Municipal Structures Act, the person elected as chairperson of the Council is designated the Speaker. The Speaker performs the duties and exercises the powers delegated in terms of the Municipal Structures Act. Councillor Nkele Ntingane was elected as the Speaker of Council for the 2006/11 electoral term. The Speaker of the Council performs the following legislated functions: Presides at meetings of the Council; Ensures that Council meets at least quarterly; Ensures compliance with the Code of Conduct as set out in the Municipal Structures Act; Ensures that Council meetings are conducted in accordance with the rules and orders of the Council; Attends to Councillors’ needs; and Organises appropriate training for Councillors in order to develop and improve individual skills. Most importantly, the Speaker in the City is entrusted with ensuring that the functions of the Council – legislation, oversight and ensuring community and stakeholder participation – are effectively implemented. Over the last year, substantial progress has been made in terms of capacitating the Office of the Speaker that is headed by the Secretary of the Council, Tshepiso Nage. The functions that are contained in the Office of the Speaker include: Private Office of the Speaker; Stakeholder Relationship Management – community participation, communications and media management, citizenship, ceremonial and protocol activities, and Ward Councillor support; Institutional Development – development of the institutional model, monitoring and evaluation policy, research, business of Council, and business of Portfolio and Standing Committees of Council; and Strategic Support – finance, legal, and Councillor and Ward Committee development and administration. In addition, the Legislature includes the Office of the Chief Whip and the offices of the political parties represented in Council. Council Chief Whip The Council Chief Whip is also the Chief Whip of the majority party. The Chief Whip plays a pivotal role in the overall system of governance by ensuring and sustaining cohesiveness within the governing party, and also maintaining relationships with other political parties. Councillor Bafana Sithole was elected as the Council Chief Whip for the current term of office. The main functions of the Council Chief Whip are: 65 Ensuring proper representation of political parties in the various committees; Maintaining sound relations with the various political parties represented on the Council;and Attending to disputes between political parties and building consensus. Section 79 Committees Section 79 Portfolio Committees perform an oversight role by monitoring the delivery and outputs of the Executive. They are entitled to request departments and MMCs to account for their functions. In line with this responsibility, these committees may summon departments to appear before the Committee, produce required documentation, or provide necessary information. The Portfolio Committees are, however, not delegated any decision-making powers. The specific functions of Portfolio Committees include: Reviewing, monitoring and evaluating departmental policies; Reviewing plans and budgets; Considering departmental quarterly and annual reports; Examining the link between the policy (sector plan) and budget (business plans); Monitoring the implementation of plans; Exploring options to increase value for money; and Holding the political executive accountable for performance against policies and City priorities. Section 79 Portfolio Committees and Chairpersons: Chairperson Councillor E Ndhlovu Councillor S Mogase Councillor N Molwele Councillor C Seefort Councillor N Maqanda (resigned) Councillor B Zondi Councillor W Van Der Schyf (acting) Councillor S Cowan Councillor M Kubayi Councillor S Malobane Councillor T Mabotja Councillor B Rajah Committee Chairperson of Committees Finance & Economic Development Infrastructure & Services Housing Health Community Development Public Safety Environment Transport Development Planning & Urban Management Corporate & Shared Services Inner City Standing Committees Standing Committees are permanent committees established to deal with Council related matters. They are delegated some decision-making powers, and are required to submit reports to Council. Councillors chair all Standing Committees except the Audit Committee, which is chaired by an independent person in line with the prescriptions of the Municipal Finance Management Act (MFMA). The Standing Committees, their roles and their chairpersons are set out as follows: Committee Rules Committee Chairperson Councillor N Ntingane (Speaker) Petitions and Public Participation Committee Councillor N Ntingane (Speaker) Ethics/ Disciplinary Committee Programming Committee 66 Councillor N Ntingane (Speaker) Councillor N Ntingane Role Develop and approve rules for proceedings Determine focus areas in respect of Councillor capacitation Allocate members to the various committees Ensure proper and timeous responses to petitions Ensure enhancement of public participation, with rigorous monitoring of all public participation processes and systems Monitor the community based planning process Ensure incorporation of wards needs into the Council’s plans Ensure declaration of financial interest and compilation of register of financial interest on an annual basis Consider any breaches of Code of Conduct by Councillors Consider and approve items/motions on the Council agenda and agree on the allocation of speaking time for the items and (Speaker) motion contained in the Council agenda Municipal Public Accounts Committee Councillor S Cachalia Political oversight over financial management and accounts Ensure that residents of the City get ‘value for money’ Soweto Development Committee Inner City Committee Councillor P Mlambo (resigned) Councillor B Rajah Drive and manage the regeneration and development of the Soweto area Drive and manage the regeneration and development of the Inner City Audit Committee Chairperson Mr Brian Hawksworth Review the financial reporting by the external audit and review the activities of internal audit Provide independent oversight over financial management and accounts EXECUTIVE The executive comprises of the Executive Mayor and Mayoral Committee, including the Leader of Executive Business. Executive Mayor and Mayoral Committee The Executive Mayor, Councillor Amos Masondo, assisted by the Mayoral Committee, heads the executive arm of the City. The Executive Mayor is at the centre of the system of governance since executive powers are vested in him by the Council to manage the daily affairs of the City. This means that he has the overarching strategic and political responsibility. Each member of the Mayoral Committee is responsible for a particular portfolio, as listed: Member of the Mayoral Committee Councillor Parks Tau Councillor Mayathula-Khoza Councillor Strike Ralegoma Councillor Rosslyn Greeff Councillor Prema Naidoo Councillor Thomas Phakathi Councillor Rehana Moosajee Councillor Matshidiso Mfikoe Councillor Christine Walters Councillor Ruby Mathang Portfolio Finance & Economic Development Community Development Housing Infrastructure & Services Environment Public Safety Transport Health Corporate & Shared Services Development Planning and Urban Management Leader of Executive Business The Leader of Executive Business provides the interface between the executive and legislative branches. Councillor Christine Walter, the MMC for Corporate & Shared services, was elected Leader of Executive Business for the 2006/2011 term. The role and responsibilities of the Leader of Executive Business include: 67 Representing the executive branch on Council matters, and serving as the link between the executive branch and the legislative branch; Responsibility for ensuring that executive business is effectively passed to Council via the Programming Committee; Consulting with the Speaker when the Speaker intends calling a special meeting of Council outside of the scheduled Council meetings; Consulting with the Speaker for purposes of allocating time for the discussion of matters of public importance in the Council agenda; and Determining what matters are referred to the Speaker, and thereafter to Section 79 Committees and Council. ADMINISTRATIVE ARRANGEMENTS The City Manager of the CoJ is Mr Mavela AV Dlamini, who is the Accounting Officer, as defined by the Municipal Structures Act. The responsibilities of the City Manager include managing the financial affairs and service delivery in the municipality. The City Manager and his direct reports constitute the Executive Management Team (EMT), which is comprised as follows: Name Mavela AV Dlamini Mankodi Moitse Uhuru Nene Pilisiwe Twala-Tau Reuben Denge Jason Ngobeni Vicky Shuping Position City Manager Executive Director: Finance & Group Chief Financial Officer Executive Director: Housing Executive Director: Community Development Executive Director: Corporate & Shared Services Executive Director: Economic Development Executive Director: Revenue & Customer Relationship Management Philip Harrison Themba Camane Refik Bismilla Flora Mokgohloa Lisa Seftel Chris Ngcobo Ntombi Gule Executive Director: Development Planning & Urban Management Executive Director: Infrastructure & Services Executive Director: Health Executive Director: Environment Executive Director: Transportation Chief of Police: Johannesburg Metropolitan Police Department Executive Director: Emergency Management Services The following are areas of responsibility for each of the City’s Departments: Finance Budget Office Valuations Supply Chain Management Treasury Expenditure & Accounting Rates & Taxes Shareholder Unit Housing Policy & Research Project Management Contract Capex Opex, Debtors, Sales & Transfers Regional Accommodation Management & Regulatory Services Community Development Arts, Culture & Heritage Services Community Services (Including Sport, Civic Theatres, Recreation & Libraries) Human Development Co-ordination (Including Social Services & Human Development Support) Policy Development & Support Services Corporate and Shared Services 68 Facilities Management Occupational Health & Safety Administration Fleet and Contract Management Human Resources Shared Services Labour Relations Economic Development Economic Analysis Research Economic Development Skills Development Business Development Sector Support Revenue and Customer Relations Management Citywide Revenue Management Electronic Channels Physical Channels Customer Relations Management Customer Database Management Development Planning and Urban Management Development Planning (Spatial Planning) Land Information Management Urban Management Infrastructure and Services Water Management & Planning Energy Management & Planning Waste Management Management, Regulatory & Support Services Bulk Infrastructure & Co-ordination Health Primary Healthcare Public Health HIV/Aids Environmental Health Environment Environmental Policy & Strategy Air Quality Control Conservation & Open Spaces Management of Regulatory Services Transportation Transport Planning & Innovation Transport Infrastructure & Systems Transport Technology & Information Johannesburg Metropolitan Police Department (JMPD) 69 Licensing & Testing JMPD Operations Processing & Prosecutions Municipal Court By-law Enforcement JMPD Support Services (Including Academy) Emergency Management Services (EMS) Proactive Services & Disaster Management Academy Fire Medical Rescue Office of the Executive Mayor The following departments in the Office of the Executive Mayor report directly to the City Manager: Name Sibongile Mazibuko Khotso Kekana Leonard Radzuma Position Executive Director: 2010 Executive Director: Public Liaison Acting Executive Head: Johannesburg Risk and Audit Services Patrick Mayaba Rashid Seedat Karen Brits Lorraine Wilkinson Zandile Ratshitanga Nomthandazo Tshuma Chief Information Officer Director: Central Strategy Unit Director: Legal and Compliance Director: External Relations Director: Office of the City Manager Head: Private Office of the Executive Mayor The functions of each of the Departments within the Office of the Executive Mayor are: 2010 Office 2010 Planning and Development Requirements 2010 Bid Book Compliance Project Management Operations Funding and Management Support Public Liaison Communications Marketing Events Management Joburg Risk and Audit Services Internal Audit and Forensics Risk Management Chief Information Officer Information Technology Innovation and Knowledge Management Central Strategy Unit Policy and Strategy 70 Integrated Development Plan (IDP) and Business Planning Performance Management Legal and Compliance Legal Services Compliance Monitoring Mayoral Committee Support External Relations International Relations Intergovernmental Relations Protocol Municipal Entities (MEs) A major part of the City’s institutional arrangements are the existence of MEs, which are wholly owned companies that operate at an arm’s length from the core administration. The 15 MEs are subject to the City’s overall strategic and policy direction, while allowing for company boards and management to exercise relative autonomy in the execution of their fiduciary duties and operational responsibilities. Oversight of the MEs takes place by the responsible portfolio, e.g. the MMC and Department of Transportation oversees the affairs of the Johannesburg Roads Agency (JRA) and Metro Bus. Furthermore, the Shareholder Unit (SHU), located in the Department of Finance, is charged with the following responsibilities vis-à-vis MEs: Monitoring enterprise governance, investment performance and business sustainability; Monitoring corporate governance policies and practices of the MEs; Exercising the City’s shareholder responsibilities; Playing a regulatory role; and Ensuring compliance with legislation and the City’s reporting requirements. The following table shows each of MEs, each of the chief executive officers or managing directors, and the portfolio to which they are allocated: Municipal Entity City Power Johannesburg Water Pikitup Johannesburg City Parks Johannesburg Zoo Johannesburg Roads Agency Metrobus Johannesburg Development Agency Name Silas Zimu Gerald Dumas Zami Nkosi Luther Williamson Stephen van der Spuy Dudu Maseko Herman van Laar Lael Bethlehem Johannesburg Property Company Johannesburg Tourism Company Metropolitan Trading Company Johannesburg Fresh Produce Market Johannesburg Theatre (Johannesburg Civic Theatre) Johannesburg Promusica Theatre (Roodepoort Civic Theatre) Johannesburg Social Housing Company Helen Botes (acting) Lindiwe Mahlangu Alfred Sam Kgosientso Ramokgopa Bernard Jay Portfolio Infrastructure & Services Infrastructure & Services Infrastructure & Services Environmental Management Environmental Management Transportation Transportation Development Planning & Urban Management Finance & Economic Development Finance & Economic Development Finance & Economic Development Finance & Economic Development Community Development Maretha Smit Community Development Rory Gallocher Housing 71 HUMAN RESOURCES The City of Johannesburg is committed to an efficient human resources system and has reviewed a number of its policies in order to ensure effective development of its staff. Currently the City employs 25 204 people, 14 801 of which are employed in the core departments. Employment Equity Employment Equity is undertaken in the City in order to comply with the Employment Equity Act and redress past imbalances. Over 80% of Section 57 employees are black (inclusive of African, Asian and Coloured) while other employment equity targets have been met as follows: Target June 2007 Dec 2007 May 2008 African 74% (EAP) 79% 81.2% 81.5% Coloured 7.6% 5.6% 5.4% 5.3% Indian 2.6% 2% 2% 2% White 19.8% (EAP) 13.4% 11.4% 11.2% Skills Development The City is implementing a number of skills development projects. These include: Implementation of the City’s Workplace Skills Plan 2008/09 Internships Scheme Learnerships Scheme Bursary Scheme Subsidised Education Scheme National Treasury Minimum Competency requirement project The Internships Scheme provides tertiary students with practical learning experience while the Learnerships Scheme targets unemployed youth from Johannesburg communities that are given an opportunity for theoretical and practical learning culminating in a nationally recognised academic qualification. The City currently has 256 people employed in internships or learnerships. The City also provides bursaries to youth from communities in Johannesburg and places an emphasis on developing employees through its Subsidised Education Scheme. The City has implemented a workplace skills development plan. Human Resource Policy Review All Human Resource policies are currently in the process of being reviewed and submitted for approval to the Mayoral Committee and Council. These include: 72 Career Development Policy Employment Equity (EE) Policy Disability Management Policy Job Evaluation Policy Flexi-time Policy Master Data Management Policy Organisational Structure Development and Maintenance Policy Payroll Management Control Policy Personnel File Archives Policy Remuneration Policy Sexual Harassment Policy Succession Planning Policy Talent Acquisition Policy Training and Development Policy Retention Strategy In response to the ever increasing competition for skills in the market place and the loss of much needed skills by the City and its MEs to other role players in the job market, the City has embarked on an extensive investigation into a group retention strategy and policy. The initial feedback from this investigation was that the City needs to widen its scope from focusing only on retention to rather dealing with talent management (which includes retention) as a whole. In order to do this, a proposal to establish a Talent Management Forum (to give direction in this regard to the core departments and MEs) is presently before the Mayoral Committee for consideration. Further proposals, which are also being considered by the Mayoral Committee at this stage, are for: A review of the fixed term contract vs. permanent employment regime; A complete skills audit to be conducted across the CoJ Group (MEs and core departments); Salary surveys and benchmarking exercises to be conducted for the whole CoJ Group every two years, instead of every four years in terms of the current practice; and That all job descriptions within the CoJ Group be reviewed by the same service provider / consultant (to ensure consistency) and that generic job descriptions amongst MEs and departments be shared. By dealing with talent management comprehensively, issues such as attraction, recruitment, career growth and development as well as succession and retention can all be addressed in conjunction with each other, instead of in isolation, which leads to fragmented policies which do not support each other. 73 CHAPTER 7: PERFORMANCE MANAGEMENT SYSTEM INTRODUCTION The City’s PMS is one of the mechanisms through which the City aims to improve organisational and individual performance to enhance service delivery. The City’s PMS was originally designed in June 2001 and subsequently revised to respond to the experience of implementation, legislative requirements and other imperatives. LEGISLATIVE FRAMEWORK FOR PERFORMANCE MANAGEMENT Legislation that governs performance management in local government includes the Municipal Systems Act, 32 of 2000 (MSA); the Municipal Planning and Performance Management Regulations, 2001 (MPPMR); the Municipal Finance Management Act, 53 of 2003 (MFMA); the Municipal Performance Regulations for Municipal Managers and Managers directly accountable to Municipal Managers, 2006. Municipal Systems Act, 32 of 2000: The MSA requires all municipalities to promote a culture of performance through the establishment of a PMS, which must set Key Performance Indicators and targets, as well as monitor, review and report on municipal performance, based on indicators linked to the Integrated Development Plan (IDP), including the national indicators prescribed by the Minister responsible for Local Government. Municipal Planning and Performance Management Regulations, 2001: In 2001, the Minister of Provincial and Local Government published the MPPMR, which require a municipality to ensure that its PMS complies with the requirements of the MSA, demonstrate the operation and management of the PMS, clarify roles and responsibilities, as well as ensure alignment with employee performance management and the IDP processes. Municipal Finance Management Act, 56 of 2003 (MFMA): The MFMA requires the Mayor to ensure that the performance agreements of Section 57 employees comply with the requirements of the MSA to promote sound financial management and linked to measurable performance objectives approved with the Budget and included in the SDBIP, which sets out the strategic municipal scorecard. Local Government: Municipal Performance Regulations for Municipal Managers and Managers Directly Accountable to Municipal Managers, 2006: In August 2006, the Department of Provincial and Local Government (dplg) promulgated regulations for Section 57 Managers, setting out how the performance of Municipal Managers and their direct reports is to be planned, reviewed, improved and rewarded. The regulations provide for the conclusion of performance agreements and personal development plans. PERFORMANCE MANAGEMENT FRAMEWORK The City’s PMS is the primary mechanism to monitor, review and improve the implementation of the IDP, and to gauge the progress made in achieving the objectives set out in the IDP. It is an integrated approach that links citywide to individual level performance management. The City’s IDP informs the development of key areas of performance and targeting across the performance levels. The key performance areas and indicators of performance contained in the organisational scorecard are cascaded into Departmental and Municipal Entity scorecards, and further into individual scorecards. This ensures the appropriate alignment between organisational and individual performance. Performance management, therefore, forms part of a strategic management approach to ensure integration with the city strategy, planning and budgeting. The 74 approach enables the City to improve planning and budgeting, effectively monitor and measure performance, and transparently and convincingly report on achievements. As such, the City’s organisational PMS facilitates increased accountability, learning, improvement and decision making through the provision of early warning signals. IMPLEMENTATION OF THE PERFORMANCE MANAGEMENT SYSTEM The PMS in the City is implemented in a manner that reflects the relationship of organisational to individual performance. At the level of the organisation, this entails the translation of the IDP and Sector Plans, as derived from the Growth and Development Strategy, into the Service Delivery and Budget Implementation Plan (SDBIP) or City scorecard. The City Manager is the custodian of the City scorecard and agrees with the Executive Mayor, as representative of the Employer, on the delivery aspects of the scorecard. The Performance Audit Committee (PAC) reviews the performance of the City Manager in implementing the organisational or City scorecard. Organisational performance is monitored through assessment of progress on the implementation of the City scorecard and reported on a quarterly basis through SDBIP reports. The quarterly SDBIP reports are consolidated to inform the City’s annual performance report and ultimately the Annual Report for submission to the Auditor-General, the MEC for Local Government and other relevant stakeholders as legislated by the MSA. The Departmental Business Plans create linkages between organisational and individual performance. The Business Plans are derived from the Sector Plans and inform the development of the individual Executive Director’s (Section 57 Employees’) scorecards, which are an endorsement of the City Manager’s scorecard. All the Section 57 Employees sign performance agreements for the financial year as required by the MSA. The signing of performance agreements and the development of scorecards is an element of performance planning, which is part of the City’s PMS cycle that covers performance planning, coaching, reviewing and rewarding stages. The individual scorecards include strategic performance objectives, key performance areas and indicators and targets for which the Section 57 Employees are responsible. The Executive Directors agree with the City Manager on the delivery contents of their scorecards. During implementation the City Manager frequently conducts coaching sessions with the individual Executive Directors to identify areas of performance weaknesses requiring development and support. Personal development plans in support of the incumbent are developed and agreed upon for implementation. Progress on the implementation of the individual scorecards is assessed and monitored on a quarterly basis using a 5-point rating scale, ranging performance from unacceptable to outstanding. This forms part of the performance reviewing stage in the PMS cycle. The City Manager conducts one-on-one performance assessment sessions with the Executive Directors. The PAC further moderates the assessment results of the Executive Directors and recommends the final ratings to the Mayoral Committee. Individual performance is monitored and reported on a quarterly basis through the Action Driven Balanced Scorecard Reports, which inform Departmental Quarterly Reports based on implementation of the Business Plans. The rewarding stage of the PMS cycle involves the payment of performance bonuses in recognition of outstanding performance, or the correction of unacceptable performance through intensified personal development plans. The payment of performance bonuses for Section 57 Employees occurs after the tabling of the Annual Report to ensure consistency between individual performance and reported organisational achievements. Challenges with Implementation of the Performance Management System The changing nature of the performance management environment requires continuous revision of the PMS to ensure relevance and effectiveness. In response, the City has to introduce new aspects into the system to ensure consistency with the changes, including legislative compliance 75 requirements. In implementing the PMS, the City is simultaneously dealing with certain challenges. Core Competency Requirements The 2006 Municipal Performance Regulations for Section 57 Managers prescribe the criteria for assessing employee performance based on two components, namely the Key Performance Areas (KPA) and Core Competency Requirements (CCR). The KPA account for 80% of the final assessment, while the CCR make up 20%. The City is in a process of ensuring that the CCR are incorporated into the Section 57 Employees scorecards for 2009/10 and exploring mechanisms 0 and criteria for their assessment, such as the 360 feedback, customer satisfaction survey etc. Evaluation Panel The 2006 Municipal Performance Regulations for Section 57 Employees further prescribe the establishment of an Evaluation Panel to evaluate the performance of all the Section 57 Employees, including the City Manager. In the City this entails approving the final performance ratings based on the Performance Audit Committee’s recommendations. The City is currently developing terms of reference for the establishment of the Evaluation Panel as prescribed. Performance Management for Municipal Entities The institutional arrangements within the City of Joburg consist of the core municipal administration made up of the various departments, as well as the Municipal owned Entities acting as the City’s service delivery agents, in the form of Section 21 companies. The Municipal Entities are headed by Chief Executive Officers or Managing Directors, who report to their respective Boards of Directors and ultimately accountable to the Executive Mayor as the shareholder. The City is in the process of ensuring that the performance management systems and practices within Municipal Entities are aligned with those of the Core Departments. PERFORMANCE MANAGEMENT SYSTEM: ROLES AND RESPONSIBILITIES Regulation 7(2)(c) of the MPPMR requires municipalities to clarify the roles and responsibilities of each role player, including the local community, in the functioning of the Performance Management System. In the City these roles are defined as follows: Johannesburg Risk Audit Services (Internal Audit): Play an internal performance auditing role, which includes monitoring the functioning of the PMS and compliance to legislative requirements. The internal audit role also involves assistance in validating the evidence provided by Executive Directors in support of their performance achievements. Performance Audit Committee: Monitor the system’s quality and integrity by moderating the one-on-one performance assessment results for Section 57 employees, including the Heads of Municipal Entities, to ensure equity and consistency in the application of evaluation norms and standards. The Committee further provides impartial recommendations on performance ratings to the Mayoral Committee, following the completion of objective appraisals. Evaluation Panel: Evaluate Section 57 Employees’ (including the City Manager’s) performance through approval of their final performance ratings based on the Performance Audit Committee’s recommendations. The 2006 Municipal Performance Regulations prescribe the composition of the Evaluation Panel. Executive Mayor and Members of the Mayoral Committee: Manage the development of the municipal PMS and oversees the performance of the City Manager and Heads of Department. 76 Council and Section 79 Committees: Play an oversight role and consider reports from the Mayoral Committee on its functions on different portfolios, and how this impacts on the overall objectives and performance of the municipality. Community: Play a role in the PMS through the annual IDP consultation processes, which are managed by the Office of the Speaker, working in close conjunction with the Central Strategy Unit. RESPONSE TO THE 2007/08 FINDINGS OF THE AUDITOR GENERAL The following table shows the findings of the Auditor–General on the City’s PMS for the 2007/08 financial year. The table also details the City’s comments and action plan in response to the findings. AG’S COMMENTS CoJ COMMENTS ACTIONS TO BE TAKEN Issue No 1: Inconsistent reporting of information Municipal circular No. 11 issued on 14 The issue was first identified in the The 2008/09 IDP/SDBIP approved in January 2005, page 2 paragraph 1 2006/07-performance audit. Since the May /June 2008 are fully compliant “requires that the annual reports must 2007/08 IDP and SDBIP were already and the amendments will be reflected be aligned with the planning approved at the time of the audit, it in the 2008/09 Annual Report documents and the municipal budget was impossible to retrospectively for the year reported on to facilitate amend the IDP and the SDBIP to as to easy understanding and to enable the ensure compliance for the 2007/08 linkage between the plans and the Annual Report. actual performance”. Contrary to this However the 2008/09 IDP/SDBIP requirement, even though the Annual approved in May /June 2008 are fully Performance Report and the compliant and the amendments will be Integrated Development Plan reflected in the 2008/09 Annual Report (IDP) were aligned, the municipality’s performance planning documents (Budget and Service Delivery and Budget Implementation Plan (SDBIP)) did not include the predetermined performance objectives as stated in the Integrated Development Plan (IDP) Issue No 2: Performance Agreements not signed timeously Inspection of the performance Agree to the audit finding and will The 2008/09 performance agreement agreements for the 2007/08 financial ensure that performance agreements and scorecards for all section 57 year indicated that some performance and scorecards for all senior employees were signed timeously (31 agreements were not signed within managers and staff are signed July 2008) one month after the beginning of the timeously financial year i.e. before the 31 July 2007 as prescribed by the MSA and the Regulations Issue No 3: Variances between planned and actual performance results There were various instances where The annual report will be updated Update annual report to include there were significant variances accordingly to include explanations on explanations on major variances between planned and actual major variances performance results Issue No 4: Internal audit function Regulation 14 (1) (c) of the Local Agree with the audit finding. A detailed A detailed process plan is to be Government: Municipal Planning and process plan is to be developed to developed to guide performance Performance Management guide performance auditing within the auditing within the City on a Regulations, 2001 requires that the City on a continuous basis and continuous basis and capacitating of municipality’s internal auditors must: capacitating of internal audit will be internal audit to will be prioritised prioritised Continually audit the performance measurement of the municipality; Submit quarterly reports on their audits to the municipal manager and performance audit committee; Even though internal audit conducted 77 AG’S COMMENTS performance audit after financial yearend, the audit was not conducted continuously during the year Issue 5.1 CoJ COMMENTS ACTIONS TO BE TAKEN Issue No 5: Actuals don't agree with source documents Issue 5. 1 The evidence provided to support the performance information reported in the annual report was materially inconsistent with the ADBS Report and Evidence Checklist from Housing Agree with the audit finding. However the source document used by the City to review and monitor performance is the ADBS report, not the checklist. Upon the inspection of evidence the AG audited the checklist instead of the ADBS report Issue 5.2 Issue 5. 2 Through inspection of the CBP/PHP Database 2007/08 Ivory Park, it was identified that the database may not be accurate because some of the beneficiaries were accounted for more than once, thereby rendering the accuracy of the actual performance questionable Agree with the audit finding. The duplication is attributable to human error and has since been corrected The Annual Report will be amended to reflect the actual performance for 2007/08 financial year as audited by JRAS prior to tabling to Mayoral Committee and Council in January 2009 CONCLUSION The City will continuously review its PMS to keep up with the evolving nature of performance management. The will involve making necessary amendments to current policy to ensure full legislative compliance and alignment of PMS across the City. 78 CHAPTER 8: SECTOR PLANS INTRODUCTION The basis for the annual review of the IDP is not only legislated, but it is also critical for the City to continually update its plans. This review primarily focused on the five year IDP Sector Plans and development of Delivery Agendas outlining key outputs and targets for the next financial year. This review process also aligns and informs departmental and ME business planning and budgeting on an annual basis; and is used to align inter-departmental planning, and City plans to those of Provincial and National sector departments. Departments and Municipal Entities (MEs) reflect on the immediate priorities brought on by communities needs, business and growth demands, implementation capacity, and available resources and, where necessary have revised some of the five year objectives and IDP programmes in line with the principles of the GDS. STRUCTURE OF SECTOR PLAN The 2009/10 sector plan describes briefly the sector, by indicating the responsible department and Municipal Entity or Entities. The sector plan also highlights key challenges and opportunities its facing, the Legislative Framework it operates within, and it reports against the IDP five-year sector indicators and its contribution towards the 2010 FIFA World Cup. The 2009/10 IDP consists of 13 sector plans, namely: Community Development; Corporate & Shared Services; Economic Development; Environment; Financial Sustainability; Governance; Health; Housing; Infrastructure & Services; Legislature; Public Safety; Spatial Form & Urban Management; and Transportation. This chapter also makes reference to the Auditor-General’s findings (2006/07) in terms of the sector indicators with specific five-year targets. Each sector is reflecting progress to date as well as targets set for 2009/10. 79 IDP 5-YEAR SECTOR INDICATORS Community Development The Community Development sector indicators are informed by the five year IDP strategic objectives of addressing social exclusion and building a safe and healthy society with special emphasis on vulnerable groups, i.e. women, children, youth and people with disabilities. INDICATOR Percentage of projected eligible population registered for Expanded Social Package 5-YEAR TARGET (2006/11) 80% % integration of COJ Social Package Services with relevant departments, Home Affairs, UIF, Social Development & SASSA % of child headed households registered in COJ database receiving social assistance according to Bana Pele principles) 90% Number of participants placed in formal employment or independent contractor/entrepreneurs 17 000 Number of shelters developed for children living and working on the street Percentage of children living / working on the street removed in the Inner City Percentage of children living/working on the street rehabilitated Number of caregivers trained Number of orphans receiving support 2 in Regions F&G 90% 90% PROGRESS AGAINST THE 5-YEAR TARGET (ACCUMULATED) No history on New Expanded Social Package but 119 000 Indigent on current register. Registration to commence in July on New Package No history prior to 2008. Programme at 85 % since inception 226 registered child headed households with 409 children 100% of children receiving social assistance. 159 of these have individual learning and career development plans 5172 2 in Region F However, MOUs with NGOs who provide shelter and are funded by the City (Inner City) On going 2009/10 DELIVERY AGENDA 50% 60% 60% 6000 70 small poverty alleviation projects through skills centres Implementation of social mobility summit recommendations at regional level Computer training to be expanded to the other three additional clubhouses in the city Entrepreneurial Programmes run at skills centres Youth incubator programme On going 50% 90% No history (these did not exist before) 60% 7000 35 000 920 18388 3040 Percentage development of information on how to access funding from CoJ in four languages Number of youth involved in African Literary Dev. Prog Establishment of African Literature Bookshop 80 100% 100% (Braille, Sotho, English and Zulu) 22 000 2251 1 Region E 1 (Orange Grove) E 10000 orphans assessed and connected with provincial and national interventions 409 Individual Development Plans for Child Headed Households 5000 (special programme 2010) INDICATOR Free Internet and E-mail at 50% of public Libraries Percentage of computer based literacy/numeracy centres at half of City’s public libraries Percentage management and maintenance of sport facilities as per norms and standards policy 2 Percentage Professional competitive sport development (swimming, tennis, golf, rugby, equestrian, basket ball & indigenous games) Roaming recreation vehicles rolled out Percentage development and implementation of heritage strategy for historically disadvantaged areas Number of talented youth identified/developed through creative industries from historically disadvantaged communities Number of monuments commissioned for cultural icons Number of informal sports fields grassed out of 35 scoped Recreation Streets in historically disadvantaged areas Revamping & completion of stadia (Rand, Dobsonville & Orlando) Development of Soweto Theatre Number of youth introduced to youth theatre via sponsored tickets Productions staged to attract new audiences 2 5-YEAR TARGET (2006/11) 42 PROGRESS AGAINST THE 5-YEAR TARGET (ACCUMULATED) 0 21 100% 100% On going 100% 20% (on going) 50% 85% 85 % On going Regions G, E& A 100% Region G weekly to day care centres 100% Soweto and Alexandra (Credo Mutwa, June 16 Trail, Kliptown, Vilakazi Precinct) 1 1000 300 3 monuments of cultural icons 2 -D&F Proposed bust of Walter Sisulu at Metro Centre 350 (establish Creative Industries unit; implement Carnival training camp; youth training through music, craft & art bank) 1 35 grassed & fenced. 16 with ablution facilities Regions B & C 12 grassed. 1 fenced with ablution facilities 6 currently under construction 7 5 in 2007/08 in Jabavu, Bellavista, Bertrams, Senoaone, Tshepisong (G,F, D, A, & B) 90% 80% precinct development) C&E 5%(tender awarded; plans drafted) 70% by June 2010 1954 (Roodepoort Theatre) (Via sponsored tickets) 2575 8 Roodepoort Theatre & JTC 26 100% 100% completion and legal process of ME establishment 7100 60 Redefined to sport transformation programmes. 81 2009/10 DELIVERY AGENDA 100% (to include Orange Farm, Diepsloot, Ivory Park) 10 % Economic Development The Economic Development Sector Indicators are informed by the IDP objective of ensuring participatory democracy, accountability and responsiveness to needs of communities. INDICATOR 5-YEAR TARGET (2006/11) 2009/10 DELIVERY AGENDA 120 000 PROGRESS AGAINST THE 5-YEAR TARGET (ACCUMULATED) 123 059 Number of jobs created through the EPWP programme 3 Percentage implementation of the Jozi Equity Fund to support SMME development and job creation.4 Percentage increase in the City’ spent to specific targeted firms owned by specific categories of HDI (BEE, Women, disabled, youth, etc) Rand Value of projects attracted into the City through accelerated and expansion of the Urban Development Zone (UDZ) Tax Incentive % Implementation of the Joburg Broadband Network/Project 50% 25% 65% 70% 65% 70% R15 billion R3.3 billion R3.5 billion 100% 80% 50% 120 000 Environmental Management The Environmental indicators are informed by the five year IDP strategic objectives of ensuring sustainable development and environmental justice, and providing recreational facilities (developing parks) especially in previously disadvantaged areas of the South. INDICATOR 5-YEAR TARGET (2006/11) PROGRES AGAINST 5YEAR TARGET (ACCUMULATED) 2009/10 DELIVERY AGENDA Number of trees planted on sidewalks, in parks and private properties Percentage reduction in waste disposal to landfill and sorting at source in the City 200 000 trees planted 62 000 173 tons of waste recyclables and 600 crates bottles collected 10 tons of waste from major events to be diverted from landfill Public education and information on best practices on waste handling and impacts Basa njengo Magogo project rolled out in: 4 000 additional households in Soweto and Alexandra Voluntary rating and incentive schemes Additional 50 km of water courses rehabilitated Implementation of hotspots improvement Percentage reduction in air pollution levels 15% reduction of waste to landfill (based on the 2006 baseline) 5 % reduction based on 2005 baselines 90 738 to date 62 000 in 2008/9 Percentage improvement in integrity of water courses and in river health 10km of water courses rehabilitated 10% improvement in river health 3 Alexandra 10 000 households Soweto 30 000 households 1 125 ha of water courses cleaned up and rehabilitated Implementation means approval of the project and the operationalisation (governance, staffing and systems) of the Fund. 82 INDICATOR 5-YEAR TARGET (2006/11) PROGRES AGAINST 5YEAR TARGET (ACCUMULATED) 2009/10 DELIVERY AGENDA Number of water bodies rehabilitated for ecological and recreational purposes 5 water bodies 4 Water bodies were identified and jointly addressed with CoJ (Florence Bloom BS, Westdene Dam, Zoo Lake and Bruma Lake) 4 water bodies have been identified and prioritised for rehabilitation (JBG Upper Dam, Florida Lake, Alberts Farm and Blue Dam) Number of wetlands rehabilitated for aquatic habitats and watercourse 5 wetlands 4 wetland systems were rehabilitated (by end 2007/8) Rehabilitation of Lenasia wetland and Orlando Dam Percentage increase the total land area proclaimed as conserved area 5% of the city’s total area by 2011 67 Recreational parks, and 41 Nature areas submitted for zoning Identify more land for conservation and facilitate for protection mechanisms 1 519 ha cleared of alien vegetation through Working for Water and JCP Submission of conservation areas for declaration and proclamation as per biodiversity assessment study in line with the relevant laws Installation of additional solar water heaters at Cosmo and ARP Retrofitting of remaining council owned buildings plan – five areas Percentage reduction in greenhouse gas emissions through flagship projects 2% reduction Two flagship projects: 5 flagship projects Retrofitting of cityowned buildings underway – 5/17 completed Percentage compliance of City’s (capital) projects to the EIA Regulations Percentage compliance of strategic projects to EIA specific conditions 100% compliance 100% compliance 222 solar water heaters installed at Cosmo City and ARP 95 % for City’s CAPEX projects 100% ARP 90%CosmoCity Target achieved, maintain or improve compliance of Capex projects Target achieved, maintain or improve compliance of strategic projects 95 % Gautrain Financial Sustainability The Financial Sustainability sector indicators are informed by the IDP objective of ensuring sustainability, accountability, and responsiveness to the needs of the City and supported communities. INDICATOR Achievement and maintenance of clean audit with matters of emphasis Collection of the recoverable portion of the Debtors Book Percentage of affirmative procurement (BEE) of total procurement value Ratio of group cost coverage (how many days operational cash covers 83 5-YEAR TARGET (2006/11) Unqualified audit report PROGRESS AGAINST THE 5- YEAR TARGET (ACCUMULATED) Unqualified audit report for 2006/07 financial year R1.8 billion Average of R3 billion 75% 2006/07 – 65% 2007/08 – 70% Ranges between 30 – 35 days 47.85 Days 2009/10 DELIVERY AGENDA Unqualified audit report Reduction of the recoverable portion of the debtors book by R1.5 billion Transferred to Department of Economic Development Target achieved. Endeavour to keep the target at the target range or higher INDICATOR 5-YEAR TARGET (2006/11) PROGRESS AGAINST THE 5- YEAR TARGET (ACCUMULATED) 2009/10 DELIVERY AGENDA 13:1 22.99 Times Target achieved. Endeavour to keep the target at 13:1 or higher 100% 100% Implementation by 1 July 2008 Increase Revenue Collection determined target (a consistent R6.4 billion per annum) R 13.3 billion Target achieved. Continuation of monitoring the implementation as well as the annual review of the Rates Policy Increase revenue collection to minimum R7 billion Percentage of collection ratios 95% 91.5% Percentage of active customers receiving accurate bills for rates and refuse Long term domestic credit rating improvement to at least AA rating 99% 84.12% customers receiving bills AA Fitch: credit rating is maintained at A+ Moody’s: credit rating was upgraded by two notches to Aa2.za Maintain at A+ 100% (save for accounts with meter related matters) 72.7 clearances issued within 30 days 95% Clearance certificates and refunds issued within 30 days of application (excluding properties with meter related issues) 90% of calls answered within 40 seconds Raise capital funding for R6 billion An average of 90 seconds An average of 60 seconds R3.8 billion Within the approved R6 from the DMTN the City has borrowed an accumulated amount of R3.8 billion from the beginning of the term with R1 billion planned for 2008/09. The remainder of R1.2 billion will be left for the 2009/10 financial year operational costs) Ratio of group debt coverage (the higher the ratio the better) Percentage of implementation of the new rates policy and valuation roll Percentage of clearance certificates and refunds issued within 30 days of application (Improvement with regard to turnaround times in respect of clearances) Call answer at Joburg Connect Pursue City’s public borrowing programme (DMTN) to raise at least R6 billion to 2010 Strengthen collection ratio at 91.5% despite the global financial pressures 95% of Rates and Refuse Account holders receiving accurate bills by June 2010 Health The Health sector indicators are informed by the five year IDP objectives of providing universal access to health care facilities, as well as implementing the HIV and AIDs awareness and support. INDICATOR 5-YEAR TARGET (2006/11) Number of diesel vehicle tested per annum for emissions % Compliance to water sampling protocol / programmes for the city Water quality management % of Council owned vacant properties where illegal dumping regularly takes place issued/served with statutory notices % Of Non Council owned vacant 84 N/A PROGRESS AGAINST THE 5YEAR TARGET (ACCUMULATED) 14 530 2009/10 DELIVERY AGENDA 7 081 95% 96% 95% 100% 100% 100% 100% 100% 100% INDICATOR 5-YEAR TARGET (2006/11) PROGRESS AGAINST THE 5YEAR TARGET (ACCUMULATED) 2009/10 DELIVERY AGENDA 269 105 Number of public awareness N/A programmes conducted per region on measures to control vectors 35 14 % of identified hot spots sites serviced by vector control personnel Number of blitzes focusing on nuisance buildings Number of campaigns per Region on chemical safety and lead awareness Number of identified informal food traders trained citywide N/A 436 436 N/A 49 7 N/A 45 14 N/A 3 153 1 946 % of cases investigated and 85% reported within 3 working days 100% of cases investigated and 85% reported within three working days Every two years 100% of cases investigated and 80% reported within three working days One survey will be conducted in 2009/10 400 542 (100%) of cases investigated and 542 (97%) reported within three working days (for 2007/08) One Knowledge, attitude and practice survey conducted in 2007/08 800 and 400 will be retrained 2 programmes 3 programmes 100% of all identified hotels 100% of all identified hotels properties where illegal dumping regularly takes place issued/served with statutory notices Number of "No dumping” signs N/A (On going) erected city-wide on properties where illegal dumping regularly takes place Number of HIV & AIDS and STI prevalence, awareness and impact surveys conducted in the city Number of Peer educators trained Commercial Sex Worker programmes implemented % Of identified hotels with CSW supported as part of the outreach campaign Number of fixed facilities providing rapid on site HIV testing services Number of fixed clinics that offer comprehensive ANC providing PMTCT services Number of fixed clinics conducting PCR testing in children % of fixed clinics implementing INH preventive therapy Number of new anti-retroviral (ART) site established in CoJ Number of clinics with extended service hours Number of satellite clinics operationalised to fixed clinics 100% of all identified hotels 100% (84) fixed facilities 100% (84) fixed facilities 87 fixed facilities All fixed clinics providing 58(66.7%) ANC 87(100%) 100%(84) fixed facilities 100%(84) fixed facilities 100%(87) fixed facilities 100% 100% 100% Identify sites in 3 established operational partnership with sites Gauteng health department and NGOs Implement the extension 5 clinics of service hours plan Implement plan to convert satellite to fixed clinics Number of EMS training session per Conduct EMS training quarter for all PHC clinical staff Number of staff satisfaction surveys Conduct annual conducted to develop interventions to satisfaction surveys improve staff morale % Regions with functional cost 100% centres % Service delivery points with 100% monthly Laboratory control systems % Service delivery points with 100% monthly pharmaceutical stock control 85 400 peer educators will be retrained 1 new programme 2 new sites will be established 2 clinics to be added 13 clinics have been converted from satellite clinics 90 nurses trained in EMS 1 mobile service points converted to fixed clinics Done annually x 2 years Survey to be done 80% 100% 85% 100% 100% 100% 60 nurses to be trained INDICATOR systems % Drug stock-out in customised EDL per region % Shrinkage on pharmaceuticals at the central pharmacy and clinics Number of internal audit reports on the pharmaceutical services % Of ward health sector representatives trained Number of training sessions for community structures including traditional healers per annum Time taken to respond to service requests & complaints and % resolution rate of complaints (as per criterion) % of clinicians trained in early identification of people with mental illnesses % Cure rate of New Smear Positive TB patients % Of sputum results received within 48 hours Number of TB awareness programmes conducted in each region Number of substance abuse awareness and education programmes conducted at high schools Number of males screened for prostrate gland & testicular cancer 5-YEAR TARGET (2006/11) PROGRESS AGAINST THE 5YEAR TARGET (ACCUMULATED) 2009/10 DELIVERY AGENDA <5% drug stock out 0.3% drug stock out <5% drug stock out Not more than 5% shrinkage on pharmaceuticals at the central pharmacy and the clinics Bi-annual 0.68% shrinkage Not more than 5% shrinkage on pharmaceuticals at the central pharmacy and the clinics Bi-annual 2 per year 100% 2 Bi-annual reports X 2 per year 70% of ward health sector representatives trained 2 per annum Monthly monitoring of Above 95% implementation of complaints management system: response time and resolution rate (targets) as per criterion 90% (cumulative) 65.2%(199) clinicians have been trained to date in early identification of people with mental illnesses for the 2006/07 & 2007/08 years 86 Above 95% 20% additional clinicians trained in early identification of people with mental illnesses including Alzheimer’s Disease, bipolar & postnatal depression 76% (annual target) 73.7% (Annualised April 75% Cure rate of New 2006 – March 2007) Smear Positive TB patients 90% (annual target) 91% (Annualised April 2007 90% of sputum results – March 2008) received within 48 hours TB awareness TB awareness programmes 1 TB awareness programmes conducted conducted in each region for programme conducted in in each region annually the 2006/07 & 2007/08 years. each region The next major campaign will be held in March 2009 as part of World TB Day (24th March 2008) 98 High Schools & 63 Substance abuse awareness Substance abuse Primary Schools and education programmes awareness and education (cumulative) conducted at 55 high schools programmes conducted at 3 high & 3 primary for the 2006/07 & 2007/08 years. Primary schools have schools per region only been included from the 2008/09 year 4,690 males screened A total of 2,010 males were 150 males screened for for prostrate gland & screened for the 2006/07 & prostrate gland and testicular cancer 2007/08 financial period testicular cancer per region Cervical & breast cancer awareness programmes conducted in each region for the 2006/07 & 2007/08 years Number of awareness programmes Awareness programmes on on chronic conditions of lifestyles chronic conditions of conducted lifestyles conducted in each region for the 2006/07 & 2007/08 years Number of awareness programme on Mental health Awareness programmes on mental health conducted awareness programmes Mental health conducted in conducted in each each region for the 2006/07 & Number of cervical & breast cancer awareness programmes conducted 85% of ward health sector representatives trained 2 Cervical & breast cancer awareness programmes conducted in each region annually Awareness programmes on chronic conditions of lifestyles conducted in each region annually 1 awareness programme on cervical cancer and breast self examination in each region Awareness programmes on chronic conditions of lifestyles conducted in each region 1 awareness programme on mental health conducted per region INDICATOR Number of EPI awareness programme conducted % (full) immunization coverage of children under 1 year 5-YEAR TARGET (2006/11) PROGRESS AGAINST THE 5YEAR TARGET (ACCUMULATED) region annually 2007/08 years EPI awareness EPI awareness programmes programmes conducted conducted in each region for in each region annually the 2006/07 & 2007/08 years 90% (Annual target) 88.5% (July 2007 – June 2008) % of severely malnourished children under 5 years monitored/followed up 100% of severely malnourished children under 5 years monitored/followed up % fixed facilities providing comprehensive ANC in the city 100% % of ANC patients pre test counselled for HIV 90% % increase in cervical cancer 5% increase in cervical screening coverage from the baseline cancer screening coverage annually Number of awareness programme on Cervical cancer and cervical cancer and breast self breast self examination examination in each region awareness programmes conducted in each region annually Number of awareness and education Awareness programmes on reproductive and programme on reproductive and maternal health maternal health in each region conducted in each including postnatal depression region annually 411 (100%) of severely malnourished children under 5 years were identified and were monitored / followed up for the 2006/07 & 2007/08 years 66.7% (58 of 87 fixed facilities providing comprehensive antenatal care) 78.5% of women attending antenatal care at LG facilities were pre-test counselled in 2007/08 The coverage for 2006/07 was 6.8% (30,422 Pap Smears) and 6.1% (28,280 Pap Smears) for 2007/08 Awareness programmes on cervical cancer and breast self examination conducted for the 2006/07 & 2007/08 years Awareness programmes on reproductive and maternal health conducted for the 2006/07 & 2007/08 years 2009/10 DELIVERY AGENDA 1 EPI awareness programme conducted per region 90% (full) immunisation coverage of children under 1 year 100% of severely malnourished children monitored / followed up 100% of fixed facilities providing comprehensive ANC in the city 90% of ANC patients offered HIV counselling 5% increase in cervical cancer screening coverage from the baseline (The target group is 83% women over 30 years for the Public Sector services) 1 awareness programme on cervical cancer and breast self examination in each region Number of awareness programmes on teenage pregnancy conducted in high schools 91 High Schools & 63 Primary Schools (cumulative) Number of educational campaign conducted focusing on CoJ by-laws & legislation Number of butcheries inspected for compliance with legislation Number of Functioning Outbreak Response teams N/A 1 awareness and education programme on reproductive and maternal health in each region, including postnatal depression Awareness programmes Awareness programmes teenage pregnancy on teenage pregnancy conducted at 43 high schools conducted in 3 high & 3 for the 2006/07 & 2007/08 primary schools per years. Primary schools have region only been included from the 2008/09 year 101 7 (1 per region) 100% of database 787 (100% of database) (100% of database) 787 7 functional Outbreak Response teams in each region 7 functional Outbreak Response teams in each region 7 functional Outbreak Response teams in each region 87 Housing The Housing sector indicators are informed by the five year IDP target of delivering 100 000 nits , as well as affordable housing opportunities through leveraging private sector investment in line with the Breaking New Ground principles. INDICATOR Number of mixed income housing units Number of housing units through the Community Builder Programme and Peoples Housing Process Number of rental housing units Number of hostel upgrading programmes 5-YEAR TARGET (2006/11) 50 000 units PROGRESS AGAINST THE 5- YEAR TARGET (ACCUMULATED) 22 872 units 2009/10 DELIVERY AGENDA 15 000 units 30 000 units 13 572 units 10 000 units 15 000 units 5 000 units 8 916 units 1 103 units 3 000 units 1 600 units Infrastructure and Services The Infrastructure and Services sector indicators is informed b the strategic objective of providing universal access to essential services in line with the national and provincial targets, as well as the Millennium Development Goals. INDICATOR 5-YEAR TARGET (2006/11) % coverage of basic level5 of service to all households Water 100% Sanitation 100% % of service connection7 of electricity to all formalised households % provision of street lighting to all formal and proclaimed informal settlements % reduction in electricity usage % reduction of electricity outages (bulk, medium and low voltage) % reduction of electricity losses % improvement of cleanliness 8 levels in the Inner City % reduction of unaccounted for water 5 95 % by 2011 PROGRESS AGAINST THE 5- YEAR TARGET (ACCUMULATED) Water and sanitation 85% (The remainder of areas are provided with nominal service6) 78% 90% of prioritised areas 95% 62% 65% 10% Indicator has not been measured yet, since programme commenced recently 10% 30% by 2010 15% 18% from 3% to 1% (non-technical losses) Inner City Charter 100% 2.9% 2% Cleanliness levels have 9 improved to level 2 Sustain cleanliness levels at level 2 Unaccounted for water losses averaged at 33.6 % Physical losses -9% Commercial losses 16% 25% (physical and commercial losses) 2009/10 DELIVERY AGENDA 90% of prioritised areas Level of service 1 (LOS 1) water include water standpipes and water tankers located within a 200meter radius LOS 1 sanitation include VIP for each household, chemical toilets and any other dry onsite sanitation 6 Nominal services are generally temporary in nature but ensure the provision of the basic services. 7 Service connection completed before or after the construction of housing structure 8 Based on prescribed Service Level Agreements 9 Level 2 represents an area predominantly free of litter except for small accumulations in 1 out of 4 street corners. 88 INDICATOR 5-YEAR TARGET (2006/11) % reduction of waste to landfill site 15% % collection of waste in all areas (formal and non formal areas) once a week 100% PROGRESS AGAINST THE 5- YEAR TARGET (ACCUMULATED) 5% waste reduction was achieved All areas provided with a standard waste service and 61 informal areas received a daily service to improve cleanliness levels 2009/10 DELIVERY AGENDA 7% reduction on green waste. At least 10% dry waste diverted to MRFs and private landfills Standard Waste service to all areas and daily service to 84 prioritised informal settlements 100% coverage of formal areas Public Safety The Public Safety sector indicators is informed by the five year strategic objectives of building a city where life, property and lifestyles are safe and secure so that residents and businesses can live and operate free from crime, threats to public safety, personal emergencies and disaster. INDICATOR 5-YEAR TARGET (2006/11) PROGRESS AGAINST THE 5YEAR TARGET (ACCUMULATED) 2009/10 DELIVERY AGENDA Number of FF/EMTs 778 278 (To date) 250 16 delivered Number of Ambulances 60 Number of Metro Police Officers employed by 2010 4 000 % Development and implementation of a safety and security readiness plan for the 2010 FIFA soccer world cup 100% Reduce incidences of crime across 7-10% reduction the City 250 to be recruited for 2008/09 25 for 2008/09 Recruited an additional 500 MPOs who commenced training in July 2008 which will bring the total number of MPOs close to 3 000 by the end of December 2008 Safety and Security readiness plan fully developed and a total of 10 joint simulation and 28 practice sessions (service animals) conducted 19 Recruit and train an additional 1 000 MPOs (appointments will be made based on availability of funds) Implement the Safety and Security plan during the 2009 FIFA Confederations Cup and 2010 Soccer World Cup 4% reduction in 2006/07 financial 7-12% reduction year 0.68% increase in 2007/2008 financial year 3.32% reduction to date 11 minutes 10 minutes Average time taken to respond to incidences of crime in areas covered by CCTV (Inner City) % City area covered by CCTV (CCTV footprint) 10 minutes 100% of the Inner City 216 CCTV cameras installed and Link existing CCTV monitored. Response teams put infrastructure of SANRAL, in place JRA and private sector to CCTV control room Improved turn-around times for vehicle licensing transactions Number of by-law cases prosecuted 30 minutes Average time taken to respond to serious road accidents across the 15 minutes 43 minutes in 2006/2007 19 minutes in 2007/2008 8 555 cases in 2006/2007 18 212 cases in 2007/2008 Target of 20 000 cases in 2008/2009 27 minutes in 2006/2007 20 minutes in 2007/2008 89 40 000 15 minutes 20 000 15 minutes city % Reduction in the number of annual road fatalities 30% Target of 15 minutes in 2008/2009 12% in 2006/2007 11% in 2007/2008 Target of 20% in 2008/2009 25% Spatial Form and Urban Management The Spatial Form & Urban Management sector indicators are informed by the City’s five year IDP strategic objectives of restructuring and re-engineering of the current distorted urban form; and it also guides the City’s key programmes and capital investment initiatives to support economic growth potential. INDICATOR Percentage building plans approved within 24 hrs 5-YEAR TARGET (2006/11) 80% PROGRESS AGAINST THE 5YEAR TARGET (ACCUMULATED) 100% of complete building plan applications are approved within 24 hrs 35% are approved within 28 days No progress. Budget request submitted in annual budgeting Percentage implementation of a block-by-block operational plan in nine priority areas per region 100% Percentage implementation of the new approach to regularise informal settlements 100% In-situ formalisation and provision of basic level of service complete by June 2009 Percentage new development and capital investment that is focused in the short and medium term priority areas of the City, as defined by the Growth Management Strategy (GMS) 50% of all private investment and 60% of all public investment in the City to be targeted at key growth nodes and focus areas identified by the GMS 100% Assessment and implementation strategy for one growth management area complete by June 2009 Turnaround times will be maintained Focus is to shift to the quality of decision-making Implementation of block-by-block operational plans in all regions with specific focus on CBDs other than the Inner City Initiate land use regularisation, where feasible Re-alignment of the Capital Investment Management System (CIMS) to include central tenets of the GMS Ongoing assessment of growth targets and development trends Finalisation and full implementation of a consolidated town planning scheme 3 yearly updates Consolidated town planning scheme finalised with public comments Maintenance of the aerial photography for the City using new technologies such as pictometry, which enables 3-D viewing and measurement 2006/2009/2011 Phase One of CoJ aerial imagery update complete by June 2009 Percentage implementation of the Inner City Regeneration Charter Plan 100% Completion of Inner City Spatial Framework Implementation Plan 100% implementation of 08/09 90 2009/10 DELIVERY AGENDA Refinement of development conditions relating to resource management Consolidated town planning scheme to be in operation (in accordance with promulgation of provincial regulations) Completion of Phase Two (final phase) of CoJ aerial imagery update complete by June 2010 Implementation of Inner City Spatial Framework INDICATOR 91 5-YEAR TARGET (2006/11) PROGRESS AGAINST THE 5YEAR TARGET (ACCUMULATED) Inner City Charter Commitments 2009/10 DELIVERY AGENDA 100% implementation of 09/10 Inner City Charter Commitments Community Development Sector Plan INTRODUCTION AND OVERVIEW Part of the sector’s vision, through the Community Development department, is being upheld and rigorously sustained in pursuit of the City’s broader goals for addressing household poverty through safeguarding and supporting the poor; addressing inequalities through championing rights and opportunities and building prospects for social inclusion. These goals are pursued to ensure a City where community development, personal growth and social mobility are enhanced, so that the challenges of poverty and vulnerability, inequality and social exclusion are fundamentally addressed. The vision, mission and goals are therefore very broad statements, further broadening an already large mandate in response to strategic and political imperatives and priorities, as well as societal demands and expectations Community development within the sector cuts across many city departments and several Municipal Entities (hereafter ME’s), since it relates to the key focus areas aimed at advancing human development with women, youth, immigrants and displaced persons; people with disability (PWD’s) and early child development (ECD) as main programme focus areas; conserving and showing artistic expression and heritage; creating opportunities for the upliftment/advancement of communities through sports and recreation, as well as promoting a culture of reading and learning, all these especially targeted at vulnerable groups in the community. It is a well-known and documented fact that vulnerability often has negative effects on people’s general health and well-being, and the concomitants thereof remain a challenge for government at every level. The City, as local government, is at the coalfront for mounting community expectations and demands, and the sector, being largely social-goals -oriented in its main focus, experiences a huge challenge in mitigating all the expressed community needs at once in the face of tight budget allocations. Prioritisation therefore assists in the execution of new projects and for maintaining programme continuity via a balanced system of community / stakeholder participation, and alternative funding mechanisms. Key focus areas Within the sector, as part of the department’s responsibility, the following key focus areas constitute the Community Development Department’s IDP programmes. The programmes are: City Social Package; Access to Social Grants; Vulnerable Households Support; Early Childhood Development (ECD); Women Development programme; Sustainable Human Settlements (Community Development component); Skills Development (Community Development component); Public Spaces; Public Arts, Cultural Life, Heritage and Theatres Support for the Arts Programmes; Sports and Development; 2010 Soccer World Cup Legacy; Youth Development; Street Children Opportunity; Counter Xenophobia and Common Citizenship; NGO/CBO Support programme; and PWD Access. 92 It should be noted that some of the key programmes outlined above are thematically grouped in the sector plan report, eg, all Arts, Culture and Heritage, social relief, skills development programmes. Mandate The mandate continues to expand, and it derives from national, provincial and local government legislation and is informed by the following: the Millennium Development Goals (MDG’s); the Growth and Development Strategy (GDS) and the Integrated Development Plan (IDP) process that includes a rigorous community participation process; the City’s scorecard; the Mayoral Priorities as set out in the recent Budget Lekgotlas held in November 2007 and March 2008; as well as all applicable national and provincial policy and strategic objectives, protocols and agreements per the constitutional requirements on cooperative governance. This has been translated into an annual implementation outcome or a detailed departmental business plan. Sixteen citywide priority interventions were adopted as ‘key’ in the November 2007 minute of the Budget Lekgotla. The broadest ones within the sector cutting across many city departments and ME’s are: proactive absorption of the poor; facilitated social mobility and equality; and settlement restructuring, whose overall coordination is a Community Development departmental responsibility. Possible departmental first priority interventions, in terms of the preliminary Budget Lekgotla November 2007 outcomes, in partnership with relevant City departments and MoE’s are: Implementation of a revised social package; Increased spend on maintaining infrastructure, roads and public facilities especially in poorer areas; Piloting and implementation of a regulatory framework to ensure that all buildings meet set environmental/demand management standards. These are further described in the detailed business plan, which, once approved by Council, will present the final mandate on the strategic and political priorities in respect of the sector, for operational execution by the department, based on the Council approved budget choices and allocations. CHALLENGES AND OPPORTUNITIES Most challenges in the sector relate to funding availability, lack/inadequate/poorly resourced facilities and growing community needs and demands. These are however, being mitigated against through partnerships with internal City and external (provincial) departments, nongovernmental organizations and the corporate sector, through innovative strategies to fund new programmes, implement uniform norms and standards for facilities including the development of new facilities, and enhancing interactions and constructive engagements with community representatives and groupings using the institutional mechanisms already in place. Within the City, the most critical dependency matrix with regard to the sector’s mandate for sustained and proactive and responsive service delivery to communities is with the internal Departments of Health, (vulnerable households support programme, HIV/Aids), Housing, (sustainable human settlements programme, inclusionary housing strategies, regularization of informal housing), Development Planning and Urban Management (sustainable human settlements programme in terms of the regularization approach to informal settlements, accelerated upgrading that must have a basket of social amenities in informal areas), Environment (sustainable human settlements programme – regulatory framework for buildings), Economic Development (skills development programme and EPWP) as well as JDA (funding support for sustainable human settlements programme, empowerment zones), JRA (sustainable human settlements programme), JFPM (food programme), JMPD (by-law enforcement, and safety and security programmes) ISD (EPWP), and EMS (disaster management). The department has structured engagements with its counterparts, and continues to enhance the Human Development Task Team outcomes as an institutional forum for such structured engagement. 93 Apart from the normal scale of activities and projects linked to programmes, and which need to be carried out in the Community Development Department, the following are some of the challenges encountered in the implementation of the 5year sector plan thus far: Access to social package by qualifying households Human Development: Partnerships and multidisciplinary engagement: There is lack of a mechanism to facilitate the establishment of partnerships so that delivery is unaffected; There is also a lack of commitment from various departments in various strategies; Social Mobility Summit: The challenge of hosting the summit is that a long wish list, demands, new and increased expectations emerged without the benefit of joint commitments; and Change management: Skills adaptation a necessary challenge to be addressed, in order to respond to the new departmental business strategy and ethos. Increased number of City-run or City-supported programme ACH: Lack of funding in ACH for the Creative Industries portfolio, thus styming the economic sectors for craft. music, design; and ACH HIV / AIDS Festival may be in jeopardy from 2009 due to the fact that 2008 is the last year that the Royal Netherlands Embassy will fund it. Literacy and numeracy training programmes Library and Information Services: CoJ needs to comply with the Carnegie Corporation of New York conditional grant conditions; CoJ needs to commit capital funding with respect to expanding direct public access to the internet programme, also to include satellites, to meet Gauteng Provincial Government (GPG) halfway; and Insufficient staff in Libraries for direct service delivery particularly to accommodate new programmes. Increased number of developed public spaces (other than formal parks) where citizens can interact freely and safely Capital Projects: Funding thereof remains a challenge; and Recreation Streets in Alec Gorshel complete, Borolo Recreation Street in Jabavu, Bertams and Bellavista Recreation Streets developed and completed. Steadily increasing percentage of residents who have either participated in or attended a City of Johannesburg led arts, culture or heritage initiative Ach: Need to maintain existing heritage sites and establish new monuments; The transfer of the Creative Industries Portfolio from EDU without a budget, resulting in inability of ACH to proactively absorb the poor; especially craft, music, film and design sectors by resourcing the said sectors; This project is un-funded / under-funded; and Operating budget for the centre yet to be secured. Improved accessibility to sports and recreation facilities and programmes, both in terms of distribution across the city and in terms of average operating hours Sport and Recreation: Budget availability still to be finalized. Xenophobic attacks on migrants to Johannesburg eliminated and tolerance of migrants increased. Human Development: 94 Social Inclusion of the foreign nationals is still a challenge. The key challenges facing the department for the period 2009 -2011: Insufficient funds both Capex and Opex to meet the community needs in terms of provision of new community facilities and adequate maintenance of existing facilities; Coordination and impact-centric integration of efforts by all spheres of government to alleviate poverty in the Johannesburg context, both in terms of programmes and funding; Institutionalizing the Expanded Social Package as a one-stop shop for social services in Johannesburg; Working with other spheres of government and the private sector to scale up the Job Pathways programme as a welfare to work solution that begins to address the scale of need for effective employment and livelihood strategies amongst Joburg's poor; To ensure completion of the Soweto Theatre and put in place effective management and resources; Reduction of poverty and increasing the pace of meeting the millennium goals by 2014 Ensuring that all the orphans and indigents in the city are in the database and have access to services; and Unfunded mandates from other spheres of government. The key programmes that the department will be implementing for the remainder of the political term: Completion of the Mayoral legacy projects (e.g. Greening of soccer fields, Soweto Theatre Siyasizana/ or the Expanded social package (ESP) a next-generation approach to targeting benefits and distributing benefits , building a system which channels different levels of subsidy for city services to those with different levels of need, but also refers the poor to a range of special needs programmes and tracks the outcome, becoming a one stop shop for social services; Pathways system - work-readiness programme attached to expanded social package that assesses and streams the jobless into different placement and training channels, based on their particular circumstances (including job pathways); Rental subsidy scheme (component of the ESP) - a radical approach to the issue of shelter for those living on the streets and b in deeply informal circumstances, by establishing a system for subsidizing private sector rentals (for a limited time) for the poorest residents of the city, specifically those registered on the ESP as homeless; Cultural life programmes in poor neighborhoods; and Counter Xenophobia programmes: namely the Africa History Week Programme (focusing on young people and communities from various communities to build understanding across cultural boundaries and inculcate tolerance) and the Johannesburg Migration Advisory Committee (made up of various role players from other sphere of government, NGO’s, chapter nine organizations to assist develop regulations on migration issues in the city. The key programmes that the department is prioritizing for the financial year 2009/10: 95 Completion of the 2010 training venues; The City Expanded Social Package Programme and the Job Pathways System - rolling out registration, ensuring benefits reach those registered, making referrals more effective and efficient; Development of the Soweto Theatre and Gauteng Craft Hub; and Addressing the challenge of homeless people and children living and working on the street and Human Trafficking. REVISION TO THE COJ 2006/11 IDP The 5 year strategic objectives have been retained and minor additions were made after the last community interactions. SECTOR RESPONSE TO COMMUNITY ISSUES Citywide regional summits and a stakeholder summit were held in February - April 2008 respectively. Ongoing community involvement and workshops are undertaken to share progress and achievements but also to obtain feedback from community development stakeholders on key departmental programmes. SECTOR CONTRIBUTION TO 2010 FIFA WORLD CUP The following are projects and programmes the Department of Community Development is currently working on towards 2010:- development of formal grassed soccer fields, recreation streets/zones, 2010 training venues, the Soweto Indoor Aquatic Centre, the creation of jobs through the EPWP Programme, Jabulani Theatre and the Johannesburg Civic Theatre’s production “The Boys In The Photograph.” Training venues The Community Development Department is currently working on the implementation of the final phases of three training venues in preparation for the 2010 FIFA World Cup. Orlando stadium The overall progress of this project is on schedule. Contract to develop the external precinct was awarded in August and work has commenced with earthworks and installation of paving and related works in the piazza at the eastern elevation, facing Mooki Street. The following work; installation of seats, tiling and construction of the ticket office, paving and fencing of the external portion of the stadium is now completed. The process for the procurement of service providers to supply gym equipment, install streetlights and access control has also started and the contracts awarded in October. Lastly, the base layer work on the pitch is being done including the installation of the sub-soil drainage system to ensure that the pitch is ready for the November 2008 official opening. Dobsonville Stadium The development of this stadium is progressing as planned. The installation of kitchen furniture and the gym equipment has been completed. The installation of seats, construction of the ticket office and paving of the internal precinct is well underway and on track for the December scheduled completion. Contract for the development of the external precinct was awarded in August and the work has started. This contract includes the development of the drop off zone, public parking, street furniture, turnstiles, landscaping and general lighting and is scheduled for completion in time for the 2009 Confederation Cup. Rand Stadium This project is on schedule as planned. Currently the installation of furniture is completed, internal paving 60% and installation of seats is about 80% complete. Contract for the development of the 96 external precinct was awarded in August and the work has started. The scope of this contract includes paving, parking, street furniture, turnstiles, landscaping, general lighting etc and it will be completed well on time for the 2009 Confederation Cup. Greening of soccer fields The table below shows the fields undergoing development during the current financial year. With the R8million funding available during this financial year, 10 fields will be developed. The scope of these projects will only cover earthworks, grassing, irrigation system, steel palisade fencing and landscaping. Appropriate layout plans for these fields have been completed and consultation with the relevant local community structures has also been done. Phase 1 of the development process for these fields is well on track with the fencing of the sites in progress. Given the outcome of the Budget Legkotla, February 2008, the final indicative budget allocation for Capital works these projects will not all is fully implemented within the current financial year. The figure is likely to be reduced from 20 to 10. However, criteria of selection will be developed. Fields to be developed during 2008/09 Field No of Fields Scope of work Status Emdeni 4167 Phiri 638 Mapetla 3388 Tladi 1873 Cnt western Jabavu 5000 Meadowlands 19331 Pimville zone 7 138 Moletsane 1804 Jabulani 2229 Dobsonville 8676 Zola 6345/6348 Emdeni 70 Zola 1851/1853 Zola ext1 6944/6945 CW Jabavu 3147 Diepkloof 13141 Emdeni 6467 2 1 1 1 1 1 1 1 1 2 1 2 1 1 1 1 2 Earthworks, fencing, irrigation grassing & landscaping Earthworks, irrigation grassing & landscaping Earthworks, fencing, irrigation grassing & landscaping Earthworks, fencing, irrigation grassing & landscaping Earthworks, fencing, irrigation grassing & landscaping Earthworks, fencing, irrigation grassing & landscaping Earthworks, fencing, irrigation grassing & landscaping Earthworks, fencing, irrigation grassing & landscaping Earthworks, irrigation grassing & landscaping Earthworks, fencing, irrigation grassing & landscaping Earthworks, fencing, irrigation grassing & landscaping Earthworks, fencing, irrigation grassing & landscaping Earthworks, fencing, irrigation grassing & landscaping Earthworks, fencing, irrigation grassing & landscaping Earthworks, fencing, irrigation grassing & landscaping Earthworks, fencing, irrigation grassing & landscaping Earthworks, fencing, irrigation grassing & landscaping 2008/09 2008/09 2008/09 2008/09 2008/09 2008/09 2008/09 2008/09 2008/09 2009/10 2009/10 2009/10 2009/10 2009/10 2009/10 2009/10 2009/10 Fields to be developed during 2010/11 financial year (Likely to be affected by the 2008/09 budget cut). Field No of Fields Scope of work Status Dobsonville 9353 Dobsonville 9851 Meadowlands 15843 Klipspruit 1096 Mapetla ext 1 2185 Dobsonville 36/7636 Dobsonville stadium Meadowlands 27130 Emdeni 4124 Diepkloof 10243 Meadowlands 18644 Dobsonville 8676 Jabulani 1340 2 1 1 2 1 1 1 1 2 1 2 2 2 Earthworks, fencing, irrigation grassing & landscaping Earthworks, fencing, irrigation grassing & landscaping Earthworks, fencing, irrigation grassing & landscaping Earthworks, fencing, irrigation grassing & landscaping Earthworks, fencing, irrigation grassing & landscaping Earthworks, fencing, irrigation grassing & landscaping Earthworks, fencing, irrigation grassing & landscaping Earthworks, fencing, irrigation grassing & landscaping Earthworks, fencing, irrigation grassing & landscaping Earthworks, fencing, irrigation grassing & landscaping Earthworks, fencing, irrigation grassing & landscaping Earthworks, fencing, irrigation grassing & landscaping Earthworks, fencing, irrigation grassing & landscaping 2010/11 2010/11 2010/11 2010/11 2010/11 2010/11 2010/11 2010/11 2010/11 2010/11 2010/11 2010/11 2010/11 In an effort to accelerate the development of the 30 suitable fields identified within the greater Soweto area and the 5 fields in the Orange Farm area, funding applications were submitted to MIG and the NDPG. Also, following a meeting held between the MMC’s for Community Development and Environment supported by their officials and City Parks, a decision for both 97 departments to work together to ensure the successful rollout of this program by 2010/11 at the latest was made. Recreation Streets With the R1.2 million budget currently available, the department will develop the 4 sites indicated below. Layout plans for these sites are complete and construction on two of the identified sites will proceed in November 08. These projects will be completed within the 2008/09 financial year Recreation streets to be developed during 08/09 (these projects could be held back to be implemented in the outer years due to lack of funding) Site Erf Project description Cost est. Expected completion Chiawelo 1438 R300 000 March 2009 Naledi Ext 1 5829 R300 000 March 2009 Jan Hofmeyer 202 R300 000 March 2009 Lakeside Ext1 3364 15mx15m - fenced perimeter including: paving, benches, bins, playground within sandpit, multipurpose court, landscaping, chess/hopscotch, shade gazebo with table and seating 15mx15m - fenced perimeter including: paving, benches, bins, playground within sandpit, multipurpose court, landscaping, chess/hopscotch, shade gazebo with table and seating 15mx15m - fenced perimeter including: paving, benches, bins, playground within sandpit, multipurpose court, landscaping, chess/hopscotch, shade gazebo with table and seating 15mx15m - fenced perimeter including: paving, benches, bins, playground within sandpit, multipurpose court, landscaping, chess/hopscotch, shade gazebo with table and seating R300 000 March 2009 EPWP In an effort to contribute towards poverty reduction, the department ensures that the majority of labour is sourced from areas within which projects are being implemented. During the first 3 months of the financial year, the department created 241 jobs and 99 training opportunities for local communities. The recent award of the external precinct contracts for Rand and Orlando stadiums will greatly contribute towards the creation of additional jobs because of their labourintensive nature. EPWP jobs created from July to August 2009 Project Name Orlando Stadium Male 2006 F/Male 221 PWD 1 Youth 1235 Total 2227 T.days 12309 Jobs 215.95 Orlando Stadium (external precinct) 24 4 0 0 28 265 4.65 Braamfischerville MPCC 164 40 0 81 204 1013 17.77 Rand Stadium 5 2 0 4 7 164 2.88 2199 267 1 1320 2466 13751 TOTAL 98 241 EPWP training opportunities created from July to August 2009 Project Name Male Female PWD Youth Total T.days Jobs First Aid 1 & Home Based Care Finance Management 8 3 22 11 0 14 26 3 30 14 2064 462 36.21 8.11 Field Management 13 18 0 31 31 2480 43.51 Business Management 3 11 14 0 14 616 10.81 27 62 28 60 89 5622 TOTAL 99 Soweto Indoor Aquatics and Sport Centre The need for an international standard, indoor swimming and gymnastics centre was identified within the City and as a result a site in Soweto (i.e. Orlando in Mooki Street) has been identified for this purpose. The development of this facility will enhance and complete the proposed Soweto Sports Precinct, which will include Orlando Stadium and various other sporting facilities in this area. This centre will greatly contribute towards the promotion of swimming among the previously disadvantaged communities and will give local talented swimmers the opportunity to train and compete in an International standard world-class facility. This centre will also be available to stage local and international competitions. Designs have been completed for this purpose and detailed investigations already undertaken to ensure that the proposed facility will be FINA (i.e. Fédération Internationale de Natation International Swimming Federation) compliant. Based on these designs, it is estimated that this facility will cost ±R180 million. Due to financial constraints, there is currently no funding set aside for this purpose within the 08/09 financial year. However, funding applications have been submitted to the NPDG (i.e. Neighborhood Partnership Development Grant) and MIG. This project also could be held back and implemented in the outer year due to lack of funding in neither 2008/09 nor 2010/11 financial years. Jabulani Theatre-Soweto Following the withdrawal of FNB from the previously awarded contract as a result of the issues raised against its joint venture partner I-Lima, a new contractor Inkanyeli/Motseng has now been appointed and the contract has been signed and finalised Phase 1 of the Jabulani Theatre in Soweto is expected to be completed by June 2010. This 400 seater theatre will greatly contribute towards the development of Arts in Soweto and the previously disadvantaged communities within the City. The Boys In The Photograph The Johannesburg Civic Theatre and Real Theatre have appointed the creative team for the Johannesburg Civic Theatre’s core production for the FIFA World Cup 2010. This production was initially titled “The Beautiful Game” and has been renamed “The Boys in The Photograph” since March08. This award-winning 2000/1 West End musical hit The Beautiful Game newly adapt The Boys In The Photograph is an emotionally charged story about young people on the verge of adulthood; young people wanting to love, to play soccer and lead normal lives in a city dominated by violence and hatred. It is full of the heart searing ballads and stirring anthems of composer Andrew Lloyd Webber and author Ben Elton. With a one-hundred-percent South African cast and creative team behind the production, Andrew Lloyd Webber and Ben Elton have given their approval for The Johannesburg Civic Theatre to create a completely original production of The Boys In The Photograph. 99 The Boys In The Photograph will be produced by The Johannesburg Civic Theatre in association with Real Theatre and presented by the City of Johannesburg as a Host City Parallel Event during the FIFA World Cup 2010. The Boys In The Photograph will have its official opening night at the Nelson Mandela Theatre on Sunday May 30th 2010 and will run until Sunday August 8th 2010 FINANCIAL IMPLICATIONS Excluding the fields done during 2007/08 and those that will be done during 2008/09, 30 more fields have already been identified in the Greater Soweto alone. To develop these with full ablution and shower facilities, a minimum of R37million CAPEX is required with normal grass and about R150 million with artificial grass. In addition, to ensure that these fields are properly kept, the OPEX requirement amounts to R300 000 per annum per field (i.e. Maintenance and Management costs). The estimated cost for the development of the Indoor Aquatics and Gymnastics Centre in Soweto is R180million. Whilst there is no funding currently set aside for the Indoor Aquatic Centre and greening of soccer fields, external funding requests have been submitted to Neighborhood Partnership Development Grant and MIG. 100 COMMUNITY DEVELOPMENT SECTOR PLAN 5-YEAR STRATEGIC OBJECTIVES Access to social package by qualifying households Qualifying citizens are knowledgeable about how to access social grants Increased City- run or Citysupported programmes IDP PROGRAMME AND KEY ACHIEVEMENTS City social package programme 2009/10 DELIVERY AGENDA Expanded Social Package Policy design & Eligibility Mechanism approved Access to relevant national databases for analytic purposes secured Pathways Advisory Centre Piloted First Special Needs water desk opened Project charter for technical systems development signed off Business process planning for registration system completed Proposal report on individual poverty index produced by HSRC/Oxford team, translated in CoJ proposal by social package working group. Now being presented for approval Access to Social Grants programme Registered indigent ID numbers matched to SASSA database. 1 additional language medium for updated information on social grants, out of a targeted 4 has been achieved as well as a Braille version has also been distributed to Regions Updated and distributed information booklet on social grants in four languages and Braille Registered indigent ID numbers matched to SASSA database Formal negotiations opened with SASSA towards an MoU on service and data alignment, which in turn will allow an SLA to be negotiated on a common service frontline Campaigns undertaken through presentations to ward committees, stakeholder forums, pamphlet distribution through clinics, ECD Centres, schools etc, public meetings and community radio talk shows Vulnerable Households Support programme 101 Homework Assistance and Information Literacy programmes: These two city wide Educational programmes were initiated from 24 libraries and targeting vulnerable groups of children, including orphanages, care centres, individual households, schools and child headed households. Number of children/youth assisted in 2007/08 = 1797 Implementation of LIS services to prisons is a new programme to be City social package programme Full roll out of the three band system for access water, power, sanitation & rates subsidies Pilot rental subsidy scheme Pilot transportation subsidy scheme Scoping of additional expanded social package components Link qualifying older persons to City Social Package Link qualifying households to EPWP & other job creation/income generating projects Full roll out of housing subsidy Full roll out of transportation subsidy Pilot of additional social package components Access to Social Grants programme Facilitate the distribution of pamphlets in all Human Development facilities Utilise the newly revamped Community Development web page to provide updated information to the frontline staff Vulnerable Households Support programme To target 409 child headed households and two vulnerable communities to receive Saturday homework assistance at Orange Farm Library and the Diepsloot Library To render a library service at the Leeukop and Johannesburg prisons To increase the number of beneficiaries and participating libraries subject to available resources 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS initiated in 2007/08 2009/10 DELIVERY AGENDA To maintain services to two prisons Food Bank: partnership with JFPM feeding 6000 households (25 000 individuals benefiting) food gardens small scale poverty alleviation projects All CHH identified in 2008/09 have individuals development plans Wellness Programmes: four programmes focusing on healthy lifestyles; awareness/educational; social support/old age centres 4000 households involved in homestead gardens as part of the exit strategy 70 small poverty alleviation projects through skills centres Hosted the social mobility summit Linking 50% of cooperatives & projects Department of Trade & Industry business support programmes to facilitate linkages with the formal business sector Sport and Recreation implemented the following programmes: 2nd International Burn Jamboree Citywide wellness programme developed & implemented Expand the Older Persons headed household programme to benefiting 1500 gogos & mkhulu’s Care centre for older persons be extended to two additional regions (G & F) Implementation of social mobility summit recommendations at Regional level Establishment of sanctuaries for displaced women, children and migrants in Regions A, D, E, & F Child Headed Support: Basket services established. Orphans & Vulnerability Strategy implemented Established a sanctuary for displaced women and children at Hospital Hill Burn victims programmes, learn-toswim, environmental education); Domestic workers training programme (cooking and hospitality, child minding, first-aid, financial management, home management & driving; and The following Sport and Recreation programmes have been continuous. Maths Championships participants Sewing and Craft Arts and culture programmes Senior Citizens programmes Moms and babes programmes Health lifestyles, fabric printing, aquaaerobics 102 Establishment of 2 Job Pathways sites Establish centre for rehabilitation against substance abuse Establish centre for daycare of senior citizens. Expand burns therapeutic recreation interventions – Expansion of programs for Focus on skills development, life skills and quality of life. Increase % of ECD facilities able to improve on their grading in terms of vulnerability index 15 000 orphans assessed and connected with provincial & national Interventions youth and women Programmes for seniors, women, caregivers, nannies and the disabled will be increased. Early Childhood Development (ECD) programme Empowerment programmes ito the physical development of the toddler, primary school child as well as youth to be employable but also transfer of skills to peers Wellness programmes focusing on socialization, exercise and on self-help and self- preservation programmes Early Childhood Development (ECD) programme “Ready to Read” development programmes are operational in 65 centres attached to 15 library sites across the CoJ Target of ECD centres and caregivers to be increased to 85 respectively 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA The ECD programme uses book based activities to give children from communities with no tradition of a reading culture the pre-literacy skills needed for success at school This programme provides the ECD centres with theme book packs that are changed on a regular basis 1655 volumes were purchased in 2007/08 to the value of R92,704.00 2 ECD centres established (Braamfisherville, Vlakfontein) Enforcement of safety standards framework on all ECD facilities controlled by the City Two training workshops were held for library staff on “Using books with young children” Implement the two components of the enforcement framework ECD Census of facilities is updated annually 50% of untrained ECD practitioners identified in the 2008/09 census to be provided with accredited training 342 ECD Care givers trained Develop a monitoring & evaluation system, based on the ECD facility ‘vulnerablility index’ to assess effectiveness of ECD programmes The skills development programme for developing Viable Economic Entities to benefit 28 centres Provide all targeted crèches with a basket of subsidies to be negotiated with rates department & utilities To increase the number of kids involved in the programmes Kiddies Olympics to be extended to other Metro Councils Regional library staff provided training to 65 caregivers in the crèches in the use of books. Caregivers were monitored, evaluated and enrolled for refresher courses if necessary Enrichment programme 103 46 centres benefited; as part of an enrichment programme, toys are made out of waste, assistance with Sick Room equipment, blankets, mats from UNICEF, & playground material & road signs from JMPD are made at various ECD Centres Pennyville creche and ECD developed An Enforcement Standards Framework for ECD’s developed in partnership with Health, Development Planning, Emergency Management Services, & JMPD in consultation with Province Disaster management Plans drawn for each ECD facility controlled by the City Target of ECD centres and caregivers to be increased to 100 respectively ECD is now part of the Human Development Directorate’s institutional design & is a fully fledged unit within the directorate Holiday Programmes viz. learn to swim, water safety, sport and recreation activities, health education, aftercare facilities and playschools operate from recreation facilities. The fact that they are on site gives recreation officers the opportunity to do kiddies olympics and indigenous games development opportunities Regional Kiddies Olympics culminating into citywide Kiddies Olympics. Target 2000 kids from the ages of 4-6 Water Safety campaign with Swimming South Africa for all preschool and school going children in Establish City ECD Fund Update City ECD census 500 care givers trained Enrichment programme reaching 70 centres 120 ECD facilities to benefit from the Enrichment Programme 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS informal settlements targeting 50% informal settlement children 2009/10 DELIVERY AGENDA Increased range of activities empowering women & increased representation of women in city activities Women Development programme Women Development programme To implement a new empowerment programme at 12 libraries to equip especially women with family literacy/numeracy skills. This will assist women to develop reading and comprehension skills to promote a culture of reading with family members/friends/children To increase the number of participating libraries to 16 Establishment of the craft training centre which will provide training opportunities for women crafters. As part of the Women Development Strategy LIS directorate has actively engaged in a 365 Days Against Abuse of Women and Children Campaign focusing on men as the target group and encouraging women to come forward and seek assistance. This is an initiative to extend programmes from 16 of activism days to ongoing programmes LIS have also delivered 14 information empowerment events across the city to promote the inclusion and development of women. Events completed focused on subjects such as health, business opportunities, rights of domestic workers etc. Number of women who benefited from the 2007/8 events = 515 Focus for 2008/09 to be on family literacy for women (newly developed programme) Establish the Women in Photography programme Empowering, educate, and support them on how to source quotations, fill in tender documents, ensuring that they are registered on the City’s supplier database & also access to other opportunities outside the City Implement the revised 365 Days of Activism Programme Skills development programme run as part of Africa Day in Diepsloot Review the Women Development Strategy Partnership with NID for annual Women’s Day programme Facilitate the Women Cooperatives in each of the skills centres Exhibitions at Jorburg Art Gallery Roll out training in other Regionstraining in civic rights and obligations, OHASA related matters Women’s dialogues at Hector Pieterson Museum Women Behind the Wheel programme at James Hall Museum of Transport 104 The department procured services from the following previously disadvantaged groups (women, youth, and PWD) of which R13. 323,558.35 benefited women owned companies Within 2007/08, 1275 jobs & training opportunities were created for women under the EPWP 365 Days of Activism Programme Women Day Celebration Regional Women’s Forums have been launched & a citywide event 54 Women in Region E & G received SAQA accredited training & certificates in Homecare Course including Safety, HIV/AIDS, Cooking and Baking, Child minding Sport Administration course Women’s day Canoe Race Gauteng Ladies Cricket is currently Enablement of procurement benefits for 40 women owned companies Implement & monitor the revised Women Development Strategy citywide Implement the framework for homeless women citywide 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS using Southern Suburbs Recreation Centre as their home ground for the U/16, U19 and their Senior teams 3 x Sports Administration and Management course per Region Implement empowerment programme to equip women with family literacy skills Improved proportion of residents within 5km of key social infrastructure Promotion of women involvement in the sport industry and NGOs Sustainable Human Settlements programme Sustainable Human Settlements programme Improved access to library facilities are provided in targeted informal settlements involving literacy teaching, reading programmes and provision of study material Services are provided from containers and available rooms in Community Development facilities Negotiations underway with Exclusive Books to provide funding for an additional satellite service in possibly Kliptown/Lehae Additional site to be identified and a service implemented subject to budget and resources 105 2009/10 DELIVERY AGENDA The service is called a LIS Satellite Service point – the services are aimed at primarily pre-school and primary school children in an attempt to instil a culture of reading at an early age, while access is also provided to recreational reading material such as newspapers and magazines for the unemployed youth living in the targeted areas. In addition, literacy teaching would be offered. A satellite is open for a limited time every week, using staff from the nearest permanent library as well as library relief staff allocated to the specific region Two Satellites were established in 2006/07 and are being maintained (Leratong and Zamimpilo). Current services include the lending of books, homework assistance, storytelling and the ECD programme “Ready to Read” – Box containers with books to crèches & training of caregivers to deliver educational themes and storytelling In 2007/08 a Satellite service was established in Klipfontein View (room in Community Centre) and LIS received a commitment from Exclusive Books to provide a fully equipped container to a site in Region G. In 2008/09 this commitment will be acted on and finalized 2006/07 Skills: Vlakfontein, Pimville, Diepsloot Multipurpose: Dlamini, Protea South, Finetown & Braamfischer Phase 1, Library: White City, River Park Youth Centres: Pimville, Umthombowalwazi ECD: Dieploot Satellite service at Zamimpilo to be relocated to Pennyville Additional services to be established at Vlakfontein in Region G and Braamfischerville in Region C 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA Greater number of users benefiting from assisted literacy & numeracy training at City libraries & targeted skills development programmes 2007/08 Multipurpose – Braamfischer Lombardy Golf Driving Range Tshepisong Multipurpose Courts X2 Arthur Ashe Upgrade Orlando stadium /Dobsonville stadium Skills Development programme Skills Development programme LIS have initiated the following skills development programmes with special focus on youth and women Implement first phase of the project and provide internet access to 20 selected libraries by June 2008 Internet access @ public libraries In support of the Premier’s 20 Township Initiative Strategy 20 libraries were identified in the Soweto area to receive free internet access Implement one group training session by skilled staff in the retrieval of Council/Community information Free Internet access (and e-mail facilities) at libraries will benefit the public with the following: Submit business plan to secure additional funding to extend the project to more libraries can Internet access linked to Career Development Management, Business Development database, Labour Market Information Database (developed by DED) Internet access supported by professional guidance from librarians Radically improved access to information for study, research and self-improvement; and Equity in information access (everyone share in better information Preliminary site inspections were completed to establish the positioning of internet workstations 106 Implement the internet project at all libraries across the CoJ subject to the commitment of the IT partners and sufficient funding from the CoJ Timeframes were not adhered to by the IT partners Commitment from partners and CoJ capital funding is necessary to continue with this project Literacy Training Literacy Training Economic inequalities are addresses by providing literacy training at libraries across the CoJ Target of 600 learners (150 women) enrolled and to ensure that 150 learners are registered for exams LIS used the Profit programme to provide traditional literacy classes and Media Works programme to deliver computer- based training Beneficiaries in 2007/08 = 793 and 166 learners registered for exams Number of beneficiaries to increase to 650 and 180 learners registered for exams. 50% of libraries in CoJ to provide literacy training 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS Business workshops/events and opportunities 2009/10 DELIVERY AGENDA To increase the number of participating libraries to 18. To maintain existing business corners and upgrade an additional 12 business collections to also include pamphlets, newspapers and BRAIN online information To promote the service more effectively continue to host 18 events and maintain and upgrade existing business collections with external partners Business workshops/events were hosted by 14 libraries focusing on the youth on subjects such as Starting a business, business plans, financial services, tender processes etc. 540 beneficiaries recorded in 2007/08 Delivering of active guidance and information services on business opportunities is enhanced by making Business Collections/Entrepreneurial Corners available at 12 targeted libraries Career Development Management Career Development Management Career guidance was delivered by 34 libraries and 2333 beneficiaries were assisted 2007/08 To increase the number of beneficiaries to be assessed to 500 Career guidance training for staff to provide the service = 30 To increase beneficiaries to be assessed to 600 and link this project to the internet subject to cooperation from DED Mass Reading Development programme Mass Reading Development programme Four programmes operational by June 2009 and Reading Holiday @ your library implemented at 38 libraries Initiate new competition for indigenous material Follow the existing format and increase the number of participants Extend the Reading Holiday programme in partnership with selected Recreation Centres To follow the existing format and establish an additional seven excellent collections at targeted libraries To follow the existing format and establish an additional seven excellent collections subject to available budget and resources Two mass reading development programmes targeting the participation of 150 schools were implemented across the CoJ. The two competitions held are: Battle of the Books and Story Skirmish. Participation by children: 2304 Two additional programmes operational at selected libraries are “Reading Holiday @ your library” and “Circles of Reading” 540 planned fun filled events were held such as treasure hunts, puppet shows, story sessions etc. to entertain children and youth “Libraries Psyched 4 Science” campaign held with special focus on model building competition for secondary schools, a Science Scuffle Quiz for primary schools as well as a career expo on science and technology promotes knowledge and awareness of science, mathematics and technology Beneficiaries/participation total for 2007/8 = 2188 youth. Seven “Psyched for Science” excellent collections were established at selected libraries across the CoJ 107 Business workshops/events and opportunities 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS Establish a “Centre of Excellence” in partnership with Carnegie Corporation of New York 2009/10 DELIVERY AGENDA 70,000 existing special collection items have been linked to the database Material have been purchased to upgrade the collections on jewel design, music, study collections etc Equipment was purchased for the digitization of the news cuttings collections and curriculum-based school project files Establish a “Centre of Excellence” in partnership with Carnegie Corporation of New York Complete the next phase of the project/operational business plan Initiate the digitization project pending progress by IT partners 40,000 additional items to be linked to the database Upgrading of the JHB Public Library building to start in November 2008 Information Services at 84 library service points 2009/10-To implement the next phase of the approved business plan if conditional grant is renewed Information Services at 84 library service points Provision of loan material, study material and reference services were delivered to the community at 84 service points across the CoJ To deliver study, reference and learner services on prescribed standards and by skilled staff at 20 selected libraries Relevant material and other resources were processed and delivered to all 84 service points, satellite services and the five major GDS programmes To maintain the existing services and increase the number of selected libraries to 40 in total In partnership with DED, to rationalize the Skills Hub Programme Introduce Life Skills programme & implement training on tendering & procurement in all skills centres Capital projects: through EPWP projects created 1972 jobs and training 774 people to date within the current financial year. A total of 2746 jobs and training opportunities created within the 2007/08 financial year Entrepreneurial programme Call centre training: 200 young people trained Youth Business Incubator site: Hydroponics Farming Orange Farm skills centre ECD caregivers trained on sewing, cooking & catering, basic computer literacy, business development, financial management, call centre, welding, brick laying, home based care, child protection, arts and craft 108 In partnership with DED, develop one group of cooperatives per region operating within a consortium/franchise model Each region to facilitate 10 innovative small scale poverty alleviation projects in the skills centres targeting beneficiaries in the indigence database of poor households Facilitate the training of SMME’s & cooperatives on tendering & procurement Business skills training for those in the second/survivalist economy Expand the services offered in the 5-YEAR STRATEGIC OBJECTIVES Increased number of developed public spaces (other than formal parks) where citizens can interact freely and safely IDP PROGRAMME AND KEY ACHIEVEMENTS Public Spaces programme existing techno hubs (life skills, youth advisory services, computer training Public Spaces programme Ellis Park precinct Extension of the roll out of upgrading and development of spaces through the use of public art across the regions. Planning of the Jabulani Precinct Orlando Ekhaya Hillbrow/ Berea/ Yeoville public art programme Kliptown: Walter Sisulu Square Redevelopment of the Hector Pieterson Memorial Fietas development 2006/07 Grassing Projects Alexandra 3 Square field Wembley stadium upgrading 2 fields Pimville youth field Vlakfontein field Dlamini Multipurpose fields Zoolake (irrigation upgrade) Dobsonville ext 3 fields Dlamini Multipurpose Within 2007/08 financial year 12 soccer fields developed; to develop 10 in 2008/09. Steadily increasing % of residents who have either participated in or attended a CoJ led arts, culture or heritage initiative Improved accessibility to sport & recreation facilities & programmes, both in terms of distribution across the city & average operating hours 109 2009/10 DELIVERY AGENDA 4 Recreation Streets/zones developed 2x Emndeni 4167 Emndeni 6467 Phiri 638 Mapetla 3388 Tladi 187 Cnt Western Jabavu 5000 Meadowlands 1933 Pimville Zone 7 138 Moletsane 1804 Jabulani 2229 Grassing Projects Dobsonville 8676 Zola 6345/6348 Emndeni 70 Zola 1851/1853 Zola ext 1 6944/6945 CW Jabavu 3147 Diepkloof 13141 Bertrams Bella Vista Tshepisong Senaoane Jabavu Public Arts programme Grassing Projects Arts Alive Public Arts programme Africa Day programme Carnival Annual programmes as listed Freedom Parades in Soweto & Alexandra Disability Festival Rememberance Sunday HIV & Aids festival Museums & galleries exhibitions programmes Sports & Development programme Sports & Development programme Sport Administration courses to expand sport programmes Women’s day Canoe Development Tennis development programmes Ladies Cricket development Learn to swim Soccer, rugby, netball, softball, volley ball couching clinics in regions with federations Expansion of the Mayoral Cup programme to other metro councils Expansion of the kiddies Olympic programme into other sporting codes Subsidization of need students identified for training on equestrian programme 5-YEAR STRATEGIC OBJECTIVES Xenophobic attacks on migrants to Joburg eliminated & tolerance of migrants increase IDP PROGRAMME AND KEY ACHIEVEMENTS Migrants help desk established in Region F, G & C Public seminar & community dialogues have been implemented citywide A Migration Unit has been established & incorporated within the Human Development Directorate Annual City Carnival includes foreign nationals Anti xenophobia awareness campaign facilitated in partnership with the Department of Home Affairs, CORMSA and Lawyers for Human Rights Establishment of satellite MHD offices in two regions Steering committee with social working groups focusing on transitional shelter, trading Counter-Xenophobia Campaign culminating into a citywide event (Ubuntu Cup) Counter Xenophobia & Common Citizenship programme Youth Development programme Intercultural dialogues, Ubuntu Cup, Africa Day Celebrations and community awareness programmes as part of the sport and recreation programmes drives The following events were held focusing on the youth and to improve on the development of special skills JoLife: One African Literary Festival with three literary development programmes and four major events were held with emphasis on indigenous publishing, intellectual products and the celebration of African writers. Development programme: Writing competition: Total of 230 entries received. There were 18 overall winners in the different categories and age groups. Cultural exchange dialogues: Intercultural platforms to encourage the youth to discuss different cultures, music and literature were held at the Florida Library and Jabavu Library 300 youth attended both sessions Poetry/Short Story workshops: .A interactive writing workshop facilitated by Prof. Maake was held at Diepsloot Library and attended by 23 enthusiastic youth who 110 Inter-cultural dialogues to be run Establish year long community dialogues & seminars aimed at improving tolerance towards migrants in the city Expand MHD satellite offices to further four regions Set up a migrants advisory committee Staff up a migration unit Ubuntu Cup will be expanded to include more participants and be a marketing tool for the city Information and awareness campaign in all seven regions to encourage immigrants to make use of Council presented programmes and facilities Africa Day Celebration, value added programmes and marketing drives will expand the programmes further The Recreation Mobile vehicle will be driving this programme with marketing material and programmes encouraging participation Develop and implement a citywide awareness campaign on human trafficking In partnership with 2010 office train 200 trainers on counter xenophobia strategies Youth Development programme Increased range of youth activities & youth representation in city activities Athletics Equestrian development in Soweto Counter Xenophobia & Common Citizenship programme 2009/10 DELIVERY AGENDA To follow the existing format and increase the number of beneficiaries to minimum of 1200 To establish an African Literature Bookstore To follow the existing format and increase the number of beneficiaries to 2000 in celebration of the 2010 World Cup Soccer Competition To maintain and upgrade the African Literature Bookstore Annual programmes with increased focus on youth development through the museums & galleries Set up youth advisory centres City wide youth forum Implementation of gateway project Implementation of HIV/AIDS 46664 programme Leadership & entrepreneurial project Youth policy Revised youth development strategy City wide drug abuse propramme 5-YEAR STRATEGIC OBJECTIVES Increased access & support for the Aged & People With Disabilities as assessed through the City’s customer 111 IDP PROGRAMME AND KEY ACHIEVEMENTS were given an opportunity to demonstrate their talents. A second workshop was held in Emndeni with 30 youth attending Festival events A Gala Evening was held on 14 March 2008 at the Civic Centre to award prizes for winners of the poetry and writing and reading competitions. 250 people attended which included the MMC, ED media, parents etc. Book discussion on “Things fall apart” by Chinua Achebe was held at Museum Africa on 15 March 2008 and 30 people attended the event which was facilitated by Prof. Maake, Walter Chakele and Liza Combrink Storytelling Festival was held on 17 March 2008 at Alex 8th Ave Library. The African Theatre Group and Nomsa Mdlalose told exciting stories. A Poetry Festival was held on 18 March 2008 in Lenasia. 200 learners attended the activity which included poetry performances by well known poets A total number of 1301 beneficiaries were reached 2006/07 and 950 in 2007/08 by the literary festival and the development programmes Carnival Youth forums at the Hector Pieterson Museum; Gerard Sekoto Youth Festival at Jhb Art Gallery; JHMT: youth programmes Tours for orphans Procured services from the previously disadvantaged groups (i.e. women, youth, & PWD) of which R3,225,123.64 benefited youth owned companies Action zones identified & Umsobomvu funding Youth forums and regional Forums established Youth diversion: gateway project for youth offenders implemented in partnership with Khulisa HIV/AIDS programme: 46664 Youth Unit has been set up Youth War Forums being resuscitated; Youth Summit held Street Children Opportunity Programme A pilot sanctuary for children has been established in region F Street children summit held A citywide policy on street children has been developed Outreach work taking place in region F through an inner city partnership PWD Access & Support programme LIS provided a service to 10 Old Age 2009/10 DELIVERY AGENDA Joburg youth services programme Enablement of procurement benefit for 40 youth owned companies Career development programme facilitating placement of youth in internships, learnerships, exchange programmes, targeting 250 youth Develop & implement a citywide entrepreneurial programme; Implement the Youth Policy as approved by Council 14 000 young people to have benefited from the Drug abuse programme 7000 young people participate in Joburg Youth Service programme 10 000 serve through the Youth Empowerment Zones 700 young people participate in mentorship programme Implementation of the sanctuary pilot Setting up an additional sanctuary Revised policy on children living and working on the street & an implementation plan Implement an “all night shelter programme” (ensuring that there is no person sleeping on the city streets Implement a “no more street life programme, (ensuring a 60 % reduction of children on the streets) Establish children’s shelters in two additional regions PWD Access & Support programme To maintain existing loan collections 5-YEAR STRATEGIC OBJECTIVES satisfaction survey Increase the spend on NGOs & CBOs targeting programmes at vulnerable & poor household IDP PROGRAMME AND KEY ACHIEVEMENTS Homes in 2006/07 involving the provision of loan collections of suitable books to the old age home, especially in disadvantaged areas for on-site use Additional four homes for 2007-8 include Andries Meyer and the Nirvana Old Age Homes in Lenasia, Millenium Centre in Kensington and Eventide Home in Emmarentia Enhancement of services to old age homes through the implementation of support programmes such as reading circles, talks etc. were implemented in 7 homes to assist with illiterate/low literacy levels of residents Additional 425 Large Print Books were purchased to the value of R243, 450 Approx. 3223 senior citizens have access to the programme at the operational 14 Old Age Homes and 17,200 items were circulated All Arts, Culture & Heritage facilities are PWD accessible There is a resident dance programme at Museum Africa for PWD’s (partnership) Procured services from previously disadvantaged groups (i.e. women, youth, & PWD) of which R 1, 331,114.50 benefited PWD owned companies Disability desk set up; and A draft policy on disability has been developed 11 PWD placement in internship programme within Community Development 2009/10 DELIVERY AGENDA NGO and CBO Support programme NGO and CBO Support programme 112 Street Opportunity Support Programme: removal of children from the streets Development of Sanctuary for street children Hosted street children summit Sourced 4 buildings for office space and programmes for NGOs and CBOs that compliment the City’s programmes and extend the support programmes to an additional 7 old age homes To maintain and upgrade the existing loan collections To monitor and evaluate the impact of the support programmes Development & implementation of policy on disability Enablement of procurement benefits for 20 PWD owned companies Career development programme facilitating placement of PWD in internships and possible permanent jobs. Targeting 100 PWDs Implement 1 city wide programme for children with disabilities for all 7 regions Develop a programme to address the need for support required by old age homes Implementation of the sanctuary pilot Setting up an additional sanctuary Revised policy on children living on the street + implementation plan Corporate management of buildings accommodation NGOs and CBOs Corporate and Shared Services Sector Plan INTRODUCTION AND OVERVIEW The Corporate and Shared Services Sector plan for 2009/10 is informed by the City’s Growth and Development Strategy (GDS) and supports the Human Development, Health and Safety, Financial Sustainability as well as Governance and Administration strategic initiatives. The Sector is primarily directed at ensuring the efficient and effective utilisation of common resources, systems and administrative processes to enable management and service delivery sectors to perform optimally. The plan provides a consolidated interpretation of critical priorities in terms of the sector’s mandate within the confines of financial resources. In addition, it defines the delivery agenda for the applicable period and establishes the baseline for periodic financial and performance progress reporting in terms of the Service Delivery Budget Implementation Plan (SDBIP), as required by the MFMA. Although the Sector’s primary focus is directed towards internal resources and systems of the organisation, the scope also includes an external element that is directed at the community at large. The sector is thus primarily aligned to two (2) primary principles of the development paradigm namely “Proactive absorption of the poor” and “Innovative governance solutions”. Through proper management of Human Resource services along with comprehensive Fleet management as well as Administrative support to other business units including clean and accessible buildings, the Corporate and Shared Services department has played a significant role in the overall governance of the City of Johannesburg. The Sector plan defines the overall responsibility framework, strategic and operational agenda, as well as challenges, performance management and human capital tendencies. It further establishes guidelines for the successful achievement of the Sector’s medium and long-term priorities and objectives. REVISION TO THE COJ 2006/11 IDP In summary the Sector is responsible for the provision of the following primary services: Administration and Support; Labour Relations; Human Resource Shared Services; Occupational Health and Safety; Facilities Management and Maintenance; and Finance, Fleet and Contract Management. During the 2008/9 revision of the Corporate and Shared Services Sector Plan several duplications with respect to the Governance as well as Finance Sectors were identified in a variety of long term objectives and adjustments were accordingly effected in the revised Sector plan and defined delivery agenda, to reduce and limit any grey areas or overlaps. In some instances programmes that have already been accommodated or duplicated in other Sectors have been terminated while programmes of a similar nature within the Corporate and Shared Services Sector were consolidated to ensure effective integration and clear objectives, as indicated in the table below:- 113 5-YEAR STRATEGIC OBJECTIVE No cases of fraud and/or corruption 5-YEAR IDP OBJECTIVE/PROGRAMME Accommodated in Governance as well as Finance Sectors Anti-fraud and corruption programme All City of Johannesburg buildings to be inspected regularly to ensure 100% compliance with the Occupational Health and Safety Act Occupational Health and Safety programme % of City buildings upgraded to be accessible for people with disabilities Disability access programme100% compliance with signed SLAs to ensure a clean, healthy and safe environment at the Metro Centre for both employees and members of the public All City of Johannesburg Corporate buildings to comply with the Occupational Health and Safety Act requirements and be accessible for people with disabilities Corporate Building maintenance programme Metro Centre programme REASON FOR CHANGE The original objective as contained in the Corporate & Shared Services Sector plan (2007/08) is duplicated in the Governance Sector’s objective namely, “Number of cases of fraud, maladministration and corruption reduced over the five year term” (Ethical Governance Programme and Enterprise-wide Risk Management Programme) as well as the Finance Sector objective to “Achieve an unqualified Audit (Financial Management, Budget Performance, Asset Management, Financial Risk and Expenditure Review Programmes) Three related objectives were consolidated into one objective related to corporate buildings that include the Metro Centre (Corporate Building) as well as the disability access programme as a requirement Clean and safe Metro Centre programme New public conveniences developed and existing ones maintained at world class standards Public conveniences programme A complete and innovative HR service rendered to all employees of the CoJ at a high level of satisfaction (staff satisfaction levels to be monitored through annual climate surveys) Human resources and shared services centre development programme Strategic HR Programme Labour Relationsprogramme 114 New public conveniences developed and existing ones maintained at world class standards Public conveniences programme Improve Customer Satisfaction rating of Human Resources Services by line function management by 20% HRSSC development Employment equity Skills development HR Policy assessment and revision 10% Improvement in response rate by employees to Climate survey done every two year Retained objective and programme Change Management Collective bargaining strategy LR capacity building Employee well-being Human Resources Objective was revised to address line function requirements and be outcome orientated. Programmes were furthermore specifically defined to be in line with primary challenges A separate objective was introduced to cover response rate to COJ Climate survey separately 5-YEAR STRATEGIC OBJECTIVE Reduction in the City’s insurance fund liability by pro-active management of the City’s fleet and by ensuring fleet contract compliance 5-YEAR IDP OBJECTIVE/PROGRAMME 10% Improvement from a baseline of 70% on the resolution of contractual provisions in terms of the Master Fleet Service Contract Fleet Contract Management and Compliance Fleet Risk Management Fleet management programme Higher levels of internal client satisfaction in respect of all administrative support services Logistical support programme Food and beverage support programme 20% improvement in client satisfaction levels with respect to administrative support services Printing Cellular Phone Service Full implementation of a Corporate and Shared Services Delivery model for Core departments (New objective) REASON FOR CHANGE Objective revised in view of Line Function responsibilities. Programmes also revised to cover both Fleet Risk, Contract Management and compliance Objective revised to be outcome based. Specific Programmes have been determined to be in line with primary challenges. The Food and beverage programme have been terminated since procurement is now regulated by Supply Chain Management New objective introduced in line with Budget Lekgotla requirements Shared Services pilot projects implementation:(Human Resources, Facility Management and Maintenance, Fleet Management, Printing Services, Cellular Phones as well as OHASA) Clear objectives were established for each functional area of accountability and interrelated initiatives that require a joint effort from various disciplines were earmarked and singled out to receive priority attention and coordination. The following interrelated programmes have however been singled out in the light of the challenges that are being faced and have been accommodated as stand-alone programmes: Skills Development; Human Resources Policy Assessment and Revision; Employment Equity – Including Gender Mainstreaming; Fleet Risk Management; Change Management; Collective Bargaining; Employee Well-being; and Shared Services Delivery Model: Including Human Resources Shared Services and Facility Management and Maintenance Shared Services Re-engineering Programmes. Considering the flexible institutional environment and acknowledging the fact that the City is still in a process of change with respect to the implementation of the new Governance model whereby Legislative and Executive functions are split and an oversight function with respect to Municipal Entities are being introduced, the abovementioned programmes are regarded as of particular importance to support the City’s desire to achieve service excellence. 115 SECTOR RESPONSE TO COMMUNITY ISSUES The Sector noted community requirements for the establishment of Public Conveniences at Ward 38 Dube, Soweto as well as Ward 1 & 2, Orange Farm and subsequently accommodated these requirements within the Capital budget provisions for 2009/10. SECTOR CONTRIBUTION TO 2010 FIFA WORLD CUP In terms of the sector’s primary responsibilities the following specific interventions have been identified for implementation: Corporate Buildings: Enhanced maintenance programmes to include beautification, greening, flowering, proper signage and compliance to Occupational Health and Safety Standards. Public Conveniences: Enhanced maintenance programmes to include beautification, greening, flowering, proper signage and compliance to Occupational Health and Safety Standards. Fleet: Enhance support services for clients in terms of additional vehicle and special signage requirement. 116 CORPORATE AND SHARED SERVICES SECTOR PLAN 5-YEAR STRATEGIC OBJECTIVES 10% Improvement on the resolution of contractual provisions in terms of the Master Fleet Service Contract IDP PROGRAMME AND KEY ACHIEVEMENTS Fleet Contract Management and Compliance 2009/10 DELIVERY AGENDA Fleet Risk Management programme Assess and review fleet contract performance citywide in relation to the fleet contract A114 Negotiate amendments and cost escalations to the fleet contract Fleet availability maintained above: 90% for SLB and 95% for FML vehicles Levied penalties for non-compliance to SLA Development of a strategic plan for the procurement of fleet services beyond 201110 Fleet Risk Management programme New public conveniences developed and existing ones maintained at world class standards Introduced new Legislation with respect to driver licenses (AARTO Act) Vehicle Abuse Management (VAMS) implemented Evaluated 200 drivers and train drivers that fail evaluation Train Fleet Managers citywide Public Convenience programme 10 Assess and review fleet contract performance citywide in relation to the fleet contract A114 Negotiate amendments and cost escalations to the fleet contract Fleet availability maintained above: 90% for SLB and 95% for FML vehicles Levied penalties for noncompliance to Service Levels Agreement (SLA) 20 additional public conveniences refurbished since July 2006 (78 in total) Built three additional new Public Conveniences (9 in total up to date) Completed a report on the management of public conveniences in the city that clarifies responsibilities to set standards and conduct an oversight role that covered Metro Trading Company, City Parks, Community Development as well as Development Planning and Urban Management 15 Public toilets upgraded for Metro Trading Co. in 2007/08 financial year Achieved 70% on public convenience rating on maintenance of C&SS PC’s The current fleet contract expire January 2011 117 Fleet Contract Management and Compliance Implement new Legislation with respect to driver licenses (AARTO Act) Maintain the Vehicle Abuse Management (VAMS) Evaluated 200 drivers and train drivers that fail evaluation Train Fleet Managers citywide Update the Fleet Working Instruction Manual (FWIM) Public Convenience programme 5 Public Conveniences (PCs) built by end 2009/10 financial year and accessible to people with disabilities Conduct needs analysis for Public Conveniences in fan parks Assess possible centralisation of Public Conveniences including MEs 5-YEAR STRATEGIC OBJECTIVES All City of Johannesburg Corporate buildings to comply with the Occupational Health and Safety Act requirements and be accessible for people with disabilities IDP PROGRAMME AND KEY ACHIEVEMENTS Corporate Building Maintenance programme 2009/10 DELIVERY AGENDA The SLA for all tenants in Corporate Buildings implemented All corporate building entrances accessible to people with disabilities re-confirmed 100% of all CoJ Corporate buildings have been audited to monitor compliance with OHASA standards. Deviations were reported on and submitted to relevant departments for verification. 100% of high-risk deviations were rectified Maintained corporate buildings to comply with OHASA standards Metro Centre programme 118 Revamped Metro Centre to improve the corporate image as per maintenance programme Reduced theft at Metro Centre by 5% Guarding Manual revised and implemented for effective and efficient management of guarding at the Metro Centre Implemented a business risk/safety assessment programme for the highest physical risks in the Metro Centre (OHASA) Successfully conducted 2 x evacuation drills at Metro Centre (OHASA) Appointment of Contractor for upgrading of Lifts finalised Order placed with service provider, subject to funds being allocated Corporate Building Maintenance programme All CoJ owned corporate building cleaning contracts managed to SLA standards SLAs for tenants to be revised for 2009/10 financial year Internal accessibility for employed people with disabilities (PWD’s) to be investigated with reports to tenants Metro Centre programme Manage Security Systems and procedures to prevent loss and damage to Council assets All 23 lifts at the Metro Centre upgraded depending on the availability of funds Implement 24 hour CCTV control room surveillance depending on the availability of funds 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA 10% Improvement in response rate by employees to Climate survey done every two year Change Management programme Change Management programme Collective Bargaining programme (New programme) Revise change management strategy and model for CoJ Develop approach to include MEs in CoJ strategic initiatives Implement Programme to deal with employee survey initiatives Collective Bargaining programme (New programme) Developed change management strategy Identified initiatives emanating from the concluded employee survey Local Labour Forums established in CoJ departments Labour Relations Training programme (New programme) Local Labour Forums established in all CoJ departments and entities Compliance with and implementation of all collective agreements Improve turnaround times in dealing with discipline, appeal cases and grievances Labour Relations Training programme (New programme) Employee Assistance programme All 400 senior management staff trained on labour relations by June 2009 Employee Assistance programme 119 Conducted 4 Health Risk projects (Body Mass Index; Blood Pressure, Vision Tests as well as Diabetes) and published results on Jozinet Conducted 10 road shows to promote EAP Ensure 90% response rate to all EAP referrals Implement a revised governance framework for the Gymnasium 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA Improve Customer Satisfaction rating of Human Resources Services by line function management by 20% HRSSC development programme HRSSC development programme Contact Centre fully operational with internal SLAs within HRSS and internal SLA statistical reports The placement process of the people within the three pillars of HRSS service delivery formalised All transactional related functions fully devolved to the Transactional Centre HR E-Services Automation programme (New programme) HR E-Services Automation programme 120 Assess Customer satisfaction rating of line function management for HR Functions to determine baseline Fully capacitated operational HRSSC Subject to the availability of funds complete a corporate readiness investigation to the introduction of an e-services capability within the organisation Skills Development programme Skills Development programme (Including Internships, Learnerships, Bursaries, Training and Management development) Appointed 82 interns Finalised programme for leadership and management development programme with enrolled candidates 50% of skills assessments completed for two core departments completed Conduct organisational productivity assessment project started, assessment method decided, start implementation WSP process underway – WSP developed, training in process, training spend in relation to salary spend at 0.5% (Including Internships, Learnerships, Bursaries, Training and Management development) WSP and IR + 1% spend, development programme in terms of skills assessments incorporated into the WSP 300 learners programmes 160 interns programmes Implemented productivity and improvement plans Evaluate possible establishment of Municipal University for CoJ 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA HR Policy assessment and revision programme HR Policy assessment and revision programme All primary HR Policies reviewed Define Succession Planning programme and roll-out Monitor implementation of new policies by HR Field Services and Line management Employment Equity programme Employment Equity programme (Including PWDs and Gender mainstreaming) Full implementation of a Corporate and Shared Services delivery model for core departments (New objective) EE Compliance facilitation and monitored in terms of the EE plans for the departments and a plan formulated for dealing with Affirmative Action Fully functional disability recruitment plan Project plan in place for the roll-out of Gender mainstreaming including the integration between the HRSS gender mainstreaming programme and the Community Development gender mainstreaming programme Shared Services Delivery Model Human Resources Shared services Fully implemented - Facilitate and guide other C&SS functions in terms of setting up additional shared services programmes Facility Management and Maintenance Re-Engineering strategy concluded and business processes revised 121 (Including PWDs and Gender mainstreaming) EE Compliance facilitation and monitoring in terms of National targets and departmental EE plan objectives and implementation of Affirmative Action measures Roll-out Gender mainstreaming and awareness training to the City Shared Services Delivery Model FMMU Consolidation and finalisation of the complete roll-out of all Shared Services projects currently in process for FMM Submission of Shared Services model for FMM 10% implementation of FMM Shared Services implemented per plan Final Roll-out of Shared Services Verification and rectification of any misalignments on Shared Services 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS Full implementation of a Corporate and Shared Services delivery model for core departments (Continue) 20% improvement in client satisfaction levels with respect to administrative support services Printing Re-Engineering 2009/10 DELIVERY AGENDA OHASA Re-engineering OHASA processes for shared services roll out Implement the Shared Service Model for OHASA Printing Re-Engineering Replaced obsolete digital copiers Increased external revenue by 20% Increased turnaround time for logistical services by 5% Centralized despatch services Filled critical vacancies Cellular Phone Service 100% compliance to SLAs operational deliverables Cellular Phone Service 122 Increase external revenue by 20% Reduce overtime cost in despatch services by 5% Implement dedicated marketing initiative to MEs 100% compliance to SLAs operational deliverables Contract renewal or extension Economic Development Sector Plan INTRODUCTION AND OVERVIEW The Department of the Economic Development (DED) is the command centre for economic growth in the City, engaging pro-actively with all role-players to create the enabling environment for accelerated, shared and sustainable growth. While the Department is responsible for the overall coordination as well as strategic direction of the economic development in the city, the other key role players are the four MEs that fall under it. Other role players include national and government departments as well as organised business. The Finance and Economic Development Portfolio is made up of the core Department of Finance and Department of Economic Development and Municipal Entities, which are Metro Trading Company, Johannesburg Property Company, Johannesburg Tourism Company and Johannesburg Fresh Produce Market. The Department of Economic Development is responsible for developing policies and strategies to the extent that acceleration, shared and sustainable growth is achieved. The four Municipal owned entities in turn act as implementing agents. The core department therefore has oversight function on business of the four entities. This oversight role also encompasses the service delivery monitoring function of the four entities together with corporate governance and financial sustainability with the support of the Office of Finance. Due to the cross cutting nature of economic issues, the core departments is also responsible for other economic catalytic functions that cannot not be delegated to other departments. Such functions include: Development of policies and strategies; Regulatory and enforcement; Compliance monitoring and reporting; and Catalytic projects; In this context, some of the deliverables that the eight directorates within the department are responsible for, include: Implementing the skills strategy jointly with SETAs, Gauteng Department of Education, FETs and private sector; Rolling out Telecommunications infrastructure via BPO and Broadband; SMME Development and Support through various institutional arrangements; Investment Facilitation; Monitoring Broad Based Black Economic Empowerment (BBBEE); Monitoring Economic trends; Policy and programme integration; and Service delivery agreement and compliance. CHALLENGES AND OPPORTUNITIES There are many reasons to believe that the Joburg economy, in line with national and international trends, will come under pressure over the short to medium term. The main negative factors are: The skills shortage has been well documented and is a negative constraint throughout South Africa. The skills shortage is a factor of both inadequate numbers of suitable graduates, particularly in engineering and sciences and the emigration of skilled people. Since Joburg’s economy is based on higher skills sectors, this is particularly important 123 The mainstay of the Joburg economy is the financial services sector which is under pressure as a result of rising interest rates, higher consumer debt and falling international equity markets. The rapid rising fuel prices are having a serious impact on Joburg since Joburg plays a major role as a freight and logistics hub. The City is dependant on road transport to move workers around and a large number of key items (such as food and fuel) have to be transported by road to the City. The City faces some significant infrastructure constraints, largely around transport and electricity supply which significantly impacts on economic growth. The retail sector is also under pressure as consumer’s disposable income falls. The retail sector is a key source of new employment opportunities for semi skilled and young people. Lastly significant in-migration is placing heavy pressure on the City infrastructure as well as on land availability and property prices. In 2005 the CoJ embarked on a process of reviewing its existing City Strategy, Joburg 2030 as well as consolidating the various strategic perspectives that exist across the City. The outcome of this process is a City Growth and Development Strategy (GDS). Central to the review process was the assumption that the 2030 strategy had too heavily emphasised economic growth constraints and failed to provide direction in respect of human development initiatives (the principle assumption being that high economic growth would go a long way to solving the City’s challenges). The 2005 Human Development Strategy went some way to addressing this gap. Overall however the City had no single coherent story that described its understanding of economic development. Central to the Johannesburg Growth and Development Strategy is therefore a ‘Development Paradigm’. This Paradigm underpins the City’s analysis of challenges and opportunities, its future vision, and its longer term strategic choices. In some ways this can be seen as the economic and development mandate for the city. This Development Paradigm is a proposal for the route that the city should take to move towards its goals, given what can be said about which approach will feasibly bring the city to its goals fastest and easiest, and/or with the greatest certainty of success. This statement of the optimal course of action for the City is based on a set of well-reasoned judgements about how it can best navigate evolving circumstances, by capitalising on available opportunities and managing emerging risks. Through an extended process of internal consultation and debate, informed by clear political choices emerging from the ANC locally and nationally, as well as national and provincial policy directions, the City of Johannesburg has extracted a set of core principles making up its Development Paradigm. Six principles have been distilled. These are value propositions that cut across and inform/underpin the strategic choices we have made in the GDS and IDP. Below are the DED catalytic projects that will lead us on the right path to sustainable economic growth and development: Jozi SMME Equity Fund (also known as the SMME Fund or SMME Equity Fund) – An innovative venture to provide equity financing to support the City’s own projects by developing the SMME business “Dirang Ba Bohle” Community Finance Institution (also known as the Community Bank) – A Micro Finance Institution to assist the City of Johannesburg’s emerging entrepreneurs to have access to financial services and credit extension Soweto Empowerment Zone – A cluster-based SMME empowerment park to support, promote and formalise Soweto-based micro, small, and medium businesses Inner City Property Scheme – A programme to upscale, reconfigure and rejuvenate the Inner City through the advancement of black property investors and the provision of adequate transitional housing 124 The Skills Hub – A primary delivery mechanism of the Skills Strategy, that will involve the provision of the strategic direction, management and oversight of economically-driven skills development programmes that address unemployment and poverty alleviation ICT SKILLS HUB- ICT skills development located in less advantaged communities (Orange Farm and Yeoville) and provision of business centre services BPO Precinct – Key growth sector for job creation, through targeted investment promotion into Johannesburg, and into the inner city in particular Johannesburg Broadband Network Project (JBNP) – A municipal broadband referred to as “Digital” or “Smart City” to ensure information age appropriateness whilst reducing telecommunication costs City of Johannesburg/ Johannesburg Chambers of Commerce & Industry Trade Point Initiative – Catalytic interventions providing trade related training- key to helping emerging enterprises “go global” and access international markets The Expanded Public Works Programme- Resulting in the creation of over 100,000 public works jobs and set to increase further, including learner-ships created and all projects being EPWP compliant Premium Hall at the Johannesburg Fresh Produce Market (JFPM)- creating value added services to attract new clients and increase turnover and mitigate the threat of alternative market Linear Markets – providing formal sustainable trading space in the Inner City, Cosmos City, and in future Alexandra, Soweto, and Orange Farm. REVISION TO THE COJ 2006/11 IDP This is an informal review of the Economic Portfolio five-year IDP sector plan since the reestablishment of the Department as a standalone Department in 2006, with the first review undertaken during the 2007/08 IDP annual review period. Most changes particularly to the fiveyear objectives were instituted with the first revision. Only minor changes are effected with this revision and these include: Introduction of a separate 5 Yr objective and associated IDP programmes focusing on poverty alleviation and job creation. The roll out of the Dirang Ba Bohle “Community Bank” is vital to achieving this objective In order to show economies of scale and be accepted as key to bridging the current gap especially in this turbulent economic downturn, this programme will be done jointly with external financial institutions, thus reducing the risk to CoJ The skills programme has been consolidated to encompass the implementation of a skills hub INITIATIVES TOWARDS MEETING THE GDS PRINCIPLES Pursuant to the vision contained in the Growth and Development Strategy, the City initiated a project to develop sustainability indicators. These indicators are long-term, citywide and outcomebased. They will measure the overall condition of the City and its inhabitants by tracking appropriate data to assess whether the City is achieving its vision in the Growth and Development Strategy. Sustainability indicators are not only relevant but necessary because they address the concerns raised by the Auditor General on the need by the City, in its reporting, to separate between the City Manager’s performance and the performance of the organization as a whole. Once approved by the Mayoral Committee, the indicators will be integrated into and form part of the City’s day-to-day business operations. SECTOR RESPONSE TO COMMUNITY ISSUES The City went through a comprehensive public participation process during March and April 2008, which included Regional Summits hosted per Ward and Stakeholder Summits where issues were prioritised per each Ward. Broad range of issues was raised from these engagements indicating an improved awareness of importance of economic issues as well as significant contribution of 125 skills development and initiatives in improving lives of the citizens. These included the following areas: Over-All Support for the GDS and IDP Goals: In both the Sectoral workshops and the Summit, there was a strong support for the goals and interventions outlined in the Growth and Development Strategy and IDP. In particular, participants noted that there had been a shift from Joburg 2030 to the Growth and Development Strategy, and welcomed the incorporation of a Human Development Strategy and the GDS’s strong focus on social issues and poverty alleviation. Management Issues: Many stakeholders expressed strong support for the City’s plans, but noted that unless the plans are properly management, well resourced, and monitored on an ongoing basis, these goals will not be realised. The following suggestions were put forward. Monitoring: There was a call for goals to be translated into measurable indicators, for the City’s plans and programmes to be monitored, and for the results of this monitoring to be communicated to the public. There was a suggestion that NGOs/CBOs and other stakeholders should participate in establishing the indicators and in conducting monitoring of the City’s progress towards its objectives. Accountability: The City has recently restructured parts of its administration. Some stakeholders noted that they are no longer sure who to contact for assistance within the City administration. The need for clear points of access to the administration and for clarity around the roles of councillors and officials in different departments was noted. Alignment: Participants urged the City to improve vertical alignment with other spheres of government on joint projects, and to ensure that City departments coordinated their work across silos. They also sought improvement in cross boundary linkages with other municipalities over joint planning issues. Responding to the needs of vulnerable groups: Many comments in the consultation exercises focused on a need for the City to be responsive to the new issues resulting from Johannesburg’s changing demographic and economic profile. In particular, the City was asked to respond to the needs of vulnerable groups, such as immigrants, child-headed households, and the aged. Internal Capacitation: A strong call was made for officials to be capacitated around the plans that were being presented. It was indicated that all officials need to understand and commit to the plans, and that every official needs to be in a position to explain the plans and respond to queries from community groups. Capital and Operating Costs: Stakeholders raised the need for IDPs and other plans to reflect both capital and operating costs committed to projects. This was raised in the context of concerns over the poor maintenance of some infrastructure (e.g. roads), and the need to ensure that capital expenditure is backed up sufficient budget allowance for the maintenance of assets and infrastructure. Issues of Engagement The issues of access to information, and space for ongoing engagement were prominent points of discussion in many of the Sector workshops and GDS Commissions. Some of the specific points raised by stakeholders are outlined below: Peoples Centres. Several participants noted that People’s Centres already offer a range of useful information. However, there is scope to build People’s Centres further as points of information dissemination and access to assistance. Some stakeholders suggested that information on provincial programmes be available at People’s Centres. Others requested information pertaining to accessing social grants, on the Transfer of Houses programme, and on the dates and details of proposed projects such as hostel upgrading. 126 Ward Committee. While Ward Committees were seen as useful points of access and engagement, some stakeholders complained that ward councillors were not sufficiently informed of the issues, or could not handle all administrative queries. Stakeholders called for the capacitation of ward committees, and requested that officials be present at ward level meetings. There were several requests for identifiable officials and fixed contact numbers, where people could direct concerns about particular issues. Capacity building and job creation. The discussions revealed that people are suffering from unemployment and low skills levels. Many requests were made for the opening of tendering opportunities, for job creation, for incentives to be provided for small business opportunities, for a boosting of EPWP projects, and for people to be directly involved in service delivery. A related issue involved people’s calls to be directly involved in housing delivery through a boosting of the Peoples Housing Process in Johannesburg. Platforms for ongoing engagement.NGOs and CBOs, in particular, highlighted the need for a forum for ongoing engagement with the City. There were also calls for forums to enable engagement around specific issues – For example, stakeholders asked for forums to enable discussion around transport issues, youth development, women’s issues, and environmental issues. Feedback processes. Stakeholders noted that they have given their time and applied themselves to give useful inputs into the City’s plans. They requested that there be a feedback process, so people could be sure that their voices had been heard. Issues of Delivery Majority of the discussions during the consultative process, centred on issues of service delivery Communities noted that there are many pressing delivery issues, including the need for the immediate repair of infrastructure, improved housing quality, the provision of health and social services, improving access to social grants, and the extension of assistance to vulnerable groups. While this document cannot reflect the detailed inputs and comments that were made during the consultative process, some of the key issues raised in respect of the economic development are summarised below: In the economic development sector workshop and economic development commission, participants emphasised the need for: Small business and innovative industries to be incentivised Information sharing on economic potential, projects and prospects in the city; Job creation to be boosted The City to clarify the roles it will play in realising the interventions proposed for economic development Support of economic development programmes for youth, women, creative industries, urban agriculture, the clothing industry Clear support programmes to facilitate the second economy Drivers/champions for the various economic projects proposed Gaps The following gaps were identified in the sector plan: An understanding (audit) of the skills available in the city A funding plan for the good ideas contained in the plan A connection of the city’s strategy with ASGISA A focus on urban agriculture A champion for each major initiative identified in the plan 127 ECONOMIC DEVELOPMENT SECTOR PLAN 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA Measured increase in sectoral diversification and growth in sectors targeted for City support Sector Support programme Sector Support programme Support tourism, and especially the emerging tourism sector, by developing a wellpublicized Joburg tourism package targeting both the local and international markets 2010 Tourism strategy approved and implementation to start.(JTC/SS) Tourism Signage plan approved - rollout to begin.(JTC/SS) Mayoral report submitted for approval of the development of Medical Database as medical/ health & Tourism sector intervention. (SS) Launch of Jozi Shopping Festival took place on 16 Sept at Fourways View.(JTC/SS) JTC participated in the following exhibitions: SAACI, African Hair and Beauty, IASP, IFORS, HICA and eTourism.(JTC) Support tourism, and especially the emerging tourism sector, by developing a well-publicized Joburg tourism package targeting both the local and international markets Develop a database of medical tourism services offered in Joburg to promote internationally via JTC (SS) Facilitate 2nd year of Joburg Shopping Festival(SS) Establishment of an advances manufacturing incubator in underserved areas (SS) Roll out of 4 additional Techno centres in partnership with Community Development (SS) Implementation of the Joburg Broadband Network Project (SS) Development of the Economic Development Policy and Strategy Framework and Development of strategic plans/Concept Papers for implementation, Monitoring and Evaluation (PPI) Broadband telecommunications Policy Framework and By-Laws (PPI) Entrepreneurship Policy Framework (PPI) Support the production of a film documentary for xcombatants (TBU) Formation of 10 business and construction co-ops for disabled persons. (TBU) Support the emergence and growth of the BPO industry Support the emergence and growth of the BPO industry Identified the BPO Precinct. (SS) Inward investment in the inner City of R 100m and 1000 new seats in the inner city. (SS) Support the massive expansion of the small construction industry 1500 Trained Learners within the BPO sector with 80% employment rate (SS) Support the massive expansion of the small construction industry 128 Target funding from the Jozi Equity Fund towards SME participating in City owned and City driven construction projects. Formation of 10 business and construction co-ops for disabled persons. (TBU) 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA Through a process of rigorous ongoing assessments, identify other industries to support and appropriate methods to support them (other sectors include wholesale and retail, medical health and property) Through a process of rigorous ongoing assessments, identify other industries to support and appropriate methods to support them (other sectors include wholesale and retail, medical health and property) Consultants have submitted 2nd and 3rd drafts for the Development of Economic Development Policy and Strategy Framework (PPI) Consultants have submitted 2nd part of the Development of Investment Initiative Policy Framework Report (PPI) Final report incorporating the investment opportunities and implementation programme has been submitted for the Urban Agribusiness Initiative: Investment Projects (SED) Consultants submitted a draft of the Manufacturing Strategy, and final strategy has been deliberately delayed to obtain at least 100 responses to an industry survey to better unpack constraints/needs of the industry. (SS) Support the information and communications technology sector Development of the Economic Development Policy and Strategy Framework and Development of strategic plans/Concept Papers for implementation, Monitoring and Evaluation (PPI) Establishment of an advances manufacturing incubator in underserved areas (SS) Support the information and communications technology sector Increase in the rate of formation of new businesses Emerging Industries Support programme Facilitate development of current contractors into sustainable small-businesses (in construction and materials supply sector). The department is in the process of completing the co-op strategy, which was presented to mayoral in June 2008 for implementation in July 2008. The SMME Equity fund business and financial model is also in the process of being completed that should assist emerging industries. The economic development framework strategy, which outlines emerging industries was completed in June 2008.(SMME) Development of the Second Economy Policy Framework and Implementation Strategy is on track. Consultation is being done with DPUM (PPI) Facilitate access to commercial and industrial property more suitable to the space requirements of start-up firms 129 86.77% Opex spend awarded to BEE (JPC) 69.40% Capex spend awarded to BEE. (JPC) 54.1% BEE participation in private sector property and construction sector. (JPC) Roll out of 4 additional Techno centres in partnership with Community Development (SS) Emerging Industries Support programme Roll-out of the Jozi Equity Fund Grant Funding (SMME) Facilitate access to commercial and industrial property more suitable to the space requirements of start-up firms Linked to other programmes 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA Develop and operationalise a regional equity fund Develop and operationalise a regional equity fund SMME Equity Fund Financial and Business Model implementation on is on track(SMME) Support development of emerging industries through the City’s own targeted procurement Reduce the rate of closure of firms in the City Across City and municipal Owned Entities increased spend on new products and services that can be commercialised 130 SMME Equity fund financial and business model is completed and caters for the City’s own targeted procurement by providing capital to assist SMME. (SMME) Development of the SMME's Policy Framework – 1st draft produced (PPI) Industry Restructuring Support programme Roll-out of the Jozi Equity Fund -Grant Funding (SMME) Support development of emerging industries through the City’s own targeted procurement Linked to other programmes Industry Restructuring Support programme Facilitate and support the restructuring of older and declining industrial areas, to provide industrial space more conducive to industry regeneration Commissioned the feasibility study for developing a second airport in Lanseria or Midrand for the COJ.(SED) Evaluation of all proposals for the Township Economic Development has been completed and awaiting finalisation from Department of Housing. (SED) Service Provider for the Industrial Parks programme has been appointed and Inception Report submitted and accepted by the Directorate. (SED) Research & Development Support programme In partnership with existing national and provincial support agencies, sponsors or facilitate R&D funding for new industry segments Citywide Township Economic Development Programme (SED) Research & Development Support programme Develop an economic plan and implementation strategy for disabled persons (TBU) Economic Summit for targeted beneficiaries 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA Expand the total volume and value of exports of goods and services in real terms Economic Connectivity programme Economic Connectivity programme Implement a defined number of strategic projects (legacy projects) that enhance the image and position of Johannesburg as the financial, business services and trading hub ‘Mall of Africa’ cross-border wholesale and retail trade hub linked to goods transport facilities and systems, especially for lowerincome cross-border shoppers. Published key marketing and tourism information brochures. (JTC & SS) Promoted business tourism through 12 advertorials and advertising. (JTC & SS) Initiated the Johannesburg Flagship Magazine, Produced brochures and newsletters.-(JTC & SS) 44 firms assisted in export readiness training. (TI) 54 SMME's participated in Export activities. (TI) Facilitated the establishment and provision of world class tourist information services for 38 SMME’s.(JTC & SS) Facilitated the participation of 4 SMME in Meetings Africa Exhibition.-(JTC & SS) Facilitated the grading of 20 B&B.-(JTC & SS) Participated in 3 Investment Promotion Activities (TI) Targeted 33 companies in 4 locations (TI) Facilitating 2 companies. One on expansion and the other to establish an African office. (TI) Facilitate large inward investments through information provision and targeted facilitation support 131 Investment promotion strategy document was completed at the end of June 2008.(TI) 8 SMME’s exhibited at the Soweto Festival 24-28 Sept 08 (TI) 8 SMME’s met up with a Nigerian delegation organised by JCCI under the BITSA 23 Sept 08 (TI) 3 SMME’s attended the GEMS in London 1-3 Sept 08 (TI) Export Promotion draft strategy is in the process of being completed by consultants (TI) Implement a defined number of strategic projects (legacy projects) that enhance the image and position of Johannesburg as the financial, business services and trading hub ‘Mall of Africa’ crossborder wholesale and retail trade hub linked to goods transport facilities and systems, especially for lower-income cross-border shoppers. Target 100 potential investors. (TI) Facilitate 10 Investment Promotion Projects (TI) Investment incentives Policy Framework-Development of Strategic Plans/Concepts for Implementation, Monitoring and Evaluation (PPI) Facilitate large inward investments through information provision and targeted facilitation support 200 SMMEs trained to Export. (TI) 80 SMMEs to implement export Strategies. (TI) Establish a Johannesburg Services Export cluster (TI) Develop a Trade and Investment Promotion Website (TI) Develop and launch Investment Marketing Material Cost of doing business and investors toolkit (TI) 5-YEAR STRATEGIC OBJECTIVES Improve the profile of Johannesburg, both on the continent and internationally, as a core centre of finance, business and trade Increased savings rate of households in the City as assessed through various surveys Greater proportion of goods and service inputs required by city firms sourced within the South African economy 132 IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA Promote business tourism through information provision, the conference bureau, etc Promote business tourism through information provision, the conference bureau, etc Initiated 3 bids (JTC) Various institutions are being consulted with the possibility of developing and implementing the integrated Skills Development Program focused on training in the tourism industry.(JTC) International Positioning programme Liaise with key partners in the business community to define what the City can do over the longer term to help consolidate, protect and enhance Johannesburg’s position as an internationally recognized finance and business centre. Targeted investment promotion strategy completed by May 2008. Implementation started in July 08.(TI) Showcased the destination through attendance at the World travel Market exhibition in London and at 4 local exhibitions.(TI) Formulated and activated the marketing and brand strategy.(JTC) JTC participated in South African Tourism Road shows that took place in Kenya, Tanzania and Nigeria. These road shows provided a platform to undertake PR activities for the recent xenophobic attacks on foreign migrants.(JTC) JTC has won two international bids namely: Miss World Pageant 2008 and – Tourism Business Conference.(JTC) Foreign investor database has 500 companies (TI) The City has currently trained 154 SMME and also exposed a number of SMME to international and national exhibitions generating potential sales to the value of R 4 million. (TI) Household and community savings programme Linked to other programmes International Positioning programme Development of the Brain Exchange Expatriate Talent (PPI) Development of a framework and implementation plan for the City's engagement with economically active migrants living in the City (PPI) Leverage R1bn of private sector investment (JPC) Household and community savings programme Support the formation of savings and investment co-operatives and facilitate their access to an expanded range of banking products The financial and business modelling of the Community bank was completed in May 2008. Implementation started in July 2008.(SMME) Make and buy-local programme To ensure steady improvement in the quality and therefore desirability of locally produced goods (both locally and internationally), work with partner organisations to develop emerging suppliers, inform and empower consumers. Linked to other programmes To ensure steady improvement in the quality and therefore desirability of locally produced goods (both locally and internationally), work with partner organisations to develop emerging suppliers, inform and empower consumers. Linked to Dirang Ba BohleCommunity Bank Make and buy-local programme 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA Increase in the City’s spending to specific targeted firms owned by specific categories of HDI (BEE, women, disabled, youth, etc.) Increase in the City’s spending to specific targeted firms owned by specific categories of HDI (BEE, women, disabled, youth, etc.) BEE Support programme BEE Support programme Expand and widely market the current BEE database. Introduced 2 BEE agents to the trading floor (JFPM) The current BEE database was revamped and aligned to the City’s BEE database in May 2008 Service provider has been appointed for Database and Strategy on Potential accessing of external funding sources for DED projects (PPI) Expand and continuously refine the City’s own targeted procurement Completion of the BEE database and the accreditation of the companies on the database (SMME) BBBEE Support Programme Maximise the economic opportunity for BEE firms through creative use of the City's property portfolio Approval of Inner City Property Scheme at Mayoral in Sep 08 (ICPS) Completion of the Inner City Property Scheme Financial Model.(ICPS) Road shows to all Major townships to sensitize SMMEs about opportunities in the ICPS completed. These covered Soweto, Diepsloot, Ivory Park, Alexandra, Orange Farm, and the Inner City Catalyse opportunities for BEE through creative public-private partnership 133 Finalise and design and begin construction of JFPM Premium Hall (JFPM) Through the Business Place or other agencies, scale up the City's assistance to SMMEs to start, formalise or accesses opportunities (SMME) The City has sponsored Soweto Festival that was held between the 2- 28 Sept 2008, which has a targeted focus on SMMEs who are sponsored by Standard Ban to exhibit.(SMME) Ongoing maintenance, registration, verification of current Black Supplier Database. (SMME) Collection of data of disabled persons particularly young women with BEE companies (TBU) Introduce 1 BEE agent; Increase BEE (JFPM) participation in the fresh produce value chain (JFPM) Expand and continuously refine the City’s own targeted procurement Increased number of SMMEs accessing procurement opportunities in the City, throughout the SMME and BBBEE policy and strategy framework. (SMME) BBBEE Support Programme Maximise the economic opportunity for BEE firms through creative use of the City's property portfolio Implementation Partnership of the ICPS (ICPS) Catalyse opportunities for BEE through creative public-private partnership Through the Business Place or other agencies, scale up the City's assistance to SMMEs to start, formalise or accesses opportunities (SMME) 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA Where feasible and appropriate, work with other agencies established by other spheres of government to ensure that HDI entrepreneurs have access to other institutional and financial support The financial and business modelling of the JOZI SMME Equity Fund is complete. MOU to be signed with DBSA and IDC to provide institutional and financial support to SMME. (SMME) Discussions with potential funders such as the IDC, DBSA and NEF have commenced.(SMME) The City has assisted 2,000 enterprises per month to access institutional and financial support (e.g. Ubsubomvhu) through the Business Place.(SMME) Where feasible and appropriate, work with other agencies established by other spheres of government to ensure that HDI entrepreneurs have access to other institutional and financial support Targeted Groups Economic Support Policy and Implementation Strategic Framework and Development of Strategic Plans/Concepts for Implementation, Monitoring and Evaluation (PPI) Increase access to financial support through for example the Business Place, and “Dirang Ba Bohle” Community Bank (SMME) Where feasible and appropriate, facilitate the support to all City department and MEs Where feasible and appropriate, facilitate the support to all City department and MEs 134 Linked to other programmes Steering committee and forum to increase the City's opening to targeted firms, report targeted spending trends to ED's and Mayoral committee task team to address contract specific underperformance (SMME) 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA Increased role of co-operatives in the city’s economy, and increased number of informal traders in citymanaged market spaces ‘graduating’ into formal businesses Informal and Community Sector Support programme Informal and Community Sector Support programme Redefine and scale up the City’s current Informal Trade Development Programme to ensure that informal traders benefit from a system that facilitates their stabilization and, where possible, graduation to the formal sector 39 co-operatives established and in the process of finalising business plans. 5 traders have graduated into formal trading. (MTC/SMME) There is an informal trading program that is run by Wits Univ. and W&R seta relating to the training of informal traders. (MTC/SMME) Hoek Street and Quartz Street Linear markets are in the process of being rolled out. (MTC & SMME) Informal Trading by-law review is in progress.(MTC & SMME) Baseline research to develop MTC database on all traders in the City is in progress. 1700 Smart Cards has been rolled out.(MTC & SMME) Work on Quartz and Hoek Streets 1 and the consolidated Linear Markets business plan is continuing.(SMME/MTC) Hoek street segment 3 with the private sector was launched in Sept 2008.Market designs ready, consultations with traders underway, alternative arrangements for relocation during construction ongoing.(SMME/MTC) Quartz street Linear Market pavement finalised in 3 segments, constructors are busy with the forth block (SMME/MTC) Facilitate a package of support for small manufacturing co-operatives 135 Co-ops strategy is going through the consultation stage.(SMME) 10 co-operatives have been registered – a further 10 is in progress of being registered. (MTC & SMME) A database of existing co-operatives is available. (MTC & SMME) MTC has registered 29 Close Corporations.(MTC) MTC has achieved of 25% of its implementation plan for the development of an incubation facility for its traders.(MTC) Demarcation and promulgation of restricted and prohibited areas in collaboration with legal and JMPD Implementation of Confederations Cup and 2010 Informal trading strategy Implementation of By-laws enforcement framework that includes street trading by-laws and ensures that stalls are replaced with Linear Markets (SMME) Noord Street Linear Market. (MTC) Wanderers Street Linear Market. (MTC) Roll out of 3600 smart cards in MTC managed facility Facilitate a package of support for small manufacturing cooperatives Through the co-operative office, increase the role of cooperatives in the City economy (SMME) 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA Work with stakeholders to roll out a community bank that enables SMMEs including, co-operatives and informal traders to build a credit record, access an expanded range of financial products Work with stakeholders to roll out a community bank that enables SMMEs including, cooperatives and informal traders to build a credit record, access an expanded range of financial products Discussions with Dept of Housing to jointly rollout the “Dirang Ba Bohle” Community Bank are continuing. (SMME) Increased number of beneficiaries reached by City-facilitated skills development initiatives Roll-out of the “Dirang Ba Bohle” Community BankGrant Funding (SMME) Skills Development programme Skills Development programme In partnership with business develop an expanded bursaries programme that will massively increase the flow of bursaries to university and FET learners Linked to other programmes Develop a City skills strategy focused on the skills supply/demand chain, first lends to the identification of a list of critically scarce skills in the city, to guide other initiatives 136 The Skills Strategy has been completed and sent to mayoral for approval.(SMME) Site under review in terms of locations for the integrated Skills Hub for COJ.(SMME) Skills supply demand analysis drawn.(SMME) Implementation of the Skills strategy has commenced (SMME) RPLing of over 2000 artisans has been completed (SMME) Facilitate skills audit of disabled persons on the database to be collected (TBU) There are an estimated 3500 destitute Ex-combatants in around Johannesburg some with semi-skilled however they are unable to find jobs. Funds for training will be provided for 40 participant who meet the criteria (TBU) Develop a City skills strategy focused on the skills supply/demand chain, first lends to the identification of a list of critically scarce skills in the city, to guide other initiatives Linked to RPL strategy (SMME) 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA Work in conjunction with educational institutions and the business community to ensure that educational institutions supply the industries with the relevant skills Linked to RPL strategy (SMME) MOU established with University of Johannesburg – general skills development.(SMME) Placed 22 students in the ambassador mentorship programme.(SMME) Provided training in Industry based and business operations to 136 SMME’s. (SMME) Currently working with Wits Plus and Wits enterprise to supply the industries with the accounting and business related skills (SMME) Initial discussion are currently underway with Dept of Research at the Vaal University of Technology with a focus on developing particularly technical skills at graduate level and targeting skills shortages at both postgraduate and doctoral levels. (SMME) MTC together with Transportation Dept, Implemented Customer Care training for 2 taxi operators.(MTC) Work with universities and FET colleges to increase the intake of more learners in career paths that are linked to current economic skills needs Develop a next-generation EPWP that expands the range of training beyond the current offerings 137 123 079 EPWP jobs created up to the end of the 2nd quarter of the 4th year of implementation.(EPWP) Nine official received training in NQF5 and NQF 7 A total of 29 Learnership projects for EPWP Vuku’phile Learnerships were approved EPWP office participated in two Cities network engagement. The first one was at the Umsunduzi Municipality on 29th July 2008. The second one was a bimonthly EPWP inclusive Cities Network meeting Hosted EPWP Lekgotla with al CoJ Departments and MoE’s to address the following; Institutional arrangements Training strategy Task rates Review of EPWP policy Linked to RPL strategy (SMME) Develop a next-generation EPWP that expands the range of training beyond the current offerings Participate in 5 City's Network Reference groups and Hosting 1 session. Convene 10 MANCO meetings and 8 EPWP SCM meetings. Participate in 4 national EPWP learning forums (EPWP) Train 60 City officials in NQF 5/7. Train 100 officials on MIS and EPWP reporting templates (EPWP) Monitoring of Learnerships implementation for all City departments and entities (EPWP) Increase EPWP branding and marketing (EPWP) Organise at least 20 tours of work to at least 50 projects (EPWP) Absorption of disabled into training programmes (TBU) 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA Within broader youth-development strategy scale-up career guidance for inand out-of- school youth, using virtual Job/Career Centres, and other mechanism, where appropriate Within broader youthdevelopment strategy scale-up career guidance for in- and outof- school youth, using virtual Job/Career Centres, and other mechanism, where appropriate The youth development strategy is in the process of being developed. (SMME) Combined Skills Development programme - various Linked to RPL strategy (SMME) Combined Skills Development programme - various Linked to other programmes 138 Support the ex military combatants in start up and emerging businesses with skills entering into labour market (SMME) Up to 3500 informal traders trained through Business Skills Programme and enrolled in Mentorship Programme which seeks to link traders with business opportunities (SMME) Train up to 1500 informal traders through Partnership (SMME) Implementation of the integrated Skills Hub incorporating, RPL and LMIDGrant Funding (SMME) 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA Economic base of underdeveloped areas of City increased over five years Area-based Economic Development programme Area-based Economic Development programme Design and rollout an intervention strategy within townships and underdeveloped areas, e.g. the Alexandra Renewal Programme, Soweto Development Initiative, and the Soweto Empowerment Initiative, to accelerate economic development. Launch of Soweto Five Year Economic Development Plan and Business Summit Bara central 50% completed Southern farms and Misgund 10% completed.(SED/JPC) Rietvlei 70% completed (SED/JPC) OrlandoEkhaya phase 2 90% completed.(SED/JPC) A township economic development program is being developed and rollout began in July 2008.(SED) Evaluation of proposals for Region Special Economic Development Plans for B & E has been finalised and service provider appointed (SED) Security Services have been contracted for the SEZ, and have been upgraded to armed guards Electrical cables have been re-installed Logo for the SEZ has been finalized and a report submitted for the Mayoral Committee meeting for Jan 2009 Secured URL for the SEZ (www.sowetoempowermentzone.com) Market and implement the inner city Urban Development Zone Successfully promoted the UDZ Tax incentive. Recorded private sector investment worth 3.3 billion cumulatively.(SED) Minister of finance has extended the UDZ BY 5 years from 2009 to 2014 as contained in the budget speech tabled before parliament on February 20, 2008.(SED) The UDZ Tax Incentive programme has been re-launched and submission made to National Treasury regarding the redemarcation of the new boundaries to cater for shadow areas (SED) Assist with the restructuring and renewal of industrial areas, inter alia by exploring the introduction of demolition (or other ) incentives 139 A city wide agribusiness initiative is being undertaken and implementation programme is being developed.(SMME) Implementation and coordination of Five year Soweto Economic Development plan (SED) Accelerate the roll out of the SEZ (SEZ) Part Implementation of the Deep South Economic Development Plan (SED) Marketing and implementation of the Urban Development Zone Programme and Region F Economic Development Plan (SED) Detailed Airport Economic Development Plan Establish 1 BEE distribution centre in previously disadvantaged area. (JFPM) Market and implement the inner city Urban Development Zone Marketing and implementation of the Urban Development Zone Programme and Region F Economic Development Plan (SED) 'Marketing and implementation of the Urban Development Zone Programme and Region F Economic Development Plan (SED) Assist with the restructuring and renewal of industrial areas, inter alia by exploring the introduction of demolition (or other ) incentives Linked to SED programmes 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA Facilitate the re-engineering of the economies of existing economic activity areas (nodes, business districts, or high streets) that may be under-performing, in decline, or at risk, through a range of appropriate interventions Facilitate the re-engineering of the economies of existing economic activity areas (nodes, business districts, or high streets) that may be underperforming, in decline, or at risk, through a range of appropriate interventions This is an ongoing project and focus on rigorous economic development intervention. The department is currently developing a proactive strategy to hamper inner cities economic decay.(SED) MTC has formulated a sustainable facility management strategy document(.MTC) Investigate feasibility and, where appropriate, design and rollout key economic infrastructure and other support in areas of future economic opportunity, notably Kya Sands/Lanseria and in and around the Gautrain stations An Airport Economic Feasibility Study and Special Economic Zone initiative is being undertaken for implementation support in 2008/09. (SED) Service Provider has been commissioned to undertake feasibility study completed by June 2008 with roll out and implementation starting in 2008/09.(SED) Architectural and layout plans for Marlboro and Midrand is being carried out (SED) The Airport City and Spatial Economic Zone - A scenario exercise regarding benefits and risks of a airport vis a vis augmenting functional capacity and specialisation of a new existing airport finalised and presented to Senior Management of the Department (SED) Facilitate improved urban management in targeted areas Implementation of projects emanating from the Regional Economic Development Framework (region A, B, C, D&E) (SED) Leverage R500m to facilitate improvement in the south of Joburg and Inner City. (JPC) Investigate feasibilities and rollout of Economic Infrastructure and other forms of support for areas of future Economic Opportunities to leverage signoffs. E.g. Gautrain Detailed Airport Economic Development Plan Facilitate improved urban management in targeted areas Reduced costs of doing business in the city on an index of microeconomic constraints (as measured by a two yearly cityspecific micro-economic constraints survey) Conducive Environment programme Investigation of incentive packages to support specific sectors 1st draft report received and stakeholder engagement underway for the development of Economic Innovation Policy (PPI) Roll out of the BPO precinct and ceremonial launch (SS) Conducive Environment programme 140 Assessment of Economic Programmes with those in other spheres of government and bordering municipalities to determine synergies (PPI) Assessment of the economic regulatory framework Projects and Programme Impact assessment framework (PPI) 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA Conducive Environment programme Conducive Environment programme Facilitate the extension of cost effective broadband ICT infrastructure to all businesses Tender process completed. The City owns substantial amount of assets in the form of fibre and negotiations are underway to secure the use of fibre network of SANRA. By securing these negotiations the City will have a substantial footprint to form the basis of the JBNP.(SS) Introduce a city-wide survey to identify other/changing micro-economic constraints (e.g. restrictive regulations) on investment and systematically address these where appropriate Linked to Broadband projects (SS) Introduce a city-wide survey to identify other/changing microeconomic constraints (e.g. restrictive regulations) on investment and systematically address these where appropriate Economic Support programme Projects and Programme Impact assessment framework (PPI) Economic Support programme Provision of Economic Development information to serve as input in economic policy and strategy formulation for the City 2008 Annual Economic Review completed.(ER) Economic Growth forecasting model for the City completed.(ER) Presented the 2008 Annual Economic Review to the Mayoral Committee in Sept 2008.(ER) Presented the quarterly presentation to the Economic Development SubCommittee on the state of South African Economy and implications to the economy of the City in Sept 2008.(ER) 141 Economic Data Subscriptions. (ER) Annual Economic Review. (ER) Economic Development Resource Centre. (ER) Qtrly presentations on the state of the Economy and its implications to the City. (ER) Regular Economic Column contribution to the DED Newsletter. (ER) Bi-monthly Economic Development. (ER) Economic Development Advisory Panel – Semi Annual Meetings. (ER) Update of the City's Economic Growth forecasting model including different budget scenarios for the City (ER) Economic Data and Profile of all COJ Regions(ER) 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA Reduction in the proportion of city firms indicating skills gaps as a constraint on investment (as measured by a two yearly cityspecific micro-economic constraints survey) Skills Development programme Skills Development programme Develop a well-articulated, widely accessible labour market database that facilitates the flow of relevant and strategic labour market information for active and inactive job seekers, and profiles diverse skills levels available. With partners, support skills development that will feed emerging industries with large jobabsorption potential (e.g. call centre staff, construction, and telecommunications There has been an expressed interest by India call centres to partner with the City. (SS) Database of property to be catalogued. SMME incubator devised and identified. (SMME) Finalisation of the Implementation and Roll-out Plan for the Skills Hub is currently underway and includes setting up of targeted focus groups with various stakeholders for the Hub including business sector, FEI’s, SETA’s and relevant government departments such as the DOL and DTI (SMME) Work has commenced between EPWP and Skills Programme on building an EPWP dataset that forms part of the Labour Market information Database.(SMME) 100% City of Johannesburg compliance with all relevant legislation Develop a well-articulated, widely accessible labour market database that facilitates the flow of relevant and strategic labour market information for active and inactive job seekers, and profiles diverse skills levels available. With partners, support skills development that will feed emerging industries with large jobabsorption potential (e.g. call centre staff, construction, and telecommunications Linked to RPL strategy (SMME) 100% City of Johannesburg compliance with all relevant legislation Achievement of unqualified audit beginning of financial period Second Quarter reviews completed and submitted in February 2009.(ME) Financial Management programme Implement all necessary Operation clean audit initiatives to enhance and facilitate proper management of systems in adherence to GAMAP principles 142 100% City of Johannesburg compliance with all relevant legislation Compilation and Finalisation of 4 ME Business Plans jointly with MEs (2009/10) (ME) Monitoring and Evaluation of quarterly reports of 4 MEs (ME) Regular monitoring of MEs Turn-around Strategies. (ME) Adhoc support to DED and MEs to ensure continuity and sustainability (ME) Financial Management programme Provide support to MEs and Directorates to ensure clean audit (ME) 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA Keep personnel expenditure to acceptable levels to release funds for aggressive service delivery improvements Keep personnel expenditure to acceptable levels to release funds for aggressive service delivery improvements Linked to other programmes Enterprise-wide risk management programme Enterprise-wide risk management programme Through an integrated enterprise wide risk management framework across the City, identify other risks that may affect the City, and work to mitigate their impact Revise the budget format to facilitate flexible programme based budgeting Manage Risk management process in conjunction with JRAS (ED) Ensuring procurement protocols, processes and practices in line with the MFMA (ME) Revise the budget format to facilitate flexible programme based budgeting Increased number of beneficiaries reached by City-facilitated skills development initiatives Skills Development programme In partnership with business develop an expanded bursaries programme that will massively increase the flow of bursaries to university and FET learners Linked to other programmes Develop a City skills strategy focused on the skills supply/demand chain, first lends to the identification of a list of critically scarce skills in the city, to guide other initiatives 143 Compliance with the City's administration policies and procedures (ME) Manage personnel costs within prudential limits as prescribed by National Treasury (ME) The Skills Strategy has been completed and sent to mayoral for approval.(SMME) Site under review in terms of locations for the integrated Skills Hub for COJ.(SMME) Skills supply demand analysis drawn.(SMME) Implementation of the Skills strategy has commenced (SMME) RPLing of over 2000 artisans has been completed (SMME) Align to CoJ budgeting processes and methodology (ME) Skills Development programme Facilitate skills audit of disabled persons on the database to be collected (TBU) There are an estimated 3500 destitute Ex-combatants in around Johannesburg some with semi-skilled however they are unable to find jobs. Funds for training will be provided for 40 participant who meet the criteria (TBU) Develop a City skills strategy focused on the skills supply/demand chain, first lends to the identification of a list of critically scarce skills in the city, to guide other initiatives Linked to RPL strategy (SMME) Work in conjunction with educational institutions and the business community to ensure that educational institutions supply the industries with the relevant skills Linked to RPL strategy (SMME) Linked to RPL strategy (SMME) MOU established with University of Johannesburg – general skills development.(SMME) Placed 22 students in the ambassador mentorship programme.(SMME) Provided training in Industry based and business operations to 136 SMME’s. (SMME) Currently working with Wits Plus and Wits enterprise to supply the industries with the accounting and business related skills (SMME) Initial discussion are currently underway with Dept of Research at the Vaal University of Technology with a focus on developing particularly technical skills at graduate level and targeting skills shortages at both postgraduate and doctoral levels. (SMME) MTC together with Transportation Dept, Implemented Customer Care training for 2 taxi operators.(MTC) Work with universities and FET colleges to increase the intake of more learners in career paths that are linked to current economic skills needs Develop a next-generation EPWP that expands the range of training beyond the current offerings 123 079 EPWP jobs created up to the end of the nd th 2 quarter of the 4 year of implementation.(EPWP) Nine official received training in NQF5 and NQF 7 A total of 29 Learnership projects for EPWP Vuku’phile Learnerships were approved EPWP office participated in two Cities network engagement. The first one was at the th Umsunduzi Municipality on 29 July 2008. The second one was a bi-monthly EPWP inclusive Cities Network meeting Hosted EPWP Lekgotla with al CoJ Departments and MoE’s to address the following; Institutional arrangements Training strategy Task rates Review of EPWP policy Within broader youth-development strategy scaleup career guidance for in- and out-of- school youth, using virtual Job/Career Centres, and other mechanism, where appropriate 144 The youth development strategy is in the process of being developed. (SMME) Develop a next-generation EPWP that expands the range of training beyond the current offerings Participate in 5 City's Network Reference groups and Hosting 1 session. Convene 10 MANCO meetings and 8 EPWP SCM meetings. Participate in 4 national EPWP learning forums (EPWP) Train 60 City officials in NQF 5/7. Train 100 officials on MIS and EPWP reporting templates (EPWP) Monitoring of Learnerships implementation for all City departments and entities (EPWP) Increase EPWP branding and marketing (EPWP) Organise at least 20 tours of work to at least 50 projects (EPWP) Absorption of disabled into training programmes (TBU) Within broader youthdevelopment strategy scale-up career guidance for in- and outof- school youth, using virtual Job/Career Centres, and other mechanism, where appropriate Linked to RPL strategy (SMME) Combined Skills Development programme various Combined Skills Development programme - various Linked to other programmes Economic base of underdeveloped areas of City increased over five years 145 Area-based Economic Development programme Design and rollout an intervention strategy within townships and underdeveloped areas, e.g. the Alexandra Renewal Programme, Soweto Development Initiative, and the Soweto Empowerment Initiative, to accelerate economic development. Launch of Soweto Five Year Economic Development Plan and Business Summit Bara central 50% completed Southern farms and Misgund 10% completed.(SED/JPC) Rietvlei 70% completed (SED/JPC) OrlandoEkhaya phase 2 90% completed.(SED/JPC) A township economic development program is being developed and rollout began in July 2008.(SED) Evaluation of proposals for Region Special Economic Development Plans for B & E has been finalised and service provider appointed (SED) Security Services have been contracted for the SEZ, and have been upgraded to armed guards Electrical cables have been re-installed Logo for the SEZ has been finalized and a report submitted for the Mayoral Committee meeting for Jan 2009 Secured URL for the SEZ (www.sowetoempowermentzone.com) Support the ex military combatants in start up and emerging businesses with skills entering into labour market (SMME) Up to 3500 informal traders trained through Business Skills Programme and enrolled in Mentorship Programme which seeks to link traders with business opportunities (SMME) Train up to 1500 informal traders through partnership (SMME) Implementation of the integrated Skills Hub incorporating, RPL and LMIDGrant Funding (SMME) Area-based Economic Development programme Implementation and coordination of Five year Soweto Economic Development plan (SED) Accelerate the roll out of the SEZ (SEZ) Part Implementation of the Deep South Economic Development Plan (SED) Marketing and implementation of the Urban Development Zone Programme and Region F Economic Development Plan (SED) Detailed Airport Economic Development Plan Establish 1 BEE distribution centre in previously disadvantaged area. (JFPM) Market and implement the inner city Urban Development Zone Market and implement the inner city Urban Development Zone Successfully promoted the UDZ Tax incentive. Recorded private sector investment worth 3.3 billion cumulatively.(SED) Minister of finance has extended the UDZ BY 5 years from 2009 to 2014 as contained in the budget speech tabled before parliament on February 20, 2008.(SED) The UDZ Tax Incentive programme has been relaunched and submission made to National Treasury regarding the re-demarcation of the new boundaries to cater for shadow areas (SED) Assist with the restructuring and renewal of industrial areas, inter alia by exploring the introduction of demolition (or other ) incentives A city wide agribusiness initiative is being undertaken and implementation programme is being developed.(SMME) Facilitate the re-engineering of the economies of existing economic activity areas (nodes, business districts, or high streets) that may be underperforming, in decline, or at risk, through a range of appropriate interventions This is an ongoing project and focus on rigorous economic development intervention. The department is currently developing a proactive strategy to hamper inner cities economic decay.(SED) MTC has formulated a sustainable facility management strategy document (.MTC) Investigate feasibility and, where appropriate, design and rollout key economic infrastructure and other support in areas of future economic opportunity, notably Kya Sands/Lanseria and in and around the Gautrain stations Marketing and implementation of the Urban Development Zone Programme and Region F Economic Development Plan (SED) 'Marketing and implementation of the Urban Development Zone Programme and Region F Economic Development Plan (SED) Assist with the restructuring and renewal of industrial areas, inter alia by exploring the introduction of demolition (or other ) incentives Linked to SED programmes Facilitate the re-engineering of the economies of existing economic activity areas (nodes, business districts, or high streets) that may be underperforming, in decline, or at risk, through a range of appropriate interventions Implementation of projects emanating from the Regional Economic Development Framework (region A, B, C, D&E) (SED) Leverage R500m to facilitate improvement in the south of Joburg and Inner City. (JPC) Investigate feasibilities and rollout of Economic Infrastructure and other forms of support for areas of future Economic Opportunities to leverage signoffs. E.g. Gautrain An Airport Economic Feasibility Study and Special Economic Zone initiative is being undertaken for implementation support in 2008/09. (SED) Service Provider has been commissioned to undertake feasibility study completed by June 2008 with roll out and implementation starting in 2008/09.(SED) Architectural and layout plans for Marlboro and Midrand is being carried out (SED) The Airport City and Spatial Economic Zone - A scenario exercise regarding benefits and risks of a airport vis a vis augmenting functional capacity and specialisation of a new existing airport finalised and presented to Senior Management of the Department (SED) Facilitate improved urban management in targeted areas Facilitate improved urban management in targeted areas 146 Detailed Airport Economic Development Plan Roll out of the BPO precinct and ceremonial launch (SS) Reduced costs of doing business in the city on an index of micro-economic constraints (as measured by a two yearly cityspecific micro-economic constraints survey) Conducive Environment programme Investigation of incentive packages to support specific sectors 1st draft report received and stakeholder engagement underway for the development of Economic Innovation Policy (PPI) Conducive Environment programme Facilitate the extension of cost effective broadband ICT infrastructure to all businesses Tender process completed. The City owns substantial amount of assets in the form of fibre and negotiations are underway to secure the use of fibre network of SANRA. By securing these negotiations the City will have a substantial footprint to form the basis of the JBNP.(SS) Introduce a city-wide survey to identify other/changing micro-economic constraints (e.g. restrictive regulations) on investment and systematically address these where appropriate Conducive Environment programme Assessment of Economic Programmes with those in other spheres of government and bordering municipalities to determine synergies (PPI) Assessment of the economic regulatory framework Projects and Programme Impact assessment framework (PPI) Conducive Environment programme Linked to Broadband projects (SS) Introduce a city-wide survey to identify other/changing microeconomic constraints (e.g. restrictive regulations) on investment and systematically address these where appropriate Economic Support programme Provision of Economic Development information to serve as input in economic policy and strategy formulation for the City 2008 Annual Economic Review completed.(ER) Economic Growth forecasting model for the City completed.(ER) Presented the 2008 Annual Economic Review to the Mayoral Committee in Sept 2008.(ER) Presented the quarterly presentation to the Economic Development Sub-Committee on the state of South African Economy and implications to the economy of the City in Sept 2008.(ER) Projects and Programme Impact assessment framework (PPI) Economic Support programme 147 Economic Data Subscriptions. (ER) Annual Economic Review. (ER) Economic Development Resource Centre. (ER) Qtrly presentations on the state of the Economy and its implications to the City. (ER) Regular Economic Column contribution to the DED Newsletter. (ER) Bi-monthly Economic Development. (ER) Economic Development Advisory Panel – Semi Annual Meetings. (ER) Update of the City's Economic Growth forecasting model including different budget scenarios for the City (ER) Economic Data and Profile of all COJ Regions(ER) Reduction in the proportion of city firms indicating skills gaps as a constraint on investment (as measured by a two yearly city-specific microeconomic constraints survey) Skills Development programme Skills Development programme Develop a well-articulated, widely accessible labour market database that facilitates the flow of relevant and strategic labour market information for active and inactive job seekers, and profiles diverse skills levels available. With partners, support skills development that will feed emerging industries with large job-absorption potential (e.g. call centre staff, construction, and telecommunications There has been an expressed interest by India call centres to partner with the City. (SS) Database of property to be catalogued. SMME incubator devised and identified. (SMME) Finalisation of the Implementation and Roll-out Plan for the Skills Hub is currently underway and includes setting up of targeted focus groups with various stakeholders for the Hub including business sector, FEI’s, SETA’s and relevant government departments such as the DOL and DTI (SMME) Work has commenced between EPWP and Skills Programme on building an EPWP dataset that forms part of the Labour Market information Database.(SMME) Develop a well-articulated, widely accessible labour market database that facilitates the flow of relevant and strategic labour market information for active and inactive job seekers, and profiles diverse skills levels available. With partners, support skills development that will feed emerging industries with large jobabsorption potential (e.g. call centre staff, construction, and telecommunications Linked to RPL strategy (SMME) 100% City of Johannesburg compliance with all relevant legislation 100% City of Johannesburg compliance with all relevant legislation 100% City of Johannesburg compliance with all relevant legislation Achievement of unqualified audit beginning of financial period Second Quarter reviews completed and submitted in February 2009.(ME) Financial Management programme Implement all necessary Operation clean audit initiatives to enhance and facilitate proper management of systems in adherence to GAMAP principles Keep personnel expenditure to acceptable levels to release funds for aggressive service delivery improvements Linked to other programmes Compilation and Finalisation of 4 ME Business Plans jointly with MEs (2009/10) (ME) Monitoring and Evaluation of quarterly reports of 4 MEs (ME) Regular monitoring of MEs Turn-around Strategies. (ME) Adhoc support to DED and MEs to ensure continuity and sustainability (ME) Financial Management programme Provide support to MEs and Directorates to ensure clean audit (ME) Keep personnel expenditure to acceptable levels to release funds for aggressive service delivery improvements Enterprise-wide risk management programme Through an integrated enterprise wide risk 148 Compliance with the City's administration policies and procedures (ME) Manage personnel costs within prudential limits as prescribed by National Treasury (ME) Enterprise-wide risk management programme management framework across the City, identify other risks that may affect the City, and work to mitigate their impact Revise the budget format to facilitate flexible programme based budgeting Manage Risk management process in conjunction with JRAS (ED) Ensuring procurement protocols, processes and practices in line with the MFMA (ME) Revise the budget format to facilitate flexible programme based budgeting 149 Align to CoJ budgeting processes and methodology (ME) Environmental Management Sector Plan INTRODUCTION AND OVERVIEW The Environmental Management Portfolio has been in existence since the new Mayoral term started in March 2006. This establishment was in recognition of ensuring that environmental sustainability issues are high on the City’s agenda in line with international trends in other cities elsewhere. The growing awareness about climate change issues and the recognition that local environmental concerns have a global dimension provides an opportunity for the city to put environmental concerns at the centre of global development debate and to respond accordingly and appropriately to such concerns. Johannesburg as an aspirant ‘world class African city’ intends to be globally recognised as taking proactive response to environmental global concerns. The Environment Portfolio is made up of the Environment Department, Johannesburg City Parks (JCP) and the Johannesburg Zoo. The Environment Department is responsible for developing policies and strategies to the extent that conservation and biodiversity is concerned. Johannesburg Zoo and Johannesburg City Parks in turn act as implementing agents. The Environment Department therefore has an oversight function on business of the two entities. This oversight role also encompasses the service delivery monitoring function of the two entities together with cooperative governance and financial sustainability with the support of the Office of the MMC. Due to the cross cutting nature of environmental issues, the core department is also responsible for other environmental functions such as: Development of policies and strategies; Regulatory and enforcement; Compliance monitoring and reporting; and Oversight on environmental performance of the city in general. Within this context, the department therefore has the following directorates responsible for: Air quality and climate change, Natural resources management, Waste policy and regulation, policy integration and General environmental policy development Service delivery agreement and compliance Johannesburg City Parks is responsible for the management of the city’s parks, cemeteries and nature conservation whilst Johannesburg Zoo provides conservation, education, research and recreation functions to the citizens of the City. CHALLENGES AND OPPORTUNITIES The Environment Sector is confronted by a number of challenges that may affect its service delivery mandate. The attempts to mitigate the impact of these challenges have provided major opportunities for the Department to efficiently and effectively deliver on its mandate. The legislative and policy environment that gives guidance to the work of the Department is ever changing and thereby expanding the scope/mandate of the Department. The Department participate on ongoing legislative processes of relevant departments such as Department of Environmental Affairs and Tourism, Department of Minerals and Energy and Department of Waster Affairs and Forestry. The Department also engages with the provincial department of Agriculture, Conservation and Environment on any legislative and policy initiatives. Through this process the City anticipates and prepare for implementation of new policy and legislative 150 requirements. There is also participation at SALGA environment subcommittees to ensure alignment with neighbouring municipalities. Since the establishment of the department, notable successes include the establishment of a dedicated directorate for Air Quality and Climate Change. This is considered the first for a city in South Africa. This has been due to the recognition that cities are at the centre of climate change response. South Africa is a signatory to some of the international treaties and conventions designed to deal with the emerging multilateral environmental issues. The department also participates in the international and national forums and initiatives to address these issues. Johannesburg experiences high levels of air pollution due to reliance on private vehicles and the burning of fossil fuels such as coal for space heating and cooking specifically in low income areas. The establishment of the Directorate Air Quality and Climate Change has led to implementation of specific programmes to respond appropriately. The implementation of the Rea Vaya Bus Rapid Transit System, Basa njengo Magogo (BnM), education and awareness programme to mention a few will go a long way in contributing to a reduction in emissions and improvement of the poor air quality levels. An awareness programme on how to burn coal efficiently has been implemented in Soweto and Alexandra and will be rolled out until the end of 2009. This programme has led to notable behavioural changes in fire lighting method to reduce emissions. The Natural Resource Management Directorate has been established to respond to challenges on biodiversity, conservation, open spaces and catchment management. Whilst surface water quality remains a challenge mainly due to blocked sewers, ageing and inadequate infrastructure and littering carried via the Storm water drains into Johannesburg’s rivers, there has been some progress in terms of responding to the issues. Quarterly reporting with specific action plan to address pollution is in place. A hotspot action programme has also been implemented to respond to recurrent hotspot areas. Appropriate institutional mechanisms have been put in place to deal with this issue. There is collaboration with the government departments, forums, communities and the private sector to do river cleanup and rehabilitation. In order to reverse environmental degradation, catchment management rehabilitation remains a key priority. The rehabilitation of the southern catchment, the Klipriver/ Klipspruit Greening and Rehabilitation project, is one of the biggest projects for the department and is implemented by JCP. Further to this is the completion of rehabilitation plans for Bruma Lake and Zoo Lake including rehabilitation of the Jukskei catchment. The department working with Johannesburg Roads Agency and Johannesburg Water is intervening directly on storm water management and sewer maintenance respectively. The availability of landfill airspace and accessibility creates a challenge of illegal dumping in the City. The department regulates the transportation and movement of waste in the city through its waste-licensing programme, whilst Johannesburg Metro Police undertakes enforcement. The Waste Policy and Regulation Directorate develops waste policy, which in turn is implemented by PIKITUP and other service providers through licensing. The Department is working with the Infrastructure and Services Department and, Environmental Health and Pikitup to ensure that a proactive strategy is implemented to reduce illegal dumping. The strategy includes doing a feasibility study on changing the current practise of waste storage, collection and disposal to explore material recovery throughout the City. It is imperative to note that in order to meet the Polokwane Declaration targets there is a need to have 360 degrees turn on the current waste management practice by the City and its Municipal Owned Entities and other waste generators and service providers. As a rapidly urbanising city, there is lot of development pressure on valuable environmental resources, accordingly the Directorate Environmental Regulatory Services. Environment is a specialised field and in order to understand the good or bad changes caused by anthropogenic factors, sophisticated scientific monitoring systems and specialised skills are required to inform decision-making and enforcement. Although the Department has secured 151 resources to deal with this challenge, more funding will still be required for expansion of some of the scientific monitoring systems. The mandate of the department is ever expanding. The City of Johannesburg is known as the Urban Jungle. However, it is evident that parks and trees that make up this urban forest are predominately occurring in the northern part of City as opposed to the South. The Department through Johannesburg City Parks have a huge programme of developing parks and planting trees in the previously disadvantaged areas of the South. REVISION TO THE COJ 2006/11 IDP This is a second review of the Environmental Portfolio five-year IDP sector plan since the reestablishment of the Department as a standalone Department in 2006, with the first review undertaken during the 2007/08 IDP annual review period. Most changes particularly to the fiveyear objectives were instituted with the first revision. Only minor changes are effected with this revision and these include: Introduction of a separate 5-year objective and associated IDP programmes focusing on provision of burial space. This was informed by the increasing demand and challenges of availability of sustainable burial spaces in the long term due to increase in deaths. Therefore a need for Johannesburg City Parks to identify and prioritise short term and long term programmes in addressing this challenge. Implementation of Extended Public Works Programme has also been included as a new strategic goal. Johannesburg City Parks and JHB Zoo creates more than 1 000 jobs through EPWP thus contributing to social and economical development of communities. Further JCP has intentions to pursue accreditation with LG Seta in providing EPWP training in the green industry, which will ensure that environment best practises are integrated in the programme as well. One of the programmes was aiming at increasing Johannesburg Zoo animal collection to 3 500, currently the number of species has been increased to 2 700 animal species; however the Zoo foresee challenges in attaining this goal. Temple of snakes feature has not been completed as yet, and when complete will only increase animal collection numbers by 100. Further there are challenges in Capital funding of other features to increase number of species. This programme has therefore been revised to 2 800 animal collection. INITIATIVES TOWARDS MEETING THE GDS PRINCIPLES Environment is responsible for the coordination of at least two following GDS indicators: Indicator 13: Total city ecological footprint in sq km - Department has commissioned a study to assist in collation of information to measure this indicator, with an intention of integrating this information into the current five-year IDP programmes. Indicator 14: No of days per annum that air pollution is within the city’s air quality guidelines - the Department monitors air emissions through its air quality stations and has recently added two new stations. This information is reported as part of Departmental quarterly reports. KEY PROGRAMMES FOR THE REMAINING TERM The Environment Portfolio has assessed its mid term performance and came up with the following key programmes in the remaining term that will see to it that the Department achieve its five year objectives and subsequently the City’s long term goals. Water resources (rivers, impoundments and wetlands) improvements Ongoing water quality interventions in identified water quality hotspots – Mshenguville; Alexandra/ Wynberg; Bosmont; Bruma Lake; Princess Dump 152 Implementation of Klipriver/ Klipspruit legacy project – Dlamini and Orlando Dube nodes. Rehabilitation of Lenasia and Orlando Dam wetlands Air quality improvements Continue with Basa njengo Magogo domestic reduction programme in Soweto and Alexandra, monitor and report on impact of this initiative Air quality licensing and permitting as per CAPCO delegations Introduce incentive schemes for voluntary reduction of air emissions - industries and vehicles sector Waste Management Continue with waste minimization initiatives during major events Establishment of enforcement unit and aggressive by-law enforcement targeting illegal dumping sites Region specific education and awareness campaigns Climate Change mitigation and adaptation programmes Completion of retrofitting of council owned buildings programme Greening of BRT and installation of solar water heaters (ARP and Cosmo City) Determination of flood prone areas Demand Side Management Demand side management by law (energy) Review of water service by-law Demand side management education and awareness campaigns Biodiversity and Open Space Management Facilitation of proclamation of identified conservation areas and nature reserves Increase number of learners visiting the Zoo through introducing interactive programmes and also increase number of disadvantaged learners visiting the Zoo Rezoning and zoning of open spaces through implementation of open space master plan and ensuring, correct zoning in development applications Parks development – Jabavu, Chiawelo and Diepkloof Mainstreaming of environmental issues Continue with compliance monitoring of strategic projects (Gautrain, Cosmo City and ARP), City’s Capex projects and private developments. Integration of information from the State of the Environment report and catchment management policy into City’s planning tools such as RSDFs and the SDF Capacity building and training of planners and MoEs on environmental requirements SECTOR RESPONSE TO COMMUNITY ISSUES The City went through a comprehensive public participation process during March and April 2008, which included Regional Summits hosted per Ward and Stakeholder Summits where three issues were prioritised per each Ward. Broad range of environmental issues were raised from these engagements indicating an improved awareness of importance of environmental issues as well as significant contribution of environmental management in improving lives of the citizens. These included the following areas: Biodiversity and Conservation management – official recognition and protection of identified conservation areas within Wards. Wetlands and river protection - the need to protect wetlands and rivers for future generations as well as minimising health associated impacts as a result of degraded watercourses. 153 Waste Minimisation initiatives – establishment of recycling facilities, which will reduce waste going to landfill sites while also providing job opportunities to community. Parks development, upgrade and maintenance to contribute towards beautification of wards in general, also contributing towards social development and providing safety environment for kids to play in. Open space management – open space management is critical in catering for social community needs and preventing crime as un-maintained open spaces promote crime and illegal dumping. The Department and MEs (City Parks and JHB Zoo) provided detailed response on how these issues will be addressed. There are already ongoing programmes to deal with some of these issues such as proclamation of conservation areas with biodiversity assessment study conducted identifying areas to be proclaimed/protected; rezoning of open spaces; watercourse protection and rehabilitation including ongoing upper Jukskei rehabilitation programme; ongoing Klipriver/Klipspruit Legacy Project focusing on eco parks development and wetlands protection within the identified corridor. Request for park developments and upgrades (Jabavu, Chiawelo, Diepkloof and Meadowlands) have been included in 2009/10 cycle. SECTOR CONTRIBUTION TO 2010 FIFA WORLD CUP 2010 World Cup is around the corner with a number of major projects such as upgrading of stadia implemented by the City in preparation of the event of this magnitude. The following are amongst the programmes implemented by the sector in preparation of 2010: 2010 Greening Programme – this programme includes beautification of road islands and development of eco-parks and rehabilitation of Klipriver/ Klipspruit corridor. Much work has been done already with 34 eco-parks nodes already designed and actual development of eco-parks and wetland rehabilitation completed in some parts of the corridor. Green Goal Standards – FIFA has made available its green goal standards; the City will develop operational plans/guideline to ensure that these standards are implemented. Waste Management – The Environment Department has started implementing waste management initiatives during major events, which focuses on waste separation thus promoting recycling and reuse of waste generated during events. Waste management guidelines during events have also been developed and are currently implemented. 2010 Capex Projects – The Department also ensures that the 2010 projects implemented by the City comply with relevant environmental regulations such as NEMA through compliance monitoring. Further the Department ensures that the projects are prioritised by approving authorities i.e. GDACE, to help fast track implementation. 154 ENVIRONMENTAL MANAGEMENT SECTOR PLAN 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA 10 % improvement in integrity of water courses Ecological reserve preservation programme and river health programme Ecological reserve preservation programme and river health programme 10 % improvement in river health 10km of watercourses rehabilitated 2 water bodies rehabilitated for ecological and recreational purposes 10% improvement against water quality requirements set for the river reserve 100% completion of wetland audit for protection of wetlands 5 wetlands rehabilitated for aquatic habitats and watercourse To increase the total land area proclaimed as conserved area from 1,3% to 5% of the city’s total area Catchment policy and stormwater by-laws and framework completed as facilitated through JRA Conceptual Designs for the rehabilitation of Upper Jukskei have been completed and Record of Decision (ROD) received Status Quo Assessment of two priority impoundments i.e. Bruma Lake and Zoo Lake completed and improved aesthetic and bio aquatics life (birds, fish and aquatic vegetation) as a result of ongoing maintenance done at Westdene Dam, Moroka Dam and Dorothy Nyembe dam, Blue Dam and Florida Lake Klipriver/Klipspruit Legacy Project Completed open space master plan design for 31 nodes; Mapetla and Mofolo Wetland and Regional Parks and Dorothy Nyembe nursery Detailed designs and development of Dlamini Node; Phase 3 development of Mapetla Wetland Park, further development of Mofolo Node and Development of the Eco-Parks (Ubuntu Node and Mofolo South node) Management of wetlands programme Preliminary zoning baseline data and zoning for priority conservation areas completed Compiled and submitted a consolidated list of potential areas for proclamation, which included approximately 67 Recreational parks, and 41 Nature areas 5 Ecological Management Plans were developed for the following areas Kloofendal Nature Reserve, Kloofendal, Cosmo City, Melville Koppies, Rietfontein and The Wilds for implementation according to Implementation of Klipriver/Klipspruit Greening and Rehabilitation Project – Dlamini and Orlando West Nodes Rehabilitation of Bruma Lake Citywide flood-line determination Management of wetlands programme Wetlands Audit of all wetlands across the City completed and a clean up of 7 wetlands to date as part of the long term rehabilitation programme River bank stabilisation was undertaken at Mapetla Wetlands Park as well as Diepkloof spruit through SANBI Working for Wetlands programme Other wetlands that were rehabilitated (Florence Bloom, Bosmontspruit, Lenasia; and Vodacom wetlands) Biodiversity protection programme 155 Rehabilitation of Lakeside and Orlando Dam wetlands Biodiversity protection programme Development and implementation of ecological management and development master plans for selected conservation areas Continue with protection of sensitive habitats diversity – capacity building and training 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS To enhance the city's biodiversity through Zoo, Botanical Gardens and nature reserves (Green belts) Johannesburg Zoological and Botanical Gardens Metropolitan open space system implementation programme Initiate benchmarking programmes that link Jo’burg Botanical Garden with other national and international Botanical Gardens and research tertiary institutions Development of a research based Environmental Education centre and Continue with participating in research projects to protect endangered species Continue to increase number of animals in Zoo through developing internal husbandry manual. Produce and manage 8 active animal studbooks and initiate programmes to improve and ensure animal well being Continue with increasing the number of learners visiting the Zoo annually through introducing and implementing interactive programs at the Zoo for education and recreational purposes Increase number of disadvantaged learners visiting the Zoo Increase the number of visitors visiting the Zoo annually to 500,000 and create incentives for return visits Continue to host Biodiversity events Metropolitan open space system implementation programme 156 legislation Biodiversity Assessment completed 1 519 ha cleared of alien vegetation through Working for Water and JCP Biodiversity and Conservation Environmental Education Programme reached approximately 23 772 during the 2006/7 and 19 684 beneficiaries during 2007/8 fiscal years (A total of 43 456 beneficiaries to date) Approximately 173 units of wild life game have been accounted for in all reserves that have capacity Develop and implement a long-term local biodiversity strategy for CoJ Development and implementation of Ecotourism Business case for selected conservation areas Johannesburg Zoological and Botanical Gardens To establish a network of open spaces that contribute to social and environmental opportunities 2009/10 DELIVERY AGENDA 2 700 species available at the Zoo Some of the attraction features completed at the Zoo include Discovery Centre, Bears to Lemurs/Madagascar, with Temple of Snakes to be completed soon Interactive snake demonstration added to program at Discovery Centre Hosted 2 Biodiversity and 2 Year of the Frog events. Completed Arbor Day event – 2988 learners attended The Zoo has seen 67 648 visitors in the first 2 months of 2008/09, well on track to reach target of 480 000 visitors annually. Number of learners seen in first 2 months is 16 276 Developed and implemented strategies to increase number of disadvantaged groups visiting the Zoo. 2 429 disadvantaged learners have already visited the Zoo this year for free Completed Open Space Development Framework and also completed ground-truthing of 7 key open space areas worthy of inclusion into green network Development of open spaces and parks completed (Avalon cemetery upgrade, Diepsloot cemetery; Lenasia Continue with implementation of open space master plan developed for 4 regions. Review of open space by-laws At least 40 open spaces properly zoned as public open spaces Groundtruthing done at Kloofendal 5-YEAR STRATEGIC OBJECTIVES To increase the number of trees on sidewalks and in parks and private properties by 200 000 5% Reduction in air pollution levels from a baseline index of (2005), within specific pollution categories IDP PROGRAMME AND KEY ACHIEVEMENTS cemetery, Crematoria, Diepkloof Park’s extension, Chiawelo Park development, Diepkloof Memorial Park (Extreme Park Makeover), Pioneer Park, Cosmo City parks) 5 parks were upgraded in the financial year 2007/08 in the Inner city complimenting the Inner- city charter commitments. Parks: Pieter Roos Park, Edith Cavell, Alec Gorshel, Donald Mckay and JZ De Villiers City Beautification- 26 Road Islands Developed/ Upgraded Development of Green Servitude Regulatory Tool for CoJ Burial Space programme Burial Space programme Primary developments of Diepsloot and Waterval cemeteries have been completed with additional development being rolled out over the next 5 years. These two cemeteries can provide a primary amount of 520,000 graves Additional sites at Avalon and Olifantsvlei have been identified and are going through the EIA process ready for development within the next two years City greening programme Over 91 000 trees have been planted at the end of 2007/8 vs. the target of 200 000 with 90,990th tree planted in celebration of Nelson Mandela’s 90th birthday, 62 000 more trees to be planted Total of 6 165 trees planted (excl. 3000 street trees) planted at Cosmo and Alexandra Renewal Projects Memorial tree programme introduced in July 2008 Air pollution prevention programme 157 2009/10 DELIVERY AGENDA Completed BnM demonstration project in Alexandra (10 000 households) and Soweto (30 000 households) Vehicle emissions reduction strategy completed and two voluntary testing programmes implemented as part of awareness creation Completed licensing and permitting strategy for scheduled processes Completed audit of 500 boilers in the City 70% completion of an emissions inventory i.e. domestic data, part of vehicle data and industries and all air quality sources and pollutants have been mapped Voluntary rating scheme developed for industries and vehicles and surrounds, Klipriviersberg NR and surrounds, Rietfontein NR, Pimville Koppies, Lower Klipriver (Lenasia), 3x areas within Region G Upgrade of Lenasia and Avalon Cemeteries City greening programme Develop Beautification Master plan (design) for 2010 and beyond Continue with the tree-planting programme: 62 000 trees target Air pollution prevention programme Implementation of targeted interventions to reduce air pollution in the domestic sector (BnM roll-out – Soweto and Alexandra) Regulation and enforcement in respect of air emissions from industrial sources – CAPCO delegation Implementation of voluntary rating and incentive schemes within industry and vehicles sector 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS Action plans implemented to address pollution hotspots (4 areas) 10% improvement against water quality requirements set for the river reserve 15 % reduction in tonnages of waste disposed to landfill based on the 2006 2% reduction in GHG emissions through flagship 158 2009/10 DELIVERY AGENDA Completion of emissions inventory, linked to Green House Gas inventory Dispersion modelling -quantification of emission sources and implications for planning Development of Cleaner Production (CP) process guidelines for selected industries Water Pollution programme Water Pollution programme Continued with implementation of water quality monitoring programme and hotspots programme (Klipriver; Bosmontspruit; Princess Dump; Mshenguville and ARP) Continued with engagement of relevant stakeholders-forums to address water pollution challenges and pollution incidents and non compliance issues investigated and referred for corrective action Ongoing Upper Jukskei litter trap and river clean-up initiatives -32 511kg of litter removed Maintenance and river clean-up for specific areas done through EPWP programme. Removed 32 511 kg of waste to date and 42 people employed Waste Minimisation programme Waste minimisation programmes implemented at ARP and Cosmo City include piloting of crushers for construction rubble recycling and minimisation, waste clean up and education and awareness training for 3 400 people and licensing of construction vehicles Separation of waste at source during major events and diverted more than 173 tons of waste from disposal by landfill at city events and through awareness and clean up campaigns Established guidelines on waste separation at events and operations of buy back centres Facilitated the establishment of a buy back centre at Orange Farm, Alexandra buy-back centre, Cosmo City buy back centres and Zondi buyback centre improvements Registered, renewed and licensed more than 740 waste service provider More than 3 300 fines were issued for non compliance with waste management by-laws Waste minimisation strategy for Region F Climate Change Mitigation programme Implementation of Water quality monitoring programme in line with the Surface Water Quality Enhancement Plan Continue with clean ups and maintenance of upper Jukskei (litter trap maintenance) Ongoing interventions inwater quality hotspot areas – five areas identified Waste Minimisation programme Waste separation at source (major events) through waste management strategy and regulations Waste minimization initiative with production/ manufacturing companies Waste management monitoring through Waste Information System (WIS) Continue with registration and licensing of waste service providers Compliance monitoring for city owned and privately landfill sites Regulation and enforcement in respect of waste by-laws Climate Change Mitigation programme 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS projects To improve City’s resilience to climate change impacts 170 and 52 solar water heaters installed at Cosmo and ARP respectively and beneficiaries trained on use of technology and its benefits, further roll out planned Retrofitting of 5 council owned buildings completed and further retrofitting of 12 council-owned buildings under Clinton Climate Initiative planned Project Idea Notes (PIN) for BRT CDM and Cosmo City CDM completed, currently undertaking CDM PDD process Implementation of emission reduction strategy with Ekurhuleni and Tshwane Climate Change Adaptation programme Climate Change Action Plan Completed Completion of general vulnerability assessment Implementation of sector specific initiatives Detailed studies undertaken, e.g. stormwater, flooding, risk assessment, cost-benefit analysis 2009/10 DELIVERY AGENDA Facilitation of implementation of retrofitting for remaining council buildings Facilitation of implementation of solar water heaters (Cosmo City and ARP) Greening of BRT – resource efficiency measures Climate Change Adaptation programme Identification of flood prone areas within the City. Continue with climate change vulnerability assessment and implemented of identified initiatives Demand Side Management Draft DSM energy by law Establish and strengthening institutional mechanisms to implement environmental strategies within the city Institutional programme Finalisation of DSM energy by-law Development of Water Conservation and demand strategy and action plan Review of water services by-law Institutional programme 159 Established Inter governmental relations with the GDACE and DME, IGR forum planned with Gauteng Metro’s on matters pertaining to environmental management Provincial liaison meetings on Environmental Implementation Plan for Gauteng Established city-wide awareness forum with MEs and Core departments Continued with participation in the DANIDA funded programme on Urban Environment Management and Climate Change Continue with strengthening inter governmental partnerships (national, provincial and local) and other private institutions Continue with information-sharing sessions with Gauteng metros in format of 2 seminars 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA To integrate environmental best practices and principles in key city plans and programmes Mainstreaming of environmental issues city wide programme Mainstreaming of environmental issues city wide programme Environmental policy principles included in comments on development applications Generic Environmental Management Plan completed Environmental Compliance strategy in place as overall framework to guide environmental compliance Environmental legislative requirements incorporated into CIMS Capacity building training on environmental legislative requirements of Land Use Management, Building Control and the Johannesburg Roads Agency Implementation of the Modderfontein/ Kyalami EMF Environmental Awareness and communication programme Hosted successful Climate Change Summit during World Environment Week (Summit, June 2008) A number of Environmental Education programmes were implemented: Greening the Workforce including; greening of schools; schools holiday programme; public exhibitions; environmental competitions; theme days celebrations The Environmental Education Programme reached approximately 23 772 during the 2006/7 and 19 684 beneficiaries during 2007/8 fiscal years (A total of 43 456 beneficiaries to date Incorporation of wetlands protection; catchment management policy; state of the environment; greening (tree planting and servitudes) into IDP process and other key city planning tools Continue with annual capacity building training on environmental requirements for planners and MEs (Part 3) Information repository/database on sustainability indicators Environmental Awareness and communication programme 160 Conduct 3x awareness programmes on water resource management (KK) Organise awareness on domestic and vehicle air emissions through BnM and car free days campaigns Conduct waste management campaigns in at least 4 regions Continue with resource efficiency programme in additional 7 schools and initiate a schools ambassador programme Design and promote a schools environmental awards programme as part of the provincial Bontle ke Botho (clean and green schools) campaign Conduct resource efficiency campaigns with households through media advertising and theme day celebrations Arrange youth summit on environmental capacity building as part of World Environmental Day and Youth month in June 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA Environmental Management System Environmental Management System Completed Environmental Management System and launched the environmental policy statement and rollout of waste (paper) recycling programme in the City through Environmental Management System To ensure 90% compliance to environmental legislation to ensure continual improvement of the City’s projects To develop and maintain an integrated environmental management information system Legislative and policy reform programme Legislative and policy reform programme Inclusion of environmental requirements in town planning processes Commented on the National Environmental Management Environmental Laws Amendment Bill and the NEMA EIA proposed amendments Commented on the Land Use Bill Review of open space and tree by laws Compliance monitoring programme (Capex and Flagship Projects) Compliance monitoring programme (Capex and Flagship Projects) Ongoing monitoring of compliance of flagship projects and city’s capital projects with respective frameworks Review of NEMA amendments and new EIA Regulations Scientific data management systems in respect of air, water and waste and analysis of trends to inform future planning and decision making EPWP programme State of Air Report completed State of Environment Report and State of the Energy Report underway Continued with streamlining existing plans/ policies/ strategies to inform RSDFs (GIS spatial layer) Continue to investigate legislative changes that impact on the operations of the entities Continue with updating and maintenance of an integrated information management system Monitor change in State of Environment Report through environmental indicators Continue updating spatial plan with new environmental information EPWP programme 161 Compliance of flagship projects and city Capex above 90% Scientific data management systems in respect of air, water and waste and analysis of trends to inform future planning and decision making Enhance growth in the EPWP programme Continue with EMS awareness raising internally Commenced awareness with external businesses and industry Encourage EMS implementation in 3 targeted businesses and industry Hold inaugural environmental awards for business and industry participation 3 596 total for new jobs created through EPWP programme 1 424 total number of people trained to date Creation of 4000 jobs through EPWP Financial Sustainability Sector Plan INTRODUCTION AND OVERVIEW The Financial Sustainability Sector’s is entrusted with the responsibility of coordinating the City’s efforts through formulation and enforcement of policies, rules and regulations to facilitate financial sustainability. This Sector oversees good governance and provides for equitable and affordable service to the City’s citizens. The Sector is further responsible for ensuring financial balance between the municipal entities, core administration and other relevant stakeholders i.e. other spheres of government, business civic society and international partners as well as compliance with relevant legislation, regulations and governance practices whilst ensuring compliance with the Municipal Finance Management Act (MFMA) thus pursuing to meet the current developmental changes. The Financial sustainability finds itself in an era of environmentally prudent revenue collection, financial strategy, financial and funding planning. The juxtaposition of sustaining and even increase revenue collection yet make green choices to save depleting natural resources and satisfy all sector expectations. The mandatory 10% power conservation and investment on solar geysers, is one example. These are extraordinary times that compel the sector to sustain and protect infrastructural investment amidst the global financial turmoil. Minister of Finance, Trevor A Manuel, Budget Speech 2009 informs that “In the past ten months, the International Monetary Fund has revised its forecast for Global growth in 2009 no less than five times, from 3.8% in April last year to its current estimate of just half a percent”. When the Minister provided an outlook for the South African Economy, he pointed out that “….growth in 2009 is forecast to be 1.2%, the lowest rate since 1998…..Several sectors,…. have retrenched workers and the pace of job losses may accelerate further’. It is against this background that the deliverables for 2009/10 for the financial sustainability sector plan are contextualised. The Financial Sustainability Sector comprises of two Departments, namely Finance and Revenue & Customer Relations Management (R&CRM).These Departments i.e. the Finance Department and Revenue and Customer Relations Management share the following long-term goals: Empowered customers enjoying highest standards of customer care and responsiveness; A city that creatively evolves its resourcing/expenditure system to ensure long term fiscal stability and growth, and optimal spending to support accelerated and sustainable development; A city with stable and growing revenue streams; Expanding range of capital funding options, supported by strong capital finance risk management; and Sustained excellence in financial management. The Finance Department has as its long term mandated goal the efficient management and sustainability of the City’s finances. This is embodied in the structure of the Department, which seeks to address all the financial aspects of running the City. The Department therefore has strong interactions with the MEs particularly through its shareholder unit, which monitors the enterprises’ governance with the view of maximizing shareholder value in the interests of the community. It also ensures the maintenance and development of infrastructure while maintaining the financial viability and sustainability of the MEs through optimal utilization of assets. The Finance Department is primarily responsible for the following: Planning and allocation of budgets according to IDP and ensure effective cash flow management, loan financing, investment planning & financial risk management; 162 Manage centralized treasury functions and act as the City’s central banker, which involves managing the primary bank accounts, borrowings, investments and financial risk management for the City and its MEs; Develop and review the City’s Rates Policy and ensure effective billing of rates, manage and monitor performance standards across the revenue value chain; Draw up and implement general & supplementary valuation rolls for the City in terms of relevant legislation; Enable an effective control environment to ensure compliance with acceptable financial and accounting practices, ensure that the City maintains an effective, efficient and transparent financial and risk management and internal control systems, provide financial administration functions. Set up group financial policy & framework and monitor group financial performance and reporting; Develop and implement an effective and efficient Supply Chain Management system; and Reviewing, monitoring and “overseeing” of the affairs, practices, activities, behaviour and conduct of the MEs to satisfy CoJ that, the MEs affairs and businesses are being conducted in the manner expected and in accordance with the normal commercial, legislative and other prescribed or agreed norms. The core functions of the Revenue and Customer Relations Management (R&CRM) Department includes amongst others the following areas: Collection of revenue for rates and services; Credit management in respect of rates and services; Facilitation and implementation of the billing cycle from inception; Management of citywide customer relations through single customer view; Management of the citywide policy and strategy in respect of CRM; and Overseeing electronic and physical CRM channels. R&CRM department is the face of the City of Johannesburg and therefore inherently works with all departments and Municipal Owned Entities. Therefore, while the department is not directly responsible for the management of Municipal Entities, functions of the department are intertwined with the operations of the Municipal Owned Entities. The department relies on Municipal Owned Entities on functions such as the reading of meters to enable the department to produce an accurate bill, issuing of prompt statements etc. REVISION TO THE COJ 2006/11 IDP The following revisions are proposed in the Financial Sector Plan to guide deliverables for 2009/10 and beyond: 5-YEAR STRATEGIC OBJECTIVE Availability of cost effective capital finance to fund the capital programme 5-YEAR IDP OBJECTIVE/ PROGRAMMES Pursue the City’s public borrowing programme (Domestic Medium Term Notes) to raise at least R6 billion to 2010 Over the five year term an average of 10% of citywide capital spending funded through public private partnerships Public Private Partnership programme 163 REASON FOR CHANGE Within the approved R6 billion from the DMTN the City has borrowed an accumulated amount of R3.8 billion from the beginning of the term with R1 billion planned for 2008/09. The remainder of R1.2 billion will be left for the 2009/10 financial year Due to the legislation not being passed at the time of the IDP signing off, it is therefore difficult to quantify the 10% as it has a lot of other interactions. The Sector will however continue to provide progress on the implementation of this IDP Programme FINANCIAL SUSTAINABILITY SECTOR PLAN 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA Completion of programme Phakama to ensure full business integration across the value chain Programme Phakama Programme Phakama Institutionalised readiness for implementation of Programme Phakama Process and transaction training on track Finalisation of in scope staff migration completed System design completed and tested Responsive Customer Care A city that creatively evolves its resourcing/expenditure system to ensure long-term fiscal stability and growth, and optimal spending to support accelerated and sustainable development Complaints raised vs. resolved at 99% Scripting in 4 different languages Embracing new business demands MPRA, New Social package Maximise Revenue Collection and Billing Increase in revenue collection to R7.4 billion against financial turmoil in the world Programme Phakama implementation 200 employees trained on SAP Processes to support Migration of staff and budget provision A drive towards optimizations of Customer Service Centre Implementation of the Extended Social Package 51 employees trained on new Social Package (1 per Contact Centre) Additional staff to respond to customers Technology improvement on the Contact Centre Reduction in time taken to answer calls 100% Readiness to Implement Key Strategic Projects Sustain 70% customer satisfaction despite forces of NCA,MPRA, credit control Reduce number of outstanding queries by 3% Maximise Revenue Collection and Billing Average 95% rate of collection of billed revenue 70% Customer satisfaction in respect of billing Financial Control and Reporting Financial Control and Reporting Staff trained to respond to the NCA, monitoring and evaluation against its implementation Staff trained on Municipal Property Rates Act, 2004 (MPRA) implementation Refunds and Clearances Efficiencies 164 Increase in revenue collection Address interim readings reducing impact on refunds and clearance figures Increase revenue collection to minimum R7 billion 100% continued support in the implementation of the Inner City Property Scheme, as well as focus on clearances and refunds in the Inner City Increase telephone collections Increase of active customers receiving bills to 80% 96%refunds issued within 30 days 72% clearance certificates issued within 100% Compliance with NCA Support the implementation of MPRA Refunds and Clearances Efficiencies Accurate billing management Phase pilot: Automation of clearance processes 95% Clearance certificates and 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 30 days Implementation and management of new rates policy, valuation roll with minimum disruption Revenue base management programme Implement the new rates policy, taking into account the full implications of the shift to valuing both site and improvements, the opportunities for rebates etc Rates Policy Rates Policy drafted and implemented on 1 July 2008. Extensive communication and consultation to raise awareness and educate public with regard to Act and Policy, took place Annual review of policy Valuation Roll Draft general valuation roll was finalised in December 2007 with the total of the draft value being R600 billion and hence after handed to the Municipal Manager on 31 January 2008 Comments from the general public on the general valuation were allowed until formal objection process begun in February 2008 Public participation strategy with phases was developed and implemented The roll contains 784 323 entries with a total market value of R 708.4 billion. The current General valuation roll (prepared in 2001) contains some 540 000 entries with a total market value of R 42 million Briefing sessions with ward councillors and ward committees, electronic newsletters, adverts on weekly basis, special newsletters, training manuals for staff, business breakfasts, various radio and TV interviews, meetings with interest groups, brochures, helpdesk created A total of 11,086 written and telephone queries were received while a further 20,136 were received on the website Notices were mailed to property owners informing them of their new values and the objection process 165 2009/10 DELIVERY AGENDA refunds issued within 30 days of application (excluding properties with meter related issues) 70% Properties on the billing system metered and billed with accurate bills Increase in active customers receiving bills to minimum of 83% 95% of Rates and Refuse Account holders receiving accurate bills by June 2010 Revenue base management programme Effectively Implement the Municipal Property Rates Act on SAP Manage applications for rebates Manage the rates tariffs per category of property Further development and review of the rates policy, including developments with regard to Special Rating Areas, proposals on density and linking the policy to geographic areas Monitor impact of the policy and tariff structure to inform possible policy changes Review the policy on an annual basis in line with the budget process and legislation 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS Provisional valuation roll was opened for public inspection for 90 days from 27 February until 27 May 2008 80 000 notices, that were mailed to owners in terms of the MPRA were returned by the Post Office as undelivered (mostly sectional title owners) The objection process statistics are as follows: Number of visits to the valuations website 1,033,680 Number of GV Roll searches 55,700 Number of visits to venues 23,992 Number of email enquiries 11,985 Number of web queries 1,405 Number of formal objections 21,021 Number of formal late objections 337 Objections were due to: Values being too high/low 17,254 Incorrect owner or property details 771 Incorrect property category 2,277 Omissions from the roll 560 Properties containing a NIL value 159 Rates Policy and Valuation Roll were implemented on 1 July 2008 Implementation of the first supplementary valuation roll in terms of the Municipal Property Rates Act to supplement the new General valuation roll, which became effective of 01 July 2008 Develop a supplementary valuation roll based on the market value of both site and improvements of all properties that had not been included in the GV Roll since 01 July 2007 (date of valuation) Reduce the cycle between general valuation rolls from four to three years 2009/10 DELIVERY AGENDA Investigate and plan to institutionalise a three yearly update of the general valuation roll. Reduce the cycle between general valuation rolls from four to three years 166 Assist the Appeal Board with appeals against the General Valuation roll Data collection and preparation of the 2012 General Valuation roll Formulate and implement supplementary valuation roll Develop an Automated Mass Valuation system that would be able to assist with the mass valuation of properties, specifically residential Plan the next general valuation roll for implementation on 01 July 2012 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA A city with stable and growing revenue streams Credit Control Enforcement Credit Control Enforcement Equitable and competitive tariff system that is informed by national inflation data and targets, comparable metros and circumstances of citizens to ensure affordability Tariff Management programme Strengthened credit management controls through 10% Reduction of areas where no credit control is taking place i.e. 72 areas Revisit credit control policies and compliance Increase in the number of estatements received by City customers on the current baseline Management of ATTCOL for purposes of enhancing collection of arrears accounts Tariff Management programme A budget system, structure and format that enables sound resource allocation decisions Evaluation on the tariff methodology to assess whether it is relevant to the current changes in local government and industry specific has been concluded Finalized analysis of departmental tariff structures in respect of four policy attributes namely: affordability/fairness/equity; sustainability/competitiveness; cost-reflectivity; and transparency. Workshops were held to critically analyse the proposed tariff model. Out of these meetings it was agreed that, tariff determination, needs to respond to the current challenges facing the City. The final tariff proposals have responded to the key issues raised in all the meetings Tariff by laws approved in June 2008 Amendment of Tariff Policy approved in August 2008 Ensure compliance to the amended Tariff Policy by the City and continuously monitor its implementation Enhance engagements with regulators and bulk services providers to help the City to make long term decision on tariff determination Review the impact of the preferred options to elicit additional fees charged by the City Budget Reform programme Budget Reform programme 167 Expansion of credit control by 21.4% Revise the budget format to facilitate flexible programme based budgeting Define the overall budget process to enable more effective case building by Departments and MEs as well as more empowered political decision making and allocations between programmes Business case template and guidelines were created in November 2007 A business case document was developed and used for 2008/09-budget process Programme budgeting guidelines and template populated by individual Departments & MEs developed 2008/09 These were sent to finance managers for completion and submitted to Budget Office prior to budget panel meeting (January 2008) Business case documents were analysed and allocations were done based on the cases submitted (February 2008) for indicative allocation Develop systems that align the financial system (chart of accounts) to reflect reporting on programme in order to ensure proper monitoring Investigate evaluation tools in the market 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA Stabilization of fiscal architecture within which the City operates The revised Budget Management Policy was implemented from 1 July 2008 Fiscal Risk programme Fiscal Risk programme Improvement in unit cost and allocative efficiency Availability of cost effective capital finance to fund the capital programme Expenditure Review programme Develop methods for evaluating unit cost efficiencies in expenditure on key services and conduct regular benchmark-comparison studies with comparable metropolitan municipalities Completed implementation of ABC at EMS Started the implementation of ABC at Corporate HR Capital Financing programme 168 Through engagements with National Treasury, explore options to replace RSC Levies with local revenue instrument strongly linked to economic growth Scoping document prepared that analyses the need for additional revenue sources Identified potential additional and alternative resources for the City in terms of its characteristics, revenue generation, incidence on group and the overall economic impact Preliminary legal investigation with regards to the various alternatives and requirements to implement each Recommendations with regard to the preferred option and project plan developed for further action Pursue the City’s public borrowing programme (Domestic Medium Term Notes) to raise at least R6 billion to 2010 Within the DMTN, explore and if appropriate offer a retail bond Pursue the City’s public borrowing programme in the Eurobond market through a Euro Medium Term Notes programme (EMTN) Establishment of SME Fund DMTN Programme was updated to include Retail Bonds The retail bonds, also known as the JoziBond, were issued 21 September 2007, in three trenches of 2, 3 and 5-years The advertising, media campaign and community awareness program began 1 August 2007 The Financial Advisory Intermediary Services (FAIS) compliant call centre went live on 1 August 2007 The initial primary offering opened on the 8th of August and closed on the 7th of September 2007 The bonds were listed on Johannesburg Stock Exchange (JSE) on the 21st of September 2007 Continuous interaction with National Treasury and participate in SALGA, FFC and other forums Continuous interaction with Finance Working Team on the creation of the REDS Expenditure Review programme Develop an expenditure Review document for department and ME’s on an annual basis Introduce additional functions to Activity Base Costing Capital Financing programme Issue funding annually and explore alternative instruments such as commercial paper (CPs) in line with budget Increase the average duration of the City’s bond and loans in order to close the assets and liability gap Tap the Retail Bond as an alternative funding source as and when necessary within the approved R1 billion Establish a funding framework for SME 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA Thereafter the secondary market was opened Over the five-year term, an average of 10% city-wide capital spending funded through public-private partnerships A total of R156, 865 million was raised; the split is as follows: R8, 843 million for the 2-year bond, R20, 722 million for the 3-year bond, and R127, 3 million for the 5-year bond The retail bonds are linked to 3-month JIBAR and the rates are JIBAR +5 basis points (bps) for the 2-year, JIBAR+25 bps for the 3-year and JIBAR+40bps for the 5year. The Department has, on behalf of the City, raised a total R1 956 785 000 in the current year i.e. JoziBond (R156 785 000 issued in September 2007) and COJ05 (R1 800 000 000 in June 2008) Public, Private Partnership programme Where appropriate and within a policy framework, raise project finance for specific infrastructure projects such as the BRT, refurbishment of the stadiums and surrounding areas and other 2010 related capital projects Waste Treatment Technology Project registered with National Treasury National Treasury has in principle approved R2.8 million for pre-feasibility studies for City Power and Pikitup projects Put in place the policy frameworks to enable a variety of public-private and public-public partnership initiatives Public, Private Partnership programme Investigate the best and optimal funding structure for each specific project depending on future projected cash flows, risk and time lines Future procurements of PPP projects will be done in terms of the City of Johannesburg MFMA PPP Guidelines Register approved PPP projects with National Treasury Stakeholder Relationships Develop and maintain stakeholder relationships Long term domestic credit rating improvement to at least AA Financial Management programmeImplement all necessary Operation Clean Audit initiatives to enhance and facilitate proper management of systems in adherence to GAMPA principles and dictates Accounting policies have been changed to be in line with the 3 GRAP, 8 GAMAP and SA GAAP statements The City participated in the development of the Discussion Paper on Financial Instruments. The Discussion Paper was approved during September by the ASB The fixed asset policy has been updated and is in the process of being approved A month end pack has been developed and rolled out to all the departments. These packs are completed by the relevant department and reviewed by the Group Accounting Division and any issues raised are addressed by the relevant department Financial Management programme Achievement of clean audit 169 Develop and maintain stakeholder relationships Management of control environment to ensure maintenance of a clean audit Implement programmes that ensure compliance with applicable standards while influencing the same standards Continue to ensure the matching of Capex and Opex through internal budgeting processes Review financial reporting systems and mechanisms with a view to improving and ensuring current and future compliance with regulations 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 170 Reporting as contained in SAP and BW has also been improved Issued declaration forms to all HODs and MD’s to build management commitment to receiving an unqualified audit report Currently submitting quarterly reports to the Audit Committee – high level monitoring of action plans on AG’s findings and highlighting areas that need more attention Follow up exercise on 2006/07 management letters was conducted to avoid repeats of AG findings Procurement Protocols, Processes and Practices Procedure Manual The procedure manual was approved for adoption Citywide. These procedures will provide guidance to the City’s officials in the procurement of goods and services, which would serve to improve the governance in the SCM arena Train the trainer workshops have been conducted for the City’s SCM practitioners during the months of July and August 2008 The Sector has issued practice notes to cover the following issues: Unacceptable increase in deviations and ratifications from prescribed SCM practices; Management of SCM related queries and advices thereof; Standard format of submission to Bid Adjudication Committees; Internal controls on risk management triggers (Red Flags) iro the procurement of goods on quotations for amounts up to a value of R30 000; Internal control and risk management triggers (Red Flags) in respect of quotations for goods and services for amounts greater than R30, 000 and less than R200, 000; Composition, mandate, role and functions of the Bid Specification and Evaluation Committees and the format of submission to the respective Adjudication Committees; Compliance To SCM Policy by all users; Reporting requirements in terms of SCM policy; Practical use of suppliers on the approved panel; Expenditure payment to all suppliers who have met all the requirements as stipulated in terms of the contract re: quality; exact specification etc 2009/10 DELIVERY AGENDA 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA Demand Management Demand Management The demand management process at the City of Johannesburg started off with a workshop in October 2007, to create a common understanding of demand management, knowledge of the practical steps for implementing demand management in each of the departments’ environments and an understanding of the timelines and information required in order to compile a Demand Management Plan A process flow of the demand management process was developed In order to support the process, Acquisition Management Plan templates were developed and distributed to all the internal stakeholders. Each department populated the Acquisition Management Plans and these were then consolidated and sent to each department for sign-off BEE/SMME Empowerment BEE/SMME Empowerment The Supplier Day was held to educate SMMEs on procurement processes and to create awareness on the opportunities available within the City. Five hundred SMMEs attended the event. Various stakeholders were present and they were the Department of Trade and Industry (DTI), Gauteng Enterprise Propeller (GEP), The Business Place (TBP), South African Revenue Service (SARS), Mendi, Gauteng Shared Service Centre(GSSC) and OHASA. MEs were also invited to display and advertise their services to SMMEs Sustained excellence in financial management 171 Identification of sourcing strategies as to realize cost saving initiatives Keep personnel expenditure to acceptable levels to release funds for aggressive service delivery improvement Benchmark (salaries to operating 30%): Achieved: 2008 – 26% 2009 – 28% Produce quarterly and monthly SDBIP reports in line with National Treasury circular Continued to improve all financial reporting systems and practices and compliance to relevant regulations in order to reduce annual effort by ensure over all budget performance monitoring and reporting Completeness of RevenueMatched accounts reaching more than 90% Fostering completeness of revenue partnering with property value chain Implementation of Land Information System (LIS) Moved to the Department of Economic Development as from the 2000/10 financial year Manage personnel costs within prudential limits (percentage of personnel costs to operating expenditure) as prescribed by National Treasury. Salaries to operating benchmark is budget not to be more than 30% Continuous improvement of the financial report system Produce quarterly and monthly SDBIP reports in line with National Treasury circular Completeness of Revenue Incremental concise completeness of revenue project Data purification 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA Development of an integrated asset management plan and system Asset management and maintenance programme Asset management and maintenance programme Increase the percentage of operating expenditure budgeted and spent on maintenance percentage 172 Asset register updated for the year ending 30 June 2008 Reconciled fixed asset register to the Deeds Office and the unbundling of townships process is still ongoing. The fair value adjustments have been performed on assets The process of reviewing the useful life of assets is currently in place. Investment properties have been identified and disclosed separately Asset register updated timeously, including newly registered properties Continuous update of the movable and immovable asset registers Develop a medium & long-range assessment of maintenance requirements on all current and planned assets, taking into account growth projections, etc Define and develop a framework for the city’s infrastructure audit Governance Sector Plan INTRODUCTION AND OVERVIEW The Governance Sector Plan incorporates key programmes to enhance the relationship between the political and administrative centre of Council. These programmes aim to promote governance mechanisms and innovations in the areas of communication, strategic planning, information and knowledge management, legal and compliance, risk management and internal audit, as well as the 2010 FIFA World Cup Project. The departmental heads of these divisions report directly to the City Manager who, in turn, is accountable to the Executive Mayor. The sector plan also identifies key activities to ensure effective functioning of the offices of the City Manager and the Executive Mayor. The executive arm of the City of Johannesburg comprises of the Executive Mayor and the Mayoral Committee. The Executive Mayor is the Head of the executive since the executive powers are vested in him to manage the affairs of the City. Challenges and Opportunities The Office of the Executive Mayor is not immune from challenges emanating from the dynamic social and business environment. The challenge facing the Office of the Executive Mayor is how to deal with those issues proactively. The following are key focus areas in the Office of the Executive Mayor: To achieve clean audit To ensure a seamless and consolidated integrated planning, budgeting and performancemanagement system To ensure 100% compliance with all relevant legislation To ensure 100% protection of City’s legal rights and interests to prevent negative financial implications To facilitate an active and mutually beneficial interaction with selected neighbouring municipalities To ensure minimal disputes between different spheres To strengthen the accounting officer’s capacity to ensure that statutory obligations are met To ensure effective interface between administration and political office bearers To ensure execution of responsibilities as the Head of Administration To improve communication with citizens on the City’s service delivery To optimise current Information and Communications Technology (ICT) To comply fully with FIFA requirements as a major host city for the 2010 FIFA World Cup To ensure soccer fans experience the best hospitality whilst visiting the City resulting in a sustainable legacy The City of Johannesburg has strategically taken advantage of the identified opportunities in addressing the above challenges. Such opportunities form a basis in addressing the critical challenges facing the Office of the Executive Mayor: Political leadership has inspired confidence on the part of other spheres of government, civil society and city stakeholders in its ability to provide a vision for the future and its ability to implement; A highly stable set of political structures including the Council, Mayoral Committee and portfolio committees; A well-capacitated municipality anchored on competent managers that are able to effectively deliver a sustainable level of service; A solid foundation in terms of legal compliance, risk management and internal audit; Favourable and stable information technology environment; and Extensive existing intergovernmental and international relationships. 173 GOVERNANCE SECTOR PLAN 5-YEAR STRATEGIC OBJECTIVES A better informed citizenry on all matters pertaining to the City's service delivery IDP PROGRAMME AND KEY ACHIEVEMENTS Better equipping the executive Mayor, members of the mayoral committee and senior officials with media skills that will enable them to better tell the City’s delivery success stories to the communities through media 2009/10 DELIVERY AGENDA Adopt collaborative approach with politicians and officials in taking advantage of available media platforms and programmes to the benefit of the City and its residents Diversify use of media platforms to enhance awareness of the City’s success stories 174 Improve on networking strategy with media stakeholders CoJ politicians and officials (including the MEs) received media training to help increase positive coverage on CoJ. This focused on key aspects of media handling techniques such as: Understanding the journalistic process and dealing with its twists and turns Pin pointing critical issues that need to be communicated to target media Identifying your messages and packaging them in sound bites Meet the journalist’s need for a ‘story’ while promoting your own corporate message Shaping your responses to increase the likelihood of being quoted Acknowledging “questions from hell’ and spinning them to your advantage Using body language and voice techniques to project a mediafriendly personality. Started interdependency relationship with officials and politicians who were media trained. MMCs, EDs and MD’s are featured in interviews and article in the mainstream and community media. This interdependency is based on a structured approach to proactively take advantage of media opportunities (through interviews, media briefings, press statements etc) to showcase the CoJ service delivery success stories Moved from primarily focusing on Better equipping the executive Mayor, members of the mayoral committee and senior officials with media skills that will enable them to better tell the City’s delivery success stories to the communities through media Enhance proactive media coverage on CoJ success stories through sustained good news story initiatives through collaboration and interdependency with other CoJ departments and entities Continue eliminating negative reporting about the City however proactively highlighting areas where there are challenges to meet with citizen’s expectations as well as possible interventions thereof Continuously exploring new and more creative methods of disseminating positive stories about CoJ achievements Strike a balance in utilising both print and electronic media and continue to encourage politicians and senior officials to host media briefings and participate in debates Identify strategic good media representatives and encourage them to write independent stories on service delivery 5-YEAR STRATEGIC OBJECTIVES Promote Joburg as the World Class African City 175 IDP PROGRAMME AND KEY ACHIEVEMENTS print media to an approach that focuses on both print and electronic media (including community media) This proved successful during the Opening of Council, Budget Day Polio and Measles vaccination, Jozibond, Soweto Festival, Growth and Development Summit, Inner City Summit and the Safety awareness campaign Moved from a focus that is confined to maintaining healthy relations with journalists to one that includes forging synergies on areas of mutual interest with the management and owners of the media. Examples include: Discussions were held and agreements reached with the management of the Caxton group and also with Editor and Editor in Chief of the Star. This resulted in greater understanding in each other’s areas of interest and priorities and agreement on areas of greater collaboration. This resulted in spinoffs such as the greater understanding leading to The Star running sympathetic articles on the Metro bus strike where employees demonstrated against the union leadership. In another instance, the Saturday Star ran articles simplifying by-laws for free in instances where such education material would usually be classified as advertorial and the space charged for according to advertising rates. Another free advertorial piece was the 10 page supplement on the CoJ 2010 FIFA Soccer World Cup participation and preparedness. In the Case of Caxton there is significant improvement in attendance and coverage of City organised events where in the past one could almost count on them shunning the city. These include the Mayoral Roadshow and Inner City Summit amongst others Introduced and executed an approach of effective containment of negative media issues through more effective media monitoring and the proactive drawing up of holding statements for standing burning issues these include: The court ruling on eviction; and Property Rates Act Creatively and effectively utilise marketing platforms, campaigns and opportunities to add value to CoJ by showcasing its unique achievements, attributes and the opportunities it offers while at the same time positively 2009/10 DELIVERY AGENDA Creatively and effectively utilise marketing platforms, campaigns and opportunities to add value to CoJ by showcasing its unique achievements, attributes and the opportunities it offers while at the same time positively 5-YEAR STRATEGIC OBJECTIVES Stage high profile events that showcase the City as a World Class African City Embed risk culture throughout 176 IDP PROGRAMME AND KEY ACHIEVEMENTS influencing stakeholder perceptions about CoJ(locally, nationally, in the continent and internationally) 2009/10 DELIVERY AGENDA Stepped up the promotion and building of the CoJ brand by providing in-house training to internal stakeholders and suppliers regarding compliance in the application of the CoJ corporate identity Promoted positive image of CoJ to local, African and International stakeholders by placing advertisements in local, national, continental and international publications Introduced an integrated approach to the utilisation of exhibitions and displays that market CoJ by instilling collective approach amongst CoJ departments and MEs (such as the Rand Show and New Years Eve Countdown) Designed and obtained FIFA approval for the composite logo for the 2010 FIFA World Cup Was the first Host City to publicly launch the composite logo for the 2010 FIFA World Cup Completed and obtained FIFA and Mayoral Committee approval of the 2010 FIFA World Cup integrated marketing and communications strategy from 2007/08 until the completion of the tournament in 2010 Introduced concept of ROI of 1:2 for key campaigns with a view to ensuring a value adding focus permeates through all marketing campaigns Stage events that portray the City internationally as providing excellent hospitality and facilities that are conducive to first class convenience and enjoyment Staged the Joburg Open Golf Tournament which not only showcased the CoJ’s ability to stage high profile events but which also having world class hospitality and facilities Had the Soweto Marathon starting and ending in Soweto for the first time and drew interest from athletes outside Soweto Drew greater number of participants and interest for key annual partnership events like the 94.7 Cycle Challenge and the 702 Walk The Talk Produced the draft for the “Easy Guide to Organising Safe Events” in CoJ Enterprise-wide Risk Management influencing stakeholder perceptions about CoJ(locally, nationally, in the continent and internationally) Creatively and effectively utilise marketing platforms, campaigns and opportunities to add value to CoJ by showcasing its unique achievements, attributes and the opportunities it offers while at the same time positively influencing stakeholder perceptions about CoJ(locally, nationally, in the continent and internationally) Develop a partnership with the corporate institutions to focus on marketing initiatives that showcase CoJ as the world class African City Extending the integrated approach to the utilisation of exhibitions and displays that market the City by introducing a more interactive marketing component. Increase the number of trade shows and exhibitions targeting local, regional and International audience Stage events that portray the City internationally as providing excellent hospitality and facilities that are conducive to first class convenience and enjoyment Run high profile events that portray the CoJ as the world class internationally and as a city that provides excellent hospitality and facilities that are conducive to first class convenience and enjoyment for residents, tourists, business investors, executives and sport’s people Enterprise-wide Risk Management 5-YEAR STRATEGIC OBJECTIVES City’s IDP PROGRAMME AND KEY ACHIEVEMENTS programme 2009/10 DELIVERY AGENDA Ethical Government programme Provide Mayoral Committee with risk management support relating to submissions Embark on risk awareness campaigns through training and information sharing forums Implement Business Continuity framework. Implement risk control standards across the City Operational budget Maintain current premiums subject to market conditions Operational Budget Ethical Government programme Fraud, maladministration and corruption reported must be within acceptable levels Retain a clean external Audit Report Implementing a data mining tool to expand the focus of detecting fraud proactively Outsourcing of projects that require specialised skills/expertise Strengthening co-operation with outside partners, e.g. SAPS, City’s business forum, etc Implementation of Anti-Fraud and Anti-Corruption Plan Internal audit Development programme Implementing a data mining tool to expand the focus of detecting fraud proactively Outsourcing of projects that require specialised skills/expertise Strengthening co-operation with outside partners, e.g. SAPS, City’s business forum, etc Implementation of Anti-Fraud and Anti-Corruption Plan Internal audit Development programme Infrastructure and Architecture Optimisation Contributed towards the achievement of a clean audit report for the City for 2009/10 Issued 100% of planned audit reports for 2009/10 Risk-based Audit Coverage Plan for 2009/10 approved by Group Audit Committee Active member of international Internal Audit Activity leadership organisation Additional Municipal Entity outsourced their Internal Audit activity to JRAS Supporting role to Project Phakama and Rapid Bus Transit project Strengthening of partnerships with other spheres of government National Treasury, GSSC, high capacity Metro’s and local municipalities Close working relationship with Auditor-General Infrastructure and Architecture Optimisation Optimise Information and Communications Technology (ICT) delivery environment Embark on initiatives to optimize the current ICT environment through: Providing a stable, robust, enabling and secure technology environment so 177 Conduct risk management workshops as part of risk assessment Revise and update Consolidated Risk Register Implement Business Continuity Policy and Framework programme Implement a ‘continuous monitoring tool’ to conduct pro-active auditing in order to add value to the City Develop and present a strategy to expand internal audit service / coverage to MEs. Operational budget Develop and implement a consulting service to clients. Continue with the existing OPCAR programme, i.e. to monitor actions on Auditor-General Management Letter and identify risk areas that may impact on clean audit report Hardware to consolidate 41 out of life servers into the blade server environment has been procured and installed. This has resulted in a reduction in maintenance and support costs We have replaced 60 % of obsolete Provide leading -edge, cost effective, secure, on demand capacity network, computing and systems infrastructures to support business operations, collaboration requirements and maximize the citizen’s role in decision-making 5-YEAR STRATEGIC OBJECTIVES that technology and information can be used to improve and transform service delivery These initiatives are also aimed at reducing the existing computing environment costs by a noticeable percentage over the next 5 years. Develop sophisticated ICT community The aim is to architect and create the delivery environment in a manner that supports the broader ICT for development agenda in economically disadvantaged communities IDP PROGRAMME AND KEY ACHIEVEMENTS desktops and realised improvement in user productivity due to less downtimes We have deployed the latest antivirus software to protect the City’s computing environment against threats and malicious code We have installed the infrastructure for CoJ Core and MEs to run on their own Virtual Private Networks and hence reduce reliance on Telkom and reduce telecommunication costs. Also, MEs that have multiple sites use the installed wireless technologies to connect the COJ network and the multiple sites. This has led to the remote sites getting access to information and computing resources at reduced costs SAP Technology programme 2009/10 DELIVERY AGENDA We continue providing infrastructure and architectures to enable the COJ SAP Programmes to be implemented successfully and optimally The Technologies to implement the Unified Customer Contact Center (UCCC) for enablement of the improvement in Customer Relations Management (Phakama) have been procured And are ready for installation on securing of the UCCC building by the User Department The COJ SAP Competency Center has been approved by Mayoral Committee and has been accredited by SAP AG as aligning to best practice support processes and this will enable COJ realise the return on their SAP investment and improved business processes Application Portfolio Management ICT Training programmes Joburg Broadband Network Project Free Telecoms Zones (FTZ) Project) 2010 Systems and Information Technology and Telecommunications Implementation Plan ICT Training programmes Joburg Broadband Network Project Free Telecoms Zones (FTZ) Project) 2010 Systems and Information Technology and Telecommunications Implementation Plan 178 The definition and evaluation of demo Networks and technology specification for the Joburg Broadband Network Project has been completed. This project is undertaken together with the Economic Development Unit (EDU) The sites for the FTZ (phase 1) have been identified. Awaiting the rollout of the JBNP The2010 ICT implementation plan has been completed and approved. We have completed the 2010/Internet Kiosk Bid evaluation Implementation of the Enterprise Information management strategy which will result in achievement of high availability systems, maximum efficiencies and cost savings Educating and creating awareness to CoJ employees and contractors of CoJ IT policies, procedures and standards Improve information security policies, controls and processes to mitigate risk, counter emerging information threats and vulnerabilities and ensure compliance with acts, regulations and legislation SAP Technology programme Continuous improvement of the customer contact centre IT architecture management and control to enable COJ improvement in customer relations management Integrate the disparate systems to enable real-time information exchange between SAP and legacy systems Improvement in service delivery and service support process in the SAP Competency Center to ensure the City derives maximum value out of the SAP investment Application Portfolio Management Continue supporting the broader ICT for development agenda in economically disadvantaged communities through the Joburg Broadband Network Project Continue to collaborate with the DED for a successful implantation of the FTZ project Continue providing and refining the architecture, infrastructure and services to support collaboration across the city and its partners, other government entities, customers and suppliers Continue collaborating with the CoJ 2010 Office and other stakeholders to deliver on the 2010 Systems and Information Technology and Telecommunications requirements 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA Develop and enhance Programmes for efficient and improved service delivery Implement an Enterprise Systems Framework for the CoJ and MEs (GIS/Spatial Information Project) Continue with the operation of the CIO Forum with the focus on ensuring that there is synergy, transparency, communication, collaboration, economies of scale, and no duplication between the City’s and ME ICT initiatives Implement an Enterprise Systems Framework for the CoJ and MEs (GIS/Spatial Information Project) The main intention for this initiative is to support the changing business needs through: Designing and implementing a Baseline Enterprise Architecture to support the changing business environment Enabling the application, infrastructure and service change strategy Enabling an Enterprise Knowledge Management environment Innovation and Knowledge Management Implementation of the Knowledge Management Business Case Implementation of the Knowledge Management Business Case Deliver the business intelligence the COJ requires to enable the best possible governance decisions to be made Deliver forums and technology to facilitate the creation and promotion of learning, sharing and informed culture Promote good governance and create learning, sharing and informed culture with the aim of transforming the City of Johannesburg into a worldclass African City through the innovative use of technology, information and knowledge (As part of 2008/09 innovation initiatives, we plan to address the ‘silo thinking’ practice in order for the city to achieve increased levels of integration necessary for the IDP as well as integrated business planning processes.) Number of CoJ service delivery challenges identified the ideation programme A Consolidated KM Business Case was developed during 2007/08 which outlined interventions required within the city in relation to the effective practice of knowledge management The business case also included findings of a Knowledge Management Awareness and Capability Project which provided clear recommendations on some of the short-term and immediate organizational needs related to knowledge management One of the recommendations was a need for the development of a highlevel 3-year (2008 – 2011) knowledge management implementation blueprint to support GDS/IDP deliverables During the development of the 2008/09 JIKE scorecards, the following KM deliverables were 179 The (GIS/Spatial Information strategy project has been initiated together with the DP&UM Department. The spatial information strategy information policy project definition workshop was held on 18 September 2008 and the draft project definition report is in distribution for comment Continue with the operation of the CIO Forum with the focus on ensuring that here is synergy, transparency, communication, collaboration, economies of scale and no duplication between the ME’s and the City’s initiatives Continue with the implementation of the CoJ Innovation Strategic Framework as part of promoting collaboration and harnessing the innovation potential of the city more effectively Implementation of an integrated Knowledge Management solution tool across CoJ core departments and municipal-owned entities enabling capturing & dissemination of up to date strategic organizational knowledge repository ensuring the storage and reuse of the city’s institutional memory Continue promoting a culture of team learning in partnership with Corporate Human Resources through structured workshops for employees on KM Frameworks which will empower participants with relevant skills and knowledge to implement and sustain major knowledge management initiatives Continue with the implementation of the Ideation Programme that encourages innovative thinking and finding creative solutions of addressing key service delivery challenges faced by the City Continuous improvement in documenting KM Case Studies of key 5-YEAR STRATEGIC OBJECTIVES 180 IDP PROGRAMME AND KEY ACHIEVEMENTS included as part of the KM Business Case milestones to be implemented Identification & collection of strategic CoJ Knowledge repository for central storage & reuse as part of institutional memory Development & implementation of an Action plan on how to ensure integration of city initiatives through the provision of relevant knowledge content, decision support, knowledge processes and knowledge capacity across the city and municipal-owned entities (improved KM Portal) Procurement of appropriate KM tool that will CoJ to manage its knowledge assets effectively whilst also creating a platform for seamless knowledge sharing and promoting a culture of learning Development and implementation of a matrix tool for capturing and sharing key learning’s from various study tours undertaken by the city’s leadership and senior officials Development & implementation of comprehensive integrated Innovation Strategy which will assist with promoting innovation through mentoring as well as addressing innovation barriers, craft end-to-end innovation process including development of innovation measurement mechanism and sustainability A consolidated Report on which we piloted the Ideation methodology in investigating possible solutions to five identified city service delivery challenges during 2007/08 was finalized and distributed to relevant internal stakeholders We provided the facilitation during the piloting of the ideation methodology and ensured that Ideation champions from the different departments committed to a plan of action regarding the actual resolutions of the identified challenges 2009/10 DELIVERY AGENDA CoJ service delivery initiatives as part of the city’s institutional memory programme 5-YEAR STRATEGIC OBJECTIVES 100% City of Johannesburg and MEs compliance with all relevant legislation IDP PROGRAMME AND KEY ACHIEVEMENTS Legal Compliance programme 2009/10 DELIVERY AGENDA Compliance monitored in accordance with legislation against a compliance register Legal opinions and advice were provided in respect of potential risk areas to ensure full compliance with legislation and to prevent any legal risk First quarterly group report (Core City departments and its MEs) in the process of being prepared The financial interests register being updated in respect of Core City Officials and their direct reports up to level 4 Fruitless and wasteful expenditure is monitored and reported Legal Compliance programme 100% protection of City’s legal rights and interests to prevent negative financial implications Legal Support programme Legal Support programme 181 Achieve compliance with new identified critical legislation by all departments and MEs Identify recurrent new areas of noncompliance, establish the reasons and ensure that corrective measures are implemented Quarterly group reports (Core City departments and MEs) to be drafted on an ongoing basis in order to identify critical new areas of noncompliance, indicating the effect and implications thereof on the Compliance Register On an ongoing basis, update register and monitor financial interests of Core City Officials up to level 5 and expand register to include MDs of MEs and their direct reports. Further ensure that it is reviewed and compared against supplier database in order to ensure that contracts are not entered into where family members have an interest in such companies Improve measures to prevent, monitor and report on fruitless and wasteful expenditure All legal opinions completed within the agreed timeframes and in accordance with brief received from client in terms of applicable legislation Ensure that policy (in terms of legal advice given) is being adhered to and that legal procedures are followed Quarterly report being done to advise the Mayoral Committee which areas and issues gave rise to litigation Human Resources and Constitutional matters were identified as new areas that gave rise to litigation and relevant stakeholders and bodies were engaged Prepared presentations and briefed all departments in terms of constitutional challenges Legislation was identified and amendments formulated. Meetings to be held with Provincial and Government Departments to discuss Inner City Charter commitments completed and 2010 by-laws in promulgation process 4 by-laws in the process of being drafted Further improve the rendering of legal advice and opinions by continuous legal development and briefing to client departments Devise damage control mechanisms where approved policies were not adhered to despite advice that was given in terms of the approved legal guidelines and ensure timeous intervention by bringing matters to the attention of the City Manager Advise Mayoral Committee strategically on new areas and issues that give rise to litigation and submit quarterly reports Identify additional new areas that give rise to litigation and engage relevant stakeholders and bodies Identify new constitutional or other legal challenges, prepare presentations and brief departments and ME’s so that pro-active measures can be put in place Identify new legislation, formulate amendments where necessary, liaise with affected departments and discuss proposals with other spheres of Government in order to reach consensus before promulgation. Review impact of new legislation and 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA Legal Executive decision-making Support programme provide training where necessary Monitor implementation of Inner City Charter commitments and advise 2010 Unit pro-actively Monitor implementation of by-law programme by reviewing existing or drafting new by-laws Legal Executive decision-making Support programme 100% provision of secretarial support programme to Mayoral Committee and Subcommittees Increased % of residents who are aware of the opportunities to participate in planning and service delivery (annual survey) Increased % of residents who say they have engaged in the City’s ward planning, GDS and IDP community participation processes, and service delivery processes (annual survey) A seamless strategic and integrated planning, budgeting Additional improvements to be identified and implemented on systems for agenda and minutes and flow of reports Monitor implementation of decisions to ensure that City’s Integrated Development Plan is updated accordingly Report quarterly on implementation of decisions to keep abreast of developments Monitor reports submitted to Mayoral Committee and ongoing executive business tabled in Council Public participation improvement programme Public participation improvement programme Strengthen the mechanisms by which the results/outputs of community participation processes influences policy-making, prioritisation, resource allocation, planning and administrative action Conceptualise and implement Phase 3 of the Community Based Planning (CBP) process Completed conceptualisation and initiated implementation of Phase 2 of the Community Based Planning (CBP) process Integrated planning and performance management programme Integrated planning and performance management programme 182 Systems have been improved to ensure seamless flow of reports Improved tracking system linked the decisions to performance management systems and the City’s Integrated Development Plan Done quarterly reports on the implementation of decisions Executive business tabled in Council was monitored on a monthly basis and reports submitted to Mayoral Committee were monitored biannually Continue to refine the integrated strategic planning, integrated development planning, business planning, budgeting and target setting process Commenced review of the 2009/10 Integrated Development Plan (IDP) Initiated facilitation of 2009/10 departmental business plans Have not commenced work on the 2009/10 Service Delivery and Budget Implementation Plan (SDBIP) Continue annual strategic planning processes Review and approval of the 2010/11 Integrated Development Plan (IDP); Facilitation of 2010/11 departmental business plans; and Formulation and approval of 2010/11 Service Delivery and Budget Implementation plan (SDBIP) 5-YEAR STRATEGIC OBJECTIVES Clear progress on making the Global City Region idea a practical reality 183 IDP PROGRAMME AND KEY ACHIEVEMENTS Build an IDP programme implementation monitoring and oversight system 2009/10 DELIVERY AGENDA Continue to focus on the link between IDP programme commitments and reporting in the SDBIP and Annual Report Initiated new format quarterly SDBIP performance reports (including midyear report) Substantial progress on 2007/08 Annual Report Continue to strengthen the performance management system (PMS) Initiated the revision of the PMS Initiated process for alignment of performance management system of municipal entities with the City’s PMS Work underway to develop and institutionalise the use of an effective tool for collecting, collating and analysing performance data to ensure effective performance monitoring and reporting (that is compatible with the SAP system) Undertaking key performance management process (reviews, scorecard Through targeted troubleshooting arrangements, deal timeously and effectively with evidence of deteriorating performance to proactively avoid administrative and service breakdowns Work initiated for pilot peer review process Global City Region (GCR) programme Assist where required with the finalisation of a Gauteng Global City Region Strategy Within the framework of the intergovernmental arrangements established by the Strategy, work concretely with other municipalities and provincial departments on a key set of large five-year projects Incorporating lessons from the project approach, work with other municipalities and other spheres of government to develop intergovernmental delivery platforms (involving joint planning, implementation and spending) that will enable better co-ordinated development in future Build an IDP programme implementation monitoring and oversight system Continue reporting against IDP programme commitments in the SDBIP and Annual Report Development of quarterly SDBIP performance reports (including midyear report) Development and approval of Annual Report for 2008/09 (full audit by AG) Continue to strengthen the performance management system (PMS) Ensure effective functioning of the Performance Audit Committee and Performance Evaluation Panel Further implementation and consolidation of revised performance management policy Implement the performance management framework of municipal entities with the City’s PMS Consolidation of tool for collecting, collating and analysing performance data Facilitate key performance management processes Implementation of peer review process, taking into account the pilot Global city region (GCR) programme Internal processes/ communication of GCR initiative Assist on finalisation of Gauteng 2055 strategy Participation in revision of GCR Roadmap Participation in OECD territorial review Continue to play an active role in GCR processes Implement a CoJ GCR programme 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS With other stakeholders decide on the future functional integration of key local and provincial economic development agencies (e.g. tourism agencies) 2009/10 DELIVERY AGENDA Provide strategy and policy support to politicians and administration Participated in various provincial processes Convened a Mayoral GCR discussion and finalised approach at Mayoral Committee Strategy and Policy enhancement programme Strengthen and support Inner City development Substantial progress on finalisation of Executive Mayor’s Mid-Term Report Initiated process for the next revision of the Growth and Development Strategy Various requests by Executive Mayor and City Manager have been responded to Undertake strategic planning for 2010 in order to ensure that it leaves a legacy and that contributes to the City’s IDP and GDS 184 Inner City Charter Partnership Forum processes (including tracking of Charter progress) Expand and enhance strategic information holdings Continue to develop customer satisfaction surveys Initiated process to develop and implement a systematic programme to build holdings of strategic information/data collected internally and by selected external bodies No progress on critical assessment of years of customer satisfaction survey data against evidence of service delivery successes Strengthen the City’s governance model through prompt response to political and administrative requests Continue to drive Inner City Charter Partnership Forum processes (including tracking of Charter progress) Continue to support selected Inner City Charter commitments (e.g. bad buildings strategy) Develop policies and strategies to guide City’s planning through provision of well researched quality data and develop an integrated platform to enable central access to strategic information collected at multiple points across the City Strategy and Policy enhancement programme Discussions held with 2010 office to ensure delivery of CSU 2010 commitments Initiate work on the Executive Mayor’s end of term report Implementation of Executive Mayor and City Manager's requests for policy and strategy development Lilongwe mentorship 2010 case study for the 2009/10 financial year 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS Ensure the inclusion of GDS principles in the City’s planning through proactive promotion of GDS principles 2009/10 DELIVERY AGENDA Initiate research programme to enable review of Growth and Development Strategy On going work to ensure inclusion Active and mutually beneficial interactions with identified sister cities Strategic, Systematic, beneficial and co-ordinated International Relations programme Strategic, Systematic, beneficial and co-ordinated International Relations programme Well established Protocol programme All local governments throughout the world are facing similar challenges: rapid urbanisation, depleting resources, and ongoing demands for improved service delivery. This suggests that there is much that municipalities can share. Foreign cities, supported by national governments are eager to share information with the City of Johannesburg as the gateway to Africa and as a premier city on the Continent. Co-operation has taken place in three ways: Twinning agreements; Project co-ordination; and Information sharing. During the period under review, the City of Johannesburg has entered into five formal partnerships, four project-level partnerships, and six partnerships devoted to research. An additional formal partnership is in the planning phase. Currently, the City has: 5 formal partnerships 1 pending formal partnership 4 project-level partnerships Approximately 8 partnerships in discussion or research 2 newly identified partnerships Effective and streamlined Protocol arrangements throughout the City 185 Support the Executive Mayor on protocol-related matters as well as established and strengthen relations with the Diplomatic Corps Consolidate the African Agenda Facilitate implementation of existing Twinning Agreement Co-ordinate all international engagements Resource mobilisation for partnership projects Continued advice and strategic support on External Relations to the City of Johannesburg Strategic engagement with and participation in Multilateral Organisations Facilitate twinning with rural municipality in SA Effective and streamlined Protocol arrangements throughout the City Provide Protocol support for the city of Johannesburg 5-YEAR STRATEGIC OBJECTIVES Strong Inter-Governmental Relations Ensure effective interface between the administration and Political Office Bearers IDP PROGRAMME AND KEY ACHIEVEMENTS Implementation of Inter-Governmental Relations Framework Act through the City’s IGR Strategy 2009/10 DELIVERY AGENDA The section has a draft MoU with GSDM; as well as developing a project cooperation with Naledi (NW) The section engaged with the other three rural municipalities in draft areas of cooperation Further, the section is charged with Implementation of Thusong Centre in Maponya Mall in Soweto. The section has also managed to engage with DLG to prevent future intergovernmental disputes that might lead to litigation. The section participates actively in GCR and brief city on developments. The section has also assisted with CoJ participation in SALGA Gauteng and national processes in support of EM being Chairperson thereof. Administration and Political interface programme Administration and Political interface programme Ensure execution of responsibilities as Political head of the City including monitoring and reviews Support the Executive 186 Monitoring meetings between the Executive Mayor and Members of the Mayoral Committee and the City Manager are taking place as per the year planner. Regular meetings are taking place in line with the year planner between the Executive Mayor, Members of the Mayoral Committee and the City Manager and relevant Heads of core departments and Municipal Owned Entities Implementation of Inter-Governmental Relations Framework Act through the City’s IGR Strategy Co-ordinating of inter-governmental project Inter-governmental participation Monitoring and evaluation of ER programmes/project Continue ensuring that the Executive Mayor is capacitated to deal with the demands of the Confederation Cup and 2010 FIFA World Cup Improve agenda setting process for Executive Mayor and MMC interfaces Improve interaction between the Executive Mayor and Mayoral Committee with members of the Community and other stakeholders. (Mayoral Roadshows, Community meetings, Stakeholder forums. Executive Mayor’s Support programme Executive Mayor’s Support programme Mayoral Committee and its subcommittees meet regularly as per year planner Council and its committees meet regularly as per year planner Performance Management Panel to monitor the City’s performance is help as per the prescribed cycle. All section 57 employees are assessed accordingly Interface between the Executive, Party (ANC) and the Speaker takes place regularly in a structured manner Interface between the City and members of the community and other stakeholders takes place regularly in the form of individual meetings, community meetings, site inspections and through Mayoral Road Shows Executive Mayor Support Strengthening Organized Intergovernmental integration and alignment through co-ordination and participation Strengthening ways for Executive Mayor to perform his duties as Chairperson of SALGA and coPresident of UCLG and board member of ICLEI and other organised local government structures Strengthen interaction between the City and ANC Regional Office through alignment of activities Executive Mayor Support 5-YEAR STRATEGIC OBJECTIVES Mayor’s external Political Interface IDP PROGRAMME AND KEY ACHIEVEMENTS programme 2009/10 DELIVERY AGENDA Support the Executive Mayor’s Social Responsibility Working relations functioning well between the Private Office and SALGA National office. Strategies worked out on how to support him as the Chairperson of SALGA and coPresident of UCLG and other organised local government related programmes Relationship established with the ANC regional, provincial and national office to ensure effective support to the Executive Mayor in his government role and as Chairperson of the Region Support programme to the Executive Mayor programme Strengthening Organized Intergovernmental integration and alignment through co-ordination and participation Strengthening ways for Executive Mayor to perform his duties as Chairperson of SALGA and coPresident of UCLG and board member of ICLEI and other organised local government structures Strengthen interaction between the City and ANC Regional Office through alignment of activities Support programme to the Executive Mayor Fulfil FIFA’s contractual requirements (Compliance) Soccer City Stadium Perform his Social Responsibility as the Executive Mayor to the residents and citizens of Johannesburg as and when it is necessary Soccer City Stadium Reconstruction of the entire stadium 62% complete, scheduled for completion in July 2009 Ellis Park Stadium 85% complete, scheduled for completion in January 2009 Construction of an evacuation tunnel 2500 parking bays added Turnstiles and replacement of seat Soccer City Precinct Soccer City Precinct 187 Soccer City Precinct 32 % complete Pedestrian Promenade Completion date is June 2009 Public Transportation Hub. Completion Date is July 2009 Golden Highway Middle Section New Nasrec Train Station .The final completion date for the station is proposed to be on the 30th September 2009 Nasrec BRT Link Phase 1 & 2. Phase 1 has been completed Phase 2A: Contractor appointed, now waiting for Taxi industry to agree on site access. Phase 2 B: Contractor appointed, also waiting for site access once agreement is reached. Overall Construction progress is 40% Land procurement is complete. Offsite manufacturing of materials is underway. Overall construction progress is 40% Land procurement is complete. Demolition work on site is 60% complete. Overall Construction progress is 20%. Contract Award has 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS taken place. Land procurement is complete (with exception of Public Works Land) Construction progress is 0%. Hazard and risk assessment report has been completed by Metrorail Application for demolitions has been approved by IPMS A total of 42% of the overall budget has been spent to date Ellis Park Precinct 188 Bertrams Road Upgrade Construction of 1250m BRT route with 1 mixed & 1 BRT lanes. Completion date: 30 April 2009 .Demolition is at 80%, clearing and grubbing at – 100%, Earthworks – 39 %, Earthworks – 100%, stormwater drainage – 98%, Earthworks – 56%. Kerbing: Saratoga road 95%, Demolition 100%, Clearing and grubbing - 100%, and Earthworks 38% Saratoga Ave Construction of 770m BRT route with 1 mixed & 1 BRT lanes in each direction. Completion date: 30 April 2009 Smit/Wolmarans Construction of 1300m long BRT route with 2 mixed & 1 BRT lanes each direction. Completion date: 30 April 2009 S/E Gateway to Mooi Works currently out to tender Northern Gateway Construction of 800m BRT route. Doornfontein Transport Square Construction of a public transport facility to accommodate taxis and buses during events. Ellis Park Sports Precinct Construction of the area between Ellis Park and Johannesburg Stadiums to comply with FIFA requirements. Completion date: 15 March 2009 Upgrade of the Concourse and Currey street Completion date: 30 April 2009 Doornfontein and new Doornfontein Precinct Urban Upgrade. Completion date: 30 May 2009. Upgrading of Parks i.e. Morris Freeman Completion date: 30 May 2009. Upgrade of Fuller, Appolonia and associated streets. Completion date : 30 April 2009. Doornfontein Train Station Expected date of completion: end of April 2009.The design progress 2009/10 DELIVERY AGENDA Ellis Park Precinct 5-YEAR STRATEGIC OBJECTIVES 189 IDP PROGRAMME AND KEY ACHIEVEMENTS report: Architectural Design development is almost complete subject to minor iterations. Working documents – 80% Drawings issued to date – 70% 2009/10 DELIVERY AGENDA Civil and structural: All structural steel shop drawings have been approved Re – routing of stormwater has been designed and completed Electrical DB line drawings have been issued to the electrical sub-contractor Lighting specification are being reviewed in line with the overall project value engineering principles Mechanical CCTV and turnstiles - Intersite is currently in discussions with a supplier to consolidate all current running projects to be installed y such a company. Construction Progress Report: Site establishment and Demolitions – 100% Zone A1/A2: Slab casting – 100% Zone B1/2: Columns – 70% International Broadcasting Centre and ICT International Broadcasting Centre and ICT The city has now officially been awarded the right to host the IBC in Johannesburg. The City has signed the agreement for the IBC with the LOC and the draft back to back agreement with Joburg Expo Centre. The City has entered into an agreement with the management of the Johannesburg Expo Centre for the use of the Expo Centre facilities for the upgrading and temporary refurbishment for use as the IBC. This includes the development outside the IBC which will have 500 accommodation rooms in the form of a hotel and 2 apartment blocks, A project management professional team has been appointed for the IBC upgrading project. The team has carried out a survey if the total facility, the state of each of the buildings and the work required to bring them to the required standard and state. A project plan has been compiled detailing all these requirements and the programme for the implementation. Work will be programmed from the second half of 2009 as the Expo Centre must be allowed to operate normally for as long as possible before the handover of the IBC to FIFA and Host Broadcast Services (HBS). Bills of quantities will be compiled by January 2009, with the Majority of the works starting after the Rand Show in April 2009. The works are to be International Broadcast Centre (IBC) -. It is expected that in excess of 3500 local and international journalist will set up camp at the Johannesburg Expo Centre. Telkom is laying up connectivity whilst Sentech is developing a redundancy farm to ensure that the matches are beemed to the millions of fans that will be watching the event. Plans for a housing development and hotel are in the development stage. The infrastructure developments that are being done in the area and the Johannesburg Expo itself will leave a lasting legacy as the connectivity within the area will attract industries such as Film industry, BPO sector , Internet sector location of the IBC as the communication centre and hub for the event is a catalyst for the expected future business development in the area. The IBC’s infrastructure legacy will provide an opportunity for the NASREC area to make a huge leap forward from an historical under-developed situation to a state-of-the-art integrated mixed use node with high tech industries, in a very short timeframe. The injection of significant infrastructure and a vastly improved image will leapfrog the area to beyond where it could ever expect to develop, and where it should be, by the second decade of the 21st century, in a few short years. 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS completed by December 2009 to allow for the facility to be handed over to HBS on 01 January as per agreement with FIFA. A scoping exercise as well as a feasibility study of the information technology and broadcasting infrastructure will be conducted to recommend the best longterm usage of the property and maximisation of the investment being made to upgrade the IT infrastructure. A development programme has been finalised for the upgrading of the Expo Centre facilities to bring them to the standard required by FIFA. The main works will commence in April / May 2009 after the Rand Show and will be completed before the end of December 2009. The facility will be handed to FIFA in January 2010. Stadium & Stadium Precincts. Soccer City Stadium & IBC - Telkom's redundant connectivity links Ellispark Stadium - Telkom's redundant connectivity links . Fan Parks Innes Free park 190 2009/10 DELIVERY AGENDA Two of the key industries expected to locate to the node are call centres, based on the telecommunications strengths, and film studios, based on the broadcasting and connectivity strengths The film and video industries are to be targeted, and with the broadcast facilities and connectivity capacity, the video and film industries would be able to serve as filming and editing centres for the world. This coupled with the strong general film support industries in Gauteng and support from the Gauteng film office, is expected to attract an entire node of film and related industries to the precinct with all the elements required for film production on one site. Many other businesses, especially those in knowledge industries and industries which are large ICT users (financial, etc), are also expected to be attracted due to the proximity The satellite and telecoms infrastructure will also allow for more, better and cheaper connectivity particularly for nearby Soweto which has poor telecommunications services and penetration, but also for the rest of Johannesburg and especially the lesser developed southern areas. The communications infrastructure will also be used to support the City’s broadband network project which will support the delivery of key local government services such as traffic, security, education, information etc. The greatest benefit of the infrastructure legacy of the IBC set-up is expected to be its catalytic effect on property development and business growth in the area and to skilled available (unemployed) labour in the area. Both the connectivity with all its possible spin off services and industries and the related training will continue to re-enforce and support the Smart Province vision for Gauteng. It is envisaged through the IBC project that 60 or more South African media students and creating an education and training programme for them with invaluable work experience in the IBC and with FIFA’s appointed broadcast rights company HBS, before and during the event. This will be an unprecedented experience for these students and equip 60 people to be world class broadcast media experts in South Africa It is anticipated that a number of media and communication education and training institutions will use both the opportunity of the IBC and the communications infrastructure to provide experiential learning opportunities for their students in the future Fan Parks 5-YEAR STRATEGIC OBJECTIVES 191 IDP PROGRAMME AND KEY ACHIEVEMENTS The area was identified and confirmed as the best place for a FIFA contractual Fan Park for the following reasons, The location is accessible by foot for international guests staying in Sandton, Rosebank and will link conveniently with residents in Midrand, Alexandra, Diepsloot `and Ivory Park. The area can accommodate up to 30 000 people. The backdrop of Sandton skyline is virtually attractive and the site is clean. Challenges identified include the small community of people resident in a fenced area of shacks within the park and the difficulty of crossing the busy road by pedestrians who stay in Alexandra. City Parks is currently busy with a plan on how to address the issue of the community. Processes and plans are being investigated to find solutions to the challenge posed by the pedestrians that will be walking from Alexander. Mary-Fitzgerald square The area is centrally located to cater for Inner City fans and residents as well as other peripheries. The proximity to the Johannesburg Park Station and other routes was also considered as an added advantage. It is 5km to Ellispark and approximately 15 km to Soccer City and the site has hosted various events of almost similar nature. The site was not approved as the contractual Fan Park, but recommended as a Public Viewing site as the area was considered as too small since it could only accommodate 22 000 people. The fact that additional people can be accommodated in the adjacent site was also considered. Walter Sisulu Square It is a new facility and situated in an iconic location in Soweto, incorporating an interesting memorial to the signing of the Freedom Charter. The area has got the potential to attract lots of international fans and visitors due to its location and history. The challenge with the venue is the proximity of various shops including banks and a hotel. It also has a limited space that can only accommodate 10 500 people and the dominance of Acacia trees has contributed to that. The LOC /FIFA board has, furthermore approved that COJ should have two FIFA official Fan Parks. Elka stadium was inspected on September 22, 2008, and approved as the second Fan Park The following venues were confirmed: Fan parks Innes Free Park in Sandton , North of Joburg Elka Stadium in Soweto , South of Joburg Public Viewing site Walter Sisulu Square in Soweto Mary Fitzgerald square in the Inner City FIFA FAN PARKS FINANCIAL TERMS. 2009/10 DELIVERY AGENDA 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS The Terms of Co operation makes provision for the discussion around Financial Terms on how the funding of the Fan Parks is structured and the roles and responsibilities between the City as a Host City and FIFA / LOC. The Financial terms are divided into two categories namely budget dealing with venue specific costs e.g. Hospitality, Insurance, Safety and Security, cleaning, sanitation, stage programs as well as local PR. The other category deals with Operational Costs and Funding by FIFA/ LOC. The aforesaid is summarised as follows, LOC / FIFA Funded Projects Giant Screen, main stage, screen and stage construction, sound and light system, technical personnel, Global PR Branding Host City Funded projects Local event management company Additional screen, video directions, camera equipment, scaffolding etc Fencing, security, utilities, cleaning, toilets, etc. Local PR / Communication Additional branding Entertainment on match days and nonmatch days. The negotiations with regard to Financial responsibilities are on-going and will report on progress in the next quarterly report. Safety & Security The Joburg City Safety Programme (JCSP) continues to works towards consolidating the gains made during the 07/08 financial year. A key activity for the first quarter focused on the joint development of the City of Johannesburg’s 2010 FIFA World Cup™ Safety and Security strategy. This was done in conjunction with the SAPS Provjoint and the LOC. In this regard, one of the key activities undertaken by the Joburg City Safety Programme for the first quarter of the 2008/2009 financial year involved facilitating the development, in cooperation with the SAPS Provjoint, of the Operational Plans for the 2009 FIFA Confederations Cup and 2010 FIFA World Cup Venues in the City of Johannesburg. This process was carried out through the newly established “COJ Integrated Public Health, Safety, and Security 2010 Working Committee”. In pursuance of its goal of ensuring the readiness of the City of Johannesburg to host the respective events, the above-mentioned Operational Plans had to be tested in a ‘live’ environment. As such, the safety and security Operational Plan for the 2009 FIFA Confederations Cup and 2010 FIFA World Cup for the Ellis Park Stadium was tested on the 30th August 2008 during the 192 2009/10 DELIVERY AGENDA Safety & Security 5-YEAR STRATEGIC OBJECTIVES 193 IDP PROGRAMME AND KEY ACHIEVEMENTS Vodacom Tri-Nations rugby match between South Africa and Australia. In order to host “the best ever FIFA World Cup” it is necessary to test the city’s readiness. The aim of the rehearsals is to start the integration between the elements of the transportation system and the traffic control measures implemented by the South African Police Services (SAPS), Johannesburg Metro Police Department (JMPD), Emergency Management Services as well as functions from other role players. Coordination between these areas is essential in the successful delivery of transportation services at major special events. The rehearsals provided an opportunity to identify gaps and make recommendations for future events. The following City MEs, Departments, and external Organizations were involved in the rehearsal: South African Police Services (Various Units) JMPD COJ 2010 Office Ellis Park Stadium Johannesburg Roads Agency COJ Transportation Pikitup City Power Joburg Water City Parks Emergency Management Services - COJ Emergency Management Services – GPG Environmental Health COJ 2010 Marketing and Communication 2010 Local Organising Committee Diligence Security Knight Event Management NEMS Events Medical Services CCTV Control room The above-mentioned exercise was used by the 2010 Office, the Department of Transport, the SAPS and the JMPD as an opportunity to test the key operational areas noted above. This event represented a huge undertaking for all stakeholders, and was important in determining the necessary preparations for the 2009 FIFA Confederations Cup and 2010 FIFA World Cup. International cooperation A key focus area of the Programme during the first quarter was also to cement relationships which have been established so as to provide for regular interchange of ideas in terms of safety and security best practices, particularly as they relate to the 2009/10 DELIVERY AGENDA 5-YEAR STRATEGIC OBJECTIVES Deliver an outstanding fan experience (Leverage) IDP PROGRAMME AND KEY ACHIEVEMENTS hosting of major sporting events. Some of the key agencies interacted with are the German Law Enforcement Agencies who were largely responsible for ensuring safety and security for Germany 2006 as well as with the United Nations Interregional Crime and Justice Institute. The aim is to develop the necessary capacities within the JMPD in order to ensure the successful management of the respective events. Supporting Infrastructure Existing infrastructure has been analysed against requirements for each of the facilities ie City Power, Water and Pikitup Marketing A service provider o be appointed to undertake the marketing activities leading up to 2010 Ticketing The prices and categories for tickets for the 2010 FIFA World Cup™, as elaborated by the ticketing sub-committee set up jointly by FIFA and the South African Local Organising committee (LOC), were approved by the Organising Committee for the FIFA World Cup, under the chairmanship of FIFA vice-president Issa Hayatou. Overall, the ticket prices for the 2010 FIFA World Cup™ are comparable to 2006 prices with an average of USD 139 per ticket compared with USD 136 (adjusted for EUR to USD exchange rate conversion) in 2006. The ticketing proposal was elaborated jointly by FIFA and the South African LOC. The prices which range from USD 20 for a category 4 ticket for a group stage match to USD 900 for a category 1 ticket for the final reflect FIFA’s positioning of the FIFA World Cup™ as a premium international sporting event, yet also take account of the South African market. In 2006, the cheapest ticket cost EUR 35 (approximately USD 51). Category 4 tickets are to make up some 15% of the total inventory of an estimated 3 million purchasable tickets and will be sold exclusively to those living in South Africa. With these tickets, FIFA and the LOC intend to enable South African residents on low incomes to attend matches. As well as being a premiere in terms of its setting on the African continent, the 2010 FIFA World Cup™ will also mark a first with a FIFA-initiated ticket fund consisting of tickets that will be distributed on a complimentary basis. As part of the overall ticketing operation, 120,000 category 4 tickets will be allocated to this ticket fund, which will offer them on a complimentary basis to 194 2009/10 DELIVERY AGENDA Marketing Ticketing 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS fans in South Africa so that they can witness the world’s largest single-sport event at first hand. The ticket fund will consist of a certain number of tickets for all matches, from the opening game right up to the final. The tickets will be distributed free of charge by FIFA, the South African LOC and FIFA Partners adidas, Coca-Cola, Emirates, Hyundai/KIA, SONY and VISA to South African residents through a special programme that will form part of a social responsibility initiative and act as a “catalyst" for sustainable change. Tickets will go on sale in several phases, starting around the beginning of February 2009. As in the past, tickets that are not be bought by various stakeholders such as FIFA member associations will subsequently be put on sale to the general public. The 32 participating member associations will be offered 12% of the purchasable tickets for each of their matches (previously 8%) in the group phase and an average of 8% in the knockout phases. While category 4 tickets will be sold exclusively to South African residents, tickets in categories 1, 2 and 3 will be sold on a worldwide basis, both on the international and domestic South African market. The ticket distribution system will be finalised at a later stage, with the internet playing a major but not an exclusive role. All transactions involving tickets in categories 1-3 will be payable in US dollars, those in category 4 in South African rand. 2009/10 DELIVERY AGENDA Ticketing prices for the 2010 FIFA World Cup™ All prices below are in USD. Category 4 is reserved to South African residents and will be solved exclusively in ZAR. Match Cat. 1 1 450 2 - 48 160 49 - 56 200 57 - 60 300 61 - 62 600 63 300 64 900 Accommodation Cat. 2 300 120 150 200 400 200 600 Cat. 3 200 80 100 150 250 150 400 Cat. 4 70 20 50 75 100 75 150 MATCH is confident that as a result of its partnership with the Department of Environment and Tourism and its agencies, the Tourism Enterprise Programme, South African Tourism, South African National Parks (SANParks) and the Tourism Grading Council of South Africa (TGCSA), coupled with the support and cooperation of the owners and operators of hotels, lodges, guests 195 Accommodation 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS houses, bed and breakfast establishments and accommodation facilities in national parks, MATCH will be able to offer a wide range of sufficient and suitable accommodation to visitors for the event. Accommodation is made up of a mixture of hotels, bed and breakfasts, lodges and guesthouses. A tent camp will be established through a private sector partnership to offer accommodation and entertainment facilities to the visitors at own cost. City beautification Airport Branded Welcome/Info Kiosks Street Lighting Road/Tourism/Heritage Signage Branding of Airport Entrances & Exits Hoisting of National Flags along Routes leading to & away from Airport Branding of Airport (e.g.) Foyer with Spectacular Image Wrapping of Trees with Decorative Lighting (e.g. Major & Protocol Routes) Major/Protocol Routes N1, N3, N12, N17, M1, M2, William Nicol, Grayston Oxford ,Soweto Highway, Old Potchefstroom, Nasrec road, Vilakazi Street, Mooki Street, Klipspruit valley etc. Landscaping (Flower Planting/Tree Wrapping,) Branding of Parks and Open Spaces Branding (e.g. Events Flags) Country/Events Flags Road/Tourism/Heritage Signage Refurbishment/Construction of Roads (e.g. Potholes, storm drains) Match & Training Precintcs Hoisting of Country Flags (NB. Exclusion Zones) Street Lighting Road/Tourism/Heritage Signage Landscaping Branding (NB. Exclusion Zones) Tidiness/Cleanliness Wrapping of Trees with Decorative Lighting Informal Traders Awareness Campaign on FIFA Regulations (e.g. Exclusion Zones, Ambush Marketing) Branding of Informal Traders Stalls/Trading Tents Inner City/Fan Boulevard/Walkway 196 2009/10 DELIVERY AGENDA City beautification 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS Decoration of Mandela Bridge with electrical 2010 Signage Road/Tourism/Heritage Signage Street Lighting % Branding of CoJ Buildings Refurbishing of Dilapidated Buildings (e.g. Inner City) Landscaping Branding along the Major Streets (e.g. Small, Elloff, Bree, Jeppe, Rissik, Main, Market, Commissioner, Sauer, President etc) Branding of Carlton Center Branding of Taxi Ranks, Bus Terminals & Train Stations (e.g. Park Station) Branding of Inner City Parks (e.g. Joubert, Ghandi’s Square, Library Gardens, Mary Fitzgerald Metro Center Precinct Hoisting of Country Flags) Tidiness/Cleanliness Regulation & Maintenance of hygiene requirements in Inner City Buildings, Buildings along Major/Protocol Routes, Buildings next to Stadia & Training Precincts Informal Traders Awareness Campaign on FIFA Regulations (e.g. Exclusion Zones, Ambush Marketing) Branding of Informal Traders Stalls/Trading Tents Places Of Interest Museums & Entertainment Zones: Hector Petersen, Africa Museum, Apartheid Museum Gold Reef ,Walter Sisulu Square Parks: Bruma Lake,Bez Valley, Emmarentia, Zoo-Lake ,Golden Harvest ,Little FallsRuimsig ,Botanical Gardens ,Thokoza Dorothy Nyembe Shopping Malls: Westgate, Sandton ,Jabulani ,Maponya ,Southgate ,Northgate ,Eastgate ,Fourways ,Cresta , Clearwater. Road/Tourism/Heritage Signage Street Lighting Branding (e.g. Events Flags, Live Outdoor Advertising) Country Flags Landscaping Tree Wrapping with Decorative Lighting Branded Information Kiosks Fan Parks & Public Viewing Sites Branding (e.g. Event Flags, Live Outdoor 197 2009/10 DELIVERY AGENDA 5-YEAR STRATEGIC OBJECTIVES Create long-term benefits for the citizens (Legacy) IDP PROGRAMME AND KEY ACHIEVEMENTS Advertising) Informal Traders Awareness Campaign on FIFA Regulations (e.g. Exclusion Zones, Ambush Marketing) Branding of Informal Traders Stalls/Trading Tents Tidiness/Cleanliness Transportation: Branding of 10% Metro busses Availability of 2 Metro Busses (e.g. No Roof ) for 2010 Stakeholder Mobilization Roadshows Branding of all COJ Fleet Bus Rapid Transit System Reported on above Diepkloof Hostel Diepkloof Hostel development – 84 units have been completed and handed over Province is funding the entire project 138 units still in progress with estimated completion by November 2008 Greening of Soccer Fields 42 fields have been identified for development in Johannesburg. Received R10m in 07/08 FY which was used for 12 fields Allocated R8m in 08/09 FY to be used for 10 fields The balance of the fields to be funded through the engagement of the private sector and budget allocations in coming FYs Soweto Theatre Soweto Theatre - To be developed as part Jabulani CBD project through a tender process. The successful bidder has indicated that they would build the Theatre at no cost to the City. Soweto Theatre - Construction to start in January 2009 for completion by March 2010 Indoor Sports Arena Indoor Olympic swimming pool and gymnastic area Conditional/provisional grant received from MIG Street Furniture Inner City Street Furniture as part of the inner city rejuvenation programme. Includes dust bins, benches etc Litter bins, informal trading stalls, street lighting, benches Inner City Street Furniture – 761 bins funded by 2010 Project Office around Ellis Park and Inner City 198 2009/10 DELIVERY AGENDA 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS Klipspruit River Greening and cleaning of Klipspruit River & tributaries - R14.2 spent to date R30m and R50 approved for 08/09 and 09/10 FYs respectively Work to be done in 08/09 FY include Buntu Kraal, Mofolo Park, 199 2009/10 DELIVERY AGENDA Health Sector Plan INTRODUCTION AND OVERVIEW The business planning process is done annually as part of strategic planning and sets the agenda for the upcoming financial year. The 5-year sector plan and its strategic objectives remain the focal point as it incorporates the political imperatives as well as the GDS principles. The strategic objectives and deliverables thus become pivotal in the development of the departmental service delivery plan and identification of key priorities for all managers and units. The finalized business plan is then utilized for development of the departmental scorecard, which then becomes the framework for all scorecards of Senior managers in the department. In the City of Johannesburg the challenges facing the health are similar to those facing the rest of the country and are made worse by historical factors such as fragmentation, inequity and lack of access to basic infrastructure such as health facilities, water, sanitation, etc. The Occupational Specific Dispensation (OSD) of the Public Service has negatively affected the Department’s attempts to recruit resulting in high staff turnover that tends to negate all the positive strides achieved. Despite these challenges, the Health Department has improved the TB cure rate and immunization coverage, and has increased the core package of services being provided at its clinics. The Department has also started piloting extended service hours in some of its clinics. In addition, the Department has in conjunction with NGO`s established 3 ART (antiretroviral treatment) and plan to increase these by 2 more sites in the 2009/10 financial year. The objectives within the health department are to increase access to services by making primary health care available to all citizens; ensure the availability of safe, good quality essential drugs in health facilities; and rationalise health financing through budget reprioritisation. The following key deliverables have been identified as areas that will receive specific attention in 2009/10: Strengthening primary health care through increasing service hours in selected regions, significantly reduce the number of mobile points clinics; facilitate functional integration and rationalisation of health facilities. Intensifying efforts in respect of HIV and AIDS through programme implementation and coordination with other spheres of government and non-governmental organisations (including business and community-based organisations. Improving access to antenatal care services, and improving the TB cure rates Strengthening the preventive and promotive health initiatives of the city through integrated health campaigns and outreach programmes. Consolidating the city’s focus on Environmental Health Services (Municipal Health Services) through promotional, educational and enforcement programmes. REVISION TO THE COJ 2006/11 IDP There has been no major change to the 2006/11 IDP programme except for the targeted efforts towards the HIV/AIDS prevention programme. The key focal areas for this programme include Jozi Ihlomile; Home based care outreach project as well as the construction of a clinic in Lawley in Region G. 200 HEALTH SECTOR PLAN 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA Environmental Health Plan to prevent and minimise environmental pollution Pollution, Prevention and Reduction programme Pollution, Prevention and Reduction programme Compliance monitoring of all identified sources of air pollution on an ongoing basis Air pollution emissions measurement Imbawula project Noise contouring requirements for new developments Noise compliance monitoring Water pollution monitoring Illegal dumping prevention programmes An integrated and wellresourced system in place for environmental health certification, monitoring and enforcement Environmental Health Risk Management programme Environmental Health Risk Management programme 201 50 identified households in informal settlements / informal food traders provided with smokeless imbawulas 7,786 diesel vehicles tested per annum for emissions 95% compliance to sampling protocol / programmes for the city – water quality management Statutory notices served on 100% of identified council-owned vacant properties where illegal dumping regularly takes place Statutory notices served on 100% of identified non- council owned vacant properties where illegal dumping regularly takes place 150 “No dumping” signs erected citywide on properties where illegal dumping regularly takes place Develop a seamless approach to health and safety surveillance so that there is a single point of certification (preferably one in each region) for buildings, food establishments, early childhood development facilities, other places of care, etc Within this seamless approach, further develop and maintain wellresourced and efficient systems of monitoring compliance and enforcement for food hygiene at food establishments; waste management at key points of waste generation; water quality; disposal of the dead at funeral undertakers and cemeteries; chemical safety; and general public health at highrisk buildings and premises Increase the number of environmental health officers in the field based on actual workloads Reduce the risk of vector-borne diseases through targeted vector control programmes in selected hotspots (key targeted areas to include: Alexandra) Develop a clear set of health and safety guidelines for all new CoJ capital projects, and ensure 100% compliance with these (as assessed through CIMS) A seamless approach to health and safety surveillance has been implemented and operationalised. No complaints or negative feedback has been received in this regards 100% implementation of a developed plan of a single point of certification 100% implementation of a system to monitor compliance and enforcement for all municipal health functions 20 Environmental Health Officers employed – subjective to availability of funds 8 pest control staff employed – subject to availability of funds One visit per year to mortuary / funeral undertaker One public awareness programme conducted per region on measures to control vectors 100% of identified hotspots sites serviced by vector control personnel 100% compliance of health and safety guidelines for all new health departments’ capital projects in the City 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA At a consistent rate of monitoring and enforcement, reduced incidence of noncompliance with environmental health regulations and set standards Environmental Health promotion programme Environmental Health Promotion programme To reduce the risks of potential outbreaks and effectively contain outbreaks when occurring One blitz per region focusing on nuisance buildings 100% of identified ECD facilities inspected One Training workshop in conjunction with Community Development on ECD legal requirements One campaign per region on chemical safety and lead awareness 2335 identified informal food traders trained city-wide Communicable Disease Outbreak Response Improvement programme Communicable Disease Outbreak Response Improvement programme 202 Within a seamless approach, promote environmental health and safety awareness and compliance in ‘nuisance’ buildings, ECD facilities, places of care, etc., to create environmental health awareness and compliance to legislation Working across City departments and with a range of external partners, assist proprietors and residents who have demonstrated need and limited financial capacity to upgrade to the applicable standards Run five city-wide campaigns to promote public awareness around the safe handling and storage of chemicals. Develop and run an ongoing health promotion and education campaign targeting food handlers Refine the health surveillance system, integrated with the City’s own disaster management response that is aligned with the provincial and national systems, with a focus on ensuring early warning on key risks and rapid responsiveness Identify areas of greatest risk in each region and institute preventative measures to mitigate communicable diseases Review systems and procedures to ensure immediate investigation of selected notifiable conditions. Co-ordinate and monitor outbreak response where necessary Health department’s surveillance system integrated into the CoJ Disaster Management System Mopping up activities undertaken in identified areas of low routine immunization coverage 100 % functional Outbreak Response teams in each region 100% of cases investigated and 85% reported within three working days 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA Improved awareness of HIV and AIDS risks, prevention methods and available services Women’s Health programme Women’s Health programme Reduce rate of HIV infections Three peer education programmes implemented in hostels 180 peer educators trained (including traditional healers) Three peer education programmes implemented in informal settlements Two youth programme implemented Three Commercial Sex Workers (CSW) programmes implemented (1 new) 100% of identified hotels with CSW supported as part of the outreach campaign – 100% of identified hotels with CSW with at least 1 peer educator each 50 new community-based condom distribution points established Two Additional sites per region distributing female condoms HIV Prevention programme HIV Prevention programme 203 With other City departments, conduct a two yearly Johannesburg-specific HIV and AIDS and STI prevalence, awareness and impact investigation, and use the information to assess the implications for (a) targeting of prevention campaigns and care services, (b) demand for household infrastructure services, and (c) the scale of the City’s social package Expand an ongoing programme of information provision and community mobilisation, with a special focus on peer education campaigns in hostels, (including males) informal settlements, commercial sex workers and amongst the youth Increase access to and promote acceptability of Voluntary Counselling and Testing (VCT), and Prevention of Mother to Child Transmission (PMTCT) Improve identification of and care for infants at risk of HIV and AIDS in and through facilities Improve integration between TB screening and VCT services, by ensuring referral between services within and across facilities 100% of fixed facilities (87 clinics) providing rapid on site HIV testing services 100% of fixed clinics (87 clinics) conducting PCR testing in children 100% of fixed clinics implementing INH preventive therapy 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA City-wide access to comprehensive HIV and AIDS support services to ensure effective medical care for people infected and affected by HIV and AIDS Medical Care and ART Roll-out Support programme Medical Care and ART Roll-out Support programme Develop and roll-out an integrated package of support to promote adherence to ART protocols (through, for example, education, nutritional support, improved transport access to ART dispensaries, etc.) Ensure availability and marketing of access to Post Exposure Prophylaxis (PEP) at all clinics, including traditional healers Strengthen syndromic management of STIs, and treatment of or referral for opportunistic infections Strengthen integration with TB control programme City-wide access to comprehensive HIV and AIDS support services to ensure effective community-based care for people infected and affected by HIV and AIDS HIV and AIDS Community Care and Capacity Development programme 204 Expand Jozi Ihlomile and other community outreach programmes that identify people / households in need, and provide HBC, referrals to services, etc With other departments, scale up nutrition programme such as the Food Bank to support individuals living with AIDS With other departments, introduce and roll-out targeted training programmes and technical support for households affected with AIDS, in order to enhance self-sufficiency in respect of nutrition through community gardens, etc With other departments, support orphans and child-headed households, inter alia by providing psycho-social services, facilitating access to schooling, etc Ensure that AIDS affected households benefit from the revised social package. Scale up PWA support to ensure 100% access in all wards 100% of regions with access to comprehensive HIV and AIDS management treatment programme in the CoJ 100% of fixed facilities (87 clinics) providing rapid on site HIV testing services 100% of fixed clinics that offer comprehensive ANC providing PMTCT services 100% of fixed clinics (87 clinics) conducting PCR testing in children One new anti-retroviral (ART) site established in CoJ One community awareness campaign in all regions to raise awareness on availability of PEP services 100% provision of comprehensive STI management at all fixed clinics 100% of fixed clinics implementing INH preventive therapy 50% newly diagnosed HIV positive patients tested for TB HIV and AIDS Community Care and Capacity Development programme Expand Jozi Ihlomile programme at two new sites (existing=18 sites) Implement outreach programme in Poortjie (Region G) Maintain Jozi Ihlomile programme at 18 sites One community HIV and AIDS forum established One new food garden per region in community-based facilities established 100% wards with access to PLHWA support groups and HBC programmes One HIV and AIDS community support and information centre established Two PLWHA forums established in the City 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA Monitoring the rate of CoJ staff absenteeism and departure attributable to HIV and AIDS Workplace Wellness HIV and AIDS programme Workplace Wellness HIV and AIDS programme Through a two-yearly workplace specific survey, establish the prevalence of HIV and AIDS amongst the City’s own staff; use this to assess the risk implications for service delivery operations, and undertake the necessary risk mitigation measures in response Expand prevention campaigns specifically targeting City staff Ensure 100% access to VCT services for City staff Across all City departments and municipal owned entities, facilitate staff access to comprehensive HIV and AIDS programme, including ART Increase access to extended EAP services for all employees 205 100% maintenance of workplace wellness, HIV and AIDS forums established (regions, departments and entities) 100% access to EAP for employees infected and affected by HIV and AIDS 100% compliance with minimum standards on HIV and AIDS in the workplace 100% of COJ departments / entities / regions conducting awareness programme to reduce / prevent risk and new HIV infections 100% implementation of integrated Workplace Wellness, HIV and AIDS programme by departments and regions 100% access to HIV and AIDS counselling services for COJ employees 100% access to comprehensive HIV and AIDS Management Treatment (including ART) to COJ employees 70 managers trained on HIV and AIDS programme 400 Workplace Wellness and HIV and AIDS peer educators retrained Three city-wide workplace HIV and AIDS awareness campaigns conducted Quarterly monitoring of the rates of absenteeism and departures attributable to HIV and AIDS 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA Equitable distribution of primary health care clinics and more convenient operating hours in clinics Primary Health Care Strengthening and Expansion programme Primary Health Care Strengthening and Expansion programme Improvement in perception of PHC services as measured by CoJ Customer Satisfaction Surveys Promote access and convenience by extending operating hours in clinics Extend satellite mobile points clinics into full five-day operating facilities On the basis of a PHC audit, ensure functional integration in services with provincial health facilities, and synchronise referral systems Undertake a five-year health facilities capital development plan Ensure adequate staffing in PHC facilities, and the multi-skilling of PHC staff Promote Patients' Rights Charter and Batho Pele principles through ongoing customer-care training Improve community involvement by facilitating the training and empowerment of community structures that liaise with clinics (including traditional healers) Assess waiting times in health facilities and proactively address causes wherever possible Implement a complaints management system, systematically monitor and assess the results, and take remedial action where necessary Promote early identification and referral of people with mental illnesses 206 Two additional clinics with extended service hours activated Two service points converted to fixed clinics 30% Implementation of the developed 3-5 CAPEX Plan including 2010 priorities % Implementation of completed annual PHC training plan (HRD plan) 10% annual increment on PHC clinically trained nurses from baseline One EMS training session per quarter 100% completion of revised PHC facility based organograms One staff satisfaction survey conducted to develop interventions to improve staff morale 50% Implementation of developed staff recruitment and retention strategy 100% regions with functional cost centres 100% service delivery points with monthly Laboratory control systems 100% service delivery points with monthly pharmaceutical stock control systems Less than 5% drug stock-out in customized EDL per region Not more than 5% shrinkage on pharmaceuticals at the central pharmacy and the clinics Quarterly waiting times’ assessments conducted at clinics 85% of ward health sector representatives trained Two information sharing workshops for community structures per annum, including traditional healers Monthly monitoring of implementation of complaints management system: response time and resolution rate (targets) as per criterion 90% of PHC staff trained in customer-care training % Improvement in Customer Satisfaction levels in PHC facilities as measured by annual survey 20% of clinicians trained in early identification of people with mental illnesses including Alzheimer`s disease % Capacitation of training and research unit 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA Improved TB cure rates across the city Tuberculosis Control programme Tuberculosis Control programme Strengthen TB treatment programmes to improve detection, reduce treatment interruption rates and improve cure rates Improve case holding through effective utilisation of Community Health Workers (CHW) As measured by a fiveyearly survey, improved community awareness of health risks, healthy lifestyle and the availability of services for chronic conditions Comprehensive and Integrated Health Promotion programme 207 Develop and run a proactive health promotion outreach programme from all fixed clinics, especially in informal settlements and other vulnerable communities, with specific targeted interventions for males Establish partnerships and inter-sectoral collaboration to extend reach and impact of health promotion activities Intensify health promotion interventions that encourage healthy lifestyles, to raise awareness around chronic noncommunicable illnesses so as to enable early recognition and timely health-seeking behaviour Expand the provision of chronic care services at all fixed facilities, and effectively communicate the availability of these services Promote mental well-being through integrated and proactive health promotion campaigns 75% cure rate of New Smear Positive TB patients 8% or less interruption rates 85% of newly diagnosed (New Smear Positive) placed on treatment 95% TB patients on Directly Observed Therapy (DOT) 90% of sputum results received within 48 hours (Turn around time) 1 TB awareness programme conducted in each region Comprehensive and Integrated Health Promotion programme Two health professionals per region trained in health promotion Substance abuse awareness and education programmes conducted at 3 high & 3 primary schools per region males screened for prostrate gland and testicular cancer per region Cervical and breast cancer awareness programmes conducted in each region Awareness programmes on chronic conditions of lifestyles conducted in each region One support group established and maintained per facility 100% of fixed facilities providing chronic care One awareness programme on mental health conducted per region 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA Five-yearly improvement across a selected set of national indicators of childhealth (viz, % immunisation coverage for children under 1 year; % measles coverage under 1 year; 0 cases of confirmed measles and polio; % Vitamin A coverage in children under 1 year; and incidence of severe malnutrition per 1 000 uninsured children under 5 years) Children and Youth Health programme Children and Youth Health programme 5-yearly improvement across a selected set of national indicators of women’s health service provision (viz, % of ANC patients tested for HIV; % Vitamin A coverage in post partum mothers; % coverage of cervical cancer screening; and % contraception coverage) Ensure provision of an expanded community health outreach programme from all clinics, targeted at ECD facilities identified in the annual census, to promote awareness and education around all child health issues Develop and conduct community awareness programmes on the need for immunisation in each region, and ensure the availability of an EPI in all areas of the city Develop and conduct community awareness programmes to prevent typical childhood health risks, accidents and injuries Implement growth monitoring of children under 5-years for early identification of growth faltering Review and ensure effective implementation of the IMC) strategy Ensure provision of Prevention of Mother to Child Transmission (PMTCT) programme at all fixed clinics that provide comprehensive antenatal (ANC) care Establish at least one Youth Friendly Health Service per region to encourage and facilitate youth access to health care HIV Prevention programme HIV Prevention programme Ensure provision of comprehensive antenatal and postnatal care at all fixed clinics in the city Provide family planning services at all clinics and facilitate referral in order to ensure access to Choice of Termination of Pregnancy (CTOP) services Strengthen breast and cervical cancer screening in all clinics, and run awareness and education programmes on reproductive, maternal and women’s health in all regions Ensure promotion and referral to PEP services, including counselling in the community 208 100% of ECD centres visited to conduct integrated awareness programmes (with Environmental Health) One EPI awareness programme conducted per region 90% (full) immunisation coverage of children under 1 year 90% measles coverage of children under 1 year One awareness programme on prevention of childhood accidents and injuries (including lead poisoning) conducted in each region 100% of severely malnourished children monitored / followed up 90% Vitamin A coverage in children under 1 year old 85% weighing rate of children under 5 years old 90% of facilities (with IMCI trained PNs) implementing IMCI strategy 100% provision of PMTCT at fixed clinics that provide comprehensive ANC 100% of fixed clinics (87 clinics) conducting PCR testing in children One additional YFS site established per region 100% fixed facilities providing comprehensive ANC in the city 90% of ANC patients offered HIV counselling 25% of Vitamin A coverage in post partum mothers 35% contraception coverage in women 15 – 45 years (uninsured) 5% cervical cancer screening coverage of target group One awareness programme on cervical cancer and breast self examination in each region One awareness and education programme on reproductive and maternal health in each region, including postnatal depression Awareness programmes on teenage pregnancy conducted in 3 high & 3 primary schools per region 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA Reduce environmental health risks 2010 Soccer World Cup programme 2010 Soccer World Cup programme Improve accessibility to and quality of service at primary health care clinics, and undertake comprehensive and integrated health promotion To ensure that the environmental health requirements in terms of the environment, food control, including food establishments, and accommodation establishments, are addressed and complied with Improve compliance to environmental health by-laws and legislation Upgrade health facilities near stadiums / practice venues and increase staffing for PHC services to operate for extended hours Implement integrated health promotion activities with focus on environmental health, and HIV and AIDS and STI's Ensure compliance by health facilities to cope with emergencies and disasters, in collaboration with EMS and Disaster Management 209 One educational campaign per region conducted focusing on COJ by-laws and legislation Statutory notices served on 100% of identified council-owned vacant properties where illegal dumping regularly takes place Statutory notices served on 100% of identified non- council owned vacant properties where illegal dumping regularly takes place 100% of butcheries inspected for compliance with legislation (as per database) 95% of identified food premises issued with certificate of acceptability as per R918 Two visits per year conducted at all public conveniences One public awareness programme conducted per region on measures to control vectors 100% of identified hotspot sites serviced by vector control personnel One blitz per region focusing on nuisance buildings Two additional clinics with extended service hours One satellite clinic and 2 mobile points operationalized to fixed clinics 30% of identified clinics upgraded and renovated Three peer education programmes implemented in hostels 150 peer educators trained (including traditional healers) Three peer education programmes implemented in informal settlements Two youth programme implemented 100% of identified hotels with CSW supported as part of the outreach campaign 100% of identified hotels with CSW with at least 1 peer educator One EMS training session per quarter 100 % functional Outbreak Response teams in each region 100% of outbreak response cases investigated and 80% reported within 3 working days Housing Sector Plan INTRODUCTION AND OVERVIEW The delivery of a 100 000 housing units is one of the key integrated development planning interventions for the City in this Mayoral term. To date approximately 46% of this delivery target has been achieved. In the first two years of the Mayoral term the focus has been on the identification and planning of new housing projects. The 2009/10 financial year will witness the delivery at scale of housing on large projects such as Lufhereng (Doornkop), Lehae Phase 2, Kanana Park, Kliptown and Princess amongst others. Many of the housing political priorities for the 2009/10 financial year will remain the same and in line with the strategic objectives of the 5 year Integrated Development Plan. These areas of focus are strongly aligned to the City’s key programmes which are the Inner City, 2010 and the Formalisation and Regularisation of Informal Settlements. In addition it is also interesting to note that the issues that have been raised through the community feedback sessions are also aligned to the priorities and programmes that are reflected in the sector plan. Many of these issues are currently being addressed in the 2008/09 financial year. Although much has been achieved to date with regard to the IDP programme for the mayoral term significant work and delivery is still required to be able to achieve on the targets that have been identified. Thus 2009/10 financial is considered a crucial year for delivery notwithstanding some of the challenges that have been highlighted in the sector plan. Strategic objectives The strategic objectives of Housing are: On a progressive basis, and over the longer term, all residents in inadequate housing to access affordable, safe and decent accommodation; Meet housing needs at all levels of the housing ladder through accelerated facilitation and supply, and effective management, of a diverse range of products for purchase or rental; A fully functional secondary housing / property market in all parts of the city, so that all households can realise economic value from investing in their residential assets; Quality of the City’s existing and future housing stock is enhanced and maintained; and Increased liveability and sustainability of all residential communities, with equitable access to green spaces, social and cultural differences, transportation and economic opportunities, and adoption of green housing practices and technologies.” POLITICAL PRIORITIES Many of the programmes that were identified in the City’s 5 year IDP and Housing Sector Plan remain a priority. The following areas continue to be a focus for the City in 2009/10: Formalisation of informal settlements Together with the department of Development Planning and Urban Management (DPUM) as well as the Gauteng Department of Housing, CoJ Housing will increase its efforts to formalise informal settlements in the City. To this end, feasibility studies on all informal settlements have been undertaken and a programmatic approach to formalisation is currently being finalised. 210 The 180 settlements where feasibilities have been undertaken have been classified into the following categories: Upgrading projects (This comprises 65 settlements and are being implemented either by the City of Johannesburg Housing Department and the Gauteng Province) Relocation projects ( This comprises 16 settlements and are implemented either by the City of Johannesburg Housing Department or the Gauteng Province) Programme linked settlements (This comprises 28 settlements linked to programmes that will formalise housing for beneficiaries over the long time. This will be implemented by both CoJ Housing and the Gauteng Province) Regularisation Projects ( This includes 23 settlements and is managed by the Department of Development Planning and Urban Management) Settlements not linked to any of the aforementioned projects (48 settlements are currently not linked to any project or programme. The key challenge in addressing the development needs of these settlements is accessing and securing additional land). Rejuvenation of the inner city and older centres The Inner City remains an area of priority for the City. Increased housing delivery for all levels of the housing ladder is required to cater for the demand; however the focus of the City is to ensure that the poor are catered for in the supply market. To date the City has been working with the Province, Social Housing Institutions, private developers, and other stakeholders to increase the scale of delivery as well as deepen the reach of affordability, so that the housing needs of lower income households are addressed. One component of the Housing Action Plan is to develop temporary accommodation. The purpose of this accommodation is to provide interim shelter for households that are living in unsafe buildings. In the 2007/08 financial year approximately 1400 beds were developed in the Inner City as temporary accommodation. In addition to temporary accommodation the focus will be on increasing the supply of medium to longer term rental accommodation, such as transitional housing, communal housing, and social housing. Already JOSHCO, the City’s social housing company has been proactive in acquiring buildings and planning the delivery of communal and social housing stock in the City. It is anticipated that 2 buildings will be refurbished in 2008/09 and a further 3 buildings will be completed by 2009/10. In addition some of the problems around the deteriorating inner city buildings will be considered as part of the framework of the Inner City Property Scheme as introduced by the Department of Economic Development. Delivery of 100 000 units by 2011 As a key area of focus the City is mobilising its resources as well as engaging with other stakeholders to ensure that the delivery of 100 000 housing units in this mayoral term is achieved. The 100 000 units target includes the delivery of 15 000 rental housing units, 30 000 housing units through the Community Builder Programme and the Peoples Housing Process programme, 5 000 units through the redevelopment and conversion of hostels, and 50 000 mixed income housing units. As at the end of the second quarter of the 2008/2009 financial year a total of 46 463 housing units have been developed and facilitated within this programme in the current mayoral term. The Pennyville project, near New Canada Station showcases some of the components that should be delivered as part of the mixed income housing programme and has set a standard to which all new housing in the City must achieve, reflecting a choice of tenure, typologies, affordability as well as the relevant social and educational facilities. In attempting to improve on the sustainability of these areas the COJ: Housing in consultation with Departments of Economic Development and Community Department, is exploring ways in which economic activities by communities are facilitated so that housing can be used as an economic asset by the residents. 211 Secondary Property Market The implementation of projects under the Neighbourhood Partnership Development Grant Programme, funded by National Treasury will also be a key area of focus in the 2009/10 financial year. The planning and design of the projects would have been completed in the 2008/09 year. Although some implementation is anticipated in 2008/09, majority of the delivery is programmed for the 2009/10 period. The Department of Housing has already structured partnerships with a number of other relevant City Departments, Provincial Departments as well as municipal owned entities to support the roll out of identified projects. By the end of 2009/10 the outcomes of stimulating the secondary property market as well as contributing to sustainable human settlements should become more realisable and evident. Hostel redevelopment In the City of Johannesburg there are a number of staff and public hostels. In implementing the hostel redevelopment programme the focus of the City is on the redevelopment and conversion of staff hostels, while the Gauteng Department of Housing is addressing the redevelopment and conversion of public hostels. Development on the following staff hostels are currently being implemented or planned by the City via Joshco: City Deep, Van Beek, Selby, Anthea and Klipspruit hostels. The critical component of the redevelopment is to ensure that these spaces that were previously sterile and unhealthy environments become mixed income rental accommodation and integrated spaces where the previous hostel residents are integrated with the communities. The focus of the Provincial Government is the redevelopment of the public hostels in the City under the Community Residential Units (CRU) programme introduced by the National Department of Housing. The Province has already commenced with construction on Diepkloof Hostel, Dube Hostel, Meadowlands Hostel and the Orlando Women’s Hostel in the Soweto region. Planning work has been initiated on the hostels in the Inner City including Jeppe, Denver and George Gogh cluster. It is anticipated that during the 2009/10 financial year a minimum of 1600 units in hostels will be redeveloped. The target for the mayoral term is 5000 units and during the first two years of the mayoral term only 480 units were achieved. The extensive injection of funding through the CRU programme however will assist in upscaling the delivery of units under this programme. Addressing the housing gap The strategic objective of this programme is to “address the housing ladder gap by facilitating private sector delivery of affordable rental and home ownership”. This strategic objective is currently being addressed through the implementation of the mixed income housing programme. The Pennyville project again demonstrates how this is being implemented together with the Private Sector (Diliculu) to provide rental accommodation in the gap market. The City is facilitating the delivery of housing projects by the private sector so as to ensure that gap market products are available. In this regard the City has determined that the product mix in mixed income housing should include approximately 25% gap housing. Proficient management of City stock The focus of this mayoral term is on the transfer of the public housing stock from the department to qualifying beneficiaries and to JOSHCO. As of the end of June 2008 three thousand three hundred and fifty units had already been transferred to JOSHCO. The signing of lease agreements is a critical component of the management of the housing stock. In the 2007/08 financial year the City has focused on ensuring that with all new allocations, lease agreements are signed and where this has not happened in the past these instances are rectified. As at the end of June 2008, 90% of all lease agreements had been signed. The rental collection for this period has also increased to 65% of billed amount. 212 CHALLENGES AND OPPORTUNITIES In developing new housing and managing current housing stock, a number of challenges arise. If not adequately addressed, these challenges can impact on housing delivery and the housing environment in the City. Some of the challenges include: Demand for housing exceeding supply Like so many other cities across the world the demand for housing within Johannesburg far exceeds the supply. The existence and growth within informal settlements, over crowding in inner city buildings, back yard shacks, and the number of people that have registered on the previous housing waiting list and more recently the demand database reflect the increased demand for housing. For many reasons such as capacity constraints, inadequate resources, lack of affordable land, unaffordable products, etc the supply of housing has been impacted. This has resulted in the limited supply of housing by both the private and public sector. In the current mayoral term, as previously articulated the City is targeting the delivery of 100 000 housing units through its own means or through the facilitation of other role players in the sector. Although the 100 000 units will make a significant delivery impact, it is recognised that the demand will still continue to exceed the supply. Land There are a number of challenges that are experienced with regard to land. These include: Lack of availability of well located land The increased cost of land to undertake housing development Acquiring privately owned land where settlements already exists Limited funding for land acquisition Lengthy procurement processes that impact on the timeframes for acquisition and which in turn has a negative impact on the cost of land Management of Housing Stock Majority of the housing stock that is owned by the City is very old. Over the years inadequate budgets have been allocated for the maintenance of the housing stock and this has impacted on the quality of the stock. In addition the unwillingness of people to pay for rentals, has also contributed to there being inadequate funding to service and maintain the housing units. These problems are not limited to the City of Johannesburg and the experiences both nationally and internationally reflect that the management of housing stock by municipalities has been challenging. As previously indicated some of the challenges are being addressed through the: transfer of stock where possible to individual households; transfer of stock to JOSHCO to manage under the social housing or community residential units programme; and regularisation of tenants and signing of lease agreements. Managing internal growth within the informal settlements For many new migrants to the City informal settlements are generally the first areas in which they seek accommodation. In the past years although not many new settlements were established the increase in households in existing settlements has been significant. Whilst it is much easier to identify and prevent new informal settlements from mushrooming, it is much more difficult to observe internal growth immediately when it occurs. 213 Although the City has an approved process to respond to the growth in settlements, the lack of capacity, especially in terms of enforcement compromises the process. In attempting to curb the internal growth, the Housing Department is currently numbering all the shacks in informal settlements, keeping a register of the households and undertaking regular visits and monitoring of the settlements. Evictions and Court Judgements Addressing the phenomenon of bad buildings in the Inner City requires an increase in the delivery of housing, especially affordable rental accommodation. Through the Inner City Charter process an Inner City Housing Action plan has been developed reflecting the range of housing interventions that must be implemented. The recent court judgements however are placing the City under increasing pressure to provide temporary or emergency accommodation in terms of the National Housing Programme for Housing in Emergency Circumstances. Even in the case of private evictions the City has to respond with possible emergency housing accommodation. REVISION TO THE COJ 2006/11 IDP The Housing Sector Plan in the whole has not fundamentally changed, save for the following amendments: 5-YEAR STRATEGIC OBJECTIVE Create new housing opportunities for people with special needs (aged, child headed households, HIV and AIDS affected/ infected households, street children etc) 5-YEAR IDP OBJECTIVE/PROGRAMME Special needs housing programme REASON FOR CHANGE Create new housing opportunities for people with special needs eg. Disabled persons Currently via National and provincial housing policies disabled persons are the only grouping of people that are able to access housing opportunities under the subsidy scheme SECTOR RESPONSE TO COMMUNITY ISSUES In the Regional Summits that were undertaken in 2008, the following issues were raised by communities: the formalisation and upgrading of informal settlements; the need for high density and social housing projects; upgrading and redevelopment of hostels; the maintenance and management of public housing stock; and poorly management and maintained buildings within the Inner City, leading to unsafe housing environments. SECTOR CONTRIBUTION TO 2010 FIFA WORLD CUP The following projects reflect how the Housing Department is contributing to 2010. Diepkloof Hostel Redevelopment The redevelopment of the Diepkloof Hostel is considered a 2010 legacy project, as it is situated at the main entrance to Soweto in close proximity to the FNB stadium, the Soweto Empowerment Zone and the Klipspruit rehabilitation project. 214 An Urban Design Framework has been approved for the hostel redevelopment with emphasis also on the façade of the building. The redevelopment was initiated by the Housing Department of the City however the current redevelopment and conversion of 1 000 units is being implemented by the Gauteng Department of Housing. International Broadcast Centre Accommodation Project The International Broadcast Centre accommodation facility will see the development of 200 residential units, each consisting of two bed room units, thus accommodating 400 journalists that would be covering the FIFA 2010 World Cup. The City has awarded a contract for the development of 200 flats. 100 of the flats to be developed will be transferred to JOSHCO. Funding from the City together with possible subsidies from Province will be utilised for the development of the 100 units for JOSHCO. The remainder of 100 units will be financed and owned by the selected developer. 215 HOUSING SECTOR PLAN 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA Formalise all settlements located on state land Informal settlement formalisation Informal settlement formalisation 50% of informal settlements formalised or upgraded to a minimum level of basic services Develop a set of interventions to improve the quality of backyard accommodation Backyard accommodation programme 20 settlements have been targeted for general plan approval Secure ownership or land availability for projects on state and private land 2000 stands to be fenced Backyard accommodation programme To date general plans have been approved in 51 settlements Feasibility studies have been completed for 180 informal settlements 750 units have been completed as a pilot project in Orlando 520 units have been completed on the Alex Far East Bank project Using alternative technology methods 200 units have been completed in Zola Support at least 5 small landlords in township areas and new housing projects Facilitate the development of 100 units to be managed by small landlords Structure partnerships with stakeholders to promote an inner city and older centres residential accommodation programme Inner City and older centres residential upgrade programme Through a hostel upgrading programme that is sensitive to issues of affordability and quality living environments upgrade 5000 units Hostel conversions programme Create new housing opportunities for people with special needs Special Needs Housing programme 1 600 hostel units will be developed Management and asset management programme with GDOH will be completed by June 2010 Finalise land rights development agreements with Province Special Needs Housing programme Through both the City’s own means and in partnership with other actors and stakeholders, deliver 100 000 well-located and good quality housing units over the next five years, which 216 1 103 units have been redeveloped or converted in hostels in City Deep, Alexandra (M2), Diepkloof, Dube, Meadowlands, and Orlando Womens Hostel Approximately 246 units for special needs have been developed to date An open day for people with disability to be convened during March 2009 Delivery of the 3000 rental units, under the 100 000 units programme will also be facilitated in the inner city and older centres Implement rental housing projects in line with Inner City spatial development framework currently being developed by DPUM Hostel conversions programme Temporary/emergency housing programme Implement projects in line with the national and provincial policies once finalised( what projects and how many) At least 70 housing units to be developed for disabled persons (average of 10 per region) Temporary/emergency housing programme More than 1400 beds have been provided for temporary/ emergency accommodation Housing programme In partnership with Province and other stakeholders, develop and manage temporary/ emergency housing stock In 2007/08 approximately 4000 rental units were developed by stakeholders in the Inner City and older centres Inner City and older centres residential upgrade programme CBP/PHP – 13 572 units developed Rental – 8 916 units developed Mixed income – 22 872 units Develop and facilitate 500 beds for temporary accommodation Housing programme Develop 10 000 units through CBP/PHP Develop 3 000 rental units 5-YEAR STRATEGIC OBJECTIVES includes the delivery of 15 000 rental housing units, 30 000 housing units through the Community Builder Programme, and 50 000 mixed income housing units Address the housing ladder gap by facilitating private sector delivery of affordable rental and home ownership Complete the transfer of title deeds and ensure that new title-holders are informed of the advantages of their new asset IDP PROGRAMME AND KEY ACHIEVEMENTS developed Pennyville project currently being implemented together with ABSA bank to address rental accommodation in the gap market Secondary Property Market Secured R109 million in capital funding for stimulating the secondary property market Feasibility studies completed and projects identified for design and implementation Facilitate the implementation of Fleurhof, Kanana Park, Lehae Phase 2 and Lufhereng projects to provide at least 3 000 units for gap housing Secondary Property Market City public housing stock upgrade and transfer programme Identified projects in Braamfisherville and Vlakfontein eg roads and stormwater upgrading, construction of police stations, construction of MPCC, street lighting, greening, rehabilitation of parks, sports facilities etc will be implemented in partnership with the relevant departments and MEs City public housing stock upgrade and transfer programme 60% rental collection achieved 90% of lease agreements have been signed 3 350 units have been transferred to Joshco Achieve 70% rental collection Implement the asset management and maintenance plan for public housing Transfer public stock units to JOSHCO in line with the approved transfer programme Sustainable Human settlements programme Sustainable Human settlements programme Held workshop with various departments and stakeholders to communicate research on sustainable human settlements Developed operational plans and systems for achieving sustainable human settlements in housing projects Social facilities facilitated on housing projects e.g. Pennyville 217 Deliver 15 000 mixed-income housing units Housing ladder gaps delivery programme Introduce the Sustainable Human Settlements approach to all new housing developments Housing ladder gaps delivery programme Promote good management and maintenance of City housing stock and associated infrastructure 2009/10 DELIVERY AGENDA Construction of 2000 alternative technology housing units Implement 3 economic empowerment projects in new and established housing projects Implement infrastructure and community facilities projects in Zola, Orlando- New Canada, Braamfisherville and Vlakfontein as part of the NDPG programme Support at least 5 small landlords in township areas and new housing projects Facilitate the development of 100 units to be managed by small landlords Infrastructure And Services Sector Plan INTRODUCTION AND OVERVIEW The sector’s primary responsibility as envisaged in the GDS is to ensure that the City’s services infrastructure (water, electricity and waste management) is maintained and its capacity is continually improved in order to provide safe, reliable and affordable services to all citizens and stakeholders. To deliver on this mandate, the Infrastructure and Services Department (ISD) has, through coordinated and integrated planning with Municipal Owned Entities (MEs) namely Joburg Water, City Power and Pikitup together with relevant City Departments, translated the vision into measurable objectives and programmes outlined in the five year sector plan, and serve as a service delivery framework for the entire sector. The role of the ISD in this regard, is to provide leadership and guidance in the delivery and implementation of key programmes by MEs towards the realisation of Growth and Development Strategy objectives. Since the beginning of the term (2006/11), the Sector has progressively realised the objectives it had set out to achieve which focused mainly on improving the socio-economic conditions of the citizens. These areas include the following: Increasing access to basic services and reduce service delivery backlog Develop Asset Management Plans to address Infrastructure upgrade and maintenance issues which will in turn improve service efficiencies and contribute towards the realisation of City’s Specials programmes i.e 2010, Inner City and EPWP Implement Demand Side Management to effectively conserve water, waste and energy resources and sustain services Although the unprecedented population growth within the City has affected the roll out and the outcomes of certain programmes, the overall performance so far indicates a fair progression towards the achievements of the five year targets. Access to water and sanitation as at end December 2008 was at approximately 85 %, whilst approximately 78% of households inclusive of Eskom supplied areas had access to electricity services. All areas within the City are provided with a standard waste management services and efforts to improve the level of cleanliness in those informal settlements with increased levels of waste generation were accelerated. In this regard approximately 61 settlements are provided with a daily cleaning service. Inline with the approved City Social package, households listed in the indigent list are receiving Free Basic Services. A certain amount of maintenance related Ward priorities identified towards the end of 2007/08 financial year are currently being addressed and would be given priority in 2009/10. Outages related to network malfunctioning have decreased by 4% from 81 to 78 compared to last financial year’s performance, due to the continuous investment on infrastructure upgrade. Approximately 37 750 megalitres of water with a rand value of R116 million have been saved through the implementation of Operation Gcinamanzi. To reduce consumption levels of water and electricity, various Demand Side Management (DSM) consumer oriented initiatives were undertaken and these include the installation of prepaid meters, Geyser ripple control, Refurbishment of Gas /Diesel turbines, CFL and solar water heaters. The impact of the above initiatives, can however not be quantified at this stage as implementation is still at its initial phases. 218 To contribute towards the reduction of unemployment the sector created more than 24 000 job opportunities which benefited mainly the youth. Whilst there has been some progress towards the achievement of set objectives, the following areas remain the Sector’s concerns Inadequate resources to address both the condition of the City’s aging services infrastructure which continues to deteriorate and carryout key special programmes i.e. 2010 and Inner City Effective delivery of Basic Services inline with Formalisation of informal settlement programme Since we are nearing the end of the five-year term, to accomplish the above the Sector has refined its strategies and programmes to focus on accelerating delivery through prioritisation. However, it is worth noting that for certain programmes this becomes a challenge particularly for Infrastructure upgrade & maintenance as it requires substantial investment to enhance its condition. Despite its increasing backlog, Capex funding has declined over time, and the indicatives for the 2009/10 FY show a further 17% and 30% decrease for City Power and Joburg Water. This has necessitated a change in approach for the planning period, the Sector will categorise its projects and prioritise implementation of those that are critical to service delivery requirements. Projects that cannot be funded for the 2009/10 will be implemented in the subsequent years subject to minimal disruptions to service delivery In the delivery of Basic services the sector will continue to engage various and critical stakeholders to the programme and also prioritise community requirements, identified through Community Based Programme. The priorities include the following: Public lighting; Sewer and water upgrade; Electrification; and Recycling services and waste collection and illegal dumping. The focus of the 2009/10 delivery agenda will generally be on the implementation of programmes that would prioritise communities needs thus ensuring accelerated access to services, increase infrastructure capacity and effective conservation of resources for the realisation of IDP, MDG and National objectives. CHALLENGES AND OPPORTUNITIES Basic Services Programme (BSP) The programme seeks to increase access to basic services to all households within the City. The national targets which envisaged water and sanitation provision to all households by 2008 & 2010 have recently been revised by National Department of Water and Forestry (DWAF) to year 2014. The electricity backlog is expected to be eradicated by December 2012. BSP has four sub-programmes, namely Electrification, Waste, Water & Sanitation services designed around the core business areas. It is implemented in the context of the City’s overarching plan, which intends to formalise informal areas driven by Housing and Planning department. The plan prioritises areas and informs level of service required enabling other City programmes including BSP to initiate the delivery process. The City Community Ward priorities and the outcomes of the Customer Satisfaction surveys also form an integral part of the programme. According to the 2007 Community Survey released by Statistics South Africa, the City has a total household population of 1 165 014 with more than 25% residing in informal dwellings. The Sector’s focus therefore is to reduce the Service delivery backlogs which are estimated to be growing at 7 % per annum in these informal areas. 219 Water and Sanitation services As at the end December 2008, the City’s water and sanitation coverage stood at approximately 11 85%. The percentage represents the number of households which have access to LOS 1 and or 12 3 . To address the backlog, the sector is providing rudimentary services to the remaining 15% through mobile and stationery water tanks and chemical toilets. The focus, however for the 2009/10 and remainder of the term will be to upgrade these households to a higher level of service inline with informal settlement formalisation and upgrade as well as housing development programme. The rolling out of water and sanitation services to informal settlements effectively remains one of our most pressing challenges. This is due to a number of factors ranging from constraints posed by densification to settlements established on privately owned land. It is understood that the integrated formalisation plan of these areas will accelerate the delivery and realization of the City’s GDS and IDP targets. The sector is working closely with various City programmes i.e. Formalisation of settlement and Housing upgrades, in order to prioritise water and sanitation delivery in these areas. Energy services (Electrification) The electricity coverage within the City’s area of jurisdiction (inclusive of Eskom serviced areas) is estimated to be 78%. As at end of December 2008 over 73 000 households had access to electricity through the implementation of the electrification programme. Although considerable progress has been made towards the reduction of the electricity backlog, the slow roll-out of the housing programme and the formalisation process have been a major constraint. The sector continues to provide services in areas which have been formalised. Waste Management services Although formal and informal areas within the City currently receive a minimum (once a week) level of waste service, there is a general consensus among the stakeholders of the need to improve the quality in certain informal settlements. This is due to the high rate of waste generation in these areas, which result in daily cleaning services being required. . These services will be implemented through a community based cleaning programme, which has been already been rolled out in 61 informal settlements. The plan is to roll out the programme to all informal settlements that have more than 2000 households. The growth of formal businesses, pedestrian traffic volumes and informal trading has resulted in a substantial increase in waste volumes in the Inner City. In general this has led to unacceptable low levels of cleanliness. Together with the Inner City office, Pikitup is implementing various cleaning initiatives to achieve acceptable levels of cleanliness in identified block precincts. Formalisation of informal settlements Although the department is confident that many of the targets it has set for next year will be achieved, there remains a genuine concern about the pace at which the identified informal settlements are currently being formalised. The successful implementation of the basic services programme to these previously under-serviced areas (informal settlements) is dependent on the formalisation of informal settlement programme, which is the responsibility of both housing and development planning department. As part of this programme 182 settlements have already been identified and registered. However registration does not confer full legal recognition to these settlements. What is still required is for these settlements to be rezoned in terms of the City's Town Planning Scheme and the Development Facilitation Act (DFA) of 1995. Rezoning will give residents recognition through issuing occupation permits, while using the DFA will consolidate existing rights in land and allow for full ownership of property at a later stage, within the same process. Basically the two regulatory frameworks offer certain tenurial options for residents. 11 12 Water standpipe within 200meters radius and VIP toilets per household Waterborne sewer system 220 According to studies by housing department, a large proportion of these 182 settlements can be developed "in situ", or where they stand. The studies found that a sizeable number of informal settlements were well situated in geo-technically stable environments. They were also in close proximity to established neighbourhoods and would be easily integrated within these existing communities. Despite all this, the process of formalising these settlements is moving at a very slow pace with the result that we have been unable to roll out the basic services programme with the speed that is required if we are to achieve the national targets. Demand Side Management Programme Energy The shortage of electricity as evidenced by the consistent outages and load shedding in the beginning of this year has had an impact on how the Sector delivers electricity services to users within the City. In this regard, the department together with City Power has developed a demand side management programme which will assist in minimising the consumption of electricity and ultimately with the availability of electricity supply in the country. Water South Africa falls under the category of countries amongst the world’s top 30, which are defined as water – scarce. It is further predicted that if the current consumer habits persist the country will become water stressed by 2025. Gauteng province will however experience water shortage by 2015. To prevent this situation, the sector will continue to implement demand side management programmes, which includes education and awareness campaigns, reducing water losses through the installation of pre-paid meter, refurbishing / rehabilitating infrastructure and removal of wasteful devices. Waste On an annual basis, the City manages approximately 1.4 million tons of waste, which is deposited at four landfill sites. The substantial increase (10-14% per annum) in waste volumes has resulted in an accelerated reduction of landfill airspace. Various DSM initiatives such as waste re-use, recycling and minimization programmes are already at different stages of implementation. The department together with Pikitup will be introducing a waste treatment technology project, which will assist the City to meet the Polokwane Declaration of diverting waste from landfill by at least 70% by 2022. Infrastructure Upgrade and Maintenance Programme For the 2009/10 the sector will prioritise the implementation of infrastructure projects which will ensure successful delivery of the 2010 SWC, BRT, Inner City and other critical City projects. Operational plans are currently being developed in order to establish areas which require intervention and minimise the level of service interruption. REVISION TO THE COJ 2006/11 IDP The objectives and programmes highlighted in the 2008/09 sector plan have not been revised. INITIATIVES TOWARDS MEETING THE GDS PRINCIPLES Most programmes that the Sector implements would contribute towards the social upliftment of the poor within the City, job creation and ensuring sustainability of services. The alignment between these programmes and GDS principles is outlined below. Proactive Absorption of the poor 221 Basic services Programme: According the latest data provided by the Planning Department, the City has an estimated total of 220 000 households in the informal areas and the implementation of this programme will facilitate access to basic services in these areas and by the poor in general in line with GDS and national government targets. For the 2009/10 financial year, informal settlement will be provided with access to basic services through Thonifho and Electrification programme. Sustainability and environmental justice Demand Side Management programme: The implementation of programmes such as landfill gas to energy project, waste minimization projects, use of alternative sources of energy and approaches to minimize/optimize the use of electricity, will contribute to the achievement of the above strategic principles. The waste projects will minimise the negative impact on the environment as a result of waste management operations and energy projects will contribute towards the minimization of the use of scarce resources through the implementation of demand side management programme. Balanced and shared growth The implementation of DSM projects will necessitate direct capital investment in the City, which will result in economic growth and job creation. INFRASTRUCTURE AND SERVICES SECTOR PLAN 5-YEAR STRATEGIC OBJECTIVES Extend access to basic services to all households IDP PROGRAMME AND KEY ACHIEVEMENTS Implementation of Electrification Programme to 95% of formalised households13 by 2011 2009/10 DELIVERY AGENDA Out of a total of 1 169 048 households, 78 %14 have access to electricity services Provide street lighting to 95% of formal areas which include proclaimed informal settlements 62% coverage in formal areas and 12% in informal areas has been achieved Implementation of Electrification Programme to 95% of formalised households15 by 2011 Provide street lighting to 95% of formal areas which include proclaimed informal settlements 14 15 Implementation of waste collection optimisation plan to ensure waste collection in all areas Collection of waste once a week in all areas has been achieved, and quality and service standard has improved in most areas The electricity coverage here excludes Eskom serviced areas The electricity coverage includes Eskom serviced areas The electricity coverage here excludes Eskom serviced areas 222 To provide street lighting to 65% of formal areas including proclaimed informal and prioritised high crime areas Implementation of waste collection optimisation plan to ensure waste collection in all areas 13 To extend the service to 90% of prioritised households Provide daily cleaning to informal settlements with more than 1000 households and provide appropriate receptacles in targeted informal settlements Rollout 240l bins to formalised areas and underground receptacles in targeted areas 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS Improve cleanliness levels in the Inner City and street cleaning in all areas 2009/10 DELIVERY AGENDA Cleanliness levels within the City have improved Improve cleanliness levels in the Inner City and street cleaning in all areas Improve waste service delivery standards in prioritised informal areas Maintain Inner City level 2 cleanliness and extend the street cleaning service citywide Facilitate enforcement of by-laws Eradicate 100 illegal dumping spots Improve waste service delivery standards in prioritised informal areas As of end December 2008, 61 Informal areas were provided with a daily cleaning service Installation of water standpipes and the construction of VIPs to cover all households by 2011 Establish new depots in Orange Farm, Haylon Hill Complete RCR collection by 17h00 and provide 100% coverage Implement community education and awareness campaigns Installation of water standpipes and the construction of VIPs to cover all households by 2011 85% of households have access to water and sanitation services Allocation of Free Basic water , electricity Allocation of Free Basic water , electricity All households registered in the City’s indigent list are provided with Free Basic Water, electricity and waste (FBE & FBW) 223 Extend water services to 90% of households prioritised by Housing through formalisation of informal settlements programme Continue with FBW of 10kl plus 4kl to indigent Continue with FBE from 50 to 100 kWh per household and reduce FBE threshold from 802 to 500 kWh Provide free waste collection services for households with property value below the threshold of R150 000 5-YEAR STRATEGIC OBJECTIVES Upgrade infrastructure and reduce maintenance backlog to meet capacity requirements IDP PROGRAMME AND KEY ACHIEVEMENTS Design and implement long-term asset management strategy and plan for waste, water and energy 2009/10 DELIVERY AGENDA Reduce electricity outages by 50% in year 2010(bulk, medium and low voltage) A total of R 117 million has been invested on infrastructure upgrade, refurbishment and maintenance Design and implement long-term asset management strategy and plan for waste, water and energy Reduce electricity outages by 50% in year 2010(bulk, medium and low voltage) Priority will be given to infrastructure projects that will ensure delivery of City’s special programmes ie. 2010, Inner City , BRT Implement Asset management plans Accelerate implementation of infrastructure refurbishment programmes Implement 3 landfill airspace optimization projects Integrate and maintain weighbridge system to SAP Design and implement alternative fleet models for yellow plant and operations Design and implement maintenance system for underground bins, composting plant, incinerator, depot and garden sites infrastructure Reduce electricity outages by 50% in year 2010(bulk, medium and low voltage) Reduce unaccounted for and nonrevenue electricity and water losses Implement DSM programmes and innovative technologies 224 Implement infrastructure refurbishment programme and install pre-paid meters to reduce losses to 25% by 2011 for water and from 3 to 1% by 2011 for energy Reduce network related bulk outages from 78 – 76 Implement infrastructure refurbishment programme and install pre-paid meters to reduce losses to 25% by 2011 for water and from 3 to 1% by 2011 for energy The amount of unaccounted for water losses was 33.6% and 3 % for energy Implement a policy to reduce losses Resume implementation of OGA and removal of illegal electricity connections and reduce losses to 25% for water Develop and implement comprehensive demand side management programmes for waste, water and energy services Develop and implement comprehensive demand side management programmes for waste, water and energy services Undertake a coherent and comprehensive research programme to provide accurate information on users consumption needs and behaviours, especially among the Continue with the implementation of all identified and funded DSM programmes Commissioning and monitoring the implementation of the Landfill Gas to Energy (LFG) project 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS poor Implement at least five innovative new technologies in service delivery Establish RED 4 Minimise waste to landfill to inline with the Polokwane Declaration Improve waste management services 225 2009/10 DELIVERY AGENDA Various DSM initiatives are currently being implemented by MEs. The projects include the following: Waste Services composting facility, Garden sites, Material recycling facilities and rubble crushing plant Water: Installation of pre-paid meters in all new developments initiated by Housing Department and implementation of OGA Energy: Geyser control, Appointment of ESCOs for CFL replacement, Rueven site - electronic ballast, lighting management and replacement fittings Participate in activities that lead up to the establishment of RED 4 Participate in activities that lead up to the establishment of RED 4 The process of establishing RED 4 has commenced and should be substantially complete by June 2009 Reduce, re-use and recycle at least 15% waste by 2010 50% green waste diverted to compost facilities by 2010 50% green waste diverted to compost facilities by 2010 Develop and implement strategy to increase landfill capacity Develop and implement strategy to increase landfill capacity About 38 756 tons has been diverted away from landfill through recycling and composting activities Implement turn-around strategy for business improvement through cost management, revenue generation by 2007 and improved service delivery Conduct a due diligence (sale of assets) on City Power business and implement the Municipal Systems Act Section 78 process Reduce, re-use and recycle at least 15% waste by 2010 Implement waste reduction and treatment project Develop legislation that will enable minimization of waste generation Process 7% green waste and divert 10% dry waste to MRFs and private landfills Implement Builders rubble plant at Marie Louise and Goudkoppies Continue with the implement project waste separation at source Establish of two garden sites and a composting plant at permitted sites Develop landfill strategy Implement turn-around strategy for business improvement through cost management, revenue generation by 2007 and improved service delivery 5-YEAR STRATEGIC OBJECTIVES Policy development and by-law review Service delivery monitoring and evaluation 226 IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA Formulate policies and by-laws that will facilitate effective service delivery Continued implementation of the turnaround of the waste management service which includes: Activity Based Costing to reflect the true costs of providing a service Business Process Reengineering and process documentation Performance management system to track corporate and individual performance Tariff and funding model for budgeting Human resource development to improve HR productivity through various initiatives Development of new and delisted cells Formulate policies and by-laws that will facilitate effective service delivery Waste management turnaround strategy has been developed and significant gains have been realised on improving operational efficiencies The draft policy on energy DSM is currently being developed Introduce and maintain quality service monitoring system for at least three years that can inform regular stakeholder engagement Formulate and implement policy on conventional and pre-paid meters for water and electricity Development of DSM policy and by-law on electricity and draft a by-law Formulate policies and by-laws that will facilitate effective service delivery & separation at source Introduce and maintain quality service monitoring system for at least three years that can inform regular stakeholder engagement Frequent service delivery inspections are conducted as means to improve and address the customer perception survey outcomes Develop and implement a service delivery monitoring system Legislature Sector Plan INTRODUCTION AND OVERVIEW Local Government has a responsibility to actively promote and facilitate “Participatory Democracy”. The Constitution of the Republic of South Africa defines the role of local government in Section 152, Act 108 of 1996, as the custodian of “democratic and accountable government for local communities”. The development of the “Johannesburg Model” as an integral part of developing participatory democracy within South Africa places significant responsibilities on the Legislature, Office of the Speaker and specific Legislative Departments to ensure that there is a clear model for other Councils that is realistically replicable in different environments, cost effective and easily understood and implemented. The implementation of clearly defined “participatory democracy” and the associated separation of powers, if successful, will inform legislative changes and will be replicated in other Councils in South Africa. There is a very clear constitutional requirement to facilitate and actively encourage the involvement of communities and community based organisations in the planning and service delivery which is within the scope of the constitutional responsibilities of local government, as well as participation in implementation, where possible and appropriate, and oversight and scrutiny of service delivery and the targets set in the existing plans, in general, but specifically ward based planning and the Integrated Development Plan. But community participation is not simply a matter of compliance with the legislation’s minimum requirements, participatory democracy is also informed by manifesto commitments, and the recognition that appropriate sustainable service delivery requires close cooperation by communities with elected representatives, and Councillors and the electorate experience participatory democracy that is ongoing and sustainable. This requires that Councillors work closely with the communities they represent and that there is effective oversight and scrutiny of both the Executive and the Administration to assist in the attainment of the City’s strategic agenda. Effective engagement and the creation of “participatory opportunities” and the encouragement of their effective utilisation requires careful consideration of the minimum legal requirements for consultation and where possible their extension to ensure time frames that are not only realist from an Executive and Administrative point of view but also the needs of Communities, this is a focal point of this years work, building on the developments of the financial year 2008/09. The “legislature” of the City of Johannesburg Metropolitan Municipality, by resolution of Council, has developed long term strategic objectives for this term of office, 2006 to 2011, to facilitate the separation of powers between the Legislature and the Executive, Executive Mayor and Members of the Mayoral Committee and the Administration, who are responsible for service delivery. 2009/10 is the final year for the implementation of new activities in this term of office and the “bedding down” of existing activities, as the final year, 2010/11, will be required for full operationalisation of all successful pilots. The 5-year strategic objectives of the Legislature, set out in its Strategic Plan are as follows (as per Sector Plan). The strategic objectives were critically evaluated in the financial year 2008/09 and significant changes were made. Ensure that the local democratic process is recognised as legitimate by the communities of Johannesburg through their ongoing participation; 227 Build a viable and sustainable participatory process through the development of a citizenship culture and the capacitation of role players to participate effectively; Build an effective, efficient co-operative and transparent institution in order to fast track the implementation of the City’s Strategic Agenda; Ensure the accountability of government through effective oversight and scrutiny; Transform the government model to incorporate best practices with respect to separation of powers, public participation, accountability and transparency and protocol; and Strengthen the capability of the Office of the Speaker and its staff to deliver exceptional value to their internal and external customers. The function and activities of Stakeholder Relationship Management include: Community Dialogue, including ward based planning; Petitions and assisting in the development of a responsive Administration to the articulated needs of Community; Communications and Media Management for the Legislature; Civic Education; Citizenship for all communities and internally; Student Councils; Ceremonial and Protocol activities for the Legislature in general and the Private Office of the Speaker in particular; and Support for Ward Councillors in term of their responsibilities to their constituencies. The functions of Strategic Support include: Implementation Approach Formalises the identified areas that require immediate action as a project/programme that will adopt a transformational approach, together with an educative & participative change management approach; Management by project with a dedicated team to ensure governance, delivery against agreed timelines and reporting of progress and/or risks and issues; Management of resources from within Strategic Support and City of Johannesburg to ensure alignment and effectiveness as well as a skilled consultant to manage the overall administration of the local legislature; and Ensure integrated change management strategies that include stakeholder management, leadership involvement and communication. Critical Success Factors for this approach The day-to-day operational work be separated from project work; Resources must be allocated to the project so that there will be sufficient focus on the task at hand; OOS members to be trained up to ensure a culture of delivery; Leadership commitment through sufficient Project Sponsoring; and The department has a specific identity, to maintain a high level of awareness among stakeholders. Between 2006 and the present day the CoJ has initiated reforms aimed at the enhancement of participatory democracy through the development of participatory opportunities and democratic accountability, which seek to realise the following objectives: Strengthen the role of the Council and Councillors, and enhance Council and the role of its Committees in the ongoing oversight and scrutiny of the Executive and Administration, with progressively increased participation by communities, organisation and individuals, to assist in the attainment of the City’s strategic agenda; 228 Ensure effective participation by communities and individuals in policy development, implementation and critical evaluation of the performance of the Administration; Ensure more meaningful debates on local issues within committees that affect the citizens and communities of the City of Johannesburg and the progressive development of plans that are clear, concise and meaningful to communities to facilitate effective engagement; Creating opportunities within Council meetings for critical, constructive debate that is relevant and meaningful to the constituencies that Councillors serve; and Progressively enhance and institutionalise sound governance and the Culture of Citizenship within all aspects of governance. With respect to the Department of Stakeholder Relationship Management, the key features of the new governance model include the following: Participatory democracy and participatory opportunities within the separation of powers between the executive and legislative functions of local government, with a view to strengthening the executive’s capacity for effective implementation of the strategic agenda and efficient service delivery, while at the same time strengthening the legislative and oversight role of Councillors, Council and Committees of Council and their ongoing engagement with communities, organisations and individuals; Strengthening the Council’s oversight role through the effective engagement by nonexecutive Portfolio and Standing Committees (“section 79 committees”), with the diverse communities and interested parties in Johannesburg, and where appropriate defined external persons or organisations ; Progressively increase the capacity and scope and scale of the activities of the Petitions and Public Participation Committee to evaluate the development of participatory democracy in Johannesburg, responsiveness of the administration to the identified and articulated needs of communities through the all needs and planning processes, including petitions, community based planning and other forms of participatory democratic engagement with communities, community based organisations and special interest organisations; The progressive development of effective two way ongoing communication with communities and associated civic education to enhance and increase participatory opportunities; and The development of a culture of citizenship within identified stakeholders and communities. CHALLENGES AND OPPORTUNITIES As previously stated in the “Governance Section” of the 2008/9 amendments to the Integrated Development Plan (2006 to 2011), change is always a challenge and the “Johannesburg Model” seeks to ensure there is increased accountability and responsiveness of the Administration and Executive to the elected representatives of Communities, within the Strategic Agenda as resolved by Council. The objective is to not only ensure compliance with the requirements of the Constitution and existing legislation, which clearly articulates the need for participatory democracy and community involvement in governance, as well as manifesto commitments; but to ensure that the developed model informs improved legislation and the practical implementation of participatory democracy within Johannesburg and as a realistic replicatable model for use by other Councils, within a progressively aligned legislative framework. The Johannesburg Model is not simply a pilot for local government as it is critical that there is awareness of the interrelationship of policy development, and service delivery between and within different spheres of Government. However, the final development of the model faces genuine challenges given the differences within provincial and national legislation and the constitutional detail and attention to these two 229 spheres of government compared to that of the local government sphere. This cannot be resolved without changes to legislation. The comparative constraints of local government legislation compared to other spheres of government has regrettably negatively impacted on the effectiveness of the pilot with respect to the separation of powers between the legislature and administration, and to a lesser degree between the legislature and executive, and the associated progressive development of oversight and scrutiny by the legislature, it is believed that what should have been a “creative tension’ has been partially resolved in 2008/9 and that legislative amendments will ensure a legislative framework that facilitates finalisation of the pilot and its replication. INITIATIVES TOWARDS MEETING THE GDS PRINCIPLES The vision contained in the Growth and Development Strategy (GDS) are long-term, City-wide and outcome-based. They have specific relevance to the changing role of the Legislature with specific reference to the development of sustainable “good governance”, through “innovative governance solutions”. However, improvements in the oversight and scrutiny through the new Portfolio and Standing Committees are also an important development in ensuring that the “vision statement”, what City we would like to see in the year 2030, and the “strategic agenda” of the City are attained. Therefore, the focus of the “Johannesburg Model” on the building supportive critical oversight and scrutiny as an integral part of the institutional design will facilitate the strategic agenda, which is wider than the development of “good governance”. The “Johannesburg Model” is an important feature of the attainment of the long term strategic objectives within each of the 12 sector areas, as defined within this IDP revision. Each service delivery sector, and the responsible Executive Mayoral Committee Member cluster are vertically aligned to the scope of responsibility and the terms of reference of individual Portfolio Committee. The question of “sustainability” is a critical underpinning factor of the GDS, in terms of the “Johannesburg Model” sustainability is not limited to Johannesburg, but the development within the innovative phase 2006 to 2010 of a clear replicatable best practice design that can be utilised by local government within South Africa in the new 2011 to 216 team of office. The GDS requirement of sustainable indicators, which are clearly those of the City and show City wide performance, and not simply a top down articulation of the City manager’s performance indicators, has previously been identified as a challenge by the Auditor General. The ability of the Portfolio Committees to critically evaluate the quality and alignment of policy development to the intentions of the GDS, with the quarterly evaluation of performance against the stated targets within the IDP is an important dimension in assisting the Mayoral Committee Members to attain their specific stated outcomes. SECTOR RESPONSE TO COMMUNITY ISSUES The development of the identification of ward priorities has been driven by Councillors and Ward Committee members with the communities they represent. The Office of the Speaker is responsible for the coordination of community participation engagements within the City. This was initiated in 2007/08 with the focus on “ward priorities” and the roll out of ward based planning in 2008/09. In the early part of this term of office Communities and Councillors had correctly critically commented on their inability to easily engage in participatory opportunities, identify local delivery targets within the Integrated Development Plans of the City, and in materials developed by the Administration on behalf of the Executive. 230 This articulation of the relationship between the City and communities also impacts on Councillors own relationships with constituencies, organised sections of communities, and ward committee members, and has been seen as a significant questioning to the legitimacy of the “Government” in general, given the closeness of local government to communities, and the Council in particular. This was and remains a threat as it raises significant questions within communities about the commitment of government to participatory democracy and negatively impacts on the potential involvement of communities in participatory opportunities in all their forms. It also created a self fulfilling prophecy, with lower identified active community ownership of community resources, and their involvement in specific aspects of service delivery within communities, as well as limiting the ability of communities to critically evaluate performance and delivery, against clearly defined targets within their local communities. In addition Councillors have believed that there has been a relative lack of responsiveness by the administration to previously identified needs, which has lead to unnecessary tensions within communities. Councillors have also identified the lack of the provision of quality ongoing information on their wards as an activity that could be significantly improved and facilitate local planning. In 2007/08, for the first time, the Integrated Development plan had a section on ward priorities and this was extended in 2008/09 with the development of “Ward Based Plans” for the majority of the 109 Wards in the City and their full implementation and integration into Department and Municipal Entities business plans for delivery in the financial year 2009/10 and in defined forthcoming years. The progressive increase in the rate of roll out of local projects, and planning processes that are ward specific within each sector, requires the active participation of Councillors, Ward Committees and Communities, with the support of Provincial Community Development Workers and project specific Community Liaison Officers. The Office of the Speaker plays a coordinating role in ensuring there is alignment between and within community initiatives. The Office of the Speaker is also responsible for the development of appropriate civic education programmes for communities, which are directly linked to the development of a culture of citizenship, awareness of rights and responsibilities, and the interrelationship of these activities with community participation, and the annual planning and implementation cycle. SECTOR CONTRIBUTION TO 2010 FIFA WORLD CUP The contribution made by the legislative arm of council is focused on assisting the local regulatory framework of by laws governing the 2010 to be streamlined and passed through council. This is done through public participation and hearings on how communities input and influence the drafting of such by laws. Furthermore the legislative arm of council exercises oversight and scrutiny on all aspects of governance of the City including 2010 FIFA Soccer world cup project. PROGRAMMES PLANNED FOR 2009/10 IDP Programmes as per Departmental Objectives Delivery agenda/Detail Ensure that communities are mobilised to participate and engage in collective action with the City towards the achievements of its goals and initiatives I.e. MRM, Anticorruption, etc Completion of replicable public participation model for local government and national conference on participatory democracy to launch the said model: 1 Community mobilisation strategy document Approved community mobilisation plan Implemented community mobilisation programmes 231 IDP Programmes as per Departmental Objectives Delivery agenda/Detail Ensure that communities experience that their voice is heard and heeded by Council and Government Evaluate scope and scale of stakeholder data against representatively targets and make recommendations on priorities 20011-2016 in terms of community participatory opportunities : annual publication and circulation of public participation framework Ensure that the legislature of the City is regarded as the benchmark in Local Government model development Evaluate local government protocols and develop a manual for use by local sphere of government: approved community feedback and dialogued component report published Ensure an effective and efficient Legislative process resulting in efficient and aligned policy development and implementation Ensure that ward communities and councillors by evaluation of project equity and decentralise: approved councillor performance evaluation system Ensure that the Legislative arm of Council and its role players are fully capacitated to ensure their effective and qualitative participation in the legal legislative process Develop proposals for improvements in the legal framework of councillors code of conduct to ensure high ethical standards aligned with citizenship culture: recorded community and councillor input agenda and information system Develop and make recommendation for legislative changes and model policy of law making, oversight and scrutiny including sanding orders to enhance participatory democracy and management of annual cycles: approved legislative amendments and strategy , results published and circulated Implement at least 10 legacy programme that enhance the Johannesburg model: degree of compliance to code of conduct, published and circulated results Ensure an effective and efficient corporate systems to enable accelerated delivery by the office Ensure that the Legislative arm of Council and its role players are fully capacitated to ensure their effective and qualitative participation in the legal legislative process Ensure an effective and efficient Legislative process resulting in efficient and aligned policy development and implementation Ensure an effective and efficient Legislative process resulting in efficient and aligned policy development and implementation Ensure the accountability and transparency of the executive to and by the Legislative arm of Council Ensure the accountability and transparency of the executive to and by the Legislative arm of Council Ensure the accountability and transparency of the executive to and by the Legislative arm of Council Ensure that the legislature of the City is regarded as the benchmark in Local Government model development Implement transparency framework guided by A Act and PAIA: results of circulated and published transparency information Undertake overseas study tours by committees of council Implement transparency framework guided by A Act and PAIA : evaluated framework results implemented and approved Publish and circulate best practice oversight, scrutiny systems: evaluated best practice framework results implemented and approved Develop section 79 committee business plan: report on benchmarks on oversight and scrutiny Conduct IDP Review and Budget Analysis: developed terms of reference for CFFG Evaluate programmes performance of committees: updated reported on protocol framework and improved baseline target Ensure an effective and efficient corporate systems to enable accelerated delivery by the office Implement tracking system of council and committee resolutions: number of petitions and council resolutions published Build a culture of high performance in the Office through the institutionalisation of the Batho Pele and Citizenship principles Undertake Research Seminar series: results of evaluated oversight and scrutiny framework 232 IDP Programmes as per Departmental Objectives Delivery agenda/Detail Ensure that communities are mobilised to participate and engage in collective action with the City towards the achievements of its goals and initiatives I.e MRM, Anticorruption, etc Oversight of annual report of the City: oversight report analysis Ensure that the Legislative arm of Council and its role players are fully capacitated to ensure their effective and qualitative participation in the legal legislative process Establish a Batho Pele principle forum and appoint champions: appointed Batho Pele champions and principles displayed at service points Ensure an effective and efficient Legislative process resulting in efficient and aligned policy development and implementation Build a culture of high performance and citizenship through customer focus service charter and appoint champions: approved and signed scorecards signed and approved performance agreements and quarterly evaluation framework of senior staff Ensure an effective and efficient corporate systems to enable accelerated delivery by the office Ensure budget and business plan adequately reflect need of OOS: approved annual business plan and budget Ensure an environment conducive to high performance Development of well resourced and supported human capital: approved service charter ad quality assurance system implemented Build a culture of high performance in the Office through the institutionalisation of the Batho Pele and Citizenship principles Undertake a safe working environment and compliance audit: compliance audit report Document the replicability of the model and proposed legislative changes to effect oversight and scrutiny: research and publications of the model with concrete proposed legislation changes Development, evaluation and enhancement of the Johannesburg Government Model and supporting Legislative Framework 233 LEGISLATURE SECTOR PLAN 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA To ensure that the local democratic process (LDP) is recognised as legitimate by the communities of Johannesburg through their ongoing participation Ensure that communities are mobilised to participate and engage in collective action with the city towards the achievement of it goals and initiatives i.e. Izimbizos, MRM, Anti-Corruption etc. Brand and Communications Strategy including Community Mobilisation Strategy Programme and Plans implemented and evaluated against the targets in said strategy Ensure that communities experience that their voice is heard and heeded by Council and Government Build an effective, efficient co-operative and transparent institution in order to fast track the implementation of the City’s Strategic Agenda Ensure the accountability and transparency of the Executive to and by the Legislative arm of Council Enable the accountability and transparency of the Legislature to and by the public Transform the government model to incorporate best practices with respect to separation of powers, public participation, accountability and transparency and 234 Implementation of an electronic correspondence and archiving system which facilitates transparency and Accessibility Framework is aligned with Promotion of Access to Information Act 2 of 2002 and the National Archives Act 1996 Oversight & Scrutiny Framework implemented that informs and is vertically aligned with Oversight and Scrutiny Legislation and Initiatives of other spheres of Government through joint portfolio committees and stakeholder workshops Critical Friend Focus Groups for media, public participation and citizenship, Terms of Reference and Targets established and at least 3 meeting per group held Local Government Protocol guidelines developed and published in line with National Protocol review Corporate Identity for the Legislature completed and implemented for all Ensure an effective and efficient Legislative Process resulting in efficient and aligned policy development and implementation Ensure the transparency and the accessibility of information Ensure the accountability of Government through effective oversight and scrutiny Participatory Democracy “Community Dialogue” Strategy implemented against the representivity index and evaluated against the targets in said strategy Participation framework dialogue and feedback component implemented. Critically evaluate participation opportunities and engagement between 2006 and 2009 Completion of a replicatable public participation model for local government and national conference on participatory democracy to launch said model Re-evaluation of the CoJ annual cycle and local and legislative requirements for public consultations. Complete recommendations on legislative changes to deepen participatory democracy Evaluate the scope and scale of stakeholder data against representivity targets and make recommendations on priorities for 2011-2016 in terms of community participatory opportunities Completion of the Communication targets for 2009/10 as defined within the Communication Strategy of Council, critical evaluation of said strategy and development of generic model local government communication strategy for replication Review the Implementation of vertical and horizontal oversight and scrutiny by Portfolio Committees and set up model for replication Evaluation of critical friend focus groups and recommendations for the future Evaluation of local government protocols and the development of manual for use by local government Make recommendations for legislative changes and model 5-YEAR STRATEGIC OBJECTIVES protocol Ensure that the Legislature of the COJ is regarded as the benchmark in Local Government Model development Ensure an inclusive and cooperative approach to the development of the Johannesburg Government Model to facilitate the ease of adoption Development, evaluation and enhancement of the Johannesburg Government Model & supporting Legislative Framework Strengthen the capability of the Office of the Speaker and its staff to deliver exceptional value to their internal and external customers IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA aspects of the legislatures work All local government legal participatory requirements reviewed and local requirements developed and implemented that enhance participatory democracy Johannesburg Government Model annual review undertaken, changes implemented, historical record kept and packaged for critical evaluation Conduct Needs Analysis Survey (implementation recommendation – combine with wellness needs analysis) policy/bylaws/standing orders for the enhancement of participatory democracy by extending participatory opportunities through the management of the annual cycle plans Ensure an environment conducive to high performance (quality of work life within a safe physical environment) Identify potential Learning Programmes (ideally at NQF level 5) 235 Establish and implement reviewed organizational structure Implement Human Resources Sub Directorate Establish a Finance sub Directorate Establish Legal Sub Directorate Ensure Councillor Affairs and Support Services is optimally functional Allocate the financial and procurement requirements for existing/new positions Identify planned projects in IDP and Business plan and implementation plan drawn out Seek agreement on a budget costing model Implement the OOS budget process plan Inform and Train employees Identify information and records that are to be handed over from Corporate and Shared Services 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA Develop and Nurture Human Capital at all levels within the office Conduct Skills Gap Analysis (includes budget training) Undertake High Level Design of programme - Aspects will include: Financial literacy & management Balanced lifestyle Health topics Computer Skills Conduct impact assessment on the current wellness centre and identify elements that can be leveraged on, and address the gaps appropriately Design Programme Build a culture of high performance in the office through the institutionalisation of the Batho Pele and Citizenship principles 236 Roll Out Training (incl. all administration) Public Safety Sector Plan INTRODUCTION AND OVERVIEW The vision of the Public Safety Sector is to build a city where life property and lifestyles are safe and secure so that the residents and businesses can live and operate free from crime, threats to public safety, personal emergencies and disasters. In an effort to ensure that the sector is still on the right course with regard to the achievement of this vision the Public Safety Sector plan was reviewed not only to assess the progress made but also to close the gaps that may have existed in the path to the achievement of the Vision. Largely the sector plan is aligned and seeks to achieve the ideals and strategic principles of the City’s Growth and Development Strategy, the Mayoral Priorities as well as the other feeding documents like the City Safety Strategy. The review of this plan further takes into account the alignment issues with regard to other departments in the city, its entities as well as Provincial and other National Priorities relating to the core business of the sector. The other input that has been taken into account is the community inputs and feedback given on various instances and engagements. The Johannesburg Metropolitan Police Department (JMPD) and the Emergency Management Services (EMS) are jointly responsible for rendering safety services to the people of Johannesburg. Johannesburg Metropolitan Police Department (JMPD) The core services of the Johannesburg Metropolitan Police Department (JMPD) is defined on the basis of its legislated mandate and encompasses the following programs Crime prevention The overall objective of the crime prevention program is to reduce crime and violence in Johannesburg by leveraging visible policing and technology, and addressing the underlying causes of crimes as well as the needs of vulnerable groups, such as women and children. By-law enforcement The overall objective of By-law enforcement program is to address the urban decay, crime and grime, by enforcing City By-laws and leveraging visible policing and technology Road traffic management The overall objective of Road Traffic Management program is to reduce road and pedestrian fatalities and to create greater compliance to road traffic regulations and road safety practices by enforcing road traffic regulations and leveraging visible policing and technology. Emergency Management Services (EMS) The core business of Emergency Management Services (EMS) is to save lives and property through pro-active interventions, and prevention programmes, as a way to mitigate the costs of risk coverage for the City’s inhabitants whilst at the same time continually enhancing our ability to render a fast, reliable and highly skilled response to any kind of emergency situation (reactive). Proactive Fire Safety: This directorate focuses on BY-LAW enforcement, Code Application, Flammable Liquids and Events Management. 237 Disaster Management: The directorate focuses Disaster Planning, Mitigation & Recovery, and Public Information, Education and Relations (Pier) and BESAFE centres. Reactive (operations) Emergency Medical response; Fire Fighting; Command and Control Centre; and Search and Rescue, Hazmat and Diving Unit. In fulfilling the above mandates, both departments are required to perform its functions in accordance with certain prescribed acts, regulations and by-laws, which guide and inform strategies, policies, procedures and practices. These obligations largely define the nature in which the departments need to conduct its business. The following are some of the key pieces of legislation that govern the core functions of the Public Safety sector. Criminal Procedure Amendment Act [No. 42 of 2003] Disaster Management Act of 2002 Gauteng Ambulance Act, 2002 National Prosecuting Authority Amendment Act [No. 61 of 2000] National Road Traffic Amendment Act [No. 21 of 1999] White Paper on Safety and Security, 1998 Prevention of Organised Crime Act [No. 121 of 1998] Gauteng City Improvement Districts Act 12 of 1997 The Constitution of the Republic of South Africa, 1996 National Crime Prevention Strategy, 1996 South African Police Service Act 68 of 1995 Fire Brigade Services Act The City of Johannesburg By-Laws The Joburg City Safety Strategy Health Professions Council of South Africa SANS 10090 and NFPA Sports and Events Bill Sports and Events Bill Strategic Direction The Sector identified the following long-term goals in terms of the IDP chapter on Public Safety. An orderly and safe urban environment; City free of fear of crime and violence; Effective regulation of road traffic in the interest of road-safety across the city; and A proactive and effective emergency response and disaster management capability. Further the following 5-year Strategic Objectives were identified aimed at contextualising the strategy of the sector: Improved citywide compliance with regulations designed to enforce a safer urban environment Reduce incident of crime by 7%-10% over a five-year period Reduce the incidents of crimes against women and children by 7%-10% over a five-year period Reduce road fatalities by 30% over a five-year period Reduce pedestrian fatalities by 30% over a five-year period Greater compliance to road traffic regulations and road safety practices Enhanced economic efficiencies through traffic mobility A proactive well-capacitated disaster management and emergency response maintained at 100% state of readiness 238 Communities aware of dangers and empowered to assist in mitigating disasters Efficient and effective response to emergency incidents Vigilant custodianship of safety prescripts CHALLENGES AND OPPORTUNITIES With the increasing demand for emergency services in the city it becomes necessary for both departments to engage in an even more proactive approach to achieving its mandate. The increasing demand is exacerbated by the rapid increase in the population figures due to inmigration, increase in crime, illegal trading, illegal occupation of buildings and open spaces, rapid increase in the number of major events held in the City, as well as the exponentially growing demand for the service. Although it remains imperative to ensure that adequate capacity exists to respond to any emergencies and disasters that may emerge, it remains critical that proactive community empowerment is explored. This approach will significantly reduce emergency calls therefore creating safer communities. Through its volunteer programme, EMS continues to make this approach a reality and creating a safer city. This is also viewed as a mitigation mechanism which enhances Disaster Management preparedness for the city. The Xenophobic Attacks experienced by the city remain vivid to the minds of many and has tested the city’s preparedness and resilience to various kinds of disasters. On the one hand it has fostered the need for world class communication and coordination on the other. This demonstrated clearly that disaster management, policing and emergency response is not a one department function but of the whole city and therefore call for coordination mechanisms. The Funding for ambulance services emanates from Province in the form of subsidies, and additional revenue is generated from ambulance fees. The fire, disaster management and support services component is funded directly by the city by means of rates and taxes. It is important to note that whilst the volumes in relation to emergency services, are increasing, the revenue collection is not improving at the same rate. This can be attributed to the profile of the customers that are categorised as indigent and are subsidised by the City in terms of the social package. This category includes: Children that are six years and younger Maternity patients Uninsured patients that have been registered with the City as indigents One of the emerging challenges that remain unclear and therefore unresolved is the provincialisation of ambulances. Although this issue has been on the table for more than four years there seems to be very minimal progress despite the takeover programme being defined. This negatively impacted on employee morale as well the resourcing of this critical component in terms of staffing and vehicles. The city’s decision to procure its own ambulances will assist the city in not only mitigating the risks regarding events but also close the gap with regard to response vehicles. It should be mentioned that EMS last got ambulances from GPG in late 2006. Events, escorts (funerals and v.i.p.) and other major functions around the city further deplete already scarce emergency resources. The JMPD and EMS are required to ensure the safety of all people who attend these events and functions leaving other areas short of resources to attend to emergency situations that may arise. Ways to address the growing demand for these services are being explored such as charging organisers for the service and providing a supervisory role over private security and emergency personnel. The shortage of skills continues to rare its ugly head in the sector particularly for the specialised skills like the ALS, fire engineering among other areas. This though is a national phenomenon 239 and is not limited to Joburg. Through the EMS Medical academy the organization is making strides to address the skills gap that exist in the country. Response to emergencies remains a challenge for both departments. EMS in particular has been experiencing challenges around the turnaround times particularly for areas like Orange Farm and Diepsloot which affect the quality of service rendered. This is mainly due to the lack of health facilities in these areas resulting in prolonged mission times for EMS. This was further exacerbated by the by the hospital closures where ambulances are diverted to other hospitals. REVISION TO THE COJ 2006/11 IDP Most of the refinements are around the targets as this is the period where some of the interventions must be wrapped up due to the FIFA Confederations Cup and 2010 World Cup. It is for this reason that more work has been done around the programme contents particularly with the intensification of the Emergency Response Improvement, Disaster Management, Crime Prevention and Traffic Management. SECTOR RESPONSE TO COMMUNITY ISSUES In the course of service delivery and various scheduled interactions with the community like the regional/stakeholder summits among others the community raised various issues that need attention and therefore incorporation into the sector planning processes. The following are some of the key issues raised during the community engagement processes: Additional ambulances Stricter by-law enforcement Improvement in response times to medical, crime and traffic emergencies High levels of crime Improved participation in CPFs Improved traffic flow management More police visibility Installation of additional CCTV cameras Building of additional fire stations and police stations In relation to the new fire stations EMS plans to complete the Protea and Cosmo City Fire stations during the 2009/10 financial year. This is to ensure that the access to the citizens of the city is improved to all communities. With regard to the reduction of fires and drownings the smoke detectors and swimming pool bylaws respectively will be very critical. The Karabo Gwala Safety campaign will also be imperative to strengthening community awareness particularly around emergency number and call prioritization. The issue of health facilities particularly at areas like Orange Farm and Diepsloot, which affect the turnaround times, remain unresolved despite them having been addressed in various engagements. The JMPD is in the process of revising its deployment strategies to ensure better police visibility, improved response to reported crime and traffic incidences and more active engagement with communities. A ward based deployment approach will be piloted and refined during the 2009/2010 financial year. It is envisaged that this approach will be beneficial in the following ways: High police visibility Reduced response time 24/7 availability of resources in wards Reduction in operating overheads Reduced overtime Reduced fuel costs (Smaller geographic area to cover) 240 Assigned Officials can be held accountable for a specific area (ward) Smoother traffic flow during peak hours JMPD Officials will be more in touch with communities Better informed around crime and traffic trends in designated area Although the building of additional police stations is not a function of the City, the JMPD raised the matter with the Gauteng Department of Community Safety during a recent joint planning workshop. The department committed to pursue the matter with the SAPS as it is an issue that spans throughout the Province. SECTOR CONTRIBUTION TO 2010 FIFA WORLD CUP The sector will continue to prepare and equip itself to fulfill its safety and security responsibilities to the City while hosting of the FIFA 2010 Soccer World. SECTOR CONTRIBUTION TO INNER CITY The sector commits to continued focus on safety and security in the Inner City, and to meeting the commitments in the Inner City Charter, and to undertake enforcement activities as it relates to the Inner City Integrated Safety and Security Plan. 241 PUBLIC SAFETY SECTOR PLAN 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA An Orderly and Safe Urban environment Safe and Secure Urban Environment Safe and Secure Urban Environment Roll out of Joburg City Safety Program methodology through the development of the JCSP Toolkit One set of safety design guidelines for developers and home-owners (CPTED) External Management of the Built Environment components Focused Law enforcement operations: (Municipal court cases prosecuted – 18212) By-Law Citations issued: - Illegal street trading – 6144 Citations, - Illegal posters and signage - 2222, - Waste management – 2652 - Illegal Connections – 2578 Dedicated Law Enforcement Teams established to address Park Safety, Illegal Connections (Water and Electricity) Introduce a communication campaign to raise the level of public awareness of the existing City By-Laws • Dedicated park safety unit has been established and 27 park safety profiles and safety plans were developed • CPTED interventions at parks for parks safety plans Development of an Integrated Inner City Safety and Security Plan Community Outreach programme Continue to conduct awareness programs relating to: Road safety, Social crime prevention and City By-Laws to all multi-cultural groups, NGO’s, business stakeholders, taxi industries, schools, churches Provision of funeral escort services Improved participation with Community Policing Forums Continue the roll out of the Joburg City Safety Program methodology in the City of Joburg with CoJ role players and stake holders CPTED guidelines to be put in a CoJ regulatory framework External Management of the Built Environment components Continue with focused law enforcement as it relates to; - Illegal street trading - Illegal dumping and littering - Illegal postage and signage - Illegal connections (water and electricity) - Parks patrol Assign dedicated resources to respond to infringements identified through CCTV Assign dedicated resources to implement deliverables of the Inner City Charter and Integrated Inner City Safety and Security Plan Community Outreach programme 242 Develop and implement schools safety plans To enhance and sensitize communities awareness levels with regard to social crime prevention issues and facilitate access to services To encourage reporting of cases To assist with the establishment, strengthen and sustain Community Safety Forums Implement Social Crime Prevention activities at ward level To support the establishment of Youth Desks to implement Social Crime Prevention programmes affecting young people To reform the outlook of youth about drugs, and create safer and drug free communities 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA To ensure that the business and residential citizens of the City conduct their everyday life free of the fear of crime and violence Crime Prevention programme Crime Prevention programme To Reduce the incidence of Crimes against women and children An Integrated Inner City Safety and Security Plan has been developed which creates a structured and targeted approach to enforcement Lighting master plan developed for Joubert Park Youth at Risk project implemented. New CCTV footprint developed and implementation plan. Increased the CCTV Cameras to 216 Dedicated rapid response team (48 MPOs and 5 Vehicles) Foot patrollers in CCTV coverage area Increased Metro Police Officers with an additional 450 Conducted focused crime prevention interventions: 102 Major crime intervention with the SAPS Successes 14 263 - Arrest across the City Arrest driving under the influence of Alcohol, Arrest for illegal Firearms – (priority police precincts) 1508 Arrest for possession of drugs(priority police precincts) Conducted 7 formal safety awareness campaigns Women and Child Safety programme 243 2 Women and Child safety audits conducted (Rabie Ridge and Protea South) Introduced Interventions at parks, transport nodes, bad buildings and public open spaces Trained Metro Police Officers in Victim Support Conducted Safety Awareness Campaigns targeted at vulnerable groups (Women, School going Children and the Elderly) in collaboration with department of Community Safety Increased visibility of Metro Police Officers at places where vulnerable groups conduct there business or places of entertainment (e.g. Perimeter of Pension Pay Points, Shopping Malls) Revise deployment plan to ensure increased police visibility and improved response to reported crime Increase the number of undercover operations, joint strategic roadblocks, and building searches Step up efforts to address the underlying causes of crime (Alcohol, drugs and firearms) through focused joint interventions: Roadside check points Stop and search operations Undercover operations Closure of illegal liquor outlets Compliance inspections to 2nd hand dealers, scrap metal dealers and panel beating shops Recruit and train an additional 1 000 MPOs (500 in January 2009 and 500 in June 2009) to meet the target of 4 000 MPOs by the December 2009 Continue to strengthen response capacity in CCTV coverage area Additional MPOs to conduct rapid response and foot patrols Engage with SANRAL, JRA and private sector to link existing CCTV infrastructure to central control room Women and Child Safety programme Conduct additional Women and Child safety audits Address safety threats raised in Women and Child safety audits Provide training and support for the establishment of networks of men to act as advocates of women and child safety through a range of community engagements Continue to ensure high visibility at pension pay points, transport nodes, schools, shopping malls and other places of entertainment Train additional MPOs in victim support Continue to conduct safety awareness campaigns targeted at vulnerable groups (Women, school going children and the elderly) 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA Reduce incidence of road accidents and pedestrian fatalities Traffic Safety Enforcement and Traffic Flow Management Traffic Safety Enforcement and Traffic Flow Management Reduced road fatalities and accidents by 11% Conducted targeted roadblocks in order to reduce the number of accidents in which driver impairment is a factor Continued with electronic speed enforcement operations Increased ‘smart roadblocks’ to apprehend offenders with outstanding fines and warrants of arrest Conducted roadside check points to check driver and vehicle fitness Participated in road safety awareness campaigns with the Road Traffic Management Corporation Enforcement outputs: 3 974 794 Fines issued for speeding violation 95 416 fines issued for vehicle defects 97 974 fines issued for driver duties 10 183 unroadworthy vehicles discontinued Disaster Management programme Greater compliance to road traffic regulations and road safety practices Enhance economic efficiency through traffic mobility A proactive well-capacitated disaster management and emergency response maintained at 100% state of readiness 244 Comprehensive City’s risk assessment completed and high profile threats identified Multidisciplinary simulation exercises for the Top 10 risks conducted throughout the City and continue Disaster Management Centre Project Manager and Project Plan done through JRA Tender process on track Volunteer Database established and has 1600 (600 already trained) volunteers currently Procedure manual developed and information streams identified Further reduce road fatalities by between 17% and 20% Identify and target hazardous locations to reduce accidents and fatalities at these locations Intensify interventions to apprehend offenders for driving under the influence of alcohol Increase in the number of arrest Increase in the number of successful prosecutions and convictions Intensify speed enforcement interventions Stricter enforcement around vehicle roadworthiness and driver responsibilities Revise deployment plan to ensure improved response to accidents and traffic flow Plan and execute more roadblocks and roadside checkpoints Disaster Management programme Continue with testing the state of readiness for the top 10 identified risks Conduct simulation exercises in 85% of the completed match venues and training venues to assess the state of readiness 100% implementation of the Volunteer Database 100% implementation of the mutual aid response team 85% completion of the Disaster Management Centre Achieve 100% operational readiness of the Disaster Management Centre 100% implementation of the Emergency Communication Network 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA Communities aware of dangers and empowered to assist in mitigating disasters Community Disaster Mitigation Information programme Community Disaster Mitigation Information programme Efficient and effective response to emergency incidents (100%) Roll-out of Karabo Gwala a community safety campaign Promoting Safer Sources of Energy for cooking, heating and lighting Implementation of the City’s injury prevention programme Partnerships with institutions like the CSIR and the weather service will be important for the early warning systems Implementation of 70% of Waste/veld fire reduction programme Implementation of the fire prevention and energy use management programme in High risk informal settlements’ Emergency Response Improvement programme Improve Compliance to Bylaws Ensure 100% operational status of the Professional reservist association Procure ambulance system (18 Ambulances) to address the risks associated with response times, events in the city 85% implementation of the twinning agreement programme of action (3year programme) 8 fire station renovations as part of the facilities revitalization programme, which will include replacement/revitalization of equipment and facilities. Implement the final 3 year Equipment replacement programme Appoint 150 FF/EMT’s to further improve response capacity Rollout the home finder programme to other hotspots as identified Improve Compliance to Bylaws 245 Emergency Response Improvement programme Vigilant Custodianship of Safety Prescripts Karabo Gwala safety campaign defined and will be relaunched soon Safe paraffin, stoves and candle campaigns continue in hotspots like Mangolongolo, George Goch, Denver, Alexandra and Orange Farm The Early warning systems in place with the weather services and other relevant institutions Although the bylaws with regard to swimming pools and smoke detectors are in the fourth draft their marketing continues The risk watch curriculum was rolled out in all public schools the City More than 11% decline in pedestrian accidents was realised through joint interventions with organizations like JMPD, Dept of Transport and JRA. 150 FF/EMT’s (Firefighter/Emergency medical technicians) have been appointed 16 new ambulances were delivered and specifications for the other 25 ambulances are being finalised 6 Stations identified, specifications drawn and EPWP Quantity Surveyor appointed Equipment Committee appointed and currently working or requirements Tender process being followed for the new equipment Bylaws in the fourth draft currently and should be finalized during the course of the year Station Commander for the Fire Investigations unit appointed and is working closely with SAPS Forensic Strategic (Corporate) Buildings in the City identified Inspections conducted and disaster plans developed Promote awareness and compliance to swimming pool bylaws Ensure 100% establishment and Capacitating of the fire investigations unit in Fire Safety 100% compliance of the strategic buildings to the City’s bylaws 100% Compliance of all 2010 match and training venues to Safety Prescripts Ensure 100% prosecutions of the 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 246 All Hazardous material in the city are being inspected for compliance with the code and the Act Accredited accommodation identified and will be inspected for compliance Dangerous Goods unit has been capacitated with the champions identified 2009/10 DELIVERY AGENDA repeat building safety offenders Conduct an audit of the extent of exposure by the City to hazardous materials (extent of unlicensed operations) Spatial Form And Urban Management Sector Plan INTRODUCTION AND OVERVIEW The Department renders strategic spatial planning for the City, producing documents such as the City’s Spatial Development Framework (SDF) and the seven Regional Spatial Development Frameworks (RSDF), as well as precinct plans and Urban Development Frameworks (UDFs) for key development nodes such as the Gautrain precincts. Through the Corporate Geo-Informatics (CGIS) function, the Department is the custodian of the City’s cadastral data, which has applications and impacts in non-spatial areas such as billing and revenue. The Department also has a legislated regulatory responsibility for processing town-planning applications, outdoor advertising applications and building plans, and for enforcing town planning and building controls. Through its seven regional offices, DP&UM renders an urban management and service delivery monitoring function, whose primary concern is to ensure the maintenance of acceptable service levels across the City. The Department has an oversight responsibility over the Johannesburg Development Agency (JDA) and plays a key role in the Alexandra Renewal Programme (ARP), the Inner City Regeneration Programme and the Cosmo City development. The Department is the custodian of the City’s Capital Investment Management System (CIMS), and thus plays a critical role in guiding and directing the City’s capital budget, through the Capital Investment Framework and Service Delivery and Budget Implementation Plan (SDBIP). Long Term Objectives and Strategic Policy Directions The Department is the City’s lead department in spatial and settlement transformation; and by implication, it is the responsibility of the Department to ensure that the spatial and other decisions taken now will contribute to the best possible pro-poor outcome for the future of Joburg, i.e. what decisions do we take now to place the City on a growth trajectory towards equality, sustainability, efficiency and accessibility? The first decade of the new century may be seen as a transitional one in which powerful new 16 trends emerged , but existing or traditional trends still persisted. There are many uncertainties into the future but a number of trends – some very positive – can be identified and collated into a long term urban view for the City, which may inform our policy choices and investment decisions. The Department acknowledges that a new City is in the making, as developments in the latter part of the decade suggest that we may be on the cusp of a more fundamental shift in development patterns, the effects of which are likely to become strongly apparent in the next five to ten years. There are at least five major interrelated reasons for this, and it is from these development trends and events that the Department is determining its strategic policy direction. Firstly, we have a responsibility to work towards a more just and equitable City of Joburg. The Department is aware of the need to confront the duality, which continues to characterise the City. As such, there is renewed focus on finding a practicable solution to existing informal settlements as well as the need to demonstrate progress against the Millennium Development Goal of formalising informal settlements by 2014. This, together with the need to bring all parts of the City into appropriate planning and regulatory frameworks has resulted in the Department (in partnership with Housing) developing a bold 16 The proliferation of decentralised shopping malls, the growth of informal settlements, strip development along major arterials, the rapid decline of the inner city, development on the edge of the City and mass roll-out of RDP housing. 247 programme towards the legal regularisation of informal settlements and the development of regulatory tools and capacities to ensure that health and safety standards and the protection offered by the state is extended to these areas, while formal township establishment processes are underway. The Department will in the 2008/09 financial year establish a dedicated Regularisation Unit, and commence with the regularisation of identified informal settlements. In 2009/10, the Department will, inter alia, continue to initiate rezonings (where feasible), pursue the ownership of settlements on privately owned land, and prepare budgets for the provision of basic levels of service. Closely linked to the regularisation of informal settlements is the establishment of sustainable human settlements in which design guidelines and the measurement of the quality of life through sustainability indices are paramount. We also have a responsibility to work towards a well-governed and managed City in terms of service delivery. The Department will continue to focus on its Urban Management function through the Regional Urban Management Plans and Operational Plans. Specific attention will be paid to the Regional Urban Management Monitoring System in the 2008/09 and 2009/10 financial years. Secondly decision-makers, spurred by events such as the FIFA World Cup in 2010, have realised how poor public transport is in South African cities. In 2006, the City responded to the challenge by announcing the construction of a Bus Rapid Transit system – modelled on the TransMilenio in Bogota, Colombia – and construction began in 2007. The Department is responding by accepting public transit systems as the backbone for future growth in the City, and has prioritised TransitOriented Development (TOD), which promotes mixed-use, walkable neighbourhoods within a 400-metre radius of transit-stopping points. An equal emphasis is being placed on non-motorised transport (NMT), and the Department will in the 2008/09 financial year conclude an NMT concept plan for the City, with phased implementation of the plan scheduled to commence in 2009/10. Thirdly, the property boom has left in its wake serious deficits in bulk infrastructure, which has prompted the Department to introduce a Growth Management Strategy (GMS) that will shape spatial patterns into the future, by addressing the current disjuncture between growth patterns and infrastructure provision. The infrastructure capacity deficits include bulk electricity, bulk water, sewer, road space, and landfill space. The areas most affected are also the areas where development has been most rapid, including along the northern and north-western edge of the City. The GMS responds to this challenge by ensuring that future capital investment is prioritised in areas where growth is desired and expected. Over the next five years, capital investment by the City will be strongly focussed around public transit systems, including traditional rail, the Gautrain, and the BRT, and developers will receive incentives to locate in these areas. In the next five to fifteen years, however, some expansion will happen in the northern parts of the City between the built-up areas of Johannesburg and Tshwane. Hence the Department will continue to engage with neighbouring municipalities and metros not only in terms of growth management, but also in the context of the evolving Global City-Region, so as to negate unhealthy competition, and foster an ethos of cooperation and coherence. A key component of the GMS is the Land Strategy, which aims to guide the acquisition and disposal of City-owned and other land in support of the Growth and Development Strategy and the GMS. In 2008/09, the Department will focus on the assessment of 10 growth areas identified in the GMS. In 2009/10, the Department will continue to assess growth targets and development trends through a GIS-based Trend Analysis System, and refine the development conditions relating to resource management. Fourth, the electricity crisis that dominated the headlines early in 2008, focused attention on the energy-efficiency of development. This has reinforced the shift towards public transport but it has 248 also brought about a hugely increased awareness of the environmental performance of buildings – of issues such as orientation, materials, solar cells, roof gardens, water conservation systems, low energy alternatives to air conditioning, and the use of natural lighting and ventilation. It is likely that national government will introduce regulations to support energy efficient development but the Department is, in the interim, concluding detailed guidelines for energy efficiency and has introduced energy efficiency as a criterion for evaluating all new developments. Fears of water stress by 2014, and of rapidly depleted landfill space, has added to the new awareness of resource limitations, and will impact on development patterns. Fifth, and most profoundly, oil prices have increased nearly six times during the past decade, ending an era of cheap fossil fuels in which car-oriented expansion was the dominant trend in urban development. In this context, urgent questions are being asked about the sustainability of traditional (twentieth century) forms of urban development. Our current response to the oil crisis may have enormous implications for our future ability to sustain urban life. There are, however, fortunately, indications that City governments and citizens in some parts of the world, at least, are responding to the economic (and moral) imperative to shift patterns of consumption. These responses include the growing use of hybrid-electric combustion engines, increasing ridership on public transport systems, the use of non-motorised transport such as bicycles, and a new interest in development within the traditional Inner City, and along transit routes. In Johannesburg, as in other South African cities, it is too early to speak of the death of sprawl or the end of car-oriented suburbanisation, but it is clear that patterns of development, and of property value, are shifting. As a result of the five factors outlined above, we are likely to see: The continued strengthening in the relative position of the Inner City, the City’s major transitrelated hub (although there may be continued pressures in the Inner City in terms of housing, servicing, and social support, and even turbulence as the mix of population continues to provoke tensions); Massive targeted investment around the Gautrain stations, beginning in Rosebank and Sandton, and then continuing in Midrand and Marlboro; A refocusing of investment, and also a re-orientation of property value, towards other transit related areas – along the BRT and traditional rail; The emergence of new mobility systems such as bikeways; The shift away from the enclosed mall near the freeway interchange towards the (resuscitated or newly created) ‘high street’ along a public transit network; The increased resource-efficiency of buildings and other development; New areas of foci for development such as, for example, the currently severely underutilised mining belt, and the area around Lanseria Airport on the Johannesburg, Mogale City, and Tshwane border. The in-situ regularisation of informal settlements and the establishment of sustainable human settlements on appropriately located land Throughout our planning, there is a need to ensure that planning processes are participatory and that the outcomes of planning are more equitable. This year, the Department will continue its active participation in the Ward Based Planning process that is driven by the Office of the Speaker and the Central Strategy Unit. The Department will extend assistance to communities in poorer parts of the City to ensure that they are able to compile their own precinct plans to guide developments in their areas. This is currently the case in wealthier parts of the City. Capacity will also be secured to drive the implementation of the upgrading of marginalised areas programme. 249 The congruent IDP programmes that frame the Department’s sector plan to address the above trends are contained in the Table 1 below: IDP PROGRAMME DESCRIPTION 1 Nodal Programme 2 Density Programme 3 Economic Area Regeneration Programme 4 Integrated Public Investment Programme 5 Upgrading Of Marginalised Areas Programme 6 Informal Settlements Regularisation Programme A new approach to the formalisation of informal settlements has been finalised and adopted by the city. During the 2008/ 2009 financial year, the institutional capacity to deliver on this will be in place and work will commence on the progressive in situ formalisation of settlements where it is deemed feasible to do so 7 Inner City Regeneration Programme 8 Growth Management Programme 9 Sustainable Human Settlements (SHS) Programme (Spatial Development Component, Including Urban Design) The Department will continue to play the coordinating role to make sure that various Core Departments and MEs meet their Charter obligations. In addition, the urban upgrades currently underway in Hillbrow, Berea and Yeoville will be extended into the City. The focus of this is to: complete projects in the Hillbrow, Berea and Yeoville areas; to start upgrade work in the Doornfontein and New Doornfontein areas (as aligned to the Greater Ellis Park project of the JDA); and to begin to create a meaningful open space system that links in a west/east direction across the inner city. The urban management function will also be enhanced to include support for the establishment of CIDS, in those parts of the Inner City where it is deemed most appropriate to do so GMS 1 was completed in 2007/2008. GMS 2 will focus on finer grained analysis, the introduction of incentives to give effect to GMS, as well as embedding GMS into the city’s resource allocation logic and processes This programme is aimed at increasing investment in affordable housing, in close proximity to public transportation and designated nodes, and to design and implement codes to create safer communities, legibility, functionality and aesthetics of the urban environment 250 Compilation of detailed precinct plans and development frameworks, promoting high density, mixed use, mixed income developments in strategic nodes such as the BRT routes and train stations in the marginalized areas. This is premised on an appreciation of the integrative opportunities offered by public transportation systems and termini Compilation of detailed precinct plans and development frameworks, promoting high density, mixed use, mixed income developments in strategic nodes such as the BRT routes and train stations in the marginalized areas. This is premised on an appreciation of the integrative opportunities offered by public transportation systems and termini The department will, through the JDA and in close collaboration with departments such as economic development, intensify the work currently being undertaken in the key economic areas in the city. In the year ahead, focus will be on strengthening the role played by decentralised nodes in promoting growth and job creation. Developments in nodes such as Stretford will move to implementation while urban management will be a priority, in nodes such as Roodepoort, Florida, Lenasia, Midrand, to halt decline in these areas Implementation of all public sector infrastructure investment to support priority nodal development, movement, urban renewal and other city priorities The planning for the redevelopment of Diepsloot, Ivory Park and Greater Orange Farm has been finalised and the focus is now on gearing the requisite resources for implementation RESPONSIBLE DIRECTORATE/ AGENCY Development planning and facilitation Development planning and facilitation Johannesburg Development Agency (JDA) Development Planning and Facilitation Development Planning and Facilitation Development Management & Regional Offices in collaboration with the Departments of Housing and Infrastructure Services Inner City Office Development Planning and Facilitation Development Planning and Facilitation 10 (NEW) Single Land Use Management System Programme 11 (NEW) Land Use Management Application Programme (NEW) Building Control Application Programme 12 13 14 15 16 (NEW) Electronic Archiving System For Building Plans Programme (NEW) GIS For Outdoor Advertising Programme (NEW) Land Use And Building Control Law Enforcement Programme Urban Management Programme 17 GIS System Development Programme 18 Spatial Information Maintenance Programme Spatial Information Dissemination Service Programme 19 20 Geo-Science Skills Development And Research And Development Programme In the year ahead, the consolidated town planning scheme will be promulgated, and this should result in significant qualitative and quantitative improvements in land use management processes To process all town planning applications to conclusion while maintaining turn around times. Focus will be shifted from turn around time improvements to quality decisions To process all building plans and outdoor advertising applications to conclusion while maintaining turn around times. Focus will be shifted from turn around time improvements to quality decisions and quality control To implement the electronic archiving system for building plans Development Management To develop a system that will operate on the City’s GIS to record all approved outdoor advertising applications spatially To investigate all alleged contraventions towards resolving them while improving on turnaround times. To adjust the current law enforcement system to respond to urban management in the regions The intensity, which characterises urban management in the Inner City, will be spread to at least 3 priority areas per region. The Regional Urban Management Plans (RUMPS) and the extent to which the process of the community based plans unfolds in each of the seven regions will in the main inform this Automate, enhance and integrate prioritised spatial information processes and systems Development Management Development Management Development And Maintenance Of Core Spatial Datasets, According To Service Level Agreements Corporate GeoInformatics (CGIS) The focus will be on increasing the numbers of people who access the City’s cadastral information via corporate geoinformatics and on implementing the new land information system (LIS) and Property Value Chain (PVC) Plans for innovative spatial information service solutions implemented Corporate GeoInformatics (CGIS) Development Management Development Management Development Management Urban Management Coordination and Special Projects Corporate GeoInformatics (CGIS) Corporate GeoInformatics (CGIS) REVISION TO THE COJ 2006/2011 IDP This year, new IDP programmes, which address the quality dimension of development management decision-making in the City, have been added, as have programmes to initiate the changeover from hard copy to electronic archiving and record keeping. The development application management improvement programme, for example, has evolved into the single land use management system programme. The corridor development and mobility routes programmes have been incorporated into the nodal and density programmes. The urban design programme has been incorporated into the sustainable human settlements programme. The Department now has twenty IDP programmes, as described in the Table 1 above. The programmes have been developed in response to the Department’s core mandate however, due to current stringent fiscal constraints, not all of these IDP programmes will receive funding. The unfortunate implication is that while the Department will retain the twenty programmes in the 2006/11 IDP, not all of the programmes may be implemented, particularly those that have not historically received funding. 251 Table 2 below gives a clear indication of the programmes or aspects of programmes that will be either funded or unfunded. However, priority programmes such as the regularisation of informal settlements and the inner city regeneration programme will remain funded to ensure their successful implementation during the current Mayoral term of office. Further, if a programme is unfunded, this does not imply that work will not continue. Where feasible, the Department will endeavour to implement alternative strategies for funding programmes, including cutting back on selected internal operational expenditure categories, without impacting on service delivery to the citizens of the City. Table 2 Funded and Unfunded IDP Programmes IDP PROGRAMME FUNDED OR UNFUNDED 1 Nodal Programme Funded. 2 Density Programme Funded. 3 Economic Area Regeneration Programme Integrated Public Investment Programme Upgrading Of Marginalised Areas Programme Informal Settlements Regularisation Programme Funded. 4 5 6 7 8 9 10 11 12 13 14 15 252 Inner City Regeneration Programme Growth Management Programme Sustainable Human Settlements (SHS) Programme (Spatial Development Component, Including Urban Design) (NEW) Single Land Use Management System Programme (NEW) Land Use Management Application Programme (NEW) Building Control Application Programme (NEW) Electronic Archiving System For Building Plans Programme (NEW) GIS For Outdoor Advertising Programme (NEW) Land Use And Building Control Law Enforcement Programme Funded. RESPONSIBLE DIRECTORATE/AGENCY Development Planning and Facilitation Development Planning and Facilitation Johannesburg Development Agency (JDA) Development Planning and Facilitation Funded. Funding to allocate dedicated capacity to these programmes at the regional level was not granted. Development Planning and Facilitation Funded. Development Management & Regional Offices in collaboration with the Departments of Housing and Infrastructure Services Inner City Office Funded. Funded. Partially funded. Specific funds for a dedicated urban design unit have not been granted. Urban design input will be facilitated within existing capacity and/or via consultants on a project-by-project basis. Partially funded. The process of re-classifying all properties within the City in terms of the consolidated scheme is unfunded. Partially funded. Processes to improve the quality of decision-making while maintaining the current turnaround time are already being undertaken within existing capacity. Development Planning and Facilitation Development Planning and Facilitation Development Management Development Management Partially funded. Processes to improve the quality of decision-making while maintaining the current turnaround time are already being undertaken within existing capacity. Unfunded. Alternative funding mechanisms will be investigated. Development Management Unfunded. Alternative funding mechanisms will be investigated. Development Management Limited funding available. Service delivery to continue within existing resource allocations. Development Management Development Management 16 Urban Management Programme 17 GIS System Development Programme 18 Spatial Information Maintenance Programme Spatial Information Dissemination Service Programme Geo-Science Skills Development And Research And Development Programme 19 20 Partially funded. Funding for additional capacity in the Regions to roll out urban management on a block-by-block basis was not granted. Urban management initiatives will continue within current human resource allocations. Limited funding available to complete acquisition of latest aerial photography. Urban Management Coordination and Special Projects Limited funding available. Corporate GeoInformatics (CGIS) Limited funding available. Corporate GeoInformatics (CGIS) Funded. Corporate GeoInformatics (CGIS) Corporate GeoInformatics (CGIS) INTEGRATED DEVELOPMENT PLANNING AND PUBLIC INVESTMENT Metropolitan and Provincial Alignment An initial round of meetings with our neighbouring metros and municipalities took place as follows: Ekurhuleni / Sedibeng on 22 August 2008; Tshwane 26 August 2008; Mogale / West Rand on 10 September 2008; and A meeting with Provincial DED is scheduled for 18 September 2008. Discussions have centered on spatial planning alignment and information sharing relating to projects / processes and regulated Spatial Plans (e.g. SDF). Concepts such as corridors, nodes, urban boundaries have been the focus of the discussion. The synthesis of these first round discussions will be collated into a draft Mayoral Committee report and/or presentation that will be presented to all the neighbouring municipalities prior to submission into the committee cycle. A draft internal discussion document is presently being prepared. A meeting with SARCC / Intersite took place on 9 September 2008. The Department presented the plans it has completed in previous financial years that relate to rail based initiatives, and those it is currently working on. The discussions focused on the current priorities of SARCC / Intersite, and which of the two parties projects were deemed priority (e.g. Stretford came out as being a priority for both). A further meeting in September is scheduled to consider their plans in more detail and to consider a ‘hit-list’ of 10 projects for closer cooperation / planning between the parties. SECTOR RESPONSE TO COMMUNITY ISSUES In 2008/09, the City continued to roll-out citywide outreach sessions, which enabled communities to raise and prioritise development issues, per Ward. The following two issues dominated community responses: The first issue is informal settlements. It was stated that the Department, through its dedicated ‘Formalisation of Informal Settlements’ IDP Programme, had commenced the regularisation of those informal settlements that were suitable for in-situ upgrade. The regularisation process gives legal recognition to the informal settlements to allow basic levels of service to be implemented, as an interim measure, while the formal township process is being undertaken. The City is aiming to regularise 23 informal settlements in this manner. 253 The second issue is urban management, and related functions such as by-law enforcement. The Regional Offices have developed Operational Plans as a key component to their Regional Urban Management Plans. The operational plans list regional ‘hot-spots’ and address areas where multi-disciplinary urban management blitzes are to take place for the financial year. The third issue is the subsidisation of City Improvement Districts. The City has undergone a process of approving the subsidisation of certain CIDs in the Inner City, however this has been done strictly within the ambit of the Inner City Charter deliverables. The Department is in the process of developing a comprehensive citywide policy to address CIDs, and the issue of the subsidisation of CIDs will be addressed in the City’s policy. The policy is due to be approved by the City in April 2009. Other issues that are not within the core competence of the Department were referred to the relevant City Departments. SECTOR CONTRIBUTION TO 2010 FIFA WORLD CUP The Department will provide support to the 2010 FIFA World Cup Soccer Event by way of urban management and by-law enforcement. It is intended that the Regions will ensure that transport routes and areas around stadiums and fan parks are clean and maintained throughout the event. This relates specifically to Region D (Soweto), Region F (Inner City, NASREC) and Region E (Innes Free Park). All Regions are affected in terms of transport routes, hospitality establishments, tourist attractions etc. By-laws will also be enforced, specifically within and immediately around the stadium perimeters. SECTOR CONTRIBUTION TO INNER CITY A comprehensive mapping of by-law contraventions, including illegal uses of public spaces and identification of buildings that indicate deterioration, illegal occupation and by-law contravention have been completed. Service breakdowns mapping have also been complete but need to be redone at the cost of R500 000. The illegal occupation of public spaces is being reviewed. An ongoing assessment of the systems and procedures for logging and responding timeously to citizen and stakeholder complaints of service breakdowns and by-law infringements has been undergone. However, there are a few problems experienced with the system and a tailored device is required. The Region F Nerve Centre has been created and its systems are under review. The sustainability of the Nerve Centre and strategic value add components do require ongoing operating funding. An operational plan for continuous, integrated block-by-block operations / blitzes by multidisciplinary teams of by-law enforcement and service delivery specialists will be completed. The operational plan has divided the Inner City into four quadrants and, within each quadrant, a number of zones. In each zone, the multidisciplinary law-enforcement and service delivery teams has successively identified key by-law infringement and service breakdowns and work to eliminate these. Once key by-law infringements and service breakdowns are addressed the blocks will are ‘handed over’ to area managers and teams of urban inspectors for regular reinspections and further interventions as required. Each of the four quadrants has one area manager and a team of roving urban inspectors. Operational plans for the block operations are annually reviewed. The Region F Offices has exceeded their 2008 target by doing 22 per year in all 4 quadrants. Urban management structures and systems will include: 254 Sustainability and value add demands ongoing operating funding Capacity to detect, record and analyze all occurrences of urban management problems in the Inner City. An electronic system of data gathering, recording and communication of service breakdowns and by-law contraventions piloted Capacity to report urban management problems to the relevant City departments and / or municipal entity, and then oversee the satisfactory response to the problem Specialist capacity to respond to unique urban management challenges in the Inner City such as bad buildings. Capacity to more effectively liaise with stakeholders in efforts to detect and respond to urban management challenges. The capacity to more effectively interface with the existing City Improvement District system is still under way. The Region has personnel on CID Boards and seeking grant funding as dedicated capacity is required for the CIDS. The operational plan for block-by-block interventions and re-inspections will be refined over time, with the form of operational interventions being adjusted to take account of the unique circumstances presenting in different zones. Research and development will be undertaken to address specific problems. Safer and better prototype manhole covers able to resist theft and vandalism still have to be found. Specific popular media and signage that clearly communicates key by-laws have been implemented. The City of Johannesburg, together with a range of stakeholders, will roll-out a comprehensive by-law education programme across the Inner City. This will be followed up with targeted measures to alert people to the law in key locations, and smaller campaigns on an annual basis. Together with other stakeholders the City will develop a range of creative alternative mechanisms to punish by-law infringements. This may include the introduction of satellite courts. A finalized by-law enforcement capacity development plan with specific attention paid to the requirements in the Inner City will be rolled out over the three year period. By December 2010, the City will have fully capacitated all its by-law enforcement functions in various departments. In the interim, the City will immediately augment by-law enforcement capacity in key departments. The enlargement of the JMPD by-law enforcement team dedicated to the Inner City, and the leasing of additional vehicles. The development of systems in Emergency Management Services to monitor fire-safety risks in bad buildings is in place. Capacity and systems will be established in the City to ensure that relevant departments and the SAPS are able to provide input on all liquor licence applications, to ensure that licences are not granted in places where there are already too many outlets or liquor-related problems. The Urban Management operational plan zone-by-zone interventions and re-inspections target illegal liquor outlets. The City recognizes the negative impact that poor urban management and by-law enforcement has on the ability of developers to secure finance for development, and maintain their properties in a manner that secures regular payment. This has effect on the pace of residential development. Residential developers are given comfort that these issues are being given a high-priority. Day and night blitzes are undertaken by Region F. Arrests and confiscations are made but the system does prove unsustainable. Street patrollers, CDWs and community liaison officers are working well. The City has allocated R500m to DPUM for the public environment upgrade. 255 SPATIAL FORM AND URBAN MANAGEMENT SECTOR PLAN 5-YEAR STRATEGIC OBJECTIVES Enhancement of the intensity of existing well-functioning nodes and transformation of declining nodes, to enable mixed-use, mixed-income, high-density development Planned development of three new economic nodes in selected marginalised areas IDP PROGRAMME AND KEY ACHIEVEMENTS Nodal programme 2009/10 DELIVERY AGENDA Urban Development Frameworks were completed in 2007/08 for all the Gautrain, and some traditional rail stations, throughout the City Inner City Regeneration Charter Nodal programme Assessment and determination of new spatial form for dysfunctional industrial nodes Further rail based studies / development frameworks Increase in densities in nodes, along public transportation routes in support of defined spatial structure Density programme Density programme Implementation of all public sector infrastructure investment to support priority nodal development, movement networks, urban renewal and other City priorities Integrated Public Investment programme Further rail based studies / development frameworks BRT – Continue construction of sections of the BRT Identification of future phases of the BRT system Continued implementation of the BRT trunk routes, NASREC BRT and ICDS Integrated Public Investment programme Inner City Regeneration Charter Density standards for informal settlements Inner City Regeneration Charter Minimised demand for investment and services on the urban periphery. Optimal utilisation of investment within the urban core (land, infrastructure and capital expenditure) Optimal utilisation of investment within the urban core (land, infrastructure and capital expenditure) Growth management programme Growth management programme Completion of GMS 1 Completion of the Land Strategy 256 Global City-Region cross-border alignment plan Continued focus on aligning CAPEX investment tools between City and Province Continued coordination and management of the grant funding received from the Neighbourhood Development Partnership Grant (NDPG) Assessment and implementation strategy for one GMS growth area Re-alignment of Capital Investment Management System (CIMS) to include central tenets of the GMS Ongoing assessment of growth targets and development trends, i.e., monitoring the outcomes of the GMS Refinement of development conditions relating to resource management 5-YEAR STRATEGIC OBJECTIVES Increased investor confidence in declining and under-performing areas IDP PROGRAMME AND KEY ACHIEVEMENTS Economic area regeneration programme 2009/10 DELIVERY AGENDA Economic area regeneration programme Upgrading of marginalized areas programme Greater Newtown Development – structural repair of Kippies Building and Worker’s Library Greater Ellis Park – Completion of Sports Precinct, Bertrams Regeneration Proejct completion of SAHRA process on Bertram’s priority block Fashion District – urban upgrade along Pritchard and President Park Station Precinct – creation of a new holding space for long distance buses and taxis Yeoville regeneration – upgrade of Yeoville Recreation Centre and completion of Yeoville library Diagonal Street – public environment upgrade Nasrec – Completion of Stadium Avenue and FIFA overlay as per 2010 office: Phase 1 Upgrading of marginalized areas programme Public investment in marginalised areas to facilitate crowding in of private sector spending All marginalised areas programmes captured and prioritised on CIMS according to Lekgotla outcomes 257 Continued implementation of the Vilakazi Street Precinct upgrades Continued implementation of the Greater Kliptown Precinct upgrades Implementation of multi-year Soweto Urban Growth Programme Continued implementation of Urban Development Frameworks for Diepsloot Activity Street, Diepsloot Government Precinct, Bambanani Industrial Node, Stretford Node Implementation of Diepsloot District Node UDF Integrated spatial development framework for Region G Continued implementation of the Alexandra Renewal Programme Continued implementation of the Cosmo City Programme Formulation of three community driven precinct plans in marginalised areas 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS Informal settlements upgrading programme (with Housing department) 2009/10 DELIVERY AGENDA Informal settlements upgrading programme Inner city regeneration programme NB: Timeframes for implementation are being reviewed. Finalisation of township establishment applications that are currently in progress Pursue ownership of settlements situated on government and private land, where feasible Initiate land use regularisation, where feasible Develop layout plans for each settlement in conjunction with relevant MEs and Core Departments Prepare budgets for basic level of services (LOS), including soft services (mobile clinics, libraries, etc) Where necessary to relocate, link with approved Housing programmes Inner city regeneration programme 258 Economic Development – Deliverables relating to informal trading and the roll out of linear markets; Business Process Outsourcing and Broadband telecommunication; Economic Development Programme and targeted support to economic sectors; package of incentives targeted support to key economic anchors; critical information package Arts Culture Heritage and Public Spaces –new public spaces developed; public events and public art rolled out; profiling of inner city as cultural capital; supporting the advancement of arts and culture production; key iconic spaces identified ; key priority streets and precinct areas identified; Inner City Urban Design Implementation Plan; rollout of public environment upgrade plan to Fordsburg/Pageview, Doornfontein, open spaces; and continued programme in Hillbrow Berea via R200m Capital Budget 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA 259 Urban Management & Safety and Security – Capacitation and sustainability of Regional Urban Management Plan; Expanded by law enforcement and education; Waste management improvements; increased visible policing; continued roll out of CCTV creative approaches to eradication of bad buildings; Priority disaster prevention, management and mitigation plans; rolled out targeting of illegal liquor outlets Community Development – Continued support to NGOs; expanded support ot vulnerable groups; roll out emergency shelters; rollout of extended Social Package; expanded support to Early Childhood Development; enhanced support for Migrants and Refugees; rehabilitated and expanded sport and recreational facilities; continued support to Hillbrow Health precinct and assistance to community based health outreach programmes; expansion of Library programmes; continue to build participatory processes and community involvement Residential Development- Roll out of Inner City Housing Action Plan; further action to ensure ‘Getting the Basics Right’; further rates and tariff issues resolved; roll out of further transitional accommodation; incentives for inclusionary housing progressed; further package of incentives; extend access to benefits of the social package; launch and progress the new Inner City Property Scheme (Old Better buildings Programme); Joshco provided with buildings for development of Social Housing (10 to 15 in total in next two years); Sectional Title interventions rolled out; 5 further Residential Improvements Districts supported; continued upgrade of informal settlements and hostels Transportation –Roll out of Bus Rapid Transit System; implementation of International Transit and Shopping Centre advanced; integrated off and on street parking programmes implemented; new/refurbished taxi facilities rolled out; traffic and pedestrian safety programmes rolled out; further mobility and alleviation of congestion programmes 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA Increase in investment of affordable housing in close proximity to public transportation and designated nodes Sustainable human settlements programme Sustainable human settlements programme (spatial development component, including urban design) Increased accessibility to social, economic and environmental infrastructure (thresholds to be determined) Increase in the % (or number) of areas that have achieved a minimum acceptable level of SHS Design and implement codes to create safer communities, legibility, functionality and aesthetics of the urban environment New Land Use Management System implemented Single Land Use Management System programme Creative rezoning for mixed use development 260 Land Use Management Application programme Implementation of SHS development indices Publication of Transit Oriented Development (TOD) Guidelines for the City Incorporation of Energy Efficiency Guidelines, norms and standards into spatial plans and consolidated town planning scheme Single Land Use Management System programme Package of mechanisms and instruments to facilitate regeneration implemented Compliance with City’s legal obligations in terms of the various town planning and building control legislations that relate to the regulation and management of land use and building construction Pageview, Vrededorp and Fordsburg - Urban upgrade of major gateways and streets in Pageview and Fordsburg Hillbrow, Berea - Upgrade of Pullinger Kop and Ekhaya Neighbourhood Park Doornfontein - Urban upgrade of major streets in Doornfontein and New Doornfontein Retail Improvement District Complete detailed design and phase 1 construction for Retail Improvement District Urban Management – continued implementation of the 5-year urban management plan Consolidated Town Planning Scheme to be in operation (in accordance with promulgation of provincial regulations) Implement regulatory mechanisms to give effect to inclusionary housing Land Use Management Application programme Processing of all town planning applications to conclusion while maintaining turn around times. Focus will be shifted from turn around time improvements to quality decisions 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS Building Control Application programme 2009/10 DELIVERY AGENDA Building Control Application programme Electronic Archiving System for Building Plans programme Processing of all building plans and outdoor advertising applications to conclusion while maintaining turn around times. Focus will be shifted from turn around time improvements to quality decisions and quality control Electronic Archiving System for Building Plans programme GIS for Outdoor Advertising programme Implementation of an electronic archiving system for building plans GIS for Outdoor Advertising programme Land Use and Building Control Law Enforcement programme Development of a system that will operate on the City’s GIS to record all approved outdoor advertising applications spatially Land Use and Building Control Law Enforcement programme Standards and guidelines for urban management developed and instituted Urban management programme GIS system development programme Ongoing identification of regional priority areas and ‘hot-spots’ Implementation of urban management monitoring system in all regions Public environment upgrades in 2010 sports precincts and around stadia By-law enforcement for 2010 stadium perimeters Implementation of the Inner City model to all regions with specific focus in CBDs (Soweto, Randburg, Roodepoort and Alexandra) GIS system development programme Quality improvements in the urban environment and improvements in citizen satisfaction with quality of life Automate, enhance and integrate prioritised spatial information processes and systems Develop and maintain core spatial datasets according to service level agreements (SLAs) 261 Investigation of all alleged contraventions towards resolving them, while improving on turnaround times Adjustment of the current Law Enforcement System to respond to urban management in the regions Urban management programme Spatial analysis to support Planning decisions Renew COJ aerial imagery Incorporate property related processes (that are currently excluded) into the Land Information System (LIS) Enhance the Internet Mapping Service (IMS) Spatial information maintenance programme Spatial Growth Management application development Completion of Phase 2 (final phase) of COJ aerial imagery update Inclusion of the Housing process in the Property Value Chain and LIS Implementation of IMS enhancements to property text, Inner City and Planning Themes Spatial information maintenance programme 5-YEAR STRATEGIC OBJECTIVES Provide accessible spatial information dissemination services for the COJ community Ensure innovative, world class spatial information service solutions IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA Spatial information dissemination service programme Increase in Internet and IMS hits Development of internet-based training (e-learning) for IMS Capture of metadata for all new datasets Spatial information dissemination service programme Improve the usage of spatial information Train clients (internal and external) to expand use of GIS. Comply with Spatial Data Infrastructure Act in terms of data dissemination requirements Geo-science skills development, research and development programme 262 Implement street addresses for CoJ Verify zoning data. Create the Sectional Title dataset Provide integrated access to spatial information (within COJ and including MEs) Include an additional IMS theme related to 2010 Completion of street address verification, allocation and implementation project for the City Phase 1 of electronic zoning certificates Capture of Sectional Titles for the City Geo-science skills development, research and development programme Develop solution for integrated access to spatial information Undertake research and userrequirement analysis for additional IMS theme, e.g. related to 2010 Transportation Sector Plan INTRODUCTION AND OVERVIEW The Transportation Department continues to deliver on its mandate in terms of the 2003/08 Integrated Transport Plan (ITP) which was updated in 2004 and has been approved by Council, the Gauteng MEC for Public Transport, Roads & Works and the Minister of Transport. This Department, together with the Johannesburg Roads Agency (JRA) and Metrobus form the “Transportation Cluster”, with the Transportation Department providing a strategic leadership, oversight and contract management function on behalf of the City over the JRA and Metrobus. CHALLENGES AND OPPORTUNITIES In the current climate and context, the key external challenges facing the transport sector include: Traffic congestion and increased private car use Providing accessible, affordable and safe public transport Aging road infrastructure and aging public transport vehicles (buses and taxis) Delivering a successful 2010 transport experience Unstable transport industry Global Economic crisis The key internal challenges facing the transport department include: Funding for road infrastructure and public transport provision Capacity especially in respect of engineers and running new public transport systems such as the Rea Vaya Bus Rapid Transit System. Poor information management However, there are also significant opportunities for the transport sector, the primary one being the opportunity to significantly transform public transport in the City making it safe, affordable and accessible, thus increasing the number of public transport users, leading to reduced congestion, improved quality of life for all residents and the economic development potential of the city. Other opportunities that the Rea Vaya BRT system offers is changing the spatial form of the city and moving away from its apartheid origins and enabling one of the biggest broad based black economic empowerment initiatives in our country if the taxi industry become the operators of this system. LEGISLATIVE FRAMEWORK The Transportation Department draws its mandate from the following legislation: (a) The Constitution (No 108 of 1996) (b) National Transport Legislation National Land Transport Transition Act (No 22 of 2000) Urban Transport Act (No 78 of 1977) SA National Roads Agency Ltd and National Roads Act (No 7 of 1998) National Road Traffic Act (No 93 of 1996) National Roads Act (No 54 of 1971). 263 (c) Gauteng Transport Legislation Gauteng Public Passenger Road Transport Act (No 7 of 2001) Gauteng Transport Infrastructure Act (No 8 of 2001) Gauteng Transport Framework Revision Act (No 8 of 2002) Gauteng Provincial Road Traffic Act (No 10 of 1997) Gauteng Rationalisation of Local Government Affairs Act (No 10 of 1998) FIVE-YEAR PERSPECTIVE Vision The vision for the Transportation sector is as follows, namely; “A city with a safe and efficient world class transportation system, with a public transport focus, and a well-developed and well-maintained roads and storm water infrastructure, able to connect businesses, people and places in a sustainable and cost effective manner, thereby enhancing the standard of living and quality of life for all inhabitants as well as the overall competitiveness and growth of the local economy” Goals and Five Year Strategic Objectives In order to achieve the above, seven long-term goals were developed which have been amended to take into account the current conjuncture. These are: 1. A community aware of and committed to a core set of values so that all road and public transport users can travel and be safe. 2. Improved access and reduced traveling time for residents to employment, education, 3. 4. 5. 6. 7. recreation and markets, through implementing an innovative public transport which is well aligned with the City’s Spatial Development Framework and is safe, affordable, accessible, convenient and comfortable. Development and maintenance of a quality and environmentally friendly road, traffic-signaling and storm water infrastructure network across the city Environmentally sustainable transport infrastructure and systems including through the promotion of public transport and non-motorised transport choices A transformed transport industry which is customer focused and maximizes broad based black economic empowerment An efficient freight-transport and logistics infrastructure to position Johannesburg as a ‘gateway city’ in relation to national and international markets. Well resourced and skilled Transportation Department and related Municipal Owned Entities able to implement the mandate of the City of Joburg. Flowing from the above goals, below we set out the five year strategic objectives: Goal 1. Values and Safety Strategic Objective To improve the safety of road and public transport users through: Contributing to reducing number of traffic accidents Running safety awareness programmes Introducing traffic safety measures in all wards including signage, traffic calming Improving the safety of our facilities and infrastructure and looking at measures to reduce the possibilities of crime and vandalism in our facilities and on our infrastructure To improve awareness in our communities of Johannesburg’s transport history 264 Goal Strategic Objective 2. Systems To improve awareness of transport services including public transport offered in the City of Joburg To ensure integration of public transport across modes and providers so as to offer highest quality of service, maximize ease of public shift to public transport and maximize efficiencies that can be achieved To improve public transport in the City of Joburg and reduce traveling times of the public through: Introduction of a new Public Transport System (BRT Rea Vaya) Improve levels of service of Metrobus Ensuring that Gautrain infrastructure and services is well integrated with other transport modes and services To meet bid book commitments in respect of transport services in respect of the Fifa 2010 World Cup and ensure that World Cup 2010 transport infrastructure is designed so as to ensure lasting value for the City. 3. Infrastructure To improve the mobility of people with disabilities through: specific public transport programmes improved accessibility in the design and construction of sidewalks, traffic signaling etc To implement a city wide gravel roads surfacing programme To resurface roads so that the Visual Conditions Index improves at 2% per annum To construct new roads to improve mobility and in newly developed areas To maintain our road network including traffic signaling, storm water and road markings to meet the following targets: Reduction in traffic signal outages to less than 1% of all signals out on a given day 100% of all major intersections provided with adequate road signs 4. Environmental sustainability To improve storm water infrastructure and management To reduce congestion and emission levels by improving the modal split between commuter public vs. private transport through: Introduction of travel demand programmes Improved off street and on street parking provision, pricing and management Awareness campaigns of the impact of private car use on air quality, climate change etc To increase the percentage of residents who can use non-motorised transport (walking or cycling) to work shops and schools. To implement energy efficient measures, use or recyclable energy and cleaner production technologies in all aspects of transport including: More energy efficient buses Solar traffic signals 5. Industry Transformation To look at new ways of managing storm water taking into consideration the increased built up nature of the city, changes in climate and the opportunities of new technology. To increase the formalization, productivity, sustainability and profitability of the taxi industry (mini bus and metered) through: Supporting taxi recapitalization Supporting and enabling the taxi industry to become part of the Bus Rapid Transit System Rea Vaya Improving and regulating public transport facilities including depots, ranks, lay byes and stops. To modernize the Metrobus operations including in respect of fare collection. 6. Freight 7. Well- resourced 265 To support and enable BBBEE and EPWP in all aspects of the transport sector. To facilitate the speedy movement of freight around as well as in and out of the City so as to enable economic development To ensure skills development, mentorship and retention strategies to develop and retain Goal department Strategic Objective staff To provide a working environment which is conducive to high levels of productivity It should be noted that many of the goals and strategic objectives are interrelated and are categorized in the above way to facilitate planning and public consultation. IDP PROGRAMMES Within each goal and to delivery on each strategic objective, programmes have been developed together with a one-year delivery agenda. These are described in detail on the Transportation Sector Plan below. It is also important to note that since the introduction of the Rea Vaya Bus Rapid Transit System it has become a major intervention with an impact beyond the transport sector. It aims to introduce efficient and quality public transport in the city, transform the taxi industry and also contribute to turning around the spatial form of the city. The Transport Department also has a major responsibility in terms of the upcoming 2010 Fifa World Cup where ensuring that all visitors and spectators are safely and speedily transported is a critical determinant for a successful tournament. The key programmes of both the Transportation Department and the two Municipal Owned Entities (Metrobus and JRA) are spelt out below include: Goal Values and Safety Systems Infrastructure Sustainability Industry transformation 266 Programme Travel values programme Safety programme including awareness and implementation of ward based traffic safety measures Transport information and awareness Integration and promotion of public transport Bus Rapid Transport Rea Vaya Metrobus modernization and improvement Support to Gautrain Accessibility for people with disabilities 2010 transport management plan 2010 transport infrastructure (N17 Road link, Nasrec and Ellis Park precincts) Gravel Roads Surfacing Programme Road Infrastructure Development Programme Road Resurfacing Programme Road Maintenance Programme Traffic signal upgrade and maintenance programme Signage Storm Water Management Programme Public transport facilities programme Travel demand management Non motorized transport Carbon credits programme Introduction of more energy efficient infrastructure and vehicles including buses, traffic signals, etc Incorporation of taxi industry into BRT Taxi recapitalization and regularization Contractor development EPWP Freight Well -resourced department 267 Freight management Skills development and retention strategy Wellness programme TRANSPORTATION SECTOR PLAN 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA To improve the safety of road and public transport users through: Implementation of travel-values programme Implementation of travel-values programme Contributing to reducing number of traffic accidents Introducing traffic safety measures in all wards including signage, traffic calming Improving the safety of our facilities and infrastructure and looking at measures to reduce the possibilities of crime and vandalism in our facilities and on our infrastructure Running safety awareness programmes Transport information and awareness programme To improve awareness in our communities of Johannesburg’s transport history To improve awareness of transport services including public transport offered in the City of Joburg Partnerships with other parts of government, private sector and civil society Distribution and production of media (billboards, pamphlets, etc) Outreach to communities and schools including through mascot, mobile unit, and industrial theatre Promotion of fraud and vandalism hot line numbers The focus will shift to those aspects of safety not covered by other programmes (e.g. implications of blocking storm water drains) and the need for community responsibility Extending engineering, education and enforcement interventions to Rabie Ridge, Tshepiso, Orange Farm, Tembisa, Braamfischerville, Durban Deep, and Diepsloot with 175 awareness programmes Continue with the implementation of the public sector law enforcement strategy in partnership with JMPD and other MEs Implementation of priority number two for each of the 109 wards as detailed in the community road safety plan Transport information and awareness programme External communication has begun in public transport facilities in each region A train-the-trainer programme was implanted during the October Transport Month 2008 Travel Values have been incorporated into the Mascot and Mobile Education programme Values inscribed at Head Office building and to be extended at the Bara, Midrand Ivory Park, Randburg taxi ranks Safety education including the use of the Mascot and Mobile Education Unit at schools in Ivory Park, Soweto, Inner City, Orange Farm and Alexandra as well as traffic training at the BE SAFE centres located in these areas An extensive ward based process in partnership with CSIR identified two traffic safety interventions per ward, one of which will be implemented by JRA by June 2009 Industrial Theatre based on safety issues and values is being developed Book on history of Transport, called “The people shall move” published Successful implementation of the 2008 October Transport Month Metrobus and JRA call centre staff have moved to Operation Phakama facility Ongoing information on traffic interruptions as a result of implementation of BRT 268 Continue to implement the October Transport Month Print more transport history books for school libraries in disadvantaged communities Ensure that the Joburg Connect service operates effectively in respect of JRA, Metrobus, and Rea Vaya services Together with JRA provide traffic tips to road users Ensure that all road users are aware of traffic disruptions as a result of upgrading and maintenance of roads (JRA) and introduction of the BRT Consider Park and Ride desk as part of transport information services 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA To ensure integration of public transport across modes and providers so as to offer highest quality of service, enable shift to public transport, maximize efficiencies and sustainability and reduce congestion Integrated transport plan programme Integrated transport plan programme Participated in provincial bus contract re-structuring and Gautrain bus service rationalization Terms of Reference for the review of ITP 2009-2013 have been completed but not implemented due to shortage of funds Review of Integrated Transport Plan with a specific focus on: Ensuring that City of Joburg’s public transport network is appropriately integrated into Gauteng and nation wide transport networks Seeking sustainable funding solutions for public transport including through possible congestion pricing Implementing relevant sections of the new National Land Transport Act Developing a toll revenue sharing model with the Gautrain Freeway Improvement Scheme Managing the division of road space between private and public car use including freight Seek practical ways of maximizing integration of public transport networks e.g. ticketing by working together with all public transport providers To improve public transport in the City of Joburg and reduce traveling times of the public through: (a) Introduction of a new Public Transport System (BRT Rea Vaya) To improve public transport in the City of Joburg and reduce traveling times of the public through: 269 Bus Rapid Transit – Rea Vaya programme Completion of Phase 1A of Rea Vaya BRT by mid-June 2009 for Confederations Cup incorporating: 25 km of dedicated lanes including from Regina Mundi to Ellis Park and Inner City Distribution System 20 stations constructed 143 buses purchased and funding for them secured BRT Control Centre upgraded Probity Advisor overseeing risk management Revised institutional structure Negotiations with taxi industry to be part of Bus Operating Contract In respect of Phase 1B: 2 km of dedicated lanes implemented 38 additional kms planned 58 additional stations planned EIA in progress Metrobus-specific programme Values programme taken to Metrobus employees and Ensure harmonization of fares as much as possible across modes including Gautrain, BRT, provincial subsidized buses, and taxis Bus Rapid Transit – Rea Vaya programme Phase 1B of Rea Vaya by midMay 2010 for Soccer World Cup incorporating the following extensions: Remainder of ICDS Sections 3, 4 & 5 Parktown to Sandton section Martindale Control Centre More bus operator companies contracted Rea Vaya Agency fully functional Metrobus-specific programme The Values Programme will be continuously entrenched by 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS Modernisation and improved levels of service of Metrobus To improve public transport in the City of Joburg and reduce traveling times of the public through: Ensuring that Gautrain infrastructure and services is well integrated with other transport modes and services To meet bid book commitments in respect of transport services in respect of the FIFA 2010 World Cup and ensure that World Cup 2010 transport infrastructure is designed so as to ensure lasting value for the City Gautrain support programme Infrastructure integration committee has been set up and a common understanding has been reached Good integration achieved so far at Park, Rosebank and Sandton BRT stations 2010 World Cup programme 270 passengers Continuous communication with Passenger Forum and Satisfaction Surveys Improved fleet management through replacing the existing Fleet Anywhere with the Enterprise Asset Management System of Oracle Thirty-three of forty learners offered employment at Metrobus Wellness training of 15 Supervisors on HIV/Aids in August 2008 Safety and security at Metrobus upgraded including the installation of electric fencing and CCTV systems at depots 10 old ERF buses refurbished in order to enhance the condition of the fleet The conversion of operating licenses commenced Metrobus involvement in the BRT concluded The N17 in vicinity of NASREC in partnership with SANRAL which is progressing well ahead of schedule Completion of pedestrian walkways at Orlando, Dobsonville and Rand Stadium are 100% complete Completion of Beit Street precinct New Doornfontein Transport Square and taxi facility will be completed by June 2009 Pedestrian promenade and public transport hub to be completed by June 2009 2009/10 DELIVERY AGENDA means of regular communications with staff and passengers Implement fare evasion strategy Implement Enterprise Asset Management Module Reschedule service timetable for 2010 An effective functioning Commuter Forum with a formal constitution representing Metrobus passengers will be in place Customers will be able to access Metrobus routes on the City’s GIS Training of (40) drivers on articulated buses. Training of Peer Group Educators on HIV/Aids More CCTV cameras and security towers will be implemented in order to curb pilfering of spares, etc in depots Provision will be made in respect of 60 buses for internal refurbishments and 30 double deck buses for external refurbishments. To fit all Metrobus buses with antisiphoning devises on the fuel tanks Participation in BRT phase 1b as agreed Gautrain support programme Construct Park, Rosebank and Sandton BRT stations with full integration Continue with the Gautrain integration forum to ensure integration and/or harmonization of: Ticketing; Fares; Feeder and distribution routes; and Public transport promotion 2010 World Cup programme N17 by December 2009 Nasrec and Ellis Park Precincts Implementing the 2010 Operational Plan by: Providing Park and Ride services to all 33 World Cup venues Accrediting public transport including metered taxis Implement all signage requirements including street name signs for 2010 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA To improve the mobility of people with disabilities through: Specific public transport programmes Improved accessibility in the design and construction of sidewalks, traffic signaling etc To implement a city wide gravel roads surfacing programmes To construct new roads to improve mobility and in newly developed areas Unable to appoint a service provider for the accreditation of 500 metered taxis due to budgetary constraints Signage audit for the 2009 Confederations Cup and the 2010 FIFA World Cup was completed in January 2008 and signs are being manufactured Four Park and Ride simulations have been done including the Orlando Stadium launch Completion of 2010 High Level Transport Plan in November 2008 Transport access improvement programme Both BRT station and bus specifications incorporate provision for people with disabilities (PWD) Gravel roads surfacing programme Orange Farm (13.3km) Ivory Park (3.3km) Diepsloot (3.3km) Braamfisherville (3.3 km) Roads Infrastructure development programme Transport access improvement programme In respect of the BRT, build BRT stations and procure BRT buses according to PWD specification All gravel road upgrading includes sidewalks Gravel roads surfacing programme Proceed with the gravel roads upgrade programme on the basis of the Mayoral priority list and in accordance with the allocated budget The following areas will be prioritized: Orange Farm, Ivory Park, Diepsloot and Braamfisherville Roads Infrastructure development programme To resurface roads so that the Visual Conditions Index improves by 20% per annum To manage other organs of state and private sector that works on our network so that they reinstatements enhance and not lead to further deterioration of the road network 271 Two Park and Ride simulations to be done in preparation for the 2010 FIFA World Cup Arranging additional public transport in terms of projected travel demand figures Deployment of roads ambassadors/points men at key intersections K43 has been stopped due to illegal informal settlement Bolani Road it’s on the planning phase with outstanding work to be completed Investigations have been conducted for Odendaal road and other access roads Road infrastructure maintenance and upgrading programme Road infrastructure maintenance and upgrading programme The VCI study completed and presented to Mayoral Committee. The VCI across the network has dropped from 74% (2003) to 68% (2008) 110 km to be resurfaced by end of financial year In respect of Gautrain, a full visual inspection was conducted of all haulage routes prior to construction to be repeated after construction of Gautrain. Province will re-instate the routes to their original condition with a 7-year functional life Completion of Koma Road Investigation into possible construction of Crownwood Road in partnership with private sector Based on the survey on the visual condition index conducted in 20082009, implement the resurfacing programme on 10 km of road. This programme is dependant on funds available Monitor the impact of the Gautrain on our road network and ensure that reinstatement takes place according to agreed upon standard. A technical expert will be appointed to assist with the monitoring of the Gautrain project Management of way leaves and enforcement of way leave infringement 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA To maintain our road network including traffic signaling storm water and road markings to meet the target of: Traffic signal upgrade and maintenance programme Traffic signal upgrade and maintenance programme All 5 designs completed for the new installations Upgraded 141 intersections by end of December 2008 to comply with SARTSM standards Complete 101 revised phases to reduce congestion at intersections % Signalized intersections out at any give (excl power) for July 2008 to December 2008 Undertaken 3965 proactive inspections at signalised intersections by end of December 2008 Connected 130 intersections to the remote monitoring station by end of December 2008 Road signage upgrade programme Road Signage Audit for 2009/10 World Cup done and road signs will be implemented in time for the 2009 Confederations Cup and 2010 World Cup 250 Street names signs implemented in Diepsloot for the period July to August 2008 Completed 267 lane km of lane markings for the period July to end of December 2008 Stormwater development and management programme Investigating all open storm water channels in order to cost them in Orange Farm, Diepsloot and Ivory Park Audit of Major storm water drain (15%) Major drain capacity analysis (20%) Infill Master-planning in Midrand and Ruimsig Public Transport facilities and infrastructure programme Reduction in traffic signal outages to less than 1% of all signals out on any given day To maintain our road network including traffic signaling storm water and road markings to meet the target of: 100% of all major intersections provided with adequate road signs 2010 signs in place To improve storm water infrastructure and management To look at new ways of managing storm water taking into consideration the increased built up nature of the city, changes in climate and the opportunities of new technology. (from goal on sustainability) To improve public transport facilities (ranks, depots, lay byes and stops) 20 semi-formal ranks, 150 BRT Stations and 150 Stops and Laybys were designated Consultation with the Legal Department, Department of Economic Development and JPC on the preparation for the new Shelter Contract is ongoing. Will involve funding from advertisers for 600 bus shelters Road signage upgrade programme Continue with the rollout of new approved street names in proclaimed townships Installation of permanent and temporary signs for 2010 FIFA Soccer World Cup 1800 lane km road markings Stormwater development and management programme Continue with the implementation of the storm water management plan Public Transport facilities and infrastructure programme 272 Complete upgrade of traffic signal to comply with 2010 requirements Continue with the roll out of remote monitoring solutions Continue installing UPS along major routes Pilot of solar in traffic signals Additional 12 semi-formal ranks, 200 stops and lay-bys to be designated Continue with the implementation of 50 shelters on non-BRT routes MTC to manage additional 5 formal ranks Midrand Taxi Rank to be upgraded Together with the JDA identify and procure land for cross boarder buses Revisit proposal and funding model for International Transit and Shopping Centre ( ITSC) 5-YEAR STRATEGIC OBJECTIVES IDP PROGRAMME AND KEY ACHIEVEMENTS 2009/10 DELIVERY AGENDA To reduce congestion and emission levels by improving the modal split between commuter public vs. private transport through: Introduction of travel demand programmes Improved off street and on street parking provision, pricing and management Awareness campaigns of the impact of private car use on air quality, climate change etc Travel Demand Management programme Travel Demand Management programme To increase the percentage of residents who can use nonmotorised transport (walking or cycling) to work shops and schools To implement energy efficient measures, use or recyclable energy and cleaner production technologies in all aspects of transport including: More energy efficient buses Solar traffic signals Asphalt plant Environmental Management programme Extensive NMT measures introduced at Ellis Park and Nasrec Precincts as part of 2010 plan but which will also leave a legacy and be a flagship for NMT Council has approved NonMotorised Transport Framework Sustainable transport programme 273 To accelerate studies and the implementation of: Travel demand management measures Park and Rides as part of legacy strategy to reduce congestion Form of congestion and/or parking pricing Revised City’s parking policy to accommodate new Public Transport developments Environmental Management programme To increase the formalization, productivity, sustainability and profitability of the taxi industry (mini bus and metered) through: Supporting taxi recapitalization Supporting and enabling the taxi industry to become part of the Bus Rapid Transit System Rea Vaya Improving and regulating public transport facilities including depots, ranks, lay byes and stops The Department initiated an email response from the public highlighting their suggestions for the reduction via the Joburg website in respect of TDM Parking Policy approved by the Mayoral Committee to guide the process of defining the management strategy Variable Working Hours (VWH) and telecommuting being investigated CDM application process has been mapped out and Project Idea Note (PIM) has been approved by DME as the first step in the CDM application process Project within Metrobus to pilot CNG on buses as well as retrofitting buses to be able to use CNG Study completed on JRA Asphalt Plant and upgrading approved by Board Taxi industry normalization programme Ongoing taxi and bus operator negotiations in respect of BRT including the signing of an MOU Resurrection of Public Transport fora and Commuter structures All 1013 non-conflicted routes have been aligned in preparation for Conversion of permits to Operating Licenses Implementation of NMT: Framework within budget constraints Sustainable Transport programme BRT to continue to procure Euro 4 buses with low emission standards Develop full CDM application report and submit it Conduct emissions measurements Roll out of Metrobus pilot in respect of CNG and/or other ways of reducing CO2 emissions through bus propulsion systems Upgrade Asphalt plant including in ways which will improve air quality and reduce harmful emissions Taxi Industry normalization programme Enabling the taxi industry to form bus operating companies to manage BRT as well as to benefit from the BRT value chain Metered taxi accreditation strategy implemented in time for 2010 but also to leave a legacy Support opportunities for the taxi industry to benefit from the 2010 transport plan A Transport Forum with all relevant Public Transport Stakeholders will be established to meet monthly Ongoing support to National and the Gauteng Province with taxi recapitalization and conversion of Operating Licenses Public transport law enforcement 5-YEAR STRATEGIC OBJECTIVES To support and enable BBBEE and EPWP in all aspects of the transport sector IDP PROGRAMME AND KEY ACHIEVEMENTS BBBEE and EPWP programme ±120 emerging contractors supported in JRA to date 597 jobs created on JRA’s capital programmes BRT will deliver approx 800 by May 2009 To facilitate the speedy movement of freight around as well as in and out of the City so as to enable economic development Freight and logistics programme To ensure skills development, mentorship and retention strategies to develop and retain staff Mentorship and skills development programme To provide a working environment which is conducive to high levels of productivity 274 Commissioned study on improving freight management at City Deep 2009/10 DELIVERY AGENDA BBBEE and EPWP programme Increase the number of BBEE contractors supported Increase BBEE spend in Transport Department Increase number of jobs created on CAPEX spend by Transport and MEs Freight and logistics programme Together with JMPD monitor overloading at City Deep Implement with other stakeholders, City Deep freight management strategy Through the Johannesburg Business Forum, set up a working group with industry to look at ways of working together to improve mobility in the City Mentorship and skills development programme Introduce formal mentorship for professionals in partnership with Metorbus and JRA CHAPTER 9: KEY IDP STRATEGIC INTERVENTIONS INTRODUCTION The well-being of its residents is paramount to the City of Johannesburg (the City). Improved health, safety, livelihoods and quality of life for citizens lie at the heart of the set of strategic objectives that will determine the service priorities for the City over the medium term. As part of preparing for the September 2008 Mayoral Budget Lekgotla, the City undertook a mid term strategic sector assessment where in key IDP interventions were assessed. The key IDP interventions, identified two years ago at the City’s 2007/08 Mayoral Budget Lekgotla, include the following: HIV and Aids awareness and support; Measuring of poverty and implementation of the revise social package; Growth management strategy; Basic services programme; Formalisation of informal settlements; Rea Vaya Bus Rapid Transit (BRT) Project; Inner City upgrading and regeneration through the Inner City Charter; Economic development initiatives towards achieving 9% growth per annum; Stimulating a functioning secondary property market; Accelerating Housing delivery and leveraging the private sector in mixed development; Revised rates, tariff and metering framework to ensure equity and affordability in service charges; Energy, water and waste demand side management; Greening of the City Shared services delivery model Targeted crime prevention safety initiatives 2010 FIFA Soccer World Cup facilities, compliance requirements, fan experience, and legacy projects. Gender Mainstreaming This exercise was undertaken to assist in assessing and report on implementation of each intervention annually so as to see concrete progress. An on the basis of this assessment define the programme for the remainder of the electoral term. Emerging from this evaluation was that, in general we have made progress in some of these interventions (namely BRT, 2010 and Inner City) and others still seem quite abstract as of these interventions. Many of these key interventions involve responsibilities that cut across departments, MEs, and other spheres of government while making contribution to a number of GDS principles but are most closely aligned with one principle. The aforementioned assessment has framed the manner in which departments and MEs have reviewed the IDP Sector Plans for 2009/10 and also their programme for the remainder of the electoral term. HIV and Aids awareness and support HIV and AIDS awareness and support is one of the six mayoral priorities. It aims to improve face-to-face education and access to antiretrovirals. The City has applied a community-based model to address the challenges faced by those affected by the disease through its HIV/AIDS Community Care and Capacity Development Programme. As part of this process the City has implemented the Jozi Ihlomile campaign to train community volunteers in prevention; care and support; voluntary counseling and testing (VCT); Anti-retrovirals (ARV) efficacy training; Prevention of Mother to Child Transmission awareness; and tuberculosis treatment. To date, the 275 Jozi Ihlomile project has been extended to four additional sites and home-based care has been initiated. During the remainder of this electoral term, the focus on HIV/AIDS will be intensified through a vigorous, holistic approach to the pandemic. The City’s participation in the National HIV Sero Prevalence survey in 2006 revealed an emerging downward trend in new infection rates. Johannesburg’s current prevalence rate at 30, 6% is less than the Gauteng average. The City’s long-term goal is to significantly reduce HIV/AIDS prevalence and incidence rates and reduce the impact of HIV/AIDS on communities. The scale of prevention and treatment measures will be increased and targeted awareness campaigns will take place. For the remainder of the term the City will escalate the door-to-door education and expand community support programmes and also roll out support of home-based care providers with an emphasis on training and education. Measuring of poverty and implementation of the revise social package Delivery of services is critical for the citizens of Johannesburg. Closely tied to this is the implementation of the revised social package that will provide a single-window approach to social assistance delivery and also alters the targeting mechanism to an individually tied poverty index. In this regard, the indigent households, currently standing at 119 000, receive a package of 10 kilolitres of free water per household per month and a 100 kilowatts hour of free basic electricity. To date, this programme has been tested and will be fully rolled out in the beginning of this year. The Job Pathways programme has been launched and the first Special Water Needs desk has been opened. The remainder of this electoral term will see the full roll out of this system for access to water, power, sanitation and rates subsidies. The housing and transportation subsidy schemes will be piloted and rolled out and additional social package components will be piloted. The CoJ seek to roll out a social support programme to every deserving citizen and ensure that it does not leave its people in destitute situations. Growth management strategy Economic growth cannot be divorced from spatial development. The Growth Management Strategy is an innovative approach to spatial decision-making and is key to the City’s role in steering future settlement patterns away from segregation. It will examine current trends in the provision of bulk infrastructure across the city and will prioritise capital investment in bulk infrastructure by designating high priority, medium priority and low priority growth management areas. This aims to address the current disjuncture between infrastructure provision and development growth. To date, the Land Strategy has been completed, as has a preliminary cut of areas. With regard to development planning and urban management, the CoJ implemented the Development Application Improvement Programme. This has seen a substantial improvement in turnaround times: Complex township establishment applications which formerly took an average of three years now take only nine months; The time taken for a rezoning has been reduced from 10 months to 7,5 months; Average time for the post-approval process has been reduced from six months to 2,2 months; and Turnaround time for simple building plan applications is a remarkable 24 hours. The remainder of this electoral term will continue to assess growth targets and development trends and in 2010/11, a review of the first three years of GMS implementation will be completed. Formalisation of informal settlements The formalisation of informal settlements is a critical project aimed at addressing the Millennium Development Goal of eradicating informal settlements by 2014. The Informal Settlements Programme aims to formalise existing informal settlements. The approach to formalisation of informal settlements includes the following: Proper layout and demarcation of stands in the area; 276 Delineating each stand in the area through fencing Registration of residents Allocating of stands to deserving and registered families Providing street names and numbering each structure in the area Providing basic lifeline services; and Providing a development framework for the upgrade of the area through local participation. A feasibility study has been completed which indicates the status of each informal settlement. Action plans for each category of formalisation are currently being completed and the remainder of this term will see the finalisation of township establishment applications, the preparation of budgets for the provision of basic services and the conclusion of all rezonings. The rolling out of this programme and the associated upgrading of informal settlements is a challenge that will be pursued with vigour in the remainder of the electoral term. The City will prioritise extending public infrastructure to informal settlements so that residents have access to basic services. Basic services programme The Basic services programme aims to eliminate all backlogs and extend access to water and sanitation services to all residents by 2011, and electricity by 2012. At the end of 2007/08 about 84% of the 1 169 048 households in the City had access to water, and 76,7% had access to adequate sanitation. A total of 78, 4% of all houses have electricity (inclusive of Eskom supplied areas). A number of programmes are linked to this IDP intervention. These include the Service Delivery Improvement Programme that set out to reduce electricity billing losses from 3% to 1% and reduce electricity outages by 50% in 2010. In the first three quarters of 2007/08, 52 unplanned electricity outages were recorded, representing almost a 50% reduction in the number of outages for the year. The City is also working on ensuring that infrastructural networks function optimally. This requires day-to-day maintenance as well as proactive measures to address leakages and infrastructural inefficiencies. City Power has worked closely with Eskom to implement a load shedding management plan and develop demand-side management plans to respond to the electricity shortages experienced in early 2008. In order to reduce unaccounted for water, the City continued to roll out Operation Gcin’amanzi. This involved a programme to introduce pre-paid water meters in Soweto, saving 38 billion litres in just over two years. Unfortunately water savings have slowed down because Operation Gcin’amanzi has been halted in response to a court ruling that deemed the pre-payment meters unconstitutional. The judgment is being appealed. The annual target of 60% cleanliness levels 3 within the City has been exceeded as a result of the introduction of 3 shifts in high density areas and additional capacity brought into cleaning the inner city through private contractors. During the remainder of this electoral term an additional 20 000 households will receive water connections, 40 000 households in informal settlements will be provided with new water and sanitation connections, the Thonifho project will provide LOS 1 for water and sanitation to an additional 38 000 households and 34 000 households will be have electricity. Rea Vaya Bus Rapid Transit (BRT) Project The City’s commitment to improved public transport is making great strides through the Rea Vaya Bus Rapid Transit (BRT) Project. BRT extends work that had already been started on developing a Strategic Public Transport Network (SPTN) for the city. The network was designed to link major nodes with high-activity public transport routes. Our all-inclusive public transport system that integrates not just different modes but different operators and patron in the transport sector has been developed through participatory and consultative process. In preparing for the Confederations Cup, the City intend to complete Phase 1A of Rea Vaya BRT by mid-May 2009, incorporating 30 kilometres of trunk routes, 18 stations, One BRT Operating Company, Control Centre and fare system, AVL, VMS and CCTV. The implementation of the phase 1C of the BRT 277 which includes the construction of routes from Sandton to Sunninghill; Sandton to Alexandra; Orlando to Dobsonville; Nancefield to Jabulani; and Regina Mundi to Lanasia will be completed by the end of the mayoral term. Inner City upgrading and regeneration through the Inner City Charter Work in the inner city has grown tremendously with the implementation of the Inner City Charter. The first part of the Inner City Charter speaks of the future of the Johannesburg’s Inner City. It engenders all stakeholders to envisage the future Inner City as a place: That will be developed in a balanced way in order to accommodate all people and interests; That remains as the vibrant business heart of Johannesburg as a whole, with an increased emphasis on residential density; That works, as many other cities do elsewhere in the world; as a key residential node. Our Inner City will not be a dormitory for the poor, nor an exclusive enclave of loft-apartments, galleries and coffee shops. Upgrading of the environment is ongoing, housing development and additional safety measures (through increased CCTV cameras and dedicated response teams), and a disaster management programme have been implemented. The success of these initiatives is evident in the billions of Rand of investment that have poured into the inner city from both public and private sector. The remainder of this term will see continued and increased development initiatives, implementation Deep South Economic Development Plans and the escalation of housing delivery in the form of both temporary accommodation and city-led social housing and also implementing our plans towards improving public transport infrastructure. Economic development initiatives towards achieving 9% growth per annum Economic development is one of the six mayoral priorities and aims to create sustainable jobs at scale focus on labour intensive sectors and create an enabling environment for SMME’s. Programmes targeted towards the second economy and economic stimulation of previously marginalised areas. In 2007, the City of Johannesburg hosted the then State President in the first ever Presidential Imbizo in our City and the key outcomes of the Imbizo was the consensus that the economic growth rate we should strive for should be 9% if the country is to realise a 6% economic growth by year 2014. However, given the recent economic meltdown it is likely that the economic growth may slow down and as a result the City may not escape unscathed but we remain committed to our economic growth targets. Therefore, our economic development initiatives are vital and require concerted efforts to ensuring that we continue to provide employment opportunities. Planning in a number of areas such as support of the ICT sector, skills development programme, the beneficiation programme, BEE and emerging industries support programme, and the informal and community sector support programme is underway. However, there is now an urgent need to focus on implementation and delivery of these programmes to ensure that by the end of this term we can be confident that our commitment to economic growth and job creation has been realized. In broad terms, for the medium term the City will intervene to: Create sustainable jobs at scale through its capital program (e.g. EPWP); Focus on labour intensive sectors; Create an enabling environment (easy access to finance opportunities) for SMME’s; Facilitate the provision of technical skills required by the economy to grow; Focus on safety security; Target programs towards the 2nd economy, the growing middle class, the 3rd economy, the poorest of the poor; and Economic stimulation of previously marginalized areas. 278 Stimulating a functioning secondary property market The City is committed to stimulating the secondary property market in historically disadvantaged areas. This will be done through investment in infrastructure by both the public and private sectors. To date, feasibility studies have been completed and the next two financial years will see the completion of a number of critical projects in Braamfischerville including, amongst others, the construction of a taxi rank, greening of the area, the construction of a library and the construction of a satellite police station. Construction of bulk bridge to link Braamfischerville and Tshepisong as well as construction of sports complex in Vlakfontein, taxi rank and Multi Purpose Complex Centre. Accelerating Housing delivery and leveraging the private sector in mixed development The acceleration of housing delivery is both a key IDP intervention and a commitment of the ANC to bettering the lives of South Africans. The City has set itself a target to deliver 100 000 welllocated and good quality housing opportunities over the five year term. This includes the delivery of 15 000 rental housing units, 30 000 housing opportunities through the Community Builder Programme; 50 000 mixed income housing units and the upgrading of hostels to accommodate 5 000 residents. The Rental Programme is well on target. Over 30 000 units have been delivered to date and work will be stepped up in the remainder of this term to ensure that we meet our commitments. Revised rates, tariff and metering framework to ensure equity and affordability in service charges The revised rates, tariff and metering framework will ensure equity and affordability in service charges. The new rates policy was successfully implemented in July 2008 after we announced the release of the draft Rates Policy for the City and invited people to comment on it in July 2007. At the time, comments we received related mainly to the affordability of rates as well as the fears of the public of how this could affect our vulnerable residents – like pensioners. We also received requests for special rating areas and special tariffs for Sectional Title properties. In all we received approximately 755 written comments and held more than 26 public meetings around the City. In the remainder of the term the City will focus on monitoring and reviewing the rates policy and valuation roll, together with the tariff policy in line with legislation. Energy, water and waste demand side management Linked to this are the critical energy, water and waste demand side management interventions by the City. The City has embarked on a number of technologically innovative programmes that allow consumers to regulate – and ultimately reduce – their own demand for municipal services. Demand-side management has advantages for the City, for residents and for the environment. To date, over 4% of waste has been diverted from landfills through recycling and compost initiatives. Energy and water demand side management projects have been implemented and in the next two financial years we will see further gains being made. Energy efficient requirements in building plans will be implemented, as will waste to energy projects and the gas fired energy regeneration project. Greening of the city Another one of the mayoral priorities for this term, and a project that has received numerous accolades and recognition is that of greening of the city. Almost 100 000 trees have been planted, with another 100 000 planned for the remainder of this term. Nine new parks have been developed, and eleven parks and seven cemeteries were upgraded. By 2011, six new regional parks and two new cemeteries will be developed and garden competitions will be introduced, clear evidence that the goal of a green city is being realized. 279 Shared Services Delivery model The City’s Shared Services Delivery model will combine resources, systems, operations and activities into a single centre that can be utilized by a variety of people. The Sector concluded the first phase of the programme and ensured the successful implementation of the Human Resources Transactional Shared Services Centre for all Core departments which is now fully operational. During the initial phase the necessity to determine mechanisms to quantify costs savings was specifically noted and measures are being implemented to quantify costs during follow-up phases. The rest of this term will see the implementation and consolidation of all shared services projects that are currently in process for both core departments and municipal entities. Furthermore, assistance will also be given to municipal entities in implementing such the City’s governance models in line with the City’s approach to enhance integration. Targeted crime prevention and safety initiatives Crime prevention is critical to ensuring the safety and security of our citizens and visitors. Crime remains a deterrent to investment and a threat to the safety and well-being of all users of the city. The 2010 FIFA World Cup brings an added emphasis to this priority with the safety of the thousands of expected visitors an essential requirement to ensure the success of this event. JMPD has assigned dedicated police officers to priority police stations such as Booysens, Hillbrow, Johannesburg Central, Honeydew and Moroka, to strengthen the crime-fighting services. The visibility of policing has also been increased through an operational plan that focuses JMPD patrols at transport nodes, parks, and areas with high incidents of crime. In the area of social crime prevention, metro police officers have been trained in victim support skills. The community outreach unit in the JMPD has visited over 300 schools to raise awareness about substance abuse and dangerous weapons, and more than 190 businesses to educate women on domestic violence and abuse. Currently the Karabo Gwala Safety campaign has been implemented, and a disaster management centre has been set up. Work on the safety strategy for the 2010 World Cup is ongoing. The City has also worked hard at tackling the underlying causes of crime and addressing the needs of vulnerable groups. Work in these areas will continue and 100% visibility of police at pension pay-points and transport nodes will be in place by the end of this term. Improved surveillance technology will be implemented as will improved traffic control and management in order to give effect to the City’s commitment to road safety. Furthermore, the City has committed itself in rooting out crime of any kind in the streets of the city, through the breaking of City bylaws, or within the City’s own administration. The focus on clean and ethical government will be unequivocal. Targeted crime prevention and safety initiatives Crime prevention is critical to ensuring the safety and security of our citizens and visitors. Crime remains a deterrent to investment and a threat to the safety and well-being of all users of the city. The 2010 FIFA World Cup brings an added emphasis to this priority with the safety of the thousands of expected visitors an essential requirement to ensure the success of this event. JMPD has assigned dedicated police officers to priority police stations such as Booysens, Hillbrow, Johannesburg Central, Honeydew and Moroka, to strengthen the crime-fighting services. 280 2010 FIFA Soccer World Cup facilities, compliance requirements, fan experience, and legacy projects The strategic vision for Joburg 2010 is to “Host the Best World Cup Ever”. This vision means that means the CoJ must surpass the rigorous standards of excellence set by all predecessors, and combine it with the warmth, generosity and welcome of an African experience. In order to achieve this vision, a framework has been developed that identifies the three levels - and imperatives - of delivery. Fulfil FIFA’s contractual requirements (Compliance): this is what is required in terms of the various contractual commitments and obligations to FIFA, as specified in the Government Guarantees and the Host City Agreement to meet the obligations to FIFA - stadia, training venues, safety and security, city by-law implementation, accommodation, ICT, marketing and branding, etc. Deliver an outstanding fan experience (Leverage): this means planning for and optimising all the leveraging that can be gained off the infrastructure and services required for the event to guarantee the fans a superb experience. This means focusing on the needs of the fans and media that will be in the City for the WC2010 and extending the investment in the event to ensure their experience is above and beyond expectation in terms of the resources and services available. Create long-term benefits for the citizens (Legacy): given that this event is a unique opportunity for the City, the energy it generates should be mobilised to ensure long-term and sustainable benefit to the citizens long after the event is over. It can only do this by ensuring that the actions taken to comply with the FIFA contract and to leverage off that to provide an outstanding fan and media experience directly benefit the city and its citizens over the long-term. The City is conscious of the obligation the event places on the CoJ, as the host of the opening match and final; as host to FIFA International Broadcasting Centre and Local Organising Committee headquarters. Furthermore, the City will be hosting the Confederations Cup in June 2009 and this event will assist us in highlighting gaps and areas for increased attention, so that we can deliver an exceptional Soccer World Cup. The aforementioned means that there can be no excuses for poor fan mobility, inadequate infrastructure capacity, inadequate safety and security and inadequate accommodation and poor service culture. In general terms, the City’s preparations for 2010 remain on track, on schedule and within budget. A number of local and international inspection teams, observers and media representatives have expressed satisfaction about the progress that has been made. The details regarding this intervention are discussed in Chapter 9. This chapter has highlighted the city’s mid-term achievements in terms of the tremendous work that has been completed so far and key areas of work remaining in order to meet the commitments. The City remains committed in focusing on measures geared towards the acceleration of the economic growth, addressing spatial imbalances, reducing poverty and ensuring social inclusion in order exceeding the commitments to the City’s citizens in 2006. Gender Mainstreaming The City of Johannesburg is committed in ensuring that gender mainstreaming remains a priority in all its work. This is a response to both the Beijing Platform for Action and Gender Policy Framework for Local Government adopted in 2008 by the Department of Provincial and Local Government (DPLG) and South African Local Government Association (SALGA). Gender mainstreaming needs provide a gender perspective in all projects, so as to address past gender based discrimination and inequality. For example, mainstreaming a gender perspective for engagement in the planning and implementation of projects so as to ensure that women also benefit and that gender awareness is prioritized. 281 The City is aware that the involvement of senior leadership and executive management is critical to the initiative of gender mainstreaming and as a result has ensured that political leaders including the Speaker of Council, Councillor Ntingane, Member of Mayoral Committee for Community Development, Councillor Mayathula-Khoza and Member of Mayoral Committee for Corporate and Shared Services and also the Leader of Executive Business, Councillor Walters champion this initiative. Their involvement is an affirmation of the City’s commitment to gender mainstreaming as an institutional responsibility and to provide political guidance in the implementation. In 2009/10, the City will ensure that gender mainstreaming is included in all new programme and that departments and municipal entities are aware of this strategy and the effect it in their work. In addition, the City will undertake gender awareness training for councillors and members of the executive management. In 2010/11 we will see the inclusion of a gender equity focus in the performance management contracts for the first three levels of management, as well as the development of a monitoring and evaluation system. Furthermore, departments and municipal entities will be required to collect, analyse and disseminate gender-related statistics, and roll-out gender mainstreaming in all of their projects. The City of Johannesburg, through these initiatives will ensure that the prioritization gender equity forms part of our policy and strategic documents such the Growth and Development Strategy (GDS), the Integrated Development Plan (IDP) and the Budget. 282 CHAPTER 10: 2010 FIFA WORLD CUP INTRODUCTION AND OVERVIEW The FIFA 2010 Football World Cup represents both the most significant challenge and the most important opportunity facing the City of Johannesburg. The scope and scale of the event is enormous – over R9 billion public sector and R6 billion private sector investment, an expected 300,000 visitors to the city, massive investments in stadia, infrastructure, transport and accommodation – and the benefits of delivering a successful event are incalculable. Early on the City identified the need to capitalise on the energy associated with the World Cup to fast-track service delivery in key areas that would impact on the World Cup experience. From the beginning therefore, the City sought to place the event in the context of better service delivery for its citizens. The event itself is important, but will come and go. What is more important to the city is to achieve a long term improvement in the lives of its citizens, especially in relation to its overall strategic goal of overcoming and redressing the inequalities of the past. Hence there has been a focus throughout the planning for the delivery of this event on how the imbalances in service delivery, spatial distribution, and other forms of apartheid legacy are addressed and overcome. The Mayoral Legacy projects that were identified in relation to 2010, therefore, all sought to address this issue, as will become clear in the report below. The City is contractually obligated as a FIFA 2010 Host City to deliver on a number of commitments to ensuring the successful hosting of this global event. These contractual obligations are significant, and have taken up an enormous amount of resources and time. But the City, in its 2010 Strategic Framework, realised that in order to deliver on its vision of hosting the ‘Best World Cup Ever’ it was necessary to go beyond simply meeting its contractual obligations to FIFA. It realised that the international exposure that the event would bring to the City via international fans and media, would have a massive impact on the image of the city, for good or ill, in the decades to come. Consequently the second focus of the Strategy is to create a superb fan experience that will create a positive positioning of the city as a tourism and investment destination for the years to come. Finally, the City realised that the ultimate judge of whether this would be a successful event would not be FIFA nor the international fans and media, but the citizens of the city itself. They would be the ones who would ultimately benefit or lose from the event. The City therefore committed itself to ensuring the legacy of the event for its citizens would be a positive one. These three strategic thrusts were encapsulated in what became known as the ‘Circles of Success’. 283 Compliance The things we must do to fulfill our contractual obligations Each FIFA project should also add to the fan experience and create a legacy for the Leverage The things we must do to make this the best fan experience ever Legacy Things we must do to leave a positive legacy for the citizens In order to ensure delivery on this strategic framework, the Joburg 2010 Office was given the full support of the managerial and political leadership of the City to help departments and MEs deliver the 2010 FIFA Soccer World Cup by implementing a range of identified projects within the agreed threefold strategic framework: plan, finance and deliver the 19 projects that would ensure full compliance with FIFA requirements for staging World Cup 2010; leverage each of these projects to optimise the experience of fans (18 of the FIFA-required projects directly influence or add to the potential of a positive fan experience); and Maximise the long-term benefit to the City and its citizens from the public sector investment (over R9 billion) and private sector investment (anticipated at over R6 billion) in these projects (17 of the projects can be leveraged to add to the socio-economic development and to the potential of a better City for all). In addition, a 20th project was added - the Mayoral Legacy Projects which leverage off the energy released by the investment in new infrastructure. This project includes four sub-projects to change the face of Soweto and one to increase the overall friendliness of the city through improved lighting, street art and furniture in key places. Two other projects are included in the activities required to deliver the 2010 World Cup: Parallel events which will run during the World Cup to showcase the City and enhance the fans’ experience; and The funding model required to finance and manage the actual staging of the two events that make up the total World Cup experience - the Confederations Cup in June 2009 and the World Cup in June 2010. 284 Cluster Cluster one Specific Projects Match venues Soccer City Stadium Ellis Park Stadium Match venue precincts Orlando Stadium Dobsonville Stadium Rand Stadium Ruimsig Stadium Training venue precincts Soccer City, Nasrec Ellis Park Orlando Dobsonville Rand Ruimsig Cluster two Training venues Support infrastructure Electricity, water, waste management Transport high-level and operations plan Nasrec Hub Rea Vaya Bus Rapid Transit (BRT) System Intelligent Transport System Park and Rides ICT IT&T International Broadcast Centre, including accommodation Environment Waste management and recycling Mine dump rehabilitation Tree planting Health Services Disaster Management Disaster Management Services Safety and Security Safety and Security Fan parks Public viewing sites Accommodation Tourism Marketing City beautification FIFA events Volunteers Business closure Greening soccer fields Indoor Sports Hall Soweto Theatre Diepkloof hostel upgrade Transport Cluster three Health Cluster four Marketing Cluster five Mayoral Legacy Projects 285 Cluster Specific Projects Street furniture Klipspruit River rehabilitation Africa Under One Roof Boys in the Photograph Football For Hope Soccer Legends Stakeholder mobilisation Confederations Cup World Cup Cluster six Parallel events Cluster seven Operational budgets Meeting the requirements of the FIFA Bid Book - delivering the 19 projects in the first four clusters timeously (and within the allocated budgets) - is a demanding challenge which the City is meeting. But the intention is to achieve success beyond the event itself - namely, to stimulate the African Renaissance, showcase the city as Africa’s leading tourist and commercial destination, to give fans a World Cup experience that whets their appetite for a return to the city, and to ignite the pride of the citizens. A driver of this success will be the fan experience-how the fans are welcomed, looked after, accommodated, transported and entertained during their stay. The WC 2010 Office is focusing on ensuring that a world-class fan experience is leveraged through the implementation of the 19 projects. Achieving this will translate into long-term commercial benefits for the city through increased tourism and investment. CHALLENGES AND OPPORTUNITIES The 2010 World Cup is the biggest programme the City of Joburg has ever undertaken. The total estimated funding required is R11,46 billion. The total amount funded, from the City’s own funding sources and the National Treasury, is R8,45 billion. This leaves a funding gap of about R3,016 billion. This is a significant challenge but the City has made applications to several funding sources for additional funds to fill the gap. This also needs to be balanced with the estimated R6,1 billion investment from the private sector that has been unlocked within the City by the World Cup programme. But the real measure of the impact of the World Cup is the stimulus it has given to a wide range of development opportunities: Two world-class stadiums - one, an iconic stadium refurbished (Ellis Park); the other, a new stadium destined to become a landmark venue for international sporting and entertainment events in the future (Soccer City); Four training venues - Orlando, Rand, Dobsonville and Ruimsig stadiums - that will also provide a range of world-class facilities for sports and entertainment well into the future; Public fan and viewing sites that will give people the security of safe venues and the unique feel of sharing in the World Cup experience; The precincts around each of these venues being upgraded with new infrastructure, creating new opportunities for citizens and for future development; The upgrading of basic infrastructure - water and electricity - in areas that will support present and future economic growth; The opportunity to develop new waste management strategies and practices through public education and implementation of new technologies; 286 A new transport infrastructure - Bus Rapid Transport and the opportunity to replan and integrate all transport modes (including Gautrain) through an Intelligent Transport System and shared responsibilities and rewards; Leapfrogging the City into an era of electronic connectivity through the world-class Information and Communication Technology network being installed at Nasrec; The opportunity to review and accelerate further greening of particularly disadvantaged areas and rehabilitation of environmentally damaged parts of the City; Strengthening the Safety and Security department with new manpower to secure visitors and citizens through improved policing; Upgrading primary healthcare facilities with new and additional equipment Energising the marketing thrust by leveraging off the Confederations Cup and World Cup to re-brand the City and project it on the world stage; Facilitating a rapid and extensive growth of new accommodation that will serve the City well into the future as a tourism and investment destination; The chance to develop the human infrastructure required for making the two events memorable for all the visiting fans - city volunteers to meet-greet-and-guide visitors, a city culture of service that will make tourists welcome and not exploited at commercial and accommodation venues; The ongoing beautification of the City that will match the warmth of the people with the comfort and attractiveness of its facilities; The events that will showcase the City and its culture and entertain fans during the World Cup; and The initiatives taken to change the face of Soweto through new sports and cultural precincts and the rehabilitation of the river that encircles the area. There are other challenges besides funding shortfalls to overcome in realising these opportunities: A greater measure of creativity has been needed in the thinking, planning and implementation of World Cup projects. Financial constraints mean that often strained resources have to be maximised and stretched in new ways to meet the needs; Balancing competing interests without neglecting one of them is a continual necessity. Ongoing delivery of day-to-day services and their extension and improvement cannot be compromised in pursuit of staging “the best World Cup ever”. At the same time, the unique opportunity offered by the event - using it as a catalyst for unleashing new development initiatives across the city and its sectors - should not be missed. This has required good planning, prioritisation and project management within each project and department; Growing coordination across all City departments and Municipal owned Entities involved in World Cup projects must be a continual endeavour. While each project has its own team and strategy to plan and deliver it, the inter-relationships and integration between the projects and their execution are where the success will be achieved during the staging of the Confederations Cup and World Cup; A profound education initiative has begun to influence citizens to open up to new attitudes towards service and towards waste management and reduction, recycling, energy usage and environmental practices that align with global better practices. The focus of the world will be on the City for at least six weeks over June and July of 2010. It is the greatest opportunity Joburg is likely to have to project itself as a world-class city and set the platform for future tourism and investment. The City will optimise this opportunity if it showcases best practices in how it “greens” the World Cup, uses resources and gives fans an outstanding experience through warm, good and affordable service; and The City’s stakeholders - CoJ employees and political leadership, citizens, business and labour - need to be engaged consistently over the coming months to stimulate and build a sense of anticipation and excitement for the two events and what they will bring. Preparation for both events, particularly the World Cup, involves all stakeholders in preparing to host, accommodate and entertain hundreds of thousands of fans from across the world for a month 287 or more. To do this well will take a high level of enthusiasm, interest and awareness of all that is involved in this event. The building of this awareness can only happen through a variety of channels that will inform and enthuse. The City is determined to achieve these and ensure they are properly managed. Joburg United – Partnerships for Delivery Delivering successfully on this challenge is a task that goes way beyond the City’s own resources. It requires that all city stakeholders – community groups, business, labour, youth and women’s formations, sporting bodies and the citizens in general – are mobilised in partnership with the City to ensure the achievement of the vision. To this end the City has launched the Joburg United campaign, whose goal is to unite the City and all its citizens in a massive effort to deliver on the ‘Best World Cup Ever’. A series of stakeholder workshops were held in 2008, culminating in a mass launch of the campaign at the Joburg Expo Centre during the Rand Show. At this event, the City committed itself to working in partnership with its citizens and stakeholder groups to deliver its strategic vision. Follow up meetings have been held throughout the City, and the process will accelerate as the event draws closer. 2009 FIFA CONFEDERATIONS CUP The Confederations Cup in June 2009 is a critical testing ground for 2010. Not only must the City ensure a successful tournament for 2009, it will also have the opportunity to undertake a live practice run for the much greater World Cup 2010. But the City cannot treat this as a rehearsal. It is a major event in and of itself, and the City plans to ensure that it is treated as such. The delivery of a successful Confederations Cup Event, which will see 8 teams competing for the trophy, will therefore be a key focus for 2009/10. Ellis Park Stadium will host the final of the event, and the eyes of the world will focus on the City from this point on until the completion of the World Cup in 2010. Not only will the City be able to test the infrastructure that it has put in place for the World Cup, more significantly will be its ability to test its operational capacities for the event. This will bring into play the full spectrum of the City’s resources – from transport, safety and security, marketing and communications, ITC, accommodation, health and EMS, volunteers etc. All of these elements are being fully integrated into an operational plan under the direction of the Joburg 2010 Office. 288 KEY ACHIEVEMENTS AND 2009/10 DELIVERY AGENDA The following report highlights the projects that are associated with each of the major clusters; tracking what has already been accomplished, showing what is planned for the coming year, and identifying some of the challenges that lie ahead. Cluster one: Venues and Precincts Strategic goal: The strategic goal for this cluster is to ensure that all facilities required by FIFA for match and practice venues are developed in full compliance with FIFA requirements, will provide an outstanding fan experience for local and international visitors, and will be able to be utilised to the long-term advantage of the citizens of Johannesburg. The City is alone among the FIFA host cities in having two match venues – Soccer City and Ellis Park. These venues have the added prestige of being the venues for the opening match and final of both the Confederations Cup 2009 and the World Cup 2010. This prestige comes with its own challenges – the stadia have to be iconic venues that will reflect positively on the city and the country, and having two match venues doubles the number of required FIFA approved training grounds. Match Venues: Soccer City We are pleased to report the following progress: The stadium is scheduled for completion by 31 July 2009, almost a year before the start of the World Cup in June 2010; Construction in therefore on schedule with FIFA requirements - overall 76% complete; Roof construction is 71% complete against programmed milestone of 76%; Cladding is 25% complete against programmed milestone of 42%; Brickwork and plumbing are at 86% completion; and Electrical and mechanical is 42% complete against programmed milestone of 50%. Overall, progress is on track but some areas of both stadium and precinct construction are behind schedule. However, the schedule aspect is not critical at this stage, and will not affect anticipated completion to meet Fifa contractual requirements. But there are two other specific challenges the City faces on this project: The budget escalations on Soccer City Stadium; and Additional technical requirements from Fifa for stadiums, stadium precincts, ticketing and ITC that could have financial implications for the host cities. These remain to be finally negotiated and settled. The key outcome for this financial year is therefore the full completion and operational hand over of the stadium to FIFA and the Local Organising Committee. 289 Stadium Precinct The development of the stadium precinct is a critical element of readiness, and much has been done at the Soccer City precinct to date. The Nasrec Urban Design Framework, when completed in April 2010, will project the region as a world-class sports, tourism and exhibition hub that will accelerate economic development and link Soweto to the City heartland through an integrated, rapid and affordable transport system and a commercial precinct. This is a critical legacy component of the Stadium development, as it begins to address the historical segregation of the City from its south western suburbs. Work started or completed at the precinct to date includes: The new transport hub and promenade linkage to the Stadium is 55% completed; Work started in February 2009 on both the International Broadcast Centre (IBC) and the media village apartments which are part of the precinct; The Rea Vaya Bus Rapid Transport links (phases 1a and 1b) are completed or under construction; and The N17 and feeder roads - Stadium Drive and Golden Highway - are at design finalisation stage or under construction but will be completed in time for the World Cup. In the coming year, the following projects will be started and mostly completed: Transport hub and promenade will be completed in July 2009; The IBC is scheduled for completion by December 2009; The apartment complex that is part of the precinct and will be used for the media during the World Cup, will be completed by March 2010; The BRT links are on track for completion and operation well ahead of the World Cup; The feeder roads are scheduled for completion in the second half of 2009 and The N17 will be completed by March 2010. This means that we are fully on track to achieve full completion of Soccer City and its precinct development well before kick-off 2010. As indicated, the long term benefits of the stadium and precinct development are enormous. Not only will the city boast a world-class sporting facility, but the development of the precinct in terms of transport, visual appeal, infrastructure and housing will go a long way to bridging the development gap from the City centre to the South West. Match Venue Ellis Park Ellis Park is critical for the World Cup, not only as an important venue for 2010, but as the stadium that will host the final of the 2009 FIFA Confederations Cup. Getting the stadium to full FIFA compliance has been completed during the course of 2008, and all works on the stadium were finalised in January 2009. During February 2009 the stadium has had its final inspection and hand-over to FIFA. This is a significant mile-stone for the City in its 2010 readiness. It will be further tested in the Confederations Cup and other sporting events that it will host during the next year. 290 The Ellis Park Precinct The upgrading of the Ellis Park Precinct is a major strategic priority of the City. The WC 2010 programme has fast-tracked delivery of a number of the elements of the overall precinct plan. About 80% of the plan has been completed in the past year. This includes: The upgrade of the main access roads (about 82% complete)’ Doornfontein Square (completed); The Sports Precinct (82%); Doornfontein Station (47%); Parks upgrade (31%); and Surrounding roads upgrade (15%). The full upgrade will be completed by April 2009, in time for the Confederations Cup. Training Venues and Precincts Hosting two match venues requires the City to have four FIFA standard training facilities available for use by teams. The City has developed four stadia for this purpose: Orlando Stadium; Rand Stadium; Dobsonville Stadium; and Ruimsig Stadium. Work on the first three of these is complete, and the new 40,000 seater Orlando Stadium hosted its successful inaugural event with a PSL match between Soweto clubs Orlando Pirates and Moroka Swallows. This stadium, standing as it does on the historic site of the original Orlando Stadium, will provide a massive boost to football in the city in general, and in Soweto in particular. There has already been significant interest in the stadium by PSL teams, and its full use in the future is well-assured. The renovated Rand and Dobsonville Stadia provide further legacy benefits to football in South Africa. Both of these stadia are ideally sized for the PSL and the National First Division clubs to use, and it is expected that there will be significant demand for them in the years to come. Ruimsig stadium is the only stadium that is not yet complete, but planning and funding is being finalised to ensure that this is done well within the required FIFA time-lines. The stadium precincts are also being upgraded in terms of the FIFA requirements, and in terms of our long term strategy for urban renewal. These include parking, transport and general landscape enhancements to the precincts. All work on the precincts will be completed by December 2009. 291 Cluster Two: Infrastructure Strategic goal: Infrastructure across the City that is planned, funded, rehabilitated or built anew to support the successful hosting of the Confederations Cup and the World Cup and to provide a long-lasting legacy for the citizens through the new opportunities provided by transport, water, power and waste management. The Infrastructure cluster of projects includes projects in support infrastructure (water, waste, power); transport; ICT; and Environment. Support Infrastructure Given last years crisis in Power delivery, this has been a major risk area. The City’s 2010 Power plan is designed to ensure that they secure power distribution throughout the city for the duration of the events. Certain priority upgrades were identified and funded in relation to this. Most of the projects are well underway, and will be completed in time for the Confederations Cup in June. Projects for completion this year include: Installation of new electrical distributors in the Nasrec precinct; New street lighting at Nasrec and Ellis Park precincts; Electrical supply for the Bus Rapid Transit system and to the Northern Gateways; Ensuring a reliable supply of electricity to all traffic lights and the Intelligent Transport System; Upgrade of Doornfontein/Fort standby generators’ Upgrade of Siemert Road sub-station’ Installing stable temporary connections for fan parks; New distributors from Siemert Road sub-station to proposed new hotel and other developments; Rationalisation of electrical supply in Aeroton to provide standby facilities to stadiums; 132kV/11kV Crown sub-station; and Upgrade of lighting on routes to Nasrec. In terms of Water, again, all the projects critical to the events are on schedule and within the requirements of FIFA. Projects to be completed this year include: Upgrade of Yeoville, Crown Gardens reservoirs; Upgrade of Yeoville supply line; Parktown and Dunkeld upgrades; and Water and sewer condition audit around match and training venues. 292 Waste management is critical for a successful event, and again projects in this sector have been prioritised in terms of their impact on a successful event, and have been fully funded and undertaken in terms of this. All are on track for completion in time for the events of 2009 and 2010. Transport The area of transport is where the three circles of success intersect most completely. In terms of FIFA Compliance there are a host of transport requirements to achieve; in terms of the Fan Experience, the ease, safety and accessibility of transport will be a key determiner; and in terms of Legacy, the investment being undertaken in transport infrastructure will re-shape the face of transport for the City for years to come. It is no surprise, therefore, that transport planning and execution has taken high priority for the City. The transport strategy is based on a pro-public modal split - a target of 70% public transport usage and 30% private. This strategy is also based on integrating use of the following components: the existing freeway system; Bus Rapid Transport, in particular the north-south corridor that links Soweto, through Parktown to Sunninghill with extensions to the match venues; Inner City Distribution System; Gautrain Rapid Rail Link from the Airport to Sandton link; and Upgraded Metrorail links (Park Station, Nasrec, Ellis Park and Orlando). The following are some of the specific elements of the Transport plan that the City has undertaken. Nasrec Hub This is a critical node for Soccer City, the IBC and precinct. It will provide an aesthetically appealing, ease of use and access, central hub for all transport to the venue. It links with Soccer City via a new pedestrian bridge and promenade. It is 55% complete, and will be completed in the coming year. Bus Rapid Transit System While the need for the BRT is independent of the transport needs for the World Cup, its implementation has been fast-tracked in order to meet the latter needs. Phase 1, which will provide linkages between the City and Nasrec and Ellis Park precincts is currently being built and will be completed for the World Cup. This new transport system has three main aims: to channel public transport into focused, high frequency corridors; to provide improved access between residential areas and economic nodes; and to allow for better law enforcement for public transport. The system will consist of: 293 exclusive median bus lanes along key routes; separate, closed median stations every half kilometre or so; complementary and feeder routes using smaller buses; high-peak frequencies of three to five minutes; 18-hour daily operations - 05:00 to 24:00; GIS-based BRT control centre; and a business model that incorporates bus and taxi operators. Orders for the 143 buses required for the Confederations Cup were placed in December 2008. Inner City Distribution System Linking in the BRT is the Inner City Distribution System (ICDS), which is also currently under construction, with work in Hillbrow and Joubert Park currently underway. When completed and integrated with the BRT, the ICDS will ensure ease of public transport access through the inner city. Intelligent Transport System A further critical element of the Transport plan is the Intelligent Transport System (ITS). This system gives transport authorities the tools to make better informed transport decisions that improve the overall operations of the whole system. advanced traveller information systems advanced traffic management systems incident management systems signage upgrades to ease mobility between the city, the stadiums and the airport. The ITS control room at Martindale, the automatic fare system, CCTV and passenger and route information systems are all at various stages of planning and implementation, and will be completed in time for the World Cup in 2010. Park and Ride A final leg of the transport strategy is to reduce significantly the number of private vehicles moving even close to the stadiums by providing four Park and Ride facilities spread around the city. The following sites have been identified as park-and-ride facilities: Marks Park and Rand Stadium for Soccer City matches Wits University West Campus and Bezuidenhout Park for Ellis Park matches. The key challenge facing Park and Ride, is the consumer uptake. Consequently, a park-and-ride desk is also being investigated to better manage the service, including its integration with the Rea Vaya-Ride Smart Help Desk. Furthermore, a focused communication and marketing strategy is being developed for positioning park-and-ride facilities in the mind of fans and spectators, and private sector involvement is being sought for the development and improvement of the park-andride facilities not only for the World Cup but for the long term. 294 Information and Communication Technology The World Cup is primarily a broadcast and media event. Despite the full stadia and vast numbers of international visitors expected to arrive in the country, the biggest audience for FIFA is the international television audience for the event. A sophisticated and robust ICT infrastructure is therefore critical for the successful delivery of the event. Furthermore, the fact that the City is to host the International Broadcast Centre (IBC) places further challenges on our plate. In order to meet these challenges, the City is working closely with Telkom and Sentech to ensure full integration of the City’s projects with the national ICT planning and implementation processes. As host city to the IBC, Joburg has appointed a project management team to manage the upgrading and refurbishment of the Expo Centre, including: Refurbishment of the Expo Centre halls in preparation for the IBC began in February 2009; and The media village apartments in the IBC precinct that will house some of the media during the World Cup, and which will be converted into housing post the event. Environment This is the final infrastructure element in the cluster. Here, the emphasis will be on implementing sustainable waste management strategies and leveraging off the World Cup to introduce new approaches. The City has also undertaken the following: A tree planting project which has achieved 66% completion against the target of 200 000 trees planted by the time of the World Cup; New technologies for managing and recycling waste at source, using underground bins, will be used for the first time in South Africa; Soccer City will use rainwater, caught in massive containers, for irrigating the field. Grey water will be recycled for use in the ablution facilities at the venue. Awareness campaigns to introduce better waste recycling and environmental practices to the general public will be needed; Negotiations are underway with Durban Roodepoort Deep, owners of the mine dumps alongside Soccer City, to mitigate the impact of the dust off the dumps during the World Cup; The vegetation testing for the mine greening is complete and planting is to begin shortly; and The mine greening project is scheduled for completion by June 2009. A further major environmental project related to the World Cup is the Mayoral Legacy Project of the greening and rehabilitation of the Klipspruit river in Soweto. This is covered in greater detail under the Mayoral Legacy Projects below. Cluster Three: Safety and Security Strategic goal: The creation of a safe, secure and people-friendly environment for the Confederations Cup 2009 and the World Cup 2010 through skilful management of all crowd situations. 295 In terms of Safety and Security specifically, the goal is long-term capacity and capability to manage and establish safety and security across the city and to integrate all initiatives taken in this regard with all City departments. Safety and Security is another area that intersects all three of the Circles of Success. Providing a safe and secure environment for all participating in the World Cup and Confederations Cup is an absolute requirement of FIFA. Ensuring a sense of welcome, safety and warm embrace is critical for a great fan experience and enhancing capacity and capability for safety and security provides a positive long term legacy for the City and its citizens. The Safety and Security Cluster includes three major project areas: Health; Emergency Management Services (EMS); and Safety and Security itself. Health Environmental health is an important part of the requirements for compliance. This includes: Accreditation of all accommodation establishments; Training and accrediting of food vendors; Vector control; Integration with Waste Management, Joburg Water, etc; and Clarity on the relationship with Emergency and Disaster Management. In preparation for the two events, the City has budgeted for: upgrading of clinics in critical areas; purchase of new medical equipment; environmental health equipment; and computers. In addition, there are plans to employ more staff for the health services that will have to be provided, with the additional need of preparing for a possible influx of people from SADC countries seeking free medical services. A grant from the National Department of Health will allow for the purchase of equipment for testing and for staff training. Disaster Management Any event of this scale embodies enormous risk in terms of the potential for disaster. In light of his, Emergency Management Services has developed an Emergency Preparedness Strategy with the necessary costings. As part of this there are plans to establish a fully-equipped Disaster Management Centre that will conform to all the legal requirements. However, the biggest challenge is the funding needed to establish this Centre. Only seed funding has been allocated by the City thus far. 296 In the interim the following will be completed: The JRA Control Room will be used as the Joint Command back-up centre and will be fully operational for the Confederations Cup. This Centre will house JRA, BRT, EMS, 2010 office, JMPD and SAPS; The establishment of the Command Centre (phase 1) will be achieved by 1 June 2009; Refurbishment of the Martindale facility for the World Cup will be done by December 2009; All key systems will be in place by April 2010; Employment of key personnel is on schedule; Risk identification for 2010 is in place; Memo of Understanding with other local authorities is in place; and The procurement of a Hazmat unit and disaster bus is underway. Safety and Security This element, so critical to the success of both Confederations Cup and World Cup 2010, is well ahead in terms of planning and execution. A key element of this is the employment of an additional 1 500 JMPD officers, which will be complete this year. A Rights Protection Unit has been set up, in compliance with FIFA requirements, to police the by-laws regarding ambush marketing and business practices that might damage FIFA Soccer World Cup partners. Training Unit began in July 2008; The first full-dress rehearsal of the Safety and Security Operational Plan was successfully carried out at the 30 August 2008 South Africa vs Australia rugby test at Ellis Park; Full implementation of the general safety and security operational plan took place during the inauguration of the Orlando Stadium from 21 to 23 November 2008. The operation was a considerable success, a big improvement on the August trial run. It also indicated an excellent level of cooperation with the SAPS , CoJ departments and ME; and A risk identification exercise has also been carried out and contingency plans are being developed to cover these. The funding allocated to Safety and Security will provide for: developing an integrated IT platform that will ensure interaction between Safety and Security and other key departments, e.g. Transport; additional equipment to improve operational efficiencies, including vehicles, dogs, horses, protective gear; communication tools - electronic billboards, Z-cards, etc - to inform visitors of the necessary safety and security protocols; and the operation of the proposed four courts that will be set up for the duration of the World Cup The operational plan for the Confederations Cup is now being developed and the lessons learned from the inauguration of Orlando Stadium will be fed into the operations plan for the World Cup. The operational plans for World Cup will be finalised and developed on the lessons learned from the Confederations Cup by May 2010. 297 Cluster Four: Marketing Strategic goal: Informed, entertained and delighted fans enjoying a Joburg experience - from arrival through accommodation and recreation to the matches - that has them looking for more and promoting the City and the country across the world. Marketing of the City is a critical success element, both in terms of the visiting fans and the experience that they have of the city, the tour operators who are planning the travels of the thousands of visitors, and the ongoing positioning of the City as a World Class African City on the global stage. Within the Marketing Cluster, the following project areas have been grouped: Fan Parks and Public Viewing Areas; Accommodation; Tourism; Marketing; City Beautification; FIFA Events; Volunteers; and Business Closure. This cluster becomes ever more important as the event draws near. Hence, in this coming year, a lot of resources, both time and monetary, will be dedicated to this cluster. Fan parks Fan Parks are almost as important for the fan experience as the stadia. They are the venues where visitors and locals can gather in large numbers to view the matches in a safe ‘crowd’ atmosphere. Each World Cup these Fan Parks have grown in importance, and much is expected of them by FIFA and by football fans in general. The City is required to host two official FIFA fan parks. The sites for them have been identified as Innes Free Park in Sandton and Elka Stadium in Soweto. Planning is underway to ensure their readiness for the World Cup. These areas are free public viewing spaces where fans can watch matches live on a big screen. The parks will be properly secured and provide for safe viewing with fan facilities such as ablution facilities and food and beverages laid on. There are several challenges to be overcome in the 2009/210 year: a fan management strategy must be completed; a full risk analysis must also be completed; an infrastructure plan, eg safety & security, needs to be put in place; and a financial model has to be drawn up in collaboration with FIFA and the SALOC. 298 Public viewing sites Public Viewing Sites are not official FIFA Fan Parks, but are optional additional Fan Zones that the city will provide. Two sites have been identified as public viewing sites - Mary Fitzgerald Square in Newtown, Johannesburg, and Walter Sisulu Square in Kliptown; and These are additional to what is required in terms of the contractual agreement with FIFA so the CoJ is not obliged to comply with any FIFA Fan Park requirements. As a result, these sites will not have all the facilities that will be put into the fan parks but will still provide free public viewing of World Cup matches. A key challenge to the success of these sites will be to attract sufficient sponsorship of the right kind to enable the City to fully fund the Viewing sites. Accommodation Although the City is not contractually obligated to fund accommodation, it is working very closely with MATCH, the FIFA organising company to assist them in partnering with local hotels, lodges, guest houses and bed-and-breakfast establishments to secure a wide range of accommodation for the FIFA family. To date, 135 hotels (6628 beds) and more than 250 non-hotels (981 beds) have been signed up by MATCH. In order to accredit accommodation, MATCH has been working with the Tourism Grading Council of SA to identify and grade establishments that sign up. This will provide a more reliable quality of accommodation than has happened before in the city. Clearly, accommodation of the right kind and quantity will be a critical component of the fan experience, so the City is delighted that in the build up to 2010, a large number of new establishments have been or are being build, and a large number of B&B and other facilities are being graded by the Tourism council. These 2010 driven initiatives will ensure an extremely positive legacy for the City, which has been struggling with hotel be under-capacity for the past while. 19 new hotels are being built in the City and surrounding areas with the intention of being ready for the June 2010 influx of fans. Six of these hotels are in Sandton, one each at Four Ways and Woodmead and the rest in the CBD and to the south; Further accommodation is being planned at universities and student residences around the city; and An external company has been engaged to plan and develop a tent city within the CoJ environs to avoid fans sleeping on the streets, in parks and in railway stations as happened in Germany. This tent city will be fully self-funding through participation by the private sector. Tourism A tourism implementation plan is completed and in place. Several projects are planned to leverage the benefits that the hundreds of thousands of visitors will bring to the City during the World Cup - and, to a lesser extent, during the Confederations Cup. Furthermore, the City has taken part in several road shows and exhibitions - Indaba Durban 2008, Explore South Africa – Sao Paulo, Brazil, to showcase its capacities for 2010: Johannesburg Tourism Company (JTC)has also conducted media briefings and travel agent seminars in Tanzania, Kenya, Nigeria, Uganda, London and at the Beijing Olympics. Local tour operators have been engaged about packaging Joburg’s leisure destinations for the Confederations Cup visitors 299 About 70% of targeted destination marketing internationally has been completed for the Confederations Cup. About 30% of targeted destination marketing has been completed for World Cup target audiences. Plans to optimise the tourism spin-off of the two events include: Destination marketing: A Marketing Plan to raise awareness or the city and to align its brand with the World Cup is in place. Both above the line and below the line activities are planned to position the city in the international spotlight; Tourism skills development: This is a project to train SMMEs in customer service and efficient operation of accommodation, commercial and entertainment venues. Training includes information on the international tourism industry, what makes a good experience for tourists, what is expected from them as providers of hospitality and how to run a regular business. This project will run through to the World Cup; Tourism signage: This entails the erection of tourist-friendly signage on all major routes and in tourism nodes as well as entry and exit points around the city. Current signage is very inadequate and this project is vital to ensure a tourist-friendly city. It is in progress; Tourist information services: The length of stay and tourist spend is dictated by compelling attractions. This starts with making the right information about quality attractions readily available and attractive to tourists of all cultures and languages; Johannesburg Tourism Company: A new website is being developed and will be ready by May 2009; and City Ambassadors: JTC is assisting in the training and orientation of the selected volunteers who will be ready for the Confederations Cup. Marketing The CoJ has approved a full Marketing Strategy, but only some elements of it have been activated to date : The first phase of a stakeholder engagement project, culminating in a Summit at the Johannesburg Expo Centre during the 2008 Rand Show, began a concerted citizens’ engagement campaign; Concurrently with this campaign is the Joburg United team project. This is aimed at engaging CoJ employees and citizens in uniting to prepare for and deliver the “fan experience” through a united and warm welcome to all visitors for the duration of their stay in the city; The Countdown Clock has been erected next to the main entrance to the Civic Centre in Braamfontein; The CoJ website has been modified and extended and now carries the latest updates on Joburg’s state of readiness as well as useful information on the World Cup. It has links to other web pages linked to the World Cup; The Host City Poster has been approved by FIFA and was jointly launched with the other host cities and the Local organising Committee in January 2009; and The CoJ shared a stand with City of Tshwane at the recent Soccerex at the Sandton Convention Centre. Several other events will take place in the run-up to the Confederation Cup - 500 Days (to World Cup) celebration and the 2009 Joburg United Summit. 300 The next phase of the stakeholder engagement campaign will take place in the first quarter of 2009, again culminating in a summit during the Rand Show; There are also plans to produce and circulate a monthly 2010 newsletter to 750 000 City householders. The aim would be to not only keep ratepayers and residents informed of preparations for the World Cup but also to raise the level of anticipation and excitement and build the Joburg United concept; A temporary information kiosk and visitors centre will be erected on the periphery of the Soccer City construction site as a visitors centre; and Additional marketing initiatives are in planning. City beautification The aim of this project area is to ensure the city is clean and safe for the FIFA family and all visitors and to make the city attractive as possible through the big and small touches - street furniture, trees, sculptures in public places, themed gardens and public places, as well as promotional ‘dressing’ of the City. The installation of street furniture on BRT routes and around match venues is also part of the initiative to make Joburg a city that is cheerful and user-friendly; World Cup 2010 and Confederation Cup 2009 posters have been erected on some major transport routes; and In addition, the rehabilitation of the Klipspruit River in Soweto, including landscaping and planting of trees along the banks and open spaces in the area, has made a large part of Soweto more attractive and user friendly. This year, the plans include: Planting a further 68 000 trees up to June 2010 - if private sector or additional funding can be sourced. The focus will be on landscaping and treeing the precincts around Soccer City and Ellis Park; Branded welcome kiosk and branded foyer at O R Tambo Airport; Wrapping of trees with decorative lighting; Event flags along major routes and branding parks with these flags. Branding informal trading stalls; Education campaign to tidy up informal trading and ensure customer friendly approaches; Decorating the inner city walkway - branding CoJ buildings, major streets, taxi ranks and bus terminals and decorating Mandela Bridge; and Branded 2010 information kiosks in shopping malls, parks, museums, entertainment zones and other places of interest. FIFA Events In the build-up to 2009 and 2010, there are a number of official FIFA events that position the World Cup and build the excitement and hype around the event. These hold major benefits for the City: 301 They allow the CoJ to showcase the best of the city’s art and culture, including dance and music; The events provide the biggest global audiences any city in Africa has ever had, providing an opportunity to project both Joburg and South Africa in a new way to this huge international audience; and They give the CoJ a platform to leverage the huge investment in the World Cup to position Joburg in the international consciousness as a truly global city. These events will also be used to put the African stamp on the World Cup, showing that the city is part of a mighty continent that is rapidly coming into its own. Volunteers These will be the “ambassadors” that will meet, greet and provide information to visitors. A total of 17,262 people in Joburg applied to become volunteers. Of these, 2,000 were short-listed to be interviewed between 15 January and 15 February 2009. All volunteers undergo security screening, and once appointed will undergo training in customer service, communications skills, general knowledge, conflict resolution and emergency procedures so as to be ready for the Confederations Cup. This training will take place in May 2009. Business Closures Business closure represents one of the trickiest parts of compliance with the FIFA requirements. In terms of the Host City Agreement, which the CoJ and the other eight host cities signed with FIFA, certain constraints have to be imposed on businesses: those that are not FIFA partners but are within a 1km radius of the two match venues will have to close on match days; no marketing or advertising hoardings for any brands other than FIFA’s partners or affiliates will be allowed within the 1km radius; and no construction work will be allowed within proximity to the match venues and along key routes. In October 2008 the CoJ approved a new set of by-laws that will deal with these FIFA-required provisions to prevent ambush marketing and control certain commercial activities on World Cup match days. The JMPD Compliance Unit is in place and is undergoing training to implement the business closure by-laws. One of the more controversial aspects is the possibility of having to use the by-laws to stop certain commercial activities at specific times during June 2010. These would include construction, informal trading, advertising and entertainment in certain areas on World Cup match days. The CoJ Department of Economic Development has done a scoping exercise to determine the true cost of business closures. Cluster Five: Mayoral Legacy Projects Strategic goal: Excellent facilities that enhance the lives of ordinary Sowetans and open up new possibilities for achievement in sport, art and culture for many more people by leveraging off the impetus created by investment in the 2010 World Cup. 302 When the 2010 Bid was first awarded, and the City of Johannesburg became an official host city, the Executive Mayor, Councillor Amos Masondo, set in process a commitment to utilise the energy and impetus created by the 2010 World Cup to fast-track a number of important long outstanding projects in the City, particularly in Soweto. Money was allocated to many of these projects, and private sector funding was sourced for others. Greening soccer fields Many soccer fields in Soweto have pitches that are barely adequate for play, so a decision was made that an appropriate 2010 Legacy project would be green these fields, contributing not only to an improvement of the lives of the residents, but also to the future skills development of young footballers. Furthermore, 101 fields in Soweto were identified for possible greening and 52 were found to be suitable. Between 2006 and 2008, 18 fields were completed. In the 2008/09 year, 10 more fields will be developed - grassed, irrigation systems installed, landscaped and fenced. In the coming 2009/10 financial year, a further 11 fields will be completed. To date, 60% of the project has been completed. Indoor Sports Hall This facility will be located on the rugby fields in Orlando East and link to the Orlando Stadium and the Orlando multi-purpose courts. Designs have been completed for this Centre which will also house an Olympic-standard swimming pool. Soweto Theatre The development of the Soweto Theatre was put out to tender and a successful bidder appointed in December. This bidder has undertaken to finance the construction of the Theatre, but there is a shortfall in the funding required. Diepkloof Hostel Upgrade This important project involves the upgrade of an old hostel complex into family accommodation. The redevelopment work is being carried out by the CoJ but the project falls directly under the Gauteng Provincial Government. The project is about 70% complete. The first 84 units were completed in the first half of 2008 and 1000 more were scheduled for completion by December 2008. In all 1424 units will be delivered and 2 778 residents have been registered as beneficiaries. A major problem is the electrification of the development. Eskom has informed the CoJ that no supply can be provided for about nine months. City Power is negotiating with Eskom to secure provision of interim electrical supply Street Furniture The impact of this project is already being felt across the city. Some of the initiatives already tackled include: 303 Benches, lighting and multi-purpose bins in Hillbrow, Berea and Yeoville; Mosaics on the Nugget Street waterfall and paving art in Hillbrow, Yeoville and Berea; Public art in the five parks in Hillbrow, Yeoville and Berea; New lighting in the Transport Square in Doornfontein; Mosaic artwork at the Bara Taxi Rank; and Paving and street lighting in Nasrec. Klipspruit River Rehabilitation Running through the heart of Soweto, the Klipspruit provides not only a recreational and sporting environment for the residents, its clean up will contribute greatly to the overall environmental rehabilitation of the City’s water sources and courses. Much of the rehabilitation work on the southern portions of the Klipspruit River has been completed and has already turned what was a polluted stream into an attractive recreational venue. Four technical and environmental reports have been drawn up to guide the complete rehabilitation of this river system. The whole project is due for completion in 2016; When completed, the river will provide a series of eco-parks, trails and picnic sites equipped with ablution facilities, irrigation systems, water features, play equipment, bird hides and board walks; This project is already providing a visible positive legacy through the vastly improved environment on this eastern side of Soweto; The Orlando-Dube node and the Mofolo South node are due for completion in June 2009; and The stabilisation of the wetlands is also scheduled for completion is June 2009. Cluster Six: Parallel Events Strategic goal: Events that will enrich the World Cup experience for fans, local and international, by showcasing other dimensions of South Africa. Africa Under One Roof This African Legacy Programme seeks to ensure Africa’s full participation in the event by using it as a platform to promote Africa’s image globally. The core project will be Africa Under One Roof, an exhibition to showcase the art and craft of Africa during the World Cup. The aim is to draw artists from all over Africa to exhibit their work and to provide local and international art lovers and art dealers the opportunity to experience the talent of Africa. It will also position Joburg as an art capital. The exhibition will be at Museum Africa in Newtown, or a similar venue, and start two weeks prior to the World Cup and end two weeks after the final. 304 Boys in the Photograph This is an Andrew Lloyd Webber musical with a soccer theme that will be staged at the Civic Theatre during the World Cup. A fully South African cast and creative team will stage this show. The musical will be produced by the Johannesburg Civic Theatre in association with Real Theatre and will open on 30 May 2010 and run to 8 August 2010. Football for Hope This is an official part of the 2010 FIFA World Cup and is built on the theme of “Development Through Football”. It will take place in Alexandra at No: 3 Square which has a multi-purpose sports complex, club house, soccer field and a range of other playing areas. The operational part of the event will be funded by FIFA’s corporate social division, the Street Football Movement. The CoJ will provide funding for the infrastructure services – water, emergency services, safety and security, etc. Discussions are underway with FIFA regarding certain of CoJ’s requirements and the roles and responsibilities of each party. The festival organising team started operating from CoJ office in Wynberg in February. This team will grow to 25 in the lead up to 2010. Approximately 360 volunteers will be deployed for the event. The festival will kick off with a prefestival from 25 June to 2 July 2009 with the main tournament being staged from 3 to 10 July. Soccer Legends The soccer greats of South Africa’s past will have a starring role in the major events leading up to and including the World Cup. Meetings have been held between CoJ and the Soccer legends Association to agree on the details of an agreement between them whereby the Soccer Legends will be paid an appearance fee and be provided with suitable outfits. 20 soccer legends will take part in a series of events that began with the inauguration of Orlando Stadium in November 2008. Stakeholder Mobilisation This programme began in February 2008 with a series of workshops in each of the City’s regions to engage with the public and inform them of the initiatives underway to stage the World Cup. The key focus was to create a sense of anticipation and excitement over what was to come, to share the sheer scope of the undertaking and to unite citizens around the theme “Joburg United”. This is a rolling campaign in three phases. The first phase culminated in a summit and the launch of Joburg United during the Rand Show in April 2008. In 2009, the second phase will also culminate with a summit during the Rand Show (April 2009). The finale event will be in April 2010, on the threshold of the World Cup. 305 Cluster Seven: Operational Budgets Strategic goal: The efficient, cost effective and successful financing of the staging of the 2009 Confederations Cup and the 2010 World Cup. With the Confederations Cup only months away, the City has begun to shift focus from preparation to delivery. As a consequence, an extensive process of setting in place all the operational planning and implementation plans is underway. Funding for this has been sought from National Treasury. Both the Confederations Cup and World Cup require a massive mobilisation of resources, as well as great coordination of city resources as well as interface with multiple stakeholders. CONCLUSION The City of Joburg has invested considerable energy and resources into planning and implementing both the Confederations Cup and the World Cup. The evidence of the success of these endeavours to date is the achievements that are visible to all: The stadiums and their changing precincts The dramatic improvements to public transport that is showing in the road upgrades and plans The emerging IT complex at Nasrec that will revolutionise connectivity for citizens once it has served the World Cup The private sector involvement that is estimated at bringing R6,1 billion into the city The changing face of safety and security through the increased capacity and planning expertise The further greening of a city that is already a world leader in suburban treeing The upgraded infrastructure tat will provide a platform for further development The legacy projects that will change Soweto and link it strongly to “a world-class African city” As the Confederations Cup 2009 draws near, the City is confident in its ability to deliver on its vision, that of hosting “The Best World Cup Ever’ in the City of Johannesburg. 306 CHAPTER 11: AREA BASED INITIATIVES AND PROJECTS INTRODUCTION This Chapter provides an overview of the City’s key projects at an area-based level as well as community issues and department’s and Municipal Entities responses. These projects are informed by the 5-year Mayoral Priorities, City’s Growth and Development Strategy (GDS), 5 year IDP and the delivery agendas for 2009/10. This chapter also include key achievements date so as to provide a solid foundation for 2009/10 plans. Key urban management issues and interventions for each of the city’s regions are also reflected as well as the Gauteng Provincial Government Capex for 2009/10, to be implemented in the City of Johannesburg. The City of Johannesburg is divided into 7 regions and 19 regional focus areas. Region Regional Focus Areas Region A Diepsloot Midrand Ivory Park Region B Randburg Auckland Park & surrounding suburbs Southwestern townships (Coronationville etc) Region C Roodepoort CBD Cosmo City Greater Princes Region D Soweto Region E Alexandra Cyrildene Orange Grove Region F Inner City Charter Plan Inner City and Southern suburbs Region G Eldorado Park Orange Farm Poortjie Lenasia The City of Johannesburg has a legal and constitutional mandate to public participation and it is for this reason that, it is deeply committed to ensuring that its planning and budget allocation 307 process are relevant and appropriate. Community and stakeholder consultation and participation have been the cornerstone of the CoJ’s good governance. In the period 2008/9 the CoJ introduced Community Based Planning (CBP). The Community Based Planning is a social contract between community, ward committee and the municipality. And the principles of the social contract is to facilitate community planning that will contribute to the IDP, enable the ward councillors, ward committee and community to take ownership of development in their ward and to realise the notion of developmental government. It is for these reasons that the CoJ balances two key concerns, firstly the need to view the City as a whole, and plan accordingly. And secondly, to respond to the specific needs as identified at ward level. ASSESSMENT OF WARD ISSUES In preparing for the implementation of CBP phase 2, the Central Strategy Unit undertook a detail analysis of sector responses in relation to the community issues. This section reviews the issues and responses. It attempts to: Draw attention to the most frequently raised issues; Outline responses made; Categorise the responses according to the nature of the action committed to. We use the following groupings: service delivery issues interventions already planned/delivered interventions specially planned interventions completed, requiring council approval interventions requiring investigation provincial interventions These responses are also grouped according to their resource implications, i.e. whether they have Capex or Opex or no budgetary implications. SECTOR-SPECIFIC COMMENTS ON ISSUES Governance The governance sector provided responses on issues to be escalated to province and one direct issue related to enhancing community participation in ward 39. In both cases the responses were adequate with the proviso that matters escalated to Province be monitored and reported on. The issue of community participation required a simple programme of activities that the ward could use to implement locally rather than a high-level policy response. This suggests the Office of the Speaker consider pragmatic tools to support local community participation. Finance Under the auspices of Finance and Customer Revenue and Management’s (CRM) attention was directed to the need for the establishment of a central point of contact between citizens and government. Although the city has a strategy of people's centres and the CRM infrastructure, this request reflects a challenge with that experience on the ground at least in Region D. Housing On balance a large part of the housing issues are addressed through projects or processes that are currently underway. Most notably communities raised concerns over the delays in the eradication of specific informal settlements and more generally on the scarcity of land for housing. The fact that a large part of the issues reflected delivery planned or in progress suggests that the important work that the Housing directorate is doing is not being adequately communicated to affected communities. 308 The balance of the issues require interface with the provincial government and the Housing directorate must ensure they track these escalations and continue to communicate results to affected residents. Infrastructure and Services By far the substantial demand for working public lighting as a strategy perceived to curb crime is the most cited issue for Infrastructure and Service Delivery (ISD). However this is followed by a very vocal demand for stormwater drainage in newly developed or previously informal areas (Soweto, Orange Farm, Ivory Park, Alexander) and increase in the capacity of the sewer system in growing areas (Diepsloot and the Deep South). It must be said at this point that although street lighting received more mentions, the lack of functional stormwater and sewerage has much more serious consequences for livelihoods than streetlights - largely a matter of convenience bar the lose relationship with safety. Mostly the streetlights are being catered for in Opex strategies and where required massive Capex projects are currently underway. The sheer volume of streetlight- maintenance requests however suggest a possible systemic problem in this regard. The Sewer upgrading requests are generally met by a response to investigate unless the matter is being attended to as part of the maintenance programme. This suggests that ISD need to undertake and articulate the results of ongoing infrastructure planning and management to mitigate the perceived lack of interest in maintaining a functional water-borne sanitation system. Health The overwhelming majority of issues raised in relation to health, although reflected as Capital requests, relate in large part to access and levels of service. In terms of the former, most communities have access to a clinic in a 5km radius, however actually travelling to the clinic or receiving adequate service once there was sharply raised as a deficit. In most cases the Health Directorate have either committed to minor upgrading within their limited budget or articulated functions and powers where it applies? There is an ongoing issue around providing maternity services, Mental Health services, TB management services, X-Ray services and extended hours that in the long-term the Health department together with provincial government will need to address. This process will require substantial community interaction and appears to be more urgent on the ground than perceived to be treated by the authorities. Public Safety The Public Safety issues relate almost evenly to traffic management, urban management/enforcement of by-laws and community policing structures. Although it is evident that JMPD and EMS have applied their minds to city-wide interventions to address these three key issues respectively. However the length of time these interventions take to entrench at ward level is what is going to hamper the perceived success of the city-wide projects. For example the new JMPD deployment strategy for traffic management needs to have some public reference so that community members know what to expect and make sufficient plans for the interim lag; and support structures for community police forums (CPF's) need to be adequately communicated and effectively monitored so that detailed feedback on each CPF can be produced for communities when they demand it. With respect to effective urban management (by-law enforcement), the role played by DPUM and regional offices is not sufficiently explored in the responses. This requires attention. Environment There are three critical issues raised in the Environment Sector: Establishment of public open spaces, maintenance of public open spaces and management of wetlands, conservancies and fragile micro-environments. Two less frequent issues were raised – the development of 309 foodgardens and recycling centres – but the importance of these, in terms of the strategic environmental issues for the city, warrant their mention here. In terms of their responses the Environment department seems not to have addressed these in terms of their strategic importance. There are a variety of collaborative solutions that may address food gardens and recycling centres, and in their investigations, the department should consider a partnership model that manages the possible Capex and Opex these potentially have. Furthermore, the Department must involve community stakeholders in their planned investigations. This is not evident from the response. Public open space establishment and management has for the most part been escalated by the department to future planning and budgeting cycles. In terms of new public open spaces, scarcity of land and future OPEX planning will play a role in determining the levels of service in each ward. However it is interesting to note the extensive demand for public open spaces possibly suggesting that developmental needs are being conceived of more holistically and communities are beginning to claim collective spaces. In terms of current maintenance requirements, there appears to be a capacity challenge related to the maintenance of the public open spaces – across the city there are extensive demands to trim grass and keep the POS clean. It is clear from the City Parks perspective that current budget limitations negatively affect their capacity to maintain POS at scale across the city. On the other hand it is also possible that CJP can innovatively address at least the cleanliness elements through community volunteering and support. This requires attention. The Wetlands management focus is addressed by the Wetlands Audit and Management Priorities. This has already been concluded and the results can now be communicated to interested parties across the city. Transportation Transportation received substantial issues in two critical areas: access to public transport services outside of the concentric model; and maintenance of roads, most notably the installation of stormwater drainage. In terms of access to public transport, the Rea Vaya BRT is expected to address most concerns in this respect but its roll-out may not necessarily correlate with community expectations. It is therefore imperative that on a ward-by-ward basis the transport sector avail local information to the public that indicates Rea Vaya BRT progress and facilities for that community/ward. In terms of road maintenance there appears that a dire situation in the city is emerging. There are substantial volumes of maintenance required that is going to be placed on the 09/10 budget; and the stormwater planning process also involves substantial requests. There is a concern that the city's affordability needs to be matched with community expectations, an aspect of communication clearly not addressed (as evident in the community issues). Secondly, the transport sector needs to consider the impact an education programme on levels of service may have in moderating expectations of full stormwater drainage. There is no mention of local and household strategies to manage localised/household flooding which may further assist the interim lag in delivery of stormwater drainage. With regard to stormwater drainage the matter is more complex. Stormwater drainage requires the installation of a certain level of service with respect to roads. The high costs of road upgrading across the City limits the CoJ's capacity to keep up with the demand. Furthermore, it is unclear whether the Transportation sector has considered the impact of recent climactic changes in their longer term planning and determinations on levels of service. Spatial Form and Urban Management A large proportion of the sector's issues related to Development Planning and Urban Management (DPUM) which evidently faces substantial challenges, most notably regional level 310 coordination between line departments and JMPD, as well as sustainable strategies to curb urban decay as a process (rather than an event). In some cases rapidly changing demographics complicate these efforts. However, as a lead department, DPUM needs to address the scale required to have a meaningful effect. It is evident that there are activities to address urban decay, by-law enforcement etc. but the ongoing insistence by communities suggests the results are uneven and/or short-lived. Land availability is the second critical issue raised in this sector. Notably the urban edge process, while highly technical is devoid of community involvement which may go a long way in assisting communities moderate their demands in this respect. The Regional Spatila Development Framework (RSDF's) also appears to have limited community knowledge or buy-in and community participation in this respect should be a key focus area in the next planning round. Community Development Not surprisingly, community development received the most demands for community facilities. There tends to be a belief within communities that capital investment infrastructure must necessarily lead community-based recreational activities. Community Development's response has tended to be a passive insistence on the lack of budget available rather than looking at the matter systemically and finding creative ways to address the needs for recreational programmes at local level. Communities also requested the upgrading of existing community facilities to make them more user-friendly in general and multi-purpose that would increase utilisation. While there is an acceptance that where no facilities exist or are reasonably accessible, such should be facilitated; where facilities do exist, they require a reconceptualisation to address more contemporary needs. In this respect Community Development needs to find creative solutions, notably community and other stakeholder partnerships (other spheres of government, local businesses, FBO's and NPO's etc), to address the need without massive capital investment in the City. This is one case where a city-wide strategy to update community facilities would be appropriate. Economic Development A large proportion of the issues for economic development are related to the need for skills development. Although most of the requests identified skills as the lever to address joblessness, this must be refined to be understood not only as the need for skills but also the need for economic opportunities in, mostly, the second economy. Although economic development have responded to this need with a macro, city-wide strategy for a Skills Hub they do need to consider localised interventions possibly emanating from the regional offices; or alternatively locally created access to the city-wide intervention. The challenge with broader scale projects is that it limits access to those who can operate outside the local. Secondly, in terms of the scale, the “trickle-down” impact of the skills hub may take longer than the current planning term, presenting substantial credibility and relevance challenges. The latter comment also applies to the Soweto Empowerment Zone. This brings us to the next type of response. There was fair amount of issues relating to supplyside support interventions such as economic concentration/agglomeration, industrial support and the creation of economic linkages vertically and horizontally at the local level. Where these intersect with other sectors such as ISD, Community Development, other spheres of government, economic Development tends to refer the lead on the issues rather than lead from the front. Given the strategic nature of economic development, it is expected that the department would lead supply-side support and draw in service departments as and when necessary on the infrastructure side. Where urban management/informal trading issues arise, the Department needs to be more proactive in communicating and engaging communities and interested parties on the provisions of the Demarcation Policy, as well as proactively engaging JMPD to address breaches. 311 312 Provincial interventions Interventions requiring investigation Interventions completed, req uiring council approval Interventions specially planned 2009-2011 45% Interventions already planned/delivered 2006-2009 Service delivery issues The graph below indicates the percentage of responses by type of response. CoJ CBP: Types of responses to ward issues 40% 35% 30% 25% 20% 15% 10% 5% 0% COMMUNITY BASED PLANNING (CBP) PHASE 2 ROLL-OUT Following from the aforementioned process was the approved of the Community Based Planning (CBP) phase 2 roll out by Mayoral Committee in order to ensure that defined community needs are considered by departments and ME’s into their budget and business plans for 2009/10 financial year. The CBP phase 2 approach consists of three distinct phases: Phase one: Ward Public meetings and Regional Summits Between October 2008 and January 2009 ward councillors convened ward public meetings to report on projects, to discuss budgets that have been prioritised for their respective wards, to confirm 3 priorities contained in ward plans and to sign off ward plans together with communities so as to form part of the revised final budgets prior the Budget Lekgotla held in February 2008. These meetings were also used as an opportunity to report back on the implementation of 2008/09 projects. The majority of the 109 elected ward councillors held meetings. Furthermore, a series of regional meetings are being held with various stakeholders, namely Youth Council, NGOs, faith-based organisations, labour and people with disability to create public awareness of the City’s mid-term achievements, to inculcate the culture of participatory planning and also to mobilise communities in order to participate meaningfully in the city’s outreach and consultation processes (i.e. stakeholder summit). Phase two: Stakeholder Summit and Outreach process In preparing for the Stakeholder summits, departments tabled their draft delivery agendas at Section 79 Portfolio Committees for comment. The Delivery Agendas provided an outline of the actual deliverables for 2009/10. Furthermore, at the Stakeholder Summit sectors are expected to provide progress on the ward issues submitted during community based planning. The IDP will be tabled at Council on 26 March 2009 for commenting purposes. Subsequent to the tabling of the IDP, the City will host the Stakeholder Summit wherein the Executive Mayor will present a high level overview of the City’s mid- term performance; overview of the 2009/10 IDP, Budget and tariffs and a summary of the all Capex projects planned for each ward and the City’s big ideas for the medium term. Also, at the Stakeholder Summit, sectors will present their midterm achievements and their delivery agendas for 2009/10 financial year in order to allow communities and stakeholders to make inputs prior the Budget Day in May 2009. Phase three: Intergovernmental engagement and commenting process This phase will include the City’s participation in various sectoral engagement sessions led by the Gauteng Department of Local Government with provincial and national counterparts. Furthermore, the tabled IDP will also be forwarded to the MEC for Local Government in preparation for the Provincial IDP Analysis wherein provincial and national departments and parastatals provide comments in relation to the issues of alignment and harmonization prior final approval of both the IDP and Budget. Culminating from these processes, the City intends to provide feedback to stakeholders and communities on the final decisions of Council, including the approved 2009/10 IDP and Budget and the City’s Service Delivery and Budget Implementation Plan. These will be undertaken in July 2009. CITY-WIDE 2009/10 PROJECTS The following table lists the proposed CoJ’s projects to be implemented in all the regions (citywide) by department or municipal entities. It also outlines the proposed budget of the CoJ funding, and total amount including external funding. 313 Citywide CAPEX Projects-2009/10 Project Description Land Regularisation - City Wide - Diepsloot, Ivory Park and Alex) GK: Scada upgrade Unplanned bulk water & sewer connections to new townships BIU.Fordsburg-Orlando Disaster Management Centre Builders Rubble Crushing Plant Other Garden Sites Upgrades of clinic across the City SME/ Community Bank Equipping of Libraries Lib accesseble to PWD Major Sport Facilities:upgrade Renovations of Swimming Pools Sport Facilities - fencing, irragation, upgrading BIR Switchgear all areas BIR.Repair transformers LM.DSM in all areas Planning and engineering studies Provision: for Emergency Work REG F: Replace and Install valves & hydrants identified by Ops Replacement of covers: Manholes, metters and fittings WWTW: Scada and PLC Replacements Public Lighting. Informal settlements REG D: Planned replacement of water mains REG D: Planned Replacement: Sewers REG D: Replace mains identified by Ops REG F: Replace and Install valves & hydrants identified by Ops Replacement of covers: Manholes, meters and fittings Acquisition of strategic open spaces and priorities conservation areas aligned to JMOSS Purchase and establishment of additional ambient air quality monitoring stations Strategic land purchases, Site Development and Preparation Public Transport Lay-bys Transportation Safety Bus Rapid Transit / Rea Vaya Intelligent Transport System (2010) Emergency Stormwater Improvements Environmental compliance and structural upgrades Mobility: New Traffic Signals Stormwater Master planning IT Infrastructure and other IT Infrastructure and other Project Phakama 314 Ward City wide Department/ME Johannesburg Property Company 2009/10 Budget R 14,000,000 City wide City wide Johannesburg Water Johannesburg Water R 20,000 R 1,200,000 City wide City Wide City wide City wide City wide City wide R 5,500,000 R 5,000,000 R 10,000,000 R 3,000,000 R 3,000,000 R 80,000,000 City wide City wide City wide City wide City-wide City Power Emergency Management Services Pikitup Pikitup Health division Department of Economic Development Community Development Community Development Community Development Community Development Community Development City-wide City-wide City-wide City-wide City-wide City-wide City Power City Power City Power Johannesburg Water Johannesburg Water Johannesburg Water R 1,666,667 R 5,000,000 R 100,000,000 R 12,300,000 R 1,250,000 R 2,500,000 City-wide Johannesburg Water R 500,000 City-wide City-wide City-wide Johannesburg Water City Power Johannesburg Water R 13,670,000 R 20,000,000 R 12,500,000 City-wide City-wide City-wide Johannesburg Water Johannesburg Water Johannesburg Water R 3,500,000 R 4,000,000 R 2,500,000 City-wide Johannesburg Water R 500,000 City-wide Environmental Planning and Management R 333,333 City-wide R 250,000 City-wide Environmental Planning and Management Johannesburg Property Company City-wide City-wide City-wide City-wide City-wide City-wide Transportation Planning Transportation Planning Transportation Planning Transportation Planning Johannesburg Roads Agency Johannesburg Roads Agency R0 R 1,428,571 R 69,773,333 R 66,400,000 R 1,000,000 R 285,714 City-wide City-wide City-wide City-wide City-wide Johannesburg Roads Agency Johannesburg Roads Agency Office of the Executive Mayor Office of the Executive Mayor Revenue Management Unit R 1,942,857 R 333,333 R 8,264,000 R 8,264,000 R 66,763,000 R 500,000 R 200,000 R 285,714 R 2,000,000 R 14,286 R 16,500,000 GAUTENG PROVINCIAL GOVERNMENT CAPEX PROJECTS FOR 2009/10 The City use the provincial led IDP engagement processes not only to engage provincial counterparts on its key 2009/10 IDP strategic interventions but also to identify areas of joint implementation, as well as collective accountability. In March 2009, the Gauteng Department of Local Government forwarded a set of 2009/10 Capex projects approved by the Gauteng MEC for Finance, which will be implemented in the City. These projects cover key provincial functions, such as housing, health, transportation, social development and education and they are categorized in terms of new infrastructure, repairs and maintenance, rehabilitations and Refurbishments and upgrading of the infrastructure. This Capex projects has aided the both the City and province not only to plan in integrated manner but al to articulate a shared vision of development and work is continuing in order to improve our prioritization process of projects The tables below lists the Gauteng Provincial Government Projects (GPG) by sector approved by the MEC: Finance the 2009/10 financial year to implement in the City of Johannesburg. GAUTENG DEPARTMENT OF HEALTH CAPEX PROJECTS FOR 2009/10 The table list Health departments’ new infrastructure projects for the medium term. Project Name Ann Latsky Nursing College Braamfischerville clinic Chris Hani Baragwanath Hospital Chris Hani Baragwanath Hospital Chris Hani Baragwanath Hospital PPP project Cosmo City Clinic Diepsloot Clinic Eldorado CHC Hillbrow regional Pharmacy Management of the Grant Protea hospital Vlakfontein Clinic Zola Hospital 315 Project Description Project Status Project Duration Start Finish New Student Facility Tender Nov 08 New Clinic Feasibility New AE&T, OPD, Rad, Pharmacy, Relocation Equipment for the Revitalisation Project PPP project - new L1 and L3 hospital Forward estimates Jun 12 Budget 2009/10 12,953 MTEF 2010/11 16,191 MTEF 2011/12 8,065 Nov 08 Dec 10 7,000 3,400 4,000 Construction Feb 05 Dec 08 41,127 0 0 Feasibility Jan 09 May 09 20,000 0 0 Identified Jun 10 Mar 14 0 167,000 434,000 New clinic New clinic New CHC New Pharmacy Identified Identified Identified Tender Jul 11 Sep 10 Sep 10 Jun 08 Mar 13 Feb 13 Dec 11 Jun 11 0 0 0 14,000 6,296 2,015 2,500 25,000 15,424 14,100 14,176 10,000 Management of OD, M&E, and QA Grant New District Hospital New Clinic New 300 bed District Hospital in Jabulani Identified Apr 08 Mar 09 6,200 7,200 7,500 Feasibility Jun 10 Sep 13 7,000 70,000 98,000 Identified Construction Sep 10 Jan 04 Dec 12 Jun 12 0 165,378 6,500 200,000 14,363 200,000 This table list Health departments’ rehabilitations and refurbishment projects for the medium term. Project Name Charlotte Maxeke Academic Hospital Charlotte Maxeke Academic Hospital Dr. Yusuff Dadoo Helen Joseph Helen Joseph Helen Joseph Helen Joseph Helen Joseph Hospital Rahima Moosa Mother and Child Hospital Transversal Transversal Various Hospitals Charlotte Maxeke Academic Hospital Project Description Project Status Project Duration Start Finish New goods hoist and Passenger lift Replacement of Vacuum Pumps Replace chimney stacks and grit Replace chimney stacks and grit Replace generator set 500 kva Replace pipes and sewers Upgrade HT switchgear Upgrade of AE&T Final account Jun 05 Final account Forward estimates MTEF 2010/11 150 MTEF 2011/12 Sep 08 Budget 2009/10 151 Apr 04 Apr 09 52 0 0 Tender Apr 08 Mar 09 300 0 0 Tender Apr 08 Mar 09 300 0 0 Tender Apr 08 Mar 09 1,000 0 0 Tender Apr 08 Mar 09 450 0 0 Tender Apr 08 Mar 09 50 0 0 Feasibility Jun 05 Sep 08 3,500 0 0 Replace chimney stacks and grit Tender Apr 04 Apr 09 300 0 0 Maintenance Radios Maintenance Paging Upgrading and replacement of Lifts New goods hoist and Passenger lift Construction Construction Tender Apr 08 Apr 08 Apr 08 Mar 09 Mar 09 Mar 09 1,600 4,500 10,000 1,600 4,500 30,000 1,696 4,770 31,410 Final account Jun 05 Sep 08 151 150 159 159 The table list Health departments’ Upgrading and Additions projects for the medium term Project Name Lilian Ngoyi rehab area 316 Project Description Extension of CHC Project Status Feasibility Project Duration Forward estimates Start Finish Budget 2009/10 Sep 08 Mar 09 3,000 MTEF 2010/1 1 0 MTEF 2011/12 0 The table list Health departments’ Maintenance and Repairs projects for the medium term. Project Duration Project Name Ann Latsky Nursing College Project Description Project Status Start Finish Forward estimates Budget 2009/10 MTEF 2010/1 1 MTEF 2011/12 Repair and Maintenance Construction Apr-08 Mar-09 1,437 762 831 Repair and Maintenance Construction Apr-08 Mar-09 975 738 2,604 ESPM - Critical Projects Repair and Maintenance Construction Apr-08 Mar-09 12,000 16,051 7,897 Clinics (Soweto Area) Repair and Maintenance Construction Apr-08 Mar-09 5,127 2,930 7,225 Clinics (Western Area) Repair and Maintenance Construction Apr-08 Mar-09 1,478 643 684 Repair and Maintenance Construction Apr-08 Mar-09 1,629 1,673 1,809 Repair and Maintenance Construction Apr-08 Mar-09 1,796 3,050 3,277 Repair and Maintenance Construction Apr-08 Mar-09 15,383 16,910 16,852 Chris Hani Bara Hospital Maintenance Revitalization Construction Apr-08 Mar-09 15,003 41,289 29,358 Chris Hani Laundry Repair and Maintenance Construction Apr-08 Mar-09 8,761 1,246 1,394 Chris Hani Maternity Hosp Repair and Maintenance Construction Apr-08 Mar-09 8,431 3,562 3,858 Diepkloof CHC Repair and Maintenance Construction Apr-08 Mar-09 1,189 484 1,462 Diepkloof Forensic Repair and Maintenance Construction Apr-08 Mar-09 688 289 346 Discoverers CHC Repair and Maintenance Construction Apr-08 Mar-09 3,473 5,328 1,167 Edenvale Hospital Repair and Maintenance Construction Apr-08 Mar-09 5,228 3,193 4,218 Helen Joseph Hospital Repair and Maintenance Construction Apr-08 Mar-09 12,035 19,505 25,924 Hillbrow CHC Repair and Maintenance Construction Apr-08 Mar-09 4,465 11,897 13,381 Repair and Maintenance Construction Apr-08 Mar-09 500 25 27 Repair and Maintenance Construction Apr-08 Mar-09 4,334 2,403 2,593 C H Nursing College Charles Hurwits TB Clinic Chiawelo CHC Chris Hani Bara Hospital Mortuary Johannesburg Mortuary JHB Provincial Laundry 317 Project Duration Project Name Project Description Project Status Start Finish Forward estimates Budget 2009/10 MTEF 2010/1 1 MTEF 2011/12 Lenasia CHC Repair and Maintenance Construction Apr-08 Mar-09 2,118 1,882 2,050 Lenasia Clinic Repair and Maintenance Construction Apr-08 Mar-09 3,360 1,169 1,257 Lilian Ngoyi Repair and Maintenance Construction Apr-08 Mar-09 2,287 1,946 2,091 Meadowlands CHC Repair and Maintenance Construction Apr-08 Mar-09 1,096 545 595 Mofolo CHC Repair and Maintenance Construction Apr-08 Mar-09 1,714 1,113 1,545 Pharmacies (Soweto) Repair and Maintenance Construction Apr-08 Mar-09 213 733 787 Repair and Maintenance Construction Apr-08 Mar-09 300 695 744 Repair and Maintenance Construction Apr-08 Mar-09 7,502 7,106 7,624 Charlotte Maxeke Hospital Repair and Maintenance Construction Apr-08 Mar-09 21,369 17,144 20,208 Sizwe Hospital Repair and Maintenance Construction Apr-08 Mar-09 3,457 3,288 3,839 South Rand Hospital Repair and Maintenance Construction Apr-08 Mar-09 3,597 10,543 11,659 Repair and Maintenance Construction Apr-08 Mar-09 1,766 1,213 1,316 Stretford CHC Repair and Maintenance Construction Apr-08 Mar-09 1,036 168 1,052 Tara Hospital Repair and Maintenance Construction Apr-08 Mar-09 3,592 1,400 1,508 Tladi CHC Repair and Maintenance Construction Apr-08 Mar-09 1,072 1,542 3,457 TMI boilerhouse Repair and Maintenance Construction Apr-08 Mar-09 6,043 3,349 3,635 TMI Clinic Repair and Maintenance Construction Apr-08 Mar-09 2,492 10,842 7,237 Ursula Mansions Flats (Charlotte Repair and Maintenance Construction Apr-08 Mar-09 549 1,730 1,836 Repair and Maintenance Construction Apr-08 Mar-09 1,838 2,229 2,402 Repair and Maintenance Construction Apr-08 Mar-09 738 891 802 Roodepoort Mortuary Repair and Maintenance Construction Apr-08 Mar-09 1,284 25 27 Ann Latsky Nursing College Repair and Maintenance Construction Apr-08 Mar-09 1,437 762 831 C H Nursing Repair and Maintenance Construction Apr-08 Mar-09 975 738 2,604 Pharmacies (Westhoven) Rahima Moosa Mother and Child Hospital St John's Eye Hospital Maxeke) Zola CHC Coronation Nursing College 318 Project Duration Project Name Project Description Forward estimates Project Status Start Finish Budget 2009/10 MTEF 2010/1 1 MTEF 2011/12 College ESPM - Critical Projects Repair and Maintenance Construction Apr-08 Mar-09 12,000 16,051 7,897 Repair and Maintenance Construction Apr-08 Mar-09 5,127 2,930 7,225 Clinics (Western Area) Repair and Maintenance Construction Apr-08 Mar-09 1,478 643 684 Charles Hurwits TB Clinic Repair and Maintenance Construction Apr-08 Mar-09 1,629 1,673 1,809 Clinics (Soweto Area) GAUTENG DEPARTMENT OF EDUCATION CAPEX PROJECTS FOR 2009/10 The table list Education departments’ New Infrastructure projects for the medium term. Project Name Project Description Project Status Project Duration Start Finish Forward estimates MTEF MTEF 2010/11 2011/12 37,252 0 MTEF 2012/13 31,541 Doornkop Primary School School Primary Design 01/11/10 30/11/12 Freedom Park PS School Primary Retention 01/02/13 30/11/14 0 39,378 29,928 0 Freedom Park Secondary Land Identified 22/05/06 29/02/08 48 0 0 0 Freedom Park SS School Secondary Constructio n started 13/01/09 13/07/10 38,541 32,287 0 0 Lehae PS School Primary Retention 710 0 0 0 Naturena Primary School no 2 School Primary Design 21/02/07 05/11/08 1,750 0 0 0 Protea Glen School Secondary Constructio n 50% 01/02/10 30/11/11 0 0 0 0 Protea Glen Primary School Primary Identified 13/10/08 13/03/09 1,793 0 0 0 Ebony Park SS No 2 School Secondary Constructio n 75% 13/01/09 13/07/10 38,116 0 0 0 Kaalfontein Secondary School Secondary Identified 15/02/07 30/12/08 2,280 0 0 4,500 Mayibuye Primary School Primary Identified 25/04/07 28/02/09 6,332 6,000 31,043 21,906 Mayibuye SS No 2(from Alternative) School Secondary Constructio n 75% 12/06/06 30/11/08 33 0 0 0 Noordwyk Secondary School Secondary Design 26/02/07 18/03/09 2,247 0 0 0 319 Budget 2009/10 31,541 Project Name Project Description Project Status Project Duration Start Finish 21/11/08 Budget 2009/10 500 Forward estimates MTEF MTEF 2010/11 2011/12 0 0 MTEF 2012/13 0 Tswelopele Primary School Primary Identified 14/02/08 Diepsloot PS No 3 School Primary Retention 01/02/13 30/11/14 0 0 0 4,500 Diepsloot Secondary School School Primary Tender 01/11/10 30/11/12 0 6,000 33,278 28,725 Diepsloot West Primary Land Identified 12/02/04 12/01/06 43 0 0 0 Diepsloot West SS No 2(ditto) School Secondary Constructio n 75% 15/02/07 28/02/09 2,402 0 0 Northriding High Secondary School Secondary Tender 12/06/06 30/11/08 3,100 0 0 Qhakazani Primary Completion contract School Primary Design 01/02/13 30/11/14 0 0 Sakhisizwe Secondary School Secondary School Secondary School Secondary School Secondary School Secondary School Primary School Primary School Primary School Primary School Secondary School Secondary School Primary Tender 01/11/10 30/11/12 0 0 0 0 Constructio n 75% Constructio n 75% Retention 01/02/13 30/11/14 0 39,378 29,928 0 22/05/06 29/02/08 48 0 0 0 13/01/09 13/07/10 38,541 32,287 0 0 710 0 0 0 1,750 0 0 0 0 0 0 Vlakfontein SS Braamfischerville SS Braamfischerville SS number 2 BraamfischervilleNo3 SS JB Marks SS Completion Matholeville Primary Slovoville Primary Tshepisong Primary Completion contract Tshepisong SS No 1 Tshepisong SS No 2 Rabie Ridge Primary 4,500 0 4,000 30,000 Constructio n 75% Constructio n started Identified 21/02/07 05/11/08 01/02/10 30/11/11 Design 13/10/08 13/03/09 1,793 0 0 0 Retention 13/01/09 13/07/10 38,116 0 0 0 Constructio n 75% Constructio n 75% Identified 15/02/07 30/12/08 2,280 0 0 25/04/07 28/02/09 6,332 6,000 31,043 21,906 12/06/06 30/11/08 33 0 0 0 0 4,500 The table list Education departments’ Upgrade and Additions projects for the medium term. Project Name Basani Primary Dikabane Primary Freedom Primary-grade R Hlakanipani Primary Hlakanipani Primary-grade R Indyebo Primary Lakeview 320 Project Description Project Status Project Duration Start Finish Additional ablutions Additional ablutions Special function rooms Additional ablutions Special function rooms Additional ablutions Upgrade to full Identified 15/09/09 28/02/10 Budget 2009/10 775 Forward estimates MTEF MTEF 2010/11 2011/12 775 0 Identified 15/09/09 28/02/10 775 775 0 0 Identified 15/05/10 15/08/10 1,860 100 1,760 0 Identified 15/09/09 28/02/10 775 775 0 0 Identified 15/05/11 15/08/11 2,036 100 0 1,936 Identified 15/09/09 28/02/10 775 775 0 0 Design 01/03/09 01/09/09 6,000 5,000 500 0 MTEF 2012/13 0 Project Name Primary Lavela Secondary Lumelang Primary Seana Marena Secondary Eqinisweni Secondary Hillcrest Primary Lyndhurst Primary MC WeilerPrimary Queens High School Umqhele Secondary Bapedi Primarygrade R Bernard Isaacs Primary HTS Langlaagte MusengaVhazimu Primary-grade R Elethu Themba Project Description service Fencing Fencing Fencing Fencing Additional ablutions Fencing Upgrade to full service Additional ablutions Fencing Special function rooms Additional ablutions Additional ablutions Special function rooms Fencing Lawley Primary Fencing Lawley Primary Additional ablutions Fencing Thusa Setjhaba Secondary Willomead Secondary Willowmead Secondary Igugulethu Primary-grade R Lawley Primarygrade R Anchor Secondary Inkonjane Primary Phefeni Secondary PJ Simelane Secondary 321 Additional ablutions Fencing Special function rooms Special function rooms Fencing Fencing Fencing Fencing Project Status Project Duration Start Finish Budget 2009/10 Forward estimates MTEF MTEF 2010/11 2011/12 MTEF 2012/13 Construction started Construction started Construction started Construction started Identified 06/11/08 30/03/09 1,199 317 0 0 06/11/08 30/03/09 819 217 0 0 06/11/08 30/03/09 1,058 280 0 0 06/11/08 30/03/09 1,301 344 0 0 15/09/09 28/02/10 775 775 0 0 Construction started Design 06/11/08 30/03/09 839 222 0 0 01/03/09 01/09/09 6,000 5,000 500 0 Identified 15/09/09 28/02/10 1,650 1,650 0 0 Construction started Identified 06/11/08 30/03/09 1,617 428 0 0 15/05/10 15/08/10 1,860 100 1,760 0 Identified 15/09/09 28/02/10 775 775 0 0 Identified 15/09/09 28/02/10 1,650 1,650 0 0 Identified 15/05/11 15/08/11 2,036 100 0 1,936 Construction started Construction started Identified 06/11/08 30/03/09 1,064 281 0 0 06/11/08 30/03/09 1,116 295 0 0 15/09/09 28/02/10 775 775 0 0 Construction started Identified 06/11/08 30/03/09 1,273 337 0 0 15/09/09 28/02/10 1,650 1,650 0 0 Construction started Identified 06/11/08 30/03/09 1,302 345 0 0 15/05/10 15/08/10 1,860 100 1,760 0 Identified 15/05/11 15/08/11 2,036 100 0 1,936 Construction started Construction started Construction started Construction started 06/11/08 30/03/09 1,091 289 0 0 06/11/08 30/03/09 911 241 0 0 06/11/08 30/03/09 919 243 0 0 06/11/08 30/03/09 1,237 327 0 0 The table list Education departments’ Rehabilitations and Refurbishments projects for the medium term. Project Name Adelaide Thambo LSEN School Alpha Primary School Aurora Girls High Eldorado Park Sekonder Emdeni Secondary School Kenilworth Secondary School Lenasia Secondary School Lobone Secondary School Mncube Secondary Pace Secondary School Vuwani Secondary Lebone High School Naledi High School Sekano Ntoana School Alexandra Secondary School Cyrildene Primary Eastbank Secondary Fairsands Primary Fairview Junior School Highlands North Boys High Ikage Primary Minerva Secondary School Orange Grove Primary School Troyeville Primary School Waverley Girls' High School AB Xuma Primary Boepakitso Primary Coronationville LSEN School Coronationville Secondary Ditau Primary Ekuthuleni Primary 322 Project Description Project Status Project Duration Start Finish Repair and Renovations Repair and Renovations Repair and Renovations Repair and Renovations Repair and Renovations Repair and Renovations Repair and Renovations Repair and Renovations Repair and Renovations Repair and Renovations Repair and Renovations Repair and Renovations Repair and Renovations Repair and Renovations Repair and Renovations Repair and Renovations Repair and Renovations Repair and Renovations Repair and Renovations Repair and Renovations Repair and Renovations Repair and Renovations Repair and Renovations Repair and Renovations Repair and Renovations Repair and Renovations Repair and Renovations Repair and Renovations Repair and Renovations Repair and Renovations Repair and Design 01/03/10 28/02/11 Budget 2009/10 5,000 Forward estimates MTEF MTEF 2010/11 2011/12 800 0 Design 01/03/10 28/02/11 5,000 800 0 5,000 Design 01/03/10 28/02/11 5,000 800 0 5,000 Design 01/03/10 28/02/11 5,000 800 0 5,000 Design 01/03/11 28/02/12 0 5,500 880 0 Design 01/03/11 28/02/12 0 880 0 MTEF 2012/13 5,000 5,500 Design 01/03/12 28/02/13 0 0 6,000 0 Design 01/03/12 28/02/13 0 0 6,000 0 Design 01/03/12 28/02/13 0 0 6,000 0 Design 01/03/12 28/02/13 0 0 6,000 0 Design 01/03/12 28/02/13 0 0 6,000 0 Construction started Construction started Construction started Design 17/10/08 27/02/09 0 0 0 0 01/10/08 27/02/09 0 0 0 0 01/10/08 27/02/09 0 0 0 0 01/03/10 28/02/11 5,000 0 5,000 Construction started Design 12/08/08 03/04/09 01/03/10 28/02/11 5,000 Construction 25% Design 11/08/08 03/04/09 0 01/03/10 28/02/11 5,000 Construction started Design 11/08/08 03/04/09 0 01/03/11 28/02/12 0 Design 01/03/11 28/02/12 Design 01/03/12 Design 800 0 0 800 0 0 0 0 800 5,000 0 0 0 5,000 0 0 5,500 880 0 0 5,500 880 0 28/02/13 0 0 6,000 0 01/03/12 28/02/13 0 0 6,000 0 Design 01/03/12 28/02/13 0 0 6,000 0 Construction 25% Design 11/08/08 03/04/09 0 0 0 0 01/03/10 28/02/11 5,000 800 0 5,000 Design 01/03/10 28/02/11 5,000 Design 01/03/10 28/02/11 0 5,500 Design 01/03/11 28/02/12 0 5,500 Design 01/03/11 28/02/12 0 5,500 0 800 0 880 880 880 5,000 0 0 0 Project Name Musi Comprehensive Namedi Secondary Noordgesig Primer Paul Mosaka Primary St Ansgars Secondary Welizibuko Primary Westbury Sekonder Zithathele Primary Coronation Secondary School Ennerdale Sekondêr Inkululeko Yesizwe Primary School Lenasia South Secondary Madume Primary Nomimi Primary School President High School - report on Structure Raphela Secondary School Seipone Primary School Thetha Secondary School W.H. Coetzer Primary Doornkop/Thulani Primary Emadwaleni Secondary School Florida Park High School Kwa-Mahlobo Secondary Livhuwani Primary Matshediso Secondary Orlando West Secondary Thutolore Secondary Uvuyo Primary 323 Project Description Renovations Repair and Renovations Repair and Renovations Repair and Renovations Repair and Renovations Site services renew Repair and Renovations Repair and Renovations Repair and Renovations Repair and Renovations Repair and Renovations Repair and Renovations Repair and Renovations Repair and Renovations Repair and Renovations Report Structural defects Repair and Renovations Repair and Renovations Repair and Renovations Repair and Renovations Repair and Renovations Repair and Renovations Repair and Renovations Repair and Renovations Repair and Renovations Repair and Renovations Repair and Renovations Repair and Renovations Repair and Renovations Project Status Project Duration Start Finish Design 01/03/11 28/02/12 0 5,500 880 0 Design 01/03/12 28/02/13 0 0 6,000 0 Design 01/03/12 28/02/13 0 0 Design 01/03/12 28/02/13 0 0 6,000 Retention 08/06/07 31/01/08 0 0 Construction started Design 11/08/08 03/04/09 0 0 0 0 01/03/12 28/02/13 0 0 6,000 0 Design 01/03/12 28/02/13 0 0 6,000 0 Construction started Design 11/09/08 27/02/09 0 0 01/03/10 28/02/11 5,000 800 5,000 800 800 5,500 Design Design 01/03/10 01/03/10 Budget 2009/10 50 Forward estimates MTEF MTEF 2010/11 2011/12 6,000 MTEF 2012/13 0 0 0 50 0 0 28/02/11 5,000 0 28/02/11 5,000 0 5,000 Design 01/03/11 28/02/12 5,000 0 Design 01/03/11 28/02/12 0 Identified 30/11/08 30/01/09 0 0 Design 01/03/12 28/02/13 0 0 6,000 0 Design 01/03/12 28/02/13 0 0 6,000 0 Design 01/03/12 28/02/13 0 0 6,000 0 Design 01/03/12 28/02/13 0 0 6,000 0 Design 01/03/10 28/02/11 5,000 800 0 Design 01/03/10 28/02/11 5,000 800 0 5,000 Design 01/03/10 28/02/11 5,000 800 0 5,000 Design 01/03/11 28/02/12 0 5,500 880 0 Design 01/03/11 28/02/12 0 5,500 880 0 Design 01/03/12 28/02/13 0 0 6,000 0 Design 01/03/12 28/02/13 0 0 6,000 0 Design 01/03/12 28/02/13 0 0 6,000 0 Design 01/03/12 28/02/13 0 0 6,000 0 5,500 880 0 880 0 0 0 5,000 GAUTENG DEPARTMENT OF SOCIAL DEVELOPMENT CAPEX PROJECTS FOR 2009/10 The table list Social Development Departments’ New Infrastructure Assets projects for the medium term. Project Name Soweto ECD Soweto Aged Centre Soweto OVC Soweto Old Age Home Project Description Project Status Project Duration Start Finish Early Childhood Centre Aged Day Care centre OVC HCBC centre Planning/De sign stage Planning/De sign stage Planning/De sign stage Planning/De sign stage 4/1/2010 Old Age Home 31/03/2013 Budget 2009/10 500 Forward estimates MTEF MTEF 2010/11 2011/12 3,000 1,500 MTEF 2012/13 500 4/1/2010 31/03/2013 500 3,000 1,500 500 4/1/2011 31/03/2013 0 1,000 3,000 0 4/1/2011 31/03/2013 0 0 1,000 0 The table list Education departments’ Upgrade and Addition projects for the medium term. Project Name Soweto Ephraim Zulu home Soweto Old Age Home Project Description Project Status Rehab/Refurbish ment of Aged Home Rehab/Refurbish ment of Aged Home Construction Phase 1 completed Project Duration Start Finish 4/1/2008 31/03/2010 Budget 2009/10 1,100 Forward estimates MTEF MTEF 2010/11 2011/12 0 0 MTEF 2012/13 1,100 31/03/2011 0 3,330 0 0 The table list Education departments’ Maintenance and Repairs projects for the medium term. Project Name Project Description Project Status Walter Sisulu Place of Safety Residential facility repairs Lenasia Service Point Office structure repairs Diepkloof Office Office structure repairs Thusanong Building Head Office structure repairs Don Mattera (Norman Hse) Place of Safety 81 Rissik Str Residential facility repairs Perm Building Head Office structure repairs Ongoing Maintenance: statutory & day to day Ongoing Maintenance: statutory & day to day Ongoing Maintenance: statutory & day to day Ongoing Maintenance: statutory & day to day Ongoing Maintenance: statutory & day to day Ongoing Maintenance: statutory & day to day Ongoing Maintenance: statutory & day to day 324 Office structure repairs Project Duration Start Finish Forward estimates MTEF MTEF 2010/11 2011/12 3,859 4,013 MTEF 2012/13 4,414 4/1/2008 31/03/2012 Budget 2009/10 3,508 4/1/2008 31/03/2012 17 18 19 21 4/1/2008 31/03/2012 51 56 58 64 4/1/2008 31/03/2012 61 67 69 76 4/1/2008 31/03/2012 751 826 859 945 4/1/2008 31/03/2012 179 197 205 226 4/1/2008 31/03/2012 2,980 836 869 956 GAUTENG DEPARTMENT OF HOUSING CAPEX PROJECTS FOR 2009/10 The table list Housing Departments’ New Infrastructure projects for the medium term. Project Name Ennrdale South Hospital Hill Kliptown Ph 3 Lawley Station Orange Farm Ext 9 Orange Farm Ext 10 Princess Plot 61 Ph 2 Stretford Ext 2 Stretford Ext 3 Stretford Ext 4 Sweetwaters Thulamtwana Thulamtwana Ph 2 Princess Plot 61 Ph 1 Slovo Park Tswelopele-Brinks Park Ext 1 Olievenhoutbosch South Ph 1 Sol Plaatjies/Mandelaville Diepsloot Ph 5 Ivory Park-Rabieridge Diepsloot West Golden Triangle Ivory Park Ward 77 & 79 Ext 2,5,7,9,12 & 13 Ivory Park Ward 78 Ext 6,8 & 10 Matholesville Proper Orange Farm Proper Ext 1 Poortjie Rabie Ridge Ext 4&5 South African Homeless Federation Stretford Ext 4 Vlakfontein Proper Vlakfontein Ext 1 Vlakfontein Ext 2 Vlakfontein Ext 3 Fox Lake-Soweto Randburg Roodepoort Breamer Court Inner City Better Buildings King Ransom Metropolitan Temple Court Zamekile Zaran Mansions Marulelo Housing Association 17 Wolmarans Archriwaa Mansions 325 Project Description Project Linked Project Linked Project Linked Project Linked Project Linked Project Linked Project Linked Project Linked Project Linked Project Linked Project Linked Project Linked Project Linked Project Linked Project Linked Project Linked Project Linked Project Linked Project Linked Project Linked Peoples Housing Process Peoples Housing Process Peoples Housing Process Peoples Housing Process Project Linked Peoples Housing Process Peoples Housing Process Project Linked Peoples Housing Process Peoples Housing Process Peoples Housing Process Peoples Housing Process Peoples Housing Process Peoples Housing Process New Build New Build New Build Inner City Inner City Inner City Inner City Inner City Inner City Inner City Special Needs Special Needs Special Needs Project Duration Start Finish Forward estimates Budget MTEF 2009/10 2010/11 4,483 4,483 2,797 2,797 2,097 2,097 3,585 3,585 2,597 2,097 1,870 1,870 659 659 156 156 165 165 3,729 4,729 3,412 4,729 3,586 4,729 2,375 4,729 2,651 4,729 14,832 14,832 299 456 5,595 5,595 964 964 2,884 2,884 2,504 2,504 876 876 MTEF 2011/12 4,483 2,797 2,097 3,585 2,097 1,870 659 156 165 4,729 4,729 4,729 4,729 4,729 14,832 456 5,595 964 2,884 2,504 876 01/04/2004 01/04/2004 01/04/2004 01/04/2004 01/04/2004 01/04/2004 01/04/2004 01/04/2004 01/04/2004 01/04/2004 01/04/2004 01/04/2004 01/04/2004 01/04/2004 01/04/2003 01/04/2004 01/04/2004 01/04/2004 01/04/2004 01/04/2004 01/04/2004 31/03/2010 31/03/2010 31/03/2010 31/03/2010 31/03/2010 31/03/2010 31/03/2010 31/03/2010 31/03/2010 31/03/2010 31/03/2010 31/03/2010 31/03/2010 31/03/2010 31/03/2010 31/03/2010 31/03/2010 31/03/2010 31/03/2010 31/03/2010 31/03/2010 01/04/2004 31/03/2010 876 876 876 01/04/2004 31/03/2010 876 876 876 01/04/2004 31/03/2010 1,050 2,050 2,050 01/04/2004 01/04/2004 31/03/2010 31/03/2010 1,050 1,050 2,050 2,050 2,050 2,050 01/04/2004 31/03/2010 1,050 2,050 2,050 01/04/2004 01/04/2004 31/03/2010 31/03/2010 1,050 762 2,050 762 2,050 762 01/04/2004 31/03/2010 1,050 2,050 2,050 01/04/1998 31/03/2010 1,050 2,050 2,050 13/05/1999 31/03/2010 1,050 2,050 2,050 13/05/1999 31/03/2010 1,050 2,050 2,050 18/08/1998 31/03/2010 1,050 2,050 2,050 01/04/2004 01/04/2004 01/04/2004 01/04/2004 01/04/2004 01/04/2004 01/04/2004 01/04/2004 01/04/2004 01/04/2004 01/04/2004 01/04/2004 01/04/2004 31/03/2010 31/03/2010 31/03/2010 31/03/2010 31/03/2010 31/03/2010 31/03/2010 31/03/2010 31/03/2010 31/03/2010 31/03/2010 31/03/2010 31/03/2010 1,050 783 565 518 171 590 8,080 1,319 172 232 756 377 490 2,050 783 565 518 171 590 10,080 2,319 172 232 754 377 490 2,050 783 565 518 171 590 10,080 2,319 172 232 754 377 490 Project Name Project Description FWC HIV/AIDS Keepha Hospice & Orphanage Reach for a Hand Marl Gardens Marlboro South RCA Ph 3 Westlake Madala (M2) Alexandra Nobuhle M2) Alexandra Project Duration Start Finish Special Needs Special Needs 01/04/2004 01/04/2004 31/03/2010 31/03/2010 Special Needs Alex Social Housing Alex Social Housing Alex Social Housing Alex Social Housing Affordable Rental Acc Affordable Rental Acc 01/04/2004 01/04/2004 01/04/2004 01/04/2004 01/04/2004 01/04/2004 01/04/2004 31/03/2010 31/03/2010 31/03/2010 31/03/2010 31/03/2010 31/03/2010 31/03/2010 Forward estimates Budget MTEF 2009/10 2010/11 150 150 301 301 377 452 324 205 646 2,285 749 377 452 324 205 646 2,285 749 MTEF 2011/12 150 301 377 452 324 205 646 2,285 749 The table list Housing Departments’ Upgrading and Repairs projects for the medium term. Project Name Alexandra Alexandra Alexandra Alexandra Alexandra Alexandra Alexandra Alexandra Alexandra Alexandra Alexandra Alexandra Alexandra Alexandra Project Description Project Duration Start Finish Forward estimates MTEF MTEF 2010/11 2011/12 17,353 17,353 34,707 34,707 Urban Agriculture Implementation Electricity Master Plan Development of new Housing Hartlands-Highlands Project Development of new Housing Frankenwald Development of new Housing Mia's Land 2004/2005 2002/2003 2009/2010 2009/2010 Budget 2009/10 17,353 34,707 2005/2006 2009/2010 49,482 49,482 49,482 2007/2008 2009/2010 75,749 77,749 77,749 2007/2008 2009/2010 75,749 77,749 77,749 Development of new Housing Linbro Park Development of new Housing Westlake 1000 Social Housing Units Hostel Development M1 Backyard Upgrading New Primary School - Mai,s Land New Primary School - Westlake New Secondary School - Mai,s Land New Clinics Counter Land Invasion, Relocation & Rehabilitation 2006/2007 2009/2010 123,705 123,705 123,705 2005/2006 2009/2010 19,479 19,479 19,479 2005/2006 2005/2006 2005/2006 2005/2006 2006/2007 2009/2010 2009/2010 2009/2010 2009/2010 2009/2010 17,880 111,474 10,966 10,966 19,529 17,880 121,474 10,966 10,966 19,529 17,880 121,474 10,966 10,966 19,529 2006/2007 2003/2004 2009/2010 2009/2010 3,099 6,199 3,099 6,199 3,099 6,199 GAUTENG DEPARTMENT OF DEPARTMENT OF PUBLIC TRANSPORT, ROADS AND WORKS CAPEX PROJECTS FOR 2009/10 The table list of Department of Public Transport, Roads and Works New Construction projects for the medium term. Project Name Radio Communication Equipment Project Description Project Status Project Duration Start Finish New Equipment Retention Apr-07 Mar-10 Forward estimates Budget MTEF 2010/11 2009/10 1,500 0 MTEF 2011/12 0 The table list Department of Public Transport, Roads and Works departments’ Upgrading and Rehabilitations projects for the medium term. Project Name Professional Services in Support of Project Implementation 326 Project Description Professional Services to Support Implementation of Project Status Project Duration Start Finish Construction Jun-06 Mar-12 Forward estimates Budget MTEF 2009/10 2010/11 25,000 20,000 MTEF 2011/12 30,000 Project Name Project Description Johannesburg Hospital Boiler Upgrade of Public Works Properties Planning Project Status Project Duration Start Finish Forward estimates Budget MTEF 2009/10 2010/11 MTEF 2011/12 Projects, Particularly Client Departments Boiler Replacement Retention Apr-07 Apr-09 406 0 0 Upgrade Design Apr-10 Mar-13 25,000 18,000 35,000 Boilers Design Apr-08 Mar-12 1,000 2,000 2,000 The table list Department of Public Transport, Roads and Works departments’ Additions and Maintenance projects for the medium term. Project Name Project Description Project Status Project Duration Forward estimates Start Finish Radio Communication – Licenses Licenses Construction Apr-07 Mar-10 Budget 2009/10 250 MTEF 2010/11 250 MTEF 2011/12 500 MTEF 2012/13 550 Radio Communication – Maintenance Maintenance Construction Apr-07 Mar-10 800 800 1000 1,100 Westhoven Regional Office Maintenance Construction Apr-08 Mar-13 939 1,033 1,137 1,250 Tulisa Park Regional Office Maintenance Construction Apr-08 Mar-13 1,504 1,654 1,819 2,001 Batho Pele House Maintenance Construction Apr-08 Mar-13 892 981 1,079 1,187 Eccleston Dr Bryanston Bonalesedi Traffic Office Regional Office Soweto Maintenance Construction Apr-08 Mar-13 799 878 966 1,063 Maintenance Construction Apr-08 Mar-13 56 62 68 75 Maintenance Construction Apr-08 Mar-13 611 672 739 813 The table list Department of Public Transport, Roads and Works departments’ Upgrading and Rehabilitations projects for the medium term. Project Name Cayman road (D2529) Phase 2 Adcock road (K15) Phase 2 Adcock (K15) Phase 3 Malibongwe drive (K29) Phase 2 K102 Phase 3 K102 Phase 4 William Nicol (K46) 327 Project Description Tarring of Cayman Rd as an access road to the Eye of Africa Development (phase 2) Phase 2 - Doubling of Adcock St (R558) from Leratong (R41) to Dobsonville K102 Phase 3 - Doubling of Adcock St (R558) from Dobsonville to Protea Glen Doubling of Malibongwe Drive (R512) from Cosmo City to the N14 Construction of Hopewell Rd from Maimane Dr to 56th Street New Construction from 56th St to Roodepoort Rd (M77) Doubling of William Nicol Project Duration Start Finish Budget 2009/10 39,200 Forward estimates MTEF MTEF 2010/11 2011/12 0 0 MTEF 2012/13 0 Mar2009 Feb 2010 Oct-2007 Aug2009 97,104 0 0 0 Mar2010 Sep2011 1,650 161,400 80,750 0 Apr-2008 Oct-2009 61,040 0 0 0 Apr-2011 Mar2012 0 0 61,000 0 Jun-2012 Jan-2014 0 0 0 68,000 May- May- 3,360 139,600 2,200 0 Phase 2 William Nicol (K46) Phase 3 Beyers Naude (D374) (R511) from Witkoppen Rd (R564) to PWV5 Doubling of William Nicol (R511) from PWV5 to Diepsloot (N14) Upgrading of Beyers Naude (D374) into a dual carriageway from Honeydew to Zandspruit 2009 2011 Jun-2011 Mar2013 0 0 65,000 215,000 Mar2009 Oct-2010 66,080 50,200 0 0 The table list Department of Public Transport, Roads and Works departments’ Public Transport Integration and Special Projects (New Construction) projects for the medium term. Project Name William Nicol / K46 Taxi Rank Beyers Naude R55 Kyalami Taxi Rank Project Description Construction of an intermodal facility / Taxi Rank Construction of an intermodal facility / Taxi Rank construction of the Kyalami taxi Rank Project Status Project Duration Start Finish Feasibility Feb2010 Design Design Forward estimates Oct-2010 Budget 2009/10 1,000 MTEF 2010/11 17,000 MTEF 2011/12 0 MTEF 2012/13 0 Jul2009 Jan-2010 18,000 0 0 0 Sep2009 Mar2010 18,000 0 0 0 The table list Department of Public Transport, Roads and Works departments’ Public Transport Integration and Special Projects (Upgrade Intermodal facilities) projects for the medium term. Project Name Nasrec intermodal facilities Orlando Station public transport facilities improvement Stretford improvement of intermodal facilities Ikhwezi Station improvement of intermodal facilities New Canada Station improvement of intermodal facilities Project Description Project Status Project Duration Start Finish Mar-10 Budget 2009/10 1,300 Forward estimates MTEF MTEF 20010/11 2011/12 0 0 MTEF 2012/13 0 Nasrec Station Design Jun-09 Orlando Station Design Jul-09 Mar-10 1,300 0 0 0 Stretford station Design Sep-09 Mar-10 1,300 0 0 0 Ikwezi Station Design Nov-09 Mar-10 1,300 0 0 0 New Canada Station Design May-09 Mar-10 2,200 0 0 0 The table list Department of Public Transport, Roads and Works departments’ Public Transport Integration and Special Projects (Workfare) projects for the medium term. 328 Project Name Project Description Project Status Project Duration Forward estimates Start Finish Budget 2009/10 3,478 MTEF 2010/11 0 MTEF 2011/12 0 MTEF 2012/13 0 Doornkop Enterprise Development Centre Construction of new Enterprise Development Centre Design 1/11/2005 03-2010 Orlando Enterprise Development Centre Construction of new Enterprise Development Centre Design 1/11/2005 30/04/2 010 4,295 0 0 0 Riverlea Empowerment Centre Construction of a New Empowertment Centre Construc tion 01/04/2007 30/01/2 009 0 0 0 0 Kibler-Park Home Care Centre Construction of new Home Based Care Centre Design 1/11/2005 31/03/2 010 6,600 5,386 0 0 Zola Multi-MPCC Construction of Multi-Purpose Centre Design 01/04/2007 30/11/2 011 13,000 10,500 0 0 Klipspruit Hall Saint Ives Construction of Hall Construc tion 1/4/2007 04-2009 236 0 0 0 Eldorado Taxi Rank Construction of Taxi Rank Tender 1/4/2005 30/12/2 008 0 0 0 - Sports field Langalibalele Primary School Upgrading of sports field Tender 0 0 0 1/4/2007 30/12/2 008 1,300 The table list Department of Public Transport, Roads and Works departments’ Public Transport Integration and Special Projects (Workforce) projects for the medium term. Project Name Sports field Langalibalele Primary School 329 Project Description Project Status Project Duration Start Finish Upgrading of sports field Tender 1/4/2007 30/12/2008 Budget 2009/10 1,300 Forward estimates MTEF MTEF 2010/11 2011/12 0 0 MTEF 2012/13 0 The table list Department of Public Transport, Roads and Works departments’ Public Transport Integration and Special Projects Upgrading and Rehabilitations (Workforce) projects for the medium term. Project Name Project Description Project Status Project Duration Start Finish EPWP Provincial / Project Capacity Support Capacity support Construction 1/6/2007 30/03/201 0 10,000 Forward estimates MTEF MTEF 2010/11 2011/1 2 0 0 Training for EPWP projects Training budget Tender 1/4/2007 31/03/200 9 20,000 0 0 NYS Consultant fees Consultants Construction 1/8/2007 31/03/201 0 0 0 0 NYS Stipends Stipends Construction 1/4/2008 31/03/200 9 52,800 57,600 63,360 NYS Citizenship Citizenship training Consultant / training Construction 1/6/2008 31/03/200 9 2,200 Mahatammoho Cooperative Transfer to the co-op Design 1/4/2008 31/03/200 9 30,000 Budget 2009/10 0 0 0 Region A Region A comprises of Diepsloot, Midrand, Fourways, Sunninghill, Woodmead, and Ivory Park. Settled areas at the upper end of the socio-economic include Dainfern, Farmall and Chartwell and informal settlements such as Diepsloot are on the other end. Commercial interests are concentrated in Kya Sand, Lanseria and Fourways. The eastern half of the region includes the fast-growing Midrand, home of one of the city's prime conferencing sites, Gallagher Estate (also the seat of the Pan African Parliament), a growing high tech IT and office development and Grand Central Airport. Two townships, Ebony Park and Ivory Park, are situated on the region's western and eastern borders. The section below outlines some of the key urban management interventions in the region by areas of focus. These interventions are summarised by key regional focus areas which identifies the areas of decay, key interventions required, law enforcement plans and clean up campaigns envisaged for the region, stakeholder engagement and visible service delivery plans. Urban Management Activities by Focus Area Areas Of Focus Diepsloot Midrand Ivory Park 330 Ward Number 95 & 96 93 &96 77,78 &79 MTEF 2012/13 Addressing Urban Decay In Diepsloot the main areas of decay are where illegal taxi ranks have emerged and where illegal dumping takes place. To date the JMPD have conducted a blitz on illegal taxi ranks (in July 2008) and together with the regional office formed an illegal dumping unit. In 2009/10 the new unit will focus on monitoring and management of illegal dumping sites in Diepsloot. Clean Up campaigns Clean-up campaigns have been conducted in Kya Sands with PIKITUP and the local roleplayers. These stakeholders conduct different projects aligned to a quarterly business plan. In 2008/09 the New Road Bridge was the focus of a beautification project. In the Midrand CBD, court and taxi rank a block operational system has been established which will continue in 2009/10. This system addresses emerging urban decay issues on the spot on a block by block basis. The Grand Central Boulevard will be the subject of a beautification project in 2009/10. Illegal trading and settlement at Swazi Inn in Ivory Park is a major contributor to urban decay in the area. In 2009/10 the region will focus on eliminating informal structures at Swazi inn and informal traders will be registered and supported by the Metro Trading Company. Law enforcement In Diepsloot the substantial weight of law enforcement focuses on by-law enforcement, particularly illegal trading, public health, illegal dumping, illegal signage and land-use management. JMPD is also focused on traffic management and safety risk mitigation. The blitz conducted between the 18th and 21st July in 2008 in Diepsloot addressed a variety of infringements including illegal trading, dumping, signage and creating awareness of increased bylaw enforcement in the community. Furthermore a law enforcement task team was established in the region to coordinate efforts among different city departments and entities. On the 30th September 2008 the MIdrand CBD blitz took place which sought to address among other things, the physical impact of by-law infringements such as illegal trading, to mention one. To support this blitz the Region conducted preparatory education and awareness campaigns on by-law enforcement. In 2009/10, mainly in Dieplsoot, the law enforcement unit will be focused on illegal car-washes, formalising informal traders and empowering community members to address water leakages through training. In Midrand the regional administration will focus on the clean up of Roos Avenue, more generalised greening and beautification on the boulevard and the management of informal traders. Notably, law enforcement structures will also focus on the elimination of illegal drag racing which currently endangers the residents of and visitors to Midrand, especially in the Boulders area (?). Stakeholder Management Every month the ward councillors in the area host a ward councillors forum to engage roleplayers in Diepsloot, namely the PR councillors, the Regional office and other parties, on common programmes and developmental commitments to date. Diepsloot also benefits from the variety of city-wide public participation processes such as the MMC sector tour and the Mayoral Road Show. In the Midrand area there have been regular meetings of the ratepayers association and special Gautrain community meetings and information sessions. Clean Up and Greening Campaigns and Special Projects 331 In 2008/09, mainly in Ivory Park, Damelin College provided career guidance services to three high schools in Diepsloot. Furthermore, the Region offered skills development workshops for SMME’s in partnership with JCCI and Standard Bank. Visible Service Delivery In Region A alone there are approximately eighty reported delivery issues monthly which are monitored by a service delivery team in the regional office. A regional inspector has been appointed and the inspection team report on a block-by-block basis in each area, noting hotspots for intervention. In 2009/10 urban inspections will continue and significant upgrading of roads undertaken. Upgrades will focus particularly on identified gravel roads and the sewer network of Diepsloot by Joburg Water. The Bambanani business node electrification project in Ivory Park will continue from 2008/09 to 2009/10 to bring much-needed infrastructure to the tenants in the business park. Lord Khanyile will also receive a face-lift through the clean-up campaign planned for the site. CITY OF JOHANNESBURG CAPEX PROJECTS- 2009/10 The table below lists the proposed City of Johannesburg projects to be implemented in each region, by ward and by department or Municipality Entity (ME). It also outlines the proposed budget of CoJ funding and a total amount including external funding Project Description BIN. Grand Central: Installation of 3rd 30 MVA Tfer BIN.New Road.132 kV interconnector from Grand Central BIU. Upgrade Noordwyk sub station. Installation of Street Lighting 2 (Ivory Park) ND. Erand Gardens. Install new rings from New Road sub station ND. Midrand:The construction of new infrastructure in newly established townships ND.New Road.Upgrade network in Halfway Gardens New Road: Establish 88/11 kV 90MVA SS PL. Diepsloot public lighting Public Lighting Midrand Service Connections: Midrand Community Relocations Miriting (Kaalfontein X22) Local Distributor Miriting (Kaalfontein X22) Stormwater Diepsloot District: Upgrade Water infrastructure NW: 2#Digesters refurbish Unit 2 NW: Desludge Dam 01 and 02 NW: Mech/elec refurbishment NW: Sludge drying area NW: Unit 3&4 elutriant pump NW: Unit 5 phase 1 REG A: Erand: Upgrade water infrastructure Phase 2 REG A: Planned replacement :Watermains REG A: Planned replacement of sewers REG A: Replace sewers identified by Ops REG C: Diepsloot Basin:Upgrade sewers REG C: Diepsloot Pumped Basin: Upgrade Sewer Phase 1 REG C: Olivedale District Upgrade water infrastructure Upgrade Sewer Network - Ivory Park 332 Ward 112 Department/ME City Power 2009/10 Budget R 1,000,000 93 City Power R 20,000,000 111 79 93 City Power City Power City Power R 44,000,000 R 1,500,000 R 6,500,000 93 City Power R 2,000,000 93 City Power R 10,000,000 93 101 94 94 101 93 93 101 96 96 96 96 96 96 94 City Power City Power City Power City Power Housing Division Housing Division Housing Division Johannesburg Water Johannesburg Water Johannesburg Water Johannesburg Water Johannesburg Water Johannesburg Water Johannesburg Water Johannesburg Water R 30,000,000 R 2,400,000 R 5,000,000 R 19,200,000 R 2,750,000 R 551,621 R 1,108,000 R 1,660,000 R 9,710,000 R 1,900,000 R 5,850,000 R 29,600,000 R 570,000 R 39,120,000 R 3,245,000 94 94 94 94 94 Johannesburg Water Johannesburg Water Johannesburg Water Johannesburg Water Johannesburg Water R 7,500,000 R 1,000,000 R 500,000 R 2,000,000 R 10,000,000 94 Johannesburg Water R 2,000,000 79 Johannesburg Water R 1,500,000 Project Description Water Network Upgrade - Ivory Park Diepsloot Gravel Roads Ward 79 101 Department/ME Johannesburg Water Johannesburg Roads Agency Johannesburg Roads Agency Johannesburg Property Company Johannesburg Development Agency 2009/10 Budget R 3,000,000 R 27,000,000 Ivory Park Gravel Roads 79 Farm Diepsloot bulk services 101 Bambanani Industrial Park (Installation of street lighting, public transport facility, pedestrian walkways, public environment upgrade) Diepsloot Economic strip development node (pedestrian walkways, bridge upgrade ext3-ext8, road upgrade, public lighting, stormwater upgrade, public transport facilities) Diepsloot Government Precinct (Pedestrian walkways, OR Tambo Clinic, Police Station, Public space lighting, post office, early childhood and victim empowerment centre) 79 101 Johannesburg Development Agency R 20,000,000 101 Johannesburg Development Agency R 20,000,000 R 35,000,000 R 1,000,000 R 15,000,000 WARD ISSUES BY REGION The table below portrays ward issues identified by each ward, departments or ME’s responsible, action required, time frame and allocated resources. Rgn Wd Issues A 77 A 77 A 77 A 78 A 78 333 Department/ME Completion of Community community Hall facility – Development youth centre and senior citizens centre and swimming pool. Expansion of Hikensile Health Clinic eg establishment of maternity ward (nearest hospital is overcrowded). Completion of Kopanong Sports Centre – (lacks ablution unit and other public facilities) The refurbishment of the Lord Khanyile Community Hall (flooring, ventilation, kitchen, seating etc) – Better facility for the community and more revenue for the council. The Development of Swazi Inn (market) – encourage and uplift current hawkers to become full-fledged business people and create more jobs for the community. This will enhance the status of the area. Community Development What/Action Who/When Costing exercise and Capital Projects prioritizing. 2009/10 The city has negotiated the development of a community health centre offering maternity services in Diepsloot to service the community of Hikensile. This is within the established norms and standards. Ablution facilities to be done What Resources CIMS CAPEX 2009/10 (R20 Million) Gauteng Health Department over three year period starting 2009 - 2012 R2 Million for planning in 2008/09 From 2010/11 to 2011/12 requirement to be determined Capital Projects Prioritized for 09/10 funding cycle CIMS CAPEX 2009/10 funding cycle R200 000 (R3 Million) Community Development Maintenance of facility Capital Projects Will be that includes completed 30-09 - 2008 refurbishment of electrical & plumbing systems are currently underway. Capital Projects CAPEX 2008 R200 000 (R1 Million) Economic Development It is part of the plan in ED MTC 2008/09 the 2008-09 financial year to develop a full market and this will be done in partnership with Spatial Economic Development dept. We are scoping the cost. 2008/09 budget Rgn Wd Issues Department/ME A 78 Taxi lay-bye with an JRA underground storm water channel – this will reduce unnecessary traffic congestion and proper water out flow. A 79 Electrification of ISD Bambanani Industrial – because this business node has the potential to create jobs and half unemployment if electrified. A 79 Build Recreation Centre Community (swimming pool) – We Development do not have recreation centre in our ward to accompany the swimming pool, hence many people have drowned due to lack of training. A 79 A 79 Upgrade of Ivory Park stadium to PSL standard – the current PSL team has no home ground and Ivory Park Stadium is big enough to accommodate big teams like Chief and Pirates, plus there is the potential for job creation. Construction of a community Crèche A 80 A 80 A 80 A 92 A 92 334 Upgrade Kanana Community Hall (soundproof, stage) to curb crime Indoor Sports Facility to respond to strong sporting community and health purposes Build a bridge that links Joe Slovo to Freedom Drive and three pedestrian bridges to shorten travelling distance between Kanana ext 4 and I/P ext Roads, Storm Water – Pedestrian access, reduce congestion, safety, street names, throughout the ward. Community Development What/Action Who/When Project is included in the Stormwater Master planning project submitted for approval in the 200910 CAPEX Budget Cycle. The project implementation has commenced, City Power made the funds available and appointed Eskom to electrify the industrial area on behalf of the City of Johannesburg. Will deploy a Mobile Recreation Vehicle to do programmes during school holidays and after school. Safety and anti-crime programmes will be done with assistance of EMS. Need identified Department has submitted a funding application. JRA 2009/10 City of Johannesburg/City Power/Eskom. When: The project commissioning is planned for 30th of June 2008 Capital Projects 2009/11 External funding sought. R35 Million (R20 Million) Capital Projects 2009/10 National Treasury Neighbourhood Partnership Development Grant CAPEX R5 Million Community Development Prioritized for 2009/10 Capital Projects financial cycle 2009/10 Community Development To be done Capital Projects 2009/10 Community Development Feasibility study has been commissioned (site identification) Transport Investigate /Conduct feasibility study Capital Projects 2009/11 Capital Projects 2009/11 JRA 2009/10 Transport Project is included in JRA 2009/10 the Stormwater Master-planning project submitted for approval in the 200910 CAPEX Budget cycle Engaging the private Anticipated to be done sector to source in 2009/11 external funding. Multi-Purpose centre – Community Vaal, Ebony, etc Development (escalate to GCIS) (Kaalfontein and Ebony Park) – library, ward office, community hall, What Resources JRA Stormwater Master planning Project CAPEX 11-2009/10 R2 Million Funding request put at CIMS (R5 million) Internal budget R500 000 (R1 Million) External funding sourced estimated at R25 Million` 2009/10 ± R260 000 2009/10/11 Budget R2 Million per year External funding Requests made for R3 Million (R20 Million) Rgn Wd Issues Department/ME What/Action Who/When To be investigated Transport: JRA What Resources home affairs. A 93 A 93 A 93 335 BRT - economic growth Transport and upliftment of quality of life for all Wetland and public Environmental open space, including Management environmental policies adhered to - For our children and future generations Crime - all SA affected. Ward based solution and crime stats and implementation (EMS/JMPD/SAPS) JMPD To be determined after investigation The wetlands An audit of wetlands The Environment An audit of wetlands Department’s wetland’s audit project within the City will be audit commenced on 13 OPEX R1.1 Million concluded by 30-06 - -06 - 2007 and will be The wetland 2008. It will provide concluded by 30-06rehabilitation data and information 2008 projects are on the location, currently being nature, opportunities funded from the and threats to Working for wetlands, and will Wetlands conclude with budget. recommendations for wetland management priorities. The audit will be taken into account in the City’s RSDFs, in order to ensure sustainable utilization and conservation of wetlands. The Environment Department is also working with SANBI Working for Wetlands in various wetland rehabilitation projects across the region. JMPD is in the JMPD and JMPD and process of reviewing SAPS Immediate and SAPS its deployment ongoing Officers Part of strategies to ensure Operating better visibility and budgets improve response to incidences of reported crime and traffic related matters. A ward based deployment approach is envisaged that will enable the JMPD to engage more actively with communities through Ward Safety Committees and CPFs. Closer working relationships with the SAPS were also fostered in the past two years to ensure joint crime combating and prevention. Joint teams were piloted in 5 priority police precincts in Joburg and the approach will be replicated throughout the City. Rgn Wd Issues Department/ME What/Action Who/When A Housing In last financial year the Kaya Sands settlement was dedensified and families moved to land owned by Province - Opening of access roads and provision of rudimentary services Housing 2007/08 94 Eradicate all informal settlements; provide housing to all those informal settlements, especially in Kaya Sands. A 94 Official DPUM policy/recognition of Gecko Conservancy - to protect the character of the Kyalami area. A 94 Establishment of a By- JMPD Law and Policy Enforcement – to interact with all spheres of government (reporting so far is ineffective) A 94 Official Environmental policy/recognition of Management Gecko Conservancy - to protect the character of the Kyalami area. 336 Long term plan: - Township establishment will be completed in this financial year - Services and top structure construction in next financial The recognition of the natural uses of the Gecko Conservancy are reflected under the Witpoort Precinct (Sub Area 8), Development Objective 2, “To promote and enhance the rural character of the non-urban areas”. The RSDF for Region A was approved by Council as the City’s official policy framework for the Region in August 2008. Management Unit is already established in JMPD and ongoing enforcement of priority By-Laws are taking place. Partnerships have been formed with key CoJ departments and ME's like City Parks, Joburg Water, Pikitup and City Power to ensure a more focused approach to related by-laws. Environment department is completing a biodiversity assessment, which will provide for official recognition and protection of similar sites. Department is also engaging the provincial and national offices on declaration of nature reserves. The affected c JRA/ JW/ City Power 2008/09 What Resources Funding to be accessed via provincial subsidies Housing Housing 2009/10 Director; DPF June 2008 Departmental Opex JMPD, City Parks, Part of JMPD Joburg Water, Pikitup, Operating City Power, EMS, budget Environmental Health and DPUM. Current and ongoing Environmental Management Department and to be completed by 30-06 2008 Environmental Management Department OPEX Rgn Wd Issues Department/ME What/Action A 95 Street lights; humps; paving; road markings; throughout the ward ISD Humps to be included JRA in the ward based safety programme. Road markings will be done. A 95 A 95 Building of a bridge over JRA wetland – safe passage to primary school Joburg Water Upgrading of sewer system – maintenance volume, capacity density throughout the ward A 95 Street lights, humps, paving, road markings throughout the ward A 96 Temporary Health Health Facility (Mobile Clinic) Currently one not centrally located within 5 km radius and also not safe. A 96 Formalisation of informal Housing settlements and review of Urban Development Boundaries (UDB) – in order to access basic services (Thabo Mbeki privately owned) ISD A 96 High Mast Lights and street lights (Diepsloot Ext 4)– for crime prevention A 96 Formalisation of informal DPUM settlements and review of Urban Development Boundaries (UDB) – in order to access basic services (Thabo Mbeki privately owned) 337 ISD Who/When Conduct feasibility study. JRA 2009/10 Upgrading requirements are being verified through hydraulic modelling The sewer basins study will verify budget allocations to include in the “Special” category of 2008/09. Other sources of funding is the MIG. Install new streetlights through the suburb (Diepsloot) JW, Capital Investment Verification by 07 - 2008 City Power One community Gauteng Health health centre is being Department planned for Cosmo City by the Gauteng Health Department. A site has been identified and consultants busy with designs. A site has been made available in Diepsloot but not yet confirmed for a community health centre Township Housing By June 2009 establishment/ formalization currently being undertaken Services and top structure construction to commence in next financial year Install R17 Million Masts and conventional streetlights (Diepsloot) Amendments to the Urban Development Boundary have been addressed through the Northern Areas Development Frameworks, which are translated into the sub-area development management tables of the RSDF for Region A. Council has approved the report City Power What Resources 08/09 budget JRA CAPEX 2009/10/11 R2 Million per year JWMIG which is pending OPEX 08/09. MIG Funding Application in process R6,500 000 Gauteng Health Department R2 Million OPEX R1.5 Million Provincial subsidies 2009/10 MIG Funding. Contractors in process of installation. R2 750 000 Director – DPF, Director Departmental Strategic Support Opex December 2008 Rgn Wd Issues Department/ME What/Action Who/When What Resources on the formalisation of informal settlements. A special unit is being established within DPUM, which will be dedicated to the' fasttracked’ regularisation of informal settlements, where feasible. The City’s Housing Department has completed the requisite feasibility studies and a process is underway to determine how many of the informal settlements in the City are appropriate for ‘fast-tracked’ regularisation. REGION B Region B comprises Rosebank, Bryanston, Randburg, Auckland Park, Westdene, and surrounding suburbs. Randburg is in the midst of change, as the City rolls out its plans to revitalise the central business district and bring back business lost to regional shopping centres and other decentralised nodes. The region's suburbs range from high to low-income areas like Coronationville and Westbury. Areas such as Parktown and Mayfair are old suburbs of historical significance. The section below outlines some of the key urban management interventions in the region by areas of focus. These interventions are summarised by key regional focus areas which identifies the areas of decay, key interventions required, law enforcement plans and clean up campaigns envisaged for the region, stakeholder engagement and visible service delivery plans. Urban Management Activities by Focus Area AREAS OF FOCUS Randburg Southwestern townships (Coronationville) Auckland Park and surrounding suburbs WARD NUMBER 102 68 & 82 69 & 87 Addressing Urban Decay In the Randburg Civic Centre focus area the main areas of decay are where illegal taxi ranks have emerged and where illegal dumping takes place. The Region is currently involved in the development of the “Randburg Revitalisation Project (RRP)” to support the declaration of Randburg as a ‘restructuring zone’. The Region is an active member of the CID, and is involved in the management of the CBD and its surrounds. To date the JMPD have conducted a blitz on illegal taxi ranks (in July 2008) and together with the regional office formed an illegal dumping unit. In 2009/10 the new unit will focus on monitoring and management of illegal dumping and land invasion. The plan for the future is to ensure the following: Randburg is a Priority Area for the Region as such will implement the 3-year Priority Area Operational Plan for the area, which 338 encompasses multi-disciplinary blitz’, by-law enforcement campaigns and cleaning campaigns. CID management is critical, and the Region will be working hand-in-hand with the CID and property owners in respect of the “Randburg Revitalisation Project” In the Southwestern townships (Coronationville) focus areas, particularly in the Westbury, Riverlea priority area and as such is the recipient of intensified initiatives by the Region. and Newlands areas, the following interventions were undertaken identified in order to remedy the situation, multi-disciplinary blitz’ to ensure compliance i.r.o. Liquor outlets, planning schemes, environmental health, and safety hazards and For 2009/10 financial, it is envisaged that these operation will be intensified with a special focus on Riverlea Over the last the years Melville has been a priory areas the Region hence the 3 year Priority Area Operational Plan was developed. In 2008/09 the following activities were undertaken, Multidisciplinary blitz’ to ensure compliance take place on a regular basis in this area – 6 operations already completed in conjunction with Brixton SAPS (3 in Melville), The Region is currently supporting the possible establishment of a City Improvement District (CID), and is actively engaged with the community in this regard. The pedestrianisation and andscaping of 7th Street, Melville has always been a goal of the Region, and this will be managed in conjunction with the CID establishment and the lease agreement between JPC and Atterbury. In 2009/10 financial year, the co-ordination and management of the Brixton Renewal Project will be intensified. Implementing law enforcement In the Randburg Civic Centre focus area the substantial weight of law enforcement is concentrated on by-law enforcement, particularly illegal trading, public health, illegal dumping, illegal signage and land-use management. In addition to this, JMPD is also focused on traffic management and safety risk mitigation. Road policing and control of public transportation takes place on an ongoing basis and will be dealt with as a major part of the “Randburg Revitalisation Project”. Furthermore, derelict properties are being dealt with by the Law Enforcement agents e.g. 331 Surrey Street. In 2009/10 3 Multi-disciplinary operations will take place in the area and road policing will continue to take place with focus on the Braamfischerville and Jan Smuts intersection and the taxi rank. In Auckland Parks, 7th Street Melville has been a focus area for the Region and the law enforcement agents. A Student Accommodation Framework for Brixton, Rossmore and Westdene is currently being constructed to ensure compliance to planning schemes. Multidisciplinary operations will remain a key activity for this area. Brixton will be targeted for a possible Urban Upgrade project as well as the control of open spaces in Vrededorp will remain a priority for the Region. In 2009/10 the region-wide law enforcement unit will be focused on Liquor outlets, planning schemes, environmental health, and safety hazards especially in Westbury and Newlands. In Brixton areas, the focus for multi-disciplinary blitz’ to ensure compliance i.r.o. Liquor outlets, planning schemes, environmental health, and safety hazards will continue throughout the area. Stakeholder engagement Every month the ward councillors in the region host a ward councillors forum to engage roleplayers in Brixton, Melville, Riverlea, Regional office and other parties, on common programmes and developmental commitments to date. Furthermore, Law Enforcement Awareness Programmes are undertaken in conjunction with the blitz. For 2009/10, it is envisaged that Law Enforcement Awareness Programmes will continue to take place within the area – namely Ferndale & Bordeaux. Clean Up and Greening Campaigns and Special Projects 339 The Region and businesses in the Industrial area manages the environment of the industrial area. In 2009/10 financial year, cleaning campaigns will take place as part of the RUMP Implementation programme A clean up strategy has been developed with Pikitup to address the illegal dumping in Riverlea Ext 3 and Westbury . The Riverlea Operational Plan encompasses the Riverlea clean-ups. Residents from Zamimpilo have begun to be relocated to Pennyville until the conclusion of the project. The protection of the wetlands in the Riverlea will also be undertaken. The rehabilitation the Bosmontspruit may be added as a Region-driven projectHill Street has been targeted by the Region in respect of “clean and green” but pruning of trees takes place on an ongoing basis. For 2009/10, the development of the Brixton project will encompass the “clean and green” aspect for the area. Furthermore, the pedestrianisation of 7th Street Melville and the development of the Faan Smit park is a planned project for the area (in the aim of revitalisation of the “vibey” Melville). Visible Service Delivery Through visible service delivery the following were achieved, Urban inspectors appointed to report on a block-by-block basis and check on progress of service delivery deficits; coordination meetings with departments/entities and councillors; define corrective actions; escalation of service delivery deficiencies. REGION-WIDE 2009/10 PROJECTS The following table lists the proposed CoJ’s projects to be implemented in all the regions by department or municipal entities. It also outlines the proposed budget of the CoJ funding, and total amount including external funding. Project Description N17:Improved Access to Soweto / 2010 Soccer World Cup GK: Balancing tank repairs GK: Replace gas pipework2700 GK: Balancing tank repairs Improving the carrying capacity of 14th Avenue/Weltevreden/Pendoring from the N1 to Cresta. Ward Region wide Department/ME Transportation Planning 2009/10 Budget R 25,000,000 Region wide (89-98) Region wide (89-98) Region wide (89-98) Region wide (86-98) Johannesburg Water Johannesburg Water Johannesburg Water Johannesburg Roads Agency R 830,000 R 1,350,000 R 830,000 R 5,000,000 CITY OF JOHANNESBURG CAPEX PROJECTS- 2009/10 The table below lists the proposed City of Johannesburg projects to be implemented in each region, by ward and by department or Municipality Entity (ME). It also outlines the proposed budget of CoJ funding and a total amount including external funding. Project Description Randburg Garden Sites CBD Regeneration Randburg (Hill Street Upgrade, Closing of Braamfischerville Drive Which was Heretofore Pedestrianised) Amazon Jungle Regulatory Compliance Upgrading of Zoo infrastructure Anthea Staff Hostel Redevelopment/Conversion Randburg Medium Density Housing (Selkirk) BIN. Oil alarms on oil pressure gauges for transmission cables BIN. Rosebank. Install 4 th transformer & feeder board BIN.Crown. Establish new 88/11 kV Sub Station BIR.Harley Street.Replace transformer and feeder board 340 Ward 104 104 Department/ME Pikitup Johannesburg Development Agency 2009/10 Budget R 2,000,000 R 5,000,000 73 73 73 60 104 85 Johannesburg Zoo Johannesburg Zoo Johannesburg Zoo JOSHCO JOSHCO City Power R 500,000 R 500,000 R 1,000,000 R 34,480,000 R 21,600,000 R 66,667 106 City Power R 8,000,000 68 102 City Power City Power R 4,875,000 R 10,000,000 BIR.Hursthill.Establish Hursthill sub station Electrification.Mountain View.5000 houses ND. Bryanston 6.6 kV conversion ND. Randburg:The construction of new infrastructure in newly established townships ND. Hursthill:The construction of new infrastructure in newly established townships ND. Randburg. Establishment of a new ring ND.Bryanston.11kV conversion Sandton / Rosebank - Installation and upgrade of public lighting infrastructure (Randburg):Sandton / Rosebank Service connections: Hursthill Service connections: Randburg UG. Vrededorp: Upgrade Electrical Network DF: Digester REG B: Delta Basin:Upgrade sewers REG B: Linden District:Upgrade water infrastracture REG B: Sandton:Upgrade supply REG C: Driefontein Basin: Upgrade sewers REG C: Kensington B District :Uprade water infrastructure REG C: Western klein jukskei Pumped Basin: Upgrade sewer REG D: 2010 Soccer World Cup: Install Hurst Hill booster pump Stn REG D: Bushkoppies basin: Upgrade sewer REG D: Corriemoor & Fairlands water district: Upgrade water infrastructure REG D: Croby/Hurst Hill: Upgrade supply REG D: Hursthill-Brixton District:Upgrade water infrastructure Thonifho DF: Digester 69 82 106 104 City Power City Power City Power City Power R 3,000,000 R 27,500,000 R 22,000,000 R 1,000,000 69 City Power R 2,000,000 104 106 106 City Power City Power City Power R 4,000,000 R 4,000,000 R 2,500,000 69 104 69 104 90 102 City Power City Power City Power Johannesburg Water Johannesburg Water Johannesburg Water R 6,450,000 R 25,800,000 R 6,000,000 R 10,110,000 R 2,000,000 R 6,910,000 106 88 101 Johannesburg Water Johannesburg Water Johannesburg Water R 2,385,000 R 4,000,000 R 390,000 97 Johannesburg Water R 7,200,000 69 Johannesburg Water R 3,500,000 23 86 Johannesburg Water Johannesburg Water R 2,700,000 R 7,300,000 69 69 Johannesburg Water Johannesburg Water R 3,800,000 R 8,060,000 87 104 Johannesburg Water Johannesburg Water R 50,000,000 R 10,110,000 WARD ISSUES BY REGION The table below portrays ward issues identified by each ward, departments or ME’s responsible, action required, time frame and allocated resources. Rgn Wd Issues B 68 B 68 B 68 B 69 341 Department/ME What/Action Slovo Park: To construct a JRA footbridge across into Industria from Slovo Park. Homestead Park: To Housing construct a new park development. Riverlea Ext 1: To prioritise Housing the housing development. To curb crime. A schedule JMPD from the JMPD and the SAPS needs to be provided (May 2008 – June 2009), detailing how they plan to deal with the following problems: Illegal dumping; Street vendors; Shebeens; Overcrowding of residential units. These problems aff Who/When What Resources To be investigated JRA To be investigated To be determined after investigation Budget to be identified after investigation JCP Housing is currently developing Pennyville that will cater for Zamimpilo & surrounding communities JMPD in partnership with relevant CoJ departments, SAPS and Gauteng Liquor Licensing developed an integrated approach to deal with compliance of liquor vendors. The Department through the City Safety Programme provided input into the Housing JMPD, SAPS, Gauteng Liquor Licensing, DPUM, Pikitup, City Parks, Environmental Health, City Power, Joburg Water, CPF and Ward Safety Committee Dedicated JMPD and SAPS Officers, Resources from relevant CoJ departments and ME's Part of Operating budgets of departments Rgn Wd Issues Department/ME What/Action Who/When What Resources Provincial liquor policy and Draft Liquor Bill. If the input is accepted, the City will have more meaningful input into the process of grating liquor licenses. Dedicated bylaw enforcement teams are in place to deal with Street Trading, Illegal dumping, Parks Patrol and Illegal connections (Electricity and Water). A detailed ward based enforcement programme will be developed and implemented in the 2008/2009 financial year. B 69 To upgrade and enlarge Joburg Water sewerage structures in the following areas: Proane Avenue; Brixton; Crosby; Mayfair West; Rossmore; Langlaagte North, Hursthill. This is necessary as the current structures are a health hazard and densification of the area has oc B 69 B 82 B 82 B 82 To upgrade Sir Drummond Chaplin Park in the following areas: Fencing, Play park area, Walking and cycle track; Security and lighting. This will go towards youth and community development. Claremont: To prioritise Princess Street New Park Development (also called Princess Koppies). Waterval Flats Complex: This area is in serious need of high mast/security lighting. Newclare/Westbury/Waterv al/Claremont: To refurbish housing rental stock (plumbing, electrical, parks, etc). 342 City Parks Budget [2] included in “Upgrading & Renewal” category of JW 3 Year Capital Plan: FY Budget 2008/09 R2 Million 2009/10 R2 Million 2010/11 Nil Water replacement programme is planned for the whole city at a budget of R20 Million in the current financial year R50 Million is planned for 2008/09. The results of the assessment study to verify budget Provision for funding JCP to submit request R 900 000 CAPEX to be made in the for funding to CIMS & R90 000 OPEX next Financial Year JW, Capital Investment 2008/09 to 2010/11 (Three Year Capital Plan)[1] Housing No funding available JCP Provision for funding to be made in the next financial year City Power Installation of streetlights City Parks Provision for funding JCP to submit request R 700 000 CAPEX to be made in the for funding to CIMS & R 30 000 OPEX next Financial Year City power 2009/2010 Capital and/or operational budget R1,2 Million Rgn Wd Issues B 82 B 86 B 86 B 86 B 87 343 Department/ME What/Action To install robots on JRA Princess/Brown/Charles Streets in Claremont (provision has already been made for this.) JRA To upgrade roads and stormwater drains. This is necessary as there is a high accident rate and there is increased traffic congestion - heavy vehicles are unable to travel on the current roads. In addition there is flooding - there has been water damage; there are extensive water run-offs and hard surfaces. The following needs to be DPUM promoted: Law enforcement; Town planning; Traffic controls; Bylaws; Environmental health. This needs to be done in an effort to curb random illegal development, to promote the development of suburbs, to curb the illegal establish To upgrade the sewerage Joburg Water system. There is an increasing number of complaints from the community; as well as increased density and sanitation needs to be looked at. To subsidise CID projects. DPUM This will lead to tourism, crime prevention, financial incentives (property value), self reliance and sustainability. Who/When What Resources Will investigate JRA Budget to be determined after investigation Will investigate and ensure that all roads and stormwater drains are maintained. Upgrade the following intersections to South African Road Traffic standards: Gordon Rd/ Eleventh Street and Long Road; Johannes Road and Coronation Street; Fifth Street, Twist Street and Tenth Street; Gordon Road, Eleventh Street and Long Road; Long Road and Eight Road; Mollie Road between Eleventh Street and Twelfth Street (Mbc). Revise the traffic signal phasings at Gordon Road & Bergbron Drive to reduce congestion. Level one maintenance planned for Ward 86 for road signs and markings. In the 07/08 financial year there were 6 multi-disciplinary blitzes and law enforcement interventions in the region as a whole. Going forward, Ward 86 will be considered in 08/09. Sewer: Condition assessment JRA 01/01 – 01/03 JRA Maintenance Budget OPEX 2008/09 R48 000 JRA OPEX 2008/09 R5 000 JRAOPEX 2008/09 R200 000 Regional Director. Ongoing Regional Opex JW, Capital Investment Budget[3] included in 3 Year Capital Plan: FY Budget08/09 nil (cut)09/10 R13 Million 10/11 R14 Million The rollover of project might lead to increase in 09/10 and 10/11 Fys Regional Opex The department is Regional Directors finalizing the policy December 2008 on CID support. This will detail the amounts available, qualification criteria etc. While this question was raised in this specific ward, Rgn Wd Issues Department/ME What/Action B 87 To refurbish pavements and JRA walkways, with signage for EMS. This is in line with the City’s vision and obligations. It will also increase accessibility. B 87 To provide a manned JMPD satellite police station 24hr/day as well as patrols. Surveillance cameras and tourism ambassadors will avoid total lawlessness and prevent the loss in property values. B 88 To upgrade the dam wall at City Parks the botanical garden, Emmarentia Dam. This will quell any flooding disasters. B 88 To implement traffic safety JMPD measures that will make at primary and secondary schools as well as churches safer. This initiative includes Mountainview Drive, Thibault Avenue, Ingalele Road, Fairbridge Nursery, John Adamson Drive and the Milner and De La Ra B 88 To establish and maintain Environmental conservation areas in order Management to reduce crime by 2010 and create a community stronghold 344 the work being undertaken has a bearing on all regions. Existing footways will be rehabilitated, those prioritized will include areas present serious risks to used by pedestrians and cyclists. The building and setting up of police stations is a function of SAPS National. Through participation in joint planning sessions with the Gauteng Department of Community Safety, the matter was raised and follow up will be done. JMPD is in the process of reviewing its deployment strategies to ensure better visibility and improve response to incidences of reported crime. A ward based deployment approach is envisaged that will enable the JMPD to engage more actively with communities through Ward Safety Committees and CPFs. City Parks has brought the matter to the attention of JRA. The problem is being investigated and necessary remediation action planned. JMPD is in the process of reviewing its deployment strategies to ensure better visibility and improve response to traffic related incidences. A wardbased deployment approach is envisaged that will enable the JMPD to better address community specific need The environmental sector is committed to ensuring that conservation areas are protected and remain sustainable. Who/When What Resources JRA 2008/09 JRA OPEX 2008/09 JMPD to engage with the Gauteng Department of Community Safety and SAPS Police stations not part of JMPD budget Patrols part of JMPD Operating budget JRA & City Parks. Investigation ongoing Budget to be made available in the JRA Opex JMPD Immediate and Part of JMPD ongoing Operating budget Environment Management and Johannesburg City Parks driving the processes R4 Million CAPEX and R400 000 OPEX Rgn Wd Issues Department/ME What/Action B 90 To upgrade security by, for JMPD example, constructing palisade fencing and a gate on Malboro Drive, having better policing and enforcing by-laws. This is necessary as there have been 10 murders in 24 months, there are many illegal immigrants, an enormous amou B 90 B 90 To improve east – west Transport mobility. The following are examples of what needs to be done in order to achieve this: Conrad Drive Bridge; Bompas/Jan Smuts intersection; Jan Smuts needs to be widened. This needs to be done in an effort to alleviate traffic congestion To upgrade the health clinic Health in Rosebank. The current clinic is only open one day per week. This is inadequate and it is too small (it is currently held in one room of the library.) B 98 To install streetlights at ISD Randpark Ridge extension 41 – 3 and 16. This is necessary as the crime rate is high. B 98 To resurface all streets in JRA the ward: Smit Street, Fairland; King Street; George; Beatrice; Countess; Repaslie Road; Du Plessis, Collins Road (Windsor Glen); Brigish and Shaka, Monkor Road. Cornelis Street; (Northcliff). This refurbishment is necessary as currently 345 Who/When Most of the areas in this region have been identified and included in the current zoning and declaration programme. The operational programmes Dedicated by-law JMPD Already in Dedicated by-law place and ongoing enforcement teams are in place to deal with Street Trading, Illegal dumping, Parks Patrol and Illegal connections (Electricity and Water). A detailed ward based enforcement programme will be developed and implemented in the 2008/2009 financial year. Widening of Gautrans/ Bombela Bompas/Jan Smuts will commence middle September 2008 to be undertaken by Bombela, Gautrain Contractor. The building currently being used by the clinic belongs to community development (libraries) Parkhurst clinic, which is 5-7 km away, can be used in the short-term. Identification of alternate building remains along-term goal Phase in over 3 financial years. Capex funding. Project scope to installation of new infrastructure R1,8 million A fair amount of work had been carried out over the previous two financial years; The remainder will be placed on the proposed resurfacing program for 2009/10. What Resources Part of JMPD Operating budget No budget implications Regional health Region Health Manager for Region B manager OPEX R6 in the next three years Million City Power R4,950 000 JRA 2009/10 JRA Resurfacing Programme OPEX / CAPEX 2009/10 R5 Million Rgn Wd Issues Department/ME What/Action Who/When What Resources much damage is caused to vehicles and there is much deterioration. In addition, west – east mobility is impeded To upgrade the stormwater JRA system at Fairland Spruit. This will mitigate the erosion of the Spruit banks and flooding due to increased water run-off. The river crossings at Kings Street (Fairlands), 3rd Avenue and Edward Street are unsafe. To upgrade the stormwater JRA drainage and energy which affects the improvement of infrastructure. To address traffic problems JMPD that affect the suburbs needs and desires B 98 B 99 B 99 B 99 B 102 To implement a better water Joburg Water supply and sewerage in Ferndale, Blairgowrie and Bordeaux because the old pipes are corroding. 102 To repair the sewerage Joburg Water system as repairs are ineffective and everything needs an overhaul. 102 To review the road JRA infrastructure and to reassess action in Ferndale, Blairgowrie and Bordeaux because of the deterioration of major and secondary roads and the congestion that causes residents to be trapped on their property. B B 346 To institute security in the neighbourhood and parks, which will cause a drop in the crime and homelessness rate. JMPD Project submitted to 2009/10 CAPEX Cycle for approval. JRA 2009/10 JRA CAPEX 2009/10 R8 Million Will investigate Transport: JRA To be determined after investigation JMPD is in the process of reviewing its deployment strategies to ensure better visibility and improve response to traffic related incidences. A ward based deployment approach is envisaged that will enable the JMPD to better address community specific need JMPD and City Parks launched a Parks Safety team in the 2007/2008 financial year. The joint team is responsible for ensuring safety and law enforcement in parks and public open spaces. Sewer: Condition assessment JMPD Immediate and Part of JMPD ongoing Operating budget Sewer: Condition assessment JMPD and City Parks JMPD and City already in place and Parks joint task ongoing team Part of JMPD and City Parks Operating budgets JW, Capital The results of the Investment Verification assessment study to by July 08 verify budget allocations JW, Capital The results of the Investment Verification assessment study to by July 08 verify budget allocations Will investigate. New JRA 01/07 – 30/09, JRA CAPEX traffic signal planned 01/10 – 31/12 and 2008/09 R250 000 01/01 – 31/03 for Conrad/ JRA OPEX 2008/09 Blairgowrie. SARTSM R137 000 upgrade at 17 JRA OPEX 2008/09 existing signalised R35 000 intersection. Revising traffic signal/phasings at 7 intersections. REGION C Region C comprises of Roodepoort, Florida Park, Ruimsig, Randpark Ridge, North Ridding Cosmo City, Braamfischerville and Thulani. The suburbs in the north of Roodepoort include Ruimsig, Strubensvalley, Honeydew, and Little falls are among the most attractive residential areas in the metro which are considered to be at the upper end of the socio-economic spectrum, and informal settlements such as Zandspruit, Sol Plaatje at the lower end. Two substantial townships, Cosmo City and Braamfischerville are situated on the region's western and northern borders. The section below outlines some of the key urban management interventions in the region. These interventions are summarised by key regional focus areas as listed above. The table identifies the areas of decay, key interventions required, enforcement plans and campaigns envisaged for the region. Urban Management Activities by Focus Area AREAS OF FOCUS Roodeopoort Cosmo City Greater Princes Area Zandspruit Informal Settlement Braamfischerville WARD NUMBER 84 100 71 & 83 100 44 Addressing Urban Decay In the Roodepoort the main areas of decay are where illegal taxi ranks have emerged and where illegal dumping takes place, Illegal land use (Informal street traders into designated market areas, Scrap metals and shack farming). There are also a number of dilapidated buildings in the inner city and missing manholes. To address these challenges, a number of interventions were undertaken city wide, namely: Inspection of scrap metal dealers to check permits and compliance; Workshops with informal traders CoJ trading policy; Task team established with an operation plan; and Assessment of the CBD was completed 2008. For 2009/10 financial year, these programmes will be intensified with main focus on implementing programmes in the of Roodepoort renewal plan. In Cosmo City and Greater Princes Area the focus has been around the issues of illegal dumping, by law enforcement, illegal businesses and land use as well as illegal building structures in the residential area in Cosmo City and Informal settlement of Itsoseng encroaching on Cosmo Land as well as lack of lack of transportation, social, community & other facilities & services. To address these challenges, a number of interventions were undertaken, namely: Establishment of Law enforcement committee to deal with illegal land uses and educational campaigns; Focused operations conducted on illegally operating business contravening land use rights Taverns and shebeens operating illegally have been closed down and warrants of arrest executed on non complying business owners Development of trading markets and assisted traders to obtain funding; Land valuation and land rights survey; Offenders fined for illegal dumping Operations on illegal immigrants employed illegally at construction sites conducted Whereas, in Zandspruit the areas focus were around upgrading of informal settlement, illegal dumping grey water problems. In relation to these challenges, the plan is to accelerate service 347 delivery and ensure sustainability of programmes. Furthermore, an area based task team has been instituted in order to monitor the implementation of the environmental and health risks plans. Implementing law enforcement In Zandspruit, a series of law enforcement interventions have been planned through the regions Law Enforcement Task Team (LETT). In 2008/09 law enforcement operation were conducted on taverns and shebeens and workshops held the communities to educate them on various legislation. Furthermore, illegal electricity connections were disconnected. For 2009/10, it is envisaged that Law Enforcement Awareness Programmes will continue paying particular attention to Roodepoort, Zandspruit and Cosmo City. in 2009/10 For 2009/10 financial year, unmarked law enforcement vehicles to be deployed Zandspruit to deal with illegal dumping. Stakeholder engagement Every month the ward councillors in the region host a ward councillors forum to engage roleplayers on common programmes and developmental commitments to date. Furthermore, Law Enforcement Awareness Programmes are undertaken in conjunction with the blitzes. By-law education session held with Zandspruit community on illegal dumping and waste management. All children in school (Zandspruit) educated on road safety and pedestrian safety. A follow-up educational campaign will be conducted due to the widening of Beyers Naude. Going forward, the plan is to sustain law enforcement activities, and intensify workshops with relevant stakeholders Clean Up and Greening Campaigns and Special Projects The Region and businesses in the Industrial areas of Roodepoort manages the environment of the industrial area in line with the Beautification of Roodepoort programme in partnership with Johannesburg City Parks In Cosmo City, a substantial number of trees were planted as part of the city wide tree planting programme and 2 parks completed. Although, Environmental Management Plan has been finalised it will only be implemented once funding is available. In Greater Princess, clean-up campaigns in partnership with Pikitup, CDW’s and Community were successfully undertaken. In 2009/10 financial year, cleaning campaigns will be intensified as part of the RUMP Implementation programme. A clean up strategy has been developed with Pikitup to address the illegal dumping in Braamfischerville. Furthermore, City Parks completed Braamfisherville Park and distributed more than 6000 trees. For 2009/10, City Parks is planning to develop walks ways and continue implementing greening programme in the area. In Zandspruit, clean up operation were conducted and offenders fined for illegal dumping and vandalism. Visible Service Delivery Through visible service delivery the following were achieved, Urban inspectors appointed to report on a block-by-block basis and check on progress of service delivery deficits; coordination meetings with departments/entities and councillors; define corrective actions; escalation of service delivery deficiencies. Going forward, is to continue monitoring the street naming project in Braamfischerville, accelerate service delivery in the entire region as well as implementing programmes aimed at addressing issues of illegal dumping, vandalisms and environmental health risk issues. 348 REGION-WIDE CAPEX PROJECTS- 2009/10 The following table lists the proposed CoJ’s projects to be implemented in all the regions by department or municipal entities. It also outlines the proposed budget of the CoJ funding, and total amount including external funding. Project Description GK: Balancing tank repairs GK: Replace gas pipework2700 GK: Scada upgrade FIRE Equipment For New Fire Engines (jaws of life, breathers for Gautrain) Ward Region wide (89-98) Region wide (89-98) Department/ME Johannesburg Water Johannesburg Water 2009/10 Budget R 830,000 R 1,350,000 Region wide (89-98) Region wide Johannesburg Water Emergency Management Services R 20,000 R 2,000,000 CITY OF JOHANNESBURG CAPEX PROJECTS- 2009/10 The table below lists the proposed City of Johannesburg projects to be implemented in each region, by ward and by department or Municipality Entity (ME). It also outlines the proposed budget of CoJ funding and a total amount including external funding Project Description (2010) Ruimsig Stadium Bramfisherville Multipurpose Cosmo City BIN. Lutz sub station BIN. Lutz: Bulk Infrastructure. Servitudes for transmission lines. BIN. New twin Zebra lines from Lutz to T-point BIN. Peter Road. Install third 88/11 kV 40 MVA transformer BIN.Pennyville.New 88/11 kV sub station BIR. Roodetown. Install additional 88/33 kV 40 MVA transformer, extend building and refurbish. ND. Randburg:The construction of new infrastructure in newly established townships ND. Roodepoort: The construction of new infrastructure in newly established townships Service Connections: Roodepoort UG. North Riding: Upgrade Electrical Network Bram Fischerville Gravel Roads Cosmo City Taxi Facilities Cosmo City Reservoir DF: Extension Lanseria/Drief NW: Install sludge conveyor NW: Refurb clarifier NW: Structural Refurb Bridges NW: Unit 3 clarifier refurb NW: Unit 5 mod 2 / Lanseria REG C: 2010 Soccer World Cup: Install fire hydrants at Cecil Payne Stadium REG C: Heldekruin District: Upgrade Water Infrastructure REG C: Honeydew Boschkop District Upgrade Water Infrastructure REG C: Planned replacement of sewers REG C: Planned replacement of watermains REG C: Replace Sewers identified by OPS Infrastructural and upgrading of facilities Pennyville -Contsruction of Bridges, Bulk Water Sewer, Roads & Stormwater Princess Plot 61 Roads & Stormwater, Bridge Culverts Zandspruit Phase :Contsruction of Bridges, Bulk Water Sewer, Roads & Stormwater 349 Ward 97 49 100 97 97 Department/ME Community Development Community Development Community Development City Power City Power 2009/10 Budget R 3,000,000 R 4,000,000 R 15,000,000 R 15,000,000 R 10,000,000 97 97 City Power City Power R 12,000,000 R 20,000,000 70 71 City Power City Power R 6,000,000 R 9,598,441 104 City Power R 1,000,000 71 City Power R 2,000,000 71 100 49 100 100 97 71 71 71 71 71 85 City Power City Power Johannesburg Roads Agency Transportation Planning Johannesburg Water Johannesburg Water Johannesburg Water Johannesburg Water Johannesburg Water Johannesburg Water Johannesburg Water Johannesburg Water R 10,800,000 R 6,500,000 R 30,000,000 R 3,000,000 R 17,300,000 R 70,765,000 R 2,215,000 R 2,625,000 R 11,340,000 R 1,540,000 R 2,700,000 R 1,000,000 85 Johannesburg Water R 2,800,000 85 Johannesburg Water R 9,285,000 85 85 85 85 70 Johannesburg Water Johannesburg Water Johannesburg Water Roodepoort Theatre Housing Division R 2,500,000 R 25,000,000 R 150,000 R 1,000,000 R 5,470,000 85 Housing Division R 3,000,000 100 Housing Division R 3,100,000 Pennyville Social Housing Roodepoort Medium Density Rental Units 70 71 JOSHCO JOSHCO R 8,000,000 R 26,400,000 WARD ISSUES BY REGION The table below portrays ward issues identified by each ward, departments or ME’s responsible, action required, time frame and allocated resources. Rgn Wd C 44 C 44 C 44 C 49 C 49 C 49 C 49 C 49 C 49 350 Issues To build storm water drainage. To establish infrastructure, e.g. tarring of streets, to construct storm water drainage, to install streetlights/high mast lights and to upgraded transformer systems To establish infrastructure, e.g. tarring of streets, to construct storm water drainage, to install streetlights/high mast lights and to upgraded transformer systems. To develop a clinic, police stations, schools, and a library at Braamfischerville. To develop a swimming pool at Tshepisong. To construct traffic lights at Impala Road and a foot bridge from Tshepisong East to Tshepisong Proper. To secure land for further council usage. Department/ME What/Action City Power Will investigate and implement JRA Included in the Stormwater Master planning project submitted for approval in the 2009/10 CAPEX budget cycle City Power To install street light infrastructure (Braamfischerville) Installation of new street lights as per master-plan and as CAPEX funding allow Health A site (numbers 3000 and 3001) has been identified. However, there is a need to get alternative site nearer to Roodepoort Road. Transport Road signs to be installed. Footbridge will be investigated Who/When Transport: JRA Economic Development To build a linking bridge from Braamfischerville to Tshepisong (which will facilitate access to Leratong Hospital) and reduce the traffic congestion. To tar Abbess Drive from ext 12 to ext 13, Braamfischerville. To tar Sipho Hashi Street in Tshepisong. To develop a clinic, police stations, schools, and a library at Braamfischerville. To develop a swimming pool at Tshepisong. Transport JPC have a programme to acquire land in various regions for housing projects, industrial and agriculture use Conduct feasibility study JRA 2009/10/11 What Resources To be determined after investigation JRA Stormwater Master planning CAPEX 2009/10/11 R2 Million per year City Power 2009/2010 MIG Funding and CAPEX R 3.5 Million Gauteng Health Department Gauteng Health Department OPEX R2 Million JRA 2008/09 JRA OPEX 2008/09 R5 000 JPC 2008/09 JRA 2009/10 JRA CAPEX 2009/10 R150 000 Transport Considered in priority JRA list within Braamfischerville. 2008/09 Budget CAPEX Community Development Capital Projects to be Development of a multi purpose centre completed end 31/10 is currently underway - 2008 and is 85% completed. Another process is underway to appoint consultants for the development of a library. Capital projects in partnership with NDPG CAPEX 2008 (R3 Million) Rgn Wd C 50 Issues To build a sewerage system; the whole ward suffers from a terrible smell as a result of overflow of existing latrines and insufficient water pipes for the increased number of usage. Department/ME What/Action ISD Water to be assessed after completion of OGA. Sewer: upgrading has been identified through network model C 50 To build a primary school in extension 2. CSU Department of Education C 50 To build/programme a Economic skills development centre, Development for which the building can also be used for a library, and to build an MPCC which will aid in SMME development. C 70 To improve service delivery. C 70 To do away with informal Economic trading in the Florida CBD. Development 351 JMPD Thulani School was built by Provincial Department of Education in 2008/09 The legal entity for Skills Hub is being established and will service economicallydriven skills needs of all regions. This is being done in consultation with Community Development. Four skills centers are servicing region C. However none of these are currently providing any training programmes currently. Last time training programmes were offered was in 2007 and focused on sewing. Currently only a sewing programme is being offered is for 20 aged women. Dedicated by-law enforcement teams are in place to deal with Street Trading, Illegal dumping, Parks Patrol and Illegal connections (Electricity and Water). A detailed ward based enforcement programme will be developed and implemented in the 2008/2009 financial year. There is a Demarcation Policy Programme in line with Informal Trade Policy approved by council. An area assessment will be carried out to determine suitability of the area in line with by-laws. The traders Who/When JW, Capital Investment 2008/09 to 2010/11 (3 Year Capital Plan)[4] What Resources Budget[5] included in “Upgrading & Renewal” category of JW 3 Year Capital Plan: Budget 2008/09 R10 Million, 2009/10 R11Million 2010/11 R2 Million Other source of funding is MIG which is pending The CoJ Skills Strategy was launched on 12/08/2008 to a targeted group of over 100 public and mainly private sector partners. The Skills Hub Business Plan and Funding Model was approved was approved by the Mayoral Committee on 14th October in February 2008. Planning for the roll out of Skills Services via the Skills Hub has commenced since beginning of new financial year from 2008/09. Onwards with budget approval. In 2008/9 Skills Programme budget, R 7, 941 Million has been allocated for the COJ Skills Hub. The current programmes that will be included in this budget include Phase II of the Labour Market Information Database, Phase II of the RPL Project and the establishment of the Skills Hub as a not-for gain Section 21 JMPD, SAPS and Part of JMPD and identified role players SAPS Operating budgets 2008/09 rollout. MTC Line Budget of MTC and Transport Rgn Wd C 70 C 70 C 70 C 70 C 70 352 Issues Department/ME What/Action will then be issued with smart cards. This work is being done in partnership with other departments and ME's. To do away with informal JMPD Dedicated by-law trading in the Florida CBD. enforcement teams are in place to deal with Street Trading, Illegal dumping, Parks Patrol and Illegal connections (Electricity and Water). A detailed ward based enforcement programme will be developed and implemented in the 2008/2009 financial year. CoJ needs to budget To upgrade the taxi rank in Transport the Florida CBD. for the upgrading of the taxi rank as required. To upgrade facilities for Community Appropriate studies disabled persons. Development will be done to assess the extent of the problem & cost implications. To upgrade social Community A crèche has just structures, e.g. churches, Development been completed, sport and recreation handed over to the City. A library will also facilities as well as lakes. provided. To upgrade health care DPUM An Urban facilities, Florida Station, Development railway bridges, Fleurhof Framework is being Informal Settlements, done in the 2008/09 Rand Leases and ablution financial year. The facilities. framework covers the Florida, Unified, Maraisburg, Bosmont, Newclare and Westbury Rail Stations. The Framework will propose strategies for the development of vacant/underutilised land between the stations, and thereafter provide detailed design frameworks for two stations. A special unit is being established within DPUM, which will be dedicated to the ‘fasttracked’ regularisation of informal settlements, where feasible. The City’s Housing Department has completed the Who/When What Resources JMPD Already in place and ongoing Part of JMPD Operating budget Transportation Planning and Regulation 2009/10 Transportation Planning and Regulation OPEX R10 Million R500 000 2009/10 financial year Capital Projects Private sector funding, August & October 2008 respectively Private sector funding (R3.5 Million) Regional Director Housing Formalisation unit September 2008 Departmental opex Rgn Wd Issues C To do away with urban decay in the CBD and Florida in general. 70 Department/ME What/Action requisite feasibility studies and a process is underway to determine how many of the informal settlements in the City are appropriate for ‘fast-tracked’ regularisation. DPUM Special operations and area management like multi disciplinary operations will be directed at bad buildings, illegal taxi ranks, illegal accommodation establishments and illegal land uses, noise and night clubs. Who/When What Resources Regional Director and Regional OPEX City’s law enforcement agencies. Between July 2008 and January 2009 An urban management operation was carried out in May 2008 for this area and regular follow up operations will be directed at this area. C 70 C 70 353 To upgrade health care Health facilities, Florida Station, railway bridges, Fleurhof Informal Settlements, Rand Leases and ablution facilities. Urban management: To DPUM consider issues of urban decay. Do away with urban – such as informal trading, taxi rank upgrade, ablution facilities, facilities for disabled people An Urban Development Framework is being done in the 2008/09 financial year. The framework covers the Florida, Unified, Maraisburg, Bosmont, Newclare and Westbury Rail Stations. The Framework will propose strategies for the development of vacant/underutilised land between the stations, and thereafter provide detailed design frameworks for two stations. Region health Minor upgrading of manager for Region Florida Clinic has C been undertaken in 2006/7 (R72 000) and 2007/8. (R40 000) Regional Director Multi disciplinary operations directed at Ongoing bad buildings, illegal taxi ranks and hawking, illegal accommodation establishments, illegal land use, noise and night-clubs. Region health manager OPEX R112 000 Regional Opex Rgn Wd C 70 C 71 C 71 C 71 C 71 C 71 354 Issues To upgrade social structures, e.g. churches, sport and recreation facilities as well as lakes. Department/ME What/Action City Parks City will investigate the nature and status of the lake and develop a plan to upgrade/rehabilitate based on the results. To establish mobile clinics. Health The clinic that is within walking distance can be used. In addition this clinic can undertake outreach campaigns and additional health promotion outlets throughout the ward. To establish information Community A feasibility study will centres. Development conducted & funding applications to be made To establish mobile police JMPD The building and stations. setting up of police stations is a function of SAPS National. Through participation in joint planning sessions with the Gauteng Department of Community Safety, the matter was raised and follow up will be done. JMPD is in the process of reviewing its deployment strategies to ensure better visibility and improve response to incidences of reported crime and traffic related matters. A ward based deployment approach is envisaged that will enable the JMPD to engage more actively with communities through Ward Safety Committees and CPFs. To exploit the availability Housing A number of sites of land at Matholesville for have been identified rezoning. by housing Department and discussed with the Department of Education for rezoning. Dependent on decision of Department of Education To proclaim Princess Plot Housing Draft layout plan for housing development. available. Township establishment currently being prepared. Requesting permission for construction to start on site prior township Who/When What Resources Aquatic Specialist to Budget to be made investigate status quo available in OPEX before the end of 2008/09 Region C Regional health manager and health promoters. Gauteng Health Department OPEX Within existing operational budget for 2008/09 Capital Projects 2009/10 financial year. CAPEX 2009/10 R12 Million JMPD to engage with the Gauteng Department of Community Safety and SAPS Police stations not catered for in JMPD budget Patrols will form part of JMPD Operating budget Housing / Dept. of Education GDoH Dec 2009 Provincial subsidies Rgn Wd Issues C 71 C 83 To upgrade Davidsonville Parks by fencing around toilets and taps. To upgrade the clinic facilities and to extend these services to 24/7 basis. C 83 To form a CPF and a neighbourhood watch. JMPD C 84 To upgrade and enlarge the Rex Street Clinic. Health C 84 To train unemployed persons and to provide them with skills. Economic Development 355 Department/ME What/Action establishment completed Environmental Provision for funding Management to be made in the next Financial Year Health There is an extended hours evening clinic from 16-18h00 Each of the SAPS Each of the SAPS stations in Johannesburg has an established CPF (Legislative requirement). Communities should approach their local SAPS station for more details on active CPF participation and neighbourhood watch programmes. JMPD actively participates in CPF forums. Motivation for extension of clinic have been made to the COJ Health Department Skills Strategy Launched in Aug 2008. Establishing Skills Hub as a legal entity. Skills Hub will be delivery vehicle for all economic driven skills project and will be linked to satellite skills across all regions in consultation with Community Development. In addition public participation workshops will be part of the Skills Hub rollout. The approach in Skills Strategy is to be both Customer and demand driven. Four skills centers are servicing region C. However none of these are currently providing any training programmes currently. Last time training programmes were offered was in 2007 and focused on sewing. Currently only a sewing programme is being offered is for 20 aged Who/When What Resources JCP to submit request for funding to CIMS Region C Regional health manager R2 Million CAPEX & R200 000 OPEX Ward Safety Committee, SAPS, CPF Gauteng Health Department OPEX For payment of operational costs towards the additional service hours No budgetary implications Regional health manager for Region C Regional health manager OPEX R2 Million Roll out commences 2008/09. Skills Hub legal entity being established. In 2008/9 Skills Programme budget, R 7, 941 Million has been allocated for the CoJ Skills Hub. The current programmes that will be included in this budget include Phase II of the Labour Market Information Database, Phase II of the RPL Project and the establishment of the Skills Hub as a not-for gain Section 21 Company. Rgn Wd Issues Department/ME What/Action women. To institute traffic Transport Will investigate and interventions from Albert implement Street/Cornish to Haak en intervention as Steek to JG Strijdom, e.g. allowed for within traffic circuits/other. 08/09 budget. To identify a road reTransport Update Resurfacing surfacing programme. programme. C 89 C 89 C 89 C 100 C 100 To put up highly-needed street lights, especially in the non-formal settlements. ISD C 100 To acquire privatelyowned land for facilities. Housing C 101 To establish street patrols JMPD and police visibility. C 101 To establish traffic-control JRA mechanisms such as speed bumps. 356 To widen JG Strijdom Transport Drive from Jim Fouche to John Vorster Drive and Jim Fouche from Hendrik Potgieter to Beyers Naude. To create a one-stop Community centre in order to integrate Development all government services. Who/When What Resources JRA 2008/09 JRA 2008/09 R50 000 JRA 2008/09 and 2009/10 JRA Resurfacing programme OPEX 2008/09 and 2009/10 JRA 2008/09 Will investigateJRA 2008/09 Geometric upgrading. Project started; fencing & earthworks already completed. Process of appointing a contractor is underway. To install High Masts. 50 percent to be installed 2007/08 in formal settlement and Zandspruit X 2009-10 R1.1 Million Capital Projects 2008/09/10 Funding request made with NDPG & MIG CAPEX (R20 Million) City Power 2007/2008 2008/2009 As building of new health facilities is competency of Provincial Health Department this request has been forwarded to the Gauteng Health Department. Each of the SAPS Each of the SAPS stations in Johannesburg has an established CPF (Legislative requirement). Communities should approach their local SAPS station for more details on active CPF participation and neighbourhood watch programmes. JMPD actively participates in CPF forums. Will implement if identified as the priority one measure through the ward based road safety process; Speed humps to be included in the ward based safety programme. Region health manager for Region C and the Gauteng Health Department to motivate for inclusion into the next five years capital budget programme. MIG Funding and CAPEX Application in process for the final 50 percent R1.1 Million Business plans in place R2100 000 R7.5 Million JMPD, SAPS, Ward Safety Committee and CPF Immediate and ongoing CPF participation and community street patrols does not have budgetary implications for JMPD Visible patrols form part of JMPD Operating budget JRA 2008/09 JRA Ward based Safety Programme 2008/09 R25 000 per ward Rgn Wd C 101 C 101 C 101 C 101 C 101 357 Issues Department/ME What/Action To establish small garden Environmental To ensure areas and city parks. Management sustainability, sites to be fully investigated with proper environmental considerations taken care of. Community Development, DPUM, Environment, JCP and JPC to consider the matter and finalize the protocol. Meeting to discuss wider protocol for urban Agriculture to be facilitated by end June 2008 (Comm Dev and Environment)To ensure sustainability, sites to be fully investigated with proper environmental considerations taken care of. Community Development, DPUM, Environment, JCP and JPC to consider the matter and finalize the protocol. Meeting to discuss wider protocol for To maintain roads. JRA Will be donemaintenance programme. To upgrade roads, JRA Maintenance and pavements, road markings updating and demarcations as well Level one road as developing marking and traffic infrastructure and local signs are planned for storm water drainage. Ward 101. To encourage community JMPD Each of the SAPS participation in the CPF. Each of the SAPS stations in Johannesburg has an established CPF (Legislative requirement). Communities should approach their local SAPS station for more details on active CPF participation and neighbourhood watch programmes. JMPD actively participates in CPF forums. To trim trees City Parks Pruning of trees to be done before end of the year. Who/When Van der Hoven Park Depot will in consultation with the stakeholder identify and agree on the land to be used. What Resources Tractor to assist in ploughing. Fertilizer to be donated to community members. JRA 2008/09 JRA Maintenance Programme OPEX 2008/09 JRA OPEX 2008/09 R200 000 JRA 2008/09 SAPS, Ward Safety No budgetary Committee and CPF implications Teams from Street Trees Depot and Contractors Operating Budget REGION D Region D is strictly Soweto. The established areas of Region D are largely composed of the old "matchbox" houses built to provide cheap accommodation for Joburg's workers during the apartheid era. However, there are also large areas of informal settlements, the most extensive being in Doornkop /Thulani, Ebumnandini, Protea South, Chris Hani, Slovo Park and Freedom Square. Hostels, originally built to house male migrant workers in the most basic of circumstances, are a feature of Soweto. Many of these have been improved and now accommodate couples and families. However, with a history that did not allow the creation of major employment centres within Soweto, almost all its working people have to commute to work in other areas of Johannesburg. Urban Management Activities by Focus Area The section below outlines some of the key urban management interventions in the region by areas of focus. These interventions are summarised by key regional focus areas which identifies the areas of decay, key interventions required, law enforcement plans and clean up campaigns envisaged for the region, stakeholder engagement and visible service delivery plans. AREAS OF FOCUS Soweto WARD NUMBER 11, 12, 13, 14, 15, 16, 19, 20, 21, 22, 24, 25, 26, 27, 28, 29, 30, 31, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 45, 46, 47, 48, 51, 52 and 53 Addressing Urban Decay The regional administration focuses on train stations as regular sites of urban decay and focuses primarily on by-law enforcement particularly in terms of regular maintenance, illegal trading, environmental health, and live-stock management. Notably the stations targeted are Inhlanzane, Dube, Naledi, Orlando and Kliptown. In all these focus areas the administration continues to implement education. The regional administration also focuses council-owned facilities and land, particularly the removal of illegal taxi ranks, mainly in Jabulani, Naledi and Dobsonville, illegal dumping and regular land-use management largely in Meadowlands, Chiawelo and Pimville. In 2008/09 the administration demolished the decaying FNB building and fenced it to prevent further occupation and removed the illegal brick building next to the SAPS in Meadowlands. In 2008/09 all the industrial parks were investigated for upgrading. In 2009/10 the administration will be implanting the recommendations of the study and revamping all the industrial parks in the region. 009/10. In 2009/10 the administration will be auditing all council-owned facilities for land-use management and will address infringements as they arise. This year the JPC will be addressing the issue of under-utilised schools in Soweto. Law enforcement A variety of law enforcement campaigns have been put in place to address illegal car washes at Bara Taxi Rank, removal of a variety of illegal activities at the Kliptown precinct and Jabulani mall and the removal of illegal scrap yards. Illegal nightclubs have had their equipment confiscated and impounded. Informal traders will be regulated on a block-by-block basis in 2009/10. The city is in legal processes with illegal coal yards anticipating their removal in 2009/10. Stakeholder Management In 2008/09 the Soweto Urban Growth Forum, comprising representatives from different sectors in the community and in the city was established. In 2009/10 the region will conduct councillor briefing sessions on a variety of issues include street-renaming. 358 Clean Up and Greening Campaigns and Special Projects In Naledi, Moroka North and Protea specifically targeted illegal dumping campaigns will be conducted particularly using pocket/urban parks as an instrument. There are significant engagements with Eskom and Transnet to address maintenance and effective management of servitudes around train stations and power installations. After an audit in 2008/09 all the council open spaces will be cleaned through a programme implemented by Environmental management in the region. Mofolo and Jabavu Parks have now been declared as regional parks. In order to address transport in the region, the administration has compiled a proposal with Joburg Roads Agency to address intra and extra mobility. To add value to improved transport in the region, an audit of traffic signage requirements was undertaken in 2008/09 and the recommendations’ will be implemented in 2009/10. Furthermore the first phase of the Bara link project has been initiated and will be continued into 2009/10 funds allowing. The site has been cleared for the Orlando Ekhaya project and will commence in February 2009. Visible Service Delivery The Dobsonville and Ikhwezi precincts have received Phase 1 approval and are awaiting budget allocations in 2009/10. As an extension of the commitment to a community park in Moletsane the stand at 846 and 847 in Moete Street has gone through preliminary planning and will be fully completed in 2009/10. Six urban inspections were undertaken with ward representatives. Sub-Area 7 recently received the additional capacity of a service delivery officer. Region- Wide Capex Project The table below lists the proposed City of Johannesburg region-wide projects to be implemented department or Municipal Entity (ME). Project Description Skills Development Centres GK: Aerators, mixers, Mod 3 GK: Sludge dams empty/line Operation Gcin amanzi Public Lighting. Soweto Klipspruit River greening throughout Soweto Ward Region wide Region wide (89-98) Region wide (89-98) Region wide Region wide Region wide (D) Department/ME Community Development Johannesburg Water Johannesburg Water Johannesburg Water City Power 2010 2009/10 Budget R 600,000 R 6,710,000 R 1,200,000 R 200,000,000 R 9,500,000 R 40,000,000 CITY OF JOHANNESBURG CAPEX PROJECTS- 2009/10 The table below lists the proposed City of Johannesburg projects to be implemented in each region, by ward and by department or Municipality Entity (ME). It also outlines the proposed budget of CoJ funding and a total amount including external funding. Project Description (2010) Orlando Stadium Precinct Dobsonville Stadium Precinct Greening of undeveloped soccer fields in Soweto (2010) Orlando Stadium Precinct DF: Conc lining to overflow dam NW: New PSTs Unit 3 Phase 2 Ward 39 48 52 39 43 24 REG E: Bushkoppies Phase 1 Basin: Upgrade Sewers 23 359 Department/ME Community Development Community Development Community Development Community Development Johannesburg Water (JW Johannesburg Water Johannesburg Water Johannesburg Water 2009/10 Budget R 54,143,640 R 25,796,782 R 8,000,000 R 54,143,640 R 3,750,000 R 16,655,000 R 6,000,000 REG E: Decommission Klipspruit Relief outfall sewer REG E: Districts west of Soweto: Upgrade water infrastructure Phase 2 REG E: Planned Replacement: Sewers REG E: Planned Replacement: Watermains REG E: SW Basin: Upgrade sewers Baralink(Motsoaledi) Doornkop (Green Village)-Construction of Bridges, Bulk Water Sewer, Roads & Stormwater Kliptown combined Thulani Infill Retention Ponds Tshepisong Proper – Stormwater Tshepisong West – Water Supply Main and Reservoir Klipspruit Hostel Lawley Ext 3 (Road and Storm water bridge culvert) Old Age Homes BIR. Orlando. Replace 88 kV breakers. Electrification. Sol - Plaatjie Public lighting. Dobsonville. BRT Station Precincts in Soweto (Precinct Development on Main Routes) Need to apply for NDPG funding High Streets: Vilikazi (Linking Vilakazi Street to Streets of Heritage Significance - Tourist Route) Jabulani & Jabavu Regional Park (Development) Orlando Wetlands Park Parks Development and Upgrade in Orlando Gardens Soccer City Precint Klipspruit Staff Hostel Redevelopment/conversion Orlando Ekhaya Staff Hostel Redevelopment Orlando eKhaya Link Services 23 Johannesburg Water R 6,500,000 23 Johannesburg Water R 3,000,000 23 23 23 24 14-15 Johannesburg Water Johannesburg Water Johannesburg Water Housing Division Housing Division R 5,000,000 R 10,000,000 R 10,000,000 R 38,325,000 R 30,000,000 37-18 13 49 49 Housing Division Housing Division Housing Division Housing Division R 16,665,299 R 3,920,000 R 1,000,000 R 4,239,423 11 7 Housing Division Housing Division R 10,000,000 R 3,285,000 7 24 46 47 37 Housing Division City Power City Power City Power Johannesburg Development Agency R 2,000,000 R 10,000,000 R 5,000,000 R 4,000,000 R 45,000,000 38 Johannesburg Development Agency Johannesburg City Parks Johannesburg City Parks Johannesburg City Parks R 46,000,000 R 50,000,000 R 36,800,000 R 12,000,000 R 1,000,000 Soweto Empowerment Zone 24 Property boomshare (land purchasing - Soweto) 36 2010 JOSHCO JOSHCO Johannesburg Property Company Department of Economic Development Johannesburg Property Company 34 39 39 24 11 39 39 R 5,000,000 R 4,500,000 R 1,000,000 R 15,000,000 R 1,000,000 WARD ISSUES BY REGION The table below portrays ward issues identified by each ward, departments or ME’s responsible, action required, time frame and allocated resources. Rgn Wd Issues D 11 D 11 360 Department/ME What/Action To construct a pedestrian Transport bridge at Thabuzi and Fox Glove Roads near the railway line (K43 road). The bridge will ensure greater road safety and alleviate traffic congestion. It will also create jobs as flea markets emerge near bride crossings A skills development Economic programme to be Development administered by the municipality which will look beyond skills development. The programme will ensure an orderly administration for Who/When What Resources Conduct feasibility study. JRA 2009/10 JRA CAPEX 2009/10 R150 000 The Skills Hub will be targeting both training and placement. In addition it will include business skills support and target survivalist businesses. Roll out of Skills DED 2008/09 Hub will be July 2008. SME Development Rgn Wd Issues Department/ME What/Action Who/When What Resources JRA 2008/09 JRA Stormwater Master planning CAPEX 2008/09 R2 Million per year skilling people and then, at a later stage, of creating jobs. Transport To build a storm water drainage system in extensions 4 and 2 as well as to maintain it. This will mitigate flooding damage to roads and houses. To construct a Housing development at Butt Hut Club House, No 989 Chiawelo. D 11 D 11 D 11 To green the soccer field Community between Kubhayi & Wisani Development Streets D 11 To relocate Heavenly DPUM Valley Informal Settlement in Klipspruit West D 11 To construct an MPCC to Community improve convenience, and Development easy access to services. D 12 To establish of grassTransport cutting and to establish storm water drains; the former will aid in crime prevention and the latter will aid in the prevention of flooding and soil erosion. D 12 To erect street lights for all City Power the streets without lights. 361 Project is included in the Stormwater Master planning project submitted for approval in the 2009/10 CAPEX Budget cycle. Ward 11 also requested an MPCC to improve convenience and access to services. In terms of that, Comm Dev will do a Scoping and Feasibility Exercise in 2008/09, whose Terms of Reference will then be extended to include the requested development at Butt Hut Scoping of the site will be done in 2008/09 The work to determine whether informal settlements should be formalized in situ or relocated is managed by Housing. Request is noted for consideration in conjunction with Ward 12’s request or a sports complex and a park to ensure resource-sharing between wards. A parallel process to run to identify land and ascertain zoning status Community Development (Capital Projects, and Sport and Recreation directorates) Community Development (Capital Projects) DPUM Community Development (Capital Projects) As part of the Executive Mayor’s legacy projects, identified sites will be upgraded To be implemented after investigation After a spatial development plan has been consulted and the permission to build on this site has been confirmed with relevant departments, external funding possibilities will be explored, about R20 Million. Designated Public open JRA Existing OPEX and spaces are maintained 2009/10/11Maint CAPEX according to Monthly enance schedule Schedules: are in place. For Flagship Parks - 7 day grass cutting. cycles Developed parks – 14 JRA to day cycles investigate storm Undeveloped Parks – water 30 day cycles Sidewalks – 30 day cycles Main Arterials – 14 to 21 day cycles Islands – 30 day cycles Maintenance of street City Power on- Operational budget light going Rgn Wd Issues D 12 D 12 D 12 D 12 D 12 D 12 D 12 D 12 D 12 362 Department/ME What/Action To construct a sports City Parks complex and to develop parks. This will prevent the youth from engaging in crime and unwanted activities. No area was specified. A suitable place needs to be found by Council. To create storm water JRA drains in all streets that are prone to flooding. To construct a sports Community complex and to develop Development parks. This will prevent the youth from engaging in crime and unwanted activities. No area was specified. A suitable place needs to be found by Council. To develop bus shelters JRA for busses at Chiawelo Station. To create Parks at City Parks Chiawelo Erf 2539, Potch. Road & Mhlaba Drive, and Erf 6513 Tsianda & Rita Streets. To green sports grounds Community and other facilities at Development Upper Vuwani Secondary School (land is available). To maintain street lights Transport and roads with a view to preventing crime and accidents. This is general throughout the ward. To maintain street lights City Power and roads with a view to preventing crime and accidents. This is general throughout the ward. JRA To establish commuter shelters (bus stop shelters) which will assist commuters during the rainy season. Protea South multipurpose hall including a sports field was developed in 2006/07. Chiawelo Recreation hall was upgraded within 2006/07 financial year Who/When What Resources Capital projects R15 million was spent on Protea South Multipurpose, fields, Chiawelo fields Project is included in the JRA Stormwater Upgrades in 2009/10 Protea Glen Exts 1 to 4 project submitted for approval in the 2009-10 CAPEX Budget cycle. Protea South Capital projects multipurpose hall including a sports field was developed in 2006/07. Chiawelo recreation hall was upgraded within 2006/07 financial year Use the City’s shelter contract project to provide shelters as needed. Transportation Planning and Regulation. This should be done during 2008/09 Financial year Fundudzi Park in Chiawello is currently being upgraded. JCP 2009/10 Budget R5 Million CAPEX R15 Million was spent on Protea South Multipurpose, fields, Chiawelo fields This project does not need financing from the City because any service provider appointed as part of this project / contract is required to upgrade shelters in different communities. Budget available in 2008/09 financial year Land zoning status first Community to be confirmed Development (Capital Projects) is in the process of doing a scoping exercise in Soweto Implement road JRA 2008/09 maintenance programme. An operating budget will be available for the scooping exercise Street light Maintenance City Power on(Chiawello) going Operational budget Use the City’s shelter contract project to provide shelters as needed This project does not need financing from the City because any service provider appointed as part of this project/contract is required to upgrade shelters in different communities Transportation Planning and Regulation. This should be done during 2008/09 Financial year JRA Road Maintenance Programme OPEX 2008/09 Rgn Wd Issues D 12 To establish commuter Transport shelters (bus stop shelters) which will assist commuters during the rainy season. D 13 D 13 D 13 D 14 To construct a multipurpose community and sports centre so as to encourage youth engagement in different activities and the community at large. To establish storm water drainage and sidewalks. This is needed as currently there is inadequate infrastructure and there is flooding into houses. This is general throughout the ward. To construct street lights and traffic lights so as to assist in avoiding accidents and combating crime. To establish a recycling centre as this will assist in creating a healthy environment, managing open spaces and poverty alleviation. D 14 To establish sporting Community facilities throughout the Development ward in order to keep the youth active and away from drugs. This is general throughout the ward. D 15 Community Development D 15 To extend the Phiri community hall as it is used by a large number of people. A multi-purpose sports centre as there is the land available for this and there is only one stadium in the ward. D 15 Paving the sidewalks of Manotsi Street and Khanya Street, which has many obstructions, as these streets are busy. 363 Department/ME What/Action Who/When What Resources Use the City’s shelter contract project to provide shelters as needed. Transportation Planning and Regulation. 2008/09 Community Development Considered in priority list within Braamfischerville. JRA 2008/09 This project does not need financing from the City because any service provider appointed as part of this project/contract is required to upgrade shelters in different communities JRA CAPEX 2008/09 Transport Project is included in the JRA 2009/10 Stormwater Upgrades in Protea Glen Exts 1 to 4 project submitted for approval in the 2009/10 CAPEX Budget cycle. JRA CAPEX 2009/10 R5 Million ISD Installation of street lights through out the ward (Protea Glen) Capital budget or MIG R9500 000 Environmental Management Feasibility study will be undertaken with a view to establish a site for 2008/09 financial year City Power 2009\2010 Environmental Management in consultation with Pikitup and Private sector Region D will be further shall facilitate engaged for this project the execution of to get more information. the project from July 2008. Naledi Ext 2 has a Capital projects sports centre including a sports hall, two multipurpose courts and a soccer field. A recreation street/zone is considered for 2008/09 Scoping and designs in progress Facility can not be Capital Projects extended beyond existing capacity CAPEX and Human Resources will be deployed to this project in 2008/09 Financial year 2009/10 Budget requested to upgrade the facility Community Development The Spatial Development Plan will be consulted, and external funding possibility explored. Community Development (Capital Projects) Provincial Funding Preliminary operating budget for the related administrative processes Transport Implementation of sidewalks/footways programme. JRA Manotsi: JRA CAPEX 2007/08 Khanya: Sidewalks / Footways 2008/09 Programme 2008/09 Recreation Street to be developed CAPEX R200 000 Rgn Wd Issues D 16 D 16 D 16 D 16 D 19 D 19 D 20 364 Department/ME What/Action To install street lights on ISD streets such as Thobejane Street, Mohlaba Street, Thulane Street and Mokoena Street. This will increase safety as well as the attractiveness of the ward. In terms of infrastructure to Transport provide storm water drains in order to mitigate flooding. To promote the improvement of sidewalks along Mphahlele Street, Masiane Street, Power Street and Matheatsie Street with a view to promoting the protection of tarred roads, the beautification of the ward and the development of clearly-defined pedestrian walkways. To revamp multipurpose skills centres, e.g. Butt House and Protea People’s Centre (which is a police barracks). In addition, these centres will provide youth empowerment by equipping the youth with computer skills, call centre skills and entrepreneurial s Need for sporting and recreational facilities in Camps 1, 2 and 3 (Chiawelo) as there are no facilities currently. A skills centre to improve literacy and reduce crime. It is possible to use the old Vista Campus as a venue for the programme. Transport Installation of street lights on requested streets. (Mapetla) Who/When What Resources City Power 2009/10 Capital budget or MIG R1.2 Million Project is included in the JRA 2009/10/11 Stormwater Master planning project submitted for approval in the 2009/10 CAPEX Budget cycle. JRA 2009/10 Will be considered in the sidewalks footways programme JRA CAPEX 2009/10/11 R2 Million per year JRA CAPEX Sidewalks/ Footways Programme 2009/10 Economic Development Site 3388 in Mapetla is Capital Projects Internal CAPEX R2 part of the Mayoral 2008/09 Million Grassing Project targeted for development in 2008/09 Community Development Com Dev. Developed soccer fields in Senaone & Dlamini as part of Mayoral grassing project in 06 – 2008 Skills Strategy Launched in Aug 2008. Establishing Skills Hub as a legal entity. Skills Hub will be delivery vehicle for all economic driven skills project and will be linked to satellite skills across all regions in consultation with Community Development Economic Development The resurfacing of roads in Transport Naledi Ext and the installation of kerbs as the present tar roads have disintegrated due to poor workmanship and the use of inferior materials. This resurfacing and installation Resurfacing Programme- Update proposal. Capital Projects R 700 000 was spent 2008/09 on grassing 2008/09 Roll out of Skills Hub started July 2008. Skills Hub legal entity being established. Planning is currently underway to map out specific SMME programmes that are Sowetobased that could be jointly offered by the COJ and the university of UJ. JRA 2009/10 2008-09 DED Note: Funding and management of skills centres is the responsibility of CommDev. However, as part of an integrated Skills Strategy roll-out, DED is targeting the provision of skills services in city-based institutions such as skills centers a JRA Resurfacing Programme OPEX 2009/10 Rgn Wd Issues Department/ME What/Action Who/When What Resources of new kerbs will serve to eradicate the flooding D 20 D 20 D 21 D A bridge connecting Naledi and Protea stretching from Modutuna into Protea. This will alleviate the traffic from Koma Road, stimulate economic opportunities, ensure the safety of pedestrians, improve accessibility and will also have a benefit for the surrounding areas. The improvement of community facilities, e.g. 2 soccer fields and a butt hut as the current facilities have been vandalised, are in very poor condition and are not well-maintained. This improvement will also serve to cater for different sporting codes. To establish a library as there is a high illiteracy rate. Transport Investigation on the JRA 2008/09 bridge completed in 2007/08. Will consult with the Metro-Rail to implement the project 2008/09. Project is included in the 2009/10 CAPEX Budget Cycle for approval. Community Development Naledi Butt Hut prioritised for 2008/09; A process to develop one recreation zone in Naledi is underway Capital Projects CIMS CAPEX R1.5 2008/09 Million Community Development It is close to Phiri Library and this facility can be easily shared. It is less than 5km from Naledi 21 To promote the industrial Economic area as this will provide job Development opportunities and the economic development of SMMEs. A Dedicated Business Industrial Park will be developed called the Soweto Empowerment Zone Ward Councillor and Regional Officials to assist by also making community aware of what is available Special Projects 2008-09 DED D 21 To rezone the open space, Environmental which is currently being Management used for public meetings, for a community hall. The open space does not have a specific name. D 21 D 22 To establish a community Community hall as currently there is no Development hall in the ward and public meetings are held in an open space. To extend Pimville clinic as Health this area is overpopulated with no maternity ward and no x-ray facilities. Keep the existing parkland for future development due to the shortage of park stands in Moletsane and Tladi. Investigate other unused or vacant stands to develop a community hall. Prioritised for 2008/09 Capital Projects CIMS CAPEX 2008/09 2008/09 R5 Million 365 Minor upgrades undertaken in 2006/7. Maternity ward and xray services cannot be added to the clinic as these services are provided by a community health centre. Regional health manager for Region D JRA CAPEX 2008/09 JRA 2009/10 R1 Million Regional health manager OPEX R 500 000 Rgn Wd Issues D 22 D 22 D 24 D 24 D 24 To construct a cultural Economic village that is a “one-stop- Development shop”. This will empower people, promote job creation as well as the GDP. D 24 D 25 D 25 To construct a multipurpose centre. This will keep our youth off the streets, it will empower the community and will promote access for the aged. To upgrade the Michael Maponya clinic by adding a backup generator, labour ward, x-ray unit, extending antenatal care. This will allow people to travel long distances for other services – this is already on the IDP. To upgrade parks ( erf 2271, 9194, 11/768/64, 1066, 1094, 1095, 1100, 1295 and 1099). This will enhance children’s safety 366 Department/ME What/Action To create an industrial site Economic (stand 11168) which will Development lead to economic development, making the ward self-sustainable with job creation, opportunities and skills development. To pave as well as install Transport storm water pipes in RDP houses in Pimville Zone 9. This is necessary as the roads become ruined after flooding. To construct a bridge over Transport the N12. This will link Namkena and Devland which will promote accessibility and fencing will promote safety. Multipurpose Centre. Community (One-stop shop). Development A dedicated business and industrial park has been developed called the Soweto Empowerment Zone in Soweto. ACH to investigate local skills within the community and develop appropriate creative industries strategies based on available skills and resources eg, Music, Crafts development Feasibility has to be determined. Work with other stakeholders. Project can be done once funding is approved. External funding to be explored. Health Minor upgrades undertaken in 2006/7. Maternity ward and xray services cannot be added to the clinic as these services are provided by a community health centre. Provision for funding to be made in the next Financial Year What Resources Special Projects DED 2008-09 Firstly will investigate if JRA 2009/10/11 the roads have been taken over by JRA and implement on the prioritised roads. Secondly we will include this in our planned stormwater upgrading programme. Project is also included in the Stormwater Master planning project submitted in the 2009/10 CAPEX Budget Cycle. Engage with SANRAL SANRAL to determine 2009/10 programme time lines. Community Development City Parks Who/When JRA Stormwater Master planning 2009/10/11 R2 Million per year SANRAL CAPEX 2009/10 R200 000 ACH 2008/09 Proposal can be tabled at 2008 Dec budget review. If funding is approved rollout can commence 2009/10 Community Development Regional health manager for Region D To be requested once studies are complete. MTC Funding to be identified for consultancy fees Regional health manager OPEX R 500 000 JCP to submit R3 Million CAPEX & request for R300 000 OPEX funding to CIMS Rgn Wd Issues Department/ME What/Action Who/When What Resources Responsibility of Arts and Culture, Johannesburg Social Development Arts and Culture and Social Development. and family gatherings D 25 To implement a flea market, museum, curio shops, a monument, a theatre, a Jazz bar and gallery in the Enoch Sontonga Theatre and Cultural Village. This will create an attraction for tourists, preserve the nature of Enoch Sontonga’s name and create jobs Economic Development D 26 To have a cultural stream between zones 5 and 6, Diepkloof. This will create jobs and revive our culture. Economic Development D 26 To have a cultural stream between zones 5 and 6, Diepkloof. This will create jobs and revive our culture. Community Development D 26 To construct a skills Economic development centre at Development zone 3, Diepkloof with ongoing programmes in association with different departments. This will empower the SMMEs and give them training. 367 These need to be done in collaboration with the Johannesburg Arts and Culture, and Social Development. The project is viable providing that funds exist for the implementation of such a project. A sustainable management entity will need to be established with annual operating funds for this project to succeed, i.e. Capital and Operational expenditure. These need to be done in collaboration with the Johannesburg Arts and Culture, and Social Development. The project is viable providing that funds exist for the implementation of such a project. A sustainable management entity will need to be established with annual operating funds for this project to succeed, i.e. Capital and Operational expenditure Further investigation required as to what is meant by a ‘cultural stream’ and where this is meant to be located. Responsibility of Arts and Culture, Johannesburg Social Development Arts and Culture and Social Development Community To be established Development, ACH will deploy a staff member to undertake further investigation. 2008/09 DED Implementing an Responsibility integrated skills strategy shared between with a skills hub as a Community and delivery vehicle for all Economic economic driven skills Development project. Skills Hub will Departments. be linked to satellite Economic skills across all regions Development in consultation with plans for a Roll Community out to Development. In commences addition public part 2008/09. SME Community Development will ensure that the Diepkloof Welfare Centre in Zone is upgraded to include a component of Rgn Wd Issues Department/ME What/Action Who/When What Resources the skills centre D 26 To institute a sports Community complex at zone 6, Development Diepkloof. This will keep children off the street and help them to develop their talents, keep them away from crime and prepare them for 2010. D 27 To engage with public works in order to contribute to people acquiring skills. EPWP D 27 Community Development D 28 To build a sports complex to help in the development of sport in the community. The development and maintenance of public places, such as parks with an emphasis on installation of high mast lights, will minimise crime. To develop stalls in the area next to the welfare centre as this will keep the area tidy, Ramapulane and Sono Road (Erf 12081) D 28 To pave sidewalks on Beyers Naude Drive. Transport D 28 To plant trees and grass, City Parks and to develop a park development on Jack Lipen Dr. and Martinus Dr. 368 Economic Development Will do a business plan for the area, ito needs, land availability and previous spatial planning. An extensive strategy will be put in place to solicit external funding. Will include the item for consideration in 2010/11 financial year’s planning cycle This is already been done on a weekly basis – Reports submitted to Public Works Community Development This responsibility is shared between Community and Economic Development Departments. This is already being done by Economic Development on a weekly basis – Reports submitted to Public Works Stand 15428 was Capital Projects developed & completed 2007/08 in June 2008 as part of Mayoral grassing project. There is a There is a Demarcation Policy Programme in line with Informal Trade Policy approved by council. An area assessment will be carried out to determine suitability of the area in line with by-laws. The traders will then be issued with smart cards. This work is being done in partnership with other departments and ME’s. Beyond N1- Built as Provincial Road. Engage Gautrans. Park Development: City Parks to get the necessary funding. Tree Planting City Parks will identify where in Ward 28 the trees are needed and plan on receipt of information R2 Million No new/additional resources required Internal R1 Million MTC and other Departments 2008/09 MTC Gautrans 2008/09 Gautrans OPEX 2008/09 Park R2 Million CAPEX & Development: R200 000 OPEX JCP will apply for funding in the next Financial Year To be addressed in the 2009/10 financial year Rgn Wd Issues D 29 To make Diepkloof a “one- Economic stop-shop” for skills Development training and development (Vacant land formerly Mandela Village) and to close the school at Lebowa. This will aid in skills development, job creation as well as establishing a satellite for the DTI, Umsobomvu D 29 D 29 D 29 To develop the vacant land formerly known as Mandela Village Settlement so as to make Diepkloof a "one-stopshop". This is necessary as, at the moment, illegal dumping is prevalent, and the area is a haven for criminals and illegal squatting. To upgrade and expand Noordgesig Clinic. This is necessary due to the fact that the population is growing and the Antenatal Clinic (ANC) has been introduced. To make Diepkloof a “onestop-shop” for skills training and development (Vacant land formerly Mandela Village) and to close the school at Lebowa. This will aid in skills development, job creation as well as establishing a satellite for the DTI, Umsobomvu D 30 369 Department/ME What/Action Who/When What Resources Implementing an integrated skills strategy with a skills hub as a delivery vehicle for all economic driven skills project. Skills Hub will be linked to satellite skills across all regions in consultation with Community Development. In addition public part The Mayoral Committee has approved the Skills Hub. Skills Strategy launched 2008. Roll out of Skills Services is from 2008/09 onwards with budget approval. DPUM To be investigated DPUM 2008/09 DED Note: Funding and management of skills centres is the responsibility of Comm Dev. However, as part of an integrated Skills Strategy roll-out, DED is targeting the provision of skills services in city-based institutions such as skills centres Determined after investigation Health Plans for extension of clinic have been discussed with the Gauteng health department and included in the 5 year capex plan Skills Hub is being established and will service skills needs of all regions. This will be done in consultation with Community Development Regional health Regional health manager Region manager OPEX R3 D Million Community Development To institute a high-density DPUM housing project. There is a shortage of houses and there is land available between Diepkloof and Orlando. There is a BRT route running through this area, The areas along the BRT route are earmarked for densification and detailed investigations Responsibility shared with Community and Economic Development. Economic Development leading the project: The Skills Hub Project will be considered by the Mayoral Committee by 5th June 2008. Roll out of Skills Services is from 2008/09 onwards with budget approval. Community Development will utilise available space within the Diepkloof Welfare Centre to build additional rooms for the proposed Director - DPF 01/06/2009 Skills Hub is being established and will service skills needs of all regions. This will be done in consultation and resource sharing with Community Development. The budget is estimated at R200 000 in 2008/09 Departmental OPEX Rgn Wd Issues Department/ME What/Action Who/When What Resources Hostel redevelopment is being implemented by JOSHCO. First phase starting in 10 - 2008. 102 units (50 units to be completed by 06 - 2009, remainder by 09 2009), 164 units to be constructed in the 2009/10 Water /Sewer is available in the vicinity. JPC and JOSHCO JPC and JOSHCO OPEX 2008/09 budget available Installation of Street lights can be erected around Rietz Circle (Orlando) if funding is made available. Master Plan in process to identify all dark areas (Meadowlands). Water /Sewer is available in the vicinity. Project is included in the Stormwater Master planning project submitted for approval in the 2009/10 CAPEX Budget cycle. City power Capital MIG Funding 2009/2010 and capex phased over the R5 100 000 next 3 financial years will have to be undertaken D 30 To institute a high- density Housing housing project. There is a shortage of houses and there is land available between Diepkloof and Orlando. D 30 D 30 To establish a 2010 legacy City Parks project, streetlights and robots (Rietz Circle). Facilities will be built and these improvements will also reduce crime and accidents. To establish a 2010 legacy City Power project, streetlights and robots (Rietz Circle). Facilities will be built and these improvements will also reduce crime and accidents. D 30 D 31 D 31 To upgrade infrastructure: sewer systems; stormwater systems; street kerbs and paving. These are necessary are there are constant blockages and there is a need to improve pedestrian movement. This is a general comment throughout the ward. Installing and regularly maintaining storm water drainage systems in Toukobong, Masuphast, Rathebe and Mokoenas will stop the flooding of the ward and the possible health threat this provides Upgrading No 2 Sports Ground between Thibedi and Jolobe streets will create a multi-purpose sports centre for the community JRA JRA 2009/10/11 JRA Stormwater Master planning 2009/10/11 R2 Million per year Transport Project is included in the JRA Stormwater Master planning project submitted for approval in the 2009-10 CAPEX Budget cycle 2009/10/11 Budget R 2 Million per year Community Development Will do a business plan Community for the area, ito specific Development needs, land zoning and previous spatial planning. An extensive strategy will be put in place to solicit external funding. To be implemented after business plan has been approved. Will include the item for consideration in the 2008/09 financial year’s planning 370 City Parks City Parks needs to As soon as their apply for connections. plans are available. Rgn Wd Issues D 31 D 33 D 33 D 33 D 34 D 34 D 34 D 35 D 35 371 Department/ME What/Action Erecting social housing by Housing COJ in the open space between Orlando and Diepkloof will address the housing backlog Storm water drainage and Transport side walks to reduce the floods and to ensure that pedestrians can walk safely. Street lights or high mast lights in order to reduce crime. To stop illegal dumping in the parks. This happens primarily in open spaces that have not been formalised City Power Investigate flooding and revert to local community on possible ways to mitigate To promote the connectivity from Jabulani Mall to Molapo; to install infrastructure (i.e. storm water drainage) in the whole of Molapo and Moroka North for the library with a view to mitigating the flooding from the mall into households. To promote the improvement of sidewalks along Mphahlele Street, Masiane Street, Power Street and Matheatsie Street with a view to promoting the protection of tarred roads, the beautification of the ward and the development of clearly-defined pedestrian walkways. To construct street lights at the soccer fields as well as change rooms. To purchase body building equipment. To install a swimming pool heating system. To repair street lights in: Mphuti Street, Diokane Street, Legau Mathabathe Street, Nkosi Street, Shabangu Street, Mlangeni Street, Nkopo Avenue, Klaas Street, Getile Street, Mlangeni Street, Letabe Street, Mbatha Street, Makapane Street, Mavi Street, Transport JMPD Who/When What Resources JOSHCO will be developing rental stock in Orlando Ekhaya. JOSHCO To be determined Project is included in the Stormwater Master planning project submitted for approval in the 2009/10 CAPEX Budget cycle. Installation of street lights through out the ward (Moroka) JMPD and City Parks launched a Parks Safety team in the 2007/08 financial year. The joint team is responsible for ensuring safety and law enforcement in parks and public open spaces. Prioritize flooding areasuse approved limited budget. JRA 2009/10/11 JRA Stormwater Master planning 2009/10/11 R2 Million per year City Power 2009/10 Capital budget or MIG R1.7 Million JMPD and City Parks Already in place and ongoing JMPD and City Parks joint task team Part of JMPD and City Parks Operating budgets JRA 2008/09 JRA OPEX 2008/09 JRA 2008/09 JRA K43 CAPEX 2008/09 R44 Million JRA K43- Committed CAPEX programme. Transport Project is included in the JRA 2009/10/11 Stormwater Master planning project submitted for approval in the 2009/10 CAPEX Budget cycle. JRA Stormwater Master planning 2009/10/11 R2 Million per year City Power City power not responsible to install lighting in soccer fields City Power and Community Development Issue to be dealt with incorporation with Community Development Department JRA Maintenance of street lights City Power Included in 2008/09 Operational budget Rgn Wd Issues Department/ME What/Action Who/When What Resources Maintenance schedule are in place. Environmental Health to verify land ownership Existing Opex Majoeng Street, Danny Kekana Street. D 35 D 35 D 35 D 36 D 36 D 36 D 36 372 To institute grass-cutting in City Parks the following areas: Next to Jabavu Clinic, The Old Post Office, Diokane Street, Club 707 in Tumahole Street, Crutse and Mosia Street, Makapane Street next to the African Gospel Church. To construct high mast lights inside Jabavu Clinic; Jabavu Library (Mlangeni Street); Lutheran Church (Pule Street); Tumahole Street and Oppenheimer Towers. To develop parks in the following areas: Next to Makapan and Ntsane Street, Diokane Street opposite Adelaide Tambo School, Tumahole Street next to Club 707. To construct storm water drainage on Nxumalo Street, Kinini Street, Zulu Street and Roodepoort Road. This needs to be done in an effort in prevent flooding. To rehabilitate the golf course (Mshenguville informal settlement). This is necessary as crime is high, the usage of this facility needs to be promoted and the wetlands and stream need to be rehabilitated. To institute traffic-calming mechanisms in the following streets: Kinini/Machava; Zulu; Street/Machava; Machava Drive (next to Tsietsi Mashinini School). This needs to be done as the accident rate is high. To rehabilitate the golf course (Mshenguville informal settlement). This is necessary as crime is high, the usage of this facility needs to be promoted and the wetlands and stream need City Power Designated Public open spaces are maintained according to Monthly Schedules: Flagship Parks - 7 day cycles Developed parks – 14 day cycles Undeveloped Parks – 30 day cycles Sidewalks – 30 day cycles Main Arterials – 14 to 21 day cycles Islands – 30 day c Installation of City power streetlights on 2009/10 requested streets Capital and/or operational budget R1.2 Million City Parks Provision for funding to be made in the next Financial Year Transport Project is included in the JRA 2009/10/11 Stormwater Master planning project submitted for approval in the 2009/10 CAPEX Budget cycle. Community Development Department will conduct Capital Projects CAPEX R20 Million a feasibility study before 2008/09 03 –2009 and will make necessary funding applications Transport Will implement if JRA 2008/09 identified as the priority one measure through the ward based road safety process; Traffic calming will be included in the ward based safety programme. JRA 2008/09 R 25 000 per ward City Parks Mshenguville prioritized and covered as part of the Klipriver/Klipspruit Greening and Rehabilitation Project City will also undertake a clean up campaign with local residents and Community Development: R150 000 required to kickstart the process JCP to submit R2 Million CAPEX & request for R200 000 OPEX funding to CIMS Community Development, City Parks and DPUM JRA Stormwater Master planning 2009/10/11 R2 Million per year City Parks: City Parks: Kliprivier/ Environment & Klipspruit budget as JCP as informed it’s made available Rgn Wd Issues Department/ME What/Action to be rehabilitated. Who/When D 37 To develop the community Community hall - Klipspruit extension. Development schools, aligned with Environment themed day. Feasibility study to be done in 2008/09 D 37 D 37 To rehabilitate Jabavu Stadium in White City To develop the Community Centre in Dlamini Community Development Community Development The Soweto Theatre to be built on this site. This request has been completed Community Development Completed D 37 JRA To be investigated Transport: JRA D 38 To rehabilitate and install storm water drainage in the whole ward. To implement a storm water drainage system D 38 D 38 D 39 373 What Resources by availability of through internal and funding external processes Community Development Funding to be sourced after feasibility study Budget to be identified after investigation Transport Project is included in the JRA 2009/10/11 JRA Stormwater Master planning Stormwater Master planning project 2009/10/11 R2 Million submitted for approval per year in the 2009/10 CAPEX Budget cycle. To have public toilets next Corporate and This request has been C&SS Facilities C&SS Facilities Management to, and around the post Management Shared Services investigated and CAPEX 2008/09 office. allocated for action during the 2008/09 Allocated as one Dependency: financial year. Budget of the five public availability of space and finance provision exists. facilities that R300 - R400 000 Matter was investigated FMM plan to and it was determined build during the Dependency: that space is available 2008/09 financial ownership of the year property on Council property. The matter is currently being addressed with Johannesburg Property Company to facilitate conclusion in order to start the development process Environmental Provision for funding to JCP to submit R1 Million CAPEX & To have open spaces be made in the next request for R100 000 OPEX turned into parks in order Management Financial Year for park funding to CIMS to create employment or to extend the Phefeni issues Community Centre To promote safety with a JMPD Each of the SAPS Each JMPD, SAPS, CPF participation and community street strong CPF focusing on of the SAPS stations in Ward Safety community and Johannesburg has an Committee and patrols does not have assessment via the established CPF CPF. Immediate budgetary implications for enforcement of by-laws (Legislative and ongoing JMPD Visible patrols through workshop requirement). form part of JMPD campaigns. Communities should Operating budget approach their local SAPS station for more details on active CPF participation and neighbourhood watch programmes. JMPD actively participates in CPF forums. JMPD is in the process of reviewing its deployment strategies to ensure better visibility and improve response to incidences of reported crime and traffic related matters. A ward based deployment approach is envisaged that will enable the JMPD to Rgn Wd Issues Department/ME What/Action Who/When What Resources DED. In progress 2008/09 DED Economic Development; Community Development’s ACH staff deployed to undertake further investigation Resource needs yet to be determined engage more actively with communities through Ward Safety Committees and CPFs. D 39 To foster business opportunities via a global exchange programme which will revitalise the Industrial Park D 39 Johannesburg To foster a focus on heritage and tourism with Tourism workshops to create business opportunities and organise trips that are informative. D 39 To foster a focus on Economic heritage and tourism with Development workshops to create business opportunities and organise trips that are informative. D 39 To focus on women and youth development with a focus on skills development including sports and art and culture programmes. 374 Economic Development Community Development Projects are being drawn up and packaged to and promoted as attractive investment opportunities to both the domestic and international investors with emphasis on job creation, skills transfer, and overall increased and sustainable economic growth and development. Community Development will undertake further investigation into the nature of the group, their existing skills, needs and potential Economic Development already being done on a quarterly basis. Workshop held in March 2008. ‘Job Creation Road Tours and Side Shows’ being done. Further engagements with Johannesburg Tourism will be entered into. Being done on a quarterly basis. On 26 March 2008 a workshop was held with regard to this. Road shows are being carried out to demonstrate what is being done, i.e. job creation. Engaging with Johannesburg Tourism Company who has identified projects that EPWP can work with. Implementing an integrated skills strategy with a Skills Hub as a delivery vehicle for all economic driven skills project. Skills Hub will be linked to satellite skills across all regions in consultation with Community Development. In addition public participation workshops will be part of the Skills Hub rollout. The approach in Skills Strategy is to be both Customer and demand driven. Community 2008/09 DED A shared responsibility with Community and Economic Development Departments. Economic Development has a leading role, and roll-out to commence in 2008/09. Implementing an integrated skills strategy with a skills hub as a delivery vehicle for all economic driven skills project. Skills Hub will be linked to satellite skills across all regions in consultation with Community Development. In addition public participation workshops will be part of the Skills Hub rollout. The approach in Skills Strategy is to Rgn D 375 Wd Issues 39 Department/ME What/Action To promote community Office of the participation that involves Speaker organising events, enhancing communication systems, door-to-door campaigns and meetings and workshops. Development will work with the Community Forum and the Youth Forum to link the community to the existing 8 Skills Centres in the Region This is a general challenge that affects all Wards, not just 39. How do you ensure that there are more opportunities for participation by communities? It must be a two way process, which includes opportunities such as Community Based Planning and the development of Ward Based Plans during the financial year 2008/9 for implementation in 2009/10.The Elected representatives in Council have already asked that more information be made available to Councillors, Ward Committee members and Communities on what is being done in terms of service delivery, what is already planned and details on infrastructure and demographics that help communities to plan. The Office of the Speaker will be running new elections for Ward Committee members in the next year and is presently reviewing the composition of these ward committees to help improve representivity and hopefully improve communication. General door to door campaigns, with a population of over 3.5 million are not possible as part of the participatory process of the Legislature, but it is something that local communities can do themselves, and obviously is a normal activity of political parties. Meetings should be held by Councillors, but is recognised that Ward Councillors are responsible for large, diverse wards and meetings are not always the best way to Who/When What Resources be both Customer and demand driven. There are no immediate additional resources required Councillors, Members of Ward Committees, The Petitions and Public Participation Committee and Stakeholder Relationship Management in the Office of the Speaker, will all be involved. The policy changing the structure of Ward Committees and the ward committee elections take place will be completed by the end of June 2008. Elections to ward committees will take place at the end of 2008. A new newsletter to Community organisations has already been initiated and the circulation will be extended in 2008/09. A major workshop on participation with Community Based Organisations to highlight participatory opportunities will take place in 2009 (subject to budget provision) The majority of initiatives to meet the recommendations of Ward 39, which is a City Wide recommendation are included in 2008/09 Budget. A representative workshop for all Community Based Organisations in Johannesburg, on participatory opportunities for th Rgn Wd Issues Department/ME What/Action D 41 To upgrade the storm Transport water drainage and kerbs. (Not all street have storm water drainage.) D 41 To establish a sports Community complex as the ward does Development not have these facilities. D 41 To construct a skills Community development centre which Development is necessary as the community is unskilled. 376 communicate, and also hear the needs of communities. The Office of the Speaker is looking for greater cooperation with Schools and the new Student Councils to help communications with communities. Also the Petition system is an important part of the democratic process and we will improve awareness in the next year. Workshops are a good way of listening and communicating with communities but this will be limited to representative structures that already exist within communities, Council cannot substitute for healthy local community organisations, but will engage with them to improve awareness of Community participation opportunities. Implementing an integrated skills strategy with a Skills Hub as a delivery vehicle for all economic driven skills project. Skills Hub will be linked to satellite skills across all regions in consultation with Community Development. In addition public participation workshops will be part of the Skills Hub rollout. The approach in Skills Strategy is to be both Customer and demand driven. Community Development will work with the Community Forum and the Youth Forum to link the community to the existing 8 Skills Centres in the Region A feasibility study will be commissioned & application for funding to be done. Skills Hub is being established and will service skills needs of all regions. This will be done in consultation with Community Development. In turn, Who/When What Resources JRA 2009/10/11 JRA Stormwater Master planning 2009/10/11 R2 Million per year Capital Projects CAPEX R7 Million 2008/09 A shared responsibility with Community and Economic Development Departments. Economic Skills Hub is being established and will service skills needs of all regions. This will be done in consultation with Community Rgn Wd Issues Department/ME What/Action Who/When Community Development will work with community structures through the Ward Committees to link the Community to the existing 8 Skills Centres in the region Development has a leading role. The Skills Hub will be approved by the Mayoral Committee by 5th June 2008. Roll out of Skills Services is from 2008/09 onwards with budget approval. Implementing an The Skills Hub integrated skills strategy has been be with a skills hub as a approved by the delivery vehicle for all Mayoral economic driven skills Committee by project. Skills Hub will February 2008. be linked to satellite Roll out of Skills skills across all regions Services is from in consultation with 2008/09 Community onwards with Development. In budget approval. addition public part Jhb City Parks currently Street Trees Department 62 busy with greening project in Meadowlands, 000 trees to be Zones 6 to 12. planted this year D 41 To construct a skills Economic development centre which Development is necessary as the community is unskilled. D 42 To institute kerb sides, sidewalk paving and greening, street furniture. D 42 To develop the inner circle Economic of Meadowlands for mixed- Development use developments. This will contribute to a growing economy within the Ward. At this stage Regional Economic Development Plans are being developed for a number of regions. These will then inform which development programmes/projects should be implemented. D 42 To institute kerb sides, sidewalk paving and greening, street furniture. Transport D 42 The improvement of the storm water drainage system will develop and beautify the Ward. Transport D 42 D 43 To upgrade the 2/2 Park City Parks and also to develop pocket parks within the Ward. This will allow for parking, toilets, lighting system, water and fence issues to be addressed as there are currently none of these present. To construct storm water Transport drainage systems in order to avoid flooding. 16 June 1976 trail implementation Water/ Sewer is available in the vicinity Project is included in the Stormwater Master planning project submitted for approval in the 2009/10 CAPEX Budget cycle. Provision for funding to be made in the next Financial Year 377 City Parks What Resources Development No additional resources required 2008-09 DED Operating Budget – where provided 2008/09 DED DED 2007/08. Done. The Soweto Economic Development has been completed and was approved by the last Mayoral Committee JRA 2008/09 JRA 2008/09 JRA 2009/10/11 JRA Stormwater Master planning 2009/10/11 R2 Million per year JCP to submit R3 Million CAPEX & request for R300 000 OPEX funding to CIMS Project is included in the JRA 2009/10/11 Stormwater Master planning project submitted for approval in the 2009/10 CAPEX Budget cycle. JRA Stormwater Master planning 2009/10/11 R2 Million per year Rgn Wd Issues Department/ME What/Action Who/When D 43 Environmental Management Provision for funding to be made in the next Financial Year JCP to submit R3 Million CAPEX & request for R300 000 OPEX funding to CIMS D 43 Community Development D 45 Development of a Capital Projects soccer field will be done 2008/09 on stand 19331/7 as part of Mayoral grassing project in 2008/09 Main Arterial Roads will JRA2009/10 be included in the programme. D 45 D 45 D 46 D 46 D 46 378 To build parks between zone 7 next to Tomokgome High school so children can play there. To build a multipurpose community as there isn’t one. To pave the sidewalk and kerbs inf Meadowlands Zone 10 (Mmila and Shomayeli). This will decrease muddiness in wet weather. To renovate the skills centre and Zondi Stores. Transport To renovate the multipurpose sports centre and structures in Zondi office in order to accommodate the social and domestic affairs of the people who travel in Ward 4S (Jabulani and Town). To develop a multipurpose community hall (and other facilities) in order to have a venue for public meetings, skills development activities, funerals and other miscellaneous community activities. To develop infrastructure and, especially, roads in order to kerb and pave sidewalks, to provide storm water drainage, to calm traffic in intersections and to provide lighting for dark streets so that safety can be promoted and to prevent sewer blockages. To develop infrastructure and, especially, roads in order to kerb and pave sidewalks, to provide storm water drainage, to calm traffic in intersections and to provide lighting for dark streets so that safety can be promoted and to prevent sewer blockages. Community Development Economic Development What Resources